CN102527601A - Preparation method for blocking preventing coating of spray head of atomizer - Google Patents

Preparation method for blocking preventing coating of spray head of atomizer Download PDF

Info

Publication number
CN102527601A
CN102527601A CN2012100527716A CN201210052771A CN102527601A CN 102527601 A CN102527601 A CN 102527601A CN 2012100527716 A CN2012100527716 A CN 2012100527716A CN 201210052771 A CN201210052771 A CN 201210052771A CN 102527601 A CN102527601 A CN 102527601A
Authority
CN
China
Prior art keywords
shower nozzle
atomizer
atomizer shower
plate
location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100527716A
Other languages
Chinese (zh)
Other versions
CN102527601B (en
Inventor
许天旱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Shiyou University
Original Assignee
Xian Shiyou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Shiyou University filed Critical Xian Shiyou University
Priority to CN2012100527716A priority Critical patent/CN102527601B/en
Publication of CN102527601A publication Critical patent/CN102527601A/en
Application granted granted Critical
Publication of CN102527601B publication Critical patent/CN102527601B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a preparation method for a blocking preventing coating of a spray head of an atomizer. The preparation method comprises the following steps of: firstly, placing the spray head of the atomizer on a lifting rack and enabling the spray head of the atomizer to be aligned to the center of a conical countersink on a lower positioning plate and to have no clearance with the conical countersink on the lower positioning plate; secondly, adjusting the height of the spray head of the atomizer to allow a certain clearance between the spray head of the atomizer and the lower positioning plate, exhausting air in the spray head of the atomizer, wherein viscous heat insulating coating cannot flow out; thirdly, arranging a metal mandrel with a low melting point at the center of the spray head of the atomizer, adjusting by using the taper above the spray head of the atomizer and the taper below the upper positioning plate to enable the metal mandrel with the low melting point to be positioned at the center of the spray head of the atomizer and the lower end of the metal mandrel with the low melting point to be led out of a through hole at the center of the conical countersink on the lower positioning plate; fourthly, adjusting the height of the upper positioning plate by using a lifting rod and injecting a heat-insulating coating solution inside the spray head of the atomizer by using a hopper; and fifthly, curing the heat-insulating coating solution by using a thermostat. The preparation method disclosed by the invention has the characteristics of simpleness, feasibility, low cost and favorable effect.

