US20060201101A1 - Floor guard for cook line - Google Patents

Floor guard for cook line Download PDF

Info

Publication number
US20060201101A1
US20060201101A1 US11/079,160 US7916005A US2006201101A1 US 20060201101 A1 US20060201101 A1 US 20060201101A1 US 7916005 A US7916005 A US 7916005A US 2006201101 A1 US2006201101 A1 US 2006201101A1
Authority
US
United States
Prior art keywords
floor
sheet
sub
accordance
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/079,160
Inventor
Joe Hutto
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Durable Surfaces LLC
Original Assignee
Durable Surfaces LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Durable Surfaces LLC filed Critical Durable Surfaces LLC
Priority to US11/079,160 priority Critical patent/US20060201101A1/en
Assigned to DURABLE SURFACES, LLC reassignment DURABLE SURFACES, LLC ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: HUTTO, JR., JOE
Publication of US20060201101A1 publication Critical patent/US20060201101A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0285Repairing or restoring flooring

Definitions

  • This invention pertains to replacing floor surfaces in commercial kitchens.
  • this invention pertains to the removal of ceramic tile flooring under cooking equipment and replacement with a smooth, impervious and easily cleaned surface.
  • the floor surface usually comprises ceramic tile set in grout or mortar. This type of surface lends itself to frequent washing with water based cleaning solutions.
  • hot grease is frequently spilled or spattered from the fryers onto the floor. Over extended periods of time, the grease penetrates the mortar. Eventually the ceramic tile floor begins to buckle, which in turn allows additional penetration by the grease and cleaning solutions. This creates an unclean and unhealthy environment in which microorganisms can grow in the kitchen environment.
  • a method for replacing a defined area of ceramic tile floor with a smooth, non-porous surface that is stable to support fryers and easily cleaned.
  • the pre-existing ceramic tile and grout are removed to expose the sub-floor, which usually comprises a concrete pad.
  • a pour volume is defined using the sub-floor, walls and/or flanges secured to the sub-floor.
  • the pour volume is then filled with settable material, such as quick-setting concrete.
  • a pre-formed sheet of a non-porous material, such as stainless steel, for example, is secured to the settable material, covering the pour volume and providing a smooth, non-porous surface for supporting kitchen equipment.
  • Another embodiment provides a sloped tile surface from the remaining tile floor to the edge of the pre-formed sheet.
  • FIG. 1 is an elevation view of a floor guard constructed in accordance with the present invention.
  • FIG. 2 is an elevation view of a portion of the floor guard depicted in FIG. 1 .
  • FIG. 3 is a plan view of a floor guard constructed in accordance with the present invention.
  • a replacement area 8 of ceramic tile floor is defined by a rear wall 10 , a left side wall 12 and a right side wall 14 .
  • the ceramic tile within the replacement area 8 is removed, as with scrapers, for example, to expose the sub-floor 20 .
  • the tiles in rows 16 and 18 , adjacent to the replacement area are also removed.
  • the concrete sub-floor 20 is thoroughly cleaned and degreased using cleansers and de-greasing agents well known in the art.
  • a flange 22 for example a 90° angle iron, is secured to the sub-floor 20 with a plurality of mechanical fasteners 24 , for example 1 ⁇ 4 inch drive pins.
  • the flange in the depicted embodiment extends from the left side wall 12 to the right side wall 14 .
  • the height of the flange 22 above the sub-floor usually ranges from 1 ⁇ 2 inch to 1 inch, depending upon the thickness of the ceramic tile that was removed.
  • the sub-floor 20 , the rear wall 10 , left side wall. 12 , right side wall 14 and the flange 22 define a pour volume 24 , which is then filled with a settable material 28 to provide a level surface that is flush with the top edge 26 of the flange 22 and extends to the rear wall 10 , left side wall 12 and right side wall 14 .
  • the settable material 28 may comprise a high early strength concrete, a sand-cement dry bed grout or a self leveling fast-set floor repair compound and filler material. The selection of settable material 28 depends upon the thickness of the pour volume as well as the time constraints for completion of the installation, as will be recognized by those skilled in the art.
  • a smooth, non-porous sheet 30 is laid over the flange 22 and the cured settable material 28 .
  • the sheet 30 comprises stainless steel, from 14 gauge to 20 gauge, and is pre-formed to define a flange wall 32 that is approximately perpendicular to the top surface 34 of the sheet 30 .
  • the flange wall 32 extends downwardly from the top surface 34 of the sheet 30 . In position upon the settable material, the flange wall 32 encapsulates the flange 22 along with the settable material.
  • the dimensions of the sheet 30 are dependent upon the dimensions of the replacement area 8 .
  • the width of the sheet 30 generally ranges between 36 inches and 54 inches, however, 47 inches is the most common width to provide space for the kitchen equipment without extending too far into the kitchen workspace.
  • the length of the sheet 30 generally ranges between 4 feet and 30 feet, depending upon the size and number of pieces of kitchen equipment that are installed.
  • the sheet 30 is preferably pre-drilled with 5/16 inch holes for attaching the sheet to the sub-floor with 1 ⁇ 4 inch drive pin fasteners.
  • a row of holes is spaced from the rear edge 36 by 3 inches and another row of holes from the front edge 38 by 3 inches.
  • a third row of holes is located approximately midway between the front edge 38 and the rear edge 36 .
  • Each row of holes is set on 16 inch centers.
  • a sloped bed of fast-curing floor repair compound 46 extends from the proexisting row 44 of ceramic tiles to the flange wall 32 at a height whereby the top rear edge of the tile 48 is flush with the top surface 34 and the top front edge of the tile 50 is flush with the preexisting row of tiles 44 .
  • rows of tiles 48 and 50 are adhesively applied to the cured compound 46 and grouted.
  • one or more of the rear wall 10 , left side wall 12 and/or right side wall 14 may be replaced with another flange similar to the flange 22 to define the pour volume 24 .
  • the edges adjacent to side walls 12 and 14 and/or the rear wall 10 may include an upwardly extending flange for securing the sheet to the wall.

Abstract

A method for replacing a tile floor with a non-porous sheet comprises removing a plurality of tiles to expose a sub-floor in a replacement area, defining a pour volume above the sub floor in the replacement area, filling the pour volume with a settable material, and securing a non-porous sheet upon the settable material.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • Not Applicable
  • STATEMENT REGARDING FEDERALLY SPONSORED RESEARCH OR DEVELOPMENT
  • Not Applicable
  • BACKGROUND OF THE INVENTION
  • 1. Field of Invention
  • This invention pertains to replacing floor surfaces in commercial kitchens.
  • More particularly, this invention pertains to the removal of ceramic tile flooring under cooking equipment and replacement with a smooth, impervious and easily cleaned surface.
  • 2. Description of the Related Art
  • In most commercial kitchens, such as in fast food establishments, for example, the floor surface usually comprises ceramic tile set in grout or mortar. This type of surface lends itself to frequent washing with water based cleaning solutions. However, when fryers are located in the commercial kitchen, hot grease is frequently spilled or spattered from the fryers onto the floor. Over extended periods of time, the grease penetrates the mortar. Eventually the ceramic tile floor begins to buckle, which in turn allows additional penetration by the grease and cleaning solutions. This creates an unclean and unhealthy environment in which microorganisms can grow in the kitchen environment.
  • One solution to the problem of buckling tile is to remove the tile and replace it with new tile and grout. However, this is a time consuming process which requires shutting down the kitchen equipment for several days. Also, it is only a temporary solution because the hot grease will eventually work its way back into the new grout and cause the floor to buckle again.
  • BRIEF SUMMARY OF THE INVENTION
  • According to one embodiment of the present invention, a method is provided for replacing a defined area of ceramic tile floor with a smooth, non-porous surface that is stable to support fryers and easily cleaned. In accordance with the method, the pre-existing ceramic tile and grout are removed to expose the sub-floor, which usually comprises a concrete pad. A pour volume is defined using the sub-floor, walls and/or flanges secured to the sub-floor. The pour volume is then filled with settable material, such as quick-setting concrete. A pre-formed sheet of a non-porous material, such as stainless steel, for example, is secured to the settable material, covering the pour volume and providing a smooth, non-porous surface for supporting kitchen equipment.
  • Another embodiment provides a sloped tile surface from the remaining tile floor to the edge of the pre-formed sheet.
  • BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWINGS
  • The above-mentioned features of the invention will become more clearly understood from the following detailed description of the invention read together with the drawings in which:
  • FIG. 1 is an elevation view of a floor guard constructed in accordance with the present invention.
  • FIG. 2 is an elevation view of a portion of the floor guard depicted in FIG. 1.
  • FIG. 3 is a plan view of a floor guard constructed in accordance with the present invention.
  • DETAILED DESCRIPTION OF THE INVENTION
  • Referring to the drawings, in which like numbered items refer to like items, a method for replacing an area of ceramic tile floor with one or more sheets of smooth non-porous material is disclosed.
  • Referring to FIG. 3, a replacement area 8 of ceramic tile floor is defined by a rear wall 10, a left side wall 12 and a right side wall 14. The ceramic tile within the replacement area 8 is removed, as with scrapers, for example, to expose the sub-floor 20. Preferably, the tiles in rows 16 and 18, adjacent to the replacement area, are also removed. Thereafter, the concrete sub-floor 20 is thoroughly cleaned and degreased using cleansers and de-greasing agents well known in the art.
  • A flange 22, for example a 90° angle iron, is secured to the sub-floor 20 with a plurality of mechanical fasteners 24, for example ¼ inch drive pins. The flange in the depicted embodiment extends from the left side wall 12 to the right side wall 14. The height of the flange 22 above the sub-floor usually ranges from ½ inch to 1 inch, depending upon the thickness of the ceramic tile that was removed.
  • Cooperatively, the sub-floor 20, the rear wall 10, left side wall. 12, right side wall 14 and the flange 22 define a pour volume 24, which is then filled with a settable material 28 to provide a level surface that is flush with the top edge 26 of the flange 22 and extends to the rear wall 10, left side wall 12 and right side wall 14. The settable material 28 may comprise a high early strength concrete, a sand-cement dry bed grout or a self leveling fast-set floor repair compound and filler material. The selection of settable material 28 depends upon the thickness of the pour volume as well as the time constraints for completion of the installation, as will be recognized by those skilled in the art.
  • After the settable material has cured to a hardened state, which may require 2-3 hours, a smooth, non-porous sheet 30 is laid over the flange 22 and the cured settable material 28. Preferably, the sheet 30 comprises stainless steel, from 14 gauge to 20 gauge, and is pre-formed to define a flange wall 32 that is approximately perpendicular to the top surface 34 of the sheet 30. The flange wall 32 extends downwardly from the top surface 34 of the sheet 30. In position upon the settable material, the flange wall 32 encapsulates the flange 22 along with the settable material.
  • The dimensions of the sheet 30 are dependent upon the dimensions of the replacement area 8. The width of the sheet 30 generally ranges between 36 inches and 54 inches, however, 47 inches is the most common width to provide space for the kitchen equipment without extending too far into the kitchen workspace. The length of the sheet 30 generally ranges between 4 feet and 30 feet, depending upon the size and number of pieces of kitchen equipment that are installed.
  • The sheet 30 is preferably pre-drilled with 5/16 inch holes for attaching the sheet to the sub-floor with ¼ inch drive pin fasteners. A row of holes is spaced from the rear edge 36 by 3 inches and another row of holes from the front edge 38 by 3 inches. A third row of holes is located approximately midway between the front edge 38 and the rear edge 36. Each row of holes is set on 16 inch centers.
  • Commercially available stainless steel sheets generally have a maximum length of 10 feet. Accordingly, when the length of the replacement area exceeds 10 feet, at least two sheets 30 and 30 a are used. Sheet 30 overlaps sheet 30 a by about 6 inches adjacent to the right edge 40. As shown in FIG. 3, holes are drilled through both sheet 30 and sheet 30 a in the overlapped area.
  • With the sheet 30 in position upon the settable material and the flange 22, holes are drilled through the pre-drilled holes in the sheet 30 and into the settable material 28 and the sub-floor 20 at the location of each of the holes drilled in the sheet 30. The sheet 30 is then anchored to the sub-floor 20 with ¼ inch drive pin fasteners 33. Thereafter, a bead of sealant 42, such as a two-part epoxy caulk, for example, is applied at the junction of the sheet 30 with the rear wall 10, left side wall 12 and right side wall 14.
  • In the area defined by the removed tile rows 16 and 18 a sloped bed of fast-curing floor repair compound 46 extends from the proexisting row 44 of ceramic tiles to the flange wall 32 at a height whereby the top rear edge of the tile 48 is flush with the top surface 34 and the top front edge of the tile 50 is flush with the preexisting row of tiles 44. After the compound 46 has cured, rows of tiles 48 and 50 are adhesively applied to the cured compound 46 and grouted.
  • It will be recognized by those skilled in the art that one or more of the rear wall 10, left side wall 12 and/or right side wall 14 may be replaced with another flange similar to the flange 22 to define the pour volume 24. Also, the edges adjacent to side walls 12 and 14 and/or the rear wall 10 may include an upwardly extending flange for securing the sheet to the wall.
  • Those skilled in the art will recognize that various curable materials, fasteners and sheet material may be used without departing from the spirit and scope of the present invention.
  • From the foregoing description, it will be recognized by those skilled in the art that an improved method for replacing a tile floor with a non-porous sheet has been provided. It is also a method that can be completed in a single night, so that the kitchen equipment is not out of commission for any appreciable period of time.
  • While the present invention has been illustrated by description of several embodiments and while the illustrative embodiments have been described in considerable detail, it is not the intention of the applicant to restrict or in any way limit the scope of the appended claims to such detail. Additional advantages and modifications will readily appear to those skilled in the art. The invention in its broader aspects is therefore not limited to the specific details, representative apparatus and methods, and illustrative examples shown and described. Accordingly, departures may be made from such details without departing from the spirit or scope of applicant's general inventive concept.

Claims (14)

1. A method for replacing a tile floor with a non-porous sheet, said method comprising:
removing a plurality of tiles to expose a sub-floor in a replacement area;
defining a pour volume above said sub floor in said replacement area;
filling said pour volume with a settable material; and
securing a non-porous sheet upon said settable material.
2. The method of claim 1 wherein said pour volume is defined at least partially by a wall.
3. The method of claim 1 wherein said pour volume is defined at least partially by a flange secured to said sub-floor.
4. The method of claim 3 wherein said sheet includes a flange wall encapsulating said flange.
5. The method of claim 1 wherein said non-porous sheet comprises stainless steel.
6. The method of claim 1 wherein said sheet is secured to said sub-floor with fasteners.
7. The method of claim 1 and further comprising the step of installing a sloped surface for installing tiles to extend between pre-existing tiles and said non-porous sheet.
8. A floor guard installed in accordance with the method of claim 1.
9. A floor guard installed in accordance with the method of claim 2.
10. A floor guard installed in accordance with the method of claim 3.
11. A floor guard installed in accordance with the method of claim 4.
12. A floor guard installed in accordance with the method of claim 5.
13. A floor guard installed in accordance with the method of claim 6.
14. A floor guard installed in accordance with the method of claim 7.
US11/079,160 2005-03-14 2005-03-14 Floor guard for cook line Abandoned US20060201101A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US11/079,160 US20060201101A1 (en) 2005-03-14 2005-03-14 Floor guard for cook line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US11/079,160 US20060201101A1 (en) 2005-03-14 2005-03-14 Floor guard for cook line

Publications (1)

Publication Number Publication Date
US20060201101A1 true US20060201101A1 (en) 2006-09-14

Family

ID=36969317

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/079,160 Abandoned US20060201101A1 (en) 2005-03-14 2005-03-14 Floor guard for cook line

Country Status (1)

Country Link
US (1) US20060201101A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013147902A (en) * 2012-01-23 2013-08-01 Hideyuki Abe Structure for reinforcing existing building by using reinforcing steel plate

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1536895A (en) * 1924-02-15 1925-05-05 Lindyberg Roman Means and method of reconditioning damaged steps
US1868815A (en) * 1930-03-31 1932-07-26 Joseph W Hoehl Enamel metallic tile
US1946690A (en) * 1931-02-28 1934-02-13 Porcelain Tile Corp Tiled construction
US2105895A (en) * 1936-03-05 1938-01-18 O H Kruger Tile
US2114474A (en) * 1936-11-14 1938-04-19 Labra Joseph Semiresilient ceramic tile flooring section
US2229742A (en) * 1937-09-15 1941-01-28 Barber Asphalt Corp Tile floor and method of producing
US3158962A (en) * 1959-03-05 1964-12-01 Frank J Faase Recessed frame for a floor mat
US3397498A (en) * 1963-02-18 1968-08-20 Murphy Timothy Corner structure for lining walls and other surfaces
US5348384A (en) * 1992-12-31 1994-09-20 Hull Harold L Apparatus for supporting a title counter cap
US6385923B1 (en) * 1997-02-19 2002-05-14 Duramax, Inc. Transition support for flooring material
US6718714B1 (en) * 2002-03-26 2004-04-13 Phil Montgomery, Sr. Safety flooring assembly
US6745528B2 (en) * 2000-12-08 2004-06-08 Kajima Corporation Stainless-steel floor and method of constructing the stainless-steel floor

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1536895A (en) * 1924-02-15 1925-05-05 Lindyberg Roman Means and method of reconditioning damaged steps
US1868815A (en) * 1930-03-31 1932-07-26 Joseph W Hoehl Enamel metallic tile
US1946690A (en) * 1931-02-28 1934-02-13 Porcelain Tile Corp Tiled construction
US2105895A (en) * 1936-03-05 1938-01-18 O H Kruger Tile
US2114474A (en) * 1936-11-14 1938-04-19 Labra Joseph Semiresilient ceramic tile flooring section
US2229742A (en) * 1937-09-15 1941-01-28 Barber Asphalt Corp Tile floor and method of producing
US3158962A (en) * 1959-03-05 1964-12-01 Frank J Faase Recessed frame for a floor mat
US3397498A (en) * 1963-02-18 1968-08-20 Murphy Timothy Corner structure for lining walls and other surfaces
US5348384A (en) * 1992-12-31 1994-09-20 Hull Harold L Apparatus for supporting a title counter cap
US6385923B1 (en) * 1997-02-19 2002-05-14 Duramax, Inc. Transition support for flooring material
US6745528B2 (en) * 2000-12-08 2004-06-08 Kajima Corporation Stainless-steel floor and method of constructing the stainless-steel floor
US6718714B1 (en) * 2002-03-26 2004-04-13 Phil Montgomery, Sr. Safety flooring assembly

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013147902A (en) * 2012-01-23 2013-08-01 Hideyuki Abe Structure for reinforcing existing building by using reinforcing steel plate

Similar Documents

Publication Publication Date Title
CA2553168C (en) Modular shower pan
US8857109B1 (en) Tile-ready corner seat
US4557004A (en) Waterproof shower module with tile-ready inner surfaces
WO2006105107A1 (en) Retrofit shower system and method for installing same
KR101830498B1 (en) Prefabricated bathroom floor
US10260223B2 (en) Wall mounted shower drain
DE202010013427U1 (en) Gutter system and gutter body for use in such a system
US20150026879A1 (en) Under mud shower pan
WO2019164658A1 (en) Tile spacer
AU2018229509A1 (en) Shower hob apparatus
CA3041317A1 (en) Shower tray
US20060201101A1 (en) Floor guard for cook line
EP2466023B1 (en) Flat plate gutter
EP2390431A1 (en) Gutter drain
DE202007014302U1 (en) Granite flat shower
DE202010012170U1 (en) shower tray
US20150067961A1 (en) Frameless shower implement having grooved surfacing
SE505836C2 (en) Restoration cladding for rooms, especially bathrooms and procedure for restoration of such rooms
EP3686363A1 (en) Lined drain
WO2009053185A2 (en) A self-supporting paving for outdoor use
EP4093252A1 (en) Floor tile with rising edge
KR100884779B1 (en) Flooring structure and construction method using it
CN111021647B (en) Assembled stair cladding structure and installation method thereof
JPH0754370Y2 (en) Front plate mounting structure for equipment unit
JP2010265716A (en) Bathroom component body and installation method for bathroom unit

Legal Events

Date Code Title Description
AS Assignment

Owner name: DURABLE SURFACES, LLC, TENNESSEE

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:HUTTO, JR., JOE;REEL/FRAME:016385/0983

Effective date: 20050311

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION