CN102127686A - Method for producing hot rolled steel coils for ship building - Google Patents

Method for producing hot rolled steel coils for ship building Download PDF

Info

Publication number
CN102127686A
CN102127686A CN 201110041352 CN201110041352A CN102127686A CN 102127686 A CN102127686 A CN 102127686A CN 201110041352 CN201110041352 CN 201110041352 CN 201110041352 A CN201110041352 A CN 201110041352A CN 102127686 A CN102127686 A CN 102127686A
Authority
CN
China
Prior art keywords
steel
tapping
time
rolled steel
controlled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110041352
Other languages
Chinese (zh)
Other versions
CN102127686B (en
Inventor
杨云清
邹阳
丘祥光
赵彦灵
唐小勇
李志伟
蔡明伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Iron and Steel Co Ltd
Original Assignee
Ningbo Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Iron and Steel Co Ltd filed Critical Ningbo Iron and Steel Co Ltd
Priority to CN2011100413528A priority Critical patent/CN102127686B/en
Publication of CN102127686A publication Critical patent/CN102127686A/en
Application granted granted Critical
Publication of CN102127686B publication Critical patent/CN102127686B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a method for producing hot rolled steel coils for ship building. The method comprises the following steps: 1) designing the components, pretreating molten iron, then carrying out converter smelting, carrying out nitrogen/argon changing over and carrying out tapping to obtain molten steel; 2) continuously casting the molten steel to obtain slabs, controlling the weight of the molten steel in the tundish to be 8-15t when casting of the continuous casting tundish is stopped, ensuring the liquid level to be 200-350mm; carrying out protective casting in the whole course and ensuring the insertion depth of the long nozzle to be 300-400mm; 3) heating the slabs; and 4) finally rolling and curling the heated slabs, thus obtaining the hot rolled steel coils. The method has the following beneficial effects: the contents of C and Mn in the grade A steel components are reduced, proper rolling and cooling control processes are adopted, the comprehensive properties of the grade A steel are improved and the produced grade A hot rolled steel coils have low cost and high properties.

Description

A kind of shipbuilding production method of coils of hot-rolled steel
Technical field
The invention belongs to the coils of hot-rolled steel preparation field, particularly a kind of shipbuilding production method of coils of hot-rolled steel.
Background technology
Now the yield strength 235MPa level Series Steel of Sheng Chaning is rolled into C height in the branch, and slab surface crack is many, and the intensity surplus capacity is big, and plasticity and toughness are low.When in the special-purpose steel the following existence of Mn being required, its intensity surplus capacity will be bigger, influence cold-forming property; Casting billet surface has the crackle probability can not directly adorn greatly, is unfavorable for energy-saving and emission-reduction; The C content height, welding property is poor.
The investigation of yield strength 235MPa level series coil of strip production performance actual achievement
Table 1 yield strength 235MPa level series coil of strip thickness, performance range cartogram
Figure BDA0000047330010000011
Can find out from table 1:
Yield strength 235MPa level series coil of strip is produced thickness below 7.5mm, and yield strength is at 275~475MPa, and tensile strength is at 405~595MPa, unit elongation 26~45.5%;
Yield strength 235MPa level series coil of strip is produced thickness more than 7.5mm, and yield strength is at 245~395MPa, and tensile strength is at 370~520MPa, unit elongation 23~40.5%;
Table 2 yield strength 235MPa level series coil of strip is less than 7.5mm thickness and performance index frequency table
Figure BDA0000047330010000012
Table 3 yield strength 235MPa level series coil of strip is greater than 7.5mm thickness and performance index frequency table
Figure BDA0000047330010000021
Can find out from table 2, table 3: the yield strength of yield strength 235MPa level series coil of strip (less than 7.5mm) mainly be in 310~430MPa, tensile strength mainly at 440~520MPa scope, unit elongation mainly 30~38%, to produce main thickness be 6-3mm;
The yield strength of yield strength 235MPa level series coil of strip (greater than 7.5mm) mainly be in 300~360MPa, tensile strength mainly at 450~490MPa scope, unit elongation mainly 29~37%, to produce main thickness be 7.5-14mm;
Yield strength 235MPa level series coil of strip produces the investigation of branch actual achievement, and 662 stove yield strength 235MPa level Series Steel are involved in capable C, Si, Mn element statistics.
Table 4 yield strength 235MPa level series coil of strip C, Si, Mn scope cartogram
Project C% Si% Mn%
Maximum value 0.19362 0.24151 0.48282
Minimum value 0.12024 0.00246 0.28643
Mean value 0.15 0.15 0.40
Can find out from table 4: yield strength 235MPa level series coil of strip C average content is 0.15%, the Mn average content is 0.40%;
Table 5C, Si, the Mn composition frequency
Figure BDA0000047330010000022
Figure BDA0000047330010000031
Can find out from table 5: yield strength 235MPa level series coil of strip heat analysis C content is main 0.13~0.18%, Mn content is mainly 0.36~0.46%.
National standard (GB712) is to A composition, performance requriements and the contrast of yield strength 235MPa level series coil of strip production actual achievement, and is as shown in table 6:
Table 6 composition, performance requriements and production actual achievement
Figure BDA0000047330010000032
Can find out from table 6: the rich amount of yield strength 235MPa level series coils of hot-rolled steel intensity is big, and plasticity is low.
Summary of the invention
Technical problem to be solved by this invention provides the production method of a kind of shipbuilding with coils of hot-rolled steel, this method has reduced C, Mn content in the A level composition of steel, adopt suitable rolling technology and cooling control technology, improve the over-all properties of A level steel, produce low-cost, high performance A level coils of hot-rolled steel, in line with the theory realization energy-saving and emission-reduction of green iron and steel.
A kind of shipbuilding of the present invention production method of coils of hot-rolled steel comprises:
1) after composition designs, molten iron is carried out pre-treatment, converter smelting then, the nitrogen argon switches, tap molten steel; Re-blow≤1 time tapping time 4.5~8.0min before the tapping; Add alloy before the tapping 4/5; The two pushing off the slag of tapping, the slag that arrives at a station is thick≤80mm; The omnidistance time 17~30min of Argon is handled at the argon station;
2) molten steel after the above-mentioned tapping is carried out continuous casting and gets slab, wherein connect water unwrap when watering in first stove in the water yield 25~30t of Baogang, liquid level 550~580mm; In bag during quick change in the water yield 15~20t of Baogang, liquid level 350~400mm; Normally water time cast keep in the water yield 42~50t of Baogang, liquid level 950~1000mm changes the big Bao Shizhong water yield 35~40t of Baogang, liquid level 800~850mm, when bag stops watering in the continuous casting in Baogang's water yield be controlled at 8~15t, liquid level 200~350mm; The whole process protection cast, long nozzle depth of penetration 300~400mm;
3) with above-mentioned slab heating, 3mm≤slab thickness≤16mm, tapping temperature is controlled at 1200 ± 30 ℃, time inside furnace 150~200min, soaking time 22~30min;
4) with the slab rolling after the above-mentioned heating, curling promptly gets coils of hot-rolled steel; 3mm≤slab thickness≤16mm, finish rolling temperature in are controlled at 1020 ± 30 ℃, and finishing temperature is controlled at 860 ± 30 ℃, and curling temperature is controlled to be 600 ± 30 ℃, and cooling strategy is a leading portion.
Above-mentioned steps 1) in, before finishing, the molten steel processing blows Ar time 5~8min, its bright circle≤200mm a little less than the ladle; Reinforced composition and the temperature adjusted in the converter smelting, ladle blows Ar time 5~8min, its bright circle≤200mm; The Argon processing finishes to unwrap the time of watering 10~13min to continuous casting steel.
Above-mentioned steps 1) weight percent of each composition of molten steel of tapping is followed successively by in:
Table 7 composition scope of design
Above-mentioned steps 2) in, liquidus temperature is controlled to be 1527 ℃ during continuous casting, and the bag temperature is controlled to be 1552 ± 7 ℃ in the target, and crystallizer protecting residue adopts low-carbon steel protecting slag.
Above-mentioned steps 4) in, the gained coils of hot-rolled steel is a shipbuilding A level coils of hot-rolled steel.
The low carbon component design of A level ship steel guarantees that coil of strip has good plasticity and toughness, and its unit elongation improves more than 13%, ballistic work is enhanced about more than once, and good plasticity and toughness have improved cold-forming property, avoid the bending cracking problem of gross distortion in the use of A level coil of strip, reduce quality objection; Low carbon component design (C≤0.08%) guarantees surface quality of continuously cast slab good (traditional A level composition of steel is in inferior peritectoid scope, and casting billet surface produces a large amount of crackles), realizes straight dress simultaneously, energy-saving and emission-reduction; Low carbon component design (C≤0.08%) has improved the material welding property; Low Mn design reduces the alloy consumption, reduces production costs.
Adopt the TMCP rolling technology, the low finishing temperature and the temperature of curling guarantee that coil of strip organizes tiny, even; Coil of strip has kept the microstructure characteristic of P+F, and coil of strip performance anisotropy is little; The A level steel of low C, low Mn composition has good combination of strength and toughness.
Beneficial effect
1, the inventive method is simple, adopts the TMCP rolling technology, and low Mn design reduces the alloy consumption, reduces production costs.
2, gained A level coils of hot-rolled steel of the present invention, low carbon component design guarantees that coil of strip has good plasticity and toughness, has improved the material welding property, guarantees that simultaneously surface quality of continuously cast slab is good, realizes directly dress, energy-saving and emission-reduction.
Description of drawings
Fig. 1 is metallographic structure (500 times of amplifications) behind the A level steel rolling of sample number into spectrum 1, and grain fineness number is 11 grades.
Fig. 2 is metallographic structure (500 times of amplifications) behind the A level steel rolling of sample number into spectrum 2, and grain fineness number is 10 grades.
Fig. 3 is metallographic structure (500 times of amplifications) behind the A level steel rolling of sample number into spectrum 3, and grain fineness number is 10 grades.
Embodiment
Below in conjunction with specific embodiment, further set forth the present invention.Should be understood that these embodiment only to be used to the present invention is described and be not used in and limit the scope of the invention.Should be understood that in addition those skilled in the art can make various changes or modifications the present invention after the content of having read the present invention's instruction, these equivalent form of values fall within the application's appended claims institute restricted portion equally.
Embodiment 1
1) after composition designs, molten iron is carried out pre-treatment, converter smelting then, the nitrogen argon switches, tap molten steel; Re-blow tapping time 4.5min before the tapping 1 time; Add alloy before the tapping 4/5; The two pushing off the slag of tapping, the thick 80mm of the slag that arrives at a station; The omnidistance time 17min of Argon is handled at the argon station;
2) weight percent of each composition of molten steel after the above-mentioned tapping is followed successively by: C 0.05%, and Si 0.12%, and Mn 0.40%, P0.010%, and S 0.010%, and Als 0.035%, and all the other are iron and unavoidable impurities; Described molten steel is carried out continuous casting gets slab, wherein connect water unwrap when watering in first stove in the water yield 25t of Baogang, liquid level 550mm; In bag during quick change in the water yield 15t of Baogang, liquid level 350mm; Normally water time cast keep in the water yield 42t of Baogang, liquid level 950mm changes the big Bao Shizhong water yield 35t of Baogang, liquid level 800mm, when bag stops watering in the continuous casting in Baogang's water yield be controlled at 8t, liquid level 200mm; The whole process protection cast, long nozzle depth of penetration 300mm;
3) with above-mentioned slab heating, time inside furnace 150min, soaking time 22min, during slab thickness 3.05mm, tapping temperature is controlled at 1230 ℃;
4) with the slab rolling after the above-mentioned heating, the finish rolling temperature in is controlled at 1050 ℃, and finishing temperature is controlled at 890 ℃; Curling temperature is controlled to be 630 ℃, and cooling strategy is a leading portion, and curling at last, promptly to get sample number into spectrum be 1 A level coils of hot-rolled steel.Accompanying drawing 1 is seen in its metallographic structure, impacts assay and sees Table 8.
Embodiment 2
1) after composition designs, molten iron is carried out pre-treatment, converter smelting then, the nitrogen argon switches, tap molten steel; Re-blow tapping time 6.0min before the tapping 0 time; Add alloy before the tapping 4/5; The two pushing off the slag of tapping, the thick 60mm of the slag that arrives at a station; The omnidistance time 25min of Argon is handled at the Argon station in the LF stove;
2) weight percent of each composition of molten steel after the above-mentioned tapping is followed successively by: C 0.07%, and Si 0.17%, and Mn 0.50%, P0.015%, and S 0.015%, and Als 0.025%, and all the other are iron and unavoidable impurities; Described molten steel is carried out continuous casting gets slab, wherein connect water unwrap when watering in first stove in the water yield 30t of Baogang, liquid level 560mm; In bag during quick change in the water yield 18t of Baogang, liquid level 380mm; Normally water time cast keep in the water yield 45t of Baogang, liquid level 980mm changes the big Bao Shizhong water yield 38t of Baogang, liquid level 830mm, when bag stops watering in the continuous casting in Baogang's water yield be controlled at 10t, liquid level 270mm; The whole process protection cast, long nozzle depth of penetration 350mm;
3) with above-mentioned slab heating, time inside furnace 180min, soaking time 25min, during slab thickness 7.05mm, tapping temperature is controlled at 1200 ℃;
4) with the slab rolling after the above-mentioned heating, the finish rolling temperature in is controlled at 1020 ℃, and finishing temperature is controlled at 860 ℃; Curling temperature is controlled to be 600 ℃, and cooling strategy is a leading portion, and curling at last, promptly to get sample number into spectrum be 2 A level coils of hot-rolled steel.Accompanying drawing 2 is seen in its metallographic structure.
Embodiment 3
1) after composition designs, molten iron is carried out pre-treatment, converter smelting then, the nitrogen argon switches, tap molten steel; Re-blow tapping time 8.0min before the tapping 1 time; Add alloy before the tapping 4/5; The two pushing off the slag of tapping, the thick 30mm of the slag that arrives at a station; The omnidistance time 30min of Argon is handled at the argon station;
2) weight percent of each composition of molten steel after the above-mentioned tapping is followed successively by: C 0.08%, and Si 0.24%, and Mn 0.60%, P0.020%, and S 0.020%, and Als 0.015%, and all the other are iron and unavoidable impurities; Described molten steel is carried out continuous casting gets slab, wherein connect water unwrap when watering in first stove in the water yield 28t of Baogang, liquid level 580mm; In bag during quick change in the water yield 20t of Baogang, liquid level 400mm; Normally water time cast keep in the water yield 50t of Baogang, liquid level 1000mm changes the big Bao Shizhong water yield 40t of Baogang, liquid level 850mm, when bag stops watering in the continuous casting in Baogang's water yield be controlled at 15t, liquid level 350mm; The whole process protection cast, long nozzle depth of penetration 400mm;
3) with above-mentioned slab heating, time inside furnace 200min, soaking time 30min, during slab thickness 10.55mm, tapping temperature is controlled at 1170 ℃;
4) with the slab rolling after the above-mentioned heating, the finish rolling temperature in is controlled at 990 ℃, and finishing temperature is controlled at 830 ℃; Curling temperature is controlled to be 570 ℃, and cooling strategy is a leading portion, and curling at last, promptly to get sample number into spectrum be 3 A level coils of hot-rolled steel.Accompanying drawing 3 is seen in its metallographic structure, impacts assay and sees Table 8.
The present invention impacts assay and sees Table 8.
Table 8 impacts assay
Figure BDA0000047330010000061
Figure BDA0000047330010000071

Claims (4)

1. a shipbuilding comprises with the production method of coils of hot-rolled steel:
1) after composition designs, molten iron is carried out pre-treatment, converter smelting then, the nitrogen argon switches, tap molten steel, re-blow≤1 time tapping time 4.5~8.0min before the tapping; Add alloy before the tapping 4/5; The two pushing off the slag of tapping, the slag that arrives at a station is thick≤80mm; The omnidistance time 17~30min of Argon is handled at the argon station; Wherein the weight percent of each composition of gained molten steel is followed successively by: C0.05~0.08%, and Si 0.12~0.24%, and Mn 0.40~0.60%, P≤0.020%, S≤0.020%, Als≤0.035%, all the other are iron and unavoidable impurities;
2) molten steel after the above-mentioned tapping is carried out continuous casting and gets slab, wherein connect water unwrap when watering in first stove in the water yield 25~30t of Baogang, liquid level 550~580mm; In bag during quick change in the water yield 15~20t of Baogang, liquid level 350~400mm; Normally water the water yield 42~50t of Baogang in time cast maintenance, liquid level 950~1000mm; Change the big Bao Shizhong water yield 35~40t of Baogang, liquid level 800~850mm; Baogang's water yield is controlled at 8~15t, liquid level 200~350mm in when bag stops watering in the continuous casting; The whole process protection cast, long nozzle depth of penetration 300~400mm;
3) with above-mentioned slab heating, 3mm≤slab thickness≤16mm, tapping temperature is controlled at 1200 ± 30 ℃, time inside furnace 150~200min, soaking time 22~30min;
4) with the slab rolling after the above-mentioned heating, curling promptly gets coils of hot-rolled steel; 3mm≤slab thickness≤16mm, finish rolling temperature in are controlled at 1020 ± 30 ℃, and finishing temperature is controlled at 860 ± 30 ℃, and curling temperature is controlled to be 600 ± 30 ℃, and cooling strategy is a leading portion.
2. a kind of shipbuilding according to claim 1 is characterized in that: blow Ar time 5~8min, its bright circle≤200mm a little less than the ladle before the molten steel processing finishes in the described step 1) with the production method of coils of hot-rolled steel; Reinforced composition and the temperature adjusted in the converter smelting, ladle blows Ar time 5~8min, its bright circle≤200mm; The Argon processing finishes to unwrap the time of watering 10~13min to continuous casting steel.
3. a kind of shipbuilding according to claim 1 production method of coils of hot-rolled steel, it is characterized in that: the weight percent of each composition of tapping gained molten steel is followed successively by in the described step 1): C 0.07%, Si 0.17%, Mn 0.50%, P≤0.015%, S≤0.015%, Als≤0.025%, all the other are iron and unavoidable impurities.
4. a kind of shipbuilding according to claim 1 production method of coils of hot-rolled steel, it is characterized in that: described step 2), liquidus temperature is controlled to be 1527 ℃ during continuous casting, and middle bag temperature is controlled to be 1552 ± 7 ℃, and crystallizer protecting residue adopts low-carbon steel protecting slag.
CN2011100413528A 2011-02-21 2011-02-21 Method for producing hot rolled steel coils for ship building Expired - Fee Related CN102127686B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100413528A CN102127686B (en) 2011-02-21 2011-02-21 Method for producing hot rolled steel coils for ship building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100413528A CN102127686B (en) 2011-02-21 2011-02-21 Method for producing hot rolled steel coils for ship building

Publications (2)

Publication Number Publication Date
CN102127686A true CN102127686A (en) 2011-07-20
CN102127686B CN102127686B (en) 2012-07-25

Family

ID=44265952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100413528A Expired - Fee Related CN102127686B (en) 2011-02-21 2011-02-21 Method for producing hot rolled steel coils for ship building

Country Status (1)

Country Link
CN (1) CN102127686B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6315946B1 (en) * 1999-10-21 2001-11-13 The United States Of America As Represented By The Secretary Of The Navy Ultra low carbon bainitic weathering steel
CN1970818A (en) * 2006-12-08 2007-05-30 武汉钢铁(集团)公司 High-strength weathering steel and method of manufacturing same
CN101619417A (en) * 2008-06-30 2010-01-06 上海梅山钢铁股份有限公司 Economical weather-resistant checkered plate and production method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6315946B1 (en) * 1999-10-21 2001-11-13 The United States Of America As Represented By The Secretary Of The Navy Ultra low carbon bainitic weathering steel
CN1970818A (en) * 2006-12-08 2007-05-30 武汉钢铁(集团)公司 High-strength weathering steel and method of manufacturing same
CN101619417A (en) * 2008-06-30 2010-01-06 上海梅山钢铁股份有限公司 Economical weather-resistant checkered plate and production method thereof

Also Published As

Publication number Publication date
CN102127686B (en) 2012-07-25

Similar Documents

Publication Publication Date Title
CN102127679B (en) Method for producing hot-rolled steel coil
CN102212748B (en) Method for producing hot-rolled steel coils
CN102127693B (en) Method for producing hot-rolled steel coil
CN102127699B (en) Method for producing hot rolled steel coils
CN102127690B (en) Method for producing hot rolled steel coil
CN102127681B (en) Production method of hot rolled steel coil
CN102127683B (en) Method for producing hot-rolled steel coil
CN102127686B (en) Method for producing hot rolled steel coils for ship building
CN102127682B (en) Method for producing hot rolled steel coils for ship building
CN102127696B (en) Method for producing hot rolled steel coils for ship building
CN102127676B (en) Method for producing hot rolled steel coils
CN102127685B (en) Method for producing hot-rolled steel coil for shipbuilding
CN102127677B (en) Method for producing hot rolled steel coil
CN102127691B (en) Method for producing hot rolled steel coil
CN102127684B (en) Method for producing hot rolled steel coils
CN102127692B (en) Production method of hot rolled steel coil
CN102127695B (en) Production method of hot rolled steel coil
CN102127700B (en) Method for producing hot rolled steel coils for ship building
CN102127694B (en) Method for producing hot rolled steel coils for ship building
CN102127688B (en) Method for producing hot-rolled steel coil for shipbuilding
CN102127689B (en) Production method of hot rolled steel coil for ship building
CN102127678B (en) Method for producing hot rolled steel coil
CN102127687B (en) Method for producing hot-rolled steel coil
CN102127701B (en) Production method of hot rolled steel coil for ship building
CN102127680B (en) Production method of hot rolled steel coil for shipbuilding

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120725

Termination date: 20150221

EXPY Termination of patent right or utility model