Description

The preparation method of the anti-blocking coating of a kind of atomizer shower nozzle
Technical field
The invention belongs to the atomized powder preparing technical field, be specifically related to the preparation method of the anti-blocking coating of a kind of atomizer shower nozzle.
Background technology
In the preparation process of solder alloy powder and other low melting point powder, the alloy liquid degree of superheat is low more, and scaling loss is few more; Degree of oxidation is low more; And the atomisation tower height can design lowlyer, and because of the flakelike powder that does not have cooling in time to cause is few more, the powder agglomerated intensity that gets into spray chamber is low more.Find also that through test atomizer shower nozzle internal diameter is more little simultaneously, atomized powder is thin more, and sphericity is good more.But atomizer shower nozzle internal diameter reduces or the alloy liquid degree of superheat reduces, and all can cause atomizer shower nozzle easy blocking, makes atomization process interrupt.Through test and analysis, the generation of obstruction is that heat conductivility is good because the atomizer shower nozzle is a ferrous materials; Low-temperature atomizing gas flows along atomizer shower nozzle outer wall fast, takes away a large amount of heats, makes atomizer shower nozzle outside wall temperature sharply reduce; And low temperature passed to the alloy flow that flows through in the liquid pipe, if flow is tiny or the degree of superheat is not high, then heat passes to the outer atomization gas of pipe rapidly; Cause the interior alloy flow velocity of atomizer shower nozzle to slow down, stop up the atomizing failure subsequently.Therefore must explore a kind of method, prepare the material of one deck heat-insulating property for atomizer shower nozzle inwall.
Summary of the invention
In order to overcome the deficiency of above-mentioned prior art, the purpose of this invention is to provide the preparation method of the anti-blocking coating of a kind of atomizer shower nozzle, have simple, easy to operate, with low cost, respond well characteristics.
To achieve these goals, the technical scheme of the present invention's employing is: the preparation method of the anti-blocking coating of a kind of atomizer shower nozzle may further comprise the steps:
At first, the atomizer shower nozzle is placed on the up-down stand, the tapered counterbore center on atomizer shower nozzle and the following location-plate is aligned, assurance atomizer shower nozzle does not have the gap with tapered counterbore on the following location-plate and contacts;
Secondly, the height of adjustment atomizer shower nozzle makes atomizer shower nozzle and following location-plate leave the gap, discharges the air in the atomizer shower nozzle, and the adiabatic coating solution of thickness can not flow out;
Once more; The low-melting-point metal core is placed the center of atomizer shower nozzle; Utilize tapering and the adjustment of the tapering under the last location-plate on the atomizer shower nozzle, make the low-melting-point metal core be positioned at the center of atomizer shower nozzle, draw from the through hole that descends the tapered counterbore center on the location-plate its lower end;
The 4th, adjust the upward height of location-plate with elevating lever, inject adiabatic coating solution with funnel to atomizer shower nozzle inside;
The 5th, solidify adiabatic coating solution with insulating box;
At last, with resistance furnace fusing low-melting-point metal core.
Described low-melting-point metal core fusing point is higher than the solidification temperature of adiabatic coating solution, and its fusing point also is lower than atomizer shower nozzle fusing point simultaneously.
The low-melting-point metal core of described fusing and the adiabatic coating solution of curing do not infiltrate, and is non-caked.
The invention has the beneficial effects as follows:
Because the present invention has adopted above preparation method, makes the present invention have the following advantages: catheter internal diameter size precision is high, the internal diameter convenient formation, anti-blocking coating insulation effect is good, can solve blockage problem, improves effective condensation rate effect and imitates work.
The specific embodiment
