CN103177399A - Transformer substation standard operation firming method - Google Patents

Transformer substation standard operation firming method Download PDF

Info

Publication number
CN103177399A
CN103177399A CN2013100787741A CN201310078774A CN103177399A CN 103177399 A CN103177399 A CN 103177399A CN 2013100787741 A CN2013100787741 A CN 2013100787741A CN 201310078774 A CN201310078774 A CN 201310078774A CN 103177399 A CN103177399 A CN 103177399A
Authority
CN
China
Prior art keywords
prompting
display screen
order
eject
unlocking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100787741A
Other languages
Chinese (zh)
Other versions
CN103177399B (en
Inventor
朱富云
陈锦翔
陈佳妮
李森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG PINGHENGMU INFORMATION TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nantong Power Supply Co of Jiangsu Electric Power Co Ltd
Original Assignee
NANTONG PINGHENGMU INFORMATION TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nantong Power Supply Co of Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG PINGHENGMU INFORMATION TECHNOLOGY Co Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Nantong Power Supply Co of Jiangsu Electric Power Co Ltd filed Critical NANTONG PINGHENGMU INFORMATION TECHNOLOGY Co Ltd
Priority to CN201310078774.1A priority Critical patent/CN103177399B/en
Publication of CN103177399A publication Critical patent/CN103177399A/en
Application granted granted Critical
Publication of CN103177399B publication Critical patent/CN103177399B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a transformer substation standard operation firming method which includes steps of operation order selection, identification verification, identification management, electric signing and the like. The transformer substation standard operation firming method is reasonable and capable of effectively improving misoperation prevention effect and achieving twice the result with half the effort in misoperation prevention. In addition, by the transformer substation standard operation firming method, 'technical prevention' measures are utilized fully to overcome defects of 'personal protection', field switching operation standardization, which is a big problem hard to solve for years, is controlled effectively and safely, accident prevention capacity is improved, and field violation and accident generation frequency are suppressed greatly. Accordingly, the transformer substation standard operation firming method has great direct economical benefit for enterprises and indirect social benefit.

Description

Solidify power transformation standard operation method
Technical field
The present invention relates to a kind of curing power transformation standard operation method.
Background technology
Grid switching operation is the O﹠M personnel's of transformer station of power supply enterprise a important process, and its relation the safe operation of transformer station and electric system, and also relation operating personnel and operating personnel's itself personal safety.Simultaneously, the work of grid switching operation or a more complicated, the operation of existing primary circuit also has the operation of secondary circuit, and operation item is various, sometimes reach tens and even hundreds of item, carelessness is slightly arranged, will cause maloperation, cause transformer station's full cut-off, even expand whole electric system to, make system break-down.
Summary of the invention
The object of the present invention is to provide a kind of curing power transformation standard operation method that can guarantee safety, accurate operation.
Technical solution of the present invention is:
A kind of curing power transformation standard operation method is characterized in that: after receiving certain scheduling order, select corresponding operation order from the list of operating means display screen operation order, open; Select to confirm that this operation scheduling is no and issue an order, insert the people that issues an order, made us name; Show " operation beginning " button of corresponding scheduling order, by " operation beginning " button, automatically start the machine recording; The confirmation operation order has been examined and is qualified; The purpose that whether clearly operates that display screen is shown adds their confirmation, and Analysis about Dangerous Point and pre-control work are carried out in the display screen prompting; According to the display screen prompting, operator, guardian carry out fingerprint signature or cryptographic signatures; According to the display screen prompting, the guardian fills in the operation start time; Display screen ejects picture, the prompting simulation is checked, equipment operation on the prompting simulation drawing must operate in displacement, check end, prompting requires guardian, operator should jointly check the system operation mode after simulated operation, the operation purpose whether system wiring meets the scheduling operation task, and by ACK button; Display screen ejects picture, according to action type, and the preliminary work of prompting Work tool, operation key; As seen the picture of first operation item of display screen ejection operation ticket, other operation items but show implicit, can not operate, in operating process, the following of operation order should arrange less " unlocking operation " button of size, with the convenient release flow process problem that flows at any time; The display screen prompting " is called out the names of those voted for while counting ballot-slips and is rehearsed, points and check, confirm to carry out ", and guardian and operator complete to call out the names of those voted for while counting ballot-slips and rehearse, point and check, confirm implementation, and the guardian ticks operation before the serial number of operation item; Eject picture, confirm that according to prompting equipment operating puts in place; First operation item of operation order falls back on the back, and the picture of second operation item of ejection operation ticket, continue to carry out aforesaid operations in order; If run into the operation of not carrying out for a long time " working copy ", " unlocking operation " button that size is less ejects, and the INQUIRE statement of " whether needing release " occurs, and "No"---operates "Yes"---, and system enters the unlocking operation program; After overall operations finishes, eject prompting frame, require the equipment after reply operates once to check all sidedly, complete without leaking item to confirm operation, select confirmation equipment to be in normal condition; Display screen ejects and fills in the prompting frame of EO time, confirms after filling in; Display screen ejects the prompting frame of " report EO and concluding time to scheduling, recheck simultaneously the single job task, rehearsed by scheduling errorless ", presses " confirmation " key; Eject the prompting that requires to carry out relative recording; Eject the picture of " executed " Electronic Signature, carry out the Electronic Signature operation below operation order last column; If carried out unlocking operation in this task, also will eject the prompting of key being playbacked and carrying out relative recording; Finish recording, video recording, operation is completed.
Described unlocking operation flow process is: the guardian is by "Yes", and system enters the unlocking operation program; Eject prompting frame, "Yes" is selected in inquiry " whether operation order is correct ", otherwise finishes, and indicates in remarks column and finishes reason; Eject prompting frame, "Yes" is selected in inquiry " whether operating interval is correct "; In the situation that confirm necessary release, eject prompting frame, require the full-time people of contact error-unlocking prevention; When continuing operation after contact is agreed, eject prompting frame, show " the full-time people of error-unlocking prevention has or not agreement ", rehearse, point and check, confirm executable operations by re-starting after "Yes" to call out the names of those voted for while counting ballot-slips.
The described data processing module that comprises, data processing module is connected with the information interaction module that is connected to display screen, capacitance contact board, data processing module is connected with operation order virtual printer module, and data processing module is connected with finger print acquisition module, and supply module provides power supply for above-mentioned module.
The present invention can effectively improve the anti-misoperation working effect, is preventing reaching the effect of getting twice the result with half the effort aspect misoperation fault; Take full advantage of " technical precaution " measure, made up the deficiency of " people's air defense ", realized being difficult to for these years realize to the more effective security management and control of on-the-spot grid switching operation standardization behavior, improved the ability that accident is taken precautions against, greatly suppressed on-the-spot violating the regulations, number of times that accident occurs, the indirect benefit of the direct economic benefit of its enterprise and society is huge.
Description of drawings
The invention will be further described below in conjunction with drawings and Examples.
Fig. 1 is the hardware configuration schematic diagram of one embodiment of the invention.
Fig. 2 is main system process flow diagram of the present invention.
Fig. 3 is the release process flow diagram.
Embodiment
A kind of curing power transformation standard operation method after receiving certain scheduling order, is selected corresponding operation order from the list of operating means display screen operation order, open; Select to confirm that this operation scheduling is no and issue an order, insert the people that issues an order, made us name; Show " operation beginning " button of corresponding scheduling order, by " operation beginning " button, automatically start the machine recording; The confirmation operation order has been examined and is qualified; The purpose that whether clearly operates that display screen is shown adds their confirmation, and Analysis about Dangerous Point and pre-control work are carried out in the display screen prompting; According to the display screen prompting, operator, guardian carry out fingerprint signature or cryptographic signatures; According to the display screen prompting, the guardian fills in the operation start time; Display screen ejects picture, the prompting simulation is checked, equipment operation on the prompting simulation drawing must operate in displacement, check end, prompting requires guardian, operator should jointly check the system operation mode after simulated operation, the operation purpose whether system wiring meets the scheduling operation task, and by ACK button; Display screen ejects picture, according to action type, and the preliminary work of prompting Work tool, operation key; As seen the picture of first operation item of display screen ejection operation ticket, other operation items but show implicit, can not operate, in operating process, the following of operation order should arrange less " unlocking operation " button of size, with the convenient release flow process problem that flows at any time; The display screen prompting " is called out the names of those voted for while counting ballot-slips and is rehearsed, points and check, confirm to carry out ", and guardian and operator complete to call out the names of those voted for while counting ballot-slips and rehearse, point and check, confirm implementation, and the guardian ticks operation before the serial number of operation item; Eject picture, confirm that according to prompting equipment operating puts in place; First operation item of operation order falls back on the back, and the picture of second operation item of ejection operation ticket, continue to carry out aforesaid operations in order; If run into the operation of not carrying out for a long time " working copy ", " unlocking operation " button that size is less ejects, and the INQUIRE statement of " whether needing release " occurs, and "No"---operates "Yes"---, and system enters the unlocking operation program; After overall operations finishes, eject prompting frame, require the equipment after reply operates once to check all sidedly, complete without leaking item to confirm operation, select confirmation equipment to be in normal condition; Display screen ejects and fills in the prompting frame of EO time, confirms after filling in; Display screen ejects the prompting frame of " report EO and concluding time to scheduling, recheck simultaneously the single job task, rehearsed by scheduling errorless ", presses " confirmation " key; Eject the prompting that requires to carry out relative recording; Eject the picture of " executed " Electronic Signature, carry out the Electronic Signature operation below operation order last column; If carried out unlocking operation in this task, also will eject the prompting of key being playbacked and carrying out relative recording; Finish recording, video recording, operation is completed.
Described unlocking operation flow process is: the guardian is by "Yes", and system enters the unlocking operation program; Eject prompting frame, "Yes" is selected in inquiry " whether operation order is correct ", otherwise finishes, and indicates in remarks column and finishes reason; Eject prompting frame, "Yes" is selected in inquiry " whether operating interval is correct "; In the situation that confirm necessary release, eject prompting frame, require the full-time people of contact error-unlocking prevention; When continuing operation after contact is agreed, eject prompting frame, show " the full-time people of error-unlocking prevention has or not agreement ", rehearse, point and check, confirm executable operations by re-starting after "Yes" to call out the names of those voted for while counting ballot-slips.
Described operating means comprises data processing module 1, data processing module is connected with the information interaction module 2 that is connected to display screen, capacitance contact board, data processing module is connected with operation order virtual printer module 3, data processing module is connected with finger print acquisition module 4, and supply module 5 provides power supply for above-mentioned module.

Claims (1)

1. one kind solidifies power transformation standard operation method, it is characterized in that: after receiving certain scheduling order, select corresponding operation order from the list of operating means display screen operation order, open; Select this operation scheduling of confirmation to issue an order, insert the people that issues an order, made us name; Show " operation beginning " button of corresponding scheduling order, by " operation beginning " button, automatically start the machine recording; The confirmation operation order has been examined and is qualified; The purpose that whether clearly operates that display screen is shown adds their confirmation, and Analysis about Dangerous Point and pre-control work are carried out in the display screen prompting; According to the display screen prompting, operator, guardian carry out fingerprint signature or cryptographic signatures; According to the display screen prompting, the guardian fills in the operation start time; Display screen ejects picture, the prompting simulation is checked, equipment operation on the prompting simulation drawing must operate in displacement, check end, prompting requires guardian, operator should jointly check the system operation mode after simulated operation, the operation purpose whether system wiring meets the scheduling operation task, and by ACK button; Display screen ejects picture, according to action type, and the preliminary work of prompting Work tool, operation key; As seen the picture of first operation item of display screen ejection operation ticket, other operation items but show implicit, can not operate, in operating process, the following of operation order should arrange less " unlocking operation " button of size, with the convenient release flow process problem that flows at any time; The display screen prompting " is called out the names of those voted for while counting ballot-slips and is rehearsed, points and check, confirm to carry out ", and guardian and operator complete to call out the names of those voted for while counting ballot-slips and rehearse, point and check, confirm implementation, and the guardian ticks operation before the serial number of operation item; Eject picture, confirm that according to prompting equipment operating puts in place; First operation item of operation order falls back on the back, and the picture of second operation item of ejection operation ticket, continue to carry out aforesaid operations in order; If run into the operation of not carrying out for a long time " working copy ", " unlocking operation " button that size is less ejects, and the INQUIRE statement of " whether needing release " occurs, and "No"---operates "Yes"---, and system enters the unlocking operation program; After overall operations finishes, eject prompting frame, require the equipment after reply operates once to check all sidedly, complete without leaking item to confirm operation, select confirmation equipment to be in normal condition; Display screen ejects and fills in the prompting frame of EO time, confirms after filling in; Display screen ejects the prompting frame of " report EO and concluding time to scheduling, recheck simultaneously the single job task, rehearsed by scheduling errorless ", presses " confirmation " key; Eject the prompting that requires to carry out relative recording; Eject the picture of " executed " Electronic Signature, carry out the Electronic Signature operation below operation order last column; If carried out unlocking operation in this task, also will eject the prompting of key being playbacked and carrying out relative recording; Finish recording, video recording, operation is completed; Described unlocking operation flow process is: the guardian is by "Yes", and system enters the unlocking operation program; Eject prompting frame, "Yes" is selected in inquiry " whether operation order is correct ", otherwise finishes, and indicates in remarks column and finishes reason; Eject prompting frame, "Yes" is selected in inquiry " whether operating interval is correct "; In the situation that confirm necessary release, eject prompting frame, require the full-time people of contact error-unlocking prevention; When continuing operation after contact is agreed, eject prompting frame, show " the full-time people of error-unlocking prevention has or not agreement ", rehearse, point and check, confirm executable operations by re-starting after "Yes" to call out the names of those voted for while counting ballot-slips.
CN201310078774.1A 2013-03-13 2013-03-13 Solidification power transformation specification operation method Active CN103177399B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310078774.1A CN103177399B (en) 2013-03-13 2013-03-13 Solidification power transformation specification operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310078774.1A CN103177399B (en) 2013-03-13 2013-03-13 Solidification power transformation specification operation method

Publications (2)

Publication Number Publication Date
CN103177399A true CN103177399A (en) 2013-06-26
CN103177399B CN103177399B (en) 2016-02-03

Family

ID=48637232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310078774.1A Active CN103177399B (en) 2013-03-13 2013-03-13 Solidification power transformation specification operation method

Country Status (1)

Country Link
CN (1) CN103177399B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104777808A (en) * 2015-03-27 2015-07-15 国家电网公司 Recording method for operating condition debugging of power station as well as record reading methods
CN108876655A (en) * 2018-06-04 2018-11-23 国网浙江省电力有限公司温州供电公司 A kind of power distribution network scheduling method for preventing misoperation containing micro-capacitance sensor
CN109213125A (en) * 2018-09-05 2019-01-15 长园共创电力安全技术股份有限公司 A kind of control method of operation task, device and equipment
CN112102527A (en) * 2020-09-14 2020-12-18 广东电网有限责任公司广州供电局 Power grid equipment operation method and device, computer equipment and storage medium
CN112687032A (en) * 2020-12-03 2021-04-20 郑勇进 Method and system for monitoring work task by using mechanical lock
CN112769628A (en) * 2021-02-08 2021-05-07 浙江浙能台州第二发电有限责任公司 Two-ticket online management implementation method comprising offline equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030013503A1 (en) * 2001-07-16 2003-01-16 Royal Thoughts, L.L.C. Intercom module for a wireless system
CN2567753Y (en) * 2002-06-24 2003-08-20 镇江市电工器材厂 On-line anti-mislatching operating system controlled by microcomputer
CN101226369A (en) * 2006-12-07 2008-07-23 三星电子株式会社 Fuser cleaning apparatus and method of operating a fuser cleaning device for use with an image forming device
CN102136759A (en) * 2011-01-10 2011-07-27 苏州工业园区金禾电气设备有限公司 All-direction monitoring and management method for switching operation or equipment routing inspection and examine and system
CN202275319U (en) * 2011-10-01 2012-06-13 洛宁供电公司 Transformer station switch operated voice repeater

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030013503A1 (en) * 2001-07-16 2003-01-16 Royal Thoughts, L.L.C. Intercom module for a wireless system
CN2567753Y (en) * 2002-06-24 2003-08-20 镇江市电工器材厂 On-line anti-mislatching operating system controlled by microcomputer
CN101226369A (en) * 2006-12-07 2008-07-23 三星电子株式会社 Fuser cleaning apparatus and method of operating a fuser cleaning device for use with an image forming device
CN102136759A (en) * 2011-01-10 2011-07-27 苏州工业园区金禾电气设备有限公司 All-direction monitoring and management method for switching operation or equipment routing inspection and examine and system
CN202275319U (en) * 2011-10-01 2012-06-13 洛宁供电公司 Transformer station switch operated voice repeater

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104777808A (en) * 2015-03-27 2015-07-15 国家电网公司 Recording method for operating condition debugging of power station as well as record reading methods
CN108876655A (en) * 2018-06-04 2018-11-23 国网浙江省电力有限公司温州供电公司 A kind of power distribution network scheduling method for preventing misoperation containing micro-capacitance sensor
CN109213125A (en) * 2018-09-05 2019-01-15 长园共创电力安全技术股份有限公司 A kind of control method of operation task, device and equipment
CN112102527A (en) * 2020-09-14 2020-12-18 广东电网有限责任公司广州供电局 Power grid equipment operation method and device, computer equipment and storage medium
CN112687032A (en) * 2020-12-03 2021-04-20 郑勇进 Method and system for monitoring work task by using mechanical lock
CN112687032B (en) * 2020-12-03 2022-07-05 郑勇进 Method and system for monitoring work task by using mechanical lock
CN112769628A (en) * 2021-02-08 2021-05-07 浙江浙能台州第二发电有限责任公司 Two-ticket online management implementation method comprising offline equipment
CN112769628B (en) * 2021-02-08 2022-11-04 浙江浙能台州第二发电有限责任公司 Two-ticket online management implementation method comprising offline device

Also Published As

Publication number Publication date
CN103177399B (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN103177399B (en) Solidification power transformation specification operation method
CN106611452B (en) Overhaul isolating closing lock system and method
CN101183251A (en) Electrical power system safety operation intelligent monitoring device and monitoring method thereof
CN103199455B (en) Solidification power transformation specification operation system
CN102591223B (en) Intelligentized diagnostic system of substation-operation operation tickets
CN103164159B (en) Solidification power transformation specification operation procedure touch working copy
CN103426215B (en) For door lock management-control method and the system of unexpected relief
CN104680634A (en) Maintenance isolation locking system and method
CN103034918A (en) Electric power safe production management system operating method
CN106059078A (en) Monitoring system for on/off state of flexible pressing plate for intelligent substation relay protection
CN105528264A (en) Anti-misoperation data recovery method and system
CN105119237A (en) Method of operating and checking under relay protection
CN111948957B (en) Control method, device and system of grounding device and storage medium
CN104598838B (en) A kind of random verification and provide trusted operating environment file store and edit methods
CN103295299A (en) Remote intelligent unlocking key management box
CN109508493A (en) A kind of application method based on BIM+ planar bar code technology in distribution debugging and maintenance
CN103631227A (en) Isolation method and isolation system
CN104092294A (en) Power grid dispatching operation intelligent monitoring system
CN202057767U (en) Standardized test operating system for relay protectors
CN103909748A (en) Printer and printing method
CN112749878A (en) Traceable safety education code management system
CN102353386B (en) Ground security detection device aiming at space camera
CN204791229U (en) Safety control system of power plant based on two -dimensional code and electron key
CN109508796A (en) A kind of Substation maintenance intelligent management apapratus
CN107733856B (en) Constant value management and control integrated platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant