The automated cleaning structure of water curtain water
Technical field
The present invention relates to field of Environment Protection, in particular it relates to a kind of automated cleaning structure of water curtain water.
Background technology
Water(Chemical formula:H2O)The inorganic matter being made up of hydrogen, two kinds of elements of oxygen is nontoxic.It is at normal temperatures and pressures colourless nothing
The transparency liquid of taste, is referred to as the source of human life.Water, including natural water(River, lake, atmospheric water, seawater, underground water
Deng){ impure }, distilled water is pure water, manually water processed(Hydrogen-oxygen atom is set to combine the water for obtaining by chemical reaction).Water is
One of most common material on the earth, is the valuable source including all life existence including inorganic chemical, the mankind, is also biological
The most important part of body.Water serves important function in Life Evolution.It is that a kind of narrow sense is non-renewable, and broad sense can be again
Production-goods source.Pure water is electrically conductive, but very faint(Electric conductivity can be ignored in daily life), belong to extremely weak electrolyte.
Water in daily life has more negative ions due to having dissolved other electrolyte, electric conductivity enhancing.In industrial production mistake
Need to consume water in journey, these water are formed industrial wastewater, and industrial wastewater refers to waste water, the dirt of generation in industrial processes
Water and waste liquid, wherein containing the dirt produced in the industrial production materials, intermediate product and the product that outflow with water and production process
Dye thing.With developing rapidly for industry, the type and quantity of waste water rapidly increase, and the pollution to water body is also increasingly extensively and tight
Weight, threatens the health and safety of the mankind.Therefore, for environmental protection, the treatment of the treatment than municipal sewage of industrial wastewater
It is even more important.All it is by the way of chemistry, to be processed using the mode toppled in now for the processing procedure of industrial wastewater,
Due to wherein containing substantial amounts of impurity, chemical treatments can not be clean by these impurity treatments, and easily causes precipitation, long
Long by blocking channel, and chemical treatments high cost, other pollution situations are easily produced, be unfavorable for the long-term hair of enterprise
Exhibition.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of automated cleaning structure of water curtain water, and the structure passes through will
Water forms water curtain, it is to avoid produce precipitation, and Water warfare is realized using the mode of physics, simple structure, and can will be miscellaneous in water
Matter treatment is clean, is easy to the recovery of water resource to use, and the cost for the treatment of is also low, is adapted to the long-term use of enterprise.
The present invention the used technical scheme that solves the above problems is:The automated cleaning structure of water curtain water, including coagulation
Native pond, is provided with dividing plate one, dividing plate two and dividing plate three, dividing plate one, dividing plate two and dividing plate three in the concrete basin
Concrete basin is divided into corresponding sealed chamber, dividing plate two is arranged between dividing plate one and dividing plate three, sealed chamber according to
Secondary connection, is provided with several water pipes being parallel to each other in the concrete basin, one end of water pipe is all connected with same water inlet
Pipe, the other end is provided with plug, and water inlet pipe is connected with elbow away from one end of water pipe, and elbow is connected with water pump, and water pump is arranged on
Outside concrete basin;The water pipe is divided into some sections, and three-way pipe is provided between the same adjacent sections of water pipe
One, and the both end of which of three-way pipe one connects with corresponding sections respectively, the other end of three-way pipe one is respectively connected with shower nozzle, shower nozzle
It is arranged in concrete basin and is arranged at dividing plate one and concrete basin towards the bottom surface of concrete basin, water pipe and shower nozzle
In the chamber of formation;Some pieces are provided between the dividing plate one and dividing plate two, between dividing plate two and dividing plate three to be arranged in parallel
Deflection plate, the bottom surface of deflection plate fixes with the bottom surface of concrete basin, and the top surface of deflection plate is provided with grid flaggy, and grid
The bottom surface of flaggy is fixed with the top surface sealing of deflection plate, and partition panel, the both sides of partition panel are provided between dividing plate two and dividing plate three
Fixed with the inwall and sealing bottom surface of concrete basin respectively with bottom surface, the deflection plate being arranged between dividing plate two and dividing plate three sets
Put between partition panel and dividing plate two and fixed with partition panel, grid flaggy seals fixation, partition panel and dividing plate two with partition panel
Between formed chamber and partition panel and dividing plate three between formed chamber, be provided with above dividing plate three and partition panel
Filtering layer, the bottom surface of filter layer is fixed with dividing plate three and partition panel sealing simultaneously, between dividing plate three and partition panel and adjacent
Filler is filled between deflection plate.By setting a plurality of water pipe in concrete basin, water pipe is apart from the bottom of concrete basin
There are enough height in portion, and the water curtain area for so being formed is just sufficiently large, it would be desirable to which the water for the treatment of opens water pump, using shower nozzle by water
Water curtain is formed, is imported into concrete basin, prevent it to be deposited in water pipe or pond, a plurality of water pipe causes the area of water curtain
It is sufficiently large, concrete basin can be completely covered, shower nozzle uses low pressure microatomization type nozzle, and the water curtain of ejection is ultra-fine in mist
Shape.Concrete basin is divided into multiple chambers using dividing plate, using the structural principle of deflection plate so that the water in concrete basin
Current realize multiple baffling after introducing, while using the porous ball filler set between deflection plate, realizing the suction to impurities in water
Receive, then realize filtering again by filter layer, finally give clean water, can realize that directly recovery is used, due to being to adopt
Be not in secondary pollution with the processing mode of physics, and being capable of quick-replaceable condiment.
The height of dividing plate one is more than the height of dividing plate two, the height of the height more than dividing plate three of dividing plate two;On dividing plate one, every
Be provided with through hole on plate two, partition panel, through hole respectively with corresponding chamber.Pending water is by flow therethrough, energy
The control of current is enough realized, and the height of dividing plate sets inconsistent so that it has drop, according to different processing links, if
The quantity of filler is put, is finally filtered so that utilizing for material is realized maximizing.
Three-way pipe two is provided between water inlet pipe and water pipe, three-way pipe two is connected with water inlet pipe and water pipe simultaneously;Shower nozzle and
Outlet pipe is provided between three-way pipe one, outlet pipe one end is connected with three-way pipe one, being sheathed with internal thread on the outer wall of the other end connects
Head, interior Threaded Connector Coupling is connected with nipple, and nipple is connected with shower nozzle, and card is provided between shower nozzle and nipple
Hoop, clip is fixed with shower nozzle and nipple simultaneously.Three-way pipe two is identical with the structure of three-way pipe one, and the pipe for having three openings connects
Head is three-way pipe.Three-way pipe is widely used in conveying liquid, the pipe network of gas.Three-way pipe is to be connected water pipe, is easy to pipe
Multiple branches are formed between road.In use for some time, its nozzle location is due to the impurity of water quality or itself corrosion for shower nozzle
Etc. factor, blocking is easily caused, can quickly realize changing by unscrewing joint, without changing whole pipe-line system, soon
Speed and convenience, clip is existing structure, is, as by the mechanism of shower nozzle and nipple fixation, to prevent the impact in water
Under effect, there is the phenomenon of shower nozzle loosening
To sum up, the beneficial effects of the invention are as follows:The structure forms water curtain by by water, it is to avoid precipitation is produced, using physics
Mode realize Water warfare, simple structure, and can be clean by the impurity treatment in water be easy to the recovery of water resource to use,
The cost for the treatment of is also low, is adapted to the long-term use of enterprise.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is the sectional view of Fig. 1;
Fig. 3 is the partial schematic diagram of Fig. 2.
Mark and corresponding parts title in accompanying drawing:1-chamber four;2-water pipe;3-concrete basin;4-chamber
Three;5-chamber five;6-dividing plate one;7-deflection plate;8-dividing plate two;9-partition panel;10-dividing plate three;11-chamber two;
12-chamber one;13-through hole;14-filler;15-grid flaggy;16-filter layer;17-plug;18-three-way pipe one;
19-three-way pipe two;20-shower nozzle;21-the second plug;22-water inlet pipe;23-elbow;24-clip;25-outlet pipe;
26-interior Threaded Connector Coupling;27-nipple.
Specific embodiment
With reference to embodiment and accompanying drawing, detailed description further, but embodiments of the present invention are made to the present invention
Not limited to this.
Embodiment:
As shown in Figure 1, Figure 2, Figure 3 shows, the automated cleaning structure of water curtain water, including concrete basin 3, the concrete water
Dividing plate 1, dividing plate 28 and dividing plate 3 10 are provided with pond 3, dividing plate 1, dividing plate 28 and dividing plate 3 10 are by concrete
Pond 3 is divided into corresponding sealed chamber, and dividing plate 28 is arranged between dividing plate 1 and dividing plate 3 10, and sealed chamber connects successively
It is logical, several water pipes 2 being parallel to each other are provided with the concrete basin 3, one end of water pipe 2 is all connected with same water inlet pipe
22, the other end is provided with plug 17, and water inlet pipe 22 is connected with elbow 23 away from one end of water pipe 2, and elbow 23 is connected with water pump, water
Pump is arranged on outside concrete basin 3;2 points of the water pipe is some sections, is all provided between the same adjacent sections of water pipe 2
Three-way pipe 1 is equipped with, and the both end of which of three-way pipe 1 is connected with corresponding sections respectively, the other end of three-way pipe 1
It is respectively connected with shower nozzle 20, shower nozzle 20 is arranged in concrete basin 3 and towards the bottom surface of concrete basin 3, water pipe 2 and shower nozzle 20
It is arranged in the chamber that dividing plate 1 and concrete basin 3 are formed;Three-way pipe 2 19 is provided between water inlet pipe 22 and water pipe 2,
Three-way pipe 2 19 is connected with water inlet pipe 22 and water pipe 2 simultaneously;Outlet pipe 25, water outlet are provided between shower nozzle 20 and three-way pipe 1
The one end of pipe 25 is connected with three-way pipe 1, and interior Threaded Connector Coupling 26 is sheathed with the outer wall of the other end, and interior Threaded Connector Coupling 26 is connected with outer silk
Joint 27, nipple 27 is connected with shower nozzle 20, and clip 24 is provided between shower nozzle 20 and nipple 27, and clip 24 is same
When fixed with shower nozzle 20 and nipple 27.One end of water pipe 2 is connected with water inlet pipe 22 by three-way pipe 2 19, in water inlet pipe 22
Two ends be respectively provided with the second plug 21 for closing the mouth of pipe, it is ensured that, when current pass through with enough pressure, the present invention is for it
It is connected using a plurality of water pipe 2 and water inlet pipe 22 are vertical, under the hydraulic pressure that water pump provides enough pressure, by water from shower nozzle
It is ejected at 20 in concrete basin 3, forms water curtain, pending water enters into the lower zone of shower nozzle 20 in concrete basin 3,
Prevent it from being precipitated in water pipe, during injection, it is also possible to dedusting is carried out to air, and a plurality of water pipe 2 is evenly arranged
In concrete basin 3, multiple shower nozzles 20 are set again on each water pipe 2, realize covering all around, coordinate what shower nozzle 20 was produced
Ultra-fine water curtain, the impact using current to basin bottom, current are kept in motion all the time, can be passed into the impurity in water
Processed in filler between deflection plate, the treatment effeciency of water is further improved.
Some pieces are provided between the dividing plate 1 and dividing plate 28, between dividing plate 28 and dividing plate 3 10 to be arranged in parallel
Deflection plate 7, bottom surface and the bottom surface of concrete basin 3 of deflection plate 7 fix, and the top surface of deflection plate 7 is provided with grid flaggy 15,
And the bottom surface of grid flaggy 15 is fixed with the top surface sealing of deflection plate 7, and partition panel 9 is provided between dividing plate 28 and dividing plate 3 10,
The both sides and bottom surface of partition panel 9 are fixed with the inwall and sealing bottom surface of concrete basin 3 respectively, are arranged on dividing plate 28 and dividing plate
Deflection plate 7 between 3 10 is arranged between partition panel 9 and dividing plate 28 and is fixed with partition panel 9, grid flaggy 15 and partition panel
9 sealings are fixed, and the chamber formed between the chamber and partition panel 9 and dividing plate 3 10 that are formed between partition panel 9 and dividing plate 28 connects
Logical, the top of dividing plate 3 10 and partition panel 9 is provided with filter layer 16, the bottom surface of filter layer 16 simultaneously with dividing plate 3 10 and partition panel
9 sealings are fixed, and filler 14 is filled between dividing plate 3 10 and partition panel 9 and between adjacent deflection plate 7;Dividing plate 1
Height of the height more than dividing plate 28, the height of the height of dividing plate 28 more than dividing plate 3 10;On dividing plate 1, dividing plate 28, every
Be provided with through hole 13 on disconnected plate 9, through hole 13 respectively with corresponding chamber.For convenience of description, the chamber name that will be formed
It is chamber 1, chamber 2 11, chamber 34, chamber 41 and chamber 55, chamber 1 is dividing plate 1 and concrete basin 3
Between formed chamber, chamber 2 11 between dividing plate 1 and dividing plate 28 formed chamber, chamber 34 be dividing plate 28 and every
The chamber formed between disconnected plate 9, chamber 41 is the chamber formed between partition panel 9 and dividing plate 3 10, and chamber 55 is dividing plate three
The chamber formed between 10 and concrete basin 3, the deflection plate 7 set in chamber 2 11 and chamber 34 is parallel by polylith
Plate is constituted, and the through hole 13 between one of end two boards with dividing plate 1 is connected, between the two boards of another end
Through hole with partition panel 9 is connected, and so all of deflection plate can be played a role, and the stroke that current pass through is maximum, pending
Water is by deflection plate 7 and the collective effect of porous ball filler so that the treatment effeciency to water reaches most preferably, and chamber 41 is cavity,
Porous ball filler is internally provided with, by the porous ball filler that enters into chamber 41 of water after the treatment of porous ball filler, when
After water volume reaches to a certain degree, spilt into the filter layer 16 being made from spongy layer in chamber 55, the water in chamber 55 is
Clean water, when current are larger in deflection plate, when the depth of water exceedes the height of deflection plate, the water after treatment can also be by grid
Plate is permeable in chamber 55, and people can be used the water in chamber 55, simple structure of the invention, principle letter
Just, using self-clearing principle, the recycling of water resource can be realized.
The above, is only presently preferred embodiments of the present invention, not does any formal limitation to the present invention, it is every according to
According to any simple modification, equivalent variations that technology of the invention, method are substantially made to above example, the present invention is each fallen within
Protection domain within.