Below in conjunction with embodiment the present invention is done further explain.
Embodiment one
The preparation method of the anti-blocking coating of a kind of atomizer shower nozzle may further comprise the steps:
The first, the atomizer shower nozzle is fixed on the up-down stand, the tapered counterbore center on atomizer shower nozzle and the following location-plate is aligned, assurance atomizer shower nozzle does not have the gap with tapered counterbore on the following location-plate and contacts;
The second, the height of adjustment atomizer shower nozzle makes atomizer shower nozzle and following location-plate leave the 0.1mm gap, discharges the air in the atomizer shower nozzle, and the adiabatic coating solution of thickness can not flow out;
The 3rd; Sn-5.0 Ag-4.0Cu the silk that utilizes diameter 1mm is as the low-melting-point metal core; Place atomizer shower nozzle center; Tapering on the atomizer shower nozzle capable of using and the adjustment of the tapering under the last location-plate make Sn-5.0 Ag-4.0Cu silk of diameter 1mm be positioned at the center of atomizer shower nozzle, and draw from the through hole that descends the tapered counterbore center on the location-plate lower end of Sn-5.0 Ag-4.0Cu silk;
The 4th, utilize the elevating lever adjustment to go up the location-plate height, apart from atomizer shower nozzle upper surface 5cm, utilize funnel to the inner adiabatic coating solution that injects of atomizer shower nozzle, adiabatic coating solution adopts following proportioning: distilled water 60%, waterglass 20% ,-200 order Zr 2O 3Powder 20%, plasticizer adopts CMC, and the plasticizer quality is about 0.2% of adiabatic coating gross mass;
The 5th, then whole device is moved in the insulating box together with the atomizer shower nozzle, solidify adiabatic coating solution, promptly heat insulating coating obtains, and calorstat temperature is set at 190 ℃, 150 minutes hardening times;
The 6th, then the atomizer shower nozzle of acquired heat insulating coating is inserted resistance furnace and melt away the low-melting-point metal core, can obtain to have the atomizer shower nozzle of interior coating, resistance furnace temperature is set at 275 ℃, and the time is 40 minutes.
Embodiment two
The preparation method of the anti-blocking coating of a kind of atomizer shower nozzle may further comprise the steps:
The first, the atomizer shower nozzle is fixed on the up-down stand, the tapered counterbore center on atomizer shower nozzle and the following location-plate is aligned, assurance atomizer shower nozzle does not have the gap with tapered counterbore on the following location-plate and contacts;
The second, adjustment atomizer sprinkler height makes atomizer shower nozzle and following location-plate leave the 0.1mm gap, discharges the air in the atomizer shower nozzle, and the adiabatic coating solution of thickness can not flow out;
The 3rd; With the Sn-1Ag-0.5Cu silk of diameter 1mm as the low-melting-point metal core; Place the center of atomizer shower nozzle; Utilize tapering and the adjustment of the tapering under the last location-plate on the atomizer shower nozzle, make the Sn-1Ag-0.5Cu silk of diameter 1mm be positioned at the center of atomizer shower nozzle, draw from the through hole that descends the tapered counterbore center on the location-plate Sn-1Ag-0.5Cu silk lower end;
The 4th, utilize the elevating lever adjustment to go up the location-plate height, apart from atomizer shower nozzle upper surface 5cm, utilize funnel to the inner adiabatic coating solution that injects of atomizer shower nozzle, adiabatic coating solution adopts following proportioning: distilled water 60%, waterglass 20% ,-200 order Zr 2O 3Powder 20%, plasticizer adopts CMC, and the plasticizer quality is about 0.2% of adiabatic coating gross mass;
The 5th, then whole device is moved in the insulating box together with the atomizer shower nozzle, solidify adiabatic coating solution, promptly heat insulating coating obtains, and calorstat temperature is set at 190 ℃, 150 minutes hardening times;
The 6th, then the atomizer shower nozzle of acquired heat insulating coating is inserted resistance furnace and melt away the low-melting-point metal core, can obtain to have the atomizer shower nozzle of interior coating, resistance furnace temperature is set at 270 ℃, and the time is 40 minutes.

Claims (5)

1. the preparation method of the anti-blocking coating of atomizer shower nozzle is characterized in that, may further comprise the steps:
At first, the atomizer shower nozzle is placed on the up-down stand, the tapered counterbore center on atomizer shower nozzle and the following location-plate is aligned, assurance atomizer shower nozzle does not have the gap with tapered counterbore on the following location-plate and contacts;
Secondly, the height of adjustment atomizer shower nozzle makes atomizer shower nozzle and following location-plate leave the gap, discharges the air in the atomizer shower nozzle, and the adiabatic coating solution of thickness can not flow out;
Once more; The low-melting-point metal core is placed the center of atomizer shower nozzle; Utilize tapering and the adjustment of the tapering under the last location-plate on the atomizer shower nozzle, make the low-melting-point metal core be positioned at the center of atomizer shower nozzle, draw from the through hole that descends the tapered counterbore center on the location-plate its lower end;
The 4th, adjust the upward height of location-plate with elevating lever, inject adiabatic coating solution with funnel to atomizer shower nozzle inside;
The 5th, solidify adiabatic coating solution with insulating box;
At last, with resistance furnace fusing low-melting-point metal core.
2. the preparation method of the anti-blocking coating of a kind of atomizer shower nozzle according to claim 1 is characterized in that, may further comprise the steps:
The first, the atomizer shower nozzle is fixed on the up-down stand, the tapered counterbore center on atomizer shower nozzle and the following location-plate is aligned, assurance atomizer shower nozzle does not have the gap with tapered counterbore on the following location-plate and contacts;
The second, the height of adjustment atomizer shower nozzle makes atomizer shower nozzle and following location-plate leave the 0.1mm gap, discharge the air in the atomizer shower nozzle on the one hand, but the adiabatic coating solution of thickness can not flow out;
The 3rd; Sn-5.0 Ag-4.0Cu the silk that utilizes diameter 1mm is as the low-melting-point metal core; Place atomizer shower nozzle center; Tapering on the atomizer shower nozzle capable of using and the adjustment of the tapering under the last location-plate make Sn-5.0 Ag-4.0Cu silk of diameter 1mm be positioned at the center of atomizer shower nozzle, and draw from the through hole that descends the tapered counterbore center on the location-plate lower end of Sn-5.0 Ag-4.0Cu silk;
The 4th, utilize the elevating lever adjustment to go up the location-plate height, apart from atomizer shower nozzle upper surface 5cm, utilize funnel to the inner adiabatic coating solution that injects of atomizer shower nozzle, adiabatic coating solution adopts following proportioning: distilled water 60%, waterglass 20% ,-200 order Zr 2O 3Powder 20%, plasticizer adopts CMC, and the plasticizer quality is about 0.2% of adiabatic coating gross mass;
The 5th, then whole device is moved in the insulating box together with the atomizer shower nozzle, solidify adiabatic coating solution, promptly heat insulating coating obtains, and calorstat temperature is set at 190 ℃, 150 minutes hardening times;
The 6th, then the atomizer shower nozzle of acquired heat insulating coating is inserted resistance furnace and melt away the low-melting-point metal core, can obtain to have the atomizer shower nozzle of interior coating, resistance furnace temperature is set at 275 ℃, and the time is 40 minutes.
3. the preparation method of the anti-blocking coating of a kind of atomizer shower nozzle according to claim 1 is characterized in that, may further comprise the steps:
The first, the atomizer shower nozzle is fixed on the up-down stand, the tapered counterbore center on atomizer shower nozzle and the following location-plate is aligned, assurance atomizer shower nozzle does not have the gap with tapered counterbore on the following location-plate and contacts;
The second, adjustment atomizer sprinkler height makes atomizer shower nozzle and following location-plate leave the 0.1mm gap, discharges the air in the atomizer shower nozzle, and the adiabatic coating solution of thickness can not flow out;
The 3rd; With the Sn-1Ag-0.5Cu silk of diameter 1mm as the low-melting-point metal core; Place the center of atomizer shower nozzle; Utilize tapering and the adjustment of the tapering under the last location-plate on the atomizer shower nozzle, make the Sn-1Ag-0.5Cu silk of diameter 1mm be positioned at the center of atomizer shower nozzle, draw from the through hole that descends the tapered counterbore center on the location-plate Sn-1Ag-0.5Cu silk lower end;
The 4th, utilize the elevating lever adjustment to go up the location-plate height, apart from atomizer shower nozzle upper surface 5cm, utilize funnel to the inner adiabatic coating solution that injects of atomizer shower nozzle, adiabatic coating solution adopts following proportioning: distilled water 60%, waterglass 20% ,-200 order Zr 2O 3Powder 20%, plasticizer adopts CMC, and the plasticizer quality is about 0.2% of adiabatic coating gross mass;
The 5th, then whole device is moved in the insulating box together with the atomizer shower nozzle, solidify adiabatic coating solution, promptly heat insulating coating obtains, and calorstat temperature is set at 190 ℃, 150 minutes hardening times;
The 6th, then the atomizer shower nozzle of acquired heat insulating coating is inserted resistance furnace and melt away the low-melting-point metal core, can obtain to have the atomizer shower nozzle of interior coating, resistance furnace temperature is set at 270 ℃, and the time is 40 minutes.
4. the preparation method of the anti-blocking coating of a kind of atomizer shower nozzle according to claim 1 is characterized in that described low-melting-point metal core fusing point is higher than the solidification temperature of adiabatic coating solution, and its fusing point also is lower than the fusing point of atomizer shower nozzle.
5. the preparation method of the anti-blocking coating of a kind of atomizer shower nozzle according to claim 1 is characterized in that the low-melting-point metal core of described fusing and the adiabatic coating solution of curing do not infiltrate, and is non-caked.
CN2012100527716A 2012-03-02 2012-03-02 Preparation method for blocking preventing coating of spray head of atomizer Expired - Fee Related CN102527601B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100527716A CN102527601B (en) 2012-03-02 2012-03-02 Preparation method for blocking preventing coating of spray head of atomizer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100527716A CN102527601B (en) 2012-03-02 2012-03-02 Preparation method for blocking preventing coating of spray head of atomizer

Publications (2)

Publication Number Publication Date
CN102527601A true CN102527601A (en) 2012-07-04
CN102527601B CN102527601B (en) 2013-12-11

Family

ID=46336333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100527716A Expired - Fee Related CN102527601B (en) 2012-03-02 2012-03-02 Preparation method for blocking preventing coating of spray head of atomizer

Country Status (1)

Country Link
CN (1) CN102527601B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103539458A (en) * 2012-04-27 2014-01-29 通用电气公司 Method of producing an internal cavity in a ceramic matrix composite
US10017425B2 (en) 2013-05-29 2018-07-10 General Electric Company Methods and materials for forming in-situ cavities for silicon-based ceramic matrix composite components
US10450235B2 (en) 2012-04-27 2019-10-22 General Electric Company Method of producing an internal cavity in a ceramic matrix composite and mandrel therefor

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6164954A (en) * 1998-12-08 2000-12-26 Husky Injection Molding Systems Ltd. High pressure injection nozzle
CN1511663A (en) * 2002-12-30 2004-07-14 北京有色金属研究总院 Method and device for reducing heat loss of metal atomizing flow guide system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6164954A (en) * 1998-12-08 2000-12-26 Husky Injection Molding Systems Ltd. High pressure injection nozzle
CN1511663A (en) * 2002-12-30 2004-07-14 北京有色金属研究总院 Method and device for reducing heat loss of metal atomizing flow guide system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103539458A (en) * 2012-04-27 2014-01-29 通用电气公司 Method of producing an internal cavity in a ceramic matrix composite
US10011043B2 (en) 2012-04-27 2018-07-03 General Electric Company Method of producing an internal cavity in a ceramic matrix composite
US10450235B2 (en) 2012-04-27 2019-10-22 General Electric Company Method of producing an internal cavity in a ceramic matrix composite and mandrel therefor
US10017425B2 (en) 2013-05-29 2018-07-10 General Electric Company Methods and materials for forming in-situ cavities for silicon-based ceramic matrix composite components

Also Published As

Publication number Publication date
CN102527601B (en) 2013-12-11

Similar Documents

Publication Publication Date Title
CN106378461B (en) A kind of two-nozzle atomization device and method preparing 3D printing globular metallic powder
CN104475744B (en) A kind of aerosolization prepares the device and method of sized spherical titanium powder and titanium alloy powder
CN107824793B (en) Device and method for preparing superfine monodisperse metal microspheres
CN103952596B (en) A kind of vitallium powder preparation method increasing material manufacture for metal
CN107557737A (en) A kind of method for preparing tubular target
CN102527601B (en) Preparation method for blocking preventing coating of spray head of atomizer
WO2020063620A1 (en) Droplet-by-droplet centrifugal atomization manner-based device and method for efficiently preparing low-melting-point spherical metal powders
WO2020063619A1 (en) Device and method for preparing superfine low-melting-point spherical metal powder using one-by-one droplet atomization method
CN104525958A (en) Device and method for using molten droplet spraying to prepare solder ball
CN105436509B (en) A kind of metal atomization bilayer restrictive nozzle with electromagnetic field booster action
CN105618773A (en) Gas atomization device for preparing 3D printing metal powder
CN104227008A (en) Method for preparing titanium-zirconium-copper-nickel alloy braze powder
CN103447542A (en) Method and device for preparation of micron-sized iron-based hollow sphere material
CN114054764B (en) Spray pipe atomizer for gas atomization powder preparation
CN201997708U (en) Device for connecting spray formed tundish and liquid guide tube
CN201693177U (en) Atomizing nozzle for preparing metal superfine powder
CN102974834A (en) Device for preparing ultrafine solder powder
CN109676146A (en) Metal alloy powders preparation method
CN203541531U (en) Welding flux powder preparing device
CN204321199U (en) A kind of water fog method produces copper alloy powder atomising device
CN204396884U (en) Molten drop sprays prepares soldered ball device
CN110170649A (en) A kind of preparation method of composite hollow ball
CN215657844U (en) Gas atomization limiting type multi-stage atomization device for refractory metal
CN203091749U (en) Preparation device for ultrathin solder powder
CN201906825U (en) Liftable heat-insulating crucible device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131211

Termination date: 20150302

EXPY Termination of patent right or utility model