CN103161157A - Cast-in-place pile capable of conducting tube sinking and rotary excavating earth borrowing synchronously of full pile long steel pipe dado - Google Patents

Cast-in-place pile capable of conducting tube sinking and rotary excavating earth borrowing synchronously of full pile long steel pipe dado Download PDF

Info

Publication number
CN103161157A
CN103161157A CN2013101161010A CN201310116101A CN103161157A CN 103161157 A CN103161157 A CN 103161157A CN 2013101161010 A CN2013101161010 A CN 2013101161010A CN 201310116101 A CN201310116101 A CN 201310116101A CN 103161157 A CN103161157 A CN 103161157A
Authority
CN
China
Prior art keywords
steel pipe
power head
pipe
rotary power
auger stem
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101161010A
Other languages
Chinese (zh)
Other versions
CN103161157B (en
Inventor
孔超
龚迪快
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310116101.0A priority Critical patent/CN103161157B/en
Publication of CN103161157A publication Critical patent/CN103161157A/en
Application granted granted Critical
Publication of CN103161157B publication Critical patent/CN103161157B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a cast-in-place pile capable of conducting tube sinking and rotary excavating earth borrowing synchronously of a full pile long steel pipe dado. The cast-in-place pile comprises an upper rotating power head provided with an auger stem and a lower rotating power head provided with a pipe joint, wherein the pipe joint is connected with the upper end of a steel pipe in a sleeved mode, and the steel pipe is provided with a connecting device which can be integrated with a standard section pipe. The pile forming steps comprise that the auger stem enters into an upper opening of the steel pipe, penetrates through the lower rotating power head, and enters into the steel pipe; a pile position is prepared, the lower rotating power head drives the steel pipe to rotate and sink into a soil layer along the clockwise direction, the upper rotating power head rotates synchronously along the clockwise direction, soil bodies which are penetrated by the steel pipe are lifted by the auger stem and discharged through a soil outlet, the standard section pipe is sleeved on the upper opening of the steel pipe; the auger stem penetrates through the lower rotating power head, enters into the steel pipe and the standard section pipe, and discharges the soil bodies entering into the pipes, and the steps are conducted until a design required depth is satisfied; and the auger stem is pulled out from the steel pipe, a reinforcement cage and filled concrete are placed in the steel pipe and the standard section pipe. The cast-in-place pile has the advantages of eliminating the problem of pollution to city environment in the process of pile foundation of civil and architectural engineering fundamentally, and improving construction efficiency notably.

Description

The synchronous immersed tube of the long steel pipe retaining wall of full stake with revolve the castinplace pile that takes soil
Technical field
The present invention relates to a kind of pile foundation of civil construction project, especially relate to and a kind ofly adopt the long casting pile steel mould-pipe retaining wall of full stake, spinning sinking pipe to synchronize immersed tube with the long steel pipe retaining wall of full stake of the dried synchronous construction that fetches earth of spiral to take native castinplace pile with revolving.
Background technology
Belonging to the most frequently used in non-extruding earth performance stake type in existing pile foundation engineering is the holing with slurry wall protection castinplace pile, and this holing with slurry wall protection castinplace pile can be chosen a footpath and reach the requirement of design bearing capacity value with stake according to the requirement of design bearing capacity value, affects without soil compaction; Since pile foundation adopted Commercial Concrete, the concrete quality and reliability of stake was comparatively stable, and is widely used in engineering; In Pile Foundation, it is the bored pile that adopts this mud off that the stake more than 80% is arranged.
Yet, the problem that the bored pile of existing mud off exists is: can cause discarded drilling slurry serious environment pollution in municipal construction, as flow into municipal sewage system, stop up urban discharging pipeline, enter the rivers in city and cause on the riverbed of rivers and rise etc., cause the cross-section of river to dwindle because drilling slurry enters rivers steathily, affect the safety of drainning off floodwaters in city.
Construction 1m 3The concrete of bored pile need 7m 3Clean water produces 4m 3Discarded drilling slurry; For example annual application bored pile is 300,000, and an average footpath is Φ 800mm, and average stake is long is 50m, is to produce the drilling slurry that 3,000 ten thousand m3 discard, and is equivalent to the volume of thirty West Lake, 3 Hangzhoupro.So a large amount of discarded drilling slurries can not find storable place at all.
Thereby the bored pile of existing mud off inevitably brings serious urban and rural environment to pollute in the construction of city civil construction project pile foundation.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of adopt dried soil extracting process and have the synchronous immersed tube of the long steel pipe retaining wall of full stake of remarkable pile efficient and revolve the castinplace pile that takes soil for above-mentioned prior art present situation.
The present invention solves the problems of the technologies described above the technical scheme that adopts: the synchronous immersed tube of the long steel pipe retaining wall of a kind of full stake with revolve the castinplace pile that takes soil, it is characterized in that, comprise the top rotary power head that is connected with auger stem, this auger stem in a tubular form, this auger stem passes again the bottom rotary power head with soil outlet, the bottom of this bottom rotary power head is provided with union, this union and steel pipe upper end socket.Its effect is that top rotary power head connection auger stem turns clockwise, and this auger stem runs through again the bottom rotary power head and enters in steel pipe; Lower rotary power head drives steel pipe along being rotated counterclockwise, and adopting two of upper and lower parts rotary power head is exactly realize preferably synchronous immersed tube and revolve the function that takes soil;
Described bottom rotary power head is provided with soil outlet; Described auger stem rotation is discharged being pushed into this soil outlet on the spiral shell leaf of the soil body in steel pipe with rotation.
Described steel pipe is provided with linkage, this linkage comprises sleeve pipe and the interconnective standard paragraphs pipe affixed with described steel pipe bottom, this sleeve pipe periphery is provided with the T-slot that is comprised of vertical slot and translot, described standard paragraphs pipe upper end is provided with the rectangle projection, this rectangle bump width matches with the width of described vertical slot, and this rectangle bump height matches with the height of described translot; Its effect is that steel pipe can be connected with the standard paragraphs pipe by linkage, also synchronously sinks to soil layer with the spreading steel pipe; Insert the vertical slot of sleeve pipe when the rectangle projection of standard paragraphs pipe upper end, then, along with the sleeve rotating of steel pipe, the rectangle projection namely enters translot, namely reaches the purpose that the standard paragraphs pipe is connected with steel pipe.
Described sleeve pipe is provided with mounting flange itself and reinforcing rib, and this mounting flange is used for together with described steel-pipe welding.The effect of mounting flange itself and reinforcing rib is the reliability that is connected accuracy and connection thereof of guaranteeing between steel pipe and standard paragraphs pipe;
Described rectangle projection arranges 4, and along the circumference uniform distribution setting of described standard paragraphs pipe; So that the joint efficiency between raising steel pipe and standard paragraphs pipe.
Described this T-slot top is provided with central small hole, and this central small hole and described vertical slot center coincide.
Described rectangle projection center line below is provided with the location small salient point, and this small salient point center, location and described rectangle projection center line coincide.The effect of this location small salient point is the center that shows the rectangle projection, when steel pipe and standard paragraphs pipe must separate when extracting from interface, need only aim at the small salient point of standard paragraphs pipe rectangle projection of the steel pipe vertical slot central small hole on top and bottom on a vertical line, can rapidly steel pipe and standard paragraphs pipe be extracted from interface.
the synchronous immersed tube of the long steel pipe retaining wall of a kind of full stake and the pile step of revolving the castinplace pile that takes soil, comprise the top rotary power head and the bottom rotary power head that are connected with auger stem, described auger stem passes this bottom rotary power head, the bottom of this bottom rotary power head is provided with union, this union and the socket of described steel pipe upper end: the bottom of described bottom rotary power head is with after described union is connected, the socket suitable for reading of this union and described steel pipe, after described top rotary power head connected described auger stem, this auger stem entered the suitable for reading of described steel pipe, and passed described bottom rotary power head and enter in described steel pipe, then in place in design stake position, the described bottom described steel pipe of rotary power head drive is rotated in a clockwise direction and sinks to soil layer, simultaneously, the described auger stem that is connected with described top rotary power head passes described lower rotary power head and enters in steel pipe, synchronously be rotated in a clockwise direction, the soil body that enters described steel pipe is upwards raised by this auger stem or is interrupted and pulls out, the soil body in this steel pipe arrives described bottom rotary power head soil outlet and discharges, continuation with described steel pipe spinning underground layer to taking over the position, extract the suitable for reading of this steel pipe with the auger stem that described top rotary power head is connected, the union that is connected bottom the rotary power head of bottom breaks away from the suitable for reading of this steel pipe, described standard paragraphs pipe box is connected to the suitable for reading of described steel pipe, described top rotary power head connects described auger stem, this auger stem passes described bottom rotary power head, enter in described steel pipe and described standard paragraphs pipe, be rotated in a clockwise direction, the soil body that enters this steel pipe is upwards raised by described auger stem or is interrupted and pulls out, the soil body in this steel pipe and standard paragraphs pipe arrives the soil outlet position discharge of bottom rotary power head, and continuation is with this steel pipe and this standard paragraphs pipe spinning underground layer, until the designing requirement degree of depth stops, described top rotary power head connects described auger stem, and this auger stem is extracted from the suitable for reading of described steel pipe, the union of the bottom of described bottom rotary power head breaks away from the suitable for reading of described steel pipe, then insert reinforcing cage in this steel pipe and standard paragraphs pipe, fill concrete, pull out again this steel pipe and standard paragraphs pipe, i.e. pile.
Compared with prior art, the invention has the advantages that: adopt the long steel pipe retaining wall of full stake spinning sinking pipe and the dried synchronous construction that fetches earth of spiral again, fundamentally eliminated the pollution of borehole wall-protection mud, especially fundamentally solved the pollution difficult problem to urban environment in the construction of city civil construction project pile foundation; Next is that efficiency of construction significantly improves.
Description of drawings
Fig. 1 is the structural representation of the embodiment of the present invention.
Fig. 2 is the sleeve pipe schematic diagram of the embodiment of the present invention.
Fig. 3 is embodiment of the present invention linkage schematic diagram.
Fig. 4 is embodiment of the present invention standard paragraphs pipe schematic diagram.
Fig. 5 is embodiment of the present invention pile program schematic diagram.
The specific embodiment
Embodiment is described in further detail the present invention below in conjunction with accompanying drawing.
As Fig. 1~shown in Figure 5, the present embodiment adopts following structure particularly: it comprises the top rotary power head 2 that is connected with auger stem 6, and this auger stem 6 in a tubular form and the clockwise direction rotation; This auger stem 6 passes again bottom rotary power head 3 and enters in steel pipe 1; The bottom of this bottom rotary power head is provided with union 7, this union 7 and steel pipe 1 upper end socket, and this steel pipe 1 drives rotation in the counterclockwise direction by bottom rotary power head 3, as shown in Figure 1;
Synchronous immersed tube with revolve that to take native process be such: bottom rotary power head 3 drives steel pipe 1 spinning sinking pipes, the soil body that enters steel pipe 1 is transferred to pull out by auger stem 6 dextrorotations of upper rotary power head 2 connections, and the soil outlet 9 that the soil body is brought to lower rotary power head 3 is discharged;
In order to realize the length requirement of different castinplace piles, steel pipe 1 can be connected with standard paragraphs pipe 10 by linkage, with spreading steel pipe 1, and synchronously sinks to soil layer; This linkage comprises sleeve pipe 11 and the interconnective standard paragraphs pipe 10 of steel pipe 1 bottom, and this sleeve pipe is provided with mounting flange 15 and reinforcing rib 16, and this mounting flange is used for being welded and fixed with steel pipe 1; This sleeve pipe periphery is provided with the T-slot that is comprised of vertical slot 13 and translot 14, and this T-slot top is provided with central small hole 4, and this central small hole and vertical slot 13 centers coincide;
Described standard paragraphs pipe 10 upper ends are provided with rectangle projection 8, and the width of this rectangle projection 8 matches with the width of vertical slot 13, and the height of this rectangle projection 8 matches with the height of translot 14;
Insert the vertical slot 13 of sleeve pipes 11 when the rectangle projection 8 of standard paragraphs pipe upper end, then, along with sleeve pipe 11 rotations of steel pipe 1, rectangle projection 8 namely enters translot 14 and reaches the purpose that standard paragraphs pipe 10 is connected with steel pipe 1; Make bottom rotary power head 3 pass through steel pipe 1 transmitting torque to standard paragraphs pipe 10, also namely realized the purpose of spreading steel pipe 1.
Be provided with location small salient point 5 below rectangle projection 8 center lines, the effect of this location small salient point 5 is the centers that show rectangle projection 8, when steel pipe 1 and standard paragraphs pipe 10 must separate when extracting from interface, need only aim at the small salient point 5 of central small hole 4 and the standard paragraphs pipe rectangle projection of bottom of steel pipe vertical slot on top on a vertical line, be the rectangle projection in the center of vertical slot, steel pipe 1 and standard paragraphs pipe 10 can be extracted from interface.
After in steel pipe, whole soil bodys are got only, clear up a hole, then insert reinforcing cage 21, pour into concrete 22, pull out steel pipe 10 in rotation and go out ground with standard paragraphs pipe 20, namely complete the synchronous immersed tube of steel pipe retaining wall of the present invention and revolve and dig cast in place pile 23:
The present invention fundamentally eliminates the pollution of borehole wall-protection mud, is to dig the castinplace pile that dried soil extracting process is constructed with the long steel pipe retaining wall of full stake and with synchronous immersed tube with revolving.
The pile step of the present embodiment is:
The first step, the bottom of bottom rotary power head 3 is connected with union 7, and this union is socketed the suitable for reading of steel pipe 1, upper rotary power head 2 connects auger stem 6, and this auger stem enters the pore of steel pipe 1, then passes bottom rotary power head 3, enter in steel pipe 1, a position is in place designing;
Second step, lower rotary power head 3 drive steel pipes 1 are rotated in a clockwise direction and sink to soil layer, simultaneously, the auger stem 6 that is connected with upper rotary power head passes lower rotary power head 3 and enters in steel pipe 1, synchronously be rotated in a clockwise direction, the soil body that enters steel pipe is upwards raised by this auger stem or is interrupted and pulls out, and the soil body in this steel pipe arrives the soil outlet 9 of lower rotary power head and discharges; To taking over the position, the auger stem that is connected with upper rotary power head is extracted the suitable for reading of steel pipe 1 with steel pipe 1 spinning underground layer in continuation, and the union 7 that is connected bottom lower rotary power head breaks away from the suitable for reading of steel pipes 1;
In the 3rd step, the standard paragraphs pipe is inserted in the suitable for reading of steel pipe 10; Top rotary power head 2 connects auger stem 6, this auger stem passes bottom rotary power head 3, enter in steel pipe 1 and standard paragraphs pipe 10, be rotated in a clockwise direction, the soil body that enters steel pipe 1 is upwards raised by auger stem 6 or is interrupted and pulls out, the soil body in steel pipe 1 and standard paragraphs pipe 10 arrives the soil outlet 9 positions discharges of bottom rotary power head 3, continues steel pipe 1 and standard paragraphs pipe 10 spinning underground layers, until the designing requirement degree of depth stops;
in the 4th step, top rotary power head 2 connects auger stem 6, and this auger stem 6 is extracted from the suitable for reading of steel pipe, and the union 7 of the bottom of bottom rotary power head 3 breaks away from the suitable for reading of standard paragraphs pipe 10, then, insert reinforcing cage 21 in steel pipe 1 and standard paragraphs pipe 10, fill concrete 22, the union 7 of the bottom of bottom rotary power head 3 is socketed the suitable for reading of standard paragraphs pipes 10, rotary power head 3 drives steel pipe and alternately rotates along clockwise direction with counterclockwise, because each steel pipe section header leaves 20 centimetres of swing offsets, after going up most 20 centimetres of displacements of joint steel pipe rotary, driving lower joint steel pipe rotates again, if full stake is long, 4 section headers are arranged, can drive after relatively upper joint stake must have (4-1) * 20=60 centimetre and descend the joint steel pipe most, original friction of rest power becomes to move frictional resistance after swing offset, rotary power head 3 drives standard paragraphs pipe 10 and rotatablely moves with steel pipe 1 alternating direction, make this steel pipe and the frictional resistance of soil property on every side significantly descend, this steel pipe all can be extracted ground with very little uplift force, namely complete the synchronous immersed tube of the long steel pipe retaining wall of full stake and revolve the castinplace pile that takes soil.

Claims (8)

  1. The synchronous immersed tube of the long steel pipe retaining wall of full stake with revolve the castinplace pile that takes soil, it is characterized in that, comprise the top rotary power head (2) that is connected with auger stem (6), this auger stem in a tubular form, this auger stem passes again bottom rotary power head (3), the bottom of this bottom rotary power head is provided with union (7), this union and steel pipe (1) upper end socket.
  2. According to claim 1 the synchronous immersed tube of the long steel pipe retaining wall of full stake with revolve the castinplace pile that takes soil, it is characterized in that, described bottom rotary power head (3) is provided with soil outlet (9).
  3. according to claim 1 the synchronous immersed tube of the long steel pipe retaining wall of full stake with revolve the castinplace pile that takes soil, it is characterized in that, described steel pipe (1) is provided with linkage, this linkage comprises the sleeve pipe (11) and interconnective standard paragraphs pipe (10) affixed with described steel pipe (1) bottom, this sleeve pipe periphery is provided with the T-slot that is comprised of vertical slot (13) and translot (14), described standard paragraphs pipe upper end is provided with rectangle projection (8), this rectangle bump width matches with the width of described vertical slot, this rectangle bump height matches with the height of described translot.
  4. According to claim 3 the synchronous immersed tube of the long steel pipe retaining wall of full stake with revolve the castinplace pile that takes soil, it is characterized in that, described sleeve pipe (11) is provided with mounting flange (15) and reinforcing rib (16), and this mounting flange is used for together with described steel pipe (1) welding.
  5. According to claim 3 the synchronous immersed tube of the long steel pipe retaining wall of full stake with revolve the castinplace pile that takes soil, it is characterized in that, described rectangle projection (8) arranges 4, and along the circumference uniform distribution setting of described standard paragraphs pipe (10).
  6. According to claim 3 the synchronous immersed tube of the long steel pipe retaining wall of full stake with revolve the castinplace pile that takes soil, it is characterized in that, described T-slot top is provided with central small hole (4), this central small hole and described vertical slot (13) center coincide.
  7. According to claim 3 the synchronous immersed tube of the long steel pipe retaining wall of full stake with revolve the castinplace pile that takes soil, it is characterized in that, described rectangle projection (8) center line below is provided with location small salient point (5), and this small salient point center, location and this rectangle projection (8) center line coincide.
  8. 8. the synchronous immersed tube of the long steel pipe retaining wall of full stake with the pile step of revolving the castinplace pile that takes soil is, comprise the top rotary power head and the bottom rotary power head that are connected with auger stem, described auger stem passes this bottom rotary power head, the bottom of this bottom rotary power head is provided with union, this union and steel pipe upper end socket, this steel pipe is provided with the linkage that comprises sleeve pipe and standard paragraphs pipe;
    The first step, the bottom of described bottom rotary power head (3) be with after described union (7) is connected, the socket suitable for reading of this union and described steel pipe (1); After described top rotary power head (2) connected described auger stem (6), this auger stem entered the suitable for reading of described steel pipe, and passed described bottom rotary power head and enter in described steel pipe; Then in place in design stake position;
    second step, the described bottom described steel pipe of rotary power head drive is rotated in a clockwise direction and sinks to soil layer, simultaneously, the described auger stem that is connected with described upper rotary power head passes described lower rotary power head and enters in steel pipe, synchronously be rotated in a clockwise direction, to enter the interior soil body of described steel pipe is upwards raised by this auger stem or is interrupted and pulls out, the soil body in this steel pipe arrives described lower rotary power head soil outlet (9) and discharges, continuation with described steel pipe spinning underground layer to taking over the position, extract the suitable for reading of this steel pipe with the auger stem that described top rotary power head is connected, the union that is connected bottom the rotary power head of bottom breaks away from the suitable for reading of this steel pipe,
    In the 3rd step, described standard paragraphs pipe (10) is socketed on the suitable for reading of described steel pipe; Described top rotary power head connects described auger stem, this auger stem passes described bottom rotary power head, enter in described steel pipe and described standard paragraphs pipe, be rotated in a clockwise direction, the soil body that enters this steel pipe is upwards raised by described auger stem or is interrupted and pulls out, the soil body in this steel pipe and standard paragraphs pipe arrives the soil outlet position discharge of bottom rotary power head, and continuation is with this steel pipe and this standard paragraphs pipe spinning underground layer, until the designing requirement degree of depth stops;
    In the 4th step, described top rotary power head connects described auger stem, and this auger stem is extracted from the suitable for reading of described steel pipe; The union of the bottom of described bottom rotary power head breaks away from the suitable for reading of described steel pipe, then inserts reinforcing cage (21) in this steel pipe and standard paragraphs pipe, fills concrete (22).
CN201310116101.0A 2013-03-27 2013-03-27 Cast-in-place pile capable of conducting tube sinking and rotary excavating earth borrowing synchronously of full pile long steel pipe dado Expired - Fee Related CN103161157B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310116101.0A CN103161157B (en) 2013-03-27 2013-03-27 Cast-in-place pile capable of conducting tube sinking and rotary excavating earth borrowing synchronously of full pile long steel pipe dado

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310116101.0A CN103161157B (en) 2013-03-27 2013-03-27 Cast-in-place pile capable of conducting tube sinking and rotary excavating earth borrowing synchronously of full pile long steel pipe dado

Publications (2)

Publication Number Publication Date
CN103161157A true CN103161157A (en) 2013-06-19
CN103161157B CN103161157B (en) 2015-02-25

Family

ID=48584666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310116101.0A Expired - Fee Related CN103161157B (en) 2013-03-27 2013-03-27 Cast-in-place pile capable of conducting tube sinking and rotary excavating earth borrowing synchronously of full pile long steel pipe dado

Country Status (1)

Country Link
CN (1) CN103161157B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088285A (en) * 2014-07-24 2014-10-08 上海强劲地基工程股份有限公司 Method for constructing cement soil mixing pile and concrete pile meshed foundation pit supporting structure
CN111287763A (en) * 2020-02-20 2020-06-16 海南大学 Control method for preventing subway shield tunnel from long-term settlement

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4009582A (en) * 1975-10-29 1977-03-01 Interpile Usa, Inc. Method for forming deep cast-in-place caseless concrete piles
CN101831906A (en) * 2009-03-09 2010-09-15 钱圣德 Dry type pneumatic rock drilling pile-driving machine and working method thereof
RU2466239C1 (en) * 2011-05-16 2012-11-10 Закрытое акционерное общество "Гипростроймост" Method to manufacture cast-in-place piles
CN202559338U (en) * 2012-05-04 2012-11-28 中国有色金属工业昆明勘察设计研究院 Screwing pile using air
CN203145004U (en) * 2013-03-27 2013-08-21 孔超 Whole pile long steel tube dado synchronous tube sinking and rotary excavating earth borrowing grouting pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4009582A (en) * 1975-10-29 1977-03-01 Interpile Usa, Inc. Method for forming deep cast-in-place caseless concrete piles
CN101831906A (en) * 2009-03-09 2010-09-15 钱圣德 Dry type pneumatic rock drilling pile-driving machine and working method thereof
RU2466239C1 (en) * 2011-05-16 2012-11-10 Закрытое акционерное общество "Гипростроймост" Method to manufacture cast-in-place piles
CN202559338U (en) * 2012-05-04 2012-11-28 中国有色金属工业昆明勘察设计研究院 Screwing pile using air
CN203145004U (en) * 2013-03-27 2013-08-21 孔超 Whole pile long steel tube dado synchronous tube sinking and rotary excavating earth borrowing grouting pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088285A (en) * 2014-07-24 2014-10-08 上海强劲地基工程股份有限公司 Method for constructing cement soil mixing pile and concrete pile meshed foundation pit supporting structure
CN111287763A (en) * 2020-02-20 2020-06-16 海南大学 Control method for preventing subway shield tunnel from long-term settlement
CN111287763B (en) * 2020-02-20 2021-04-23 海南大学 Control method for preventing subway shield tunnel from long-term settlement

Also Published As

Publication number Publication date
CN103161157B (en) 2015-02-25

Similar Documents

Publication Publication Date Title
CN202117556U (en) Auger driller for moulding concrete piles with different depth and shapes
CN102852141B (en) Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN203145004U (en) Whole pile long steel tube dado synchronous tube sinking and rotary excavating earth borrowing grouting pile
CN105114029B (en) A kind of shutoff method of the bad drilling of mine laneway inner sealing
WO2008086693A1 (en) Piling machine with high-pressure jet spiral bit and its piling method
CN101806196A (en) Compound rotary drilling rig drilling mechanism
CN103088820B (en) Waterpower self-excited oscillation jet flow vibratory pile sinking device and pile sinking technology
CN203569561U (en) Novel pile forming device of steel pipe protection wall cast-in-place piles following up drill
CN103161157B (en) Cast-in-place pile capable of conducting tube sinking and rotary excavating earth borrowing synchronously of full pile long steel pipe dado
CN104878745A (en) Pile-forming device with double-helix drill rod and pile-forming method
CN103174133A (en) Pile-forming device and method of steel tube dado super embedded rock filling piles
CN111852556B (en) Forward and reverse drainage method in downward through-layer drilling
CN106088123A (en) A kind of sand geology steel tube well fall water level device and construction method thereof
CN108266131A (en) Rotate soil compaction bottom expanding drill and method for constructing foundation pile
CN205116168U (en) End grout static pressure tubular pile construction equipment is expanded in drilling
CN205012325U (en) Prefabricated precipitation tubular pile in building foundation
CN201650102U (en) Drilling mechanism of compound rotary drilling rig
CN203757177U (en) Mud sand sludge area manual pipe jacking construction device
CN102155157B (en) Spiral drilling machine for forming concrete piles of different depths and shapes
CN209178989U (en) A kind of PHC tubular pole anti-freeze expansion processing unit
CN103615000A (en) Construction device of original-state earth-borrowing cast-in-place pile
CN203808057U (en) Pile bottom rear grouting cast-in-place belled pile
CN107268602A (en) A kind of construction method of interlocking pile
CN203188203U (en) Thread filling pile capable of synchronously sinking pipeline and rotatably excavating and borrowing soil
CN103161156A (en) Threaded grouting pile enabling pipeline sinking and rotary excavating earth borrowing to be synchronous

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Gong Dikuai

Document name: Notice of termination of patent right

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150225