CN103231483A - Foaming and solidifying limiting device and technology for sandwich polyurethane (PU) building block production line - Google Patents

Foaming and solidifying limiting device and technology for sandwich polyurethane (PU) building block production line Download PDF

Info

Publication number
CN103231483A
CN103231483A CN2013101846183A CN201310184618A CN103231483A CN 103231483 A CN103231483 A CN 103231483A CN 2013101846183 A CN2013101846183 A CN 2013101846183A CN 201310184618 A CN201310184618 A CN 201310184618A CN 103231483 A CN103231483 A CN 103231483A
Authority
CN
China
Prior art keywords
building block
foaming
conveying mechanism
section conveying
location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101846183A
Other languages
Chinese (zh)
Inventor
马道钰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENJIANG AOLI POLYURETHANE MACHINERY CO Ltd
Original Assignee
ZHENJIANG AOLI POLYURETHANE MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENJIANG AOLI POLYURETHANE MACHINERY CO Ltd filed Critical ZHENJIANG AOLI POLYURETHANE MACHINERY CO Ltd
Priority to CN2013101846183A priority Critical patent/CN103231483A/en
Publication of CN103231483A publication Critical patent/CN103231483A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a foaming and solidifying limiting device and a technology for a sandwich polyurethane (PU) building block production line and belongs to building block production equipment. The device is characterized by being provided with upright columns, a beam, grid frames and limiting rollers. The technology is characterized by comprising the following steps of: 1) mounting, wherein the periphery of a roller body at the lower end of each limiting roller is tightly attached to a non-foaming adhesive side surface on the upper part of a basic building block or a veneer building block, and a distance between the limiting rollers on the same grid frame is smaller than the length of each building block; 2) debugging, wherein a foaming process of a foamed material which is not poured at the first time is started from the time that the foamed material enters the start end of the foaming and solidifying limiting device, and the foaming process is finished at the tail end of the foaming and solidifying limiting device; and 3) operating, wherein the tension which is produced by foaming swelling of the foamed material on the inner side surfaces of the basic building block and the veneer building block which are oppositely upright on two sides is balanced by clamping force at the periphery of the roller body of each limiting roller tightly attached to the non-foaming adhesive side surface on the upper part of the basic building block or the veneer building block. Therefore, the basic building block and the veneer building block are limited, and the size precision of a sandwich PU building block is guaranteed.

