CN102352773A - Sectional filling method of old lane - Google Patents

Sectional filling method of old lane Download PDF

Info

Publication number
CN102352773A
CN102352773A CN2011103461364A CN201110346136A CN102352773A CN 102352773 A CN102352773 A CN 102352773A CN 2011103461364 A CN2011103461364 A CN 2011103461364A CN 201110346136 A CN201110346136 A CN 201110346136A CN 102352773 A CN102352773 A CN 102352773A
Authority
CN
China
Prior art keywords
filling
old working
old
work plane
working
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103461364A
Other languages
Chinese (zh)
Other versions
CN102352773B (en
Inventor
郭德春
王道广
王建沪
孙念昌
田志岭
王伟
王友峰
吴传伟
孙圣明
王永平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yanzhou Mining Group Zouchenghua Construction Design Research Institute Co., Ltd.
Original Assignee
Yankuang Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yankuang Group Corp Ltd filed Critical Yankuang Group Corp Ltd
Priority to CN 201110346136 priority Critical patent/CN102352773B/en
Publication of CN102352773A publication Critical patent/CN102352773A/en
Application granted granted Critical
Publication of CN102352773B publication Critical patent/CN102352773B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention belongs to the field of mining and relates to a sectional filling method of an old lane. The sectional filling method of the old lane comprises the following steps: A) drawing a stratigraphic relation layout diagram of a working face and the old lane and marking the positions of the old lane, the working face and other lanes, the shoring way of the old lane and other parameters in a detailed manner; B) selecting fly ash or slag ash and other radiation-free materials with lower sulfur content as filling materials, screening the filling materials, then bagging and putting into a well; C) filling the old lane in the position which is ahead of the working face 50m at least, and performing stage-by-stage step-by-step filling on the old lane from the working face to a terminal mining line; and D) performing sectional filling construction. The method has the beneficial effects that the sectional filling is adopted, the filling efficiency is high, the recovery and the filling do not affect each other, the filling cost is low, and the consumed time is short, thereby not only solving the problems of ground pressure occurrence of the working face, roof caving, subsidence of a support, loss of coal resources and the like during the recovery period, but also avoiding the defects of waste of the filling materials and long consumed time for filling.

Description

Old working sublevel fill stoping method
Technical field
The invention belongs to field of mining, relate to a kind of old working sublevel fill stoping method.
Background technology
For the special mining face of crossing old working in the progradation; Because old working is various at layer position, the arrangement of work plane; Stoping period can cause work plane ground to press to manifest, the advance of the face is sunk, influenced in roof fall, support, cause problem such as coal resources loss, and traditional whole fill method exists filling cost height, length consuming time, the easy shortcoming that normal propelling is impacted.
Summary of the invention
The present invention provides a kind of old working sublevel fill stoping method in order to remedy the deficiency of prior art, not only guarantees filling effect but also avoid the casting resin waste, reduces loading time, effectively solves the contradiction between the normal propelling of filling and work plane.
The present invention realizes through following technical scheme:
Old working sublevel fill stoping method of the present invention, its special character is: may further comprise the steps:
A, drawing face old working layer position relationship figure mark position, old working support pattern and other parameter in old working and work plane and other tunnel in detail;
Lower, the cold materials of sulfur content such as B, selection flyash or slag ash screen the back pack to casting resin to go into the well as casting resin;
C, work plane 50m carries out filling to old working at least in advance, to carrying out stage by stage progressively filling from work plane to the old working that stops adopting line;
D, carry out sublevel fill stoping construction.
Old working sublevel fill stoping method of the present invention, among the step D,
(1) is in this layer and the old working parallel with work plane; Take intensive sublevel fill stoping mode; Be to leave not filling section between per two fillings buttress in the old working; Distance between per two fillings buttress is not more than span length; During filling; Casting resin is filled to apart from old working top board 0.7m-1.0m, stays airspace;
(2) be in the old working and the top layer old working of this layer and or oblique vertical with work plane; Take general sublevel fill stoping mode; Be to leave not filling section between per two fillings buttress; Distance between per two fillings buttress; When the old working support pattern falls behind, face pressure is big, when existing specific positions such as grade separation, usual friendship, oblique to concern with other tunnel; Dwindle the distance between the filling buttress, on the contrary the distance of widening;
(3) part bottom old working is that tunnel part is in the work plane, part is in the work plane bottom, during filling, in old working, demarcates work plane coal cutting base plate line earlier, and 0.4m marks fill line under the base plate line then, whole fill under the fill line.
The invention has the beneficial effects as follows; According to old working top board situation and support pattern; Arrangement and length; Face pressure; Adopt sublevel fill stoping with the factors such as position relation in other tunnel; There is not filling section in the old working (stowboard); Through adopting flyash; Casting resin sublevel fill stopings such as slag ash; Pack effectiveness is high; Back production and filling are independent of each other; Filling cost is low; Weak point consuming time; Both having solved stoping period work plane ground pressure manifests; Roof fall; Support sink and problem such as coal resources loss; The casting resin waste of having avoided traditional filling method to cause again; The shortcoming of filling length consuming time has reached quick filling; Do not influence the purpose of working face extraction.
Description of drawings
Accompanying drawing is a structural representation of the present invention.Fig. 1 is in this layer and the old working parallel with work plane, and Fig. 2 is old working and the top layer old working that is in this layer and or oblique vertical with work plane, and Fig. 3 is the bottom old working, and arrow is represented advance of the face direction among Fig. 3.
Among the figure, 1 pack portion, 2 old workings, 3 work planes.
The specific embodiment
Old working sublevel fill stoping method of the present invention may further comprise the steps:
A, according to the reality of stope, drawing face old working layer position relationship figure in advance marks position, old working support pattern and other parameter in old working and work plane and other tunnel, in detail for next step filling construction is got ready;
B, according to the reality and the prior art situation of stope; Lower, the cold material fillings of sulfur content such as general selection flyash or slag ash; For guaranteeing that the attal size is unlikely to the excessive filling effect that influences, the back pack is screened in casting resin go into the well;
C, according to old working arrangement, top board situation, face propulsion speed, work plane 50m carries out filling (to carrying out stage by stage progressively filling from work plane to the old working that stops adopting line) to old working at least in advance, avoids filling, working face extraction to influence each other;
D, take corresponding sublevel fill stoping method, specifically be divided into following three kinds of situation according to the factors such as layer position, arrangement relation of old working and work plane:
(1) is in this layer and the old working parallel, takes intensive sublevel fill stoping mode, promptly leave not filling section between per two fillings buttress in the old working with work plane; Distance between per two fillings buttress is unsuitable excessive; Generally can not guarantee filling effect, see Fig. 1 greater than span length;
Cause the blind lane that ventilates when preventing that the tunnel drum end from destroying the roadway support state and preventing the filling construction during filling, casting resin is filled to apart from old working top board 0.7m-1.0m and is advisable, and stays airspace;
(2) be in the old working and the top layer old working of this layer and or oblique vertical with work plane; Take general sublevel fill stoping mode; Be to leave not filling section between per two fillings buttress; Distance between per two fillings buttress according to old working top board situation and support pattern, face pressure, with factors such as the position relation decision in other tunnel; Such as the old working support pattern fall behind, face pressure is big, when existing specific positions such as grade separation, usual friendship, oblique to concern with other tunnel; Should dwindle the distance between the filling buttress; Otherwise the distance of widening is seen Fig. 2;
(3) filling method of part bottom old working (tunnel part is in the work plane, part be in the work plane bottom); In old working, demarcate work plane coal cutting base plate line earlier; And then 0.4m (coal breakage is understood not fill area of self-packing when considering the bulging end of old working, coal-winning machine coal cutting) marks fill line under the base plate line; Whole fill under the fill line is seen Fig. 3.

