CN1628273A - 在自动化制造环境中主动软件代理的特性化 - Google Patents
在自动化制造环境中主动软件代理的特性化 Download PDFInfo
- Publication number
- CN1628273A CN1628273A CNA028290585A CN02829058A CN1628273A CN 1628273 A CN1628273 A CN 1628273A CN A028290585 A CNA028290585 A CN A028290585A CN 02829058 A CN02829058 A CN 02829058A CN 1628273 A CN1628273 A CN 1628273A
- Authority
- CN
- China
- Prior art keywords
- agency
- batch
- handling implement
- processing
- resource
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 101
- 238000012545 processing Methods 0.000 claims abstract description 98
- 238000000034 method Methods 0.000 claims abstract description 45
- 238000012423 maintenance Methods 0.000 claims description 63
- 230000003449 preventive effect Effects 0.000 claims description 58
- 238000012512 characterization method Methods 0.000 claims description 42
- 230000009471 action Effects 0.000 claims description 35
- 238000003860 storage Methods 0.000 claims description 13
- 230000008569 process Effects 0.000 abstract description 11
- 230000002860 competitive effect Effects 0.000 description 93
- 235000012431 wafers Nutrition 0.000 description 75
- 230000009183 running Effects 0.000 description 28
- 230000006399 behavior Effects 0.000 description 25
- 238000004364 calculation method Methods 0.000 description 20
- 230000006870 function Effects 0.000 description 20
- 238000011068 loading method Methods 0.000 description 19
- 239000004065 semiconductor Substances 0.000 description 18
- 230000004044 response Effects 0.000 description 16
- 230000008859 change Effects 0.000 description 14
- 239000000463 material Substances 0.000 description 13
- 230000005540 biological transmission Effects 0.000 description 8
- 239000003795 chemical substances by application Substances 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 8
- 238000012163 sequencing technique Methods 0.000 description 7
- 230000032258 transport Effects 0.000 description 7
- 238000004891 communication Methods 0.000 description 6
- 230000000875 corresponding effect Effects 0.000 description 6
- 238000005457 optimization Methods 0.000 description 6
- 102100031262 Deleted in malignant brain tumors 1 protein Human genes 0.000 description 5
- 101000844721 Homo sapiens Deleted in malignant brain tumors 1 protein Proteins 0.000 description 5
- 238000006243 chemical reaction Methods 0.000 description 5
- 238000013461 design Methods 0.000 description 5
- ZINJLDJMHCUBIP-UHFFFAOYSA-N ethametsulfuron-methyl Chemical compound CCOC1=NC(NC)=NC(NC(=O)NS(=O)(=O)C=2C(=CC=CC=2)C(=O)OC)=N1 ZINJLDJMHCUBIP-UHFFFAOYSA-N 0.000 description 5
- 238000002156 mixing Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 230000005611 electricity Effects 0.000 description 3
- 230000005291 magnetic effect Effects 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 238000009825 accumulation Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000002950 deficient Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 238000005530 etching Methods 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 230000008676 import Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 239000013307 optical fiber Substances 0.000 description 2
- 238000000059 patterning Methods 0.000 description 2
- 238000013439 planning Methods 0.000 description 2
- NHDHVHZZCFYRSB-UHFFFAOYSA-N pyriproxyfen Chemical compound C=1C=CC=NC=1OC(C)COC(C=C1)=CC=C1OC1=CC=CC=C1 NHDHVHZZCFYRSB-UHFFFAOYSA-N 0.000 description 2
- 239000007858 starting material Substances 0.000 description 2
- 238000007669 thermal treatment Methods 0.000 description 2
- 238000011144 upstream manufacturing Methods 0.000 description 2
- SDNXQWUJWNTDCC-UHFFFAOYSA-N 2-methylsulfonylethanamine Chemical compound CS(=O)(=O)CCN SDNXQWUJWNTDCC-UHFFFAOYSA-N 0.000 description 1
