US7114567B2
(en)
*
|
2003-01-28 |
2006-10-03 |
Schlumberger Technology Corporation |
Propped fracture with high effective surface area
|
US7561998B2
(en)
*
|
2005-02-07 |
2009-07-14 |
Schlumberger Technology Corporation |
Modeling, simulation and comparison of models for wormhole formation during matrix stimulation of carbonates
|
US8693405B2
(en)
|
2005-10-27 |
2014-04-08 |
Qualcomm Incorporated |
SDMA resource management
|
FR2898382B1
(fr)
*
|
2006-03-10 |
2008-04-18 |
Inst Francais Du Petrole |
Methode pour modeliser et simuler a grande echelle la stimulation des puits carbonates
|
US8056619B2
(en)
|
2006-03-30 |
2011-11-15 |
Schlumberger Technology Corporation |
Aligning inductive couplers in a well
|
US7712524B2
(en)
|
2006-03-30 |
2010-05-11 |
Schlumberger Technology Corporation |
Measuring a characteristic of a well proximate a region to be gravel packed
|
US7793718B2
(en)
*
|
2006-03-30 |
2010-09-14 |
Schlumberger Technology Corporation |
Communicating electrical energy with an electrical device in a well
|
RU2486336C2
(ru)
*
|
2007-11-01 |
2013-06-27 |
Лоджинд Б.В. |
Способы имитации разрыва пласта-коллектора и его оценки и считываемый компьютером носитель
|
US8121790B2
(en)
*
|
2007-11-27 |
2012-02-21 |
Schlumberger Technology Corporation |
Combining reservoir modeling with downhole sensors and inductive coupling
|
DK2229423T3
(en)
*
|
2008-01-09 |
2017-08-28 |
Akzo Nobel Nv |
APPLICATION OF AN ACID Aqueous SOLUTION CONTAINING A CHELATING AGENT AS AN OIL FIELD CHEMICAL
|
US7950455B2
(en)
|
2008-01-14 |
2011-05-31 |
Baker Hughes Incorporated |
Non-spherical well treating particulates and methods of using the same
|
US9074454B2
(en)
*
|
2008-01-15 |
2015-07-07 |
Schlumberger Technology Corporation |
Dynamic reservoir engineering
|
US20110067871A1
(en)
*
|
2008-05-22 |
2011-03-24 |
Burdette Jason A |
Methods For Regulating Flow In Multi-Zone Intervals
|
US8293696B2
(en)
*
|
2009-02-06 |
2012-10-23 |
Ecolab, Inc. |
Alkaline composition comprising a chelant mixture, including HEIDA, and method of producing same
|
US8082992B2
(en)
*
|
2009-07-13 |
2011-12-27 |
Halliburton Energy Services, Inc. |
Methods of fluid-controlled geometry stimulation
|
US8494827B2
(en)
*
|
2009-09-25 |
2013-07-23 |
Exxonmobil Upstream Research Company |
Method of predicting natural fractures and damage in a subsurface region
|
US8839850B2
(en)
|
2009-10-07 |
2014-09-23 |
Schlumberger Technology Corporation |
Active integrated completion installation system and method
|
US9249559B2
(en)
|
2011-10-04 |
2016-02-02 |
Schlumberger Technology Corporation |
Providing equipment in lateral branches of a well
|
US9644476B2
(en)
|
2012-01-23 |
2017-05-09 |
Schlumberger Technology Corporation |
Structures having cavities containing coupler portions
|
US9175560B2
(en)
|
2012-01-26 |
2015-11-03 |
Schlumberger Technology Corporation |
Providing coupler portions along a structure
|
US9938823B2
(en)
|
2012-02-15 |
2018-04-10 |
Schlumberger Technology Corporation |
Communicating power and data to a component in a well
|
US9405867B2
(en)
|
2012-06-07 |
2016-08-02 |
Dassault Systemes Simulia Corp. |
Hydraulic fracture simulation with an extended finite element method
|
US10036234B2
(en)
|
2012-06-08 |
2018-07-31 |
Schlumberger Technology Corporation |
Lateral wellbore completion apparatus and method
|
US9418184B2
(en)
*
|
2013-07-25 |
2016-08-16 |
Halliburton Energy Services, Inc. |
Determining flow through a fracture junction in a complex fracture network
|
US9482079B2
(en)
*
|
2013-08-30 |
2016-11-01 |
Halliburton Energy Services, Inc. |
Determining acid injection treatment parameters
|
US20150075797A1
(en)
*
|
2013-09-16 |
2015-03-19 |
Schlumberger Technology Corporation |
Well treatment
|
US20150330199A1
(en)
*
|
2014-05-15 |
2015-11-19 |
Baker Hughes Incorporated |
Method for enhancing acidizing treatment of a formation having a high bottom hole temperature
|
US10132147B2
(en)
|
2014-07-02 |
2018-11-20 |
Weatherford Technology Holdings, Llc |
System and method for modeling and design of pulse fracturing networks
|
WO2016028564A1
(en)
*
|
2014-08-22 |
2016-02-25 |
Schlumberger Canada Limited |
Methods for monitoring fluid flow and transport in shale gas reservoirs
|
MX2018002718A
(es)
*
|
2015-09-23 |
2018-04-13 |
Halliburton Energy Services Inc |
Composiciones que comprenden quelante acido para tratar formaciones subterraneas que incluyan una o mas fracturas.
|
US10190388B2
(en)
|
2015-10-15 |
2019-01-29 |
Halliburton Energy Services, Inc. |
Diverter fluid diverter fluid
|
US20170267909A1
(en)
*
|
2016-03-17 |
2017-09-21 |
Baker Hughes Incorporated |
Methods and Materials for Improving Wellbore Stability in Laminated Tight Carbonate Source-Rock Formations
|
CN106522935B
(zh)
*
|
2016-12-26 |
2019-04-26 |
西南石油大学 |
实验确定碳酸盐岩油气藏酸压裂缝导流能力分布的方法
|
WO2018204259A1
(en)
|
2017-05-02 |
2018-11-08 |
Saudi Arabian Oil Company |
Synthetic source rocks
|
CN109931045B
(zh)
*
|
2017-12-18 |
2021-08-31 |
中国石油化工股份有限公司 |
一种双缝系统的自支撑酸压方法
|
US10871061B2
(en)
|
2018-01-10 |
2020-12-22 |
Saudi Arabian Oil Company |
Treatment of kerogen in subterranean zones
|
WO2019143320A1
(en)
*
|
2018-01-16 |
2019-07-25 |
Halliburton Energy Services, Inc. |
Modeling fracture closure processes in hydraulic fracturing simulators
|
US11520070B2
(en)
*
|
2018-02-01 |
2022-12-06 |
Schlumberger Technology Corporation |
Effective medium theory of acidized carbonate matrix resistivity employed to calculate the apparent geometric parameters of the wormholes
|
US10520407B2
(en)
|
2018-03-01 |
2019-12-31 |
Saudi Arabian Oil Company |
Nano-indentation tests to characterize hydraulic fractures
|
US11573159B2
(en)
|
2019-01-08 |
2023-02-07 |
Saudi Arabian Oil Company |
Identifying fracture barriers for hydraulic fracturing
|
US11319478B2
(en)
|
2019-07-24 |
2022-05-03 |
Saudi Arabian Oil Company |
Oxidizing gasses for carbon dioxide-based fracturing fluids
|
US11492541B2
(en)
|
2019-07-24 |
2022-11-08 |
Saudi Arabian Oil Company |
Organic salts of oxidizing anions as energetic materials
|
CN110609974B
(zh)
*
|
2019-09-09 |
2022-09-16 |
西南石油大学 |
一种考虑蚓孔扩展的酸压裂缝动态滤失计算方法
|
CN113008750B
(zh)
*
|
2019-12-19 |
2023-02-24 |
中国石油天然气股份有限公司 |
酸蚀裂缝导流能力的确定方法
|
US11352548B2
(en)
|
2019-12-31 |
2022-06-07 |
Saudi Arabian Oil Company |
Viscoelastic-surfactant treatment fluids having oxidizer
|
US11339321B2
(en)
|
2019-12-31 |
2022-05-24 |
Saudi Arabian Oil Company |
Reactive hydraulic fracturing fluid
|
WO2021138355A1
(en)
|
2019-12-31 |
2021-07-08 |
Saudi Arabian Oil Company |
Viscoelastic-surfactant fracturing fluids having oxidizer
|
US11473001B2
(en)
|
2020-01-17 |
2022-10-18 |
Saudi Arabian Oil Company |
Delivery of halogens to a subterranean formation
|
US11473009B2
(en)
|
2020-01-17 |
2022-10-18 |
Saudi Arabian Oil Company |
Delivery of halogens to a subterranean formation
|
US11268373B2
(en)
|
2020-01-17 |
2022-03-08 |
Saudi Arabian Oil Company |
Estimating natural fracture properties based on production from hydraulically fractured wells
|
US11365344B2
(en)
|
2020-01-17 |
2022-06-21 |
Saudi Arabian Oil Company |
Delivery of halogens to a subterranean formation
|
US11549894B2
(en)
|
2020-04-06 |
2023-01-10 |
Saudi Arabian Oil Company |
Determination of depositional environments
|
CN113494284B
(zh)
*
|
2020-04-07 |
2023-06-30 |
中国石油天然气股份有限公司 |
深层页岩气储层水力压裂参数确定方法、装置和存储介质
|
US11578263B2
(en)
|
2020-05-12 |
2023-02-14 |
Saudi Arabian Oil Company |
Ceramic-coated proppant
|
CN113818854B
(zh)
*
|
2020-06-18 |
2023-08-08 |
中国石油化工股份有限公司 |
一种超深碳酸盐岩储层提高导流能力的复合酸压方法及应用
|
US11542815B2
(en)
|
2020-11-30 |
2023-01-03 |
Saudi Arabian Oil Company |
Determining effect of oxidative hydraulic fracturing
|
US11885790B2
(en)
|
2021-12-13 |
2024-01-30 |
Saudi Arabian Oil Company |
Source productivity assay integrating pyrolysis data and X-ray diffraction data
|
US11697759B1
(en)
|
2022-03-03 |
2023-07-11 |
Halliburton Energy Services, Inc. |
Inducing subterranean formation complexity
|