Claims (2)

1. old working sublevel fill stoping method is characterized in that: may further comprise the steps:
A, drawing face old working layer position relationship figure mark position, old working support pattern and other parameter in old working and work plane and other tunnel in detail;
Lower, the cold materials of sulfur content such as B, selection flyash or slag ash screen the back pack to casting resin to go into the well as casting resin;
C, work plane 50m carries out filling to old working at least in advance, to carrying out stage by stage progressively filling from work plane to the old working that stops adopting line;
D, carry out sublevel fill stoping construction.
2. old working sublevel fill stoping method according to claim 1 is characterized in that: among the step D,
(1) is in this layer and the old working parallel with work plane; Take intensive sublevel fill stoping mode; Be to leave not filling section between per two fillings buttress in the old working; Distance between per two fillings buttress is not more than span length; During filling; Casting resin is filled to apart from old working top board 0.7m-1.0m, stays airspace;
(2) be in the old working and the top layer old working of this layer and or oblique vertical with work plane; Take general sublevel fill stoping mode; Be to leave not filling section between per two fillings buttress; Distance between per two fillings buttress; When the old working support pattern falls behind, face pressure is big, when existing specific positions such as grade separation, usual friendship, oblique to concern with other tunnel; Dwindle the distance between the filling buttress, on the contrary the distance of widening;
(3) part bottom old working is that tunnel part is in the work plane, part is in the work plane bottom, during filling, in old working, demarcates work plane coal cutting base plate line earlier, and 0.4m marks fill line under the base plate line then, whole fill under the fill line.
CN 201110346136 2011-11-07 2011-11-07 Sectional filling method of old lane Active CN102352773B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110346136 CN102352773B (en) 2011-11-07 2011-11-07 Sectional filling method of old lane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110346136 CN102352773B (en) 2011-11-07 2011-11-07 Sectional filling method of old lane

Publications (2)

Publication Number Publication Date
CN102352773A true CN102352773A (en) 2012-02-15
CN102352773B CN102352773B (en) 2013-06-19

Family

ID=45576404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110346136 Active CN102352773B (en) 2011-11-07 2011-11-07 Sectional filling method of old lane

Country Status (1)

Country Link
CN (1) CN102352773B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104564137A (en) * 2015-01-19 2015-04-29 中国矿业大学 Handling method and device for double-medium stacked supporting and hard top plate type mined-out area
CN109577981A (en) * 2018-11-15 2019-04-05 山西潞安环保能源开发股份有限公司常村煤矿 A kind of high seam pillar recovery method
CN112943243A (en) * 2021-02-08 2021-06-11 中国矿业大学 Method for old hole cutting of oversize section of fully mechanized caving face of shallow-buried extra-thick coal seam

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4377353A (en) * 1978-08-03 1983-03-22 Granges Ab Method of selective underground mining and stabilization of rock cavities
US20040070257A1 (en) * 2000-03-13 2004-04-15 Oil Sands Underground Mining, Inc. Method and system for mining hydrocarbon-containing materials
CN1952349A (en) * 2006-11-09 2007-04-25 中国矿业大学 Mining method for replacement of pressed coal under village by waste rock
CN101372891A (en) * 2008-06-10 2009-02-25 沈阳市华祥矿山机械厂 Strip filling integral backstopping coal mining method
CN101737052A (en) * 2009-12-28 2010-06-16 河北邯邢矿冶设计院有限公司 Sublevel fill-mining method
CN101749020A (en) * 2010-01-26 2010-06-23 淄博市王庄煤矿 Forward coal mining by filling method
CN102155226A (en) * 2010-11-30 2011-08-17 淄博市王庄煤矿 Roadway backfill mining method for coal seams with medium-high thickness

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4377353A (en) * 1978-08-03 1983-03-22 Granges Ab Method of selective underground mining and stabilization of rock cavities
US20040070257A1 (en) * 2000-03-13 2004-04-15 Oil Sands Underground Mining, Inc. Method and system for mining hydrocarbon-containing materials
CN1952349A (en) * 2006-11-09 2007-04-25 中国矿业大学 Mining method for replacement of pressed coal under village by waste rock
CN101372891A (en) * 2008-06-10 2009-02-25 沈阳市华祥矿山机械厂 Strip filling integral backstopping coal mining method
CN101737052A (en) * 2009-12-28 2010-06-16 河北邯邢矿冶设计院有限公司 Sublevel fill-mining method
CN101749020A (en) * 2010-01-26 2010-06-23 淄博市王庄煤矿 Forward coal mining by filling method
CN102155226A (en) * 2010-11-30 2011-08-17 淄博市王庄煤矿 Roadway backfill mining method for coal seams with medium-high thickness

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张海波等: "评述国内外充填采矿技术发展现状", 《中国矿业》, no. 12, 31 December 2009 (2009-12-31) *
惠功领: "我国煤矿充填开采技术现状与发展", 《煤炭工程》, no. 02, 31 December 2010 (2010-12-31) *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104564137A (en) * 2015-01-19 2015-04-29 中国矿业大学 Handling method and device for double-medium stacked supporting and hard top plate type mined-out area
CN104564137B (en) * 2015-01-19 2017-01-18 中国矿业大学 Handling method and device for double-medium stacked supporting and hard top plate type mined-out area
CN109577981A (en) * 2018-11-15 2019-04-05 山西潞安环保能源开发股份有限公司常村煤矿 A kind of high seam pillar recovery method
CN112943243A (en) * 2021-02-08 2021-06-11 中国矿业大学 Method for old hole cutting of oversize section of fully mechanized caving face of shallow-buried extra-thick coal seam

Also Published As

Publication number Publication date
CN102352773B (en) 2013-06-19

Similar Documents

Publication Publication Date Title
AU2013358812B2 (en) Solid-filling coal mining method with two pre-excavated tunnels for advancing
CN104405437B (en) A kind of solid filling with combine the hybrid working face mining method of adopting
CN108952716B (en) Thick coal seam longwall working face multi-lane arrangement method
AU2013354613A1 (en) Method of local filling to control surface subsidence in worked-out area
CN105298496B (en) Complete adopt of reserved working face coal column is set to fill coal-mining method entirely
CN110985058A (en) Grouting reinforcement method for fault fracture zone of coal face
CN103590831A (en) Novel mining method of gently-inclined thin and medium thickness ore bodies
CN104763425A (en) Pressure relief presplitting blasting gob-side entry retaining pillar-free mining method
WO2016206616A1 (en) Equipment system for no-roadway no-coal-pillar retained roadway mining method
CN108756882A (en) A kind of district sublevel entry adopts recovery method without the short length of filling of driving formula
CN107725052B (en) One kind, which is adopted, stays integration exploitation gob side entry top plate constant-resistance anchor body beam method for protecting support
CN109630112B (en) N00 mining method of cut top filling
CN104533419B (en) Method for partial recovery of residual coal from wide coal pillar
CN101749020A (en) Forward coal mining by filling method
CN102352773B (en) Sectional filling method of old lane
CN101457645B (en) Thick coal seam stepwise full-seam coal mining method
CN105240012B (en) F-type section coal-mining method allowing commingled mining of coal pillars
CN111255456B (en) Mine advancing type filling roadway mining method
CN103174424B (en) Breast and pillar method under long-wall arrangement
CN108204244A (en) The spoil interval method of collecting coal by the means of filling
CN104343453B (en) Thick mineral deposit filling mining method in a kind of low-angle dip
CN113565510B (en) Ultra-thick coal seam fully mechanized filling mining method based on underground gangue pile
CN103061767B (en) Lower to horizontal slice Dry-placed fill mining
CN108708724B (en) A kind of consolidated fill recycling Wangeviry coal column coal-mining method
CN102808624A (en) System and method for simultaneous mining of coal gangue

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190328

Address after: 273500 No. 169 Zoucheng Design Institute Road, Shandong Province

Patentee after: Yanzhou Mining Group Zouchenghua Construction Design Research Institute Co., Ltd.

Address before: 273522 No. 40 Fushan Road, Zoucheng City, Jining City, Shandong Province

Patentee before: Yankuang Group Ltd.