Description

Foamed solidification stopping means and the technology of sandwich PU building block production line
Technical field: the invention belongs to production equipment and the technology of building block, particularly a kind of foamed solidification stopping means and technology of sandwich PU building block production line.
Background technology: prior art document 1 Chinese patent application publication No. CN 102628303A discloses a kind of air entrained concrete sandwich polyurethane foam plastics building block continuous producing method, wherein " technical scheme that realizes the object of the invention is: a kind of air entrained concrete sandwich polyurethane foam plastics building block continuous producing method; the common process batch production concrete segment that manufactures a finished product is characterized in that also comprising following series-operation:
Line procedures in A, the building block: neatly lie against on the roller path the basic building block of finished product concrete and facial ornament building block in twos;
Operation is erect in B, building block upset: the above-mentioned finished product concrete segment that neatly lies against in twos on the roller path, overturn accordingly in twos 90 ° through switching mechanism, and become in twos and relative thirty years of age two line up the product concrete segment;
Spacing is adjusted operation between C, the two row's building blocks: a fixing wherein row is adopted in the spacing adjustment between the above-mentioned relative thirty years of age finished product concrete segment in twos, only adjust relative thirty years of age another and line up the position of product concrete segment, make it along moving perpendicular to the involutory in-plane of blockhouse through the spacing guiding mechanism, make in twos spacing between the relative thirty years of age finished product concrete segment adjust to the distance of technological requirement;
D, leakproof film place mat operation: when the opposed building block in twos of adjusting to technological requirement when spacing continues to run on the chain-plate type belt feeder forward, under unreeling machine cooperates, at chain-plate type belt feeder upper surface place mat plastic sheeting, this area mat plastic sheeting extends to foaming---curing area, and the other end of this area mat plastic sheeting draws rolling by winder then;
E, layering foamed process repeatedly: when the opposed building block in twos of adjusting to technological requirement when spacing continues to run to forward foaming district on the chain-plate type belt feeder, use quantitative pouring apparatus, between relative thirty years of age in twos building block, account for half the first time cast that the polyurethane foam raw material is cast total amount; After cast for the first time, carry out the cast second time, or repeatedly cast;
F, foaming layer curing process: cast finish after, adopt hot blast to solidify to the polyurethane foam layer, make in twos relative thirty years of age two to line up the product concrete segment and be combined into integral body through foaming layer;
G, be separated into the piece operation: use separator allow to be combined into whole two through foaming layer and line up the product concrete segment, be separated into by basic building block and facial ornament building block and between be compounded with the sandwich building block of monolithic of polyurethane foam layer;
H, sandwich building block down line process: adopt to count automatically and pile up bunching device, block-by-block rolls off the production line sandwich building block and piles up stacking behind counting.”
Though relate in the prior art document 1 " the foaming layer curing process: cast finish after, adopt hot blast to solidify to the polyurethane foam layer, make in twos relative thirty years of age two to line up the product concrete segment and be combined into integral body through foaming layer; Yet "; unexposed or relate in the foaming layer solidification process spacing to the basic building block, the top, the bonding side of non-foaming of faced block, the bottom that are erected between the location-plate; as to prevent from the foaming and intumescing process of polyurethane sandwich layer foamed material, occurring foamed solidification stopping means and the technology of displacement, to cause to be difficult to guarantee that the accurate dimension that reaches technological requirement is combined into sandwich PU building block.
Need to prove the life idea of pursuing green low-carbon along with people, the heat-insulating construction material of energy savings will substitute existing construction material, the building block of air entrained concrete sandwich polyurethane foam plastics also claims the building block of concrete sandwich hard polyurethane foam to arise at the historic moment.This is the building block that the sandwich polyurethane foam plastics constitutes between a kind of basic building block of finished product concrete of, rectangular shape identical or different by thickness and the facial ornament building block.Because the polyurethane foam plastics laminboard layer has good heat insulation effect, so this is a kind of novel building building block that will substitute existing building block.Its production method also rests on step making by hand the stage at present, prior art document 1 discloses a kind of air entrained concrete sandwich polyurethane foam plastics building block continuous producing method, but implement its method concrete sandwich hard polyurethane foam building block production line relevant device and technology still is not reported or open.This shows, study and design a kind of foamed solidification stopping means and technology of concrete sandwich hard polyurethane foam building block production line, the foamed solidification stopping means and the technology that are called for short sandwich PU building block production line are necessary.
PU is the abbreviation of polyurethanes Polyurethane, and Chinese polyurethanes by name is called for short polyurethane." PU " in the subject name of the present invention " foamed solidification stopping means and the technology of sandwich PU building block production line " refers in particular to polyurethane foam plastics, as shown in Figure 3, " sandwich PU building block " refer in particular to by isometric, wide, the uniform thickness on polyurethane hard bubble sandwiched 01 both sides or not the basic building block 02 of the rectangular shape of uniform thickness and facial ornament building block 03 through polyurethane foam high strength the air entrained concrete sandwich polyurethane foam plastics building block that is combined into.
Summary of the invention: the objective of the invention is to overcome the deficiencies in the prior art, study and design a kind of foamed solidification stopping means and technology of sandwich PU building block production line, spacing to the basic building block, the top, the bonding side of non-foaming of faced block, the bottom that are erected between the location-plate practically, preventing in the foaming and intumescing process that constitutes polyurethane sandwich layer foamed material, occurring displacement, thereby guarantee to be combined into sandwich PU building block with the accurate dimension of technological requirement.
The technical scheme that realizes the object of the invention is: a kind of foamed solidification stopping means of sandwich PU building block production line, comprise the curing section conveying mechanism after the transition cylinder is connected in foaming section conveying mechanism, solidify the section conveying mechanism and include chain plate conveyor belt and 2 groups of involutory location-plates that are symmetrically fixed on the carrier bar, 2 groups of involutory location-plates are to be that 2 interior location-plates that symmetry axis is fixed in the carrier bar centre are formed with 2 relative therewith limit location-plates with the chain plate conveyor belt center line, it is characterized in that design has: vertically be fixed in the column that first half solidifies section conveying mechanism both sides, be positioned at the column top, be connected across the crossbeam that solidifies section conveying mechanism top, be parallel to and solidify section conveying mechanism chain plate conveyor belt, be connected across the bar frame on the crossbeam, the orderly fixed interval in upper end is on the bar frame, and 2 groups of limiting rolls of 2 groups of involutory location-plates are vertically stretched in the lower end.
A kind of spacing technology of foamed solidification of sandwich PU building block production line is characterized in that comprising the steps:
1), installs: according to the foamed solidification technological requirement of sandwich PU building block production line, rise on the initiating terminal both sides of solidifying the section conveying mechanism, between the curing section conveying mechanism medium position both sides that foaming process is near completion to the foamed solidification technology, initiating terminal column and the terminal column of foamed solidification stopping means is installed; At initiating terminal column and terminal column top cross-over connection crossbeam, between crossbeam, be parallel to and solidify a section conveying mechanism conveyer belt connection strap frame, considering that the bar frame must be parallel to fully solidifies a section conveying mechanism conveyer belt, sets up column at bar frame middle part and crossbeam supports; In order the compartment of terrain on the bar frame with the fixing limiting roll of nut, limiting roll must satisfy its bottom when installing roll body vertically stretches to the corresponding location-plate that solidifies on the section conveying mechanism conveyer belt, and when location-plate is located simultaneously basic building block, faced block bottom, in view of this roll body periphery of its bottom is formed the limit positive stop strip frame of bar frame, interior positive stop strip frame orderly fixing limiting roll on the installation site on the crossbeam must allow it and is satisfied above-mentioned condition near the bonding side of non-foaming on basic building block or faced block top; Simultaneously, be fixed on the mutual spacing of same the limiting roll on the frame in order less than the length of building block or facing building block;
2), debugging: after the installation, open and try out the building block eedle threader of whole production line synchronously, preheating device before the foaming, leakproof film shop receiving apparatus, the foamed material apparatus for pouring, foaming heater and the preheating section conveying mechanism that cooperates with it, foaming section conveying mechanism, solidify the section conveying mechanism, the speed of service of debugging between them reaches technological requirement: casting complete between the basic building block of involutory setting and the facing building block, the foamed material of the formation polyurethane sandwich layer that is foaming to be solidified, the foaming process of the foamed material that positive right and wrong are poured into a mould first when entering foamed solidification stopping means initiating terminal of the present invention begins, move to foamed solidification stopping means of the present invention when terminal foaming process finish;
2), operation: formally open the building block eedle threader of whole production line successively synchronously, preheating device before the foaming, leakproof film shop receiving apparatus, the foamed material apparatus for pouring, foaming heater and the preheating section conveying mechanism that cooperates with it, foaming section conveying mechanism, solidify the section conveying mechanism with the speed operation of technological requirement, the foamed material of the formation polyurethane sandwich layer that foams to be solidified of casting complete between the facing building block of basic building block and involutory setting, the foaming process of the foamed material that positive right and wrong are poured into a mould first when entering foamed solidification stopping means initiating terminal of the present invention begins, move to foamed solidification stopping means of the present invention when terminal foaming process finish, the foamed material foaming and intumescing produces in this process to basic building block and the facing building block medial surface tension force of the involutory setting on both sides, by the chucking power balance near the limiting roll roll body periphery of the bonding side of non-foaming, the top of basic building block or faced block, thereby the collaborative location-plate that solidifies on the section conveying mechanism conveyer belt, from being erected at the basic building block between the location-plate, the top, the bonding side of non-foaming of faced block, the bottom is spacing, guarantees the dimensional accuracy of sandwich PU building block.
Purpose of the present invention also adopts following further technical measures to realize:
The described first half that vertically is fixed in solidifies section column on conveying mechanism both sides, the initiating terminal column that refers to the foamed solidification stopping means is fixed in the leading section that solidifies the section conveying mechanism, and the terminal column of foamed solidification stopping means is fixed in the middle part of solidifying the section conveying mechanism.The technique effect of this design is: for reaching between the facing building block of basic building block and involutory setting the foamed material of the formation polyurethane sandwich layer that foams to be solidified of casting complete, the foaming process of the foamed material that positive right and wrong are poured into a mould first when entering foamed solidification stopping means initiating terminal of the present invention begins, move to foamed solidification stopping means of the present invention when terminal foaming process finish.
Described frame is made up of with 2 relative therewith limit positive stop strip framves 2 interior positive stop strip framves of 2 groups of involutory configurations, corresponds respectively to 2 interior location-plates and 2 relative therewith limit location-plates.
Described limiting roll includes: the upper end is socketed on the bearing on the roll shaft through the roll shaft of nut vertical fixing on the bar frame, is connected to the ring-type roll body of bearing periphery, the ring spacer that transfer roll body upper-lower position is used.The technique effect of this design is: the position of using the height transfer roll body of packing ring, make it to realize near the bonding side of non-foaming, the top of basic building block or faced block, and when building block or faced block move forward along with a curing section conveying mechanism conveyer belt substantially, be connected to the ring-type roll body of bearing periphery neatly along with rotation, and spacing to the bonding side of non-foaming, the top of basic building block or faced block in rotation process.
Be positioned with between described 2 groups of involutory location-plates: the basic building block of location-plate in 2 groups of bottoms are adjacent to, the bottom of involutory setting be adjacent to the facing building block of limit location-plate and therebetween casting complete foam to be solidified polyurethane hard bubble sandwiched.
Distance between the roll body periphery of every group of 2 limiting rolls that are involutory of described 2 groups of limiting rolls equals the basic building block that every group of bottom is adjacent to interior location-plate, and the facing building block that the bottom of involutory setting is adjacent to the limit location-plate reaches therebetween the polyurethane hard bubble sandwiched thickness sum to be solidified that foams of casting complete.The roll body lower surface of described each limiting roll and vertical interval between the chain plate conveyor belt upper surface of location-plate is fixedly arranged less than the height of basic building block or facing building block but greater than the height of location-plate.The orderly spacing distance of the adjacent limiting roll of the orderly fixed interval in described upper end on same frame on the bar frame is less than the length of basic building block or facing building block.The technique effect of above-mentioned three designs is: the foamed material of the formation polyurethane sandwich layer that foams to be solidified of casting complete between the facing building block of basic building block and involutory setting, the foaming process of the foamed material that positive right and wrong are poured into a mould first when entering foamed solidification stopping means of the present invention, the foamed material foaming and intumescing produces in this process to basic building block and the facing building block medial surface tension force of the involutory setting on both sides, by the chucking power balance near the limiting roll roll body periphery of the bonding side of non-foaming, the top of basic building block or faced block, thereby the collaborative location-plate that solidifies on the section conveying mechanism conveyer belt, from being erected at the basic building block between the location-plate, the top, the bonding side of non-foaming of faced block, lower limit displacement does not appear in the foaming and intumescing process of polyurethane sandwich layer foamed material, be combined into sandwich PU building block with the accurate dimension that guarantees technological requirement.
The foamed solidification stopping means of the sandwich PU building block production line that the invention process obtains, in conjunction with the spacing technology of foamed solidification, through on probation, spacing to the top, the bonding side of non-foaming that is erected at basic building block between the location-plate, faced block practically, preventing in the foaming and intumescing process that constitutes polyurethane sandwich layer foamed material, occurring displacement, thereby guarantee to be combined into sandwich PU building block with the accurate dimension of technological requirement.
Description of drawings: Fig. 1 is the schematic diagram that meets thematic structure of the present invention; Fig. 2 is the side schematic view that meets thematic structure of the present invention; Fig. 3 is the structural representation of sandwich PU building block; Fig. 4 is the side schematic view of foamed solidification stopping means of the present invention; Fig. 5 is the schematic top plan view of foamed solidification stopping means of the present invention; Fig. 6 is the structural representation of limiting roll in the foamed solidification stopping means of the present invention.
The specific embodiment: for technological means, creation characteristic that the present invention is realized, reach purpose and effect and understand and understand, further specify the present invention below in conjunction with concrete diagram:
As Fig. 1,2,4, shown in 5, a kind of foamed solidification stopping means of sandwich PU building block production line, comprise the curing section conveying mechanism 1 after transition cylinder 05 is connected in foaming section conveying mechanism 05, solidify the section conveying mechanism and include chain plate conveyor belt 11 and 2 groups of involutory location-plates 12 that are symmetrically fixed on the carrier bar, 2 groups of involutory location-plates are to be that 2 interior location-plates 121 that symmetry axis is fixed in the carrier bar centre are formed with relative therewith 2 limit location-plates 122 with the chain plate conveyor belt center line, it is characterized in that design has: vertically be fixed in the column 2 that first half solidifies section conveying mechanism both sides, be positioned at the column top, be connected across the crossbeam 3 that solidifies section conveying mechanism top, be parallel to and solidify section conveying mechanism chain plate conveyor belt, be connected across the bar frame 4 on the crossbeam, the orderly fixed interval in upper end is on the bar frame, and 2 groups of limiting rolls 5 of 2 groups of involutory location-plates are vertically stretched in the lower end.
As shown in Figure 1, 2, the described first half that vertically is fixed in solidifies section column 2 on conveying mechanism both sides, the initiating terminal column that refers to the foamed solidification stopping means is fixed in the leading section that solidifies section conveying mechanism 1, and the terminal column of foamed solidification stopping means is fixed in the middle part of solidifying the section conveying mechanism.
Shown in Fig. 1,5, described frame 2 is made up of with 2 relative therewith limit positive stop strip framves 42 2 interior positive stop strip framves 41 of 2 groups of involutory configurations, corresponds respectively to 2 interior location- plates 121 and 2 relative therewith limit location-plates 122.
Shown in Fig. 6,1,4,5, described limiting roll 5 includes: the upper end is socketed on the bearing 52 on the roll shaft through the roll shaft 51 of nut vertical fixing on bar frame 4, is connected to the ring-type roll body 53 of bearing periphery, the ring spacer 54 that transfer roll body upper-lower position is used.
Shown in Fig. 1,3, be positioned with between described 2 groups of involutory location-plates 12: the basic building block 02 of location-plate 121 in 2 groups of bottoms are adjacent to, the bottom of involutory setting be adjacent to the facing building block 03 of limit location-plate 122 and therebetween casting complete foam to be solidified polyurethane hard bubble sandwiched 01.
As shown in Figure 1, distance between roll body 53 peripheries of every group of 2 limiting rolls that are involutory of described 2 groups of limiting rolls 5 equal every group of bottom be adjacent in the basic building block 02 of location-plate 121, the bottom of involutory setting is adjacent to the facing building block 03 of limit location-plate 122 and to be solidified polyurethane hard bubble sandwiched 01 the thickness sum of foaming of casting complete therebetween.
Shown in Fig. 1,3, roll body 53 lower surfaces of described each limiting roll 5 and vertical interval between chain plate conveyor belt 11 upper surfaces of location-plate 12 is fixedly arranged less than the height of basic building block 02 or facing building block 03 but greater than the height of location-plate.
Shown in Fig. 1,3,4,5, the orderly fixed interval in described upper end is in the length of the orderly spacing distance of the adjacent limiting roll 5 on the bar frame 4 on the bar frame less than basic building block 02 or facing building block 03.
More than show and described basic principle of the present invention, principal character and advantage of the present invention.The technical staff of the industry should understand, and the present invention is not comprised the restriction of the foregoing description of embodiment; Without departing from the spirit and scope of the present invention, the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention; The claimed scope of the present invention is defined by appending claims and equivalent thereof.

Claims (9)

1. the foamed solidification stopping means of a sandwich PU building block production line, comprise through transition cylinder (05) and be connected in foaming section conveying mechanism (04) curing section conveying mechanism (1) afterwards, solidifying the section conveying mechanism includes chain plate conveyor belt (11) and is symmetrically fixed on 2 groups of involutory location-plates (12) on the carrier bar, 2 groups of involutory location-plates are to be that symmetry axis is fixed in 2 interior location-plates (121) in carrier bar centre and relative therewith 2 limit location-plates (122) are formed with the chain plate conveyor belt center line, it is characterized in that design has: vertically be fixed in the column (2) that first half solidifies section conveying mechanism both sides, be positioned at the column top, be connected across the crossbeam (3) that solidifies section conveying mechanism top, be parallel to and solidify section conveying mechanism chain plate conveyor belt, be connected across the bar frame (4) on the crossbeam, the orderly fixed interval in upper end is on the bar frame, and 2 groups of limiting rolls (5) of 2 groups of involutory location-plates are vertically stretched in the lower end.
2. foamed solidification stopping means according to claim 1, it is characterized in that the described column (2) that first half solidifies section conveying mechanism both sides that vertically is fixed in, the initiating terminal column that refers to the foamed solidification stopping means is fixed in the leading section that solidifies section conveying mechanism (1), and the terminal column of foamed solidification stopping means is fixed in the middle part of solidifying the section conveying mechanism.
3. foamed solidification stopping means according to claim 1, it is characterized in that described frame (4) be made up of with relative therewith 2 limit positive stop strip framves (42) 2 interior positive stop strip framves (41) of 2 groups of involutory configurations, correspond respectively to 2 interior location-plates (121) and relative therewith 2 limit location-plates (122).
4. foamed solidification stopping means according to claim 1, it is characterized in that described limiting roll (5) includes: the upper end is through the roll shaft (51) of nut vertical fixing on bar frame (4), be socketed on the bearing (52) on the roll shaft, be connected to the ring-type roll body (53) of bearing periphery, the ring spacer (54) that transfer roll body upper-lower position is used.
5. foamed solidification stopping means according to claim 1, it is characterized in that being positioned with between described 2 groups of involutory location-plates (12): 2 groups of bottoms are adjacent to the basic building block (02) of interior location-plate (121), and the facing building block (03) that the bottom of involutory setting is adjacent to limit location-plate (122) reaches therebetween foam polyurethane hard bubble sandwiched (01) to be solidified of casting complete.
6. according to claim 1, or 4, or 5 described foamed solidification stopping means, it is characterized in that the distance between roll body (53) periphery of every group of 2 limiting rolls that are involutory of described 2 groups of limiting rolls (5) equals the basic building block (02) that every group of bottom is adjacent to interior location-plate (121), the bottom of involutory setting is adjacent to the facing building block (03) of limit location-plate (122) and the thickness sum of foam polyurethane hard bubble sandwiched (01) to be solidified of casting complete therebetween.
7. according to claim 1, or 4, or 5 described foamed solidification stopping means, it is characterized in that roll body (53) lower surface of described each limiting roll (5) and vertical interval between chain plate conveyor belt (11) upper surface of location-plate (12) is fixedly arranged less than the height of basic building block (02) or facing building block (03) but greater than the height of location-plate.
8. according to claim 1, or 4, or 5 described foamed solidification stopping means, it is characterized in that adjacent limiting roll (5) the orderly spacing distance on bar frame of the orderly fixed interval in described upper end on same frame is less than the length of basic building block (02) or facing building block (03).
9. the spacing technology of foamed solidification of a sandwich PU building block production line is characterized in that comprising the steps:
1), installs: according to the foamed solidification technological requirement of sandwich PU building block production line, rise on the initiating terminal both sides of solidifying the section conveying mechanism, between the curing section conveying mechanism medium position both sides that foaming process is near completion to the foamed solidification technology, initiating terminal column and the terminal column of foamed solidification stopping means is installed; At initiating terminal column and terminal column top cross-over connection crossbeam, between crossbeam, be parallel to and solidify a section conveying mechanism conveyer belt connection strap frame, considering that the bar frame must be parallel to fully solidifies a section conveying mechanism conveyer belt, sets up column at bar frame middle part and crossbeam supports; In order the compartment of terrain on the bar frame with the fixing limiting roll of nut, limiting roll must satisfy its bottom when installing roll body vertically stretches to the corresponding location-plate that solidifies on the section conveying mechanism conveyer belt, and when location-plate is located simultaneously basic building block, faced block bottom, in view of this roll body periphery of its bottom is formed the limit positive stop strip frame of bar frame, interior positive stop strip frame orderly fixing limiting roll on the installation site on the crossbeam must allow it and is satisfied above-mentioned condition near the bonding side of non-foaming on basic building block or faced block top; Simultaneously, be fixed on the mutual spacing of same the limiting roll on the frame in order less than the length of building block or facing building block;
2), debugging: after the installation, open and try out the building block eedle threader of whole production line synchronously, preheating device before the foaming, leakproof film shop receiving apparatus, the foamed material apparatus for pouring, foaming heater and the preheating section conveying mechanism that cooperates with it, foaming section conveying mechanism, solidify the section conveying mechanism, debug the speed of service between them and reach technological requirement: casting complete between the basic building block of involutory setting and the facing building block, the foamed material of the formation polyurethane sandwich layer that is foaming to be solidified, the foaming process of the foamed material that positive right and wrong are poured into a mould first when entering foamed solidification stopping means initiating terminal of the present invention begins, move to foamed solidification stopping means of the present invention when terminal foaming process finish;
3), operation: formally open the building block eedle threader of whole production line successively synchronously, preheating device before the foaming, leakproof film shop receiving apparatus, the foamed material apparatus for pouring, foaming heater and the preheating section conveying mechanism that cooperates with it, foaming section conveying mechanism, solidify the section conveying mechanism with the speed operation of technological requirement, the foamed material of the formation polyurethane sandwich layer that foams to be solidified of casting complete between the facing building block of basic building block and involutory setting, the foaming process of the foamed material that positive right and wrong are poured into a mould first when entering foamed solidification stopping means initiating terminal of the present invention begins, move to foamed solidification stopping means of the present invention when terminal foaming process finish, the foamed material foaming and intumescing produces in this process to basic building block and the facing building block medial surface tension force of the involutory setting on both sides, by the chucking power balance near the limiting roll roll body periphery of the bonding side of non-foaming, the top of basic building block or faced block, thereby the collaborative location-plate that solidifies on the section conveying mechanism conveyer belt, from being erected at the basic building block between the location-plate, the top, the bonding side of non-foaming of faced block, the bottom is spacing, guarantees the dimensional accuracy of sandwich PU building block.
CN2013101846183A 2013-05-15 2013-05-15 Foaming and solidifying limiting device and technology for sandwich polyurethane (PU) building block production line Pending CN103231483A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101846183A CN103231483A (en) 2013-05-15 2013-05-15 Foaming and solidifying limiting device and technology for sandwich polyurethane (PU) building block production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101846183A CN103231483A (en) 2013-05-15 2013-05-15 Foaming and solidifying limiting device and technology for sandwich polyurethane (PU) building block production line

Publications (1)

Publication Number Publication Date
CN103231483A true CN103231483A (en) 2013-08-07

Family

ID=48879586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101846183A Pending CN103231483A (en) 2013-05-15 2013-05-15 Foaming and solidifying limiting device and technology for sandwich polyurethane (PU) building block production line

Country Status (1)

Country Link
CN (1) CN103231483A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106149508A (en) * 2015-04-21 2016-11-23 李宇轩 The preparation method of the precast type polyurethane skin layer on athletic ground and the preparation method on athletic ground thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4761256A (en) * 1987-01-27 1988-08-02 Eastman Kodak Company Method for producing microcellular foamed plastic material with smooth integral skin
TWI275470B (en) * 2005-05-02 2007-03-11 Shiou-Rung Jiang Conveying mechanism of foam forming machine
CN101474842A (en) * 2009-01-24 2009-07-08 南京红宝丽股份有限公司 Method for improving filling property of rigid polyurethane foam plastics
CN203236644U (en) * 2013-05-15 2013-10-16 镇江奥力聚氨酯机械有限公司 Foaming and solidifying limit device of sandwiched PU (Poly Urethane) building block production line

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4761256A (en) * 1987-01-27 1988-08-02 Eastman Kodak Company Method for producing microcellular foamed plastic material with smooth integral skin
TWI275470B (en) * 2005-05-02 2007-03-11 Shiou-Rung Jiang Conveying mechanism of foam forming machine
CN101474842A (en) * 2009-01-24 2009-07-08 南京红宝丽股份有限公司 Method for improving filling property of rigid polyurethane foam plastics
CN203236644U (en) * 2013-05-15 2013-10-16 镇江奥力聚氨酯机械有限公司 Foaming and solidifying limit device of sandwiched PU (Poly Urethane) building block production line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106149508A (en) * 2015-04-21 2016-11-23 李宇轩 The preparation method of the precast type polyurethane skin layer on athletic ground and the preparation method on athletic ground thereof
CN106149508B (en) * 2015-04-21 2019-05-07 李宇轩 The preparation method of the precast type polyurethane skin layer on athletic ground

Similar Documents

Publication Publication Date Title
CN102628303B (en) Continuous production method for aerated concrete sandwiched polyurethane foam building blocks
CN104827548B (en) Pressing forming device and method for building wallboards
CN104960139A (en) Die charging mechanism and charging method for oblique injection molding machine
CN203236644U (en) Foaming and solidifying limit device of sandwiched PU (Poly Urethane) building block production line
CN101456209A (en) Conveyer-belt type block molding device for continuous producing gypsum block
CN103950211A (en) Molding device and molding method for hat-shaped composite material stringer blank
CN103231483A (en) Foaming and solidifying limiting device and technology for sandwich polyurethane (PU) building block production line
CN103231484A (en) Foamed material pouring device and technology for sandwich polyurethane (PU) building block production line
CN203236577U (en) Positioning conveying mechanism for sandwiched PU building block production line
CN204327154U (en) A kind of moving die plate system for tread air channel
CN203237773U (en) Separating and blocking device for sandwich polyurethane (PU) building block production line
CN103231442A (en) Positioning delivery mechanism and technology for sandwich polyurethane (PU) building block production line
CN205835614U (en) A kind of toilet composite floor board bricks die
CN101456210A (en) Conveyer-belt type block molding device for continuous producing incubation block
CN203622631U (en) Wallboard production line
CN203158870U (en) Leakproof film retraction device of sandwich PU (polyurethane) building block production line
CN205685781U (en) A kind of Chinese herbal piece pressing machine
CN206083459U (en) Ring gear hot extrusion die
CN103231482A (en) Foaming heating device and technology for sandwich polyurethane (PU) building block production line
CN107791515A (en) A kind of compound light solidifying quick forming device of continuous fiber and photosensitive resin
CN201317042Y (en) Novel brick molding machine
CN209141243U (en) A kind of multiple field foaming vulcanizer
CN106239853A (en) A kind of rubber insulators sulfuration injection device
CN203639838U (en) Self-propelled movable mold frame pre-camber adjusting device
CN201056022Y (en) High thermal insulation building block shaping mold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130807