EP0940360A2 - Method and device for splicing webs - Google Patents

Method and device for splicing webs Download PDF

Info

Publication number
EP0940360A2
EP0940360A2 EP99100542A EP99100542A EP0940360A2 EP 0940360 A2 EP0940360 A2 EP 0940360A2 EP 99100542 A EP99100542 A EP 99100542A EP 99100542 A EP99100542 A EP 99100542A EP 0940360 A2 EP0940360 A2 EP 0940360A2
Authority
EP
European Patent Office
Prior art keywords
new
web
bobbin
piece
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP99100542A
Other languages
German (de)
French (fr)
Other versions
EP0940360B1 (en
EP0940360A3 (en
Inventor
Heinz Focke
Jens Renken
Harald Freudenberg
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Focke and Co GmbH and Co KG
Original Assignee
Focke and Co GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Focke and Co GmbH and Co KG filed Critical Focke and Co GmbH and Co KG
Priority to EP03006338A priority Critical patent/EP1340702B8/en
Publication of EP0940360A2 publication Critical patent/EP0940360A2/en
Publication of EP0940360A3 publication Critical patent/EP0940360A3/en
Application granted granted Critical
Publication of EP0940360B1 publication Critical patent/EP0940360B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H23/00Registering, tensioning, smoothing or guiding webs
    • B65H23/04Registering, tensioning, smoothing or guiding webs longitudinally
    • B65H23/18Registering, tensioning, smoothing or guiding webs longitudinally by controlling or regulating the web-advancing mechanism, e.g. mechanism acting on the running web
    • B65H23/188Registering, tensioning, smoothing or guiding webs longitudinally by controlling or regulating the web-advancing mechanism, e.g. mechanism acting on the running web in connection with running-web
    • B65H23/1882Registering, tensioning, smoothing or guiding webs longitudinally by controlling or regulating the web-advancing mechanism, e.g. mechanism acting on the running web in connection with running-web and controlling longitudinal register of web
    • B65H23/1886Synchronising two or more webs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H21/00Apparatus for splicing webs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H19/00Changing the web roll
    • B65H19/10Changing the web roll in unwinding mechanisms or in connection with unwinding operations
    • B65H19/105Opening of web rolls; Removing damaged outer layers; Detecting the leading end of a closed web roll
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H19/00Changing the web roll
    • B65H19/10Changing the web roll in unwinding mechanisms or in connection with unwinding operations
    • B65H19/107Processing the trailing end of the replaced web after splicing operation, e.g. rewinding it
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H19/00Changing the web roll
    • B65H19/10Changing the web roll in unwinding mechanisms or in connection with unwinding operations
    • B65H19/18Attaching, e.g. pasting, the replacement web to the expiring web
    • B65H19/1842Attaching, e.g. pasting, the replacement web to the expiring web standing splicing, i.e. the expiring web being stationary during splicing contact
    • B65H19/1852Attaching, e.g. pasting, the replacement web to the expiring web standing splicing, i.e. the expiring web being stationary during splicing contact taking place at a distance from the replacement roll
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H19/00Changing the web roll
    • B65H19/10Changing the web roll in unwinding mechanisms or in connection with unwinding operations
    • B65H19/18Attaching, e.g. pasting, the replacement web to the expiring web
    • B65H19/1857Support arrangement of web rolls
    • B65H19/1868The roll support being of the turret type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2301/00Handling processes for sheets or webs
    • B65H2301/40Type of handling process
    • B65H2301/41Winding, unwinding
    • B65H2301/415Unwinding
    • B65H2301/41505Preparing unwinding process
    • B65H2301/41508Preparing unwinding process the web roll being in the unwinding support / unwinding location
    • B65H2301/41509Preparing unwinding process the web roll being in the unwinding support / unwinding location opening web roll and related steps
    • B65H2301/415095Preparing unwinding process the web roll being in the unwinding support / unwinding location opening web roll and related steps gripping an edge of the web, e.g. by clamping and forward it, e.g. to splicing web advancing unit
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2301/00Handling processes for sheets or webs
    • B65H2301/40Type of handling process
    • B65H2301/46Splicing
    • B65H2301/461Processing webs in splicing process
    • B65H2301/4611Processing webs in splicing process before splicing
    • B65H2301/46115Processing webs in splicing process before splicing by bringing leading edge to splicing station, e.g. by chain or belt
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2301/00Handling processes for sheets or webs
    • B65H2301/40Type of handling process
    • B65H2301/46Splicing
    • B65H2301/461Processing webs in splicing process
    • B65H2301/4615Processing webs in splicing process after splicing
    • B65H2301/4617Processing webs in splicing process after splicing cutting webs in splicing process
    • B65H2301/46176Processing webs in splicing process after splicing cutting webs in splicing process cutting both spliced webs simultaneously
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2301/00Handling processes for sheets or webs
    • B65H2301/40Type of handling process
    • B65H2301/46Splicing
    • B65H2301/462Form of splice
    • B65H2301/4622Abutting article or web portions, i.e. edge to edge
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2301/00Handling processes for sheets or webs
    • B65H2301/40Type of handling process
    • B65H2301/46Splicing
    • B65H2301/463Splicing splicing means, i.e. means by which a web end is bound to another web end
    • B65H2301/4631Adhesive tape
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2403/00Power transmission; Driving means
    • B65H2403/50Driving mechanisms
    • B65H2403/51Cam mechanisms
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2406/00Means using fluid
    • B65H2406/30Suction means
    • B65H2406/34Suction grippers
    • B65H2406/341Suction grippers being oscillated in arcuate paths
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2406/00Means using fluid
    • B65H2406/30Suction means
    • B65H2406/34Suction grippers
    • B65H2406/342Suction grippers being reciprocated in a rectilinear path
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2801/00Application field
    • B65H2801/54Cigarette making
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2801/00Application field
    • B65H2801/81Packaging machines

Abstract

The preceding web (29) on the one hand and the new web on the other hand are clamped and from the preceding web and from the new web a commencement piece and an end piece are separated. The thus formed ends are positioned next to each other in a common plane for connection and application of the tape. To form the commencement piece of the new web, a closed outer casing of a new bobbin and a closed outer layer of a new web are separated in an axial direction so that at least a free web leg of the new web hangs freely by its own weight, the web leg is secured and a commencement piece of the new bobbin (30) is drawn away.

Description

Die Erfindung betrifft ein Verfahren zum Verbinden von Materialbahnen aus Verpackungsmaterial oder dergleichen, nämlich eines Ablaufendes einer Ablaufbahn mit einem Neuanfang einer anzuschließenden Neubahn durch Verbindungsmittel, insbesondere Klebestreifen, wobei die Neubahn und die Ablaufbahn durch Klemmen erfaßt, durchtrennt und daß so gebildete Ablaufende einerseits und Neuanfang andererseits miteinander verbunden werden. Weiterhin betrifft die Erfindung eine Vorrichtung für die Durchführung des Verfahrens.The invention relates to a method for connecting material webs from packaging material or the like, namely an end of a runway with a fresh start to be connected new line by connecting means, in particular Adhesive tape, the new track and the runway by clamping grasped, severed and that end of flow thus formed on the one hand and new beginning on the other hand. Furthermore, the invention relates to a device for Execution of the procedure.

Verpackungsmaschinen verarbeiten vielfach bahnförmiges Verpackungsmaterial zum Herstellen von Zuschnitten. Verpackungsmaschinen mit hoher Leistung, z. B. Zigaretten-Verpackungsmaschinen, haben einen großen Verbrauch an Verpackungsmaterial. Zum Anschließen einer Materialbahn einer neuen, vollen Bobine - Neubahn - an eine ablaufende Materialbahn einer fast leergefahrenen Bobine - Ablaufbahn - sind automatisch arbeitende Verbindungsaggregate bekannt, die ohne manuellen Eingriff die Neubahn an die Ablaufbahn anschließen. Bei einem bekannten Verbindungsaggregat (EP 0 638 499) wird ein freies Ende der Neubahn von der "vollen" Bobine abgezogen und einem Verbindungsaggregat zugeführt. Im Bereich desselben werden die Ablaufbahn und die Neubahn durch Klemmorgane aneinandergedrückt und durchtrennt. Der dadurch geschaffene Neuanfang und das Ablaufende werden durch einen Klebestreifen (Tape) miteinander verbunden.Packaging machines often process sheet-like packaging material for making blanks. Packaging machines with high performance, e.g. B. cigarette packaging machines, have a large consumption of packaging material. To the Connection of a material web of a new, full bobbin - New web - to a running material web of an almost empty one Bobine - runway - are automatically working connection units known that the Neubahn without manual intervention connect to the runway. In a known connection unit (EP 0 638 499) becomes a free end of the new railway subtracted from the "full" bobbin and a connecting unit fed. In the same area, the runway and the New web pressed together by clamps and severed. The new beginning created thereby and the end of it will be connected by an adhesive tape.

Der Erfindung liegt die Aufgabe zugrunde, die Maßnahmen zum selbsttätigen Anschließen einer Neubahn an eine Ablaufbahn zu verbessern, insbesondere die Leistungsfähigkeit und Zuverlässigkeit zu erhöhen.The invention has for its object the measures for automatic connection of a new track to a runway improve, especially performance and reliability to increase.

Zur Lösung dieser Aufgabe ist das erfindungsgemäße Verfahren dadurch gekennzeichnet, daß die Ablaufbahn einerseits und die Neubahn andererseits je für sich klemmend erfaßt und von der Ablaufbahn sowie von der Neubahn je ein Endstück bzw. ein Anfangsstück abgetrennt werden und daß das so gebildete Ablaufende und der Neuanfang miteinander verbunden werden.The method according to the invention is used to achieve this object characterized in that the runway on the one hand and the Neubahn, on the other hand, is gripped by itself The runway as well as an end piece or an initial piece from the new track be separated and that the end of the run thus formed and the new beginning are connected.

Die separate Vorbereitung der Ablaufbahn einerseits und der Neubahn andererseits durch Abtrennen von Bahnabschnitten erhöht die Arbeitsgeschwindigkeit und die Sicherheit. Dabei werden Klemm- bzw. Halteorgane eingesetzt, die die geschaffenen Enden, nämlich Ablaufende und Neuanfang, in eine Position unmittelbar nebeneinander bringen, so daß ein Verbindungsmittel, also ein Klebestreifen, Klebeetikett oder eine Verklebung im Bereich einer Bahnüberlappung angebracht werden kann.The separate preparation of the runway on the one hand and the Neubahn, on the other hand, increased by separating sections of track the speed of work and safety. In doing so Clamping or holding elements used, the created ends, namely expiry and new beginning, in a position immediately bring next to each other so that a lanyard, so a Adhesive tape, adhesive label or a glue in the area a web overlap can be attached.

In besonderer Weise wird das Anfangsstück der Neubahn gebildet. Eine äußere geschlossene Lage der gewickelten Neubahn auf der Neubobine wird in achsparalleler Richtung - quer zur Materialbahn - durchtrennt, und zwar derart, daß ein Anfangsstück der Neubahn als Schenkel frei nach unten hängt. Dieses freie Anfangsstück wird von einem Bahnhalter erfaßt und zum Verbindungsaggregat gezogen.The beginning of the new course is formed in a special way. An outer closed position of the wound new track on the The new bobbin is placed in an axis-parallel direction - across the material web - severed, in such a way that an initial piece of Neubahn as a leg hangs down freely. This free start is grasped by a web holder and to the connecting unit drawn.

Der Bahnhalter ist in besonderer Weise ausgebildet, insbesondere mit einem Greiforgan zum Erfassen der Materialbahn unter Bildung einer durch Klemmwirkung erfaßten Falte. Des weiteren ist das Verbindungsaggregat eine Besonderheit.The web holder is designed in a special way, in particular with a gripping element for gripping the material web underneath Formation of a fold gripped by clamping action. Furthermore the connection unit is special.

Die Arbeitsweise der Vorrichtung ist so eingerichtet, daß das von der Ablaufbahn abgetrennte Endstück ebenso wie das von der Neubahn abgetrennte Anfangsstück selbsttätig entsorgt werden. Des weiteren ist vorgesehen, daß ein Bobinenkern, der nach Verbrauch einer Bobine frei wird, ebenfalls entsorgt wird.The operation of the device is set up so that the end piece separated from the runway as well as that from the The newly separated initial piece can be disposed of automatically. Furthermore, it is provided that a bobbin core, according to consumption a bobbin becomes free, is also disposed of.

Weitere Einzelheiten der Erfindung betreffen Verfahren und Vorrichtung zum Handhaben der Neubobine bzw. der Neubahn und die Ausgestaltung und Arbeitsweise des Verbindungsaggregats.Further details of the invention relate to methods and apparatus for handling the new bobbin or the new train and the Design and mode of operation of the connecting unit.

Einzelheiten des Verfahrens und der Vorrichtung werden nachfolgend anhand der Zeichnungen näher erläutert. Es zeigt:

Fig. 1
eine Verpackungsanlage, nämlich Verpackungsmaschine und Materialeinheit, im schematischen Grundriß,
Fig. 2
die Materialeinheit der Fig. 1 in schematischer Seitenansicht, bei vergrößertem Maßstab,
Fig. 3 bis Fig. 14
eine Abfolge von Arbeitsschritten bei der Verbindung einer Neubahn mit einer Ablaufbahn, bei schematischer Darstellung von Organen und Aggregaten in Seitenansicht,
Fig. 15 bis Fig. 17
einen Bahnhalter zum Abziehen einer Materialbahn in verschiedenen Arbeitsphasen, in Seitenansicht bei vergrößertem Maßstab,
Fig. 18
eine Darstellung des Bahnhalters entsprechend Fig. 15 bis Fig. 17 in Zusammenarbeit mit einem Verbindungsaggregat für Material bahnen,
Fig. 19 bis Fig. 23
das Verbindungsaggregat für die Materialbahnen in verschiedenen Arbeitsphasen, in Seitenansicht,
Fig. 24
einen Bereich des Verbindungsaggregats in einer Ansicht gemäß Pfeil XXIV in Fig. 19,
Fig. 25
eine Ansicht des Verbindungsaggregats gemäß Pfeil XXV in Fig. 19.
Details of the method and the device are explained in more detail below with reference to the drawings. It shows:
Fig. 1
a packaging system, namely packaging machine and material unit, in a schematic plan view,
Fig. 2
1 in a schematic side view, on an enlarged scale,
3 to 14
a sequence of work steps in the connection of a new track with a runway, with a schematic representation of organs and units in side view,
15 to 17
a web holder for pulling off a material web in different working phases, in a side view on an enlarged scale,
Fig. 18
15 shows a representation of the web holder corresponding to FIGS. 15 to 17 in cooperation with a connecting unit for material,
19 to 23
the connection unit for the material webs in different working phases, in side view,
Fig. 24
a region of the connecting unit in a view according to arrow XXIV in Fig. 19,
Fig. 25
a view of the connecting assembly according to arrow XXV in Fig. 19th

Die in den Zeichnungen dargestellten Einzelheiten befassen sich mit der Handhabung von gewickeltem Verpackungsmaterial , also Bobinen 10. Diese können aus Papier, Stanniol , Folie oder einem anderen bahnförmigen Material bestehen. Die Materialbahn ist auf einen Bobinenkern 11 gewickelt, der aus Pappe bestehen kann, aber auch aus Kunststoff oder Metall.The details shown in the drawings deal with with the handling of wrapped packaging material, so Bobbin 10. These can be made of paper, tinfoil, foil or a other sheet material. The web of material is wound on a bobbin core 11 made of cardboard can, but also made of plastic or metal.

Fig. 1 zeigt als wichtiges Anwendungsbeispiel eine Verpackungsmaschine 12 in Grundrißdarstellung. Es handelt sich dabei um einen Weichpacker, also um eine Verpackungsmaschine 12 zum Fertigen von Zigarettenpackungen 13 des Typs Weichbecher. Der Verpackungsmaschine 12 ist eine Materialeinheit 14 zugeordnet. Diese ist an der Rückseite der Verpackungsmaschine 12 angeordnet, nämlich gegenüberliegend zu einem Faltrevolver 15 und anderen Aggregaten.1 shows a packaging machine as an important application example 12 in plan view. It is about a soft packer, i.e. around a packaging machine 12 for manufacturing of cigarette packs 13 of the soft cup type. The packaging machine A material unit 14 is assigned to 12. This is arranged on the back of the packaging machine 12, namely opposite to a folding turret 15 and others Aggregates.

Die Materialeinheit 14 weist entsprechend den zu verarbeitenden Materialien zwei Bobinen-Magazine 16, 17 auf mit einem Vorrat an in Axialrichtung nebeneinander positionierten Bobinen 10. Das Bobinen-Magazin 16 enthält beispielsweise Bobinen 10 aus Stanniol und das Bobinen-Magazin 17 Bobinen 10 aus Papier für die Fertigung eines Bechers der Zigarettenpackung 13. Weiterhin sind Banderolen-Bobinen 21 im Bereich eines separaten Bobinen-Vorrats 18 untergebracht aus einer verhältnismäßig schmalen Materialbahn für die Fertigung von (Steuer-)Banderolen, die bekanntermaßen im Bereich von Stirnseiten der Zigarettenpackungen 13 angebracht werden.The material unit 14 corresponds to those to be processed Materials two bobbin magazines 16, 17 on one stock on bobbins 10 positioned side by side in the axial direction. The bobbin magazine 16 contains, for example, bobbins 10 Tinfoil and the Bobinen-Magazin 17 Bobinen 10 made of paper for the production of a cup of the cigarette pack 13. Furthermore are banderole bobbins 21 in the area of a separate bobbin stock 18 housed from a relatively narrow web of material for the production of (tax) banderoles, which are known in the area of the front sides of the cigarette packs 13 are attached.

Im Bereich des Bobinen-Magazins 16, 17 sind die Bobinen 10 in axialer Ausrichtung mit Abstand voneinander angeordnet. Eine jeweils vornliegende Bobine 10 wird dem Bobinen-Magazin 16, 17 entnommen und unmittelbar an eine Tragvorrichtung übergeben, nämlich an einen drehbaren Zapfen, der in eine durch den Bobinenkern 11 gebildete Mittenöffnung der Bobine 10 eintritt. Durch Drehen des Zapfens wird die Materialbahn von der Bobine 10 abgezogen. The bobbins 10 are in the area of the bobbin magazine 16, 17 axial alignment spaced apart. A the bobbin 10 in front is the bobbin magazine 16, 17 removed and handed over directly to a carrying device, namely on a rotatable pin, which in one through the bobbin core 11 formed center opening of the bobbin 10 occurs. By turning the pin, the material web is removed from the bobbin 10 deducted.

Die Materialeinheit 14 ist so angeordnet, daß die größeren Bobinen-Magazine 16, 17 an gegenüberliegenden Seiten einer zentralen Betriebseinheit 22 angeordnet sind. Diese besteht aus einem Gehäuse zur Aufnahme von Antriebsorganen und Steuerungen. An gegenüberliegenden Längsseiten der Betriebseinheit 22 ist jeweils eine Tragvorrichtung für Bobinen 10 bzw. Zapfen zur Aufnahme von Bobinen 10 angeordnet, und zwar ein Bobinenarm 23, 24 als zweiarmiger Hebel mit einem mittigen Drehlager 25. An den Enden des Bobinenarms 23, 24 ist jeweils ein Tragzapfen für eine Bobine 10 angeordnet, nämlich ein Arbeitszapfen 26 und ein Vorratszapfen 27. Die Zapfen 26, 27 sind frei abstehend am Bobinenarm 23, 24 gelagert. Der der Verpackungsmaschine 12 zugekehrte Zapfen ist der Arbeitszapfen 26. Dieser trägt eine Ablaufbobine 28, von der die Materialbahn, nämlich eine Ablaufbahn 29, abgezogen wird. Der dem Bobinen-Magazin 16, 17 Zugekehrte Vorratszapfen 27 dient zur Aufnahme einer neuen, kompletten Ersatz- bzw. Neubobine 30. Der Vorratszapfen 27 ist durch Drehbewegung des Bobinenarms 23, 24 in eine auf die Bobinenkerne 11 des Bobinen-Magazins 16, 17 ausgerichtete Position bewegbar, so daß nachfolgende Bobinen 19, 20 unmittelbar auf den Vorratszapfen 27 aufgeschoben werden können. Dabei kann, wie schematisch angedeutet, die betreffende Bobine 10 bzw. die Neubobine 30 zur Übergabe an den Vorratszapfen 27 angehoben werden.The material unit 14 is arranged so that the larger bobbin magazines 16, 17 on opposite sides of a central one Operating unit 22 are arranged. This consists of a housing for receiving drive elements and controls. Is on opposite long sides of the operating unit 22 one carrying device for bobbins 10 or tenons for Receiving bobbins 10 arranged, namely a bobbin arm 23, 24 as a two-armed lever with a central pivot bearing 25 the ends of the bobbin arm 23, 24 is a support pin for arranged a bobbin 10, namely a working pin 26 and a Storage spigot 27. Spigot 26, 27 protrude freely from the bobbin arm 23, 24 stored. The one facing the packaging machine 12 The spigot is the working spigot 26. This carries a drain bobbin 28, of which the material web, namely a run-off web 29, is subtracted. The one who joined Bobinen-Magazin 16, 17 Storage pin 27 is used to hold a new, complete Replacement or new bobbin 30. The supply pin 27 is by rotating the bobbin arm 23, 24 into one on the bobbin core 11 of the bobbin magazine 16, 17 aligned position movable, so that subsequent bobbins 19, 20 immediately on the supply pin 27 can be pushed on. In doing so, as indicated schematically, the relevant bobbin 10 or New bobbins 30 raised for transfer to the supply spigot 27 become.

Der Verpackungsmaschine 12 werden im vorliegenden Falle drei Materialbahnen zugeführt, nämlich eine Stanniolbahn 31, eine Papierbahn 32 und eine Banderolenbahn 33. Die vorgenannten Bahnen 31, 32, 33 sind mehrmals umgelenkt, so daß sie in einer für die Bearbeitung günstigen Position der Verpackungsmaschine 12 zugeführt werden.The packaging machine 12 will be three in the present case Material webs supplied, namely a tinfoil 31, a Paper web 32 and a banderole web 33. The aforementioned webs 31, 32, 33 are deflected several times so that they are in one for the processing favorable position of the packaging machine 12 be fed.

Die Banderolen-Bobinen 21 sind an der gemeinsamen Materialeinheit 14 angeordnet, und zwar im Bereich des Bobinen-Magazins 16 queraxial zu diesen. Auch für die Banderolen-Bobinen 21 sind Tragzapfen vorgesehen, nämlich ebenfalls Arbeitszapfen 26 und Vorratszapfen 27.The banderole bobbins 21 are on the common material unit 14 arranged, in the region of the bobbin magazine 16 transverse to these. Also for the banderole reels 21 are Support pin provided, namely also working pin 26 and Supply spigot 27.

Vor Verbrauch der Ablaufbobine 28 wird die Neubobine 30 durch Schwenkbewegung des Bobinenarms 23, 24 in Position gebracht und eine von der Neubobine 30 abgezogene Neubahn 34 mit der Ablaufbahn 29 mechanisch verbunden.Before the drain bobbin 28 is consumed, the new bobbin 30 is run through Pivotal movement of the bobbin arm 23, 24 brought into position and a new track 34 subtracted from the new pool 30 with the run-off track 29 mechanically connected.

Das Anschließen der Neubahn 34 an die Ablaufbahn 29 erfolgt in mehreren Schritten. Zuerst wird die Neubobine 30 vorbereitet, indem ein freier, erfaßbarer Anfang der Neubahn 34 geschaffen wird. Danach wird ein Abschnitt der Neubahn, nämlich ein Anfangsstück 35, von der Neubobine 30 abgezogen und mit der Ablaufbahn 29 verbunden. Durch Abtrennen wird dabei das Anfangsstück 35 von der Neubahn 34 und ein Endstück 36 von der Ablaufbahn 29 abgetrennt. Anfangsstück 35, Endstück 36 und der auf dem Arbeitszapfen 26 verbleibende Bobinenkern 11 werden entsorgt.The new track 34 is connected to the runway 29 in FIG several steps. First, the new bobbin 30 is prepared, by creating a free, comprehensible beginning of the new course 34 becomes. Then a section of the new course, namely an initial piece 35, subtracted from the Neubobine 30 and with the runway 29 connected. By separating it becomes the starting piece 35 from the new track 34 and an end piece 36 from the runway 29 separated. Start piece 35, end piece 36 and on the bobbin core 11 remaining in the working pin 26 is disposed of.

Als erstes wird das Anfangsstück 35 der Neubobine 30 freigelegt. Diese ist mit einer äußeren geschlossenen Umhüllung versehen, die üblicherweise durch eine äußere, durch Klebung geschlossene Lage der Neubahn 34 gebildet wird. Diese Lage muß durchtrennt werden. Zu diesem Zweck wird die Neubobine 30 durch entsprechende Schwenkbewegung des Bobinenarms 23, 24 im Gegenuhrzeigersinn in eine untere Bearbeitungsposition bewegt, in der der Bobinenarm 23, 24 eine schräggerichtete Position einnimmt (Fig. 3 ff.).First, the starting piece 35 of the new bobbin 30 is exposed. This is provided with an outer closed envelope, which is usually closed by an external adhesive Location of the new course 34 is formed. This situation must be severed. For this purpose, the new bobbin 30 is passed through corresponding pivoting movement of the bobbin arm 23, 24 in the counterclockwise direction moved to a lower processing position, in which the bobbin arm 23, 24 assumes an oblique position (Fig. 3 ff.).

In dieser Position wird ein Trennaggregat 37 wirksam, nämlich wird aus einer unteren Warteposition (Fig. 2) aufwärts bewegt bis zur Anlage am Umfang der Neubobine 30 (Fig. 3). Nunmehr wird die äußere Lage der Materialbahn in Querrichtung durchtrennt. Es entstehen dadurch freie Bahnschenkel 38, 39 (Fig. 4). Diese hängen in tangentialer Relativstellung an gegenüberliegenden Seiten der Neubobine 30 in vertikaler Ebene. Das Trennaggregat 37 kehrt nach Durchführung des Trennschnitts in die untere Ausgangsstellung zurück. Das Trennaggregat 37 ist vorzugsweise nach Maßgabe von DE 197 10 657.9 ausgebildet und in Axialrichtung der Neubobine 30 bewegbar. Ein Bahnschenkel 39 ist Teil des Anfangsstücks 35 der Neubahn 34. Dieser freie Bereich der Neubahn 34 kann erfaßt werden, um ein längeres Anfangsstück 35 von der Neubobine 30 abzuziehen.In this position, a separation unit 37 is effective, namely is moved up from a lower waiting position (Fig. 2) until it touches the circumference of the new bobbin 30 (FIG. 3). Now the outer layer of the material web is cut in the transverse direction. This results in free web legs 38, 39 (Fig. 4). These hang in a tangential relative position on opposite Sides of new bobbin 30 in a vertical plane. The Separating unit 37 returns to after performing the separating cut the lower starting position back. The separation unit 37 is preferably formed in accordance with DE 197 10 657.9 and movable in the axial direction of the new bobbin 30. A web leg 39 is part of the initial piece 35 of the new track 34. This free area the new track 34 can be grasped by a longer starting piece Subtract 35 from the new 30.

Die Verbindung von Ablaufbahn 29 und Neubahn 34 erfolgt im Bereich eines Verbindungsaggregats 40 dieses ist in einer Schrägstellung im Bereich der Materialeinheit 14 angeordnet, und zwar für jeden Bobinenarm 23, 24. Aufgrund der Schrägstellung laufen die Ablaufbahn 29 und die Neubahn 34 in schräg abwärtsgerichteten Ebenen durch das Verbindungsaggregat 40 hindurch.The runway 29 and the new runway 34 are connected in the area a connecting unit 40 this is in an inclined position arranged in the area of the material unit 14, namely for each bobbin arm 23, 24. Run due to the inclination the runway 29 and the new run 34 in an obliquely downward direction Levels through the connecting unit 40.

Die Vorrichtung ist so ausgebildet, daß die Ablaufbahn 29 während des Betriebs durch das Verbindungsaggregat 40 hindurchläuft. Zu diesem Zweck sind an der Eintrittsseite und an der Austrittsseite des Verbindungsaggregats 40 jeweils Umlenkwalzen 41, 42 angeordnet. Die Ablaufbobine 28 befindet sich während dieser Betriebsphase oberhalb des Verbindungsaggregats 40, seitlich versetzt zu diesem. Die aus dem Verbindungsaggregat 40 austretende Ablaufbahn 29 wird durch einen oberhalb des Verbindungsaggregats 40 angeordneten Bahnspeicher 43 hindurchgeleitet. Dieser hat die Aufgabe, momentane Stillstandsphasen der Ablaufbahn 29 während des Anschließens der Neubahn 34 auszugleichen. Auch der Bahnspeicher 43 befindet sich im Bereich der Materialeinheit 14.The device is designed so that the runway 29 during of operation passes through the connecting unit 40. For this purpose, on the entry side and on the Exit side of the connecting unit 40 each deflecting rollers 41, 42 arranged. The drain bobbin 28 is during this operating phase above the connecting unit 40, laterally offset to this. The connection unit 40 emerging runway 29 is by a above the connecting unit 40 arranged web storage 43 passed through. This is responsible for the current standstill phases of the Compensate for runway 29 while connecting the new runway 34. The web store 43 is also in the area of the Material unit 14.

Zur Verbindung mit der Ablaufbahn 29 wird das Anfangsstück 35 der Neubahn durch das Verbindungsaggregat 40 hindurchgezogen. Zu diesem Zweck ist ein in besonderer Weise ausgebildetes Organ zum Erfassen und Abziehen des Anfangsstücks 35 vorgesehen, nämlich ein Bahnabholer 44. Dieser ist in einer schräggerichteten, parallel zur Ebene der Ablaufbahn 29 verlaufenden Bewegungsebene 45 hin- und herbewegbar, nämlich durch das Verbindungsaggregat 40 hindurch bis zur Neubobine 30 und zurück in eine untere Ausgangsstellung außerhalb des Verbindungsaggregats 40. Der Bahnabholer 44 ist mit einem besonderen Halteorgan, nämlich einem Greifer 67, versehen zum Erfassen des Anfangsstücks 35 der Neubahn 34. Diese wird in einer schräg abwärtsgerichteten Ebene durch das Verbindungsaggregat 40 hindurchgezogen und zeitweilig von dem Bahnabholer 44 gehalten (Fig. 6).For connection to the runway 29, the starting piece 35 the new web is pulled through the connecting unit 40. For this purpose is an organ specially trained provided for grasping and pulling off the initial piece 35, namely a web pickup 44. This is in an oblique, plane of movement running parallel to the plane of the runway 29 45 reciprocable, namely through the connecting unit 40 through to Neubobine 30 and back into one lower starting position outside the connecting unit 40. The web pickup 44 is with a special holding member, namely a gripper 67 provided for gripping the initial piece 35 the new train 34. This is in an obliquely downward direction Plane pulled through the connecting unit 40 and temporarily held by the web pickup 44 (Fig. 6).

Aufbau und Arbeitsweise des Verbindungsaggregats 40 sind schematisch in Fig. 3 bis Fig. 14 dargestellt. Zum Erfassen des Anfangsstücks 35 der Neubahn 34 wird der Bahnabholer 44 entlang der Bewegungsebene 45 an die Neubobine 30 herangefahren, bis das Halteorgan - Greifer 67 - den frei herabhängenden Bahnschenkel 39 erfassen kann (Fig. 5). Danach kehrt der Bahnabholer 44 in die untere Ausgangsstellung zurück, wobei das Anfangsstück 35 von der Neubobine 30 abgezogen und durch das Verbindungsaggregat 40 hindurchgeführt wird. Die Relativstellung des Anfangsstücks 35 im Bereich des Verbindungsaggregats 40 ist durch eine Führungswalze 47 bestimmt, die an einem Schwenkarm 48 angeordnet ist.The structure and mode of operation of the connecting unit 40 are schematic shown in Fig. 3 to Fig. 14. To capture the beginning 35 the new train 34 is the train pickup 44 along the plane of movement 45 moved up to the new bobbin 30 until the holding member - gripper 67 - the freely hanging web leg 39 can detect (Fig. 5). Then the train picker returns 44 back to the lower starting position, the starting piece 35 withdrawn from the new bobbin 30 and through the connection unit 40 is passed through. The relative position of the initial piece 35 is in the region of the connecting unit 40 determined by a guide roller 47 on a swivel arm 48 is arranged.

Im Bereich des Verbindungsaggregats 40 sind Halteorgane für die Ablaufbahn 29 einerseits und die Neubahn 34 andererseits angeordnet. Es handelt sich dabei um gegeneinander bewegbare Klemmstücke 49, 50 für die Ablaufbahn 29 einerseits und um Klemmstücke 51, 52 für Neubahn 34 andererseits. Ablaufbahn 29 und Neubahn 34 sind so geführt, daß sie zwischen den zugeordneten Klemmstücken 49, 50 bzw. 51, 52 hindurchlaufen. Die Klemmstücke 49, 50 einerseits und 51, 52 andererseits sind in versetzten Ebenen zueinander angeordnet, entsprechend den Bewegungsebenen von Ablaufbahn 29 und Neubahn 34.In the area of the connecting unit 40 are holding members for the Runway 29 on the one hand and the new track 34 on the other hand. These are clamping pieces that can be moved against each other 49, 50 for the runway 29 on the one hand and around clamping pieces 51, 52 for Neubahn 34 on the other hand. Runway 29 and Neubahn 34 are guided so that they between the assigned Clamp pieces 49, 50 and 51, 52 run through. The clamp pieces 49, 50 on the one hand and 51, 52 on the other hand are in offset Layers arranged to each other, according to the movement levels of runway 29 and new runway 34.

Vor Einleitung des Bahnverbindens wird das vom Bahnabholer 44 gehaltene Anfangsstück 35 an ein anderes Halteorgan übergeben, nämlich an eine (ortsfeste) Förderwalze 53 mit Gegenwalze 54. Zwischen diesen verläuft das vom Bahnabholer 44 gehaltene Anfangsstück 35. Die Gegenwalze 54 an einem Hebel 55 wird unter Mitnahme des Anfangsstücks 35 gegen die Förderwalze 53 gedrückt. Das Anfangsstück 53 wird sodann vom Bahnabholer 44 freigegeben und zwischen Förderwalze 53 sowie Gegenwalze 54 fixiert (Fig. 7). Förderwalze 53 und Gegenwalze 54 ziehen einen längeren Bereich des Anfangsstücks 35 von der Neubobine 30 ab, so daß ein freies Bahnstück nach unten durchhängt (Fig. 7 und Fig. 8).Before initiating the rail connection, this is done by the rail pickup 44 hand over initial piece 35 held to another holding member, namely to a (stationary) conveyor roller 53 with counter roller 54. The initial piece held by the web pickup 44 runs between these 35. The counter roller 54 on a lever 55 is under Driving the initial piece 35 pressed against the conveyor roller 53. The initial piece 53 is then picked up by the web 44 released and between conveyor roller 53 and counter roller 54 fixed (Fig. 7). Conveyor roller 53 and counter roller 54 pull one longer area of the starting piece 35 from the new bobbin 30, so that a free piece of web sags down (Fig. 7 and Fig. 8).

Nunmehr werden die Klemmstücke 49, 50 sowie 51 und 52 gegeneinander bewegt unter Erfassen und Festhalten der Ablaufbahn 29 einerseits und der Neubahn 34 andererseits (Fig. 8). Während dieser Phase ist die Förderbewegung der Ablaufbahn 29 im Bereich des Verbindungsaggregats 40 unterbrochen.Now the clamping pieces 49, 50 and 51 and 52 against each other moves while grasping and holding the runway 29 on the one hand and the new track 34 on the other hand (Fig. 8). While this phase is the conveying movement of the runway 29 in the area the connection unit 40 interrupted.

Beim Erfassen der Neubahn 34 bzw. des Anfangsstücks 35 durch die Klemmstücke 51, 52 oder unmittelbar danach wird das Anfangsstück 35 von der Neubahn 34 abgetrennt durch ein den Klemmstücken 51, 52 zugeordnetes bzw. an diesen angebrachtes Trennmesser 56. Das freigewordene Anfangsstück 35 wird aus dem Verbindungsaggregat 40 herausgefördert, und zwar durch die Förderwalze 53 mit Gegenwalze 54. Das Anfangsstück 35 fällt in einen unterhalb des Verbindungsaggregats 40 angeordneten Behälter 57.When capturing the new track 34 or the initial piece 35 through the clamping pieces 51, 52 or immediately afterwards becomes the starting piece 35 separated from the new railway 34 by a Clamping pieces 51, 52 assigned or attached to these Cutting knife 56. The released starting piece 35 is from the Connection unit 40 conveyed out, namely by the conveyor roller 53 with counter roller 54. The starting piece 35 falls in a container arranged below the connecting unit 40 57.

Die Ablaufbahn 59 wird gleichzeitig oder zeitlich versetzt ebenfalls durchtrennt, und zwar derart, daß die der Verpackungsmaschine 12 zugekehrte Ablaufbahn 29 durch die Klemmstücke 49, 50 gehalten, das abgetrennte Endstück 36 hingegen frei wird (Fig. 9). Die Ablaufbahn 29 wird durch das (gemeinsame) Trennmesser 56 durchtrennt, welches zusammen mit den Klemmstücken 51, 52 in den Bereich der Ablaufbahn 29 bewegt wird (Fig. 8, Fig. 9).The runway 59 is offset at the same time or in time also severed in such a way that that of the packaging machine 12 facing runway 29 through the sprags 49, 50 held, the separated end piece 36, however becomes free (Fig. 9). The runway 29 is by the (common) Cutting knife 56, which together with the Clamping pieces 51, 52 are moved into the area of the runway 29 (Fig. 8, Fig. 9).

Die Klemmstücke 49, 50; 51, 52 sind so angeordnet, daß sie nach dem Durchtrennen beider Bahnen nebeneinander liegen, so daß ein Ablaufende 58 der Ablaufbahn 29 und ein Neuanfang 59 der Neubahn 34 unmittelbar benachbart zueinander positioniert sind, gegebenenfalls mit Überlappung oder geringem Abstand, und zwar in einer gemeinsamen Ebene.The clamping pieces 49, 50; 51, 52 are arranged so that after the severing of both webs lie side by side, so that a End 58 of the runway 29 and a fresh start 59 of the new run 34 are positioned immediately adjacent to one another, if necessary with an overlap or a small distance on a common level.

In dieser Position können Ablaufende 58 und Neuanfang 59 miteinander verbunden werden, im vorliegenden Falle durch einen Klebestreifen bzw. durch ein Tape 60. Dieses wird durch einen Tapehalter 61 zugeführt und an der freien Seite, nämlich zwischen benachbarten Klemmstücken 49 und 51, an Ablaufende 58 und Neuanfang 59 angedrückt. Die Verbindung der Bahnen, nämlich Ablaufbahn 29 und Neubahn 34 ist damit hergestellt (Fig. 10).In this position, end of run 58 and new start 59 can be together be connected, in the present case by a Adhesive tape or by a tape 60. This is by a Tape holder 61 supplied and on the free side, namely between adjacent clamping pieces 49 and 51, at the drain end 58 and New start 59 pressed. The connection of the lanes, namely runway 29 and new track 34 is thus produced (Fig. 10).

Die somit geschaffene neue Ablaufbahn 29 wird durch Auseinanderbewegen der Klemmstücke 49..52 freigegeben (Fig. 11). Der Transport der Ablaufbahn 29 wird wieder aufgenommen. Zwischenzeitlich ist der Bahnspeicher 43 verringert worden und kann nun durch entsprechende erhöhte Förderleistung wieder aufgebaut werden (Fig. 12). Die Klemmstücke 49..52 kehren währenddessen in die Ausgangsstellung gemäß Fig. 3 ff. zurück.The new runway 29 thus created is moved apart the clamping pieces 49..52 released (Fig. 11). Of the Transport of the runway 29 is resumed. In the meantime the web memory 43 has been reduced and can now rebuilt by corresponding increased output become (Fig. 12). The clamps 49..52 sweep along the way back to the starting position according to FIG. 3 ff.

Durch weitere Schwenkbewegung des Bobinenarms 23, 24 im Gegenuhrzeigersinn wird die (neue) Ablaufbobine 28 in eine vom Verbindungsaggregat 40 entfernte, obere Position bewegt (Fig. 12). Die bisherige Ablaufbobine 28 mit einem Reststück der Ablaufbahn 29, nämlich dem Endstück 36 und dem Bobinenkern 11, wird in die untere Position bewegt bei Schrägstellung des Bobinenarms 23, 24. In dieser Stellung befindet sich der (bisherige) Arbeitszapfen 26 im Arbeitsbereich eines Entsorgungsorgans. Es handelt sich dabei um den Bahnabholer 44. Dieser wird durch entsprechende Bewegung entlang der Bewegungsebene 45 an die restliche Ablaufbobine 28 herangefahren. Das dort vorhandene Endstück 36 wird erfaßt und durch Rückkehrbewegung des Bahnabholers 44 in die Ausgangsstellung (Fig. 13) von dem Bobinenkern 11 abgezogen. Das Endstück 36 wird in der ebenfalls bereits beschriebenen Weise an das Abzugsorgan übergeben, nämlich an Förderwalze 53 und Gegenwalze 54. Diese transportieren das Endstück 36 in den Behälter 57, in dem sich bereits das Anfangsstück 35 befindet.By further pivoting movement of the bobbin arm 23, 24 in the counterclockwise direction is the (new) drain bobbin 28 in one of Connection unit 40 removed, upper position moved (Fig. 12). The previous drain bobbin 28 with a remnant of the drain track 29, namely the end piece 36 and the bobbin core 11, is moved to the lower position when the bobbin arm is tilted 23, 24. In this position the (previous) Working pin 26 in the work area of a disposal organ. This is the train pickup 44. This will by corresponding movement along the movement plane 45 the rest of the drain bobbin 28 moved up. The one there End piece 36 is detected and by return movement of the Web pickup 44 in the starting position (Fig. 13) from the bobbin core 11 deducted. The end piece 36 is already in the handed over to the deduction body, namely on conveyor roller 53 and counter roller 54. These transport the End piece 36 in the container 57, in which there is already the starting piece 35 is located.

Damit das Endstück 36 der (bisherigen) Ablaufbahn 29 nach dem Abtrennen nicht die weiteren Abläufe stört, ist vorgesehen, daß das Endstück 36 durch gegenläufigen Antrieb des Arbeitszapfens 26 auf diesen aufgewickelt wird (Fig. 9, Fig. 10).So that the end piece 36 of the (previous) runway 29 after Separation does not interfere with the further processes, it is provided that the end piece 36 by counter-driving the working pin 26 is wound on this (Fig. 9, Fig. 10).

Nach dem Beseitigen des Endstücks 36 wird ein Abziehorgan für den (leeren) Bobinenkern 11 aktiv. Auch dieser Arbeitsschritt wird hier durch den Bahnabholer 44 vollzogen. Dieser wird gemäß Fig. 14 nochmals an den vormaligen Arbeitszapfen 26 heranbewegt. Das Halteorgan 46 erfaßt den Bobinenkern 11 und bewegt diesen in einer Axialrichtung vom Arbeitszapfen 26. Der freie Bobinenkern 11 gelangt unter Eigengewicht in einen gesonderten Sammelbehälter 62 (Fig. 14).After removal of the end piece 36, a puller for the (empty) bobbin core 11 active. This step too is carried out here by the train pickup 44. This is according to Fig. 14 again moved to the previous working pin 26. The holding member 46 grips the bobbin core 11 and moves this in an axial direction from the working pin 26. The free one Bobbin core 11 passes under its own weight into a separate one Collection container 62 (Fig. 14).

Durch gegenläufige Schwenkbewegungen des Bobinenarms 23, 24 - im Uhrzeigersinn - kehrt die Ablaufbobine 28 in die eigentliche Arbeitsstellung gemäß Fig. 2 zurück. Der freie Vorratszapfen 27 wird im Bereich des Bobinen-Magazins 16, 17 für die Übernahme einer neuen Bobine (Neubobine 30) bereitgehalten.By counter-rotating swivel movements of the bobbin arm 23, 24 - clockwise - the flow reel 28 returns to the actual one Working position according to FIG. 2 back. The free supply spigot 27 is in the area of the bobbin magazine 16, 17 for the Takeover of a new bobbin (Neubobine 30) kept ready.

Zur korrekten Führung der Materialbahn während der Schwenkbewegungen und der unterschiedlichen Positionen des Bobinenarms 23, 24 ist ein Führungsorgan für die Materialbahn am Bobinenarm 23, 24 angeordnet, und zwar ein jeder Bobine bzw. jedem Zapfen am Bobinenarm 23, 24 zugeordneter Stützbügel 63, 64. Die beiden Stützbügel 63, 64 sind an gegenüberliegenden Seiten des Bobinenarms 23, 24 angeordnet und bewirken, daß die jeweilige Materialbahn mit Abstand vom jeweils anderen Zapfen geführt ist.For the correct guidance of the material web during the swiveling movements and the different positions of the bobbin arm 23, 24 is a guide element for the material web on the bobbin arm 23, 24 arranged, namely each bobbin or pin on Bobbin arm 23, 24 associated support bracket 63, 64. The two Support brackets 63, 64 are on opposite sides of the bobbin arm 23, 24 arranged and cause the respective material web is guided at a distance from the other pin.

Ein wichtiges Organ mit vielfältiger Anwendbarkeit ist der Bahnabholer 44. Dieser ist im Detail in Fig. 15 bis Fig. 18 dargestellt.An important organ with a variety of uses is the Web pick-up 44. This is in detail in FIGS. 15 to 18 shown.

Der Bahnabholer 44 ist verfahrbar mit einer ortsfesten Lineareinheit 65 verbunden. Diese erstreckt sich in der Bewegungsebene 45, ist also entsprechend schräg gerichtet. Der Bahnabholer 44 ist unterhalb der Lineareinheit 65 positioniert und über ein Verbindungsorgan, nämlich einen Schlitten 66, verfahrbar mit der ortsfesten Lineareinheit 65 verbunden.The web pickup 44 can be moved with a stationary linear unit 65 connected. This extends in the plane of movement 45, is therefore directed obliquely. Of the Web pickup 44 is positioned below the linear unit 65 and can be moved via a connecting element, namely a slide 66 connected to the stationary linear unit 65.

Ein Organ zum Erfassen und Halten der Materialbahn, nämlich des Anfangsstücks 35 oder des Endstücks 36, besteht aus einem Greifer 67. Dieser ist an einer mit dem Schlitten 66 verbundenen Halterung 68 angebracht. Der Greifer 67 besteht im vorliegenden Falle aus Klemmorganen zum Erfassen der Materialbahn, nämlich aus zwei relativ zueinander bewegbaren Klemmbacken 69, 70. Bei dem gezeigten Ausführungsbeispiel ist die Klemmbacke 69 feststehend angeordnet, und zwar an einem Tragarm 19. Die andere Klemmbacke 70 ist an einem bewegbaren Träger angebracht, nämlich an einem Schwenkarm 71. Durch Betätigen, nämlich Aufwärts-bewegen des Schwenkarms 71 wird die (untere) Klemmbacke 70 gegen die feststehende Klemmbacke 69 bewegt, und zwar durch einen Betätigungszylinder 72. Dabei wird zwischen den Klemmbacken 69, 70 eine zuvor gebildete Falte bzw. Schlaufe 73 der Materialbahn eingeklemmt und diese so erfaßt (Fig. 16). Der Greifer 67 kann danach entlang der Lineareinheit 65 aus der der jeweiligen Bobine bzw. dem jeweiligen Zapfen zugekehrten Position (Fig. 16) in die Ausgangsposition (Fig. 17) zurückbewegt werden unter Mitnahme der Materialbahn (Anfangsstück 35, Endstück 36).An organ for grasping and holding the material web, namely the Start piece 35 or end piece 36 consists of a gripper 67. This is connected to the carriage 66 on one Bracket 68 attached. The gripper 67 is present Trap made of clamping elements for grasping the material web, namely from two relatively movable clamping jaws 69, 70 the embodiment shown, the jaw 69 is fixed arranged, namely on a support arm 19. The other Clamp 70 is attached to a movable support, namely on a swivel arm 71. By actuating, namely moving upwards of the swivel arm 71 is the (lower) jaw 70 against the fixed jaw 69 moves, by one Actuating cylinder 72. Thereby, between the jaws 69, 70 a previously formed fold or loop 73 of the material web pinched and so detected (Fig. 16). The gripper 67 can then along the linear unit 65 from that of the respective bobbin or the position facing the respective pin (FIG. 16) be moved back to the starting position (Fig. 17) under Taking the material web (start piece 35, end piece 36).

Zum Erfassen der Materialbahn ist der Greifer 67 mit Organen zur Bildung der Schlaufe 73 und zum Einführen derselben in die Position zwischen den Klemmbacken 69, 70, versehen. Es handelt sich dabei um zwei (oder mehrere) im Abstand voneinander angeordnete Sauger 74, 75 diese erfassen die Materialbahn in einer Position mit (größerem) Abstand voneinander (Fig. 15). Danach werden die beiden Sauger 74, 75 in Richtung gegeneinander bewegt, im vorliegenden Falle durch Aufwärtsbewegung des unteren Saugers 75, der an dem Schwenkarm 71 angebracht ist. Durch diese Relativbewegung entsteht zwischen den beiden Saugern 74, 75 die Schlaufe 73. Diese bildet eine seitliche Auslenkung der Materialbahn, wobei die Schlaufe 73 automatisch zwischen die beiden Klemmbacken 69, 70 bewegt und durch diese erfaßt wird (Fig. 16). Der ortsfeste, obere Sauger 74 ist am Ende des Tragarms 19 angebracht, in Verlängerung desselben.To grasp the material web, the gripper 67 has organs to form the loop 73 and to insert it into the Position between the jaws 69, 70 provided. It deals are two (or more) spaced apart Suction cups 74, 75 capture the material web in one Position with (greater) distance from each other (Fig. 15). After that the two suction cups 74, 75 are moved towards each other, in the present case by moving the lower one upwards Sucker 75 which is attached to the swivel arm 71. Through this Relative movement occurs between the two suction cups 74, 75 the loop 73. This forms a lateral deflection of the material web, the loop 73 automatically between the two Jaws 69, 70 are moved and gripped by them (Fig. 16). The fixed, upper suction cup 74 is at the end of the support arm 19 attached, in extension of the same.

Der Greifer 67 ist querbewegbar an der Halterung 68 angebracht, und zwar durch eine Kulissenführung 76. Diese Querbewegung ist erforderlich, wenn der Greifer 67 - durch entsprechenden Einsatz der Sauger 74, 75 - den leeren Bobinenkern 11 durch Axialbewegung von dem jeweiligen Arbeitszapfen 26 abzieht. Mindestens einer der Sauger 74, 75 erfaßt dabei den Bobinenkern 11. Der Tragarm 19 ist mit der Kulissenführung 76 verbunden.The gripper 67 is attached to the holder 68 such that it can be moved transversely, by a guide 76. This transverse movement is required if the gripper 67 - by appropriate use the suction 74, 75 - the empty bobbin core 11 by axial movement subtracts from the respective working pin 26. At least one of the suction cups 74, 75 grips the bobbin core 11. The support arm 19 is connected to the link guide 76.

Bei der Bewegung des Bahnabholers 44 aus der Aufnahmeposition gemäß Fig. 15 in die andere Endstellung gemäß Fig. 17 wird die jeweilige Bahn in der beschriebenen Weise zwischen den im Abstand voneinander positionierten Walzen, nämlich Förderwalze 53 und Gegenwalze 54, hindurchbewegt (Fig. 6). Die (untere) Förderwalze 53 ist ortsfest gelagert an einer Tragwand 77. Die bewegbare Gegenwalze 54 ist an einem Betätigungshebel 78 angebracht. Dieser ist durch einen Zylinder 79 im schwenkbarem Sinne bewegbar, so daß in einer unteren Stellung die Gegenwalze 54 unter Andrücken der Materialbahn an der Förderwalze 53 anliegt (Fig. 17). Die Materialbahn wird um die Förderwalze 53 nach unten gelenkt. Die korrekte Führung der Materialbahn ist durch ein Leitorgan gewährleistet, nämlich durch ein Leitblech 80, welches in einer Schrägstellung an der Tragwand 77 angebracht ist, zwischen Förderwalze 53 und Zylinder 79.When the web pick-up 44 moves from the pick-up position 15 into the other end position according to FIG. 17 respective path in the manner described between those at a distance rollers positioned from one another, namely conveyor roller 53 and counter roll 54, moved through (Fig. 6). The (lower) conveyor roller 53 is stationary on a support wall 77. The movable Counter roller 54 is attached to an operating lever 78. This is pivotable by a cylinder 79 Senses movable, so that the counter roller in a lower position 54 abuts the conveyor roller 53 while pressing the material web (Fig. 17). The material web is around the conveyor roller 53 steered down. The correct guidance of the material web is guaranteed by a guide, namely by a guide plate 80, which is attached to the support wall 77 in an inclined position between conveyor roller 53 and cylinder 79.

Außerdem ist der Förderwalze 53 auf der gegenüberliegenden Seite der Materialbahn ein Führungsblech 81 zugeordnet. Dieses ist unmittelbar benachbart zum Umfang der Förderwalze 53 positioniert und verhindert, daß die um die Förderwalze 53 herumgeführte Materialbahn auf diese aufgewickelt wird.In addition, the conveyor roller 53 is on the opposite side assigned a guide plate 81 to the material web. This is positioned immediately adjacent to the circumference of the conveyor roller 53 and prevents that from being guided around the conveying roller 53 Material web is wound on this.

Besonderheiten der Gestaltung und Arbeitsweise des Verbindungsaggregats 40 sind in Fig. 19 bis Fig. 25 im Detail gezeigt. Special features of the design and mode of operation of the connection unit 40 are shown in detail in FIGS. 19 to 25.

Das als geschlossene Einheit ausgebildete Verbindungsaggregat 40 hat eine insgesamt annähernd quaderförmige Gestalt. Diverse Organe sind unmittelbar oder mittelbar an einem aufrechten Traggestell 82 gelagert, welches aus kastenartig angeordneten aufrechten Tragwänden 83, 84 und Querwänden 85 besteht.The connecting unit designed as a closed unit 40 has an overall approximately cuboid shape. Various Organs are directly or indirectly upright Support frame 82 stored, which consists of a box-like arrangement upright supporting walls 83, 84 and transverse walls 85.

Wichtige Organe des Verbindungsaggregats 40 sind die Klemmstücke 49..52. Die der Neubahn 34 bzw. deren Anfangsstück 35 zugeordneten Klemmstücke 51, 52 sind unabhängig voneinander auf- und abbewegbar. Bei Beginn des Verbindungsvorgangs befindet sich das (obere) Klemmstück 51 in der unteren Endstellung unter Anlage an einem festen Anschlag 86. Das Klemmstück 51 wird durch elastische Kraft in dieser unteren Stellung gehalten, im vorliegenden Falle durch eine Zugfeder 87, die mit einem unteren Ansatz 88 an der Querwand 85 und mit einem oberen Ansatz 89 mit einem Schlitten 90 verbunden ist. An diesem wiederum ist das obere Klemmstück 51 angebracht. Der Schlitten ist an einer aufrechten, feststehenden Führung 91 in Vertikalrichtung verfahrbar.Important elements of the connecting unit 40 are the clamping pieces 49..52. That of the new course 34 or its initial piece 35 assigned clamping pieces 51, 52 are independent of one another can be moved up and down. At the start of the connection process the (upper) clamping piece 51 in the lower end position under contact with a fixed stop 86. The clamping piece 51 is held in this lower position by elastic force, in the present case by a tension spring 87 with a lower extension 88 on the transverse wall 85 and with an upper one Approach 89 is connected to a carriage 90. On this in turn the upper clamp 51 is attached. The sledge is on an upright, fixed guide 91 in the vertical direction movable.

Das untere Klemmstück 52 ist mit einem Schlitten 92 verbunden, der seitlich versetzt zum Klemmstück 52 angeordnet und an aufrechten Führungsstangen 93 verfahrbar ist. Der Schlitten 92 und damit das Klemmstück 52 ist gegen abwärtsgerichteten, elastischen Druck nach oben verfahrbar. Zu diesem Zweck sind auf den Führungsstangen 93 Druckfedern 94 angeordnet.The lower clamping piece 52 is connected to a carriage 92, which is laterally offset from the clamping piece 52 and upright Guide rods 93 is movable. The carriage 92 and so that the clamping piece 52 is against downward, elastic Pressure can be moved upwards. For this purpose, the Guide rods 93 compression springs 94 arranged.

Der Schlitten 92 ist durch einen Kurbeltrieb 95 auf- und abbewegbar. Durch diesen wird der Schlitten 92 mit dem Klemmstück 52 aufwärts bewegt, wobei die Neubahn 34 bzw. das Anfangsstück 35 in einer erhöhten Stellung durch Anlage an dem Klemmstück 51 festgeklemmt wird (Fig. 21).The carriage 92 can be moved up and down by a crank mechanism 95. Through this the carriage 92 with the clamping piece 52 moves upwards, with the new track 34 or the starting piece 35 in an elevated position by contact with the clamping piece 51 is clamped (Fig. 21).

Danach wird das Trennmesser 56 betätigt. Dieses ist an der aus Klemmstück 52 und Schlitten 92 bestehenden Einheit relativ bewegbar angeordnet. Zu diesem Zweck ist ein Tragkörper 96 für das nach oben gerichtete Trennmesser 56 an aufrechten Gleitstangen 97 gegen den Druck einer Feder 98 aufwärtsbewegbar, wenn ein Trennschnitt durchgeführt werden soll. Das Trennmesser 56 wird dabei unmittelbar neben dem Klemmstück 52 bewegt, auf der von der Neubobine 30 abliegenden Seite.The separating knife 56 is then actuated. This is off Clamp 52 and carriage 92 existing unit relatively movable arranged. For this purpose, a support body 96 for the upward cutting knife 56 on upright slide rods 97 can be moved upwards against the pressure of a spring 98, when a cut is to be made. The cutting knife 56 is moved directly next to the clamping piece 52 the side away from the Neubobine 30.

Zur Betätigung des Trennmessers 56 durch Verschieben des Tragkörpers 96 dient ein Druckhebel 99, der schwenkbar an der aus Druckstück 52 und Schlitten 92 bestehenden Einheit angebracht ist. Ein Ende 100 des zweiarmigen Druckhebels 99 läuft gegen einen feststehenden Nocken 101 und wird bei fortgesetzter Aufwärtsbewegung im Gegenuhrzeigersinn verschwenkt, derart, daß eine gegenüberliegend zum Ende 100 angeordnete Druckrolle 102 den Tragkörper 96 mit dem Trennmesser 56 aufwärts bewegt unter Ausführung des Trennschnitts (Fig. 21).For actuating the separating knife 56 by moving the supporting body 96 serves a pressure lever 99 which is pivotable on the Pressure piece 52 and slide 92 existing unit attached is. One end 100 of the two-armed pressure lever 99 runs against a fixed cam 101 and becomes with continued upward movement pivoted counterclockwise, such that a pressure roller 102 located opposite end 100 the support body 96 with the cutting knife 56 moves up under Execution of the separating cut (Fig. 21).

Die Klemmstücke 49, 50 für die Ablaufbahn 29 sind innerhalb des Verbindungsaggregats 40 höher positioniert als die Klemmstücke 51, 52. Das obere Klemmstück 49 ist auf- und abbewegbar an einer aufrechten Führung 103. Das Klemmstück 49 wird durch eine seitliche Zugfeder 104 in eine untere Endstellung bewegt bzw. in dieser durch Anlage an einem festen Anschlag 105 gehalten.The clamping pieces 49, 50 for the runway 29 are within the Connection unit 40 positioned higher than the clamping pieces 51, 52. The upper clamping piece 49 can be moved up and down an upright guide 103. The clamping piece 49 is by a lateral tension spring 104 moved into a lower end position or held in this by contact with a fixed stop 105.

Das zugeordnete untere Klemmstück 50 ist mit einem Führungskörper 106 ebenfalls auf einer Führung 103 auf- und abbewegbar. Der Führungskörper 106 ist mit den oberen Enden der Führungsstangen 93 verbunden. Bei Aufwärtsbewegung des Schlittens 92 wird der Führungskörper 106 und damit das untere Klemmstück 50 über die Druckfedern 94 angehoben aus einer Position gemäß Fig. 19 in die Klemmstellung gemäß Fig. 20. Der erforderliche Klemmdruck wird bei Erhöhung der Druckkraft aus den Druckfedern 94 erzeugt, wenn der Schlitten 92 weiter nach oben bewegt wird, und zwar zunächst in die Stellung gemäß Fig. 21 und danach in die gemäß Fig. 22. Während dieser Bewegungsphase wird auch der Trennschnitt im Bereich der Ablaufbahn 29 durchgeführt, wobei durch die Ausgestaltung des Nockens 101 das Trennmesser 56 weiterhin in der nach oben ausgefahrenen Schneidposition bleibt (Fig. 22).The associated lower clamping piece 50 is with a guide body 106 can also be moved up and down on a guide 103. The guide body 106 is with the upper ends of the guide rods 93 connected. When the carriage 92 moves upwards becomes the guide body 106 and thus the lower clamping piece 50 raised via the compression springs 94 from a position according to FIG. 19 into the clamping position according to FIG. 20. The required clamping pressure when the pressure force increases, the compression springs 94 generated when the carriage 92 is moved upward, first in the position shown in FIG. 21 and then in 22 during this movement phase Separation cut in the region of the runway 29, wherein by the design of the cam 101, the separating knife 56 continues remains in the cutting position extended upwards (Fig. 22).

Nach dem Trennschnitt im Bereich der Ablaufbahn 29 (Fig. 22) befinden sich die Paare der Klemmstücke 49, 50 einerseits und 51, 52 andererseits auf gleichem Niveau. Das Ende 100 des Druckhebels 99 hat den Nocken 101 verlassen (Fig. 23). Das Trennmesser 56 ist aus der Schneidstellung herausbewegt. Nunmehr kann auf der gegenüberliegenden, oberen Seite der Klebestreifen bzw. das Tape 60 durch den Tapehalter 61 von oben her auf die einander zugekehrten Bahnenden, nämlich auf das Ablaufende 58 und den Neuanfang 59, gedrückt werden.After the separating cut in the region of the runway 29 (FIG. 22) are the pairs of clamping pieces 49, 50 on the one hand and 51, 52 on the other hand at the same level. The end 100 of Pressure lever 99 has left cam 101 (FIG. 23). The Cutting knife 56 is moved out of the cutting position. Now can be on the opposite, upper side of the adhesive tape or the tape 60 through the tape holder 61 from above on the facing web ends, namely on the end of the run 58 and the new beginning 59.

Die nach den Trennschnitten jeweils freigegebenen Bahnstücke, nämlich das Anfangsstück 35 einerseits und das Endstück 36 andererseits werden in der Position gemäß Fig. 21 bzw. Fig 22 freigegeben in der beschriebenen Weise.The web sections released after the separating cuts, namely the start piece 35 on the one hand and the end piece 36 on the other hand are in the position according to FIG. 21 or FIG. 22 released in the manner described.

Der Tapehalter 61 ist in besonderer Weise ausgebildet. Es handelt sich dabei um einen schwenkbaren Tapehebel 107, an dessen freiem Ende ein Haltekopf 108 mit Saugbohrungen (nicht gezeigt) zum Halten des Tapes 60 mittels Saugluft angeordnet ist. Der winkelförmige Tapehebel 107 ist in der Ausgangsstellung (Fig. 20) mit einem Endschenkel 109 aufwärts gerichtet. Auf die Oberseite des Haltekopfes 108 kann so das Tape 60 aufgelegt werden. Durch Schwenkbewegung wird der Tapehebel um 180° bewegt, so daß der Endschenkel 109 mit dem Haltekopf 108 nach unten gerichtet ist, wobei sich ein Kleber auf der freien, nach unten gerichteten Seite des Tapes 60 befindet. Der Haltekopf 108 wird mit dem Tape 60 an die einander zugekehrten Enden der Materialbahn angedrückt, nämlich an das Ablaufende 58 einerseits und den Neuanfang 59 andererseits, so daß diese miteinander verbunden werden. Die Saugluft zum Halten des Tapes wird dabei abgeschaltet.The tape holder 61 is designed in a special way. It deals a pivotable tape lever 107, on the free end a holding head 108 with suction bores (not shown) is arranged to hold the tape 60 by means of suction air. Of the angular tape lever 107 is in the starting position (Fig. 20) with an end leg 109 directed upwards. On top the holding head 108, the tape 60 can be placed on it. The tape lever is moved by 180 ° by pivoting movement, so that the end leg 109 with the holding head 108 directed downwards is, with an adhesive on the free, downward facing Side of the tape 60 is located. The holding head 108 is with the tape 60 to the mutually facing ends of the material web pressed, namely on the drain end 58 on the one hand and the New beginning 59 on the other hand, so that they are connected become. The suction air for holding the tape is switched off.

Konkret wird bei der Anbringung des Tapes 60 an Ablaufbahn 29 und Neubahn 34 so vorgegangen, daß der Haltekopf 108 mit dem Tape 60 in geringem Abstand oberhalb der Material bahnen positioniert ist. Durch einen geringen Hub werden die sich in Klemmstellung befindenden Klemmstücke 49, 50; 51, 52 gemein angehoben, wodurch die Enden der Materialbahnen an den Haltekopf 108 bzw. an das Tape 60 gedrückt werden. Der Kurbeltrieb 95 ist so ausgelegt, daß in der Endphase einer vollen Umdrehung dieser Hub ausgeführt wird (Fig. 10).Specifically, when tape 60 is attached to runway 29 and Neubahn 34 proceeded so that the holding head 108 with the Tape 60 positioned a short distance above the material webs is. With a small stroke, they are in Clamping positions 49, 50; 51, 52 raised mean, which brings the ends of the webs of material to the holding head 108 or pressed onto the tape 60. The crank mechanism is 95 designed so that in the final phase of a full revolution this Stroke is executed (Fig. 10).

Der Tapehebel 107 ist schwenkbar mit einem Drehlager 110 verbunden. Die Drehbewegung des Tapehebels 107 wird im vorliegenden Fall über einen Endlosabtrieb vollzogen, nämlich über einen Zahnriemen 111, der hin- und hergehend antreibbar ist und dabei die beschriebene Drehbewegung im Bereich des Drehlagers 110 durchführt. Ein Teil des Drehlagers 110 ist zugleich Umlenkrad für den Zahnriemen 111.The tape lever 107 is pivotally connected to a pivot bearing 110. The rotary movement of the tape lever 107 is in the present Case carried out via an endless output, namely via one Timing belt 111, which can be driven back and forth while doing so the described rotary movement in the area of the rotary bearing 110 carries out. Part of the pivot bearing 110 is also a deflection wheel for the timing belt 111.

Zur Durchführung der hin- und hergehenden Bewegung wird unmittelbar der Zahnriemen 111 bewegt, und zwar durch ein mit diesem verbundenes Kuppelstück 112, welches mit einem Lineartrieb 113 verbunden ist. Das Kuppelstück 112 wird durch den Lineartrieb hin- und hergehend bewegt, wodurch entsprechende Schwenkbewegungen des Tapehebels 107 vollzogen werden.To carry out the back and forth movement is immediate the timing belt 111 moves, by a with this connected coupling piece 112, which with a linear drive 113 connected is. The coupling piece 112 is through the linear drive moved back and forth, causing corresponding pivoting movements of the tape lever 107 are performed.

Eine weitere Besonderheit besteht in der Bewegung der Klemmstücke 49..52, und zwar insbesondere des oberen Klemmstücks 51. Dieses muß nach dem Verbinden der Ablaufbahn 29 mit der Neubahn 34 aus einer Position oberhalb der (neuen) Ablaufbahn 29 (Fig. 23) in eine Position unterhalb derselben (Fig. 20) zurückbewegt werden.Another special feature is the movement of the clamping pieces 49..52, in particular the upper clamping piece 51. This must be done after connecting the runway 29 to the new train 34 from a position above the (new) runway 29 (Fig. 23) moved back to a position below it (Fig. 20) become.

Zu diesem Zweck ist das obere Klemmstück 51 als auskragender, einarmiger Hebel ausgebildet (Fig. 25). Ein abgekröpfter Endbereich 114 ist im Bereich eines gabelförmigen Drehlagers 115 fest mit einer aufrechten Drehwelle 116 verbunden. Durch drehen der Drehwelle 116 wird der wirksame, auskragende Teil des Klemmstücks 51 aus dem Bewegungsbereich der Ablaufbahn 29 herausbewegt in eine Stellung neben dieser Ablaufbahn 29. Nun kann das Klemmstück 57 neben der Ablaufbahn 29 abwärts bewegt werden in die Position gemäß Fig. 19 bzw. Fig. 20. Fig. 25 zeigt die Stellung des Klemmstücks 51 unterhalb der Ablaufbahn 29.For this purpose, the upper clamping piece 51 is a cantilevered one-armed lever formed (Fig. 25). A bent end area 114 is in the region of a fork-shaped pivot bearing 115 firmly connected to an upright rotating shaft 116. Go berserk the rotating shaft 116 becomes the effective, cantilevered part of the Clamping piece 51 from the movement range of the runway 29 moved out into a position next to this runway 29. Well the clamping piece 57 can be moved down next to the runway 29 19 and 20. FIG. 25 shows the position of the clamping piece 51 below the runway 29.

Ein oberes Ende der Drehwelle 116 ist in einem feststehenden Haltelager 117 geführt. Ein in diesem Bereich auf die Drehwelle 116 wirkender Betätigungshebel 118 ist mit einem geeigneten Betätigungsorgan z.B. einem Zylinder verbunden. Durch Schwenkbewegung des Betätigungshebels 118 wird die Drehwelle 116 in der einen oder anderen Richtung gedreht mit entsprechender Bewegung des Klemmstücks 51. Die Drehwelle 116 ist gleitend im Haltelager 117 geführt, kann also mit dem Klemmstück 51 auf- und abbewegt werden. Fig. 22 und Fig. 23 zeigen die obere Endstellung der Drehwelle 116. Das Drehlager 115 ist mit einem Gleitkörper 119 an der gemeinsamen aufrechten Führung 91 auf- und abbewegbar.An upper end of the rotating shaft 116 is fixed Holding bearing 117 out. One in this area on the rotating shaft 116 operating lever 118 is with a suitable actuator e.g. connected to a cylinder. By swiveling movement of the operating lever 118, the rotary shaft 116 in the one or the other direction rotated with appropriate movement of the clamping piece 51. The rotary shaft 116 is sliding in the holding bearing 117 out, so it can be moved up and down with the clamping piece 51 become. 22 and 23 show the upper end position the rotary shaft 116. The rotary bearing 115 is with a sliding body 119 movable up and down on the common upright guide 91.

Bei Material bahnen mit einer Bedruckung oder anderen vorgegebenen Markierungen, insbesondere bei Papierbahnen 32 mit der üblichen Bedruckung einer (Zigaretten-)Packung, erfolgt die Verbindung von Ablaufbahn 29 und Neubahn 34 zuschnittgerecht, also in Abstimmung mit der für jeden Zuschnitt übereinstimmenden Bedruckung. Zu diesem Zweck wird so vorgegangen, daß die Ablaufbahn 29 und die Neubahn 34 positionsgenau angehalten werden nach Maßgabe der Bedruckung. Die Klemmstücke 49, 50 einerseits und 51, 52 andererseits werden demnach aufgrund einer bahnabhängigen Steuerung aktiviert, um die Ablaufbahn 28 und die Neubahn 34 in zueinander passender Relativstellung anzuhalten. Zu diesem Zweck werden die Ablaufbahn 28 und die Neubahn 34 anhand von Druckmarken (nicht gezeigt) überwacht. Solche Druckmarken sind in Abständen entsprechend den Abmessungen einer Bedruckung bzw. eines Zuschnitts in bekannter Weise an den Materialbahnen angebracht. Ein Druckmarkenleser 120 für die Ablaufbahn 29 und ein Druckmarkenleser 121 für die Neubahn 34 erfassen die Druckmarken und steuern die zugeordneten Klemmstücke 49, 50 bzw. 51, 52. Die Druckmarkenleser 120, 121 sind im vorliegenden Falle außerhalb des Verbindungsaggregats 40 angeordnet, und zwar der Druckmarkenleser 120 für die Ablaufbahn 29 an der Eintrittsseite zum Verbindungsaggregat 40 und der Druckmarkenleser 121 an der Austrittsseite. In the case of material webs with a print or other specified Markings, especially with paper webs 32 with the usual If a (cigarette) pack is printed, the connection is made of runway 29 and new runway 34 according to the cut, that is in coordination with the printing that matches each cut. For this purpose, the procedure is that the runway 29 and the new track 34 are stopped in the correct position according to the printing. The clamping pieces 49, 50 on the one hand and 51, 52 on the other hand are therefore due to a path-dependent Control activated to runway 28 and the new runway 34 to stop in a matching relative position. To For this purpose, the runway 28 and the new run 34 are used monitored by print marks (not shown). Such print marks are at intervals according to the dimensions of a print or a cut in a known manner on the material webs appropriate. A print mark reader 120 for the runway 29 and a print mark reader 121 for the new web 34 detects the print marks and control the associated clamping pieces 49, 50 and 51, 52. The print mark readers 120, 121 are in the present case arranged outside the connecting unit 40, namely the Print mark reader 120 for the runway 29 on the entry side to the connecting unit 40 and the print mark reader 121 on the exit side.

Bezugszeichenliste:Reference symbol list:

1010th
BobineBobine
1111
BobinenkernBobbin core
1212th
VerpackungsmaschinePackaging machine
1313
ZigarettenpackungPack of cigarettes
1414
MaterialeinheitMaterial unit
1515
FaltrevolverFolding turret
1616
Bobinen-MagazinBobinen magazine
1717th
Bobinen-MagazinBobinen magazine
1818th
Bobinen-VorratBobbin stock
1919th
TragarmBeam
2121
Banderolen-BobineBanderole bobbin
2222
BetriebseinheitOperating unit
2323
BobinenarmBobbin arm
2424th
BobinenarmBobbin arm
2525th
DrehlagerPivot bearing
2626
ArbeitszapfenWorking spigot
2727
VorratszapfenSupply spigot
2828
AblaufbobineDrain bobbin
2929
AblaufbahnRunway
3030th
NeubobineNewborns
3131
StanniolbahnFoil Railway
3232
PapierbahnPaper web
3333
BanderolenbahnBanderole
3434
NeubahnNeubahn
3535
AnfangsstückInitial piece
3636
EndstückTail
3737
TrennaggregatSeparation unit
3838
BahnschenkelWeb leg
3939
BahnschenkelWeb leg
4040
VerbindungsaggregatConnecting unit
4141
UmlenkwalzeDeflection roller
4242
UmlenkwalzeDeflection roller
4343
BahnspeicherRailway store
4444
BahnabholerTrain pick-up
4545
BewegungsebenePlane of movement
4747
FührungswalzeGuide roller
4848
Schwenkarm Swivel arm
4949
KlemmstückClamp
5050
KlemmstückClamp
5151
KlemmstückClamp
5252
KlemmstückClamp
5353
FörderwalzeConveyor roller
5454
GegenwalzeCounter roll
5555
Hebellever
5656
TrennmesserCutting knife
5757
Behältercontainer
5858
AblaufendeExpiration
5959
NeuanfangNew beginning
6060
TapeTape
6161
TapehalterTape holder
6262
SammelbehälterCollection container
6363
StützbügelSupport bracket
6464
StützbügelSupport bracket
6565
LineareinheitLinear unit
6666
Schlittencarriage
6767
GreiferGripper
6868
Halterungbracket
6969
KlemmbackeJaw
7070
KlemmbackeJaw
7171
SchwenkarmSwivel arm
7272
BetätigungszylinderActuating cylinder
7373
Schlaufeloop
7474
SaugerMammal
7575
SaugerMammal
7676
KulissenführungScenery tour
7777
TragwandSupporting wall
7878
BetätigungshebelOperating lever
7979
Zylindercylinder
8080
LeitblechBaffle
8181
FührungsblechGuide plate
8282
TraggestellSupport frame
8383
TragwandSupporting wall
8484
TragwandSupporting wall
8585
Querwand Transverse wall
8686
Anschlagattack
8787
ZugfederTension spring
8888
Ansatzapproach
8989
Ansatzapproach
9090
Schlittencarriage
9191
Führungguide
9292
Schlittencarriage
9393
FührungsstangeGuide rod
9494
DruckfederCompression spring
9595
KurbeltriebCrank mechanism
9696
TragkörperSupporting body
9797
GleitstangeSlide rod
9898
Federfeather
9999
DruckhebelPush lever
100100
EndeThe End
101101
NockeCam
102102
DruckrollePressure roller
103103
Führungguide
104104
ZugfederTension spring
105105
Anschlagattack
106106
FührungskörperGuide body
107107
TapehebelTape lever
108108
HaltekopfHolding head
109109
EndschenkelEnd leg
110110
DrehlagerPivot bearing
111111
ZahnriemenTiming belt
112112
KuppelstückCoupling piece
113113
LineartriebLinear drive
114114
EndbereichEnd area
115115
DrehlagerPivot bearing
116116
DrehwelleRotary shaft
117117
HaltelagerHolding camp
118118
BetätigungshebelOperating lever
119119
GleitkörperSliding body
120120
DruckmarkenleserPrint mark reader
121121
DruckmarkenleserPrint mark reader

Claims (21)

Verfahren zum Verbinden von Materialbahnen aus Verpackungsmaterial oder dergleichen, nämlich eines Neuanfangs (59) einer Neubahn (34) mit einem Ablaufende (58) einer Ablaufbahn (29), durch Verkleben bzw. durch ein Tape (60), wobei die Ablaufbahn (29) und die Neubahn (34) durch Klemmen erfaßt, durchtrennt und das so gebildete Ablaufende (58) mit dem Neuanfang (59) verbunden wird, dadurch gekennzeichnet, daß die Ablaufbahn (29) einerseits und die Neubahn (34) andererseits je für sich klemmend erfaßt und von der Ablaufbahn (29) sowie von der Neubahn (34) je ein Anfangsstück (35) bzw. ein Endstück (36) abgetrennt werden und daß die so gebildeten Enden, nämlich Ablaufende (58) und Neuanfang (59), in einer gemeinsamen Ebene benachbart zueinander positioniert werden zum Verbinden bzw. zum Anbringen des Tapes (60).Method for connecting material webs made of packaging material or the like, namely a new beginning (59) of a new web (34) with a drain end (58) of a drain web (29), by gluing or by a tape (60), the drain web (29) and the new path (34) is gripped, severed and the end of the run (58) thus formed is connected to the new beginning (59), characterized in that the runway (29) on the one hand and the new path (34) on the other hand each grips by itself and a starting piece (35) and an end piece (36) are separated from the run-off track (29) and from the new track (34), and that the ends thus formed, namely the end of the run-off (58) and the new beginning (59), in one Be positioned plane adjacent to each other for connecting or for attaching the tape (60). Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß zur Bildung des Anfangsstücks (35) der Neubahn (34) eine geschlossene äußere Umhüllung einer Neubobine (30) bzw. eine geschlossene äußere Lage der Neubahn (34) in Axialrichtung durchtrennt wird, insbesondere derart, daß mindestens ein freier Bahnschenkel (38, 39) der Neubahn (34) infolge Eigengewichts frei hängend gebildet wird und daß der Bahnschenkel (38, 39) auf bzw. an der Neubobine (30) erfaßt und ein Anfangsstück (35) von der Neubobine (30) abgezogen wird.Method according to claim 1, characterized in that to form the initial piece (35) of the new web (34), a closed outer covering of a new bobbin (30) or a closed outer layer of the new web (34) is severed in the axial direction, in particular in such a way that at least one free web leg (38, 39) of the new web (34) is formed hanging freely due to its own weight and that the web leg (38, 39) is gripped on or on the new bobbin (30) and an initial piece (35) of the new bobbin (30 ) is subtracted. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß das von der Neubobine (30) abgezogene Anfangsstück (35) der Neubahn (34) durch ein Verbindungsaggregat (40) hindurchgezogen wird, insbesondere in einer Ebene parallel zur Förderebene der Ablaufbahn (29).Method according to claim 1 or 2, characterized in that the initial piece (35) of the new web (34) drawn off from the new bobbin (30) is pulled through a connecting unit (40), in particular in a plane parallel to the conveying plane of the run-off path (29). Verfahren nach Anspruch 1 oder einem der weiteren Ansprüche, dadurch gekennzeichnet, daß ein von der Ablaufbahn (29) abgetrenntes Endstück (36) durch gegenläufige Drehbewegung auf die Ablaufbobine (28) aufgewickelt wird.Method according to claim 1 or one of the further claims, characterized in that an end piece (36) separated from the run-off track (29) is wound onto the run-off bobbin (28) by a counter-rotating movement. Verfahren nach Anspruch 1 oder einem der weiteren Ansprüche, dadurch gekennzeichnet, daß das durch Aufwickeln auf der Ablaufbobine (28) gesammelte Endstück (36) der Ablaufbahn (29) und/oder das von der Neubahn (34) abgetrennte Anfangsstück (35) in einen Behälter (57) gefördert wird, wobei das Endstück (36) der Ablaufbahn (29) von der Ablaufbobine (28) abgezogen wird.Method according to claim 1 or one of the further claims, characterized in that the end piece (36) of the run-off track (29) collected by winding on the run-off reel (28) and / or the start-up piece (35) separated from the new runway (34) into one Container (57) is conveyed, with the end piece (36) of the run-off track (29) being pulled off the run-off bobbin (28). Verfahren nach Anspruch 1 oder einem der weiteren Ansprüche, dadurch gekennzeichnet, daß ein auf dem Arbeitszapfen (26) verbleibender Bobinenkern (11) in axialer Richtung vom Arbeitszapfen (26) abgezogen und in einen Sammelbehälter (62) gefördert wird, vorzugsweise nach dem Beseitigen des Endstücks (36) der Ablaufbahn (29).Method according to claim 1 or one of the further claims, characterized in that a bobbin core (11) remaining on the working pin (26) is drawn off from the working pin (26) in the axial direction and conveyed into a collecting container (62), preferably after removing the End piece (36) of the run-off track (29). Vorrichtung zum Verbinden von Material bahnen aus Verpackungsmaterial oder dergleichen, nämlich eines Neuanfangs (59) einer Neubahn (34) mit einem Ablaufende (58) einer Ablaufbahn (29), wobei Ablaufbahn (29) und Neubahn (34) durch Klemmstücke (49, 50; 51, 52) erfaßbar und Ablaufbahn (29) sowie Neubahn (34) durch ein Trennmesser (56) durchtrennbar sind zur Bildung von durch ein Tape (60) miteinander zu verbindenden Enden - Ablaufende (56) und Neuanfang (59) -, dadurch gekennzeichnet, daß der Ablaufbahn (29) einerseits und der Neubahn (34) andererseits zugeordnete Klemmstücke (49, 50) bzw. (51, 52) unabhängig voneinander zum Fixieren der Ablaufbahn (29) bzw. Neubahn (34) betätigbar und Ablaufbahn (29) sowie Neubahn (34) aufeinanderfolgend durchtrennbar sind, wobei die Klemmstücke (49, 50) und (51, 52) mit den durchtrennten Bahnen in eine gemeinsame Ebene bewegbar sind zum Anbringen des Tapes (60).Device for connecting material webs made of packaging material or the like, namely a new beginning (59) of a new web (34) with a drain end (58) of a drain web (29), wherein the web (29) and new web (34) by clamping pieces (49, 50 ; 51, 52) detectable and runway (29) and new course (34) can be separated by a separating knife (56) to form ends to be connected by a tape (60) - end of run (56) and new beginning (59) -, thereby characterized in that clamping pieces (49, 50) or (51, 52) assigned to the drain track (29) on the one hand and the new track (34) on the other hand can be actuated independently of one another to fix the drain track (29) or new track (34) and drain track (29 ) and the new web (34) can be severed in succession, the clamping pieces (49, 50) and (51, 52) with the severed webs being movable in a common plane for attaching the tape (60). Vorrichtung nach Anspruch 7, dadurch gekennzeichnet, daß die jeweils mit Abstand voneinander angeordneten Klemmstücke (49, 50) einerseits und (51, 52) andererseits in zueinander versetzten Ebenen positioniert sind entsprechend den Bewegungsebenen von Ablaufbahn (29) und Neubahn (34) und daß die Klemmstücke (49, 50; 51, 52) mit den durchtrennten Bahnenden - Ablaufende (58), Neuanfang (59) - in eine gemeinsame Ebene bewegbar sind.Apparatus according to claim 7, characterized in that the clamping pieces (49, 50) on the one hand and (51, 52) on the other hand , which are arranged at a distance from one another, are positioned in mutually offset planes corresponding to the movement planes of the runway (29) and new track (34) and that the clamping pieces (49, 50; 51, 52) with the severed web ends - drain end (58), new beginning (59) - can be moved into a common plane. Vorrichtung nach Anspruch 7 oder 8, dadurch gekennzeichnet, daß die Klemmstücke Teil eines Verbindungsaggregats (40) sind, durch das die Ablaufbahn (29) ständig hindurchläuft, wobei die anzuschließende Neubahn (34) durch einen hin- und herbewegbaren Bahnabholer (44) von der Neubahn (34) ab- und durch das Verbindungsaggregat (40) hindurchziehbar ist.Apparatus according to claim 7 or 8, characterized in that the clamping pieces are part of a connecting unit (40) through which the run-off track (29) runs continuously, the new track (34) to be connected being moved back and forth by a track pick-up (44) New track (34) can be removed and pulled through the connecting unit (40). Vorrichtung nach Anspruch 9 oder einem der weiteren Ansprüche, dadurch gekennzeichnet, daß das vom Bahnabholer (44) abgezogene Anfangsstück (35) der Neubahn (34) an einen Bahnförderer übergebbar ist, insbesondere an eine Förderwalze (53) mit andrückbarer Gegenwalze (54), durch die ein weiteres Teilstück der Neubahn (34) von der Neubobine (30) abziehbar ist.Apparatus according to claim 9 or one of the further claims, characterized in that the starting piece (35) of the new web (34) drawn off from the web pick-up (44) can be transferred to a web conveyor, in particular to a conveyor roller (53) with a pressable counter roller (54), through which another section of the new track (34) can be pulled off the new bobbin (30). Vorrichtung zum Erfassen eines Anfangs einer Materialbahn, insbesondere eines freien Endes bzw. eines Bahnschenkels (38, 39) einer als Bobine gewickelten Neubahn (34), dadurch gekennzeichnet, daß ein Bahnabholer (44) einen hin- und herbewegbaren Greifer (67) aufweist zum Erfassen der Bahn, insbesondere eines Anfangsstücks (35) der Neubahn (34), wobei der Greifer (62) mindestens zwei Halteorgane aufweist, insbesondere Klemmbacken (69, 70), in die bei geöffneter Position eine gebildete Schlaufe (73) bzw. Falte der Bahn bzw. Neubahn (34) zum klemmenden Erfassen einführbar ist.Device for detecting a start of a material web, in particular a free end or a web leg (38, 39) of a new web (34) wound as a bobbin, characterized in that a web pick-up (44) has a reciprocating gripper (67) for Detecting the web, in particular an initial piece (35) of the new web (34), the gripper (62) having at least two holding members, in particular clamping jaws (69, 70), into which a loop (73) or fold formed in the open position Web or new web (34) can be inserted for clamping detection. Vorrichtung nach Anspruch 11 oder einem der weiteren Ansprüche, dadurch gekennzeichnet, daß zum Erfassen der Bahn bzw. Neubahn (34) durch den Greifer (67) ein Abschnitt der Bahn zusammenschiebbar ist unter Bildung einer seitwärtsgerichteten Schlaufe (73) im Bereich der Klemmbacke (69, 70), wobei am Greifer (67) bewegbare Halteorgane zum Erfassen der Bahn bzw. Neubahn (34) angeordnet sind, nämlich vorzugsweise zwei im Abstand voneinander angeordnete Sauger (74, 75), die die Bahn erfassen und durch Verringerung des Abstandes zwischen den Saugern (74, 75) die zu erfassende Schlaufe (73) bzw. Falte bilden.Apparatus according to claim 11 or one of the further claims, characterized in that for gripping the web or new web (34) by the gripper (67) a section of the web can be pushed together to form a sideways loop (73) in the region of the clamping jaw (69 , 70), movable gripping elements for gripping the web or new web (34) being arranged on the gripper (67), namely preferably two suction cups (74, 75) arranged at a distance from one another, which grasp the web and by reducing the distance between the Suction cups (74, 75) form the loop (73) or fold to be detected. Vorrichtung nach Anspruch 7 oder einem der weiteren Ansprüche, dadurch gekennzeichnet, daß zum Bilden eines freien Anfangsstücks (35) der Neubahn (34) eine geschlossene Umhüllung bzw. äußere Lage der Neubobine (30) in axialer Richtung durchtrennbar ist unter Bildung mindestens eines Bahnschenkels (38, 39), wobei der Abholer (44) einen der Bahnschenkel (38, 39) erfaßt und von der Neubahn (34) abzieht.Apparatus according to claim 7 or one of the further claims, characterized in that in order to form a free starting piece (35) of the new web (34), a closed covering or outer layer of the new web (30) can be severed in the axial direction to form at least one web leg ( 38, 39), the pickup (44) gripping one of the web legs (38, 39) and pulling it off the new web (34). Vorrichtung nach Anspruch 7 oder einem der weiteren Ansprüche, dadurch gekennzeichnet, daß die Ablaufbobine (28) und die Neubobine (30) je auf einem Tragzapfen angeordnet sind, nämlich auf einem Arbeitszapfen (26) bzw. einem Vorratszapfen (27), wobei die Arbeitszapfen (26, 27) mit Ablaufbobine (28) und Neubobine (30) an einem gemeinsamen, zweiarmigen Bobinenarm (23, 24) angeordnet sind, der um ein mittiges Drehlager (25) drehbar ist und wobei der Bobinenarm (23, 24) in einer Bearbeitungsposition der Ablaufbobine (28) oder Neubobine (30) in einer schräggerichteten Position angeordnet und die jeweils zu bearbeitende Bobine nach unten weist.Apparatus according to claim 7 or one of the further claims, characterized in that the drain bobbin (28) and the new bobbin (30) are each arranged on a supporting pin, namely on a working pin (26) or a supply pin (27), the working pins (26, 27) with drain bobbin (28) and new bobbin (30) are arranged on a common, two-armed bobbin arm (23, 24) which is rotatable about a central pivot bearing (25) and wherein the bobbin arm (23, 24) in one Processing position of the drain bobbin (28) or new bobbin (30) is arranged in an oblique position and the bobbin to be machined points downward. Vorrichtung nach Anspruch 7 oder einem der weiteren Ansprüche, dadurch gekennzeichnet, daß Klemmstücke (51, 52) zum Erfassen der Neubahn (34) bzw. des Anfangsstücks (35) benachbart zu einer Eintrittsseite der Material bahnen innerhalb des Verbindungsaggregats (40) und Klemmstücke (49, 50) zum Erfassen der Ablaufbahn (29) auf der einer Austrittsseite der Materialbahnen zugeordneten Seite angeordnet sind.Device according to claim 7 or one of the further claims, characterized in that clamping pieces (51, 52) for gripping the new web (34) or the starting piece (35) adjacent to an entry side of the material webs within the connecting unit (40) and clamping pieces ( 49, 50) for detecting the run-off path (29) are arranged on the side assigned to an exit side of the material webs. Vorrichtung nach Anspruch 7 oder einem der weiteren Ansprüche, dadurch gekennzeichnet, daß einander zugeordnete Klemmstücke (49, 50) einerseits und (51, 52) andererseits in getrieblicher Verbindung zueinander stehen, insbesondere derart, daß obere Klemmstücke (49, 51) in einer festen Ausgangsposition angeordnet und untere Klemmstücke (50, 52) in Richtung auf die feststehenden Klemmstücke (49, 51) bewegbar sind, vorzugsweise durch einen gemeinsamen Kurbeltrieb (95).Apparatus according to claim 7 or one of the further claims, characterized in that mutually associated clamping pieces (49, 50) on the one hand and (51, 52) on the other hand are in geared connection with one another, in particular in such a way that upper clamping pieces (49, 51) have a fixed connection Starting position arranged and lower clamping pieces (50, 52) in the direction of the fixed clamping pieces (49, 51) are movable, preferably by a common crank mechanism (95). Vorrichtung nach Anspruch 7 oder einem der weiteren Ansprüche, dadurch gekennzeichnet, daß mindestens je ein Klemmstück (49, 51) der einander paarweise gegenüberliegenden Klemmstücke elastisch gelagert ist, vorzugsweise durch Verbindung mit Zugfedern (87) bzw. (104), wobei die jeweils durch Antrieb bewegbaren Klemmstücke (50, 52) bis zur Anlage an den elastisch gelagerten Klemmstücken (49, 51) zum Festklemmen der Ablaufbahn (29) bzw. der Neubahn (34) bewegbar und gegen die elastische Kraft darüber hinaus bewegbar sind.Device according to claim 7 or one of the further claims, characterized in that at least one clamping piece (49, 51) of the clamping pieces lying opposite one another in pairs is elastically mounted, preferably by connection to tension springs (87) or (104), the respectively by Drive movable clamping pieces (50, 52) to rest against the elastically mounted clamping pieces (49, 51) for clamping the runway (29) or the new track (34) and can also be moved against the elastic force. Vorrichtung nach Anspruch 16 oder einem der weiteren Ansprüche, dadurch gekennzeichnet, daß der Kurbeltrieb (95) mit einem auf- und abbewegbaren Träger verbunden ist, insbesondere mit einem Schlitten (92), an dem unmittelbar ein Druckstück (52) angebracht ist und der über Druckfedern (94) auf ein anderes bewegbares Klemmstück (52) wirkt.Apparatus according to claim 16 or one of the further claims, characterized in that the crank mechanism (95) is connected to a carrier which can be moved up and down, in particular to a carriage (92), to which a pressure piece (52) is directly attached and which Compression springs (94) act on another movable clamping piece (52). Vorrichtung nach Anspruch 7 oder einem der weiteren Ansprüche, dadurch gekennzeichnet, daß das Trennmesser (56) zum Durchtrennen der Bahnen - Ablaufbahn (29) und Neubahn (34) - durch Aufwärtsbewegung aus einer unteren Position zuerst die Neubahn (34) und danach die Ablaufbahn (29) durchtrennt, wobei vorzugsweise das Trennmesser gegen elastischen Druck bewegbar an einem Druckstück (52) angeordnet und durch einen gesonderten Antrieb zur Durchführung eines Trennschnitts aufwärtsbewegbar ist, insbesondere durch einen Druckhebel (99), der bei Aufwärtsbewegung des Druckstücks (52) von einem feststehenden Nocken (101) beaufschlagbar ist.Apparatus according to claim 7 or one of the further claims, characterized in that the separating knife (56) for severing the tracks - runway (29) and new course (34) - by moving upwards from a lower position, first the new course (34) and then the runway (29) severed, the separating knife preferably being arranged movably against elastic pressure on a pressure piece (52) and being movable upwards by a separate drive for performing a separating cut, in particular by a pressure lever (99) which is moved by one when the pressure piece (52) moves upwards fixed cam (101) can be acted upon. Vorrichtung nach Anspruch 7 oder einem der weiteren Ansprüche, dadurch gekennzeichnet, daß mindestens ein Druckstück (51) zum Erfassen einer Bahn - Neubahn (34) - in einer Klemmposition unterhalb der Bewegungsebene der anderen Bahn - Ablaufbahn (29) - positioniert und nach Durchführung des Trennschnitts in eine Position oberhalb von Ablaufbahn (29) und Neubahn (34) bewegbar und zur Rückkehr in die (untere) Ausgangsstellung seitwärts und sodann zur (unteren) Ausgangsposition bewegbar ist.Apparatus according to claim 7 or one of the further claims, characterized in that at least one pressure piece (51) for gripping a web - new web (34) - is positioned in a clamping position below the plane of movement of the other web - run-off web (29) - and after carrying out the Separating cut can be moved into a position above the run-off track (29) and new track (34) and can be moved sideways to return to the (lower) starting position and then to the (lower) starting position. Vorrichtung nach Anspruch 7 oder einem der weiteren Ansprüche, dadurch gekennzeichnet, daß das Tape (60) durch einen bewegbaren Tapehalter (51) den Bahnen - Ablaufbahn (29), Neubahn (34) - zustellbar ist, wobei der Tapehalter (61) einen Haltekopf (81) aufweist, an dem das Tape (60) durch Saugluft gehalten ist, wobei der vorzugsweise winkelförmig ausgebildete Tapehalter (61) durch Schwenkbewegung aus einer Position mit nach oben weisendem Haltekopf (81) durch Schwenkbewegung in eine Position mit nach unten weisendem Haltekopf (108) bewegbar ist.Device according to claim 7 or one of the further claims, characterized in that the tape (60) can be fed to the webs - run-off web (29), new web (34) - by means of a movable tape holder (51), the tape holder (61) holding a holding head (81) on which the tape (60) is held by suction air, the preferably angular tape holder (61) being pivoted from a position with the holding head pointing upwards (81) being pivoted into a position with the holding head pointing downwards ( 108) is movable.
EP99100542A 1998-02-06 1999-01-13 Method and device for splicing webs Expired - Lifetime EP0940360B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP03006338A EP1340702B8 (en) 1998-02-06 1999-01-13 Device for drawing off a material web

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE19804614 1998-02-06
DE19804614A DE19804614A1 (en) 1998-02-06 1998-02-06 Method for connecting packing material webs

Related Child Applications (1)

Application Number Title Priority Date Filing Date
EP03006338A Division EP1340702B8 (en) 1998-02-06 1999-01-13 Device for drawing off a material web

Publications (3)

Publication Number Publication Date
EP0940360A2 true EP0940360A2 (en) 1999-09-08
EP0940360A3 EP0940360A3 (en) 2000-08-30
EP0940360B1 EP0940360B1 (en) 2004-08-11

Family

ID=7856769

Family Applications (2)

Application Number Title Priority Date Filing Date
EP99100542A Expired - Lifetime EP0940360B1 (en) 1998-02-06 1999-01-13 Method and device for splicing webs
EP03006338A Expired - Lifetime EP1340702B8 (en) 1998-02-06 1999-01-13 Device for drawing off a material web

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP03006338A Expired - Lifetime EP1340702B8 (en) 1998-02-06 1999-01-13 Device for drawing off a material web

Country Status (9)

Country Link
US (1) US6142408A (en)
EP (2) EP0940360B1 (en)
JP (2) JP3905240B2 (en)
KR (1) KR19990072462A (en)
CN (1) CN1160234C (en)
AT (1) ATE335690T1 (en)
BR (1) BR9900617A (en)
DE (3) DE19804614A1 (en)
ES (1) ES2226208T3 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002000536A2 (en) * 2000-06-29 2002-01-03 G.D Societa' Per Azioni Strip feed unit and method, and reel end pickup method
FR2814731A1 (en) * 2000-10-02 2002-04-05 Monomatic Sa Machine adapted for continuous unrolling of paper, aluminum or plastics foil from bobbins, has band accumulator with band pursuing zigzag path over movable rollers
FR2814730A1 (en) * 2000-10-02 2002-04-05 Monomatic Sa Precise joining machine for rolls of paper for printing machines, uses secondary storage area to hold paper as it is delivered to an indexing and joining station

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001233514A (en) * 2000-02-23 2001-08-28 Shikoku Kakoki Co Ltd Device and method for splicing roll film
DE50305110D1 (en) * 2003-03-27 2006-11-02 Hauni Maschinenbau Ag Device for changing bobbins
DE102004026312A1 (en) * 2004-05-26 2005-12-15 Krones Ag Folienspleißstation
DE102005005371A1 (en) * 2005-02-05 2006-08-10 Voith Paper Patent Gmbh Method and device for unwinding a material web from a material web roll
WO2008087711A1 (en) * 2007-01-16 2008-07-24 Orihiro Engineering Co., Ltd. Film feeding device and filling/packaging system with the film feeding device
US8070087B2 (en) * 2008-02-11 2011-12-06 Adalis Corporation Splicing apparatus and method
US7980504B2 (en) 2009-04-17 2011-07-19 C.G. Bretting Manufacturing Co., Inc. Automated unwind system with auto-splice
EP2258643B1 (en) 2009-06-01 2015-01-14 Tetra Laval Holdings & Finance S.A. Method for feeding a supply station of a packaging unit with a new reel of sheet packaging material, sheet packaging material holder and lift truck
CN101654198B (en) * 2009-09-08 2012-03-28 安庆市恒昌机械制造有限责任公司 Device for positioning, compounding and splicing continuous base material patterns on hygienic product production line
CN102674056B (en) * 2012-04-24 2015-03-18 华中科技大学 Clamping and feeding system used for synchronous transmission of flexible membranes and application thereof
JP2014058372A (en) * 2012-09-18 2014-04-03 Lintec Corp Long body connection device, and connection method
DE102015113496A1 (en) * 2015-08-14 2017-02-16 Krones Aktiengesellschaft Supply roll with at least one predetermined breaking point and method for handling such a supply roll
JP6694507B2 (en) 2016-06-22 2020-05-13 株式会社瑞光 Sheet feeding system and sheet feeding method
CN106743865B (en) * 2017-03-16 2018-02-13 辽宁工业大学 Packing machine packaging material feed connection
DE102019203748A1 (en) * 2019-02-07 2020-08-13 Bhs Corrugated Maschinen- Und Anlagenbau Gmbh Material web feed device
CN114408635A (en) * 2021-12-22 2022-04-29 软控股份有限公司 Automatic rubber strip feeding device
CN115116674B (en) * 2022-08-23 2022-11-18 金长城线缆有限公司 Cable stranding machine

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3769124A (en) 1972-03-21 1973-10-30 Mobil Oil Corp Method and apparatus for splicing foam sheet material
US4120739A (en) 1975-11-19 1978-10-17 Agfa-Gevaert, N.V. Butt splicer for butt-joining a fresh web to a progressing web
US4848691A (en) 1986-12-25 1989-07-18 Tokyo Automatic Machinery Works, Ltd. Apparatus for splicing a replacement web to a moving web
US4878986A (en) 1987-12-17 1989-11-07 Fuji Photo Film Co., Ltd. Web butt splicing device
DE4219910A1 (en) 1991-06-21 1992-12-24 Blm Ltd Automatic, joining appts. for two material strip ends - comprises horizontally movable strip carriers with shear edges, vertical shearing knives, joining tape applicator and feed clamp to form strip loop
US5468321A (en) 1992-02-04 1995-11-21 Stork Contiweb B.V. Apparatus and method for joining two webs together
US5518202A (en) 1993-08-03 1996-05-21 Focke & Co. (Gmbh & Co.) Process and apparatus for connecting material webs, in particular of packaging material

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3841944A (en) * 1973-06-26 1974-10-15 Harris Intertype Corp Web splicing apparatus
LU80589A1 (en) * 1978-11-28 1980-06-05 Hauni Werke Koerber & Co Kg BOBINE CHANGING DEVICE
US4455190A (en) * 1983-04-20 1984-06-19 Butler Automatic Inc. Web splicer
IT1178613B (en) * 1983-11-24 1987-09-09 Hauni Werke Koerber & Co Kg REEL CHANGE DEVICE
DE3614221C2 (en) * 1986-04-26 1995-02-02 Kolbus Gmbh & Co Kg Roll changing device for book cover machines
JPS63165259A (en) * 1986-12-25 1988-07-08 Tokyo Jido Kikai Seisakusho:Kk Band like material replacing unit in band like material feeding device
JPS63176253A (en) * 1987-01-13 1988-07-20 Hamada Insatsuki Seizosho:Kk Method and device for terminal processing of takeup paper
DE3726139A1 (en) * 1987-08-06 1989-02-16 Beck & Co Packautomaten Device for the automatic exchange of film supply rolls
US4821971A (en) * 1988-03-17 1989-04-18 Kabushiki Kaisha Kaneda Kikai Seisakusho Device for peeling and cutting off surface portions of paper rolls
US4984750A (en) * 1988-07-01 1991-01-15 Tokyo Automatic Machinery Works Ltd. Method and apparatus for replacing web-like material in a web-like material supplying device
JPH089441B2 (en) * 1989-04-26 1996-01-31 日本たばこ産業株式会社 Continuous feeder for strips
DE4212095C1 (en) * 1992-04-10 1993-08-19 Man Roland Druckmaschinen Ag, 6050 Offenbach, De
DE4236691A1 (en) * 1992-10-30 1994-05-05 Hauni Werke Koerber & Co Kg Opener for bobbin of paper with outer wrapper strip - has adhesive strip on bobbin periphery, dispenser strip, scraper blade and pivoting arm
IT1264090B1 (en) * 1993-03-25 1996-09-10 Gd Spa METHOD AND DEVICE FOR AUTOMATIC JOINTING OF TAPES UNWINDED FROM REELS.
DE69729693T2 (en) * 1996-07-17 2004-10-21 Fuji Photo Film Co Ltd Preparation method and apparatus for joining webs

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3769124A (en) 1972-03-21 1973-10-30 Mobil Oil Corp Method and apparatus for splicing foam sheet material
US4120739A (en) 1975-11-19 1978-10-17 Agfa-Gevaert, N.V. Butt splicer for butt-joining a fresh web to a progressing web
US4848691A (en) 1986-12-25 1989-07-18 Tokyo Automatic Machinery Works, Ltd. Apparatus for splicing a replacement web to a moving web
US4878986A (en) 1987-12-17 1989-11-07 Fuji Photo Film Co., Ltd. Web butt splicing device
DE4219910A1 (en) 1991-06-21 1992-12-24 Blm Ltd Automatic, joining appts. for two material strip ends - comprises horizontally movable strip carriers with shear edges, vertical shearing knives, joining tape applicator and feed clamp to form strip loop
US5468321A (en) 1992-02-04 1995-11-21 Stork Contiweb B.V. Apparatus and method for joining two webs together
US5518202A (en) 1993-08-03 1996-05-21 Focke & Co. (Gmbh & Co.) Process and apparatus for connecting material webs, in particular of packaging material

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002000536A2 (en) * 2000-06-29 2002-01-03 G.D Societa' Per Azioni Strip feed unit and method, and reel end pickup method
WO2002000536A3 (en) * 2000-06-29 2002-06-20 Gd Spa Strip feed unit and method, and reel end pickup method
US6866221B2 (en) 2000-06-29 2005-03-15 G. D Societa' Per Azioni Strip feed unit and method, and reel end pickup method
FR2814731A1 (en) * 2000-10-02 2002-04-05 Monomatic Sa Machine adapted for continuous unrolling of paper, aluminum or plastics foil from bobbins, has band accumulator with band pursuing zigzag path over movable rollers
FR2814730A1 (en) * 2000-10-02 2002-04-05 Monomatic Sa Precise joining machine for rolls of paper for printing machines, uses secondary storage area to hold paper as it is delivered to an indexing and joining station
EP1199272A1 (en) * 2000-10-02 2002-04-24 Monomatic, S.A. Precision splicing device for an nonstop unwinding machine

Also Published As

Publication number Publication date
EP1340702B8 (en) 2010-07-07
US6142408A (en) 2000-11-07
JP4202382B2 (en) 2008-12-24
DE59910156D1 (en) 2004-09-16
EP0940360B1 (en) 2004-08-11
EP1340702B1 (en) 2006-08-09
EP0940360A3 (en) 2000-08-30
DE59913766D1 (en) 2006-09-21
JP3905240B2 (en) 2007-04-18
ATE335690T1 (en) 2006-09-15
JPH11268853A (en) 1999-10-05
EP1340702A1 (en) 2003-09-03
KR19990072462A (en) 1999-09-27
ES2226208T3 (en) 2005-03-16
CN1160234C (en) 2004-08-04
JP2007039251A (en) 2007-02-15
CN1225330A (en) 1999-08-11
BR9900617A (en) 1999-12-14
DE19804614A1 (en) 1999-08-12

Similar Documents

Publication Publication Date Title
EP0940360B1 (en) Method and device for splicing webs
EP0442038B1 (en) Method and device for automatically replacing a full roll by a new winding core
EP0638499B1 (en) Method and device for joining webs of material, in particular packaging material
EP0299181B1 (en) Unwinding device for paper or cardboard web reels or similar
EP0189582B1 (en) Device for grasping and detaching the leading end of a wound roll
DE102005033486A1 (en) Device and method for splicing label strips
DE3538893C2 (en) Device for releasing and grasping the beginning of the strip of a bobbin
EP0421148A2 (en) Device and method for transporting and stacking of die-cuts for the production of (cigarette-) packages
DE2223557C2 (en) Process for applying stickers to a continuous web
DE3441205A1 (en) Reel (bobbin) changing device
EP3212552B1 (en) Method and device for handling flat and/or film material wound on rolls
EP0299180B1 (en) Unwinding device for paper or cardboard web
EP1727755B1 (en) Devices for preparing a storage roll wound with a web of material for a flying roll change
DE3523139C1 (en) Device on a machine of the tobacco-processing industry for automatically receiving and transferring the start of a strip of paper to a splicing station
DE3531731C1 (en) Device for continuously feeding a band-shaped material to a processing machine
DE3925988A1 (en) DEVICE FOR DETACHING THE REWINDING THREAD FROM THE SURFACE OF COPPS
DE2417515C2 (en) Device for feeding a wrapping material web to a conveyor in a cigarette packaging machine
DE2549264C3 (en) Device for separating stacked valve bags
DE19735418A1 (en) Method and device for feeding a wrapping material web to a tubular bag packaging machine
DE3925987A1 (en) Rotation of cops and pallet against each other - to locate and detach yarn end
DE3726139A1 (en) Device for the automatic exchange of film supply rolls
DE2453525C2 (en) Device for the formation of thread clamp blanks and their correct positioning with continuously conveyed folded sheets
DE20321534U1 (en) System and apparatus for preparing a reel for flying reel change, for detecting a web and for applying a double-sided adhesive tape on a surface
DE10235786A1 (en) Winding reel preparation for flying change of reels in printing machine involves applying double-sided adhesive tape between beginning of paper web and subjacent web layer of winding reel
DE202022001848U1 (en) Device for connecting two webs of material, each running off a bobbin

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): CH DE ES FR GB IT LI NL

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: FOCKE & CO. (GMBH & CO.)

17P Request for examination filed

Effective date: 20010216

AKX Designation fees paid

Free format text: AT BE CH CY DE DK ES LI

RBV Designated contracting states (corrected)

Designated state(s): CH DE ES FR GB IT LI NL

17Q First examination report despatched

Effective date: 20020828

TPAD Observations filed by third parties

Free format text: ORIGINAL CODE: EPIDOS TIPA

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): CH DE ES FR GB IT LI NL

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 59910156

Country of ref document: DE

Date of ref document: 20040916

Kind code of ref document: P

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 20040909

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: R. A. EGLI & CO. PATENTANWAELTE

RAP2 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: FOCKE & CO. (GMBH & CO. KG)

NLT2 Nl: modifications (of names), taken from the european patent patent bulletin

Owner name: FOCKE & CO. (GMBH & CO. KG)

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2226208

Country of ref document: ES

Kind code of ref document: T3

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

ET Fr: translation filed
26N No opposition filed

Effective date: 20050512

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20120202

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20130207

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20130110

Year of fee payment: 15

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20130930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130131

REG Reference to a national code

Ref country code: NL

Ref legal event code: V1

Effective date: 20140801

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140801

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20150407

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140114

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20150114

Year of fee payment: 17

Ref country code: IT

Payment date: 20150116

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20150107

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20160126

Year of fee payment: 18

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20160113

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160131

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160131

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160113

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160113

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 59910156

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170801