- 208000035126 Facies Diseases 0.000 description 1
- 101150064138 MAP1 gene Proteins 0.000 description 1
- 238000003723 Smelting Methods 0.000 description 1
- 239000000956 alloy Substances 0.000 description 1
- 229910045601 alloy Inorganic materials 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000003745 diagnosis Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000002045 lasting effect Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 230000005055 memory storage Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 238000009418 renovation Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000000758 substrate Substances 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
- 238000013396 workstream Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32263—Afo products, their components to be manufactured, lot selective
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32328—Dynamic scheduling, resource allocation, multi agent negotiation
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/45—Nc applications
- G05B2219/45031—Manufacturing semiconductor wafers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
Abstract
Description
软件代理 | 帮助者层级物件 | 帮助者层级对象的功能 |
批次排程代理 | AMHS收听者 | 收听并报告AMHS移动事件 |
竞标要求者 | 产生并发布竞标要求 | |
竞标选择者 | 依据成本与时间选择竞标 | |
混合比例计算器 | 计算混合比例,该混合比例系需求比例与关键比例的混合 |
需求比例计算器 | 计算该代理的需求比例,该需求比例系特定批次是否需要加速以供给于处理流程中的瓶颈下游的量测 | |
关键比例计算器 | 计算该代理的关键比例,该关键比例特定批次是否于排程上的测量 | |
批次预算计算器 | 决定并维持该代理用以处理的预算 | |
LDT计算器 | 计算该代理的最少运送时间或完成日期 | |
移动约定安排者 | 安排移动约定 | |
批次排程日历 | 存储并操作约定 | |
批次约定安排者 | 安排处理约定 | |
批次收听者 | 收听影响约定期间的状态变更并对其做出回应 | |
机器排程代理 | 机器收听者 | 收听冲击约定的状态改变并对其做出响应 |
容器排程代理 | 对该机器的生产量冲击的容器事件做出响应 | |
容器收听者 | 收听容器事件 | |
机器功能 | 负责维持该机器的处理功能 | |
提早启动器 | 当该机器闲置时寻找约定以初启 | |
批次转换权利再安排者 | 响应批次要求以转换约定至较后的初启时间 | |
总运送计算器 | 通过竞标产生器的呼叫,其计算给定批次的总运送时间 | |
竞标产生器 | 自竞标要求中产生竞标;呼叫该空隙产生器、取代空隙产生 |
器以及批次竞标产生器 | ||
取代竞标产生器 | 通过竞标产生器的呼叫,其产生取代于该机器排程日历上其它约定的竞标 | |
空隙竞标产生器 | 通过竞标产生器的呼叫,其于该机器排程日历上的空隙中产生竞标 | |
竞标成本产生器 | 为特定的竞标计算成本 | |
竞标确认者 | 排除竞标或于日历上标示接受的约定 | |
批次竞标产生器 | 通过竞标产生器的呼叫,其为批次产生竞标以结合群组或初启新群组 | |
机器排程日历 | 存储与操作约定 | |
PM排程代理 | 机器收听者 | 收听冲击约定的状态改变并对其做出响应 |
容器收听者 | 收听容器事件 | |
PM排程日历 | 存储与操作约定 | |
PM竞标选择器 | 选择PM竞标 | |
PM窗口计算器 | 计算于窗口中可执行的PM | |
PM预算计算器 | 计算PM的预算 | |
竞标要求者 | 为特定的服务产生竞标要求并发送该要求至该适当的MSA | |
PM排程代理 | 机器收听者 | 收听冲击约定的状态改变并对其做出响应 |
批处理代理 | MES转换器 | 初启MES处理 |
通知 | 通知适当的制造厂人员 | |
AMHS外观 | 初启批次运送动作 | |
机器处理代理 | 批次收听者 | 收听附属于影响该机器处理 |
的批次的事件 | ||
MES转换器 | 初启MES处理 | |
通知 | 通知适当的制造厂人员 | |
EI转换器 | 发送指令至该设备接口(equipment interface;EI) | |
PM处理代理 | MES转换器 | 初启MES处理 |
通知 | 通知适当的制造厂人员 | |
EI转换器 | 发送指令至该设备接口 | |
资源处理代理 | MES转换器 | 初启MES处理 |
通知 | 通知适当的制造厂人员 | |
EI转换器 | 发送指令至该设备接口 | |
资源排程代理 | 装载顺序计算器 | 为群组约定的所有关系者计算适当装载顺序以及可能的装载初启时间 |
取代竞标要求处理器 | 响应来自MSA的取代竞标要求,其产生于资源排程日历上可能的取代竞标 | |
空隙竞标要求处理器 | 响应来自MSA的空隙竞标要求,其产生于资源排程日历上可能的空隙竞标 | |
结合群组竞标要求处理器 | 响应来自MSA的结合群组竞标要求,其产生于资源排程日历上可能的结合群组竞标 | |
结合群组取代竞标要求处理器 | 响应来自MSA的结合群组取代竞标要求,其产生于资源排程日历上可能的结合群组取代竞标 | |
左移(shift left)行动转换器 | 产生约定移动的收集并为来自相应的机器排程日历的给定的左移行动收集跨越行动 |
右移(shift right)行动转换器 | 产生约定移动的收集并为来自相应的机器排程日历的给定的右移行动收集跨越行动 | |
取代可能性处理器 | 评估取代竞标的可能性,当具有可能性时,其将产生行动的收集以完成该取代竞标 | |
空隙可能性处理器 | 评估空隙竞标的可能性,当具有可能性时,其将产生行动的收集以完成该空隙竞标 | |
结合群组可能性处理器 | 评估结合群组竞标的可能性,当具有可能性时,其将产生行动的收集以完成该结合群组竞标 | |
结合群组取代可能性处理器 | 评估结合群组取代竞标的可能性,当具有可能性时,其将产生行动的收集以完成该结合群组取代竞标 | |
机器收听者 | 收听冲击约定的状态改变并对其做出响应 | |
资源排程日历 | 存储与操作约定 |
Claims (18)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/160,990 US20030225474A1 (en) | 2002-05-31 | 2002-05-31 | Specialization of active software agents in an automated manufacturing environment |
US10/160,990 | 2002-05-31 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1628273A true CN1628273A (zh) | 2005-06-15 |
CN100403324C CN100403324C (zh) | 2008-07-16 |
Family
ID=29583320
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB028290585A Expired - Fee Related CN100403324C (zh) | 2002-05-31 | 2002-12-20 | 在自动化制造环境中主动软件代理的特性化 |
Country Status (9)
Country | Link |
---|---|
US (1) | US20030225474A1 (zh) |
JP (1) | JP4722479B2 (zh) |
KR (1) | KR100946397B1 (zh) |
CN (1) | CN100403324C (zh) |
AU (1) | AU2002359877A1 (zh) |
DE (1) | DE10297744T5 (zh) |
GB (1) | GB2404458B (zh) |
TW (1) | TWI295754B (zh) |
WO (1) | WO2003102771A2 (zh) |
Families Citing this family (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7640529B2 (en) * | 2002-07-30 | 2009-12-29 | Photronics, Inc. | User-friendly rule-based system and method for automatically generating photomask orders |
US7529695B2 (en) * | 2002-06-14 | 2009-05-05 | E2Open, Inc. | Multi-stage supply chain management system with dynamic order placement |
US20030233290A1 (en) * | 2002-06-14 | 2003-12-18 | Yang Lou Ping | Buyer, multi-supplier, multi-stage supply chain management system with lot tracking |
US7426419B2 (en) * | 2002-08-13 | 2008-09-16 | Texas Instruments Incorporated | Scheduling system and method |
US6909996B2 (en) * | 2003-03-12 | 2005-06-21 | Taiwan Semiconductor Manufacturing Co., Ltd | Online material consumption monitoring system and method for monitoring material within a wafer fabrication facility |
US7006885B2 (en) * | 2003-06-19 | 2006-02-28 | Taiwan Semiconductor Manufacturing Co., Ltd. | Method for generating a suggestive dispatch lot list that considers upstream/downstream stage requirements |
KR100524472B1 (ko) * | 2003-07-18 | 2005-10-31 | 삼성전자주식회사 | 반도체공정장치 및 공정진단방법 |
US7039482B2 (en) * | 2003-10-28 | 2006-05-02 | Taiwan Semiconductor Manufacturing Company, Ltd. | Floating process flow control system to handle operation events in a full automation plant |
JP2005294473A (ja) * | 2004-03-31 | 2005-10-20 | Canon Inc | 露光装置、デバイス製造方法及びデバイス |
US6983188B2 (en) * | 2004-04-16 | 2006-01-03 | Hewlett-Packard Development Company, L.P. | Scheduling system |
JP2006108474A (ja) * | 2004-10-07 | 2006-04-20 | Canon Inc | 露光装置及びそれを用いたデバイス製造方法 |
US7680970B2 (en) * | 2004-10-22 | 2010-03-16 | Fisher-Rosemount Systems, Inc. | Method and system for batch process arbitration in a process control system |
US7463939B1 (en) * | 2004-11-18 | 2008-12-09 | Advanced Micro Devices, Inc. | Scheduling tools with queue time constraints |
US20080275582A1 (en) * | 2004-11-19 | 2008-11-06 | Nettles Steven C | Scheduling AMHS pickup and delivery ahead of schedule |
US7151972B2 (en) * | 2005-01-05 | 2006-12-19 | International Business Machines Corporation | Method for autonomic control of a manufacturing system |
US20060271223A1 (en) * | 2005-05-27 | 2006-11-30 | International Business Machines Corporation | Method and system for integrating equipment integration software, equipment events, mes and rules databases |
WO2007044007A1 (en) * | 2005-10-13 | 2007-04-19 | Stratasys, Inc. | Transactional method for building three-dimensional objects |
US7206653B1 (en) * | 2005-11-29 | 2007-04-17 | Taiwan Semiconductor Manufacturing Co., Ltd. | Wafer-based planning methods and systems for batch-based processing tools |
US20070143124A1 (en) * | 2005-12-15 | 2007-06-21 | International Business Machines Corporation | Extensible object data enabled manufacturing |
US7515982B2 (en) * | 2006-06-30 | 2009-04-07 | Intel Corporation | Combining automated and manual information in a centralized system for semiconductor process control |
US8160736B2 (en) * | 2007-01-31 | 2012-04-17 | Globalfoundries Singapore Pte. Ltd. | Methods and apparatus for white space reduction in a production facility |
KR101055645B1 (ko) | 2009-06-30 | 2011-08-09 | 국민대학교산학협력단 | 로봇을 이용한 협업 방법 및 시스템 |
CN102239453A (zh) * | 2010-02-25 | 2011-11-09 | 先进计算机服务株式会社 | 生产设备移动时的资源配置自动化系统及其方法 |
TWI512415B (zh) * | 2014-09-04 | 2015-12-11 | Formosa Plastics Corp | 製程控制系統 |
US10295979B2 (en) * | 2015-09-15 | 2019-05-21 | Applied Materials, Inc. | Scheduling in manufacturing environments |
KR20170034053A (ko) * | 2015-09-18 | 2017-03-28 | 삼성전자주식회사 | 제품의 생산 또는 분석과 연동하는 데이터 수집/처리 시스템, 및 이를 포함하는 제품 생산/분석 시스템 |
US10003549B2 (en) | 2016-04-21 | 2018-06-19 | Google Llc | System for allocating sensor network resources |
US11383377B2 (en) * | 2018-10-09 | 2022-07-12 | Jpmorgan Chase Bank, N.A. | System and method for bot automation lifecycle management |
Family Cites Families (100)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0757002B2 (ja) * | 1982-10-05 | 1995-06-14 | キヤノン株式会社 | 画像処理装置 |
JP2513180B2 (ja) * | 1986-01-13 | 1996-07-03 | ソニー株式会社 | ビデオテックス表示装置 |
US4796194A (en) * | 1986-08-20 | 1989-01-03 | Atherton Robert W | Real world modeling and control process |
DE3722169C2 (de) * | 1987-07-04 | 1997-06-05 | Thomson Brandt Gmbh | Verfahren und Vorrichtung zur Durchführung des Verfahrens zur Anpassung eines Mehrbetriebsarten-Monitors an einen Personal Computer |
JPS6471652A (en) * | 1987-09-09 | 1989-03-16 | Fanuc Ltd | Automatic work scheduling method based on expert system |
US4912624A (en) * | 1988-03-30 | 1990-03-27 | Syracuse University | Multi-parameter optimization circuit |
US5014208A (en) * | 1989-01-23 | 1991-05-07 | Siemens Corporate Research, Inc. | Workcell controller employing entity-server model for physical objects and logical abstractions |
US5093794A (en) * | 1989-08-22 | 1992-03-03 | United Technologies Corporation | Job scheduling system |
US5040123A (en) * | 1989-09-08 | 1991-08-13 | General Motors Corporation | Expert system scheduler |
US5233533A (en) * | 1989-12-19 | 1993-08-03 | Symmetrix, Inc. | Scheduling method and apparatus |
US5291394A (en) * | 1990-06-01 | 1994-03-01 | Motorola, Inc. | Manufacturing control and capacity planning system |
WO1992007331A1 (en) * | 1990-10-16 | 1992-04-30 | Consilium, Inc. | Object-oriented architecture for factory floor management |
US5249120A (en) * | 1991-01-14 | 1993-09-28 | The Charles Stark Draper Laboratory, Inc. | Automated manufacturing costing system and method |
US5402350A (en) * | 1991-06-28 | 1995-03-28 | Texas Instruments Incorporated | Scheduling for multi-task manufacturing equipment |
JPH05250377A (ja) * | 1992-03-04 | 1993-09-28 | Fujitsu Ltd | スケジューリング方式 |
US5487144A (en) * | 1992-12-01 | 1996-01-23 | Yokogawa Electric Corporation | Scheduling system |
US6128542A (en) * | 1993-03-29 | 2000-10-03 | Cmsi Acquisition Corporation | Method and apparatus for generating a sequence of steps for use by a factory |
US5666493A (en) * | 1993-08-24 | 1997-09-09 | Lykes Bros., Inc. | System for managing customer orders and method of implementation |
US5446671A (en) * | 1993-10-22 | 1995-08-29 | Micron Semiconductor, Inc. | Look-ahead method for maintaining optimum queued quantities of in-process parts at a manufacturing bottleneck |
US5467268A (en) * | 1994-02-25 | 1995-11-14 | Minnesota Mining And Manufacturing Company | Method for resource assignment and scheduling |
US5963911A (en) * | 1994-03-25 | 1999-10-05 | British Telecommunications Public Limited Company | Resource allocation |
US5444632A (en) * | 1994-04-28 | 1995-08-22 | Texas Instruments Incorporated | Apparatus and method for controlling and scheduling processing machines |
US5787000A (en) * | 1994-05-27 | 1998-07-28 | Lilly Software Associates, Inc. | Method and apparatus for scheduling work orders in a manufacturing process |
US6801820B1 (en) * | 1994-05-27 | 2004-10-05 | Lilly Software Associates, Inc. | Method and apparatus for scheduling work orders in a manufacturing process |
US5548518A (en) * | 1994-05-31 | 1996-08-20 | International Business Machines Corporation | Allocation method for generating a production schedule |
US5548535A (en) * | 1994-11-08 | 1996-08-20 | Advanced Micro Devices, Inc. | Monitor utility for use in manufacturing environment |
US5596502A (en) * | 1994-11-14 | 1997-01-21 | Sunoptech, Ltd. | Computer system including means for decision support scheduling |
JP3334400B2 (ja) * | 1995-02-02 | 2002-10-15 | トヨタ自動車株式会社 | 仕掛計画立案装置 |
US5546326A (en) * | 1995-04-04 | 1996-08-13 | Taiwan Semiconductor Manufacturing Company Ltd | Dynamic dispatching rule that uses long term due date and short term queue time to improve delivery performance |
US5933354A (en) * | 1995-10-13 | 1999-08-03 | Matsushita Electric Industrial Co., Ltd. | System for controlling physical distribution pallets |
US5890134A (en) * | 1996-02-16 | 1999-03-30 | Mcdonnell Douglas Corporation | Scheduling optimizer |
US5765137A (en) * | 1996-03-04 | 1998-06-09 | Massachusetts Institute Of Technology | Computer system and computer-implemented process for correlating product requirements to manufacturing cost |
US5960417A (en) * | 1996-03-19 | 1999-09-28 | Vanguard International Semiconductor Corporation | IC manufacturing costing control system and process |
US5970476A (en) * | 1996-09-19 | 1999-10-19 | Manufacturing Management Systems, Inc. | Method and apparatus for industrial data acquisition and product costing |
US5953229A (en) * | 1996-09-24 | 1999-09-14 | Environmental Research Institute Of Michigan | Density-based emergent scheduling system |
US6571215B1 (en) * | 1997-01-21 | 2003-05-27 | Microsoft Corporation | System and method for generating a schedule based on resource assignments |
US6192354B1 (en) * | 1997-03-21 | 2001-02-20 | International Business Machines Corporation | Apparatus and method for optimizing the performance of computer tasks using multiple intelligent agents having varied degrees of domain knowledge |
US5920692A (en) * | 1997-03-24 | 1999-07-06 | International Business Machines Corp. | Method and system for a remote notification service for a multi-user server architecture |
AU735024B2 (en) * | 1997-07-25 | 2001-06-28 | British Telecommunications Public Limited Company | Scheduler for a software system |
US6216108B1 (en) * | 1997-08-11 | 2001-04-10 | Levander Mark R. | Service business management system |
US5963447A (en) * | 1997-08-22 | 1999-10-05 | Hynomics Corporation | Multiple-agent hybrid control architecture for intelligent real-time control of distributed nonlinear processes |
US6415196B1 (en) * | 1997-08-28 | 2002-07-02 | Manugistics, Inc. | Manufacturing scheduling process with improved modeling, scheduling and editing capabilities for solving finite capacity planning problems |
JPH11328465A (ja) * | 1998-05-13 | 1999-11-30 | Dainippon Screen Mfg Co Ltd | デジタル情報を処理するとともにジョブ情報の管理を行うシステムおよび方法、並びにプログラムを記録した記録媒体 |
US6571147B1 (en) * | 1997-09-22 | 2003-05-27 | Dainippon Screen Mfg. Co., Ltd. | System for and method of managing jobs |
US6889178B1 (en) * | 1997-10-01 | 2005-05-03 | Sony Corporation | Integrated wafer fabrication production characterization and scheduling system |
US6128588A (en) * | 1997-10-01 | 2000-10-03 | Sony Corporation | Integrated wafer fab time standard (machine tact) database |
US6470227B1 (en) * | 1997-12-02 | 2002-10-22 | Murali D. Rangachari | Method and apparatus for automating a microelectric manufacturing process |
JPH11235648A (ja) * | 1998-02-17 | 1999-08-31 | Toshiba Corp | 製造計画管理装置、製造計画管理方法、及び、製造計画管理プログラムを記録したコンピュータ読み取り可能な記録媒体 |
US6263255B1 (en) * | 1998-05-18 | 2001-07-17 | Advanced Micro Devices, Inc. | Advanced process control for semiconductor manufacturing |
US6615091B1 (en) * | 1998-06-26 | 2003-09-02 | Eveready Battery Company, Inc. | Control system and method therefor |
US6400999B1 (en) * | 1998-07-06 | 2002-06-04 | Yokogawa Electric Corporation | Production system and manufacturing equipment selecting method on production system |
AU5318699A (en) * | 1998-07-22 | 2000-02-14 | Vibhu K. Kalyan | Computer-implemented value management tool for an asset intensive manufacturer |
US6397197B1 (en) * | 1998-08-26 | 2002-05-28 | E-Lynxx Corporation | Apparatus and method for obtaining lowest bid from information product vendors |
US6091998A (en) * | 1998-09-30 | 2000-07-18 | Rockwell Technologies, Llc | Self organizing industrial control system using bidding process |
JP3327235B2 (ja) * | 1998-12-22 | 2002-09-24 | トヨタ自動車株式会社 | 受注品納期管理システム |
US6374144B1 (en) * | 1998-12-22 | 2002-04-16 | Varian Semiconductor Equipment Associates, Inc. | Method and apparatus for controlling a system using hierarchical state machines |
US6356797B1 (en) * | 1999-01-04 | 2002-03-12 | Taiwan Semiconductor Manufacturing Co., Ltd. | Method for automatic scheduling of production plan |
US6202062B1 (en) * | 1999-02-26 | 2001-03-13 | Ac Properties B.V. | System, method and article of manufacture for creating a filtered information summary based on multiple profiles of each single user |
US6389454B1 (en) * | 1999-05-13 | 2002-05-14 | Medical Specialty Software | Multi-facility appointment scheduling system |
US6434443B1 (en) * | 1999-05-17 | 2002-08-13 | Taiwan Semiconductor Manufacturing Company | Method for performing dynamic re-scheduling of fabrication plant |
US6556949B1 (en) * | 1999-05-18 | 2003-04-29 | Applied Materials, Inc. | Semiconductor processing techniques |
US6408220B1 (en) * | 1999-06-01 | 2002-06-18 | Applied Materials, Inc. | Semiconductor processing techniques |
US6397115B1 (en) * | 1999-10-08 | 2002-05-28 | Smithkline Beecham | Hazardous material classification system |
US7130807B1 (en) * | 1999-11-22 | 2006-10-31 | Accenture Llp | Technology sharing during demand and supply planning in a network-based supply chain environment |
EP1259901A1 (en) * | 2000-01-27 | 2002-11-27 | Synquiry Technologies, Ltd | Software composition using graph types, graphs, and agents |
US6584369B2 (en) * | 2000-02-02 | 2003-06-24 | Texas Instruments Incorporated | Method and system for dispatching semiconductor lots to manufacturing equipment for fabrication |
US6711450B1 (en) * | 2000-02-02 | 2004-03-23 | Advanced Micro Devices, Inc. | Integration of business rule parameters in priority setting of wafer processing |
US6714830B2 (en) * | 2000-02-28 | 2004-03-30 | Canon Kabushiki Kaisha | Push-type scheduling for semiconductor fabrication |
US6907546B1 (en) * | 2000-03-27 | 2005-06-14 | Accenture Llp | Language-driven interface for an automated testing framework |
US6856848B2 (en) * | 2000-04-24 | 2005-02-15 | Matsushita Electric Industrial Co., Ltd. | Method and apparatus for controlling progress of product processing |
US6636848B1 (en) * | 2000-05-31 | 2003-10-21 | International Business Machines Corporation | Information search using knowledge agents |
US6418350B1 (en) * | 2000-06-09 | 2002-07-09 | Brooks Automation Inc. | Periodic scheduler for dual-arm robots in cluster tools with process-module residency constraints |
US6591262B1 (en) * | 2000-08-01 | 2003-07-08 | International Business Machines Corporation | Collaborative workload management incorporating work unit attributes in resource allocation |
US6618692B2 (en) * | 2000-09-20 | 2003-09-09 | Hitachi, Ltd. | Remote diagnostic system and method for semiconductor manufacturing equipment |
US7457680B2 (en) * | 2000-12-27 | 2008-11-25 | Tokyo Electron Limited | Conveyance method for transporting objects |
JP4213871B2 (ja) * | 2001-02-01 | 2009-01-21 | 株式会社日立製作所 | 半導体装置の製造方法 |
US20020116210A1 (en) * | 2001-02-20 | 2002-08-22 | Honeywell International Inc. | Computerized method for online quoting and pricing of tasks |
US20020120533A1 (en) * | 2001-02-23 | 2002-08-29 | Hubert Wiesenmaier | Method and system for management of ordering, production, and delivery of made-to-specification goods |
US7194323B2 (en) * | 2001-03-22 | 2007-03-20 | International Business Machines Corporation | Method and system for object oriented approach and data model for configure-to-order manufacturing system |
US8065219B2 (en) * | 2001-06-13 | 2011-11-22 | Sungard Energy Systems Inc. | System architecture and method for energy industry trading and transaction management |
US20030004912A1 (en) * | 2001-06-29 | 2003-01-02 | Lalit Pant | Architecture for intelligent agents and distributed platform therefor |
US6898472B2 (en) * | 2001-12-27 | 2005-05-24 | Manugistics, Inc. | System and method for order group planning with attribute based planning |
US20030149631A1 (en) * | 2001-12-27 | 2003-08-07 | Manugistics, Inc. | System and method for order planning with attribute based planning |
US7035877B2 (en) * | 2001-12-28 | 2006-04-25 | Kimberly-Clark Worldwide, Inc. | Quality management and intelligent manufacturing with labels and smart tags in event-based product manufacturing |
US6731999B1 (en) * | 2002-01-02 | 2004-05-04 | Taiwan Semiconductor Manufacturing Company | Wafer start order release algorithm in a foundry fab |
US7010386B2 (en) * | 2002-03-22 | 2006-03-07 | Mcdonnell Ryan P | Tool wear monitoring system |
US20040030531A1 (en) * | 2002-03-28 | 2004-02-12 | Honeywell International Inc. | System and method for automated monitoring, recognizing, supporting, and responding to the behavior of an actor |
US6907305B2 (en) * | 2002-04-30 | 2005-06-14 | Advanced Micro Devices, Inc. | Agent reactive scheduling in an automated manufacturing environment |
US7286999B2 (en) * | 2002-05-09 | 2007-10-23 | International Business Machines Corporation | Integrated project management and development environment for determining the time expended on project tasks |
US7512454B1 (en) * | 2002-05-31 | 2009-03-31 | Advanced Micro Devices, Inc. | Display unit with processor and communication controller |
US6748282B2 (en) * | 2002-08-22 | 2004-06-08 | Taiwan Semiconductor Manufacturing Co., Ltd | Flexible dispatching system and method for coordinating between a manual automated dispatching mode |
US7069097B1 (en) * | 2002-08-30 | 2006-06-27 | Advanced Micro Devices, Inc. | Method and apparatus for reducing scheduling conflicts for a resource |
US6904329B1 (en) * | 2002-08-30 | 2005-06-07 | Advanced Micro Devices, Inc. | Method and apparatus for generating a multi-dimensional cost function |
US6782302B1 (en) * | 2002-08-30 | 2004-08-24 | Advanced Micro Devices, Inc. | Method and apparatus for scheduling workpieces with compatible processing requirements |
US6801819B1 (en) * | 2002-08-30 | 2004-10-05 | Advanced Micro Devices, Inc. | Method and apparatus for evaluating bids for scheduling a resource |
US7127310B1 (en) * | 2002-08-30 | 2006-10-24 | Advanced Micro Devices, Inc. | Method and apparatus for determining cost functions using parameterized components |
US6862555B2 (en) * | 2002-11-27 | 2005-03-01 | Taiwan Semiconductor Manufacturing Co., Ltd | Enhanced preventative maintenance system and method of use |
US7027885B1 (en) * | 2002-12-30 | 2006-04-11 | Advanced Micro Devices, Inc. | Determining batch start versus delay |
US7565662B2 (en) * | 2004-09-24 | 2009-07-21 | International Business Machines Corporation | Program agent initiated processing of enqueued event actions |
US7337032B1 (en) * | 2004-10-04 | 2008-02-26 | Advanced Micro Devices, Inc. | Scheduling ahead for various processes |
-
2002
- 2002-05-31 US US10/160,990 patent/US20030225474A1/en not_active Abandoned
- 2002-12-20 KR KR1020047019536A patent/KR100946397B1/ko not_active IP Right Cessation
- 2002-12-20 WO PCT/US2002/041659 patent/WO2003102771A2/en active Application Filing
- 2002-12-20 CN CNB028290585A patent/CN100403324C/zh not_active Expired - Fee Related
- 2002-12-20 GB GB0424487A patent/GB2404458B/en not_active Expired - Fee Related
- 2002-12-20 DE DE10297744T patent/DE10297744T5/de not_active Ceased
- 2002-12-20 JP JP2004509789A patent/JP4722479B2/ja not_active Expired - Fee Related
- 2002-12-20 AU AU2002359877A patent/AU2002359877A1/en not_active Abandoned
-
2003
- 2003-04-11 TW TW092108319A patent/TWI295754B/zh not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
GB2404458A (en) | 2005-02-02 |
KR20050004902A (ko) | 2005-01-12 |
KR100946397B1 (ko) | 2010-03-09 |
TWI295754B (en) | 2008-04-11 |
JP2005528787A (ja) | 2005-09-22 |
DE10297744T5 (de) | 2005-08-11 |
WO2003102771A3 (en) | 2004-04-01 |
TW200400428A (en) | 2004-01-01 |
JP4722479B2 (ja) | 2011-07-13 |
CN100403324C (zh) | 2008-07-16 |
WO2003102771A2 (en) | 2003-12-11 |
GB2404458B (en) | 2006-06-14 |
AU2002359877A1 (en) | 2003-12-19 |
GB0424487D0 (en) | 2004-12-08 |
US20030225474A1 (en) | 2003-12-04 |
AU2002359877A8 (en) | 2003-12-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1628273A (zh) | 在自动化制造环境中主动软件代理的特性化 | |
CN100351723C (zh) | 用于自动化制造环境的代理人反应式调度 | |
CN101057192A (zh) | 提前的调度自动化物料搬运系统(amhs)取货及送货 | |
CN1288519C (zh) | 机器人系统控制 | |
US20070073430A1 (en) | Optimization-based process scheduling method and system | |
US6957113B1 (en) | Systems for allocating multi-function resources in a process system and methods of operating the same | |
Chou et al. | A multiobjective hybrid genetic algorithm for TFT-LCD module assembly scheduling | |
US7337032B1 (en) | Scheduling ahead for various processes | |
CN1376999A (zh) | 根据已接收的数据来选定光掩模的制造商的装置及其方法 | |
CN1942888A (zh) | 用于半导体制造设备的服务活动管理系统和方法 | |
CN1674025A (zh) | 计划操作管理支持系统,以及计划操作管理支持程序 | |
US7623936B1 (en) | Determining scheduling priority using queue time optimization | |
CN1389766A (zh) | 远程维护方法、工业装置和半导体器件 | |
US7257459B1 (en) | Method and apparatus for scheduling pilot lots | |
Lin et al. | A multi-site supply network planning problem considering variable time buckets–A TFT-LCD industry case | |
TWI279694B (en) | Method and system for enabling a customer to monitor and alter an order in a semiconductor manufacturing environment | |
CN1144569A (zh) | 资源分配 | |
CN105631624A (zh) | 半导体制造中用于库存管理的方法和优先系统 | |
Kuo et al. | Industry 4.0 enabling manufacturing competitiveness: Delivery performance improvement based on theory of constraints | |
Yurtsever et al. | Heuristic based scheduling system for diffusion in semiconductor manufacturing | |
Aydt et al. | Symbiotic simulation for optimisation of tool operations in semiconductor manufacturing | |
Chen et al. | Capacity planning in thin film transistor–Liquid crystal display cell process | |
Liu* et al. | Practical lot release methodology for semiconductor back-end manufacturing | |
Reinhardt et al. | Simulation-based optimiziation to design equipment health-aware dispatching rules | |
Lin et al. | The study of the cycle time improvement by work‐in‐process statistical process control method for IC foundry manufacturing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: GLOBALFOUNDRIES SEMICONDUCTORS CO., LTD Free format text: FORMER OWNER: ADVANCED MICRO DEVICES CORPORATION Effective date: 20100721 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: CALIFORNIA STATE, THE USA TO: GRAND CAYMAN ISLAND, BRITISH CAYMAN ISLANDS |
|
TR01 | Transfer of patent right |
Effective date of registration: 20100721 Address after: Grand Cayman, Cayman Islands Patentee after: Globalfoundries Semiconductor Inc. Address before: American California Patentee before: Advanced Micro Devices Inc. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080716 Termination date: 20161220 |