US20060156684A1 - Building assembly system and method - Google Patents

Building assembly system and method Download PDF

Info

Publication number
US20060156684A1
US20060156684A1 US10/696,004 US69600403A US2006156684A1 US 20060156684 A1 US20060156684 A1 US 20060156684A1 US 69600403 A US69600403 A US 69600403A US 2006156684 A1 US2006156684 A1 US 2006156684A1
Authority
US
United States
Prior art keywords
building
assemblages
assemblage
frame
building frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US10/696,004
Inventor
Brian Foucher
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Good Ideas LLC
Original Assignee
Good Ideas LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Good Ideas LLC filed Critical Good Ideas LLC
Priority to US10/696,004 priority Critical patent/US20060156684A1/en
Assigned to GOOD IDEAS, LLC reassignment GOOD IDEAS, LLC ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: FOUCHER, BRIAN R.
Priority to PCT/US2004/035698 priority patent/WO2005045150A2/en
Publication of US20060156684A1 publication Critical patent/US20060156684A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/34Extraordinary structures, e.g. with suspended or cantilever parts supported by masts or tower-like structures enclosing elevators or stairs; Features relating to the elastic stability
    • E04B1/3408Extraordinarily-supported small buildings
    • E04B1/3412Extraordinarily-supported small buildings mainly supported by a central column or footing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/344Structures characterised by movable, separable, or collapsible parts, e.g. for transport with hinged parts
    • E04B1/3441Structures characterised by movable, separable, or collapsible parts, e.g. for transport with hinged parts with articulated bar-shaped elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B2001/0053Buildings characterised by their shape or layout grid
    • E04B2001/0084Buildings with non right-angled horizontal layout grid, e.g. triangular or hexagonal
    • E04B2001/0092Small buildings with hexagonal or similar horizontal cross-section

Definitions

  • the present invention relates to assemblage construction, shipment and building construction, and, more particularly, to a method and system for design, prefabrication, shipping and construction of a building.
  • factory precut buildings have been shipped in kit form with loose pieces, lumber precuts and precut panels of sheathing and flooring.
  • the loose and precut pieces arrive at a building site ready for assembly, without requiring measuring and cutting.
  • the loose pieces must be unpacked and sorted.
  • the loose pieces are assembled and constructed in a standard manner pertaining to on-site building construction.
  • factory assembled roof trusses were available for shipment.
  • the trusses are individual pieces that lack assemblage with framing members for walls and floors.
  • the roof trusses need to be constructed onto load bearing walls, which consumes time and labor costs in significantly large amounts.
  • the invention is a method and system of prefabricated assemblages that are shipped to a building site for construction of a building.
  • the invention relates to a building frame wherein the function of design simplifies it to evolve from a configuration that is collapsible for shipment, and into an deployed configuration to provide a frame for a building.
  • a method according to the invention includes the steps of; designing a building frame to fit in one or more shipping containers, and collapsing the building frame to fit in the shipping containers.
  • the invention includes the step of transferring the collapsed building frame from containers to a building site where the building frame is constructed to make a building.
  • the invention fulfills a considerable need for one or more buildings constructed over water or uneven terrain, and constructed at resort regions experiencing hurricane force winds in the tropics, or heavy snowfall in mountainous elevations, and/or high seismic activity.
  • the invention further includes a method of constructing a building frame that has been collapsed for shipment in corresponding shipping containers, by removing the building frame from the corresponding shipping containers, and transferring the collapsed building frame to an un-collapsed configuration, and onto a building site to provide a frame for a building.
  • FIG. 1A is an isometric view of a building frame for a building.
  • FIG. 1B is an elevation view of a building frame with parts separated from one another.
  • FIG. 1C is a perspective view of frame assemblages of the building frame disclosed by FIG. 1B .
  • FIG. 1D is an isometric view of a hinge connection for a frame assemblage.
  • FIG. 1E is an elevation view of another embodiment of a building frame with parts separated from one another.
  • FIG. 1F is an elevation view of another embodiment of a building frame with parts separated from one another.
  • FIG. 1G is an elevation view of another embodiment of a building frame with parts separated from one another.
  • FIG. 1H is an elevation view of another embodiment of a building frame with parts separated from one another.
  • FIG. 1I is an isometric view of a hinge connection for a frame assemblage.
  • FIG. 2A is an isometric view of a shipping container and frame assemblages.
  • FIGS. 2B-2D are isometric views of first story frame assemblages being folded or collapsed and unfolded or constructed.
  • FIGS. 2E-2G are isometric views of second story frame assemblages being folded or collapsed and unfolded or constructed.
  • FIGS. 2H-2J are isometric views of roof truss frame assemblages being folded or collapsed and unfolded or constructed.
  • FIG. 2K is an isometric view of an embodiment of a foundation.
  • FIG. 3A is an isometric view of a subassembly prior to construction of a floor.
  • FIG. 3B is an isometric view of a subassembly constructed with a floor.
  • FIG. 3C is an isometric view of a permanent building site and construction of subassemblies.
  • FIG. 3D is an isometric view of a temporary building site and a crane, together with the permanent building site and subassemblies as disclosed by FIG. 3C .
  • FIG. 4 is a diagrammatic view of a method of constructing a building using a crane and a temporary building site and at least one permanent building site.
  • FIG. 5 is an isometric view of a hollow, box beam, steel construction and systems contained therein.
  • FIGS. 6A-6G are isometric views of an embodiment of the invention designed for one crane pick.
  • FIG. 1A discloses a constructed frame ( 100 ) for a building ( 102 ).
  • the frame ( 100 ) is constructed with modular, prefabricated frame assemblages.
  • FIG. 1B and FIG. 1C disclose a hinged pair of first story frame assemblages ( 104 ) and a hinged pair of second story frame assemblages ( 200 ) and a hinged pair of second story roof frame assemblages ( 300 ).
  • each modular, first story frame assemblage ( 104 ) has coplanar frame elements extending in the same vertical plane.
  • the frame elements of each assemblage ( 104 ) include, an horizontal, first story floor girder ( 106 ), or floor joist plate, extending lengthwise from a horizontal, first story floor truss ( 108 ) that extends lengthwise of the floor girder ( 106 ).
  • the truss ( 108 ) has diagonal brace elements ( 110 ) and vertical brace elements ( 112 ).
  • the brace elements ( 110 ) and ( 112 ) are connected between spaced apart beams formed by, a portion of the floor girder ( 106 ) and a horizontal, vertically offset floor girder ( 114 ).
  • FIG. 1B discloses an embodiment of the invention, wherein the truss ( 108 ) is an interior elevated floor truss ( 108 ).
  • FIG. 1E and FIG. 1F disclose embodiments of the invention, wherein the truss ( 108 ) is an exterior, non-elevated floor truss ( 108 ).
  • the length and vertical dimensions of the truss ( 108 ) are variable, depending on the floor load capacity desired, and/or the square footage to be supported by the truss ( 108 ). For example, each of the floor girder ( 106 ) and the truss ( 108 ) supports a floor load of 100 pounds per square foot. To support equal floor loads, the truss ( 108 ) weighs less, and/or can have a taller height than that of a beam such as the floor girder ( 106 ).
  • the truss ( 108 ) extends from a central axis ( 120 ) to a first post ( 116 ). In an alternative construction the truss ( 108 ) extends from the central location, and between the first post ( 116 ) and a second post ( 118 ).
  • different combinations of floor loads and square footage are constructed by different length combinations of the first story floor girder ( 106 ) and the first story floor truss ( 108 ).
  • configurations of different first story floor elevations are constructed by having an elevated truss ( 108 ), and further, by having an elevated truss ( 108 ) of different lengths.
  • Each first story frame assemblage ( 104 ) is of post and beam construction having the floor girder ( 106 ) supporting a vertical first post ( 116 ) and a vertical second post ( 118 ).
  • the girders ( 106 ) and ( 114 ), and the posts ( 116 ) and ( 118 ), are beams, including, and not limited to; box beams, I-beams, H-beams, and beams of varying cross sectional shapes.
  • the beams are constructed of materials, including, and not limited to; steel, aluminum, wood, plastics, and composites having fibers, strands and agglomerates.
  • Exposed surfaces of the girders ( 106 ) and ( 114 ), and the posts ( 116 ) and ( 118 ) are prefinished, for example, with a veneer of laminated bamboo.
  • the vertical posts ( 116 ) and ( 118 ) are to be supported by the girder ( 106 ) when the frame assemblage ( 104 ) is constructed at a temporary or permanent building site.
  • the posts ( 116 ) and ( 118 ) are either prefabricated with the frame assemblage ( 104 ), or are precut members for installation with the frame assemblage ( 104 ) at the building site.
  • the posts ( 116 ) and ( 118 ) are pivotally attached to the corresponding girders ( 106 ) and ( 108 ) to collapse or fold, vertically, for packaging in a shipping container.
  • the posts ( 116 ) and ( 118 ) are loose piece subassemblies for packaging in a shipping container.
  • the posts ( 116 ) and ( 118 ) are prefabricated by being joined and secured to the respective girders ( 106 ) and ( 108 ) by industry standard, steel construction gussets or by welding. For example, gussets and the box beams connect by, first, aligning bolt receiving openings through the gussets and the box beams, and then inserting threaded bolts through the aligned bolt receiving openings.
  • FIG. 1A , FIG. 1B and FIG. 1E discloses an embodiment of the invention having an alternative construction of diagonal knees ( 122 ) joined to either the first post ( 116 ), or the second post ( 118 ).
  • each second story assemblage ( 200 ) has coplanar frame elements extending in the same vertical plane.
  • the frame elements of each assemblage ( 200 ) include, a horizontal second story floor girder ( 202 ) or floor joist plate extending from the central axis ( 120 ) to align vertically over the second post ( 118 ).
  • the girder ( 202 ) supports a first story roof rafter ( 206 ).
  • the rafter ( 206 ) extends at an upward slope, for example, 15 degrees.
  • the frame assemblage ( 200 ) further includes, a second story post ( 204 ) for vertical alignment with the post ( 116 ).
  • the assemblage ( 200 ) is of post and beam construction.
  • the girder ( 202 ), the post ( 204 ) and rafter ( 206 ) are of hollow, box beam, steel construction. Exposed surfaces of the girder ( 202 ), the post ( 204 ) and rafter ( 206 ) are prefinished, for example, prefinished with a veneer of laminated bamboo.
  • the vertical post ( 204 ) is to be supported by the girder ( 202 ) when the frame assemblage ( 200 ) is constructed at a temporary or permanent building site.
  • the post ( 204 ) is either prefabricated with the frame assemblage ( 200 ), or is a precut member for installation with the frame assemblage ( 200 ) at the building site.
  • the prefabricated post ( 204 ) is pivotally attached to the corresponding girder ( 202 ) to pivot in the direction of the arrow ( 204 a ), and to collapse or fold, vertically, for packaging in a shipping container.
  • the post ( 204 ) is a loose piece subassembly for packaging in a shipping container.
  • the post ( 204 ) is prefabricated by being joined and secured to the respective girder ( 202 ) by industry standard, steel construction gussets or by welding.
  • FIG. 1H discloses another embodiment in which the frame assemblage ( 104 ) and the frame assemblage ( 200 ) provide a first story cantilever deck that is uncovered.
  • the post ( 116 ) and the rafter ( 206 ) are eliminated from respective assemblages ( 104 ) and ( 200 ).
  • the girder ( 202 ) is shortened.
  • each assemblage ( 300 ) serves as a roof truss assemblage, and has coplanar frame elements extending in the same vertical plane.
  • the frame elements of each assemblage ( 300 ) include, a horizontal, purlin that serves as a second story ceiling girder ( 302 ) or ceiling joist plate extending from the central axis ( 120 ) to align vertically over the post ( 204 ).
  • the purlin or girder ( 302 ) supports a second story roof rafter ( 304 ).
  • the rafter ( 304 ) extends at an upward slope, for example, 15 degrees.
  • An alternative embodiment of the frame assemblage ( 300 ) further includes, a diagonal strut ( 306 ) extending between the rafter ( 304 ) and the purlin or girder ( 302 ).
  • the frame assemblage ( 300 ) is of hollow box beam steel construction.
  • the strut ( 306 ), if present, is supported by the girder ( 302 ) and the rafter ( 304 ) when the frame assemblage ( 300 ) is constructed at a temporary or permanent building site.
  • the girder ( 302 ) and the strut ( 306 ) are either prefabricated with the frame assemblage ( 300 ), or are precut members for installation with the frame assemblage ( 300 ) at the building site.
  • the girder ( 302 ) and/or the strut ( 306 ) are pivotally secured to the rafter ( 304 ), such that they collapse or fold, vertically, into a compact space for fitting in a container ( 400 ).
  • FIG. 1D discloses that each pair of frame assemblages ( 104 ) have steel hinge connections ( 124 ) at their inner ends at the axis ( 120 ) for connecting the frame assemblages ( 104 ) in hinged pairs.
  • the hinge connections ( 124 ) allow the assemblages ( 104 ) to pivot toward each other and fold together, side by side for packaging in an industry standard container ( 400 ) for shipping.
  • FIG. 2A discloses a container ( 400 ).
  • the combined overall length of the floor girder ( 106 ) and floor truss ( 108 ) fits within a standard ocean freight shipping container ( 400 ).
  • the post ( 116 ), if present in a prefabricated assemblage ( 104 ), is hinged to the truss ( 108 ) to pivot in the direction of either of the arrows ( 116 a ), and to collapse or fold, vertically, into a compact space for fitting within a container ( 400 ).
  • the post ( 118 ), if present in a prefabricated assemblage ( 104 ), is hinged to the girder ( 106 ) to pivot in the direction of the arrow ( 118 a ) to collapse or fold vertically, into a compact space for fitting within a container ( 400 ).
  • the assemblages ( 104 ) are removed from a container ( 400 ) and are unfolded, by being pivoted apart, laterally, or horizontally, in preparation for construction on a temporary or permanent building site.
  • the assemblages ( 104 ) are removed vertically from the container ( 400 ) through a vertical opening ( 402 ) of the container ( 400 ), or alternatively, the assemblages ( 104 ) are removed laterally from the container ( 400 ) through a lateral opening ( 404 ) of the container ( 400 ).
  • FIG. 2B discloses three pairs of assemblages ( 104 ) that are folded laterally, or horizontally, into a compact space for packaging and shipment in a container ( 400 ).
  • FIG. 2C discloses one of the three pairs pivoted about the axis ( 120 ).
  • FIG. 2D discloses the three pairs of assemblages ( 102 ) shown unfolded about an axis ( 120 ) to form a first story frame ( 100 ) for an exemplary version of the building ( 102 ).
  • Each pair of respective frame assemblages ( 200 ) and ( 300 ) has corresponding steel hinge connections ( 124 ) at their inner ends at the axis ( 120 ) for connecting the respective frame assemblages ( 200 ) and ( 300 ) in hinged pairs.
  • FIG. 1I discloses the hinge connections ( 124 ) on the pair of assemblages ( 200 ), which are similar for the hinge connections ( 124 ) on the pair of assemblages ( 300 ).
  • the hinge connections ( 124 ) allow the assemblages ( 200 ) and ( 300 ) to pivot laterally, or horizontally, toward each other and fold together, side by side for packaging in an industry standard container ( 400 ) for shipping.
  • the post ( 204 ), if present in a prefabricated assemblage ( 200 ), is hinged to the girder ( 202 ) to pivot in the direction of the arrow ( 204 a ), and to collapse or fold, vertically, into a compact space for fitting within a container ( 400 ). Subsequently, the assemblages ( 200 ) and ( 300 ) are removed from a container ( 400 ) and are unfolded, by being pivoted apart, for construction on a temporary or permanent building site.
  • FIG. 2E discloses three pairs of assemblages ( 200 ) that are collapsed or folded, laterally, or horizontally, into a compact space for packaging and shipment.
  • a crane is used to hoist, i.e., vertically remove the assemblages ( 200 ) from a container ( 400 ) and to transfer the assemblages ( 200 ) to a building site.
  • FIG. 2F discloses one of the three pairs pivoted about the axis ( 120 ).
  • FIG. 2G discloses the three pairs of assemblages ( 200 ) shown unfolded about an axis ( 120 ) to form a second story frame ( 100 ) for an exemplary version of the building ( 102 ).
  • FIG. 2H discloses three pairs of assemblages ( 300 ) that are collapsed, or folded, laterally, or horizontally, into a compact space for packaging and shipment in a container ( 400 ).
  • a crane is used to hoist, i.e., vertically, or laterally, remove the assemblages ( 300 ) relative to a container ( 400 ) and to transfer the assemblages ( 300 ) to a building site.
  • FIG. 2I discloses one of the three pairs pivoted about the axis ( 120 ).
  • FIG. 2D discloses the three pairs of assemblages ( 102 ) shown unfolded about an axis ( 120 ) to form a second story roof truss of the frame ( 100 ) for an exemplary version of the building ( 102 ).
  • the frame assemblages ( 104 ), ( 200 ) and ( 300 ) are arranged in containers ( 400 ) in the order in which they would be removed relative to respective containers ( 400 ) by a crane.
  • the containers ( 400 ) are transported by sea, and then by land, involving transfer of containers ( 400 ) from a ship to a truck that delivers the containers ( 400 ) as close as possible to the building site, where a crane removes the frame assemblages ( 104 ), ( 200 ) and ( 300 ) vertically, or alternatively, laterally, with respect to their containers ( 400 ) in the reverse order in which the frame assemblages ( 104 ), ( 200 ) and ( 300 ) were packaged in the containers ( 400 ).
  • the frame assemblages ( 104 ), ( 200 ) and ( 300 ) are removed from containers ( 400 ) in the order in which they are assembled on site, i.e., on the building site, which can be a temporary building site or a permanent building site.
  • a crane refers to any industrial lifting apparatus capable of lifting a structure of about 8 tons overhead, which includes, and is not limited to, an industrial ginpole and a block and tackle lifting device.
  • FIG. 1A An embodiment of a foundation ( 500 ) for the building ( 102 ) is shown in FIG. 1A at grade level, which requires only a conventional basement or a concrete pad supported on a buried footer.
  • FIGS. 1B, 1E , 1 F, 1 G and 1 H discloses an embodiment of a foundation ( 500 ) provided by multiple, elevated pilings ( 500 a ) or columns, which are useful for providing a permanent building site elevated over water or over terrain that is uneven or sloped.
  • the pilings ( 500 a ) are sunken in the earth or supported on an industry recognized, buried concrete footer.
  • the depth of the pilings ( 500 a ) or footer is sufficient to resist sinking under the weight of the building ( 102 ) and to resist heaving by freezing and thawing cycles, and to resist tidal and storm waves, and seismic activity, which ever is appropriate for the building site.
  • the assemblages ( 104 ) of the first story girder ( 106 ) and truss ( 108 ), are self-supporting with minimum deflection when cantilever supported on pilings or columns ( 500 a ).
  • FIG. 2K discloses an embodiment of a foundation ( 500 ) wherein elevated walls ( 500 b ) provide the foundation ( 500 ) as a modification of the pilings ( 500 a ) or columns.
  • the walls ( 500 b ) can join one another and form an enclosure for a utilities closet for the building ( 102 ).
  • a door opening ( 502 ) is provided through one of the walls ( 500 b ).
  • the walls ( 500 b ) are supported on buried pilings or on a buried footer.
  • the walls ( 500 b ) are steel reinforced concrete, adapted to be joined to the first story frame assemblages ( 104 ) with industry standard gussets ( 506 ).
  • the walls ( 500 b ) have optional notches ( 504 ) for registration with respective first story floor girders ( 106 ).
  • the assemblages ( 104 ) of the first story girder ( 106 ) and truss ( 108 ), are self-supporting with minimum deflection when cantilever supported on the elevated walls ( 500 b ) of the enclosure.
  • FIG. 3A discloses a hinged pair of first floor frame assemblages ( 104 ) which have been constructed on a building site, for example, a temporary building site. The pair is or hoisted by a crane to the building site. The pair of assemblages ( 104 ) is unfolded by workmen at the building site, where a perimeter beam or floor girder ( 600 ) is installed, and floor joists ( 602 ) are installed, and a knee wall ( 604 ) is installed. Then, as disclosed by FIG. 3B , flooring is installed over the joists ( 602 ) to provide a portion of a first story floor ( 608 ).
  • a subassembly ( 610 ) is constructed on a building site that is either a temporary building site or permanent building site that has one form of the foundation ( 500 ).
  • the subassembly ( 610 ) When the building site is a temporary building site, the subassembly ( 610 ) is hoisted or lifted by the crane and transferred to a permanent building site, where it is lowered by the crane, and is attached by workers to one or another embodiment of the foundations ( 500 ). Thereby, the subassembly ( 610 ) is erected or constructed at the permanent building site. The subassembly ( 610 ) is joined and secured by industry standard gussets or by welding. Following construction of the first subassembly ( 600 ) the construction process disclosed by FIGS. 3A and 3B is repeated. According to an embodiment of the invention, six subassemblies ( 610 ) are constructed, making a complete first story portion of the frame ( 100 ) having a complete first story floor ( 608 ) that is constructed at a permanent building site.
  • FIG. 3C discloses another embodiment of the invention wherein of the assemblages ( 104 ) has a prefabricated perimeter beam or floor girder ( 600 a ) hinged to floor girders ( 104 ) and prefabricated knee walls ( 604 a ).
  • each prefabricated perimeter beam ( 600 a ) is of hollow, box beam construction, and is hinged to an assemblage ( 104 ), as shown in FIG. 3C , by a hinge connection similar to the hinge connection ( 120 ) disclosed by FIG. 1I .
  • each prefabricated knee wall ( 604 a ) is a steel construction truss, and is hinged to an assemblage ( 104 ), as shown in FIG.
  • One of the prefabricated floor girders ( 600 a ) and one of the prefabricated knee walls ( 604 a ) is a platform on which to construct a floor ( 608 ), in the manner discussed with respect to FIGS. 3A and 3B .
  • a second floor girder ( 600 a ) and a second knee wall ( 604 a ) are available for further construction, as will now be discussed with reference to FIGS. 3C and 3D .
  • FIG. 3D discloses a crane ( 702 ) in the process of transferring a subassembly ( 610 ) from a temporary building site ( 700 ) to a permanent building site. Both the temporary building site ( 700 ) and the permanent building site are anywhere within the cane's perimeter reach ( 704 ). Further, FIG. 3D discloses a pair of assemblies ( 610 ) having floors ( 608 ) erected or constructed at the permanent building site.
  • the subassembly ( 610 ) being transferred by the crane ( 702 ) has a second perimeter beam ( 600 a ) and a second knee wall ( 604 a ) that are pivotable outward to be used to construct an adjacent subassembly ( 610 a ) at the permanent building site.
  • FIGS. 3C and 3D disclose such a subassembly ( 600 a ) that was previously constructed.
  • two subassemblies ( 610 ) having floors ( 608 ) are constructed according to the process disclosed by FIGS. 3A and 3B . Then the two subassemblies ( 610 ) are transferred, for example, by the crane ( 702 ) to the permanent building site disclosed by FIGS.
  • the second perimeter beam ( 600 a ) and the second knee wall ( 604 a ) are pivoted to bridge between the two subassemblies ( 610 ) that have been erected or constructed previously at the permanent building site of FIG. 3C .
  • the second perimeter beam ( 600 a ) and the second knee wall ( 604 a ) are used to construct another, third subassembly ( 610 a ) between the two erected subassemblies ( 610 ).
  • the construction process disclosed by FIGS. 3A, 3B , 3 C and 3 D are repeated to build a completed first story floor ( 608 ) and a first story portion of the frame ( 100 ).
  • FIG. 4 discloses a temporary building site ( 700 ) together with a crane ( 702 ) having a perimeter reach ( 704 ).
  • a crane ( 702 ) transfers the two subassemblies ( 610 ) to the permanent building site of FIG. 3C .
  • the two subassemblies ( 610 ) contribute a second perimeter beam or floor girder ( 600 a ) and a second knee wall ( 604 a ) to build a third subassembly ( 610 a ) at the permanent building site of FIG. 3C .
  • the construction process is repeated, until adjacent subassemblies ( 610 ) are joined to each other by a perimeter floor girder ( 600 a ) that spans between the adjacent subassemblies ( 610 ), followed by construction of floor joists or purlins ( 602 ) spanning between the adjacent subassemblies ( 610 ), followed by an installed floor, similar to the floor ( 608 ), making a complete first story frame ( 100 ) constructed at a permanent building site, with a complete first story floor.
  • six subassemblies ( 610 ), as disclosed by FIG. 3B are constructed at the permanent building site, making a complete first story frame ( 100 ) constructed at a permanent building site, with a complete first story floor ( 608 ).
  • each hinged pair of first story frame assemblages ( 104 ) has a perimeter floor girder ( 600 ).
  • the perimeter floor girder ( 600 ) is attached by a hinge connection ( 124 ) to a first story girder ( 106 ) for pivoting side by side with the hinged pair of first story frame assemblages ( 104 ).
  • the perimeter floor girder ( 600 ) is pivoted out to bridge between the corresponding pair of first story frame assemblages ( 104 ).
  • each subassembly ( 610 ) that is made from a hinged pair of first story frame assemblages ( 104 ) has a perimeter floor girder ( 600 a ).
  • the perimeter floor girder ( 600 a ) is attached by a hinge connection ( 124 ) to a first story girder ( 106 ) for pivoting side by side with the hinged pair of first story frame assemblages ( 104 ) for fitting in a compact space for shipment in a container ( 400 ).
  • the perimeter floor girder ( 600 a ) is pivoted out to bridge from one pair of first story frame assemblages ( 104 ) to another pair.
  • a pair of second story frame assemblages ( 200 ) is installed by the crane ( 702 ) onto the constructed pair of first story frame assemblages ( 104 ).
  • the crane ( 702 ) lifts or hoists the second story frame assemblages ( 200 ) and sets them on the first story frame assemblages ( 104 ). Workers then attach the second story frame assemblages ( 200 ) to the first story frame assemblages ( 104 ) and to the mast ( 208 ) by industry standard gussets or by welding.
  • FIG. 4 discloses a temporary building site ( 700 ) that includes, and is not limited to, a platform, a pier, a water floating barge, or a land based barge, or a clearing on the ground, which allows construction of a subassembly ( 610 ) within reach of the crane ( 702 ), within the perimeter ( 704 ), and which allows the crane ( 602 ) to lift or hoist the subassembly ( 610 ), and to transport and transfer the subassembly ( 610 ) to a permanent building site ( 706 ).
  • the permanent building site ( 706 ) includes, and is not limited to, a foundation ( 500 ) in the form of previously described pilings ( 500 a ) that have been constructed over water or over uneven terrain at the permanent building site ( 706 ).
  • the advantage of the invention is that the crane ( 702 ) is within reach of multiple permanent building sites ( 706 ), using a single temporary building site ( 700 ).
  • Another advantage of the invention is the capability of constructing one or more buildings ( 102 ) on permanent building sites ( 706 ) without the need for either or both, graded road, or site finish grading of the building sites ( 700 ) and/or ( 706 ).
  • the second story frame assemblages ( 104 ) and ( 200 ) and ( 300 ) are removed by the crane ( 702 ) from a corresponding shipping container ( 400 ), and are constructed at a temporary building site ( 700 ).
  • one or more, or all of the first story frame assemblages ( 104 ) are constructed at the permanent building site ( 706 ) before constructing the second story frame assemblages ( 200 ) onto the first story frame assemblages.
  • one or more, or all of the second story frame assemblages ( 200 ) are constructed at the permanent building site ( 706 ) before constructing the second story roof truss assemblages ( 300 ) onto the second story frame assemblages ( 200 ).
  • the second story assemblages ( 200 ) are removed from a container ( 400 ) and are unfolded, by being pivoted apart, for construction on a temporary or permanent building site. For example, at a permanent building site ( 706 ), each hinged pair of assemblages ( 200 ) are constructed on a previously constructed pair of first story frame assemblages ( 104 ).
  • the second story, floor girder ( 206 ) is supported from below on a diagonal knee ( 122 ) that diagonally bridges between the girder ( 206 ) and a corresponding post ( 116 ) or ( 118 ).
  • each girder ( 206 ) is joined to a second story mast ( 208 ), or bearing load column, FIGS. 1B , and 1 H, of a construction including, and not limited to; a box beam, I-beam, H-beam, and a beam of varying cross sectional shape.
  • the beam is constructed of materials, including, and not limited to; steel, aluminum, wood, plastics, and composites having fibers, strands and agglomerates.
  • the assemblages ( 200 ) are secured to the assemblages ( 140 ) and the mast ( 208 ) by industry standard gussets or by welding.
  • each hinged pair of assemblages ( 300 ) are constructed on a previously constructed pair of second story assemblages ( 200 ).
  • Each rafter ( 304 ) and each purlin ( 302 ) are joined to the second story mast ( 208 ).
  • the assemblages ( 300 ) are secured to the assemblages ( 200 ) and the mast ( 208 ) by industry standard gussets or by welding.
  • a method according to the invention includes the steps of; designing a building frame ( 100 ) to fit in one or more shipping containers ( 400 ), and collapsing the building frame ( 100 ) laterally (horizontally), or vertically, or both laterally and vertically, to fit in the shipping containers ( 400 ), and transferring the collapsed building frame ( 100 ) from containers ( 400 ) to a building site where the building frame ( 100 ) is constructed to make a building.
  • the invention fulfills a considerable need for one or more buildings ( 102 ) constructed over water or uneven terrain, and constructed at resort regions experiencing hurricane force winds in the tropics, high seismic activity, or heavy snowfall in mountainous elevations.
  • the invention further includes a method of constructing a building frame ( 100 ) packaged for shipping container shipment, by removing the building frame ( 100 ) from the corresponding shipping container ( 400 ), and transferring the folded building frame ( 100 ) to an unfolded configuration, and onto a building site in an unfolded configuration.
  • the hollow box beam construction ( 800 ) is a rugged, crush and bending resistant, fire proof conduit for containing point-to-point systems for power distribution, media and data communications and HVAC (heating, ventilation and air conditioning) systems, including, but not limited to, electrical power wiring ( 802 ), for example, multiple wire Romex plus ground, Ethernet communications wiring ( 804 ), broadband communications wiring ( 806 ), optical fiber communications cables ( 808 ), security systems cabling, water, water sprinkler system pipes and vent plumbing pipes ( 810 ) and HVAC air plenums ( 812 ).
  • the structural elements exposed to view from the interior of the building are of steel hollow box beam construction, and are covered by a decorative surface finish, for example, exposed bamboo laminate.
  • the hollow box beam construction ( 800 ) is a rugged conduit for tensioning cables that become part of the building, and for guy ropes and cables that are temporarily used for hauling and lashing when assembling and constructing the structural elements. These point-to-point systems are installed inside the hollow structural elements of the frame ( 100 ), and thus, are protected during shipment and handling.
  • the building frame assemblages ( 104 ), ( 200 ) and ( 300 ) are important to have as many point-to-point systems installed, and as much decorative finish work installed and prefabricated, before shipment of the structural elements, to tailor the building frame assemblages ( 104 ), ( 200 ) and ( 300 ) for factory fabrication, instead of field fabrication, and to tailor the building frame assemblages ( 104 ), ( 200 ) and ( 300 ) for fabrication at a selected region where labor costs are low, when viewed on a world wide, country-by-country basis. Then the building frame assemblages ( 104 ), ( 200 ) and ( 300 ) can be shipped and constructed at a final building site ( 700 ) or ( 706 ), where fabrication of the assemblages is not as affordable and/or where the building site ( 706 ) is anything but dry, level land.
  • the building frame ( 100 ) is ready for assembly of walls and roofing.
  • the walls and roofing do not require the point-to-point systems installed in them, prior to being sealed and/or covered with finishing materials.
  • the walls and roofing are easily modular in form and construction to facilitate their installation on the frame ( 100 ).
  • FIG. 6A discloses another embodiment of a preassembled, frame ( 100 a ) having frame assemblages ( 104 a ) of hollow box beam, steel construction.
  • the frame ( 100 a ) is designed for a single crane pull, or one crane pull.
  • the frame ( 100 a ) as disclosed by FIGS. 6A and 6B is of one piece that is collapsed, or folded, to fit in a single container ( 400 ).
  • the frame ( 100 a ) is inserted in the corresponding container ( 400 ) and is removed from the container ( 400 ) by a single hoist by a crane, for example, the crane ( 702 ).
  • the frame ( 100 a ) is removed from an open end of the container ( 400 ).
  • FIG. 6B the frame ( 100 a ) is removed from an open top of the container ( 400 ).
  • FIG. 6C discloses the frame ( 100 a ) being lowered on a permanent building site.
  • the crane ( 702 ) lowers the frame ( 100 a ) onto one form of the foundation ( 500 ) that has vertical projecting pilings ( 55 a ) or columns, in turn, having the previously described notches ( 504 ).
  • any other form of the foundation ( 500 ) is intended for use with the frame ( 100 a ).
  • FIG. 6D-6G disclose an embodiment of the frame ( 100 ) having hinged pairs of frame assemblages ( 104 a ) that are preassembled as a complete frame ( 100 ), prior to being inserted in a corresponding container ( 400 ).
  • each of the assemblages ( 104 a ) is of hollow, box beam, steel construction.
  • Each of the assemblages ( 104 a ) has a floor girder ( 106 a ) and a post ( 118 a ) and an inclined roof rafter ( 206 a ), secured, end to end, with corresponding hinge connections similar to the hinge connection ( 124 ) for pivoting to collapse, or to fold, in the same vertical plane.
  • a diagonal knee ( 122 a ) of hollow, box beam, steel construction pivotally secures to a corresponding girder ( 106 a ) by a hinge connection similar to the hinge connection ( 124 ).
  • Each floor girder ( 106 a ) has a hinge connection ( 124 ) with a corresponding first central hollow sleeve beam ( 126 ).
  • Each rafter ( 206 a ) has a hinge connection ( 124 ) with a corresponding second central hollow sleeve beam ( 128 ).
  • the floor girder ( 106 a ) and post ( 118 a ) of each assemblage ( 104 a ) collapse or fold end-to-end, and in the same plane.
  • the knee ( 122 a ) pivots to extend against a corresponding girder ( 106 a ) in the same plane with the corresponding girder ( 106 a ).
  • the assemblages ( 104 a ) are collapsed or folded to a compact space.
  • the order of collapse or order of folding is disclosed in the sequence of drawing figures, FIG. 6G , FIG. 6F , FIG. 6E , FIG. 6D and FIG. 6C .
  • the floor girders ( 106 a ) and posts ( 118 a ) collapse or fold inwardly toward the first sleeve beam ( 126 ).
  • the rafters ( 206 a ) of the assemblages ( 104 a ) collapse or fold inwardly toward the second sleeve beam ( 128 ).
  • a single hoist by the crane, or single crane pick transfers the assemblages ( 104 a ) while in a fully collapsed or fully folded state to a corresponding container ( 400 ).
  • a single crane pick removes the assemblages ( 104 a ) from a corresponding container ( 400 ) and lowers the assemblages ( 104 a ) to the permanent building site, as disclosed by FIG. 6C .
  • the assemblages ( 104 a ) unfold according to the sequence disclosed by FIG. 6C , FIG. 6D , FIG. 6E , FIG. 6F and FIG. 6G .
  • FIG. 6G discloses the knees ( 122 a ) connected by industry standard steel construction gussets, or by welding, to the foundation ( 500 ) comprised of the pilings ( 55 a ).
  • the invention provides a building frame wherein, the function of design simplifies it to evolve into an un-collapsed configuration, and onto a building site.
  • the invention provides an assemblage, and to its construction, shipment and building construction, with particular emphasis on a method and system for its design, prefabrication, shipping and construction.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A building frame (100) is designed as multiple assemblages (104), (200) and (300), which are built and then collapsed for shipment in one or more shipping containers (400), transported to a building site, and removed from the corresponding shipping containers (400). the assemblages (104), (200) and (300) are constructed as a building frame (100) at the permanent building site, or, alternatively, are assembled into subassemblies at a temporary building site, and are transferred to the permanent building site.

Description

    FIELD OF THE INVENTION
  • The present invention relates to assemblage construction, shipment and building construction, and, more particularly, to a method and system for design, prefabrication, shipping and construction of a building.
  • BACKGROUND
  • Prior to the invention, factory precut buildings have been shipped in kit form with loose pieces, lumber precuts and precut panels of sheathing and flooring. The loose and precut pieces arrive at a building site ready for assembly, without requiring measuring and cutting. However, the loose pieces must be unpacked and sorted. Then the loose pieces are assembled and constructed in a standard manner pertaining to on-site building construction. Prior to the invention, factory assembled roof trusses were available for shipment. However, the trusses are individual pieces that lack assemblage with framing members for walls and floors. Thus, the roof trusses need to be constructed onto load bearing walls, which consumes time and labor costs in significantly large amounts.
  • SUMMARY OF THE INVENTION
  • The invention is a method and system of prefabricated assemblages that are shipped to a building site for construction of a building.
  • The invention relates to a building frame wherein the function of design simplifies it to evolve from a configuration that is collapsible for shipment, and into an deployed configuration to provide a frame for a building.
  • A method according to the invention includes the steps of; designing a building frame to fit in one or more shipping containers, and collapsing the building frame to fit in the shipping containers. According to an embodiment of the invention, the invention includes the step of transferring the collapsed building frame from containers to a building site where the building frame is constructed to make a building.
  • There is considerable cost advantage obtained by the invention, by prefabricating the building frame initially as one or more assemblages in a geographical location where material and labor costs are low, and shipping corresponding building frame assemblages by sea container to a region of the world where buildings and their construction costs are expensive.
  • The invention fulfills a considerable need for one or more buildings constructed over water or uneven terrain, and constructed at resort regions experiencing hurricane force winds in the tropics, or heavy snowfall in mountainous elevations, and/or high seismic activity.
  • The invention further includes a method of constructing a building frame that has been collapsed for shipment in corresponding shipping containers, by removing the building frame from the corresponding shipping containers, and transferring the collapsed building frame to an un-collapsed configuration, and onto a building site to provide a frame for a building.
  • Embodiments of the invention will be described by way of example with reference to the accompanying drawings.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1A is an isometric view of a building frame for a building.
  • FIG. 1B is an elevation view of a building frame with parts separated from one another.
  • FIG. 1C is a perspective view of frame assemblages of the building frame disclosed by FIG. 1B.
  • FIG. 1D is an isometric view of a hinge connection for a frame assemblage.
  • FIG. 1E is an elevation view of another embodiment of a building frame with parts separated from one another.
  • FIG. 1F is an elevation view of another embodiment of a building frame with parts separated from one another.
  • FIG. 1G is an elevation view of another embodiment of a building frame with parts separated from one another.
  • FIG. 1H is an elevation view of another embodiment of a building frame with parts separated from one another.
  • FIG. 1I is an isometric view of a hinge connection for a frame assemblage.
  • FIG. 2A is an isometric view of a shipping container and frame assemblages.
  • FIGS. 2B-2D are isometric views of first story frame assemblages being folded or collapsed and unfolded or constructed.
  • FIGS. 2E-2G are isometric views of second story frame assemblages being folded or collapsed and unfolded or constructed.
  • FIGS. 2H-2J are isometric views of roof truss frame assemblages being folded or collapsed and unfolded or constructed.
  • FIG. 2K is an isometric view of an embodiment of a foundation.
  • FIG. 3A is an isometric view of a subassembly prior to construction of a floor.
  • FIG. 3B is an isometric view of a subassembly constructed with a floor.
  • FIG. 3C is an isometric view of a permanent building site and construction of subassemblies.
  • FIG. 3D is an isometric view of a temporary building site and a crane, together with the permanent building site and subassemblies as disclosed by FIG. 3C.
  • FIG. 4 is a diagrammatic view of a method of constructing a building using a crane and a temporary building site and at least one permanent building site.
  • FIG. 5 is an isometric view of a hollow, box beam, steel construction and systems contained therein.
  • FIGS. 6A-6G are isometric views of an embodiment of the invention designed for one crane pick.
  • DETAILED DESCRIPTION
  • This description of the exemplary embodiments is intended to be read in connection with the accompanying drawings, which are to be considered part of the entire written description. In the description, relative terms such as “lower,” “upper,” “horizontal,” “vertical,”, “above,” “below,” “up,” “down,” “top” and “bottom” as well as derivative thereof (e.g., “horizontally,” “downwardly,” “upwardly,” etc.) should be construed to refer to the orientation as then described or as shown in the drawing under discussion. These relative terms are for convenience of description and do not require that the apparatus be constructed or operated in a particular orientation. Terms concerning attachments, coupling and the like, such as “connected” and “interconnected,” refer to a relationship wherein structures are secured or attached to one another either directly or indirectly through intervening structures, as well as both movable or rigid attachments or relationships, unless expressly described otherwise.
  • FIG. 1A discloses a constructed frame (100) for a building (102). The frame (100) is constructed with modular, prefabricated frame assemblages. FIG. 1B and FIG. 1C disclose a hinged pair of first story frame assemblages (104) and a hinged pair of second story frame assemblages (200) and a hinged pair of second story roof frame assemblages (300).
  • With reference to FIG. 1B, a hinged pair of modular, prefabricated first story frame assemblages (104) will now be described. The assemblages (104) are hinged together at the axis (120). Each modular, first story frame assemblage (104) has coplanar frame elements extending in the same vertical plane. The frame elements of each assemblage (104) include, an horizontal, first story floor girder (106), or floor joist plate, extending lengthwise from a horizontal, first story floor truss (108) that extends lengthwise of the floor girder (106). The truss (108) has diagonal brace elements (110) and vertical brace elements (112). The brace elements (110) and (112) are connected between spaced apart beams formed by, a portion of the floor girder (106) and a horizontal, vertically offset floor girder (114).
  • FIG. 1B discloses an embodiment of the invention, wherein the truss (108) is an interior elevated floor truss (108). FIG. 1E and FIG. 1F disclose embodiments of the invention, wherein the truss (108) is an exterior, non-elevated floor truss (108). The length and vertical dimensions of the truss (108) are variable, depending on the floor load capacity desired, and/or the square footage to be supported by the truss (108). For example, each of the floor girder (106) and the truss (108) supports a floor load of 100 pounds per square foot. To support equal floor loads, the truss (108) weighs less, and/or can have a taller height than that of a beam such as the floor girder (106).
  • In one embodiment of the invention, the truss (108) extends from a central axis (120) to a first post (116). In an alternative construction the truss (108) extends from the central location, and between the first post (116) and a second post (118). Thus, different combinations of floor loads and square footage are constructed by different length combinations of the first story floor girder (106) and the first story floor truss (108). Further, configurations of different first story floor elevations are constructed by having an elevated truss (108), and further, by having an elevated truss (108) of different lengths.
  • Each first story frame assemblage (104) is of post and beam construction having the floor girder (106) supporting a vertical first post (116) and a vertical second post (118). The girders (106) and (114), and the posts (116) and (118), are beams, including, and not limited to; box beams, I-beams, H-beams, and beams of varying cross sectional shapes. The beams are constructed of materials, including, and not limited to; steel, aluminum, wood, plastics, and composites having fibers, strands and agglomerates. Exposed surfaces of the girders (106) and (114), and the posts (116) and (118) are prefinished, for example, with a veneer of laminated bamboo. The vertical posts (116) and (118) are to be supported by the girder (106) when the frame assemblage (104) is constructed at a temporary or permanent building site. The posts (116) and (118) are either prefabricated with the frame assemblage (104), or are precut members for installation with the frame assemblage (104) at the building site. According to an embodiment of the invention, the posts (116) and (118) are pivotally attached to the corresponding girders (106) and (108) to collapse or fold, vertically, for packaging in a shipping container. According to another embodiment of the invention, the posts (116) and (118) are loose piece subassemblies for packaging in a shipping container. According to another embodiment of the invention the posts (116) and (118) are prefabricated by being joined and secured to the respective girders (106) and (108) by industry standard, steel construction gussets or by welding. For example, gussets and the box beams connect by, first, aligning bolt receiving openings through the gussets and the box beams, and then inserting threaded bolts through the aligned bolt receiving openings.
  • Each of FIG. 1A, FIG. 1B and FIG. 1E discloses an embodiment of the invention having an alternative construction of diagonal knees (122) joined to either the first post (116), or the second post (118).
  • With reference to FIG. 1C, a hinged pair of modular, prefabricated second story frame assemblages (200) will now be described. The assemblages (200) are hinged together at the axis (120). Each second story assemblage (200) has coplanar frame elements extending in the same vertical plane. The frame elements of each assemblage (200) include, a horizontal second story floor girder (202) or floor joist plate extending from the central axis (120) to align vertically over the second post (118). The girder (202) supports a first story roof rafter (206). The rafter (206) extends at an upward slope, for example, 15 degrees. The frame assemblage (200) further includes, a second story post (204) for vertical alignment with the post (116). The assemblage (200) is of post and beam construction. For example, the girder (202), the post (204) and rafter (206) are of hollow, box beam, steel construction. Exposed surfaces of the girder (202), the post (204) and rafter (206) are prefinished, for example, prefinished with a veneer of laminated bamboo.
  • The vertical post (204) is to be supported by the girder (202) when the frame assemblage (200) is constructed at a temporary or permanent building site. The post (204) is either prefabricated with the frame assemblage (200), or is a precut member for installation with the frame assemblage (200) at the building site. According to an embodiment of the invention, the prefabricated post (204) is pivotally attached to the corresponding girder (202) to pivot in the direction of the arrow (204 a), and to collapse or fold, vertically, for packaging in a shipping container. According to another embodiment of the invention, the post (204) is a loose piece subassembly for packaging in a shipping container. According to another embodiment of the invention the post (204) is prefabricated by being joined and secured to the respective girder (202) by industry standard, steel construction gussets or by welding.
  • FIG. 1H discloses another embodiment in which the frame assemblage (104) and the frame assemblage (200) provide a first story cantilever deck that is uncovered. The post (116) and the rafter (206) are eliminated from respective assemblages (104) and (200). The girder (202) is shortened.
  • With reference to FIG. 1C, a pair of modular, prefabricated frame assemblages (300) will now be described. The assemblages (300) are hinged together at the axis (120). Each assemblage (300) serves as a roof truss assemblage, and has coplanar frame elements extending in the same vertical plane. The frame elements of each assemblage (300) include, a horizontal, purlin that serves as a second story ceiling girder (302) or ceiling joist plate extending from the central axis (120) to align vertically over the post (204). The purlin or girder (302) supports a second story roof rafter (304). The rafter (304) extends at an upward slope, for example, 15 degrees. An alternative embodiment of the frame assemblage (300) further includes, a diagonal strut (306) extending between the rafter (304) and the purlin or girder (302). For example, the frame assemblage (300) is of hollow box beam steel construction. The strut (306), if present, is supported by the girder (302) and the rafter (304) when the frame assemblage (300) is constructed at a temporary or permanent building site. The girder (302) and the strut (306) are either prefabricated with the frame assemblage (300), or are precut members for installation with the frame assemblage (300) at the building site. When prefabricated, the girder (302) and/or the strut (306) are pivotally secured to the rafter (304), such that they collapse or fold, vertically, into a compact space for fitting in a container (400).
  • FIG. 1D discloses that each pair of frame assemblages (104) have steel hinge connections (124) at their inner ends at the axis (120) for connecting the frame assemblages (104) in hinged pairs. The hinge connections (124) allow the assemblages (104) to pivot toward each other and fold together, side by side for packaging in an industry standard container (400) for shipping. FIG. 2A discloses a container (400). The combined overall length of the floor girder (106) and floor truss (108) fits within a standard ocean freight shipping container (400). According to an embodiment of the invention, the post (116), if present in a prefabricated assemblage (104), is hinged to the truss (108) to pivot in the direction of either of the arrows (116 a), and to collapse or fold, vertically, into a compact space for fitting within a container (400). According to an embodiment of the invention, the post (118), if present in a prefabricated assemblage (104), is hinged to the girder (106) to pivot in the direction of the arrow (118 a) to collapse or fold vertically, into a compact space for fitting within a container (400). Subsequently, the assemblages (104) are removed from a container (400) and are unfolded, by being pivoted apart, laterally, or horizontally, in preparation for construction on a temporary or permanent building site. The assemblages (104) are removed vertically from the container (400) through a vertical opening (402) of the container (400), or alternatively, the assemblages (104) are removed laterally from the container (400) through a lateral opening (404) of the container (400).
  • FIG. 2B discloses three pairs of assemblages (104) that are folded laterally, or horizontally, into a compact space for packaging and shipment in a container (400). FIG. 2C discloses one of the three pairs pivoted about the axis (120). FIG. 2D discloses the three pairs of assemblages (102) shown unfolded about an axis (120) to form a first story frame (100) for an exemplary version of the building (102).
  • Each pair of respective frame assemblages (200) and (300) has corresponding steel hinge connections (124) at their inner ends at the axis (120) for connecting the respective frame assemblages (200) and (300) in hinged pairs. FIG. 1I discloses the hinge connections (124) on the pair of assemblages (200), which are similar for the hinge connections (124) on the pair of assemblages (300). The hinge connections (124) allow the assemblages (200) and (300) to pivot laterally, or horizontally, toward each other and fold together, side by side for packaging in an industry standard container (400) for shipping. According to an embodiment of the invention, the post (204), if present in a prefabricated assemblage (200), is hinged to the girder (202) to pivot in the direction of the arrow (204 a), and to collapse or fold, vertically, into a compact space for fitting within a container (400). Subsequently, the assemblages (200) and (300) are removed from a container (400) and are unfolded, by being pivoted apart, for construction on a temporary or permanent building site.
  • FIG. 2E discloses three pairs of assemblages (200) that are collapsed or folded, laterally, or horizontally, into a compact space for packaging and shipment. A crane is used to hoist, i.e., vertically remove the assemblages (200) from a container (400) and to transfer the assemblages (200) to a building site. FIG. 2F discloses one of the three pairs pivoted about the axis (120). FIG. 2G discloses the three pairs of assemblages (200) shown unfolded about an axis (120) to form a second story frame (100) for an exemplary version of the building (102).
  • FIG. 2H discloses three pairs of assemblages (300) that are collapsed, or folded, laterally, or horizontally, into a compact space for packaging and shipment in a container (400). A crane is used to hoist, i.e., vertically, or laterally, remove the assemblages (300) relative to a container (400) and to transfer the assemblages (300) to a building site. FIG. 2I discloses one of the three pairs pivoted about the axis (120). FIG. 2D discloses the three pairs of assemblages (102) shown unfolded about an axis (120) to form a second story roof truss of the frame (100) for an exemplary version of the building (102).
  • It is preferred to have the frame assemblages (104), (200) and (300) arranged in containers (400) in the order in which they would be removed relative to respective containers (400) by a crane. The containers (400) are transported by sea, and then by land, involving transfer of containers (400) from a ship to a truck that delivers the containers (400) as close as possible to the building site, where a crane removes the frame assemblages (104), (200) and (300) vertically, or alternatively, laterally, with respect to their containers (400) in the reverse order in which the frame assemblages (104), (200) and (300) were packaged in the containers (400). The frame assemblages (104), (200) and (300) are removed from containers (400) in the order in which they are assembled on site, i.e., on the building site, which can be a temporary building site or a permanent building site.
  • A crane refers to any industrial lifting apparatus capable of lifting a structure of about 8 tons overhead, which includes, and is not limited to, an industrial ginpole and a block and tackle lifting device.
  • An embodiment of a foundation (500) for the building (102) is shown in FIG. 1A at grade level, which requires only a conventional basement or a concrete pad supported on a buried footer. Each of FIGS. 1B, 1E, 1F, 1G and 1H discloses an embodiment of a foundation (500) provided by multiple, elevated pilings (500 a) or columns, which are useful for providing a permanent building site elevated over water or over terrain that is uneven or sloped. The pilings (500 a) are sunken in the earth or supported on an industry recognized, buried concrete footer. The depth of the pilings (500 a) or footer is sufficient to resist sinking under the weight of the building (102) and to resist heaving by freezing and thawing cycles, and to resist tidal and storm waves, and seismic activity, which ever is appropriate for the building site. The assemblages (104) of the first story girder (106) and truss (108), are self-supporting with minimum deflection when cantilever supported on pilings or columns (500 a).
  • FIG. 2K discloses an embodiment of a foundation (500) wherein elevated walls (500 b) provide the foundation (500) as a modification of the pilings (500 a) or columns. The walls (500 b) can join one another and form an enclosure for a utilities closet for the building (102). A door opening (502) is provided through one of the walls (500 b). The walls (500 b) are supported on buried pilings or on a buried footer. For example, the walls (500 b) are steel reinforced concrete, adapted to be joined to the first story frame assemblages (104) with industry standard gussets (506). In an embodiment, the walls (500 b) have optional notches (504) for registration with respective first story floor girders (106). The assemblages (104) of the first story girder (106) and truss (108), are self-supporting with minimum deflection when cantilever supported on the elevated walls (500 b) of the enclosure.
  • FIG. 3A discloses a hinged pair of first floor frame assemblages (104) which have been constructed on a building site, for example, a temporary building site. The pair is or hoisted by a crane to the building site. The pair of assemblages (104) is unfolded by workmen at the building site, where a perimeter beam or floor girder (600) is installed, and floor joists (602) are installed, and a knee wall (604) is installed. Then, as disclosed by FIG. 3B, flooring is installed over the joists (602) to provide a portion of a first story floor (608). An elevated, stepped floor level is supported on the knee wall (604) and the trusses (108). Thus, a subassembly (610) is constructed on a building site that is either a temporary building site or permanent building site that has one form of the foundation (500).
  • When the building site is a temporary building site, the subassembly (610) is hoisted or lifted by the crane and transferred to a permanent building site, where it is lowered by the crane, and is attached by workers to one or another embodiment of the foundations (500). Thereby, the subassembly (610) is erected or constructed at the permanent building site. The subassembly (610) is joined and secured by industry standard gussets or by welding. Following construction of the first subassembly (600) the construction process disclosed by FIGS. 3A and 3B is repeated. According to an embodiment of the invention, six subassemblies (610) are constructed, making a complete first story portion of the frame (100) having a complete first story floor (608) that is constructed at a permanent building site.
  • FIG. 3C discloses another embodiment of the invention wherein of the assemblages (104) has a prefabricated perimeter beam or floor girder (600 a) hinged to floor girders (104) and prefabricated knee walls (604 a). For example, each prefabricated perimeter beam (600 a) is of hollow, box beam construction, and is hinged to an assemblage (104), as shown in FIG. 3C, by a hinge connection similar to the hinge connection (120) disclosed by FIG. 1I. For example, each prefabricated knee wall (604 a) is a steel construction truss, and is hinged to an assemblage (104), as shown in FIG. C., by a hinge connection similar to the hinge connection (124) as disclosed by FIG. 1D. One of the prefabricated floor girders (600 a) and one of the prefabricated knee walls (604 a) is a platform on which to construct a floor (608), in the manner discussed with respect to FIGS. 3A and 3B. A second floor girder (600 a) and a second knee wall (604 a) are available for further construction, as will now be discussed with reference to FIGS. 3C and 3D.
  • FIG. 3D discloses a crane (702) in the process of transferring a subassembly (610) from a temporary building site (700) to a permanent building site. Both the temporary building site (700) and the permanent building site are anywhere within the cane's perimeter reach (704). Further, FIG. 3D discloses a pair of assemblies (610) having floors (608) erected or constructed at the permanent building site. The subassembly (610) being transferred by the crane (702) has a second perimeter beam (600 a) and a second knee wall (604 a) that are pivotable outward to be used to construct an adjacent subassembly (610 a) at the permanent building site. FIGS. 3C and 3D disclose such a subassembly (600 a) that was previously constructed. According to this embodiment of the invention, two subassemblies (610) having floors (608) are constructed according to the process disclosed by FIGS. 3A and 3B. Then the two subassemblies (610) are transferred, for example, by the crane (702) to the permanent building site disclosed by FIGS. 3C and 3D. The second perimeter beam (600 a) and the second knee wall (604 a) are pivoted to bridge between the two subassemblies (610) that have been erected or constructed previously at the permanent building site of FIG. 3C. The second perimeter beam (600 a) and the second knee wall (604 a) are used to construct another, third subassembly (610 a) between the two erected subassemblies (610). The construction process disclosed by FIGS. 3A, 3B, 3C and 3D are repeated to build a completed first story floor (608) and a first story portion of the frame (100).
  • FIG. 4 discloses a temporary building site (700) together with a crane (702) having a perimeter reach (704). When the building site is a temporary building site (700), a crane (702) transfers the two subassemblies (610) to the permanent building site of FIG. 3C. At a permanent building site, the two subassemblies (610) contribute a second perimeter beam or floor girder (600 a) and a second knee wall (604 a) to build a third subassembly (610 a) at the permanent building site of FIG. 3C. The construction process is repeated, until adjacent subassemblies (610) are joined to each other by a perimeter floor girder (600 a) that spans between the adjacent subassemblies (610), followed by construction of floor joists or purlins (602) spanning between the adjacent subassemblies (610), followed by an installed floor, similar to the floor (608), making a complete first story frame (100) constructed at a permanent building site, with a complete first story floor. Alternatively, six subassemblies (610), as disclosed by FIG. 3B, are constructed at the permanent building site, making a complete first story frame (100) constructed at a permanent building site, with a complete first story floor (608).
  • Although the construction process is described with reference to a temporary building site (700), either a temporary building site (700) or a permanent building site is within the scope of the invention. The construction process that is described herein as being performed at a temporary building site, may be performed at a permanent building site.
  • Thus, each hinged pair of first story frame assemblages (104) has a perimeter floor girder (600). The perimeter floor girder (600) is attached by a hinge connection (124) to a first story girder (106) for pivoting side by side with the hinged pair of first story frame assemblages (104). When constructed at a permanent or temporary building site the perimeter floor girder (600) is pivoted out to bridge between the corresponding pair of first story frame assemblages (104).
  • Further, each subassembly (610) that is made from a hinged pair of first story frame assemblages (104) has a perimeter floor girder (600 a). The perimeter floor girder (600 a) is attached by a hinge connection (124) to a first story girder (106) for pivoting side by side with the hinged pair of first story frame assemblages (104) for fitting in a compact space for shipment in a container (400). When constructed at a building site the perimeter floor girder (600 a) is pivoted out to bridge from one pair of first story frame assemblages (104) to another pair.
  • Following construction of the first story frame assemblages (104) with a floor (608) at the permanent building site, a pair of second story frame assemblages (200) is installed by the crane (702) onto the constructed pair of first story frame assemblages (104). The crane (702) lifts or hoists the second story frame assemblages (200) and sets them on the first story frame assemblages (104). Workers then attach the second story frame assemblages (200) to the first story frame assemblages (104) and to the mast (208) by industry standard gussets or by welding.
  • FIG. 4 discloses a temporary building site (700) that includes, and is not limited to, a platform, a pier, a water floating barge, or a land based barge, or a clearing on the ground, which allows construction of a subassembly (610) within reach of the crane (702), within the perimeter (704), and which allows the crane (602) to lift or hoist the subassembly (610), and to transport and transfer the subassembly (610) to a permanent building site (706). For example, the permanent building site (706) includes, and is not limited to, a foundation (500) in the form of previously described pilings (500 a) that have been constructed over water or over uneven terrain at the permanent building site (706). The advantage of the invention, is that the crane (702) is within reach of multiple permanent building sites (706), using a single temporary building site (700). Another advantage of the invention is the capability of constructing one or more buildings (102) on permanent building sites (706) without the need for either or both, graded road, or site finish grading of the building sites (700) and/or (706).
  • According to an embodiment of the invention, the second story frame assemblages (104) and (200) and (300) are removed by the crane (702) from a corresponding shipping container (400), and are constructed at a temporary building site (700). Alternatively, one or more, or all of the first story frame assemblages (104) are constructed at the permanent building site (706) before constructing the second story frame assemblages (200) onto the first story frame assemblages. Alternatively, one or more, or all of the second story frame assemblages (200) are constructed at the permanent building site (706) before constructing the second story roof truss assemblages (300) onto the second story frame assemblages (200).
  • The second story assemblages (200) are removed from a container (400) and are unfolded, by being pivoted apart, for construction on a temporary or permanent building site. For example, at a permanent building site (706), each hinged pair of assemblages (200) are constructed on a previously constructed pair of first story frame assemblages (104). According to an embodiment of the invention, as disclosed by FIGS. 1A, 1B and 1E, the second story, floor girder (206) is supported from below on a diagonal knee (122) that diagonally bridges between the girder (206) and a corresponding post (116) or (118). When the second story frame assemblages (200) are constructed, each girder (206) is joined to a second story mast (208), or bearing load column, FIGS. 1B, and 1H, of a construction including, and not limited to; a box beam, I-beam, H-beam, and a beam of varying cross sectional shape. The beam is constructed of materials, including, and not limited to; steel, aluminum, wood, plastics, and composites having fibers, strands and agglomerates. The assemblages (200) are secured to the assemblages (140) and the mast (208) by industry standard gussets or by welding.
  • Subsequently, the assemblages (300) are removed from a container (400) and are unfolded, by being pivoted apart, for construction on a temporary or permanent building site. For example, at a permanent building site)706), each hinged pair of assemblages (300) are constructed on a previously constructed pair of second story assemblages (200). Each rafter (304) and each purlin (302) are joined to the second story mast (208). The assemblages (300) are secured to the assemblages (200) and the mast (208) by industry standard gussets or by welding.
  • A method according to the invention includes the steps of; designing a building frame (100) to fit in one or more shipping containers (400), and collapsing the building frame (100) laterally (horizontally), or vertically, or both laterally and vertically, to fit in the shipping containers (400), and transferring the collapsed building frame (100) from containers (400) to a building site where the building frame (100) is constructed to make a building.
  • There is considerable cost advantage obtained by the invention, by prefabricating the building frame assemblages (104), (200) and (300) in a geographical location, including, but not limited to, Africa, China, Mexico and South America, where material and labor costs are low, and shipping the building frame assemblages (104), (200) and (300) by sea container to a region of the world where buildings and their construction costs are expensive.
  • The invention fulfills a considerable need for one or more buildings (102) constructed over water or uneven terrain, and constructed at resort regions experiencing hurricane force winds in the tropics, high seismic activity, or heavy snowfall in mountainous elevations.
  • The invention further includes a method of constructing a building frame (100) packaged for shipping container shipment, by removing the building frame (100) from the corresponding shipping container (400), and transferring the folded building frame (100) to an unfolded configuration, and onto a building site in an unfolded configuration.
  • As disclosed by FIG. 5, the hollow box beam construction (800) is a rugged, crush and bending resistant, fire proof conduit for containing point-to-point systems for power distribution, media and data communications and HVAC (heating, ventilation and air conditioning) systems, including, but not limited to, electrical power wiring (802), for example, multiple wire Romex plus ground, Ethernet communications wiring (804), broadband communications wiring (806), optical fiber communications cables (808), security systems cabling, water, water sprinkler system pipes and vent plumbing pipes (810) and HVAC air plenums (812). The structural elements exposed to view from the interior of the building are of steel hollow box beam construction, and are covered by a decorative surface finish, for example, exposed bamboo laminate.
  • Further, the hollow box beam construction (800) is a rugged conduit for tensioning cables that become part of the building, and for guy ropes and cables that are temporarily used for hauling and lashing when assembling and constructing the structural elements. These point-to-point systems are installed inside the hollow structural elements of the frame (100), and thus, are protected during shipment and handling. It is important to have as many point-to-point systems installed, and as much decorative finish work installed and prefabricated, before shipment of the structural elements, to tailor the building frame assemblages (104), (200) and (300) for factory fabrication, instead of field fabrication, and to tailor the building frame assemblages (104), (200) and (300) for fabrication at a selected region where labor costs are low, when viewed on a world wide, country-by-country basis. Then the building frame assemblages (104), (200) and (300) can be shipped and constructed at a final building site (700) or (706), where fabrication of the assemblages is not as affordable and/or where the building site (706) is anything but dry, level land.
  • The building frame (100) is ready for assembly of walls and roofing. The walls and roofing do not require the point-to-point systems installed in them, prior to being sealed and/or covered with finishing materials. Thus, the walls and roofing are easily modular in form and construction to facilitate their installation on the frame (100).
  • FIG. 6A discloses another embodiment of a preassembled, frame (100 a) having frame assemblages (104 a) of hollow box beam, steel construction. The frame (100 a) is designed for a single crane pull, or one crane pull. For example, the frame (100 a) as disclosed by FIGS. 6A and 6B is of one piece that is collapsed, or folded, to fit in a single container (400). The frame (100 a) is inserted in the corresponding container (400) and is removed from the container (400) by a single hoist by a crane, for example, the crane (702). In FIG. 6A, the frame (100 a) is removed from an open end of the container (400). In FIG. 6B, the frame (100 a) is removed from an open top of the container (400).
  • FIG. 6C discloses the frame (100 a) being lowered on a permanent building site. For example, the crane (702) lowers the frame (100 a) onto one form of the foundation (500) that has vertical projecting pilings (55 a) or columns, in turn, having the previously described notches (504). Alternatively, any other form of the foundation (500) is intended for use with the frame (100 a).
  • FIG. 6D-6G disclose an embodiment of the frame (100) having hinged pairs of frame assemblages (104 a) that are preassembled as a complete frame (100), prior to being inserted in a corresponding container (400). With reference to FIG. 6G, each of the assemblages (104 a) is of hollow, box beam, steel construction. Each of the assemblages (104 a) has a floor girder (106 a) and a post (118 a) and an inclined roof rafter (206 a), secured, end to end, with corresponding hinge connections similar to the hinge connection (124) for pivoting to collapse, or to fold, in the same vertical plane. A diagonal knee (122 a) of hollow, box beam, steel construction pivotally secures to a corresponding girder (106 a) by a hinge connection similar to the hinge connection (124). Each floor girder (106 a) has a hinge connection (124) with a corresponding first central hollow sleeve beam (126). Each rafter (206 a) has a hinge connection (124) with a corresponding second central hollow sleeve beam (128). When fully collapsed or fully folded, the floor girder (106 a) and post (118 a) of each assemblage (104 a) collapse or fold end-to-end, and in the same plane. The knee (122 a) pivots to extend against a corresponding girder (106 a) in the same plane with the corresponding girder (106 a).
  • The assemblages (104 a) are collapsed or folded to a compact space. The order of collapse or order of folding is disclosed in the sequence of drawing figures, FIG. 6G, FIG. 6F, FIG. 6E, FIG. 6D and FIG. 6C. When fully collapsed or fully folded, the floor girders (106 a) and posts (118 a) collapse or fold inwardly toward the first sleeve beam (126). The rafters (206 a) of the assemblages (104 a) collapse or fold inwardly toward the second sleeve beam (128). Since all of the assemblages (104 a) are preassembled to the first sleeve beam (126) and the second sleeve beam (128), a single hoist by the crane, or single crane pick, transfers the assemblages (104 a) while in a fully collapsed or fully folded state to a corresponding container (400).
  • A single crane pick removes the assemblages (104 a) from a corresponding container (400) and lowers the assemblages (104 a) to the permanent building site, as disclosed by FIG. 6C. At the building site, the assemblages (104 a) unfold according to the sequence disclosed by FIG. 6C, FIG. 6D, FIG. 6E, FIG. 6F and FIG. 6G. Further, FIG. 6G discloses the knees (122 a) connected by industry standard steel construction gussets, or by welding, to the foundation (500) comprised of the pilings (55 a).
  • The invention provides a building frame wherein, the function of design simplifies it to evolve into an un-collapsed configuration, and onto a building site. The invention provides an assemblage, and to its construction, shipment and building construction, with particular emphasis on a method and system for its design, prefabrication, shipping and construction.
  • Although the invention has been described in terms of exemplary embodiments, it is not limited thereto. Rather, the appended claims should be construed broadly, to include other variants and embodiments of the invention, which may be made by those skilled in the art without departing from the scope and range of equivalents of the invention.

Claims (20)

1. A method of designing a building, comprising the steps of:
designing a building frame to fit in one or more corresponding shipping containers;
constructing the building frame assemblage to fold laterally, or vertically, or both laterally and vertically to fit in the one or more corresponding shipping containers; and
designing the building frame assemblage to remove vertically from the one or more corresponding shipping containers, and lower onto an construction site.
2. The method of claim 1, and further comprising the steps of:
designing the building frame as having separate assemblages in a corresponding shipping container;
removing the assemblages from the corresponding shipping container, and
constructing the separate assemblages at a building site.
3. The method of claim 2, and further comprising the step of:
arranging the separate assemblages in the corresponding shipping container according to the order in which the separate assemblages are removed from the corresponding shipping container.
4. The method of claim 3, and further comprising the steps of:
removing the separate assemblages in said order from the corresponding shipping container;
constructing the separate assemblages at a temporary building site; and
transferring the separate assemblages to a permanent building site.
5. The method of claim 4, and further comprising the steps of:
constructing a first story assemblage at the temporary building site; and
transferring the first story assemblage to the permanent building site;
constructing a second story assemblage at the temporary building site; and
transferring the second story assemblage to the permanent building site.
6. A method of constructing a building frame assemblage packaged for shipment in a shipping container, comprising the steps of:
vertically removing the building frame assemblage that has been folded either vertically or laterally or both vertically and laterally to fit in the shipping container; and
lowering the building frame assemblage on a building site in an unfolded configuration.
7. The method of claim 6, and further comprising the steps of:
building a floor on the building frame assemblage; and
constructing the building frame assemblage and the floor at a permanent building site.
8. The method of claim 6, and further comprising the step of: securing the assemblage to the permanent building site.
9. The method of claim 6, and further comprising the steps of:
building a floor on the building frame assemblage at a temporary building site;
transferring the building frame assemblage and the floor to a permanent building site; and
securing the building frame assemblage to the permanent building site.
10. A method for constructing a building frame assemblage, comprising the steps of:
prefabricating the building frame assemblage in a geographical location where material and labor costs are low;
shipping the building frame assemblage by container to a region of the world where buildings and their construction costs are expensive; and
transferring the building frame assemblage to a building site.
11. The method of claim 10 wherein, the step of transferring the building frame assemblage further comprises the step of:
removing the building frame assemblage from a shipping container by a crane.
12. The method of claim 10 wherein, the step of transferring the building frame assemblage further comprises the steps of:
removing the building frame assemblage from a corresponding container by a crane; and
setting the building frame assemblage on a temporary building site;
and further comprising the steps of:
assembling a floor on the building frame assemblage; and
transferring the building frame assemblage and the floor from the temporary building site to a permanent building site.
13. The method of claim 10 wherein, the step of transferring the building frame assemblage further comprises the steps of:
removing the building frame assemblage from a corresponding container by a crane; and
lowering the building frame assemblage on a platform;
and further comprising the steps of:
assembling a floor on the building frame assemblage; and
transferring the building frame assemblage and the floor from the platform to a permanent building site.
14. The method of claim 10 wherein, the step of transferring the building frame assemblage further comprises the steps of:
removing the building frame assemblage from a corresponding container by a crane; and
lowering the building frame assemblage on a permanent building site;
and further comprising the step of:
assembling a floor on the building frame assemblage.
15. A building frame comprising:
at least first story frame assemblages; and
the assemblages being collapsible to fit in a corresponding shipping container; and
the assemblages being arranged according to the order in which they are removed from the corresponding shipping container and used in the construction of a building.
16. The building frame as recited in claim 15, and further comprising:
the assemblages being collapsible laterally.
17. The building frame as recited in claim 15, and further comprising:
the first story assemblages being cantilever supported at the permanent building site.
18. The building frame as recited in claim 15, and further comprising:
second story frame assemblages for building on the first story assemblages; and
the second story frame assemblages being collapsible to fit in a corresponding shipping container.
19. The building frame as recited in claim 15, and further comprising:
second story frame assemblages for building on the first story assemblages; and
roof truss assemblages for building on the second story assemblages;
the second story frame assemblages being collapsible to fit in a corresponding shipping container, and the roof truss assemblages being collapsible to fit in a corresponding shipping container.
20. The building frame as recited in claim 19, and further comprising:
the assemblages being collapsible laterally.
US10/696,004 2003-10-29 2003-10-29 Building assembly system and method Abandoned US20060156684A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US10/696,004 US20060156684A1 (en) 2003-10-29 2003-10-29 Building assembly system and method
PCT/US2004/035698 WO2005045150A2 (en) 2003-10-29 2004-10-27 Building assembly system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US10/696,004 US20060156684A1 (en) 2003-10-29 2003-10-29 Building assembly system and method

Publications (1)

Publication Number Publication Date
US20060156684A1 true US20060156684A1 (en) 2006-07-20

Family

ID=34573225

Family Applications (1)

Application Number Title Priority Date Filing Date
US10/696,004 Abandoned US20060156684A1 (en) 2003-10-29 2003-10-29 Building assembly system and method

Country Status (2)

Country Link
US (1) US20060156684A1 (en)
WO (1) WO2005045150A2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070260344A1 (en) * 2006-02-20 2007-11-08 Masatoshi Takada Module evaluation method and system
US11893315B2 (en) * 2019-11-07 2024-02-06 Consulting Engineers, Corp. Method and system for optimizing shipping methodology for 1-directional roof trusses

Citations (56)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US414976A (en) * 1889-11-12 Portable house
US2701038A (en) * 1949-09-03 1955-02-01 Flint Steel Corp Portable house
US2920920A (en) * 1957-05-01 1960-01-12 Couse Mfg Inc Expansible building structure
US3482005A (en) * 1964-10-16 1969-12-02 Lucien Quentin Method of constructing concrete buildings
US3633325A (en) * 1970-06-01 1972-01-11 Guy A Bartoli Building structure cantilevered from vertical central support
US3689019A (en) * 1967-11-28 1972-09-05 Joseph W Ferenc Apparatus for shuttering poured concrete structures
US3719012A (en) * 1970-04-29 1973-03-06 F Laurent Tower-construction with overhangs to support light-weight dwellings
US3815861A (en) * 1972-04-22 1974-06-11 J Maier Collapsible form for erecting of monolithic structures
US3952463A (en) * 1974-05-29 1976-04-27 General Aluminum Products, Inc. Flexible cover support structure
US4035964A (en) * 1975-11-14 1977-07-19 Robinson Kenneth J Foldable enclosure
US4127254A (en) * 1976-09-08 1978-11-28 Kahan Ghetel P Concrete building construction forms
US4166343A (en) * 1977-01-26 1979-09-04 Brian Edward D O Collapsible structures
US4203788A (en) * 1978-03-16 1980-05-20 Clear Theodore E Methods for manufacturing cementitious reinforced panels
US4375010A (en) * 1980-12-12 1983-02-22 Rosemount Office Systems, Inc. Panel construction including electrical connectors
US4462951A (en) * 1983-03-17 1984-07-31 Martin Fred E Method and apparatus for constructing multi-storied concrete buildings
US4545171A (en) * 1983-05-05 1985-10-08 Shanni International, Inc. Prefabricated folding structure
US4706429A (en) * 1985-11-20 1987-11-17 Young Rubber Company Permanent non-removable insulating type concrete wall forming structure
US4715159A (en) * 1986-10-07 1987-12-29 Yousef Hijazi Collapsible building construction system
US4730422A (en) * 1985-11-20 1988-03-15 Young Rubber Company Insulating non-removable type concrete wall forming structure and device and system for attaching wall coverings thereto
US4765109A (en) * 1987-09-25 1988-08-23 Boeshart Patrick E Adjustable tie
US4768938A (en) * 1987-09-21 1988-09-06 Greeson Logan C Apparatus for pouring concrete slabs
US4815242A (en) * 1986-11-12 1989-03-28 Four Seasons Solar Products Corporation Modular lean-to post and beam structure
US4829726A (en) * 1985-04-04 1989-05-16 Potter D Indoye Eric A De Extensible construction
US4866891A (en) * 1987-11-16 1989-09-19 Young Rubber Company Permanent non-removable insulating type concrete wall forming structure
US4889310A (en) * 1988-05-26 1989-12-26 Boeshart Patrick E Concrete forming system
US4896165A (en) * 1987-09-24 1990-01-23 Mitsubishi Denki Kabushiki Kaisha Module for expandable structure and expandable structure employing said module
US4916879A (en) * 1989-09-18 1990-04-17 Boeshart Patrick E Corner tie
US4921649A (en) * 1987-09-21 1990-05-01 Greeson Logan C Method for pouring concrete slabs
US4944127A (en) * 1986-09-24 1990-07-31 The Dow Chemical Company Composite building panel and methods
US5024031A (en) * 1988-10-27 1991-06-18 Charles Hoberman Radial expansion/retraction truss structures
US5039058A (en) * 1990-07-10 1991-08-13 Boeshart Patrick E Hinged tie for forming angles walls
US5209039A (en) * 1992-04-10 1993-05-11 Boeshart Patrick E Apparatus for interconnecting concrete wall forms
US5224321A (en) * 1990-02-22 1993-07-06 Fearn Richard N Building foundation and floor assembly
US5265748A (en) * 1987-12-10 1993-11-30 Shigenobu Furukawa Multi-purpose container
US5265394A (en) * 1992-11-17 1993-11-30 X-Span-Tec Corporation Expandable-retractable portable structure
US5267420A (en) * 1991-04-05 1993-12-07 Sam Segman Building construction
US5332863A (en) * 1991-07-01 1994-07-26 Emmert Raymond L Wiring installation method for modular building structures
US5426900A (en) * 1992-03-11 1995-06-27 Springer; Robert H. Multi-purpose hexagonal building module
US5462330A (en) * 1993-08-23 1995-10-31 Brown; Quentin M. Folding camping/cargo trailer
US5493818A (en) * 1994-04-28 1996-02-27 Wilson; Martin L. Collapsible structure having compact shipping properties
US5765316A (en) * 1996-09-17 1998-06-16 Kavarsky; Raymond R. Building module, collapsible for transport and expandable for use
US5794393A (en) * 1996-05-29 1998-08-18 Fearn; Richard Neil Concrete foundation wall form apparatus and method
US5882540A (en) * 1996-11-12 1999-03-16 Farrington; Albert J. Wall construction apparatus and methodology
US5922236A (en) * 1997-04-01 1999-07-13 Zuhl; David M. Modular forming system for forming concrete foundation walls
US6343894B1 (en) * 1997-06-27 2002-02-05 Richard Neil Fearn Reusable building foundation form apparatus and method
US6434895B1 (en) * 1999-09-09 2002-08-20 Bendon, L.L.C. Foldable trailerable building
US6523312B2 (en) * 2000-04-17 2003-02-25 Paul W. Budge Wall forming system for retaining and non-retaining concrete walls
US6532701B2 (en) * 2000-09-25 2003-03-18 Robert Edward Williams Shelter system of clustered modular enclosures
US6568141B2 (en) * 2001-07-24 2003-05-27 Dennis H. Kremers Concrete footing and wall system
US20030097801A1 (en) * 2001-11-26 2003-05-29 Charles Hoberman Folding covering panels for expanding structures
US6604328B1 (en) * 2001-09-12 2003-08-12 David R. Paddock Portable cabin, components therefor, methods of making and erecting same
US20030168575A1 (en) * 2000-06-21 2003-09-11 Fearn Richard N. Concrete wall forming system using fabric
US6658810B2 (en) * 2002-03-27 2003-12-09 Deloach, Sr. W. Michael Tilt-up concrete wall panel form and method of fabricating same
US6681539B2 (en) * 2000-05-26 2004-01-27 Louis L. Yost Concrete form panels, concrete wall and method of forming
US6688066B1 (en) * 1998-09-02 2004-02-10 James Hardie Research Pty Limited Construction technique and structure resulting therefrom
US6702247B2 (en) * 2001-07-31 2004-03-09 Fukuvi Usa, Inc. Tilt-up construction chamfers

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3832811A (en) * 1971-06-07 1974-09-03 E Briel Relocatable building module
US3736708A (en) * 1972-02-01 1973-06-05 Chapman & Miller Architects Collapsible roof for preassembled building
US5491934A (en) * 1992-07-24 1996-02-20 Bigelow, Jr.; Floyd E. Two story building collapsed for shipping
US20020116878A1 (en) * 2000-09-29 2002-08-29 Ciotti Theodore T. Containerized habitable structures

Patent Citations (57)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US414976A (en) * 1889-11-12 Portable house
US2701038A (en) * 1949-09-03 1955-02-01 Flint Steel Corp Portable house
US2920920A (en) * 1957-05-01 1960-01-12 Couse Mfg Inc Expansible building structure
US3482005A (en) * 1964-10-16 1969-12-02 Lucien Quentin Method of constructing concrete buildings
US3689019A (en) * 1967-11-28 1972-09-05 Joseph W Ferenc Apparatus for shuttering poured concrete structures
US3719012A (en) * 1970-04-29 1973-03-06 F Laurent Tower-construction with overhangs to support light-weight dwellings
US3633325A (en) * 1970-06-01 1972-01-11 Guy A Bartoli Building structure cantilevered from vertical central support
US3815861A (en) * 1972-04-22 1974-06-11 J Maier Collapsible form for erecting of monolithic structures
US3952463A (en) * 1974-05-29 1976-04-27 General Aluminum Products, Inc. Flexible cover support structure
US4035964A (en) * 1975-11-14 1977-07-19 Robinson Kenneth J Foldable enclosure
US4127254A (en) * 1976-09-08 1978-11-28 Kahan Ghetel P Concrete building construction forms
US4166343A (en) * 1977-01-26 1979-09-04 Brian Edward D O Collapsible structures
US4203788A (en) * 1978-03-16 1980-05-20 Clear Theodore E Methods for manufacturing cementitious reinforced panels
US4375010A (en) * 1980-12-12 1983-02-22 Rosemount Office Systems, Inc. Panel construction including electrical connectors
US4462951A (en) * 1983-03-17 1984-07-31 Martin Fred E Method and apparatus for constructing multi-storied concrete buildings
US4545171A (en) * 1983-05-05 1985-10-08 Shanni International, Inc. Prefabricated folding structure
US4829726A (en) * 1985-04-04 1989-05-16 Potter D Indoye Eric A De Extensible construction
US4706429A (en) * 1985-11-20 1987-11-17 Young Rubber Company Permanent non-removable insulating type concrete wall forming structure
US4730422A (en) * 1985-11-20 1988-03-15 Young Rubber Company Insulating non-removable type concrete wall forming structure and device and system for attaching wall coverings thereto
US4885888A (en) * 1985-11-20 1989-12-12 Young Rubber Company Insulating non-removable type concrete wall forming structure and device and system for attaching wall coverings thereto
US4944127A (en) * 1986-09-24 1990-07-31 The Dow Chemical Company Composite building panel and methods
US4715159A (en) * 1986-10-07 1987-12-29 Yousef Hijazi Collapsible building construction system
US4815242A (en) * 1986-11-12 1989-03-28 Four Seasons Solar Products Corporation Modular lean-to post and beam structure
US4921649A (en) * 1987-09-21 1990-05-01 Greeson Logan C Method for pouring concrete slabs
US4768938A (en) * 1987-09-21 1988-09-06 Greeson Logan C Apparatus for pouring concrete slabs
US4896165A (en) * 1987-09-24 1990-01-23 Mitsubishi Denki Kabushiki Kaisha Module for expandable structure and expandable structure employing said module
US4765109A (en) * 1987-09-25 1988-08-23 Boeshart Patrick E Adjustable tie
US4866891A (en) * 1987-11-16 1989-09-19 Young Rubber Company Permanent non-removable insulating type concrete wall forming structure
US5265748A (en) * 1987-12-10 1993-11-30 Shigenobu Furukawa Multi-purpose container
US4889310A (en) * 1988-05-26 1989-12-26 Boeshart Patrick E Concrete forming system
US5024031A (en) * 1988-10-27 1991-06-18 Charles Hoberman Radial expansion/retraction truss structures
US4916879A (en) * 1989-09-18 1990-04-17 Boeshart Patrick E Corner tie
US5224321A (en) * 1990-02-22 1993-07-06 Fearn Richard N Building foundation and floor assembly
US5039058A (en) * 1990-07-10 1991-08-13 Boeshart Patrick E Hinged tie for forming angles walls
US5267420A (en) * 1991-04-05 1993-12-07 Sam Segman Building construction
US5332863A (en) * 1991-07-01 1994-07-26 Emmert Raymond L Wiring installation method for modular building structures
US5426900A (en) * 1992-03-11 1995-06-27 Springer; Robert H. Multi-purpose hexagonal building module
US5209039A (en) * 1992-04-10 1993-05-11 Boeshart Patrick E Apparatus for interconnecting concrete wall forms
US5265394A (en) * 1992-11-17 1993-11-30 X-Span-Tec Corporation Expandable-retractable portable structure
US5462330A (en) * 1993-08-23 1995-10-31 Brown; Quentin M. Folding camping/cargo trailer
US5493818A (en) * 1994-04-28 1996-02-27 Wilson; Martin L. Collapsible structure having compact shipping properties
US5794393A (en) * 1996-05-29 1998-08-18 Fearn; Richard Neil Concrete foundation wall form apparatus and method
US5765316A (en) * 1996-09-17 1998-06-16 Kavarsky; Raymond R. Building module, collapsible for transport and expandable for use
US5882540A (en) * 1996-11-12 1999-03-16 Farrington; Albert J. Wall construction apparatus and methodology
US5922236A (en) * 1997-04-01 1999-07-13 Zuhl; David M. Modular forming system for forming concrete foundation walls
US6343894B1 (en) * 1997-06-27 2002-02-05 Richard Neil Fearn Reusable building foundation form apparatus and method
US6688066B1 (en) * 1998-09-02 2004-02-10 James Hardie Research Pty Limited Construction technique and structure resulting therefrom
US6434895B1 (en) * 1999-09-09 2002-08-20 Bendon, L.L.C. Foldable trailerable building
US6523312B2 (en) * 2000-04-17 2003-02-25 Paul W. Budge Wall forming system for retaining and non-retaining concrete walls
US6681539B2 (en) * 2000-05-26 2004-01-27 Louis L. Yost Concrete form panels, concrete wall and method of forming
US20030168575A1 (en) * 2000-06-21 2003-09-11 Fearn Richard N. Concrete wall forming system using fabric
US6532701B2 (en) * 2000-09-25 2003-03-18 Robert Edward Williams Shelter system of clustered modular enclosures
US6568141B2 (en) * 2001-07-24 2003-05-27 Dennis H. Kremers Concrete footing and wall system
US6702247B2 (en) * 2001-07-31 2004-03-09 Fukuvi Usa, Inc. Tilt-up construction chamfers
US6604328B1 (en) * 2001-09-12 2003-08-12 David R. Paddock Portable cabin, components therefor, methods of making and erecting same
US20030097801A1 (en) * 2001-11-26 2003-05-29 Charles Hoberman Folding covering panels for expanding structures
US6658810B2 (en) * 2002-03-27 2003-12-09 Deloach, Sr. W. Michael Tilt-up concrete wall panel form and method of fabricating same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070260344A1 (en) * 2006-02-20 2007-11-08 Masatoshi Takada Module evaluation method and system
US7409255B2 (en) * 2006-02-20 2008-08-05 Hitachi, Ltd. Module evaluation method and system
US11893315B2 (en) * 2019-11-07 2024-02-06 Consulting Engineers, Corp. Method and system for optimizing shipping methodology for 1-directional roof trusses

Also Published As

Publication number Publication date
WO2005045150A3 (en) 2006-05-11
WO2005045150A2 (en) 2005-05-19

Similar Documents

Publication Publication Date Title
US4807407A (en) Modular building system for a three-story structure
AU2011223504B2 (en) Improvements in prefabricated modular building units
US7086209B1 (en) Method for constructing a building and resulting building
US20040103596A1 (en) Construction system for manufactured housing units
US20040134152A1 (en) Method and apparatus for precast and framed block element construction
US4912891A (en) Folding building structure
CA2334703A1 (en) Prefabricated building systems
CN111527272A (en) Modular housing system
US7171792B2 (en) Pipe and cable truss system
CA1196464A (en) Composite gambrel roof truss with prefabricated truss components
US20220145632A1 (en) A building truss, system, and construction method
GB2141762A (en) Gable roof modules
US20060156684A1 (en) Building assembly system and method
US4171600A (en) Process for constructing modular building and resulting product
WO2004053233A1 (en) Heliport and civil engineering/building material
JP2001115559A (en) Container for container house and container house
FR2602533A1 (en) Elements for building a house with prefabricated metal panels
EP1000210A1 (en) Transportable building
CN217000177U (en) Modular building
AU2017248411A1 (en) Method for erecting a portal frame
AU2013201693B2 (en) Improvements in prefabricated modular building units
AU630127B2 (en) Adjustable space frames and trusses
WO1987005349A1 (en) A method for constructing huge modules, and a module fabricated by said method
AU4251399A (en) Prefabricated building systems
AU2004200422A1 (en) Transportable building with higher roof

Legal Events

Date Code Title Description
AS Assignment

Owner name: GOOD IDEAS, LLC, VIRGIN ISLANDS, U.S.

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:FOUCHER, BRIAN R.;REEL/FRAME:015314/0569

Effective date: 20040219

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION