CN105332672A - Multi-element composite water-control oil-enhancement method for extracting oil - Google Patents

Multi-element composite water-control oil-enhancement method for extracting oil Download PDF

Info

Publication number
CN105332672A
CN105332672A CN201510788735.XA CN201510788735A CN105332672A CN 105332672 A CN105332672 A CN 105332672A CN 201510788735 A CN201510788735 A CN 201510788735A CN 105332672 A CN105332672 A CN 105332672A
Authority
CN
China
Prior art keywords
nitrogen
water
plugging agent
oil
shafts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510788735.XA
Other languages
Chinese (zh)
Inventor
郑观辉
伍晓妮
田华
张志良
宋远飞
刘国华
汪晓多
李光前
于兰春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Great Wall Drilling Co
Original Assignee
CNPC Great Wall Drilling Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Great Wall Drilling Co filed Critical CNPC Great Wall Drilling Co
Priority to CN201510788735.XA priority Critical patent/CN105332672A/en
Publication of CN105332672A publication Critical patent/CN105332672A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to the field of technologies for extracting oil from high-turn steam-stimulated wells, in particular to a multi-element composite water-control oil-enhancement method for extracting oil. The multi-element composite water-control oil-enhancement method includes steps of firstly, injecting 0.15-0.3 PV of nitrogen into shafts at the nitrogen injection speeds of 1.5*10<4>-3*10<4> m<3>/d, enabling the nitrogen to force water in the shafts to flow towards the bottoms of the shafts, reducing the edge and bottom water coning speeds and enabling the nitrogen to displace bottom water to flow into water outlet passages to form nitrogen cavities; secondly, injecting water-base plugging agents with the mass percent concentration of 0.5%-1% into the shafts at the water-base plugging agent injection speeds of 15-30 m<3>/h. The multi-element composite water-control oil-enhancement method has the advantages that diversified injectants are effectively combined with one another to be injected into target strata, accordingly, steam channeling passages can be effectively plugged, steam absorption profiles can be adjusted, stratum pressures can be increased, the viscosity of crude oil can be reduced, the flowability of the crude oil can be improved, development effects of high-turn stimulated wells can be ultimately enhanced, and recovery ratios of the high-turn stimulated wells can be increased.

Description

A kind of multiple elements design water-control oil-increasing oil production method
Technical field:
The present invention relates to high round steam-stimulated well oil recovery technique field, particularly a kind of multiple elements design water-control oil-increasing oil production method.
Background technology:
Along with thin oil production decline, 21st century the status of heavy oil development become increasingly conspicuous, its exploitation status will occupy an leading position in the long period.Compared with thin oil, the more difficult exploitation of viscous crude, investment cost and development cost are also higher.The agent technology of current Chinese heavy oil development is still steam soak.
But along with the increase of steam soak round, there is following problem in well of handling up: steam entry profile is uneven, and the steam of the injection height that enters oozes passage more, effectively cannot heat the high Middle-Low Permeability Reservoirs of remaining oil abundance; Near wellbore zone is in debt serious, and edge-bottom water is invaded, and causes oil well High water cut; Light composition in viscous crude is plucked out of, and crude oil becomes thicker, and mobility is poorer, oil pumper card.Above many reasons causes high round to be handled up, and well steam injection is of poor quality, well yield is low, oil pump running efficiency is low, gas oil ratio is low, finally affects Development Response of Oilfield.
Summary of the invention:
The technical problem to be solved in the present invention is to provide a kind of multiple elements design water-control oil-increasing oil production method, the method achieve and effectively combine injection target zone by multiple injectant, effective shutoff vapour alters passage, adjustment steam entry profile, improve strata pressure, reduce viscosity of crude, improve crude oil fluidity, final improve high round and to handle up the development effectiveness of well and recovery ratio.Overcome existing high round well steam entry profile of handling up uneven, formation depletion is serious, and viscosity of crude is high, the deficiency that recovery ratio is low.
The technical solution used in the present invention is: a kind of multiple elements design water-control oil-increasing oil production method, and the method step is as follows: the nitrogen first injecting 0.15 ~ 0.3PV, and nitrogen injection rate is 1.5 × 104 ~ 3 × 104m 3between/d, nitrogen forces water in pit shaft to flows, slows down edge and basal water speed, and nitrogen is displaced Di Shui and entered exhalant canal and form nitrogen air cavity; Then implantation quality percent concentration is the water base plugging agent of 0.5% ~ 1%, and water base plugging agent injection rate is 15 ~ 30m 3/ h, water base plugging agent shutoff nitrogen air cavity, extends the action time of nitrogen setting-out cone, the exhalant canal of shutoff simultaneously; Then inject compound plugging agent, the further shutoff exhalant canal of compound plugging agent, compound plugging agent seals water base plugging agent simultaneously; Compound plugging agent Hou Ning 24 hours, after then injecting liquid carbon dioxide, stewing well, makes liquid carbon dioxide fully be dissolved in crude oil, reduces viscosity of crude, improves crude oil flow performance; Finally inject steam, stewing well back production.
The invention has the beneficial effects as follows: the present invention effectively combines injection target zone by multiple injectant, effective shutoff vapour alters passage, adjustment steam entry profile, improve strata pressure, reduce viscosity of crude, improve crude oil fluidity, final improve high round and to handle up the development effectiveness of well and recovery ratio.
Accompanying drawing illustrates:
Below in conjunction with the drawings and specific embodiments, the present invention will be further described in detail.
Fig. 1 is the schematic diagram of nitrogen injection.
Fig. 2 is the schematic diagram injecting water base plugging agent.
Fig. 3 is the schematic diagram injecting compound plugging agent.
Fig. 4 is the schematic diagram injecting liquid carbon dioxide.
Fig. 5 is the schematic diagram injecting steam.
Detailed description of the invention:
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, a kind of multiple elements design water-control oil-increasing oil production method, the method step is as follows: the nitrogen 1 first injecting 0.15 ~ 0.3PV, and nitrogen 1 injection rate is 1.5 × 104 ~ 3 × 104m 3between/d, nitrogen 1 forces water in pit shaft to flows, slows down edge and basal water speed, and nitrogen 1 is displaced Di Shui and entered exhalant canal 2 and form nitrogen air cavity 4; Then implantation quality percent concentration is the water base plugging agent 3 of 0.5% ~ 1%, and water base plugging agent 3 injection rate is 15 ~ 30m 3/ h, water base plugging agent 3 shutoff nitrogen air cavity 4, extends the action time of nitrogen 1 setting-out cone, the exhalant canal of shutoff simultaneously 2; Then inject compound plugging agent 5, compound plugging agent 5 is shutoff exhalant canal 2 further, and compound plugging agent 5 seals water base plugging agent 3 simultaneously; Compound plugging agent 5 Hou Ning 24 hours, after then injecting liquid carbon dioxide 6, stewing well, makes liquid carbon dioxide 6 fully be dissolved in crude oil, reduces viscosity of crude, improves crude oil flow performance; Finally inject steam 7, stewing well back production.
Be understandable that, above about specific descriptions of the present invention, the technical scheme described by the embodiment of the present invention is only not limited to for illustration of the present invention, those of ordinary skill in the art is to be understood that, still can modify to the present invention or equivalent replacement, to reach identical technique effect; Needs are used, all within protection scope of the present invention as long as meet.

Claims (1)

1. a multiple elements design water-control oil-increasing oil production method, is characterized in that: the method step is as follows: the nitrogen (1) first injecting 0.15 ~ 0.3PV, nitrogen (1) injection rate is 1.5 × 104 ~ 3 × 104m 3between/d, nitrogen (1) forces water in pit shaft to flows, slows down edge and basal water speed, and nitrogen (1) is displaced Di Shui and entered exhalant canal (2) and form nitrogen air cavity (4); Then implantation quality percent concentration is the water base plugging agent (3) of 0.5% ~ 1%, and water base plugging agent (3) injection rate is 15 ~ 30m 3/ h, water base plugging agent (3) shutoff nitrogen air cavity (4), extends the action time of nitrogen (1) setting-out cone, shutoff exhalant canal simultaneously (2); Then inject compound plugging agent (5), compound plugging agent (5) is shutoff exhalant canal (2) further, and compound plugging agent (5) seals water base plugging agent (3) simultaneously; Compound plugging agent (5) Hou Ning 24 hours, then injects liquid carbon dioxide (6) stewing well afterwards, liquid carbon dioxide (6) is fully dissolved in crude oil, reduces viscosity of crude, improve crude oil flow performance; Finally inject steam (7), stewing well back production.
CN201510788735.XA 2015-11-17 2015-11-17 Multi-element composite water-control oil-enhancement method for extracting oil Pending CN105332672A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510788735.XA CN105332672A (en) 2015-11-17 2015-11-17 Multi-element composite water-control oil-enhancement method for extracting oil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510788735.XA CN105332672A (en) 2015-11-17 2015-11-17 Multi-element composite water-control oil-enhancement method for extracting oil

Publications (1)

Publication Number Publication Date
CN105332672A true CN105332672A (en) 2016-02-17

Family

ID=55283405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510788735.XA Pending CN105332672A (en) 2015-11-17 2015-11-17 Multi-element composite water-control oil-enhancement method for extracting oil

Country Status (1)

Country Link
CN (1) CN105332672A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863581A (en) * 2016-05-11 2016-08-17 中国石油天然气股份有限公司 Oil extraction method for water controlling and oil increasing of buried hill oil reservoir high-water-cut oil-producing well
CN109538175A (en) * 2017-09-22 2019-03-29 中国石油化工股份有限公司 The resident method sealed up for safekeeping of LOW PERMEABILITY RESERVOIR water slug auxiliary nitrogen soak
CN110630234A (en) * 2018-06-21 2019-12-31 中国石油天然气股份有限公司 Steam injection method for heavy oil thermal recovery well
CN111577224A (en) * 2019-02-19 2020-08-25 中国石油化工股份有限公司 Method for improving bottom water gas reservoir recovery ratio by controlling water with carbon dioxide in horizontal well
CN112145140A (en) * 2019-06-28 2020-12-29 中国石油化工股份有限公司 Gas injection method in thermal recovery process
CN114427428A (en) * 2020-10-14 2022-05-03 中国石油化工股份有限公司 Method for improving recovery ratio by controlling water under stable pressure in bottom water heavy oil reservoir

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5259453A (en) * 1992-06-25 1993-11-09 Phillips Petroleum Company Blocking water coning in oil and gas producing reservoirs
US20070068674A1 (en) * 2005-09-23 2007-03-29 Alberta Research Council, Inc. Toe-To-Heel Waterflooding With Progressive Blockage Of The Toe Region
CN101139920A (en) * 2007-10-26 2008-03-12 辽河石油勘探局 Dibasic composite horizontal well bottom water plugging technique
CN104629698A (en) * 2015-01-19 2015-05-20 中国石油天然气股份有限公司 Water plugging agent and water plugging method of thick oil buried hill edge-bottom water reservoir
CN104847317A (en) * 2014-02-13 2015-08-19 中国石油化工股份有限公司 Method for raising recovery efficiency of super-deep low permeability heavy oil reservoir
CN104847302A (en) * 2015-03-25 2015-08-19 中国石油天然气股份有限公司 Heavy oil reservoir water-coning-control water plugging method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5259453A (en) * 1992-06-25 1993-11-09 Phillips Petroleum Company Blocking water coning in oil and gas producing reservoirs
US20070068674A1 (en) * 2005-09-23 2007-03-29 Alberta Research Council, Inc. Toe-To-Heel Waterflooding With Progressive Blockage Of The Toe Region
CN101139920A (en) * 2007-10-26 2008-03-12 辽河石油勘探局 Dibasic composite horizontal well bottom water plugging technique
CN104847317A (en) * 2014-02-13 2015-08-19 中国石油化工股份有限公司 Method for raising recovery efficiency of super-deep low permeability heavy oil reservoir
CN104629698A (en) * 2015-01-19 2015-05-20 中国石油天然气股份有限公司 Water plugging agent and water plugging method of thick oil buried hill edge-bottom water reservoir
CN104847302A (en) * 2015-03-25 2015-08-19 中国石油天然气股份有限公司 Heavy oil reservoir water-coning-control water plugging method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863581A (en) * 2016-05-11 2016-08-17 中国石油天然气股份有限公司 Oil extraction method for water controlling and oil increasing of buried hill oil reservoir high-water-cut oil-producing well
CN109538175A (en) * 2017-09-22 2019-03-29 中国石油化工股份有限公司 The resident method sealed up for safekeeping of LOW PERMEABILITY RESERVOIR water slug auxiliary nitrogen soak
CN109538175B (en) * 2017-09-22 2021-06-01 中国石油化工股份有限公司 Method for assisting nitrogen gas huff-puff resident sealing storage of low-permeability reservoir water slug
CN110630234A (en) * 2018-06-21 2019-12-31 中国石油天然气股份有限公司 Steam injection method for heavy oil thermal recovery well
CN110630234B (en) * 2018-06-21 2021-11-02 中国石油天然气股份有限公司 Steam injection method for heavy oil thermal recovery well
CN111577224A (en) * 2019-02-19 2020-08-25 中国石油化工股份有限公司 Method for improving bottom water gas reservoir recovery ratio by controlling water with carbon dioxide in horizontal well
CN111577224B (en) * 2019-02-19 2022-07-08 中国石油化工股份有限公司 Method for improving bottom water gas reservoir recovery ratio by controlling water with carbon dioxide in horizontal well
CN112145140A (en) * 2019-06-28 2020-12-29 中国石油化工股份有限公司 Gas injection method in thermal recovery process
CN112145140B (en) * 2019-06-28 2022-12-02 中国石油化工股份有限公司 Gas injection method for thermal recovery process
CN114427428A (en) * 2020-10-14 2022-05-03 中国石油化工股份有限公司 Method for improving recovery ratio by controlling water under stable pressure in bottom water heavy oil reservoir

Similar Documents

Publication Publication Date Title
CN105332672A (en) Multi-element composite water-control oil-enhancement method for extracting oil
US10196884B2 (en) Method for enhancing oil recovery in huff-puff oil production of tight oil from a fractured horizontal well
Yuncong et al. Performance and gas breakthrough during CO2 immiscible flooding in ultra-low permeability reservoirs
CN106223922B (en) Shale gas horizontal well proppant intra-seam shielding temporary plugging staged fracturing process
CN105696997B (en) It is spaced cyclic water stimulation oil production method between multistage fracturing horizontal well seam
CN105114048A (en) Horizontal well staged fracturing oil production method through injection and production in same well
CN109653721B (en) Fracturing and energy-increasing oil displacement integrated process method for shallow low-pressure low-permeability oil reservoir
CN109209306B (en) Horizontal well CO injection for ultra-low permeability tight oil reservoir2Asynchronous throughput energy supplementing method
CN105756634B (en) It is spaced cyclic water stimulation oil production method between multistage fracturing horizontal well seam
CN101333922A (en) Fracturing process for removing breakdown fluid contamination
CN104847317A (en) Method for raising recovery efficiency of super-deep low permeability heavy oil reservoir
CN105626036A (en) Oil reservoir engineering calculation method for determining reasonable oil reservoir liquid yield
CN105927198A (en) Energy complementing and fracturing stimulation integrated repeated transformation method of dense oil reservoir old well
EP3337870B1 (en) Supplementing the immiscible water injection cycle with nutrients to improve oil release in oil-containing rock formations
CN106437642A (en) Fractured reservoir horizontal well injection-production asynchronous exploitation method
US10202540B2 (en) Zirconium gel particle combination flooding system and preparation method thereof
CN111577231A (en) Method for improving water plugging effect of flooded oil well through reverse profile control and flooding
CN108729893B (en) Foam composite cold recovery method for improving recovery ratio of heavy oil reservoir
CN105863581A (en) Oil extraction method for water controlling and oil increasing of buried hill oil reservoir high-water-cut oil-producing well
CN101915079A (en) Integrated de-plugging yield increasing process
CN104060974B (en) Deng the mobility displacement of reservoir oil and profile control integrated technique
CN111594124A (en) Shallow tight oil reservoir imbibition fracturing method, fracturing system for shallow tight oil reservoir and discharge-free imbibition fracturing fluid
CN105804710A (en) Method for improving gas injection driving effect of low-permeability fractured reservoir
CN204941498U (en) A kind of two electric submersible pump single-well injection-production integral tubular column
CN109025940B (en) CO for tight oil reservoir2Fracturing oil displacement integrated oil extraction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160217

RJ01 Rejection of invention patent application after publication