CA2602180A1 - System and method for field management using radio frequency tags - Google Patents

System and method for field management using radio frequency tags Download PDF

Info

Publication number
CA2602180A1
CA2602180A1 CA002602180A CA2602180A CA2602180A1 CA 2602180 A1 CA2602180 A1 CA 2602180A1 CA 002602180 A CA002602180 A CA 002602180A CA 2602180 A CA2602180 A CA 2602180A CA 2602180 A1 CA2602180 A1 CA 2602180A1
Authority
CA
Canada
Prior art keywords
identifier
project
radio frequency
storage device
mobile computing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
CA002602180A
Other languages
French (fr)
Inventor
Adam H. Omansky
Joshua L. Kanner
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vela Systems Inc
Original Assignee
Vela Systems, Inc.
Adam H. Omansky
Joshua L. Kanner
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vela Systems, Inc., Adam H. Omansky, Joshua L. Kanner filed Critical Vela Systems, Inc.
Publication of CA2602180A1 publication Critical patent/CA2602180A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders

Abstract

A system and methods are provided for field administration of a project, such as construction, maintenance, safety inspections or other projects involving the tracking of issues and one or more levels of review or approval in the closure of the issues. One or more radio frequency tags, each having an identifier, can be affixed to a physical component of a project. A storage device can store an issue list, wherein the issue list has one or more work items corresponding to the physical component of the project on which the radio frequency tag is affixed. User interfaces may be provided to allow interaction by stationary or mobile users with the issue list. The issue list on the storage device may provide better organization and/or a more efficient work flow, particularly during a close-out phase, or other phase of a project, involving the tracking of issues.

Description

SYSTEM AND METHOD FOR FIELD MANAGEMENT
USING RADIO FREQUENCY TAGS
Related Applications [0001] This application claims the benefit of U.S. Application No. 60/663,460, filed March 21, 2005, entitled Radio Frequency Identification Tag Application For Quality Control, Operations & Maintenance, And Turnaround Of Construction And Capital Projects, which is incorporated herein by reference.

Background [0002] A strategic closeout process is involved in the success of any constru.ction or capital project. In general, a disproportionate amount of time and cost is required to produce relatively marginal progress toward "perfection," as a measurable degree of quality, in both the current standard and non-standard project delivery methods. Time and cost expenditures, to address quality control during the construction process and closeout phases, can be a balance between the disparate interests of the stakeholders and related parties:
owners, developers, capital partners and equity investors, operators, architects, consulting engineers, contractors, sub-contractors, vendors, etc. Attaining the quality established in the contract documents, and demanded by the architect, consulting engineers, and other designers, can jeopardize both the schedule and the budget.
[0003] The current, industry-standard quality control and closeout workflow process, in general, provides that stakeholders employ manual means and methods during the quality control and closeout process. In one example, stakeholders inspect the work and generate issue lists and related reports and protocols by hand, using traditional paper and pen, a laptop, or tape recorder or digital audio recording device. Administrators transfer the data and meta-data, from the in-situ inspections to a paper or electronic document, usually a spreadsheet. In most projects each stakeholder, including the general contractor, sub-contractors, architect, and consulting engineers, manages a separate document, distinct and insulated from the other parties. The result: a non-productive working environment, plagued by wasted expenditures of time and energy, and increased stress and strife.
The accuracy and integrity of information is often neither dependable nor verifiable at any given moment in time.

Summary [0004] Embodiments of the present invention may be used in a wide variety of field administration applications, e.g. those involving the tracking of issues and one or more levels of review or approval in the closure of the issues. Examples include, but are not limited to: the construction and capital project areas such as comniercial buildings, residential buildings, non-residential buildings, non-building structures, such as marine, off-shore, power, and process industry segments; safety inspections; facility maintenance and various observation and inspection tasks, start-up activities, pre-commissioning, commissioning, testing, adjusting, balancing, operations, maintenance, service, repair and turnaround of work.
[0005] According to one illustrative embodiment of the invention, a system for field administration of a project includes a radio frequency tag having an identifier and adapted to be affixed to at least one physical component of the project. The radio frequency tag is capable of transmitting the identifier via a radio frequency transmission. A
receiver is provided that is capable of receiving the identifier transmitted via a radio frequency transmission. A storage device stores an issue list. The issue list includes at least one worlc item corresponding to the physical component of the project on which the radio frequency tag is affixed. A first user interface enables a first party to view the at least one work item and indicate completion of an activity corresponding to the at least one work item, thereby signifying closure of the at least one work item. A second user interface enables a second party to view a status of the at least one work item and accept or reject the closure of the at least one work item.
[0006] In another illustrative embodiment of the invention, a method of field administration of a project is provided. The method includes the acts of affixing a radio frequency tag having an identifier to a physical component of the project. The identifier is transmitted from the radio frequency tag via a radio frequency transmission.
The identifier is received at a first mobile computing device. Information associated with the identifier is input into the first mobile computing device relating to a deficiency in the physical component. The information and the identifier are transmitted from the first mobile computing device to a storage device. The information and identifier are stored in the storage device.
[0007] According to a further illustrative embodiment of the invention, another method of field administration of a project is provided. In this method, a plurality of radio frequency tags, each having a unique identifier, are affixed to a plurality of physical components of the project. Each tag is capable of transmitting a unique identifier. The unique identifier is transmitted from at least one radio frequency tag via a radio frequency transmission. At least one unique identifier is received at a mobile computing device.
Information relating to the physical component of the project and associated with the at least one unique identifier is received from a stationary storage device.
[0008] According to another enlbodiment of the invention, a method is provided including the acts of associating an identifier of a radio frequency tag to a physical component of a project and creating a work item on an issue list. The work item is associated with the identifier and related to a deficiency in the physical component. A first comment corresponding to the work item is input. The first comment is associated with the identifier. The method also includes displaying the first comment in relation to an inquiry pertaining to the identifier.

Brief Description of the Drawings [0009] The invention will be apparent from the description herein and the accompanying drawings.
[0010] Figure 1 is a schematic illustration of an example implementation of an embodiment to the present invention;
[0011] Figure 2 is a schematic illustration of an illustrative embodiment of a system for field administration of a project, according to an illustrative embodiment of the invention;
[0012] Figure 3 illustrates a method of field administration of a project according to an illustrative embodiment of the invention;
[0013] Figure 4 illustrates another embodiment of a method of field administration of a project according to the invention;
[0014] Figure 5 illustrates another embodiment of a method of field administration of a project according to the invention; and 100151 Figure 6 illustrates a screen shot of a graphical user interface according to an embodiment of the invention.

Detailed Description [0016] According to various embodiments of the invention, radio frequency (RF) tags are used to uniquely identify various project components and may be used with an issue list located on a storage device to provide an inventory of the deficiencies of the project components, which may be described as physical work to be completed and / or corrected.
Various embodiments of the invention may create static and / or dynamic information links, between the deficiencies and an extranet or shared database, via wireless connections and /
or radio waves. The invention's use of RF technology may streamline the project quality control, closeout, and lifecycle process, in the best interests of project stakeholders.

[0017] According to an example of the invention, during a field inspection, the contractor, sub-contractor, architect, consulting engineer, or other party identifies a deficient component of the project, obtains a tag's identifier with a receiver, such as a mobile computing device, and adheres the tag to the physical object. One RF tag can relate to one deficiency, or one room or one area with niultiple deficiencies, depending on the need.
Optionally in real-time, the mobile computing device communicates the data about the deficient work to an issue list on a storage device accessible to all of the connected parties, either on or off site. The issue list itself may become live and direct, an active force to propel the quality control and closeout process. Various embodiments of the invention may transform the issue list to an integrated networking technology. When the sub-contractor or vendor addresses the deficiency, the issue list is updated by the use of the RF identifier as a reference to the deficiency.

[0018] The standard contract closeout inspection procedure is congested with layers of formal invitations, inspections, document transmissions, and related protocols. Various embodiments of the invention may change the workflow, from a linear, sequential process to parallel, simultaneous workflow. By way of contrast, a typical project closeout process may be as follows.

[0019] On some projects with a high budget and / or a high cost of construction, and with a high degree of complexity and / or non-standard means and methods of construction, such as a mega-hotel or mixed-use complex for example, the issue list can contain thousands to tens of thousands of items of work. Management and implementation of the thousands of items of work, in cooperation with the sub-contractors and the vendors, and in strict accordance with the contract documents, can require months of time, at a phase in the project when the stakeholders can least afford any delays. To complicate matters, the plethora of work in the quality control and closeout phase resides in the details, which can be very laborious to locate and to track. When the issue list item requires work by multiple sub-contractors and / or vendors, the general contractor can face major problems to recall the trades back to the project site, to coordinate and to sequence the execution of the work in a timely manner, and to verify the worlc when completed or corrected;
accountability can be very problematic in areas with multiple trades.

[0020] When presented with the tradeoff between compliance with the schedule or the standard of quality, the owner, in the majority of cases, sacrifices quality in favor of time.
Relinquishing selected contractual rights, as part of a negotiated, pre-handover settlement, is not uncommon in complex, modern-day projects. In return for an agreement to compromise on quality, the owner deducts a pre-determined or a negotiated sum of money from the contractor's fee. The contractor needs to finish the job, and the owner needs to occupy and to use the space for its intended use. Neither party is interested in engaging first in mediation, second in formal arbitration, and third in adjudication or litigation.

[0021] A zero-sum game not a plus-sum game, all parties lose to meet the deadline. The owner and architect sacrifice quality, and the contractor suffers a reduction in fee. "End-game" tradeoff negotiations can instigate disputes, at a period when cooperation and collaboration, not conflict, is fundamental. Focus shifts to non-constructive activities, and to re-negotiation of the general contract. Focus should be on the construction work. If not well-managed, a project with a sound start and a fluid construction process can fail in the end-game. In practice, the standard contract closeout process does not always support the interests of the stalceholders, in particular when financial sustenance and reputation is at stake.

[0022] With the ever-increasing complexity of modern-day projects, thousands of issue list items significantly impede the momentum of the work, in the end-phase of the job, between substantial completion and final acceptance of the contract. Final acceptance is the stage in the contract when the contracting officer determines that all work has been 100 percent completed according to the terms and conditions of the contract documents, including administrative obligations. As the contractor is at the peak of the learning curve, toward the end of the project, in theory, the remaining 5% or thereabouts of the work will take proportionately less time to execute. In practice however, the remaining 5% to 10% or thereabouts of the work can require significantly more time, jeopardizing deadlines. The subsequent handover to and final acceptance by the owner, operators and other end-users can be compromised. If the project team misses the final acceptance deadline, the contractor can incur severe liquidated damages, payable to the owner. The owner can suffer a loss of revenue from a lack of operations, penalties from commercial banlcs and other lending institutions, and perhaps scandal from shareholders and the general public.

[0023] As a legal record, the substantial completion inspection list functions as the means and method to communicate all items to be coinpleted and corrected, before the owner, owner's agent, architect or other contracting officer can accept the work as 100% complete.
Final acceptance entitles the contracting officer to issue the final certificate for payment, co-signed by the architect, contractor and owner. Final payment, plus hold-backs by the owner, motivates the contractor to complete the final work, often about 5% or thereabouts, depending on the conditions of the project.

[0024] When the issue list inspection process is completed by the contractor, sub-contractors, and the architect, the parties acknowledge in writing that the work is substantially complete. The contractor agrees in writing to complete and correct all outstanding work. Accordingly, the owner accepts in writing to assuine full possession of the work, or designated portion thereof. Depending on the conditions of the contract for construction, the contractor may transfer responsibility for security, maintenance, and insurance to the owner. Parties sign-off on the date of substantial completion of the project, and applicable warranties commence, as required by the contract documents.

[0025] Attached to the certificate of substantial completion, the issue list quantifies the outstanding physical work, in a legal format, for short-term use and long-term record. By defining the scope of the outstanding work for the sub-trades, the issue list benefits the contractor. In high-liability projects, such as condominiums where individual owners demand a high standard of quality, the issue list helps to protect against future litigation.
Serving future owners, the issue list also acts as the vehicle to help ensure that the contractor delivers the degree of quality established in the contract documents.
Supplementary to the certificate of substantial completion, the issue list provides a checks-and-balances system to the final 5% to 10%, or thereabouts, of the project delivery process, with respect to the distinct interests of all of the stakeholders and other project parties.

[0026] The project closeout period, between the dates of substantial completion and final acceptance, presents legal obligations for both the contractor and the owner.
Between substantial completion and final acceptance, the contractor demobilizes or "ramps down,"
and the owner mobilizes or "ramps up." The owner and the contractor simultaneously occupy the space, which sometimes instigates conflict. The owner has the right to utilize the space for its intended use, as the contractor completes the issue list worlc prior to final acceptance. The owner and contractor may use the changeover period to train the owner's facility manager in general operations. Contracts can also call for the demonstration to and the training of the owner's personnel, in the operation, adjustment, and maintenance of products, equipment, and systems, as a pre-requisite of substantial completion.

[0027] Submitting a final application for payment reaffirms the due date for handover in accordance with the contract, and the respective obligations between the owner and the contractor. The contractor may also be required to submit: evidence that all record documents, operation and maintenance manuals, warranties and similar required submittals are approved; final sub-contractor payment forms; evidence of final, continuing insurance coverage; record as-built contract schedule; warranty book; etc. Before the contractor can request the final inspection, to determine the date of final acceptance, the contractor needs to submit a certified copy of the substantial completion inspection list or issue list, endorsed and dated by the contracting officer or architect. As the end-date for any liquidated damages, final acceptance is crucial to control the contractor's exposure, as responsibility transitions to the owner. At final acceptance, insurance or risk of loss shifts from the contractor to the owner. The warranty period starts. Time limitations begin for an action on a bond, for the filing of a mechanic's lien, and for exposure under statutes of limitations and repose. The issue list becomes the essential "driver" of the end-game, as events hinge upon the completion, and the subsequent certification of completion of the physical work.

[0028] According to an illustrative implementation 100 of the embodiment of the invention, one or more radio frequency (RF) tags 110 are each located on a corresponding pllysical component of a project. The RF tag I 10 may be affixed to the component of the project because the component is somehow deficient. The terms "deficient" and "deficiency" as used herein, refer to a component in need of additional work or other remedial action or inspection. As used herein, the term "affixed" is meant to designate a wide variety of actions whereby the RF tag 110 is co-located with the component. Examples include mounting the RF tag 110 by an adhesive, a removable fastener, such as a hook and loop _7 -fastener, a physical fastener, such as a nail, screw, or rivet, or simply positioning the RF tag 110 proximate to the physical component of the project.

[0029] An .RF tag 110 may be a wide variety of radio frequency transmission devices or transceiver devices, capable of issuing transmissions of an identifier, optionally in response to an interrogation signal and/or a predetermined schedule. Both active RF
tags, those emitting a signal from the tag's own power source, and passive RF tags, those emitting a signal based on power received from a received signal, are within the scope of the invention.

[0030] RF tags require no optical scanning; the user typically need not find the exact location of the tag, but only be within the radio range of the tag.
Accordingly, RF tags may be concealed or located behind permanent construction (for example, behind a wall). RF
tags may enable owners, operators, property managers, and other end-users to manage and to track operations, maintenance, service, repair, turnaround, and other related information about the work, on-the-spot of the work.

[0031] As illustrated in Figure 1, one or more sites 120 may be used simultaneously within the scope of the invention. A site 120 may be geographically located adjacent to a near by site 120, or may be substaiitially geographically separated from other sites 120. One or more receivers 130 may be used on the site to receive radio frequency transmissions from the RF tags 110. The radio frequency transmissions include a unique identifier such that the RF tag 110 issuing the transmission can be distinguished from other tags by the use of the unique identifier. The receiver may optionally be a transceiver, capable of sending an interrogation signal to the RF tag 110. The receiver and RF tag 100 each have an integrated antenna or are coupled to an external antenna to enable transmission/reception as appropriate. Optionally, the radio frequency transmissions may include additional data stored by an optional remote storage capability of the RF tag 110. Examples of additional data stored by an optional remote storage capability may include all or a subset of the type of information stored on the storage device 160, described in greater detail herein.

[0032] A mobile computing device 140 may also be used on the site 120.
Examples of mobile computing devices may include, but are not limited to, a laptop, a tablet personal computer, a personal digital assistant, and a smart phone. Other examples of mobile computing devices include devices having a computer processing capability, an ability to communicate with a networlc, and a display and/or input capability for interaction with a mobile user. In the present example, the mobile computing device 140 can communicate with a network 150. Optionally, the receiver 130 may also communicate directly with the network 150, such as by the use of stationary receivers 130 coupled to the networlc 150.
Examples of communications may include, -but are not limited to, a wireless network and a wired network, or combinations thereof. Examples of networlc 150 types include local area networks; such as 'fqr example, Ethernet, extranets, the Internet, Bluetooth and a wide variety of other networking protocols.

[0033] A storage device 160 as provided and configured to maintain an issue list. Examples of storage devices 160 include, but are not limited to computer servers, including those having processors and/or controllers, data storage devices such as hard drives or memory, or other devices capable of storing digital data and communicating with a network. The issue list includes the unique identifiers corresponding to the RF tags 110 and a wide variety of additional information that may be stored in association with the unique identifiers. It is understood that a wide variety of database or other memory management structures may be used within the skill in the art. Such structures may involve maintaining the unique identifiers in a separate table or structure from other information. Such structures are within the scope of the present invention. Multi-tenant computer architecture may also optionally be used, capable of supporting multiple projects concurrently while maintaining data security. In one example, the software may use standard username and password authentication via a web browser to determine the lists of projects and issues/defects that a given user may access. Therefore, each separate customer will have their own separate view of the data and not be able to access the data of other customers stored in the same database.
In a further example, each customer will have a unique set of data within the shared database and each user within a customer will only have access to the information relevant to their company.

[0034] The information located on the storage device 160 in the present example would be directed toward the specifics of the physical component of the project upon which the RF
tag 110 is affixed. Examples of various attributes of the information include by way of example, but are not limited to:
Multi-party Field Identification = Example: PL-123.456.78 = Primary auto-number: report number; PL (Defect or issue list) 123 = Secondary number: room or area number; Room 456 = Tertiary auto-number: sequential item number; Item 78 Preface Metadata = Project name and project number = Date and time stamp of every revision on the issue = Focus area of the report; example: Fourth Floor Function Rooms = Status of the item, including open, new, closed, under review, reopen = Comments section with date/time stamp General Data or Content = Type of issue: Which may include plumbing, electrical, systems, finish or any other code in a selection list as outlined in the Subcontractor key attributes list below.
= Severity of issue: Critical, Serious, Medium, Low = Priority of issue: High, Mediuin, Low = Notes; a brief description of the work to be coinpleted or corrected = Responsible party: sub-contractor key = Repair code, if applicable, for repeat problems = Monetary value, assigned by the Contractor = Reasons why the work is not complete, indicated by the Contractor = Drawing or otlier contract document reference, if applicable = Specification division and sub-division reference, if applicable = Audio or other recording (photo, video) to establish record of what must be done Postscript Metadata = Author of the report = Signature by the Architect = Due date to complete the work, scheduled by the Contractor Acceptance attributes = Actual date of completion = Signature of acceptance by the Contracting Officer, Owner's Agent, Project Manager, etc.
= Signature of acceptance by the Architect = Signature of acceptance by the Contractor = Audio or other recording (photo, video) to establish record of what was completed Sub-Contractor Information to establish type of work to be conducted A Sitework = Earthwork / Footings = Utilities / Sewerage / Drainage = Waterproofing = Paving / Landscaping B Elevator / Stairs C Structure = Concrete = Masonry = Framing = Metal work D Roofing / Flashing E Exterior Surfaces / Insulation F Exterior Openings / Glazing G Doors / Hardware H Plumbing / Sprinkler I Mechanical / HVAC
J Electrical K Carpentry / Millwork L Finishes = Drywall = Flooring = Painting = Specialties [0035] In the present example, the mobile computing device 140 may contain a subset or a full set of the issue list stored of a storage device 160. In such a case, the mobile computing device 140 may operate locally, accepting inputs from a user and transmissions from various RF tags I 10. Periodically, the mobile computing device 140 could synchronize the data stored on the mobile computing device 140 with the issue list stored on the storage device 160. Other variations are within the scope of the invention, such as, by way of non-limiting example, a mobile computing device 140 that interacts directly with the issue list located on the storage device 160, updating the issue list upon receipt or inputting of the identifiers or information at the mobile computing device 140.

[0036] An optional network 170, which may be the same as the previously mentioned network 150, or may be a different network, provides for communication between the storage device 160 and an optional user interface 180. The user interface 180 may be a stationary user interface, providing interaction with the issue list located on the storage device 160 for those not located on the site 120, or for those users not located on the site for which they presently wish to obtain issue list information. The user interface 180 may be a graphical user interface or text-only or other some other type of user interface and may optionally include one or more input devices, such as a keyboard or mouse. The user interface 180 may also include an output device, such as a printer. Examples of users that may interact with the user interface 180 include, by way of non-limiting example, architects, construction managers, consulting engineers, contracting officers, designers, builders, general contractors, owners, owners' representatives, project managers, subcontractors, vendors, and IT specialists tasked with maintaining the implementation 100.
[0037] Information available from the user interface 180 and/or mobile computing device 140 may include, but is not limited to, reports, and other interactive views of existing issues and defects to monitor ongoing project status, attach comments, change statuses and otherwise provide management comment and oversight. Optionally, a download or export of the data may be provided from a given project into an external system in a file or report format. The user interface may optionally be inulti-lingual.

[0038] According to an example, an embodiment of the invention may provide an interactive functionality to allow users to provide comments, and view comments by others, regarding a specific component of the project. The comments, as noted above, may be provided with a date/time stamp and may optionally include text, audio or other recording (photo, video). While not limited to these exainples, the comments can be a brief description of the work to be completed or corrected, reasons why the work is not complete, recording to establish a record of what must be done and/or a record of what was completed.
Use of the RF identifier associated with both the project component and each of the comments can provide a powerful organizational tool, enabling a wide variety of parties to have input to the process of defining/describing the worlc items and the process of working on and resolving the work items, regardless of where the parties are located.
According to the example, the parties can cominunicate regarding a large number of project conlponents, even though the parties may not be near the project component, or even on the work site, at the same time. Cominunication can be in the form of a real-time conversation through the use of the comments, or by the posting of comments by one party and the reply through later comments posted by another party.

[0039] As illustrated in Figure 2, a system 200 is illustrated by way of example according to an embodiment of the invention. The system 200 can be used for field administration of a project. The system 200 includes one or more radio frequency tags 210 that may optionally include a remote storage capability 212. As described above in relation to Figure 1, An RF tag is provided with a unique identifier and is capable of transmitting the unique identifier, and optionally additional information, by a radio frequency transmission. A
receiver is capable of receiving the identifier transmitted via the radio frequency transmission. The receiver 220 may communicate with a storage device 230. The storage device 230 is configured for storing an issue list. The issue list, as discussed above in relation Figure 1, may include details regarding one or more physical components of the project. The information in the issue list is configured so that the information pertaining to a particular component of the project correspond to the unique identifier of the radio frequency tag 210 that is affixed to that component. A mobile computing device may optionally be provided for communication with the receiver 220 and/or the storage device 230. The mobile computing device 240 may optionally provide one or more user interfaces 242, 244 to display information and/or receive information input by user. Such information may relate to a wide variety of items, such as the issue list located on the storage device 230, data located on the mobile computing device 240 but not yet transmitted to the issue list of the storage device 230 and/or unique identifiers or other information corresponding to the physical objects of the project, the RF tags 210 and/or the optional remote storage 212 located on one or more RF tags 210.

[0040] As illustrated by way of example in Figure 3, a method 300 of field administration of a project is illustrated by way of example. An RF tag is affixed 310 to a physical component of the project. The RF tag has an identifier so as to distinguish it from other RF
tags. The identifier is transmitted 320 from the RF tag via a radio frequency transmission.
The identifier is received 330 at a first mobile computing device. By way of example, the first mobile computing device may be used by an architect, engineer or other person responsible for inspection of the project and/or insuring quality control of the project.
[0041] Information is input 340 into the first mobile computing device. The information relates to a deficiency in the physical component of the project and is associated with the identifier of the RF tag that is affixed to the physical component of the project. The information and identifier are transmitted from the first mobile computing device to a storage device. The information and identifier are stored 360 in the storage device.

[0042] Optionally, the information and identifier may be received 370 at a second mobile computing device. The identifier and an indication that the deficiency has been corrected may be transmitted 380 to the storage device from the second mobile computing device. By way of example, the second mobile computing device may be used by a worker that is mending or addressing the deficiency of the physical object of the project.

[0043] Further optionally, the identifier and the indication that the deficiency has been corrected may be received 390 at a third mobile computing device. The identifier and an indication that the correction of the deficiency has been accepted may be transmitted 400 from the third mobile computing device. The third mobile computing device may, for example, be used by a user responsible for inspecting work done to mend previously identified deficiencies, such as a supervisor, an owner, and/or a person responsible for quality control of the project.

[0044] It is within the scope of the invention that the first, second and third mobile computing devices may be a single piece of hardware. By way of example, a single tablet personal computer could be used by two or three different parties, such as for example an architect, a worker and later an owner or other final approval authority.
Optionally, the mobile computing device may provide for different login or other authentication procedures so as to confirm the identity of the user thereby preventing improper or unauthorized entries by an inappropriate user. In other implementations, more than one mobile computing device may be used, including when each party has their own mobile computing device.
[0045] Figure 4 provides an illustration of a method 500 for field administration of a project according to another illustrative embodiment of the invention. According to this method 500, a plurality of RF tags are affixed 510 to a plurality of physical components of the project. Each tag has a unique identifier and is capable of transmitting the unique identifier.
The unique identifier is transmitted 520 from at least one RF tag of the plurality of tags.
The unique identifiers transmitted via a radio frequency transmission. It is understood that the transmission/reception of an identifier may occur before the RF tag is initially affixed to the physical component of the project. The unique identifier is received 530 at a first mobile computing device. It is understood that a mobile computing device may optionally include a receiver and/or may receive the identifier via an external receiver in communication with the mobile computing device. Information relating to the physical component of the project and associated with the unique identifier is received 540 from a stationary storage device.

[0046] Optionally, the method 500 may also include displaying 550 information relating to each of the unique identifiers received at the first mobile computing device.
In this exainple, the information is displayed on the mobile computing device. In one example, a user may enter a given location via an input device on the mobile computing device and/or a user interface and access the list of all current issues and defects for that location as based on the issue list. Alternatively or in addition, a remote storage 212 may be read to determine the RF tag's data of deficiencies from the RF tag's identifiers received by a mobile computing device. In one implementation, this could be limited to a room, floor, area, or component in the project. With an omni-directional RF antenna, signal strength filtering could be used. By the use of a directional RF receiver, such as some RF pens, RF
tags in a specific direction or area may be detected, with or without signal strength filtering.

[0047] Also optionally, information pertaining to each of the t,tnique identifiers that are believed, by reason of the issue list information, to be proximate to the mobile computing device, but whose unique identifiers are not received at the mobile computing device via a radio frequency transmission, may be displayed 560. It is understood that describing the reception of a radio frequency transmission at the mobile computing device includes the configuration in which a receiver is integrated with the mobile computing device and also the configuration in which an external receiver is used in conjunction with the mobile computing device.

[00481 In a further optional variation, unique identifiers that are received at a mobile computing device via a radio frequency transmission but are not stored in the storage device, may be displayed 570. Such a display could provide for an inventory check, showing those RF tags located on the work site within radio frequency range of the mobile computing device but not entered into the issue list located on the stationary storage device.
[0049] In anotller optional variation, information may be input 580 into the first mobile computing device. The information may relate to a deficiency in the physical component of the project and associated with the identifier corresponding to the physical component of the proj ect.

[0050] Figure 5 provides an illustration of another embodiment of the invention. The method 600 includes associating 610 an identifier of a radio frequency tag to a physical component of the project and creating 620 a work item on an issue list. The worlc item is associated with the identifier and related to a deficiency in the physical component. A first comment corresponding to the work item is input 630. The first comment is associated 640 with the identifier. The method also includes displaying 650 the first comment in relation to an inquiry pertaining to the identifier.

[0051] The method optionally further includes, after the act of inputting, transmitting the identifier and the first comment from a first mobile computing device to a storage device.
Also, before the act of displaying, transmitting the identifier and the first coinment from the storage device to a second mobile computing device.

[0052] The method may optionally include inputting a second comment corresponding to the work item and associating the second comment with the identifier. In this example, the first comment and the second comment are displayed in relation to an inquiry pertaining to the identifier.
[0053] The method may optionally include the act of affixing the tag to the physical component.

[0054] It is understood that various embodiments of the present invention may be implemented by the use of software run on various devices, such as mobile computing devices, storage devices, RF tags, networking components, and/or other computers that may be used to provide user interfaces or other output and/or export functionalities. It is further understood that the present invention is not limited to the use of software to implement the systems or methods of the invention. Otlier non-limiting examples of ways to impleinent various embodiments of the invention can include firmware, Read Only Memories (ROMs), Prograinmable Read Only Memories (PROMs), Electrically Erasable Programmable Read Only Memories (EEPROMs), Application-Specific Integrated Circuits (ASICs) and other hard-wired circuits.

[0055] According to the various methods of the invention, the information may optionally include a sound recording, text and/or a photograph or other graphical image.
Sound recordings may optionally be processed using voice processing capabilities to convert the voice data into textual data that is instead or in addition to the sound recording, saved to the issue list. The voice processing may optionally be multi-lingual. The information stored may relate to work to be performed on the physical component of the project associated with the RF tag affixed to that component. A storage device, including stationary storage devices, may store information such that a user is restricted from accessing at least a portion of the information not related to the user's portion of the project. In addition or alternatively, the storage device may store information such that the user is restricted from accessing and/or modifying at least a portion of the information not related to the user's role in the project.

[0056] Various embodiments of the invention may include additional features, such as features described in relation to other embodiments or implementations. Other features include various alarms, for example, a user may locate an RF tag that is already in place by pointing a mobile computing device in the area of the RF tag and having the mobile device make a noise or create a signal of some kind. Additional features may be provided within the scope of the invention, for example, a user may choose a certain data value from a list of available options and otller users may view those options in their native language - the software may support user-level personalization to the users preferred language, currency and locale. Information links between identifiers and an extranet or shared database may enable: harmonization of data; coordination of work; real-time communication between the construction and / or capital project site and any party connected via mobile computing device, via extranet, and / or via the Internet; proactive notification to the responsible party or stakeholder; record locations of physical worlc via Global Positional System (GPS), General Radio Packet System (GRPS), and Global System for Mobile Communications (GSM); automatic alerts on the status of the worlc; periodic and / or scheduled updates of the status of the mending of the deficiencies; and a broad spectrum of other beneficial features described herein. Two- and / or three-dimensional digital drawings or "maps" of the site may also be used within the scope of the invention site that identify the physical location in real space of the components of the projects associated with the RF tags.

[0057] Figure 6 illustrates an example of a user interface 800 providing a project closeout at a glance. This example illustrates a variety of deficiencies 810, or categories of deficiencies with status icons 820 and indications 830 of days to the next milestone, e.g.
substantial completion or final acceptance. This user interface provides a top-level summa.ry of data in the issue list of the example.

[0058] The illustrative embodiments, implementations and examples herein are meant to be illustrative and not limiting. The present invention has been described by way of example, and modifications and variations of the exemplary embodiments will suggest themselves to slcilled artisans in this field without departing from the spirit of the invention. Features and characteristics of the above-described embodiments may be used in combination.
The preferred embodiments are merely illustrative and should not be considered restrictive in any way.

Claims (29)

1. A system for field administration of a project, comprising:
a radio frequency tag having an identifier and adapted to be affixed to at least one physical component of the project, the radio frequency tag capable of transmitting the identifier via a radio frequency transmission;
a receiver capable of receiving the identifier transmitted via a radio frequency transmission;
a storage device storing an issue list, the issue list comprising at least one work item corresponding to the physical component of the project on which the radio frequency tag is affixed;
a first user interface to enable a first party to view the at least one work item and indicate completion of an activity corresponding to the at least one work item, thereby signifying closure of the at least one work item; and a second user interface to enable a second party to view a status of the at least one work item and accept or reject the closure of the at least one work item.
2. The system of claim 1, further comprising:
a mobile computing device capable of receiving the identifier from the receiver and communicating with the storage device to modify at least one attribute of the at least one work item on the storage device and receive information regarding the issue list, using the identifier received to associate the physical component of the project to a corresponding portion of the issue list.
3. The system of claim 2, wherein the first user interface and the second user interface are presented on the mobile computing device.
4. The system of claim 1, wherein the radio frequency tag transmits the identifier upon receipt of an interrogation signal.
5. The system of claim 1, wherein the radio frequency tag further comprises a remote storage device, the remote storage device configured to store a plurality of attributes relating to the at least one work item corresponding to the physical component of the project on which the radio frequency tag is affixed.
6. The system of claim 5, wherein the radio frequency tag is adapted to communicate directly with the storage device to synchronize the remote storage device with the storage device.
7. The system of claim 1, further comprising a third user interface in communication with the storage device and configured to receive information from the issue list, modify the issue list and add items to the issue list.
8. The system of claim 7, wherein the user interface is in communication with the storage device by way of the Internet.
9. The system of claim 1, wherein the at least one work item pertains to a defect in the physical component of the project.
10. A method of field administration of a project, comprising:
affixing a radio frequency tag having an identifier to a physical component of the project;
transmitting the identifier from the radio frequency tag via a radio frequency transmission;
receiving the identifier at a first mobile computing device;
inputting information into the first mobile computing device relating to a deficiency in the physical component, the information being associated with the identifier;
transmitting the information and the identifier from the first mobile computing device to a storage device; and storing the information and identifier in the storage device.
11. The method of claim 10, further comprising:
receiving the information and the identifier from the storage device at a second mobile computing device; and transmitting the identifier and an indication that the deficiency has been corrected to the storage device from the second mobile computing device.
12. The method of claim 11, further comprising:
receiving the identifier and the indication that the deficiency has been corrected at a third mobile computing device; and transmitting, from the third mobile computing device, the identifier and an indication that correction of the deficiency has been accepted.
13. The method of claim 10, wherein the information includes a sound recording.
14. The method of claim 10, wherein the information includes a photograph.
15. The method of claim 10, wherein the project involves construction of a building.
16. The method of claim 10, wherein the project involves maintenance of a facility.
17. A method of field administration of a project, comprising:
affixing a plurality of radio frequency tags each having a unique identifier to a plurality of physical components of the project, each tag capable of transmitting the unique identifier;
transmitting the unique identifier from at least one radio frequency tag of the plurality of radio frequency tags via a radio frequency transmission;
receiving at least one unique identifier at a first mobile computing device;
receiving from a stationary storage device, information relating to the physical component of the project and associated with the at least one unique identifer.
18. The method of claim 17, further comprising displaying on the mobile computing device, the information relating to each of the unique identifiers received at the first mobile computing device.
19. The method of claim 17, further comprising displaying the information pertaining to each of the unique identifiers that location details stored on the storage device signify should be proximate to the mobile computing device, but whose unique identifiers are not received at the mobile computing device via a radio frequency transmission.
20. The method of claim 17, further comprising displaying the unique identifiers that are received at the mobile computing device via a radio frequency transmission, but are not stored on the storage device.
21. The method of claim 17, further comprising inputting the information into the first mobile computing device relating to a deficiency in the physical component of the project and associated with the at least one unique identifier.
22. The method of claim 17, wherein the information relates to work to be performed on the physical component of the project associated with the radio frequency tag affixed to the physical component.
23. The method of claim 17, wherein the stationary storage device stores the information such that a user is restricted from accessing at least a portion of the information not related to the user's portion of the project.
24. The method of claim 17, wherein the stationary storage device stores the information such that a user is restricted from accessing at least a portion of the information not related to the user's role in project.
25. The method of claim 17, wherein the stationary storage device stores the information such that a user is restricted from modifying at least a portion of the information not related to the user's role in project.
26. A method of field administration of a project, comprising:
associating an identifier of a radio frequency tag to a physical component of the project;
creating a work item on an issue list, the work item associated with the identifier and related to a deficiency in the physical component;
inputting a first comment corresponding to the work item;
associating the first comment with the identifier; and displaying the first comment in relation to an inquiry pertaining to the identifier.
27. The method of claim 26, further comprising:
after the act of inputting, transmitting the identifier and the first comment from a first mobile computing device to a storage device; and before the act of displaying, transmitting the identifier and the first comment from the storage device to a second mobile computing device.
28. The method of claim 26, further comprising:
inputting a second comment corresponding to the work item;
associating the second comment with the identifier; and displaying the first comment and the second comment in relation to an inquiry pertaining to the identifier.
29. The method of claim 26, further comprising affixing the tag to the physical component.
CA002602180A 2005-03-21 2006-03-21 System and method for field management using radio frequency tags Abandoned CA2602180A1 (en)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
US66346005P 2005-03-21 2005-03-21
US60/663,460 2005-03-21
US11/384,926 2006-03-20
US11/384,926 US8022816B2 (en) 2005-03-21 2006-03-20 System and method for field management using radio frequency tags
PCT/US2006/010131 WO2006102277A2 (en) 2005-03-21 2006-03-21 System and method for field management using radio frequency tags

Publications (1)

Publication Number Publication Date
CA2602180A1 true CA2602180A1 (en) 2006-09-28

Family

ID=37024501

Family Applications (1)

Application Number Title Priority Date Filing Date
CA002602180A Abandoned CA2602180A1 (en) 2005-03-21 2006-03-21 System and method for field management using radio frequency tags

Country Status (3)

Country Link
US (1) US8022816B2 (en)
CA (1) CA2602180A1 (en)
WO (1) WO2006102277A2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7779039B2 (en) * 2004-04-02 2010-08-17 Salesforce.Com, Inc. Custom entities and fields in a multi-tenant database system
WO2008079092A1 (en) * 2006-12-22 2008-07-03 Telefonaktiebolaget Lm Ericsson (Publ) Method and apparatus for mobile subscriber alert notification
US8283361B2 (en) 2008-06-04 2012-10-09 Astrazeneca Ab Heterocyclic urea derivatives and methods of use thereof
NZ605586A (en) * 2010-07-29 2015-03-27 Hardie James Technology Ltd Systems and methods for providing product information
US20130082101A1 (en) * 2011-09-30 2013-04-04 Vela Systems, Inc. System and method for field management using barcodes and optical scanners
CN106403842B (en) * 2016-10-31 2019-12-31 紫光智云(江苏)物联网科技有限公司 Electronic tracking system and method for target object
US11150635B2 (en) * 2017-10-02 2021-10-19 Fisher-Rosemount Systems, Inc. Projects within a process control asset management system

Family Cites Families (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5966695A (en) * 1995-10-17 1999-10-12 Citibank, N.A. Sales and marketing support system using a graphical query prospect database
US5774876A (en) * 1996-06-26 1998-06-30 Par Government Systems Corporation Managing assets with active electronic tags
US6662210B1 (en) 1997-03-31 2003-12-09 Ncr Corporation Method of remote collaboration system
US5963134A (en) * 1997-07-24 1999-10-05 Checkpoint Systems, Inc. Inventory system using articles with RFID tags
US6409086B1 (en) * 1997-08-08 2002-06-25 Symbol Technolgies, Inc. Terminal locking system
US6148291A (en) * 1998-01-26 2000-11-14 K & T Of Lorain, Ltd. Container and inventory monitoring methods and systems
US6285931B1 (en) * 1998-02-05 2001-09-04 Denso Corporation Vehicle information communication system and method capable of communicating with external management station
US6509828B2 (en) * 1998-07-30 2003-01-21 Prc Inc. Interrogating tags on multiple frequencies and synchronizing databases using transferable agents
US20020057208A1 (en) * 1998-09-25 2002-05-16 Fong-Jei Lin Inventory control system using r.f. object identification
SG151082A1 (en) * 2000-01-14 2009-04-30 3M Innovative Properties Co User interface for portable rfid reader
US6411817B1 (en) * 2000-01-21 2002-06-25 Lucent Technologies Inc. Method and system for dynamic downlink power control in a time-division, multiplex wireless system
DE10010436A1 (en) * 2000-03-03 2001-09-06 Bosch Gmbh Robert Transferring position-related data between a central station and a mobile terminal involves, central station forming position related information depending on position received from terminal
US20010030232A1 (en) * 2000-03-08 2001-10-18 Piatek John T. System and method for validation of packing and shipping operations using two-dimensional bar codes
US6275153B1 (en) * 2000-07-26 2001-08-14 Andrew Brooks Identification and tracking system
US6614351B2 (en) * 2000-12-07 2003-09-02 Sap Aktiengesellschaft Computerized system for automatically monitoring processing of objects
US7283975B2 (en) * 2001-02-05 2007-10-16 Broughton W Curtis System and method for tracking and managing construction projects
US6574549B2 (en) * 2001-03-09 2003-06-03 International Business Machines Corporation Method and system for the visually impaired to navigate a route through a facility
JP2002279091A (en) * 2001-03-16 2002-09-27 Hitachi Ltd Maintenance service system of home electric appliance
US7042468B2 (en) * 2001-05-04 2006-05-09 Disney Enterprises, Inc. Text overlay for multi-dimensional construction project models
US7035814B2 (en) * 2001-07-12 2006-04-25 International Buisness Machines Corporation Method for delivering a product to a register according to a tracked location of a mobile device
US6954737B2 (en) * 2001-11-05 2005-10-11 Johnsondiversey, Inc. Method and apparatus for work management for facility maintenance
US8321302B2 (en) * 2002-01-23 2012-11-27 Sensormatic Electronics, LLC Inventory management system
US7370532B2 (en) * 2002-01-11 2008-05-13 Lockheed Martin Corporation RF communications method and system for laser ultrasonic testing
US20060136441A1 (en) 2002-04-02 2006-06-22 Tetsunosuke Fujisaki Method and apparatus for synchronous project collaboration
US20030227385A1 (en) * 2002-06-10 2003-12-11 Lancaster Cory L. Limited access article identifier and locator system and method
US7070091B2 (en) * 2002-07-29 2006-07-04 The Code Corporation Systems and methods for interfacing object identifier readers to multiple types of applications
US20040024658A1 (en) * 2002-08-05 2004-02-05 General Electric Company System and method for providing asset management and tracking capabilities
US7409392B2 (en) * 2002-08-16 2008-08-05 Gcc, Inc. System and method for managing construction projects
US7340314B1 (en) * 2002-11-21 2008-03-04 Global Network Security, Inc. Facilities management system with local display and user interface
JP2004343275A (en) 2003-05-14 2004-12-02 Murata Mach Ltd Image processing system and scanner
US20050065830A1 (en) * 2003-09-24 2005-03-24 Xerox Corporation System and method for the acquisition and analysis of data for print shop performance evaluation and adjustment
US20050246217A1 (en) * 2004-04-30 2005-11-03 Horn Mark W System and methods of mobile field inspection
US7623028B2 (en) * 2004-05-27 2009-11-24 Lawrence Kates System and method for high-sensitivity sensor
US9189756B2 (en) 2004-09-21 2015-11-17 International Business Machines Corporation Case management system and method for collaborative project teaming
US20060069890A1 (en) * 2004-09-30 2006-03-30 Emc Corporation Triangular asynchronous replication with minimal synchronous storage
US7274294B2 (en) * 2005-01-26 2007-09-25 Rf Technologies, Inc. Mobile locator system and method
US20060229928A1 (en) * 2005-04-12 2006-10-12 Nix James L Jr System and method of tracking objects being serviced
US7413124B2 (en) * 2005-07-19 2008-08-19 3M Innovative Properties Company RFID reader supporting one-touch search functionality
US8639543B2 (en) * 2005-11-01 2014-01-28 International Business Machines Corporation Methods, systems, and media to improve employee productivity using radio frequency identification
US7654456B2 (en) * 2005-11-30 2010-02-02 Basf Corporation Method and system for managing supplies and performance in a collision center

Also Published As

Publication number Publication date
WO2006102277A2 (en) 2006-09-28
US20060253492A1 (en) 2006-11-09
US8022816B2 (en) 2011-09-20
WO2006102277A3 (en) 2009-04-02

Similar Documents

Publication Publication Date Title
US20210110347A1 (en) Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods
Dallasega et al. Industry 4.0 as an enabler of proximity for construction supply chains: A systematic literature review
US20130082101A1 (en) System and method for field management using barcodes and optical scanners
Li et al. An Internet of Things-enabled BIM platform for on-site assembly services in prefabricated construction
Abdirad Metric-based BIM implementation assessment: a review of research and practice
US20170053244A1 (en) Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods
US20190220936A1 (en) Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods
US20190220796A1 (en) Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods
US8022816B2 (en) System and method for field management using radio frequency tags
Charoenngam et al. Web‐based application for managing change orders in construction projects
US20140278705A1 (en) Hierarchical Workflow Management System
US11741271B1 (en) Method, system and programmed product for administering building projects
US20230015535A1 (en) Digital project based competitive bidding in government contracts
US20220101235A1 (en) Automated, integrated and complete computer program/project management solutions standardizes and optimizes management processes and procedures utilizing customizable and flexible systems and methods
Kang et al. Information-integration maturity model for the capital projects industry
Okorocha Factors Affecting Effective Materials Management in Building Construction Projects–A Case Study of Selected Building Sites, in Imo State, Nigeria
KR20090051354A (en) The construction management system and the servicemethod using the system
US20130205224A1 (en) Electronic data plate system for collaboration amongst multiple disparate parties
JP2008123469A (en) Management system of object management information, person management information and real estate information
US20210182989A1 (en) Method and apparatus for extended workforce management
US20130144677A1 (en) Workflow automation system and method for construction industry
KR102257343B1 (en) Integration operating service method and integration operating service system for facility management
Bildsten A project-based purchasing portfolio matrix applied to the Australian construction industry
Elbashbishy et al. Role of transactional blockchain in facilitating procurement in international construction projects
Lasni et al. Implementing construction planning and control software: A specialized contractor perspective

Legal Events

Date Code Title Description
EEER Examination request
FZDE Discontinued

Effective date: 20130321