CN104070602A - Composite layer telegraph pole manufacturing and maintaining process - Google Patents
Composite layer telegraph pole manufacturing and maintaining process Download PDFInfo
- Publication number
- CN104070602A CN104070602A CN201410279373.7A CN201410279373A CN104070602A CN 104070602 A CN104070602 A CN 104070602A CN 201410279373 A CN201410279373 A CN 201410279373A CN 104070602 A CN104070602 A CN 104070602A
- Authority
- CN
- China
- Prior art keywords
- epoxy resin
- electric pole
- hollow lever
- layer
- poured
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B21/00—Methods or machines specially adapted for the production of tubular articles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/12—Structures made of specified materials of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements
Abstract
The invention discloses a composite layer telegraph pole manufacturing and maintaining process which includes the following steps: A. first manufacturing a common steel bar cement hollow rod body, and then pouring epoxy resin in the hollow rod body; B. moving an obtained product into a high pressure operation chamber, pouring a cement layer on an epoxy resin pouring layer in a full covering mode to enable the epoxy resin pouring layer to be located in the high pressure closed space between the cement layer and the hollow rod body; C. conducting drilling operation on the cement layer at the top end or the bottom end of a telegraph pole in a circle area and communicating the inside of the hollow rod body and the external atmosphere. The telegraph pole has the advantage of natural maintaining. When the hollow rod body is cracked due to winter low temperature and day and night temperature difference change, the epoxy resin pouring layer on the outside of the hollow rod body permeates cracks naturally and slowly. Especially when the temperature rises in the summer, the epoxy resin completely permeates the cracks to repair the rod body, and the natural maintaining effect that the hollow rod body is cracked in winter and repaired in summer is achieved.
Description
Technical field
The present invention relates to electrical equipment technical field, especially a kind of high strength, composite bed electric pole prepare maintaining process.
Background technology
Concrete wire pole belongs to reinforced concrete structure.Concrete tensile strength is about 1/10th of compression strength.Concrete wire pole when load, be subject to the effect of tension in defeated, distribution line.The pulling force producing spreads all over each position of concrete wire pole, and whole electric pole all belongs to tensile region.So concrete wire pole the whole body all needs to put people's reinforcing bar, generally with round steel or screw-thread steel.Armored concrete can ftracture owing to having produced tension in maintenance with during shrinking.If obtain meticulous maintenance, both can prevent cracking, can improve again the qualification rate of product.Although present problem is aborning completely according to technological procedure well construction and maintenance, product can be also all qualified through strict inspection before dispatching from the factory, but in use still there will be crackle, and the degree of depth of crackle, width and length can get over along with the increase of service life seriously.Especially approaching ground level below approximately one meter in this segment distance, the degree of crackle is more serious.What have has even been covered with a large amount of iron rust around crackle.
In the area having, winter minimum temperature can reach subzero 30-40 degree sometimes, and day and night temperature can reach more than 15 DEG C.Under such weather conditions, because the rate of expanding with heat and contract with cold of reinforcing bar and cement is different, be easy to because stress difference cracks, the general undulate of crackle instead of rectilinear reason, be owing to containing a large amount of sands and stone in concrete, the adhesion on these sands and stone surface is generally less than the adhesion of sand and stone inside.Concrete is in the time of stressed cracking, and crackle must appear at the surface of sand and stone, seldom appears at the centre of sand and stone, and naturally and understandably crackle can be only also waveform instead of rectilinear.In addition, the moisture infiltrating in crackle will freeze at night, turned to again by day water.In this variation, because the volume of the volume ratio water of ice is large, thus when becoming ice, water will make to external world one time volumetric work, volumetric work of every work, and crackle will be broadened a bit, in the course of time, has greatly shortened the service life of concrete wire pole.
Summary of the invention
The technical problem to be solved in the present invention is to provide the maintaining process of preparing of a kind of high strength, composite bed electric pole.
For solving the problems of the technologies described above, the technical solution used in the present invention is as follows.
The preparation technology of composite bed electric pole, the method comprises the steps:
A, first prepare regular reinforcement cement hollow lever, then at hollow lever upper epoxy resin;
B, steps A products obtained therefrom move into operation with high pressure chamber, controlling the indoor air pressure of operation with high pressure is 0.5-5Mpa, under hyperbaric environment on poured with epoxy resin layer all standing joints cement layer, top and the bottom of this cement layer complete parcel poured with epoxy resin layer and hollow lever, be in the high-pressure sealed space between cement layer and hollow lever poured with epoxy resin layer;
Bore operation is carried out in C, region, the center of circle on the cement layer of electric pole top or bottom, get through hollow lever inner with being communicated with of ambient atmosphere.
As a preferred technical solution of the present invention, the thickness of the thickness of described cement layer, poured with epoxy resin layer, the thickness three's of hollow lever ratio is 2:(0.4-0.7): (7.5-10).
As a preferred technical solution of the present invention, the ratio between cement layer thickness, poured with epoxy resin layer thickness, hollow lever thickness three is 2:0.6:8.4.
As a preferred technical solution of the present invention, described cement layer, poured with epoxy resin layer, hollow lever three's gross thickness is determined according to following formula, unit employing centimetre:
Wherein, a year maximum temperature difference is the annual temperature difference maximum that electric pole makes land used, unit employing DEG C; Annual minimum temperature is the lowest temperature in winter that electric pole makes land used, and this numerical value, if positive number is unified to be designated as 1, as is negative, is got its absolute value, unit employing DEG C; The design height that the whole height of electric pole is electric pole, unit is centimetre; Body of rod thickness optimization constant value is 160000-170000.
As a preferred technical solution of the present invention, the value of described body of rod thickness optimization constant is 162000-168000.
As a preferred technical solution of the present invention, the value of described body of rod thickness optimization constant is 165000.
As a preferred technical solution of the present invention, in step B, the indoor air pressure of described operation with high pressure is 2Mpa.
As a preferred technical solution of the present invention, in step C, the aperture of bore operation gained intercommunicating pore is 3-10mm.
As a preferred technical solution of the present invention, in step C, the aperture of bore operation gained intercommunicating pore is 5mm.
The maintaining process of above-mentioned composite bed electric pole, its main points comprise:
A, first take natural curing technique according to the design feature of electric pole, it mainly comprises: 1. cement layer and poured with epoxy resin layer be to playing temperature buffer effect as the hollow lever of main stress mechanism, avoid hollow lever at low temperature and when day and night difference variation is excessive because the stress difference of internal water silt particle grain and reinforcing bar cracks; 2. along with the growth of service life, winter low temperature and day and night difference variation change while finally causing cracking hollow lever internal stress, the poured with epoxy resin layer in hollow lever outside slowly infiltrates crackle naturally, in the time that summer temp increases, epoxy resin fully infiltrates mended crack, reaches the natural curing effect of rhegma in winter, repairing in summer;
B, when detecting electric pole and serious crackle or deformation occur and fail nature maintenance, carry out artificial maintenance, concrete grammar comprises: 1. heating promotes epoxy resin to infiltrate crackle to carry out nature reparation; 2. physics is reinforced; 3. while being difficult to reparation or high cost, doing and scrap processing.
Adopt the beneficial effect that produces of technique scheme to be: electric pole of the present invention has good cracking resistance line effect, service life large leap ahead.First, the cement layer of electric pole and poured with epoxy resin layer be to playing temperature buffer effect as the hollow lever of main stress mechanism, avoid hollow lever at low temperature and when day and night difference variation is excessive because the stress difference of internal water silt particle grain and reinforcing bar cracks.Secondly, the present invention has obtained following formula by a large amount of theory analysises and verification experimental verification,
Determine the integral thickness of electric pole according to above-mentioned formula, there is great guidance and reference value for the production of electric pole and similar devices, be expected to form professional standard or country, international standard.Again, electric pole of the present invention also has the effect of self-maintenance, along with the growth of service life, winter low temperature and day and night difference variation change while finally causing cracking hollow lever internal stress, the epoxy resin (more than reaching as high as 5Mpa) under High Pressure in hollow lever outside slowly infiltrates crackle naturally, in the time that summer temp increases, epoxy resin fully infiltrates mended crack, reaches the natural curing effect of rhegma in winter, repairing in summer.
Brief description of the drawings
Fig. 1 is schematic appearance of the present invention.
Fig. 2 is the cross sectional representation of electric pole of the present invention.
In figure: 1, hollow lever; 2, poured with epoxy resin layer; 3, cement layer; 4, intercommunicating pore.
Detailed description of the invention
Referring to accompanying drawing, the structure of a specific embodiment of the present invention comprises regular reinforcement cement hollow lever 1, outer poured with epoxy resin layer 2 and the cement layer 3 of setting gradually of hollow lever 1, cement layer 3 covers parcel to electric pole bottom and top simultaneously, in the confined space of poured with epoxy resin layer 2 between cement layer 3 and hollow lever 1, the pressure in this confined space is 2Mpa; Cement layer 3 thickness, poured with epoxy resin layer 2 thickness, hollow lever 1 thickness three's ratio is 2:0.6:8.4.
The preparation technology of above-mentioned high strength cement electric pole, comprises the steps:
A, first prepare regular reinforcement cement hollow lever 1, then at hollow lever 1 upper epoxy resin;
B, steps A products obtained therefrom move into operation with high pressure chamber, controlling the indoor air pressure of operation with high pressure is 2Mpa, under hyperbaric environment on poured with epoxy resin layer 2 all standing joints cement layer 3, top and the bottom of this cement layer 3 complete parcel poured with epoxy resin layer 2 and hollow lever 1, be in the high-pressure sealed space between cement layer 3 and hollow lever 1 poured with epoxy resin layer 2;
Bore operation is carried out in C, region, the center of circle on the cement layer 3 of electric pole top or bottom, get through hollow lever 1 inner with being communicated with of ambient atmosphere; The aperture of bore operation gained intercommunicating pore 4 is 5mm;
Wherein, the ratio between cement layer 3 thickness, poured with epoxy resin layer 2 thickness, hollow lever 1 thickness three is 2:0.6:8.4; Cement layer 3, poured with epoxy resin layer 2, hollow lever 1 three's gross thickness is determined according to following formula, unit employing centimetre:
Wherein, a year maximum temperature difference is the annual temperature difference maximum that electric pole makes land used, unit employing DEG C; Annual minimum temperature is the lowest temperature in winter that electric pole makes land used, and this numerical value, if positive number is unified to be designated as 1, as is negative, is got its absolute value, unit employing DEG C; The design height that the whole height of electric pole is electric pole, unit is centimetre; Body of rod thickness optimization constant value is 165000; For example, North China, annual minimum temperature is-10 DEG C of left and right, maximum temperature difference is 10 DEG C of left and right, the high 1000cm of bar, has 10 × 10 × 1000/16500=6.06cm, is the gross thickness of electric pole three-decker, can obtain thickness value separately according to the thickness proportion of three layers again, unit employing centimetre.
The maintaining process of above-mentioned high strength cement electric pole, its main points comprise: A, first take natural curing technique according to the design feature of electric pole, 1. 2 pairs of hollow lever 1 as main stress mechanism of cement layer 3 and poured with epoxy resin layer play temperature buffer effect, avoid hollow lever 1 at low temperature and when day and night difference variation is excessive because the stress difference of internal water silt particle grain and reinforcing bar cracks; 2. along with the growth of service life, winter low temperature and day and night difference variation change while finally causing cracking hollow lever 1 internal stress, the poured with epoxy resin layer 2 in hollow lever 1 outside slowly infiltrates crackle naturally, in the time that summer temp increases, epoxy resin fully infiltrates mended crack, reaches the natural curing effect of rhegma in winter, repairing in summer.B, when detecting electric pole and serious crackle or deformation occur and fail nature maintenance, carry out artificial maintenance, concrete grammar comprises: 1. heating promotes epoxy resin to infiltrate crackle to carry out nature reparation; 2. physics is reinforced; 3. while being difficult to reparation or high cost, doing and scrap processing.
No matter for the improvement of wire pole structure, or to its preparation technology's exploration, the present invention has all carried out outstanding innovative design to the prior art of industry, has obvious facilitation for electric pole manufacturing technology field, is expected to become the planning equalization standard of the industry.
Foregoing description only proposes as the enforceable technical scheme of the present invention, not as the Single restriction condition to its technical scheme itself.
Claims (10)
1. the preparation technology of composite bed electric pole, is characterized in that: the method comprises the steps:
A, first prepare regular reinforcement cement hollow lever (1), then at hollow lever (1) upper epoxy resin;
B, steps A products obtained therefrom move into operation with high pressure chamber, controlling the indoor air pressure of operation with high pressure is 0.5-5Mpa, under hyperbaric environment, go up all standing joints cement layer (3) at poured with epoxy resin layer (2), top and the bottom of this cement layer (3) complete parcel poured with epoxy resin layer (2) and hollow lever (1), be in the high-pressure sealed space between cement layer (3) and hollow lever (1) poured with epoxy resin layer (2);
Bore operation is carried out in C, region, the center of circle on the cement layer (3) of electric pole top or bottom, get through hollow lever (1) inner with being communicated with of ambient atmosphere.
2. the preparation technology of composite bed electric pole according to claim 1, is characterized in that: the thickness three's of the thickness of described cement layer (3), the thickness of poured with epoxy resin layer (2), hollow lever (1) ratio is 2:(0.4-0.7): (7.5-10).
3. the preparation technology of composite bed electric pole according to claim 2, is characterized in that: the ratio between cement layer (3) thickness, poured with epoxy resin layer (2) thickness, hollow lever (1) thickness three is 2:0.6:8.4.
4. the preparation technology of composite bed electric pole according to claim 1, it is characterized in that: described cement layer (3), poured with epoxy resin layer (2), hollow lever (1) three's gross thickness is determined according to following formula, unit employing centimetre:
Wherein, a year maximum temperature difference is the annual temperature difference maximum that electric pole makes land used, unit employing DEG C; Annual minimum temperature is the lowest temperature in winter that electric pole makes land used, and this numerical value, if positive number is unified to be designated as 1, as is negative, is got its absolute value, unit employing DEG C; The design height that the whole height of electric pole is electric pole, unit is centimetre; Body of rod thickness optimization constant value is 160000-170000.
5. the preparation technology of composite bed electric pole according to claim 4, is characterized in that: the value of described body of rod thickness optimization constant is 162000-168000.
6. the preparation technology of composite bed electric pole according to claim 4, is characterized in that: the value of described body of rod thickness optimization constant is 165000.
7. high strength cement electric pole according to claim 1, is characterized in that: in step B, the indoor air pressure of described operation with high pressure is 2Mpa.
8. the preparation technology of composite bed electric pole according to claim 1, is characterized in that: in step C, the aperture of bore operation gained intercommunicating pore (4) is 3-10mm.
9. the preparation technology of composite bed electric pole according to claim 8, is characterized in that: in step C, the aperture of bore operation gained intercommunicating pore (4) is 5mm.
10. the maintaining process of the prepared electric pole of claim 1, is characterized in that:
A, first take natural curing technique according to the design feature of electric pole, it mainly comprises: 1. cement layer (3) and poured with epoxy resin layer (2) play temperature buffer effect to the hollow lever as main stress mechanism (1), avoid hollow lever (1) at low temperature and when day and night difference variation is excessive because the stress difference of internal water silt particle grain and reinforcing bar cracks; 2. along with the growth of service life, winter low temperature and day and night difference variation change while finally causing cracking hollow lever (1) internal stress, the poured with epoxy resin layer (2) in hollow lever (1) outside slowly infiltrates crackle naturally, in the time that summer temp increases, epoxy resin fully infiltrates mended crack, reaches the natural curing effect of rhegma in winter, repairing in summer;
B, when detecting electric pole and serious crackle or deformation occur and fail nature maintenance, carry out artificial maintenance, concrete grammar comprises: 1. heating promotes epoxy resin to infiltrate crackle to carry out nature reparation; 2. physics is reinforced; 3. while being difficult to reparation or high cost, doing and scrap processing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410279373.7A CN104070602B (en) | 2014-06-20 | 2014-06-20 | Composite bed electric pole prepare maintaining process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410279373.7A CN104070602B (en) | 2014-06-20 | 2014-06-20 | Composite bed electric pole prepare maintaining process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104070602A true CN104070602A (en) | 2014-10-01 |
CN104070602B CN104070602B (en) | 2016-03-02 |
Family
ID=51592414
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410279373.7A Active CN104070602B (en) | 2014-06-20 | 2014-06-20 | Composite bed electric pole prepare maintaining process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104070602B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108915340A (en) * | 2018-04-03 | 2018-11-30 | 合肥海银杆塔有限公司 | A kind of novel and multifunctional shaft tower in city |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04191041A (en) * | 1990-11-27 | 1992-07-09 | Nkk Corp | Heat resistant plastic-clad steel pipe |
US5556673A (en) * | 1991-07-08 | 1996-09-17 | Compagnie Generale D'innovation Et De Developpement Cogidev | Transparent composite structural elements and methods for producing same |
JP2002054766A (en) * | 2000-08-09 | 2002-02-20 | Nittetsu Corrosion Prevention Co Ltd | Steel pipe covered with highly anticorrosion metal and manufacturing method therefor |
CN101870799A (en) * | 2010-07-07 | 2010-10-27 | 淮北科奥工程建设有限公司 | Modified epoxy resin composite for strengthening concrete pole |
CN101967901A (en) * | 2010-10-20 | 2011-02-09 | 常熟风范电力设备股份有限公司 | Composite tower |
CN202064678U (en) * | 2010-11-18 | 2011-12-07 | 常熟风范电力设备股份有限公司 | Novel electric pole |
CN202493070U (en) * | 2012-04-04 | 2012-10-17 | 张雪燕 | Pouring cement telegraph pole |
CN103711354A (en) * | 2013-12-27 | 2014-04-09 | 曾义强 | Composite telegraph pole/street lamp pole and manufacturing method of street lamp pole |
-
2014
- 2014-06-20 CN CN201410279373.7A patent/CN104070602B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04191041A (en) * | 1990-11-27 | 1992-07-09 | Nkk Corp | Heat resistant plastic-clad steel pipe |
US5556673A (en) * | 1991-07-08 | 1996-09-17 | Compagnie Generale D'innovation Et De Developpement Cogidev | Transparent composite structural elements and methods for producing same |
JP2002054766A (en) * | 2000-08-09 | 2002-02-20 | Nittetsu Corrosion Prevention Co Ltd | Steel pipe covered with highly anticorrosion metal and manufacturing method therefor |
CN101870799A (en) * | 2010-07-07 | 2010-10-27 | 淮北科奥工程建设有限公司 | Modified epoxy resin composite for strengthening concrete pole |
CN101967901A (en) * | 2010-10-20 | 2011-02-09 | 常熟风范电力设备股份有限公司 | Composite tower |
CN202064678U (en) * | 2010-11-18 | 2011-12-07 | 常熟风范电力设备股份有限公司 | Novel electric pole |
CN202493070U (en) * | 2012-04-04 | 2012-10-17 | 张雪燕 | Pouring cement telegraph pole |
CN103711354A (en) * | 2013-12-27 | 2014-04-09 | 曾义强 | Composite telegraph pole/street lamp pole and manufacturing method of street lamp pole |
Non-Patent Citations (1)
Title |
---|
孙俊毅: "水泥电线杆裂纹的成因及防治", 《阴山学刊•自然科学版》, vol. 14, no. 3, 30 June 1998 (1998-06-30), pages 157 - 159 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108915340A (en) * | 2018-04-03 | 2018-11-30 | 合肥海银杆塔有限公司 | A kind of novel and multifunctional shaft tower in city |
Also Published As
Publication number | Publication date |
---|---|
CN104070602B (en) | 2016-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206486820U (en) | Repair fixing device in a kind of road and bridge crack | |
CN104278794B (en) | Prefabricated thermal insulation composite wallboard of a kind of carrying space three-dimensional structure and preparation method thereof | |
CN103015414B (en) | A kind of precast concrete post grouting pile and grouting process | |
CN203977957U (en) | A kind of high strength cement electric pole | |
CN104070602B (en) | Composite bed electric pole prepare maintaining process | |
CN102561134B (en) | Compaction method for embankment filling under high liquid limit red clay according to equilibrium moisture content | |
CN207260144U (en) | Electric power earth anchor | |
CN104074387B (en) | High strength cement electric pole and maintaining process thereof | |
CN203514143U (en) | Precast cement road panel for rapid maintenance of pavement | |
CN103741708A (en) | Prefabricated concrete pole sleeve base | |
CN204282845U (en) | Buildings in cold roof insulating structure | |
CN203625932U (en) | Cable pipeline coupling well made from composite material and with high strength | |
CN207260367U (en) | A kind of prefabricated heat preservation wall | |
CN204703363U (en) | Energy-saving wall heat insulation building block | |
CN202214986U (en) | Carbon fiber composite material arm support for concrete pump truck | |
CN203684258U (en) | Prefabricated concrete rod sleeve foundation | |
CN103465357B (en) | A kind of precast hollow concrete structure inner chamber core tire | |
CN211873376U (en) | Anti-cracking and anti-seepage insulation board | |
CN204401627U (en) | To pull-type prestressed pipe pile pit supporting construction | |
CN204001926U (en) | Light-duty complex cement bar | |
CN204152073U (en) | A kind of prefabricated thermal insulation composite wallboard of carrying space three-dimensional structure | |
CN206071596U (en) | Impermeabilisation subway segment | |
CN106168135A (en) | Impermeabilisation subway segment | |
CN204020378U (en) | A kind of emulation garden rockery waterborne | |
CN205314128U (en) | Plastic power communication well of integral type |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |