EP2497815A1 - Method for improving oil sands hot water extraction process - Google Patents

Method for improving oil sands hot water extraction process Download PDF

Info

Publication number
EP2497815A1
EP2497815A1 EP11170433A EP11170433A EP2497815A1 EP 2497815 A1 EP2497815 A1 EP 2497815A1 EP 11170433 A EP11170433 A EP 11170433A EP 11170433 A EP11170433 A EP 11170433A EP 2497815 A1 EP2497815 A1 EP 2497815A1
Authority
EP
European Patent Office
Prior art keywords
carbon dioxide
pipeline
oil
oil sands
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP11170433A
Other languages
German (de)
French (fr)
Inventor
Zhixiong Cha
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linde GmbH
Original Assignee
Linde GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linde GmbH filed Critical Linde GmbH
Publication of EP2497815A1 publication Critical patent/EP2497815A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G1/00Production of liquid hydrocarbon mixtures from oil-shale, oil-sand, or non-melting solid carbonaceous or similar materials, e.g. wood, coal
    • C10G1/04Production of liquid hydrocarbon mixtures from oil-shale, oil-sand, or non-melting solid carbonaceous or similar materials, e.g. wood, coal by extraction
    • C10G1/047Hot water or cold water extraction processes
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G2300/00Aspects relating to hydrocarbon processing covered by groups C10G1/00 - C10G99/00
    • C10G2300/80Additives
    • C10G2300/805Water

Abstract

In order to increase the bitumen extraction efficiency in a hot water oil sands extraction process, a method for recovering bitumen comprising adding carbon dioxide to a pipeline containing an oil-bearing formation being transported is proposed.

Description

    Technical field
  • The present invention relates to a process for adding carbon dioxide in a hydrotransport pipeline through which oil sands slurry is transported to an extraction plant in order to improve bitumen recovery efficiency.
  • Background of the present invention; prior art
  • Hot water extraction process is the most frequently employed technique to recover bitumen from surface mined oil sands. Due to the high capacity and low operating cost of modern hot water extraction process for oil sands and other mined oil bearing formations, other alternative processes are not likely to replace this process in the near future.
  • In a conventional hot water extraction process, before bitumen is extracted in a separation vessel, a mixture of oil sand, hot process water, and extraction additive, normally caustic reagent such as sodium hydroxide or sodium carbonate, is conditioned in a large tumbler or drum by intense mechanical agitation for a predetermined period to achieve a desired separation degree of bitumen from sand grains and entraining of air bubbles in the slurry.
  • This modern hot water extraction process, which is developed from the conventional hot water process, transports oil sand, hot process water and extraction additives to a separation vessel in a pipeline wherein conditioning of oil sand is achieved during transportation.
  • This method, called hydrotransport, is one of the most important developments in the oil sands surface mining industry since it greatly increases treatment capacity of the oil sands extraction plant and reduces energy cost.
  • Prior art document US 5 264 118 describes a pipeline conditioning process for mined oil sands wherein oil sands is transported with hot water and sodium hydroxide via a pipeline of sufficient length. During the conditioning process, with assistance of sodium hydroxide, bitumen is liberated from sand grains and entrained air facilitates subsequent aeration of the bitumen.
  • The conditioned oil sands slurry is fed to a gravity separation vessel, known as primary separation vessel (PSV), to settle into three layers, bitumen froth, middlings, and sand under quiescent conditions. The middlings, which is normally processed in a secondary separation vessel, is a mixture of buoyant bitumen, clay and water.
  • In one embodiment of US 5 264 118 achieving more than ninety percent total bitumen recovery efficiency, the pipeline has a length of 2.5 kilometers to achieve a desired extraction efficiency for a mixture of fifty percent to seventy percent by weight of oil sands, fifty percent to thirty percent by weight of hot water, and less than 0.05% by weight of sodium hydroxide at a temperature between 40°C to 70°C. The residence time of oil sands slurry in the pipeline is about fourteen minutes.
  • It is believed that bitumen flecks tend to coalesce and attach or coat to the air bubbles entrained in the slurry. Because the amount of the entrained air is an important factor for oil sands conditioning in the hydrotransport pipeline, a more effective method of adding air into oil sands slurry can significantly improve the overall bitumen extraction efficiency.
  • A device, cyclofeeder, described in prior art documents CA 2 029 795 A1 and US 5 039 227 , can simultaneously entrain air into the slurry when it is mixing oil sands with hot water.
  • In prior art document US 6 007 708 , the aeration effects by gas bubbles are enhanced by injecting compressed air in the hydrotransport pipeline to improve the bitumen extraction efficiency at a relatively low conditioning temperature.
  • The drawback of this process is that the extracted bitumen contains relatively high concentration of impurities due to bitumen's high viscosity at low temperature and incomplete separation of bitumen from sand grains. The volume ratio of air to slurry can be up to 2.5:1 and the overall bitumen recovery efficiency can be as high as 98 percent.
  • Another example to explore the separation and floatation effects of gas bubbling is described in prior art document CA 2 703 835 A1 , in which the oil sands and hot water mixture is treated in a closed vessel by cyclic compression and decompression of compressed air or carbon dioxide in the vessel.
  • This method can achieve more than ninety percent bitumen extraction efficiency for tar sands or oil sands from different countries without the assistant of caustic reagent and does not generate middlings. The major drawback of this method is that the extraction capacity of a device is limited by the vessel size due to the high construction cost of a large pressure vessel.
  • Also, prior art document WO 2005/123608 A1 teaches a method of adding hydrogen peroxide into a conditioned mixture of oil sands and hot water. The oxygen bubbles generated through decomposition of hydrogen peroxide may accelerate separation and floatation of bitumen.
  • An obvious drawback of this process is that the high purchasing price of hydrogen peroxide makes this process less competitive. Also, oxygen, which is not preferred in the subsequent bitumen upgrading processes, may have been added into bitumen structures.
  • Caustic reagent is normally required to improve the conditioning effects in the hot water extraction process. However, addition of caustic reagent such as sodium hydroxide has many drawbacks.
  • The major problem is that caustic reagent will cause emulsification of released bitumen in water and suspension of fine particles in the aqueous phase. Those effects greatly reduce the overall bitumen extraction efficiency and cause serious environmental problems when the process water is being disposed.
  • Another problem is generation of large amount of middlings in the separation vessel. Although most bitumen contained in the middlings and tailings can be recovered in the subsequent extraction processes, improving the primary separation vessel's froth production and quality is the most effective way to reduce the overall operating cost.
  • Prior art document CA 2 004 352 A1 has addressed these problems by replacing the caustic reagent by kerosene and methyl-isobutyl carbinol. This method also has a problem of high operating cost due to usage of large amount of chemicals.
  • In order to treat the process water from the hot water extraction process that contains suspended solids and emulsified bitumen at a high pH level by the caustic reagent, prior art document CA 1 022 098 discloses a method to break the emulsion to recover additional bitumen and accelerate precipitation of the suspended solids through neutralizing the process water by addition of inorganic acids and carbon dioxide.
  • It has been recognized that neutralizing the process water to pH at around 7 by an inorganic acid is not sufficient for emulsion breaking. The purpose of utilizing inorganic acid to adjust water pH is to facilitate the emulsion breaking effect of carbon dioxide since carbon dioxide is not a strong acid for pH adjustment. But the addition of inorganic acid generates permanent unwanted salt in the process water and limits reuse of the process water.
  • It is noticed that after bitumen is separated from sand grains and bitumen droplets are formed with the help of the caustic reagent, the basic condition is not necessarily to be maintained in the separation vessel for formation of froth. On the contrary, the caustic condition can cause emulsification of bitumen in hot water and generate large amount of middlings. De-emulsification of the emulsion, such as reducing pH of the process water or adding flocculent, can improve the total recovery ratio of bitumen in the primary separation vessel.
  • Since carbon dioxide is a good reagent to neutralize process water, using carbon dioxide to adjust oil sands slurry's pH level is a practical measure. To achieve the emulsion breaking effect, a lower pH value by dissolving more carbon dioxide under elevated pressure may be required.
  • In addition, since noticeable amount of carbon dioxide is dissolved in bitumen under elevated pressure, pressure drop in the primary separation vessel can significantly increase bitumen's buoyancy through expansion of the bitumen droplets. Also, reduction of emulsified bitumen in water and increase of bitumen's buoyancy can prevent generation of large amount of middlings.
  • So the operating costs for middlings treatment and subsequent process water treatment can be reduced. Compared to adjusting water pH using assistant inorganic acid, which is used in other methods because carbon dioxide is not sufficient for pH adjustment in a non pressure vessel or a low pressure vessel, using carbon dioxide will not permanently increase the water salt concentration since the product of carbon dioxide and sodium hydroxide is sodium carbonate, which is also used as a caustic reagent for oil sands extraction in the how water extraction process.
  • However, pressurizing the primary separation vessel in a larger oil sands extraction plant is not practical because of the high construction cost of a large pressure vessel. Injecting carbon dioxide in the hydrotransport pipeline is a more practical method for adjusting the oil sands slurry's pH.
  • Disclosure of the present invention: object, solution, advantages
  • Starting from the disadvantages and shortcomings as described above and taking the prior art as discussed into account, an object of the present invention is to increase the bitumen extraction efficiency in a hot water oil sands extraction process; more particularly, the present invention aims to improve the bitumen recovery efficiency in a primary separation vessel by simultaneous improvement of the aeration effect and reduction of the bitumen emulsification degree.
  • This object is accomplished by a method comprising the features of claim 1. Advantageous embodiments and expedient improvements of the present invention are disclosed in the dependent claims.
  • A method for improving oil sands hot water extraction process, in particular for recovering bitumen comprising adding carbon dioxide to a pipeline containing an oil-bearing formation being transported is disclosed. By this method, the bitumen extraction efficiency in a hot water oil sands extraction process is increased.
  • According to an advantageous embodiment of the present invention, the oil-bearing formation is selected from the group consisting of an oil sands slurry, tar sands slurry and oil-contaminated soil slurry.
  • According to an expedient embodiment of the present invention, the volumetric flow rate ratio of the carbon dioxide to process water in the pipeline is controlled from 0.2:1 to 15:1.
  • According to a favoured embodiment of the present invention, the carbon dioxide injection pressure is maintained at a pressure from 1.2 bars to 21 bars.
  • According to a preferred embodiment of the present invention, the pressure in the pipeline behind the carbon dioxide injection point is maintained between 1.1 bars to twenty bars.
  • According to an advantageous embodiment of the present invention, the pH of the oil sands slurry in the pipeline is adjusted to a level below 8.
  • According to an expedient embodiment of the present invention, the carbon dioxide is injected in the pipeline at a point where the oil-bearing formation has been conditioned to a degree higher than fifty percent.
  • According to a favoured embodiment of the present invention, the length of the pipeline is from one meter to two kilometers.
  • According to a preferred embodiment of the present invention, the oil-bearing formation flow is merged with a fresh water stream before it is fed to a separation vessel and the volumetric flow rate ratio of the fresh water to oil-bearing formation is from 0:1 to 3:1,
    • wherein the separation vessel can be operated under ambient pressure and/or
    • wherein the separation vessel can be operated at a pressure lower than the pressure in the hydrotransport pipeline.
  • According to an advantageous embodiment of the present invention, the carbon dioxide is directly injected into the oil-bearing formation through a device selected from the group consisting of nozzles and a venturi device.
  • According to an expedient embodiment of the present invention, carbon dioxide is mixed with a water stream before being injected in the pipeline, wherein the volumetric flow rate ratio of the carbon dioxide to the water can be from 1:0 to 20:1.
  • According to a favoured embodiment of the present invention, carbon dioxide is injected in the pipeline at several points.
  • In more detail, a volume of gaseous carbon dioxide can be added into the oil sands slurry that is being transported through a hydrotransport pipeline from the oil sands mining site to the bitumen extraction plant at a position where the oil sands has been conditioned to a desired degree.
  • Carbon dioxide can be injected into the slurry under elevated pressure through a gas distribution device while the hydraulic pressure in the pipeline can be maintained at an elevated pressure. After the carbon dioxide-bearing oil sands slurry is fed into the separation vessel, a part of the carbon dioxide can be recovered for reinjection.
  • The present invention can be applied, but is not limited to, improving the oil extraction of oil sands and other oil bearing formation in a hot water extraction process. The same method can be applied to remediation of contaminated soil, treatment of waste water, and mine floatation in order to improve treatment efficiency.
  • In one embodiment of the present invention, carbon dioxide is injected into the hydrotransport pipeline, through which oil sands slurry is conditioned when being transported from a mining site to an extraction plant, at a position where the oil sands have been conditioned to a desired degree.
  • The pH of the oil sand slurry after dissolving carbon dioxide in the process water, which can be measured by a set of pH probes installed on the pipeline, is adjusted to a value below 8 and preferably below 7 by controlling the carbon dioxide's flow rate.
  • Since the volumetric ratio of the dissolved carbon dioxide to water is mainly decided by the water temperature and the pressure, the hydraulic pressure in the pipeline is maintained at an elevated pressure to guarantee that a desired amount of carbon dioxide is dissolved in the process water. Also, some other aspects such as the salt concentration and alkalinity of water that can affect the equilibrant carbon dioxide concentration in the aqueous phase are taken into account.
  • In the pipeline in which carbon dioxide is being dissolved, the hydraulic pressure is maintained between 1.1 bars to twenty bars for the purpose of dissolving more carbon dioxide and a boosting pump is installed if necessary. The pressure used in describing the present invention is absolute pressure.
  • The improvement of bitumen extraction is also facilitated by other synergetic effects due to injection of carbon dioxide, such as aeration and gas bubble floatation effect in the separation vessel and higher buoyancy of the bitumen droplets. Therefore, by maintaining an elevated hydraulic pressure in the pipeline, the volumetric flow rate ratio of carbon dioxide to the process water in the hydrotransport pipeline is controlled from 0.2:1 to 15:1.
  • The gas volume used in the present invention is its volume under standard condition. Adding carbon dioxide into the hydrotransport pipeline can be achieved by one venturi device or other gas dissolving devices such as a set of nozzles. The pressure of carbon dioxide is maintained at a pressure higher than the hydraulic pressure in the hydrotransport pipeline for the purpose of injection at a high gas flow rate, preferably between 1.5 bars to 21 bars.
  • To adjust the dissolved carbon dioxide concentration in the oil sands slurry, a fresh water stream can be optionally mixed with the oil sands slurry flow prior to being fed into the primary separation tank. The volumetric mixing ratio of the fresh water to the oil sands slurry is from 0:1 to 3:1. The water's temperature can be controlled from 20°C to 120°C.
  • Also, the present invention comprises a carbon dioxide recycling pipeline to recover the released carbon dioxide from the oil sands slurry in the primary separation vessel, in which the operating pressure is at ambient pressure or a pressure lower than the hydraulic pressure in the pipeline.
  • The recovered carbon dioxide can be stored in a carbon dioxide storage tank or be injected into another hydrotransport pipeline in parallel operation with or without treatment, depending on the insoluble gas concentration in it. Since a part of carbon dioxide that dissolved in the process water under ambient pressure is not recoverable, supplementary carbon dioxide is provided to maintain the carbon dioxide flow rate.
  • To reduce corrosion of equipment caused by the dissolved carbon dioxide in water and to recycle process water for continuous conditioning of oil sands in the hydrotransport pipeline under basic conditions, the process water recovered from the separation vessel is aerated by air or other inert gases such as nitrogen, methane, carbon monoxide and argon, or is heated to an elevated temperature by injection of steam.
  • The present invention also relates to a system, in particular to an apparatus, for conducting the method as described above.
  • The present invention finally relates to the use of a method as described above and/or of a system as mentioned above for increasing the bitumen extraction efficiency in the hot water oil sands extraction process.
  • Brief description of the drawing
  • As already discussed above, there are several options to embody as well as to improve the teaching of the present invention in an advantageous manner. To this aim, reference is made to the claims dependent on claim 1; further improvements, features and advantages of the present invention are explained below in more detail with reference to a preferred embodiment by way of non-limiting example and to the accompanying drawing where
  • Fig. 1
    is a schematic process flow diagram showing injection of carbon dioxide in the hydrotransport pipeline in the oil sands hot water extraction process, with this process flow being realized according to the method of the present invention.
    Detailed description of the drawings; best way of embodying the present invention
  • As shown in the schematic process flow diagram according to Fig. 1 referring to a method for improving oil sands hot water extraction process according to the present invention, carbon dioxide from carbon dioxide tank A is injected into the hydrotransport pipeline 3, which transports oil sands slurry to an extraction plant, through line 2, at a position where the oil sands slurry has been conditioned to a desired degree higher than fifty percent, preferably higher than eighty percent, and more preferably higher than ninety percent, that the basic condition is no longer required for liberation of bitumen from sand grains.
  • The carbon dioxide may be supplied to the carbon dioxide tank A through line 1 from a trailer or other ready source of carbon dioxide.
  • In order to neutralize the slurry by dissolving a desired amount of carbon dioxide in the process water, the hydrotransport pipeline 3 pressure for carbon dioxide injection is maintained at an elevated pressure from 1.2 bars to 21 bars, preferably from three bars to ten bars.
  • The pH of the oil sands slurry in the hydrotransport pipeline 3, which can be measured by a set of pH probes installed on the hydrotransport pipeline 3, is adjusted to a level below 8 and preferably below 7 by controlling the carbon dioxide flow rate.
  • Carbon dioxide can be directly injected in oil sand slurry through a set of nozzles or a gas disperser such as a venturi device. Although it is not necessary that all carbon dioxide be dissolved in the oil sands slurry since existence of gas bubbles in the slurry improves conditioning effect, an elevated pressure is maintained in the pipeline to keep as much as possible of carbon dioxide is dissolved in the oil sands slurry.
  • The pressure in the hydrotransport pipeline 3 behind the carbon dioxide injection point is maintained between 1.1 bars to twenty bars, preferably between two bars to ten bars.
  • The length of the hydrotransport pipeline 3 for dissolving carbon dioxide and the residence time of oil sands slurry in the hydrotransport pipeline 3 for breaking emulsion are decided by the hydraulic pressure, the slurry's pH, amount of impurities in water such as suspended fine particles, alkalinity of the process water and the emulsification degree of bitumen in water, preferably from one meter to two kilometers, more preferably from hundred meters to one kilometer.
  • The volumetric flow rate ratio of carbon dioxide to the process water in the hydrotransport pipeline 3 is controlled from 0.2:1 to 15:1, preferably from 0.5:1 to 10:1.
  • The oil sands slurry is fed into the hydrotransport pipeline 3 from mixer B through line 12. The oil sands slurry is fed into mixer B through line 9; hot water is also fed into the mixer B through line 8 to line 11 and additives such as sodium hydroxide or sodium carbonate are also fed into the mixer B through line 10. The mixer B is typically a cyclofeeder. The hot water in line 8 can also be directed immediately or in addition to its transport into line 11 and mixer B, directly into the hydrotransport pipeline 3.
  • Before the carbon dioxide-bearing oil sands slurry is added into the primary separation vessel C or other separation vessels, the oil sands slurry flow in hydrotransport pipeline 3 is merged with a fresh water stream through line 8 to adjust the volumetric ratio of gas to water for the purpose of optimizing the gas flotation effect for bitumen in the vessel.
  • The mixing volumetric flow rate ratio of the fresh water to oil sands slurry is controlled from 0:1 to 3:1, preferably from 0.1:1 to 1:1. And the water's temperature is controlled from 20°C to 120°C.
  • After dilution, the oil sands slurry is fed into the separation vessel C though a pressure reducing device such as a nozzle or a valve.
  • In this embodiment, the primary separation vessel C is operated under ambient pressure or a pressure lower than the hydraulic pressure in the hydrotransport pipeline 3. Therefore, a part of carbon dioxide dissolved in water and bitumen transforms into bubbles after pressure drop to provide additional bitumen separation and flotation effects in the separation vessel.
  • Gaseous carbon dioxide in the primary vessel's overhead space can be recycled through a carbon dioxide recovery pipeline 7 to a carbon dioxide storage tank A or be directly injected into another hydrotransport pipeline in parallel operation, not shown in Fig. 1.
  • The recycled carbon dioxide may contain air entrained in oil sands during conditioning, so the carbon dioxide is diluted by fresh carbon dioxide or be treated by other measures to control the insoluble gas concentration in it if it is necessary. The overall impurities concentration in carbon dioxide is controlled lower than twenty percent, preferably less than ten percent, and more preferably less than five percent by volume. Also, the recovered carbon can be used for other purposes.
  • The primary separation vessel C is typically a large, conical-bottomed, cylindrical vessel. The primary separation vessel C will separate the oil sand slurry that is fed through hydrotransport pipeline 3 into three distinct components plus excess carbon dioxide that may be present in the oil sand slurry.
  • The sand and water will exit through the bottom of the primary separation vessel C through the bottom line 6 which can be treated and returned to where the oil sand was originally derived from or transported for other disposal means.
  • The middlings which are separated in the primary separation vessel C are removed through line 5 and froth is removed through line 4. As mentioned previously, carbon dioxide is recovered and recycled through line 7 back to the carbon dioxide storage tank A where it can be used for injection into the hydrotransport pipeline 3.
  • Since the process water recovered through line 6 from the separation vessel C contains dissolved carbon dioxide, which may cause corrosion of the equipments and pipelines and require additional caustic reagent to condition the oil sands when the recovered water is to be reused, the process water is aerated by air or other inert gases such as nitrogen, methane, carbon monoxide and argon, or is heated to a higher temperature by injection of steam or other heating methods before reuse.
  • In another embodiment, carbon dioxide is mixed with a fresh water stream before being added in the oil sands slurry. The purpose of mixing the fresh water with carbon dioxide is to make carbon dioxide partially dissolved in water at a pressure higher than the pressure in the pipeline.
  • The fresh water's temperature can be higher or lower than the oil sands slurry's temperature transported in the pipeline. The volumetric flow rate ratio of the carbon dioxide to fresh water is controlled from 1:0 to 20:1. The water's temperature is controlled from 1°C to 100°C.
  • In another further embodiment, the carbon dioxide is injected into the hydrotransport pipeline at several points and the distance between two adjacent points is from one meter to 500 meters, more likely from ten meters to 200 meters.
  • The number of injection points is from two to twenty, and the carbon dioxide's injection rate at different injection points can be the same, close to or different at each injection point. The flow rate ratio of the overall of carbon dioxide to the process water in the oil sands slurry is from 0.2:1 to 15:1, preferably from 0.5:1 to 10:1.
  • Fig. 1 also illustrates a corresponding system 100, in particular to a corresponding apparatus, for recovering bitumen, with such system 100 working according to the method of the present invention.
  • While the present invention has been described with respect to particular embodiments thereof, it is apparent that numerous other forms and modifications of the present invention will be obvious to those skilled in the art. The appended claims in the present invention generally should be construed to cover all such obvious forms and modifications which are within the true scope of the present invention.
  • List of reference numerals
  • 1
    line to carbon dioxide tank A
    2
    line from carbon dioxide tank A to hydrotransport pipeline 3
    3
    pipeline, in particular hydrotransport pipeline
    4
    line from separation vessel C, in particular for froth
    5
    line from separation vessel C, in particular for middlings
    6
    line, in particular bottom line, from separation vessel C, in particular for sand and/or for water
    7
    line, in particular carbon dioxide recovery pipeline, from separation vessel C to carbon dioxide tank A
    8
    line to mixer B and/or to hydrotransport pipeline 3
    9
    line to mixer B, in particular for oil sands slurry
    10
    line to mixer B, in particular for additives, for example for sodium hydroxide and/or for sodium carbonate
    11
    line from line 8 to mixer B
    12
    line from mixer B to hydrotransport pipeline 3
    100
    system, in particular apparatus, for recovering bitumen
    A
    carbon dioxide tank, in particular carbon dioxide storage tank
    B
    mixer, in particular cyclofeeder
    C
    separation vessel, in particular primary separation vessel

Claims (15)

  1. A method for recovering bitumen comprising adding carbon dioxide to a pipeline (3) containing an oil-bearing formation being transported.
  2. The method according to claim 1 wherein said oil-bearing formation is selected from the group consisting of an oil sands slurry, tar sands slurry and oil-contaminated soil slurry.
  3. The method according to claim 1 or 2 wherein the volumetric flow rate ratio of said carbon dioxide to process water in the pipeline (3) is controlled from 0.2:1 to 15:1.
  4. The method according to at least one of claims 1 to 3 wherein said carbon dioxide injection pressure is maintained at a pressure from 1.2 bars to 21 bars.
  5. The method according to at least one of claims 1 to 4 wherein the pressure in the pipeline (3) behind the carbon dioxide injection point is maintained between 1.1 bars to twenty bars.
  6. The method according to at least one of claims 1 to 5 wherein the pH of the oil sands slurry in the pipeline (3) is adjusted to a level below 8.
  7. The method according to at least one of claims 1 to 6 wherein said carbon dioxide is injected in the pipeline (3) at a point where the oil-bearing formation has been conditioned to a degree higher than fifty percent.
  8. The method according to at least one of claims 1 to 7 wherein the length of the pipeline (3) is from one meter to two kilometers.
  9. The method according to at least one of claims 1 to 8 wherein the oil-bearing formation flow is merged with a fresh water stream before it is fed to a separation vessel (C) and the volumetric flow rate ratio of the fresh water to oil-bearing formation is from 0:1 to 3:1.
  10. The method according to claim 9 wherein said separation vessel (C) is operated under ambient pressure.
  11. The method according to claim 9 or 10 wherein said separation vessel (C) is operated at a pressure lower than the pressure in the pipeline (3).
  12. The method according to at least one of claims 1 to 11 wherein said carbon dioxide is directly injected into said oil-bearing formation through a device selected from the group consisting of nozzles and a venturi device.
  13. The method according to at least one of claims 1 to 12 wherein carbon dioxide is mixed (B) with a water stream before being injected in the pipeline (3).
  14. The method according to claim 13 wherein the volumetric flow rate ratio of said carbon dioxide to said water is from 1:0 to 20:1.
  15. The method according to at least one of claims 1 to 14 wherein carbon dioxide is injected in the pipeline (3) at several points.
EP11170433A 2011-03-09 2011-06-17 Method for improving oil sands hot water extraction process Withdrawn EP2497815A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US13/044,044 US20120228195A1 (en) 2011-03-09 2011-03-09 Method for improving oil sands hot water extraction process

Publications (1)

Publication Number Publication Date
EP2497815A1 true EP2497815A1 (en) 2012-09-12

Family

ID=44834977

Family Applications (1)

Application Number Title Priority Date Filing Date
EP11170433A Withdrawn EP2497815A1 (en) 2011-03-09 2011-06-17 Method for improving oil sands hot water extraction process

Country Status (3)

Country Link
US (1) US20120228195A1 (en)
EP (1) EP2497815A1 (en)
WO (1) WO2012121837A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018141067A1 (en) * 2017-02-03 2018-08-09 Uti Limited Partnership Deconstruction of oilsand materials using ionic liquids

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1022098A (en) 1973-10-12 1977-12-06 Dusan A. Vendrinsky Method of treating effluents from hot water extraction of bitumen from tar sands utilizing carbon dioxide gas
US4120777A (en) * 1976-07-13 1978-10-17 Guardian Chemical Corporation Process for recovery of bituminous material from tar sands
CA1237689A (en) * 1985-09-26 1988-06-07 Moshe Greenfeld Froth flotation method for recovery of bitumen from aqueous suspensions of tar sands
US4968412A (en) * 1989-01-17 1990-11-06 Guymon E Park Solvent and water/surfactant process for removal of bitumen from tar sands contaminated with clay
CA2029795A1 (en) 1989-11-10 1991-05-11 George J. Cymerman Pipeline conditioning process for mined oil-sand
CA2004352A1 (en) 1989-12-01 1991-06-01 Kohur N. Sury Hot water extraction process and apparatus
US5039227A (en) 1989-11-24 1991-08-13 Alberta Energy Company Ltd. Mixer circuit for oil sand
US5264118A (en) 1989-11-24 1993-11-23 Alberta Energy Company, Ltd. Pipeline conditioning process for mined oil-sand
US6004455A (en) * 1997-10-08 1999-12-21 Rendall; John S. Solvent-free method and apparatus for removing bituminous oil from oil sands
US6007708A (en) 1997-10-02 1999-12-28 Alberta Energy Company Ltd. Cold dense slurrying process for extracting bitumen from oil sand
WO2005123608A1 (en) 2004-06-10 2005-12-29 Lawrence Conaway Method for using peroxide and alkali to recover bitumen from tar sands
CA2703835A1 (en) 2007-11-02 2009-05-07 University Of Utah Research Foundation Cyclic gaseous compression/expansion for heightened oil sands extraction

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4415858A (en) * 1981-06-12 1983-11-15 The United States Of America As Represented By The United States Department Of Energy pH Meter probe assembly
BR9506092A (en) * 1995-12-26 1997-12-23 Liquid Carbonic Ind Sa Processes for controlling the pH of mines pulps during conditioning and / or flotation to neutralize the pulps and to control the pH of ores and to recover their waters and the system for carrying out the processes
CA2325223A1 (en) * 2000-11-06 2002-05-06 Reginald D. Humphreys Tar sands extraction process
CA2462359C (en) * 2004-03-24 2011-05-17 Imperial Oil Resources Limited Process for in situ recovery of bitumen and heavy oil
US8003844B2 (en) * 2008-02-08 2011-08-23 Red Leaf Resources, Inc. Methods of transporting heavy hydrocarbons
US8157003B2 (en) * 2008-12-18 2012-04-17 Stillwater Energy Group, Llc Integrated carbon management system for petroleum refining
WO2011063137A2 (en) * 2009-11-18 2011-05-26 Chevron U.S.A. Inc. System and method for transporting fluids in a pipeline

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1022098A (en) 1973-10-12 1977-12-06 Dusan A. Vendrinsky Method of treating effluents from hot water extraction of bitumen from tar sands utilizing carbon dioxide gas
US4120777A (en) * 1976-07-13 1978-10-17 Guardian Chemical Corporation Process for recovery of bituminous material from tar sands
CA1237689A (en) * 1985-09-26 1988-06-07 Moshe Greenfeld Froth flotation method for recovery of bitumen from aqueous suspensions of tar sands
US4968412A (en) * 1989-01-17 1990-11-06 Guymon E Park Solvent and water/surfactant process for removal of bitumen from tar sands contaminated with clay
CA2029795A1 (en) 1989-11-10 1991-05-11 George J. Cymerman Pipeline conditioning process for mined oil-sand
US5039227A (en) 1989-11-24 1991-08-13 Alberta Energy Company Ltd. Mixer circuit for oil sand
US5264118A (en) 1989-11-24 1993-11-23 Alberta Energy Company, Ltd. Pipeline conditioning process for mined oil-sand
CA2004352A1 (en) 1989-12-01 1991-06-01 Kohur N. Sury Hot water extraction process and apparatus
US6007708A (en) 1997-10-02 1999-12-28 Alberta Energy Company Ltd. Cold dense slurrying process for extracting bitumen from oil sand
US6004455A (en) * 1997-10-08 1999-12-21 Rendall; John S. Solvent-free method and apparatus for removing bituminous oil from oil sands
WO2005123608A1 (en) 2004-06-10 2005-12-29 Lawrence Conaway Method for using peroxide and alkali to recover bitumen from tar sands
CA2703835A1 (en) 2007-11-02 2009-05-07 University Of Utah Research Foundation Cyclic gaseous compression/expansion for heightened oil sands extraction

Also Published As

Publication number Publication date
WO2012121837A1 (en) 2012-09-13
US20120228195A1 (en) 2012-09-13

Similar Documents

Publication Publication Date Title
CA2610463C (en) Integration of an in-situ recovery operation with a mining operation
US6007708A (en) Cold dense slurrying process for extracting bitumen from oil sand
CA2610230C (en) Water integration between an in-situ recovery operation and a bitumen mining operation
US8043494B2 (en) Method for improving bitumen recovery from oil sands by production of surfactants from bitumen asphaltenes
US20100258477A1 (en) Compositions and processes for separation of bitumen from oil sand ores
US20040222164A1 (en) Method and apparatus for using peroxide and alkali to recover bitumen from tar sands
CA2983975C (en) Remote steam generation and water-hydrocarbon separation in hydrocarbon recovery operations
Zhou Role of mineral flotation technology in improving bitumen extraction from mined A thabasca oil sands III. Next generation of water‐based oil sands extraction
EP2497815A1 (en) Method for improving oil sands hot water extraction process
US20020104799A1 (en) Tar sands extraction process
US10711200B2 (en) Nanobubble aided bitumen extraction from oil sand
ITMI20111977A1 (en) PROCEDURE FOR RECOVERY OF BITUMEN FROM A BITUMINOUS SAND
CA2915851C (en) Process for recovering bitumen from oil sands ore with aluminum-containing compounds
KR101698575B1 (en) Apparatus and method for purify soil polluted crude
CA2880959C (en) Sodium citrate and caustic as process aids for the extraction of bitumen from mined oil sands
US7727385B2 (en) Enhanced bitumen flotation
CA3057226C (en) Managing ore blending for froth solids control
CA3010081C (en) Co2 injection into a bitumen extraction process
CA3067314C (en) Shearing and sparging of bitumen froth treatment tailings
US11697776B1 (en) Treatment of heavy crude oil and bitumen recovery from surface tar sands with magnetized oxygen/air micro nano bubbles water
CA2577743C (en) Enhanced bitumen flotation
CA2901082C (en) Recovering degraded bitumen from tailings
CA3037959C (en) Pretreatment of froth treatment affected tailings with floatation and stripping prior to tailings dewatering and containment
CA2863571C (en) Emulsification and transportation of bitumen froth for removal of impurities
CA3009957A1 (en) Methods for reducing caustic addition during bitumen extraction from mined oil sands

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20130313