US20100319928A1 - Through tubing intelligent completion and method - Google Patents

Through tubing intelligent completion and method Download PDF

Info

Publication number
US20100319928A1
US20100319928A1 US12/489,103 US48910309A US2010319928A1 US 20100319928 A1 US20100319928 A1 US 20100319928A1 US 48910309 A US48910309 A US 48910309A US 2010319928 A1 US2010319928 A1 US 2010319928A1
Authority
US
United States
Prior art keywords
completion
tubing
string
seals
intelligent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/489,103
Inventor
Terry R. Bussear
Jesse J. Constantine
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baker Hughes Holdings LLC
Original Assignee
Baker Hughes Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baker Hughes Inc filed Critical Baker Hughes Inc
Priority to US12/489,103 priority Critical patent/US20100319928A1/en
Assigned to BAKER HUGHES INCORPORATED reassignment BAKER HUGHES INCORPORATED ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: BUSSEAR, TERRY R., CONSTANTINE, JESSE J.
Priority to BRPI1011984A priority patent/BRPI1011984A2/en
Priority to PCT/US2010/039479 priority patent/WO2011005517A2/en
Priority to EP10797572.4A priority patent/EP2446105A4/en
Publication of US20100319928A1 publication Critical patent/US20100319928A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • E21B33/124Units with longitudinally-spaced plugs for isolating the intermediate space
    • E21B33/1243Units with longitudinally-spaced plugs for isolating the intermediate space with inflatable sleeves
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/066Valve arrangements for boreholes or wells in wells electrically actuated
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0035Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well

Definitions

  • a through tubing intelligent completion including a completion string; one or more isolation seals on the completion string and having an undeployed set of dimensions smaller than one or more restrictions in a tubing string through which the completion string is deployed; and one or more interventionlessly actuable flow control devices in the completion string having a set of dimensions smaller than one or more restrictions in a tubing string through which the completion string is deployed.
  • a method for upgrading an existing well with an intelligent completion including making up a completion string; one or more isolation seals on the completion string and having an undeployed set of dimensions smaller than one or more restrictions in a tubing string through which the completion string is deployed; and one or more interventionlessly actuable flow control devices in the completion string having a set of dimensions smaller than one or more restrictions in a tubing string through which the completion string is deployed; running the completion string into a production tubing string in a borehole; exiting a downhole end of the production tubing string with the completion string; and deploying the one of more isolation seals.
  • FIG. 1 is a schematic view of a borehole system as disclosed herein;
  • FIG. 2 is an enlarged view of one of the control valves in accordance with the teaching hereof
  • a borehole system 10 having a tubing string 12 that may be preexisting or may just be preinstalled is illustrated.
  • a through tubing system is taught herein that allows installation of an intelligent completion through an existing tubing string 12 , such as production tubing into an open hole 14 .
  • the through tubing completion 16 includes a string 18 one or more isolation seals 20 (three shown) and one or more flow control devices 22 (three shown) which in one embodiment will mirror the number of isolation seals 20 .
  • These components are run on a capillary coil tubing 24 or similar conveyance through the tubing string 12 and into, in one embodiment, an open hole.
  • a restriction 26 representing one or more possible restrictions in the tubing string 12 .
  • the restriction 26 In order to have a useful through tubing completion 16 , it must be of reasonable size (for example, for a tubing string 12 of 4.5 inch diameter, the restriction 26 will in one instance be 3.75 inches. Accordingly the completion string 18 must have an outside diameter of less than 3.75 inches).
  • the through tubing intelligent completion 16 provides both zonal isolation and control in a through tubing package.
  • Isolation seals 20 are, in one embodiment, high expansion packers that may be inflatable or swellable, for example, and are hence capable of having a very diminutive diameter prior to deployment allowing them to pass the restriction 26 .
  • the control devices 22 must similarly pass through the restriction.
  • actuatable devices heretofore were not able to pass through the restriction except for sliding sleeves that require surface intervention by a shifting tool to open or close.
  • the interventionlessly actuable flow control devices of the present invention include on board actuators that can be actuated electrically, hydraulically, optically, magnetically pneumatically, etc.
  • Each of the devices 22 includes a housing 30 having an actuator 32 centrally located therewithin.
  • the actuator in a central position in the housing is made possible by the lack of a central flow channel, which was heretofore common in the art. Rather than trying to retain the central flow channel as would one of ordinary skill in the art and push the actuator to the side of the housing, resulting is a larger overall diameter, the inventors hereof have followed an unconventional path.
  • the devices 22 disclosed herein take advantage of the shapelessness of fluid to reduce the overall housing size.
  • bypass flow 46 the fluid flow that is to be conveyed through the device, bypass flow 46 , as distinct from the flow that is selectively admitted or denied entry to the completion 16 through the valve (discussed below), is diverted around the actuator 32 in one or more channels.
  • this is represented in FIG. 2 with one bypass flow channel 46 , it is to be understood that such channels may be perimetrically located around the actuator and housing.
  • the same overall flow area is achieved by that of a central flow area device but since the flow is spread out it can be thinner in radial dimension and hence allow for the actuator to be housed without increasing housing dimension.
  • the housing 30 includes, in one embodiment, a poppet type or similar valve 34 having a poppet 36 in operable communication with the actuator 32 and a seat 38 .
  • the poppet valve 34 and seat 38 are interposed between an orifice 40 and a flow channel 42 that is in communication with a tubing flow channel 44 .
  • Flow through the valve 34 is commingled with bypass flow 46 for delivery uphole in the embodiment where the borehole is intended to produce.
  • the valve 34 may be opened, closed or choked to serve the overall purpose or optimization of flow into or out of the completion 16 .
  • the valve 34 is interventionlessly actuable to selectively admit or deny (or choke) fluid from a particular area while not affecting the fluid flowing through the bypass 46 .
  • the intelligent completion may also in some embodiments include one or more sensors 48 configured to sense one or more parameters associated with the borehole to optimize production.
  • the one or more sensors 48 may be located anywhere that is convenient along the completion string.
  • the through tubing completion system as described is capable of passing through the restriction 26 in tubing 12 and thereby facilitates the delivery of an intelligent completion system through an existing tubing string which may have been from a preexisting borehole system or a newly created one where it has been determined that an intelligent completion downhole of an installed tubing string would be beneficial.
  • an intelligent completion system through an existing tubing string which may have been from a preexisting borehole system or a newly created one where it has been determined that an intelligent completion downhole of an installed tubing string would be beneficial.
  • the ever-changing conditions in the downhole environment provide ample opportunity for such an upgrade or change in plan.
  • a set of one or more ports 52 are provided that allow fluid flowing in the completion 16 to exit the tubing 18 and thereby flow into the production tubing 12 for production to the surface.
  • control line 60 that is supplied with a signal (of whatever type may be propagated by the particular type of control line) through a wet connect 62 that connects to a control line 64 from surface.
  • the system of the invention provides dramatically enhanced functionality over a tubing 12 alone and allows for retrofitment in older wells created before intelligent completions were ubiquitously accepted.

Abstract

A through tubing intelligent completion including a completion string; one or more isolation seals on the completion string and having an undeployed set of dimensions smaller than one or more restrictions in a tubing string through which the completion string is deployed; and one or more interventionlessly actuable flow control devices in the completion string having a set of dimensions smaller than one or more restrictions in a tubing string through which the completion string is deployed and method.

Description

    BACKGROUND
  • In the downhole industry, boreholes and various levels of completion are used for many different operations. Many of these completions have long lifespans and sometimes the lifespan of the completion is greater than the life of a particular well in which it is installed. In other words, there may be a desire to rework a well before the completion is beyond its actual useful life. Such can be the case with older wells that are not instrumented leading an owner to consider a rework of the well at significant expense and down time. As will be immediately recognized by one of ordinary skill in the art, more instrumentation faster and for less money and downtime would be well received.
  • SUMMARY
  • A through tubing intelligent completion including a completion string; one or more isolation seals on the completion string and having an undeployed set of dimensions smaller than one or more restrictions in a tubing string through which the completion string is deployed; and one or more interventionlessly actuable flow control devices in the completion string having a set of dimensions smaller than one or more restrictions in a tubing string through which the completion string is deployed.
  • A method for upgrading an existing well with an intelligent completion including making up a completion string; one or more isolation seals on the completion string and having an undeployed set of dimensions smaller than one or more restrictions in a tubing string through which the completion string is deployed; and one or more interventionlessly actuable flow control devices in the completion string having a set of dimensions smaller than one or more restrictions in a tubing string through which the completion string is deployed; running the completion string into a production tubing string in a borehole; exiting a downhole end of the production tubing string with the completion string; and deploying the one of more isolation seals.
  • BRIEF DESCRIPTION OF THE DRAWING
  • Referring now to the drawings wherein like elements are numbered alike in the several figures:
  • FIG. 1 is a schematic view of a borehole system as disclosed herein;
  • FIG. 2 is an enlarged view of one of the control valves in accordance with the teaching hereof
  • DETAILED DESCRIPTION
  • Referring to FIG. 1, a borehole system 10 having a tubing string 12 that may be preexisting or may just be preinstalled is illustrated. A through tubing system is taught herein that allows installation of an intelligent completion through an existing tubing string 12, such as production tubing into an open hole 14. The through tubing completion 16 includes a string 18 one or more isolation seals 20 (three shown) and one or more flow control devices 22 (three shown) which in one embodiment will mirror the number of isolation seals 20. These components are run on a capillary coil tubing 24 or similar conveyance through the tubing string 12 and into, in one embodiment, an open hole.
  • Recognizable to one of ordinary skill is a restriction 26, representing one or more possible restrictions in the tubing string 12. This presents a significant hurdle with respect to running a through tubing intelligent completion such as that depicted in the Figures hereof. In order to have a useful through tubing completion 16, it must be of reasonable size (for example, for a tubing string 12 of 4.5 inch diameter, the restriction 26 will in one instance be 3.75 inches. Accordingly the completion string 18 must have an outside diameter of less than 3.75 inches). Currently available interventionlessly actuatable flow control devices cannot be used while maximizing the completion string size. For purposes of clarity, “interventionlessly” as used herein is intended to mean that a tool need not be run to adjust the valve but rather that adjustment may be done remotely based upon input from a control line or autonomously. Types of control lines contemplated include electric, hydraulic, optic, etc. In accordance with the present invention however, the inventors hereof have solved this persistent problem.
  • The through tubing intelligent completion 16 provides both zonal isolation and control in a through tubing package. Isolation seals 20 are, in one embodiment, high expansion packers that may be inflatable or swellable, for example, and are hence capable of having a very diminutive diameter prior to deployment allowing them to pass the restriction 26. The control devices 22 must similarly pass through the restriction. As noted above, actuatable devices heretofore were not able to pass through the restriction except for sliding sleeves that require surface intervention by a shifting tool to open or close. The interventionlessly actuable flow control devices of the present invention however, include on board actuators that can be actuated electrically, hydraulically, optically, magnetically pneumatically, etc. and in some embodiments can be actuated automatically pursuant to a controller nearby the device 22. Each of the devices 22 includes a housing 30 having an actuator 32 centrally located therewithin. The actuator in a central position in the housing is made possible by the lack of a central flow channel, which was heretofore common in the art. Rather than trying to retain the central flow channel as would one of ordinary skill in the art and push the actuator to the side of the housing, resulting is a larger overall diameter, the inventors hereof have followed an unconventional path. The devices 22 disclosed herein take advantage of the shapelessness of fluid to reduce the overall housing size. More particularly, the fluid flow that is to be conveyed through the device, bypass flow 46, as distinct from the flow that is selectively admitted or denied entry to the completion 16 through the valve (discussed below), is diverted around the actuator 32 in one or more channels. Although this is represented in FIG. 2 with one bypass flow channel 46, it is to be understood that such channels may be perimetrically located around the actuator and housing. The same overall flow area is achieved by that of a central flow area device but since the flow is spread out it can be thinner in radial dimension and hence allow for the actuator to be housed without increasing housing dimension.
  • The housing 30 includes, in one embodiment, a poppet type or similar valve 34 having a poppet 36 in operable communication with the actuator 32 and a seat 38. The poppet valve 34 and seat 38 are interposed between an orifice 40 and a flow channel 42 that is in communication with a tubing flow channel 44. Flow through the valve 34 is commingled with bypass flow 46 for delivery uphole in the embodiment where the borehole is intended to produce. The valve 34 may be opened, closed or choked to serve the overall purpose or optimization of flow into or out of the completion 16. Note too that the valve 34 is interventionlessly actuable to selectively admit or deny (or choke) fluid from a particular area while not affecting the fluid flowing through the bypass 46. This therefore allows the selective control of areas or zones of the borehole while not having a resultant effect on other zones or areas that was common with prior art completions. In addition to the flow control, the intelligent completion may also in some embodiments include one or more sensors 48 configured to sense one or more parameters associated with the borehole to optimize production. The one or more sensors 48 may be located anywhere that is convenient along the completion string.
  • The through tubing completion system as described is capable of passing through the restriction 26 in tubing 12 and thereby facilitates the delivery of an intelligent completion system through an existing tubing string which may have been from a preexisting borehole system or a newly created one where it has been determined that an intelligent completion downhole of an installed tubing string would be beneficial. As one of skill in the art will recognize, the ever-changing conditions in the downhole environment provide ample opportunity for such an upgrade or change in plan.
  • At a relative uphole end 50 of the completion 16, a set of one or more ports 52 are provided that allow fluid flowing in the completion 16 to exit the tubing 18 and thereby flow into the production tubing 12 for production to the surface.
  • Finally, it will be noted that the completion 16 is provided, in one embodiment, with a control line 60 that is supplied with a signal (of whatever type may be propagated by the particular type of control line) through a wet connect 62 that connects to a control line 64 from surface.
  • The system of the invention provides dramatically enhanced functionality over a tubing 12 alone and allows for retrofitment in older wells created before intelligent completions were ubiquitously accepted.
  • While one or more embodiments have been shown and described, modifications and substitutions may be made thereto without departing from the spirit and scope of the invention. Accordingly, it is to be understood that the present invention has been described by way of illustrations and not limitation.

Claims (16)

1. A through tubing intelligent completion comprising:
a completion string;
one or more isolation seals on the completion string and having an undeployed set of dimensions smaller than one or more restrictions in a tubing string through which the completion string is deployed; and
one or more interventionlessly actuable flow control devices in the completion string having a set of dimensions smaller than one or more restrictions in a tubing string through which the completion string is deployed.
2. A through tubing intelligent completion as claimed in claim 1 further comprising a control line in operable communication with one or more of the one or more interventionlessly actuable flow control devices.
3. A through tubing intelligent completion as claimed in claim 1 wherein the one or more isolation seals are inflatable seals.
4. A through tubing intelligent completion as claimed in claim 1 wherein the one or more isolation seals are swellable seals.
5. A through tubing intelligent completion as claimed in claim 1 wherein the one or more interventionlessly actuable flow control devices comprises:
a housing;
a fluid bypass channel within the housing;
an actuator within the housing; and
a valve in operable communication with the actuator.
6. A through tubing intelligent completion as claimed in claim 5 wherein the actuator is disposed centrally of the housing.
7. A through tubing intelligent completion as claimed in claim 5 wherein the bypass is disposed perimetrically of the housing relative to the actuator.
8. A through tubing intelligent completion as claimed in claim 5 wherein the valve is a poppet type valve.
9. A through tubing intelligent completion as claimed in claim 1 wherein the completion string further includes a wet connect.
10. A through tubing intelligent completion as claimed in claim 1 wherein the completion string further includes one or more sensors.
11. A through tubing intelligent completion as claimed in claim 1 wherein the completion string further includes a set of one or more ports fluidly communicating the completion string with an annuls thereof.
12. A method for upgrading an existing well with an intelligent completion comprising:
making up a completion string as defined in claim 1;
running the completion string into a production tubing string in a borehole;
exiting a downhole end of the production tubing string with the completion string; and
deploying the one of more isolation seals.
13. A method as claimed in claim 12 further comprising adjusting one or more of the one or more control devices to optimize production.
14. A method as claimed in claim 12 wherein the running is on coil tubing.
15. A method as claimed in claim 12 wherein the deploying is by inflating the one or more seals.
16. A method as claimed in claim 12 wherein the deploying is by swelling the one or more seals.
US12/489,103 2009-06-22 2009-06-22 Through tubing intelligent completion and method Abandoned US20100319928A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US12/489,103 US20100319928A1 (en) 2009-06-22 2009-06-22 Through tubing intelligent completion and method
BRPI1011984A BRPI1011984A2 (en) 2009-06-22 2010-06-22 Smart Completion and Through Piping Method
PCT/US2010/039479 WO2011005517A2 (en) 2009-06-22 2010-06-22 Through tubing intelligent completion and method
EP10797572.4A EP2446105A4 (en) 2009-06-22 2010-06-22 Through tubing intelligent completion and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US12/489,103 US20100319928A1 (en) 2009-06-22 2009-06-22 Through tubing intelligent completion and method

Publications (1)

Publication Number Publication Date
US20100319928A1 true US20100319928A1 (en) 2010-12-23

Family

ID=43353287

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/489,103 Abandoned US20100319928A1 (en) 2009-06-22 2009-06-22 Through tubing intelligent completion and method

Country Status (4)

Country Link
US (1) US20100319928A1 (en)
EP (1) EP2446105A4 (en)
BR (1) BRPI1011984A2 (en)
WO (1) WO2011005517A2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180156009A1 (en) * 2016-12-06 2018-06-07 Saudi Arabian Oil Company Thru-Tubing Subsurface Completion Unit Employing Detachable Anchoring Seals
US10323476B2 (en) * 2014-11-12 2019-06-18 Halliburton Energy Services, Inc. Internally trussed high-expansion support for inflow control device sealing applications
WO2020086656A1 (en) * 2018-10-24 2020-04-30 Saudi Arabian Oil Company Completing slim-hole horizontal wellbores
US10927654B2 (en) 2019-05-23 2021-02-23 Saudi Arabian Oil Company Recovering hydrocarbons in multi-layer reservoirs with coiled tubing
WO2022225592A1 (en) * 2021-04-23 2022-10-27 Halliburton Energy Services, Inc. Extensible transition joint for control line protection
US20230287759A1 (en) * 2022-03-09 2023-09-14 Saudi Arabian Oil Company Methods and systems for cemented open hole intelligent completions in multilateral wells requiring full isolation of gas cap, fractures and / or water bearing boundaries

Citations (42)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3980135A (en) * 1971-08-18 1976-09-14 Schlumberger Technology Corporation Self-contained, retrievable valving assembly
US4026363A (en) * 1975-12-09 1977-05-31 Otis Engineering Corporation Apparatus and method for performing a desired operation at a specified location in a well
US4066128A (en) * 1975-07-14 1978-01-03 Otis Engineering Corporation Well flow control apparatus and method
US4357952A (en) * 1979-08-29 1982-11-09 Teledyne Adams Tubular valve device and method of assembly
US4360064A (en) * 1980-11-12 1982-11-23 Exxon Production Research Co. Circulating valve for wells
US4441558A (en) * 1982-04-15 1984-04-10 Otis Engineering Corporation Valve
US4629002A (en) * 1985-10-18 1986-12-16 Camco, Incorporated Equalizing means for a subsurface well safety valve
US4790378A (en) * 1987-02-06 1988-12-13 Otis Engineering Corporation Well testing apparatus
US4951752A (en) * 1989-04-20 1990-08-28 Exxon Production Research Company Standing valve
US4962815A (en) * 1989-07-17 1990-10-16 Halliburton Company Inflatable straddle packer
US4976314A (en) * 1988-02-03 1990-12-11 Crawford William B T-slot mandrel and kickover tool
US5018575A (en) * 1988-10-25 1991-05-28 Mandrels, Inc. Apparatus for reducing abrasion and corrosion in mandrels
US5291947A (en) * 1992-06-08 1994-03-08 Atlantic Richfield Company Tubing conveyed wellbore straddle packer system
US5297634A (en) * 1991-08-16 1994-03-29 Baker Hughes Incorporated Method and apparatus for reducing wellbore-fluid pressure differential forces on a settable wellbore tool in a flowing well
US5743497A (en) * 1996-02-13 1998-04-28 Michael; Douglas C. Wire installation strip
US5896928A (en) * 1996-07-01 1999-04-27 Baker Hughes Incorporated Flow restriction device for use in producing wells
US6112817A (en) * 1997-05-06 2000-09-05 Baker Hughes Incorporated Flow control apparatus and methods
US20010040033A1 (en) * 1999-06-18 2001-11-15 Halliburton Energy Services, Inc. Self-regulating lift fluid injection tool and method for use of same
US6334486B1 (en) * 1996-04-01 2002-01-01 Baker Hughes Incorporated Downhole flow control devices
US20020020534A1 (en) * 2000-08-17 2002-02-21 Wilson James B. Flow control device
US6382569B1 (en) * 2000-01-12 2002-05-07 Graydon Products, Inc. Line holder apparatus
US6619392B2 (en) * 2001-03-20 2003-09-16 Fast S.R.L. Blast joint assembly
US6810955B2 (en) * 2002-08-22 2004-11-02 Baker Hughes Incorporated Gas lift mandrel
US6883610B2 (en) * 2000-12-20 2005-04-26 Karol Depiak Straddle packer systems
US6883613B2 (en) * 2001-04-25 2005-04-26 Weatherford/Lamb, Inc. Flow control apparatus for use in a wellbore
US7222676B2 (en) * 2000-12-07 2007-05-29 Schlumberger Technology Corporation Well communication system
US20070181312A1 (en) * 2006-02-03 2007-08-09 Baker Hughes Incorporated Barrier orifice valve for gas lift
US7255178B2 (en) * 2000-06-30 2007-08-14 Bj Services Company Drillable bridge plug
US7261155B1 (en) * 2004-08-23 2007-08-28 Varco I/P Cable side-entry sub with grease injection flow tubes
US7273106B2 (en) * 2003-03-28 2007-09-25 Shell Oil Company Surface flow controlled valve and screen
US20080004158A1 (en) * 2006-06-30 2008-01-03 Harley-Davidson Motor Company Group, Inc. Cylinder deactivation for a motorcycle engine
US20080035350A1 (en) * 2004-07-30 2008-02-14 Baker Hughes Incorporated Downhole Inflow Control Device with Shut-Off Feature
US20080041581A1 (en) * 2006-08-21 2008-02-21 William Mark Richards Apparatus for controlling the inflow of production fluids from a subterranean well
US20080047703A1 (en) * 2006-08-23 2008-02-28 Stoesz Carl W Annular electrical wet connect
US20080190608A1 (en) * 2005-01-14 2008-08-14 Baker Hughes Incorporated Gravel pack multi-pathway tube with control line retention and method for retaining control line
US20080283238A1 (en) * 2007-05-16 2008-11-20 William Mark Richards Apparatus for autonomously controlling the inflow of production fluids from a subterranean well
US20090008078A1 (en) * 2007-03-13 2009-01-08 Schlumberger Technology Corporation Flow control assembly having a fixed flow control device and an adjustable flow control device
US20090012064A1 (en) * 2000-06-16 2009-01-08 Kazuyoshi Sagara Compositions controlling pH range of release and/or release rate
US20090095468A1 (en) * 2007-10-12 2009-04-16 Baker Hughes Incorporated Method and apparatus for determining a parameter at an inflow control device in a well
US20090120647A1 (en) * 2006-12-06 2009-05-14 Bj Services Company Flow restriction apparatus and methods
US20110000679A1 (en) * 2009-07-02 2011-01-06 Baker Hughes Incorporated Tubular valve system and method
US20110000660A1 (en) * 2009-07-02 2011-01-06 Baker Hughes Incorporated Modular valve body and method of making

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6209636B1 (en) * 1993-09-10 2001-04-03 Weatherford/Lamb, Inc. Wellbore primary barrier and related systems

Patent Citations (42)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3980135A (en) * 1971-08-18 1976-09-14 Schlumberger Technology Corporation Self-contained, retrievable valving assembly
US4066128A (en) * 1975-07-14 1978-01-03 Otis Engineering Corporation Well flow control apparatus and method
US4026363A (en) * 1975-12-09 1977-05-31 Otis Engineering Corporation Apparatus and method for performing a desired operation at a specified location in a well
US4357952A (en) * 1979-08-29 1982-11-09 Teledyne Adams Tubular valve device and method of assembly
US4360064A (en) * 1980-11-12 1982-11-23 Exxon Production Research Co. Circulating valve for wells
US4441558A (en) * 1982-04-15 1984-04-10 Otis Engineering Corporation Valve
US4629002A (en) * 1985-10-18 1986-12-16 Camco, Incorporated Equalizing means for a subsurface well safety valve
US4790378A (en) * 1987-02-06 1988-12-13 Otis Engineering Corporation Well testing apparatus
US4976314A (en) * 1988-02-03 1990-12-11 Crawford William B T-slot mandrel and kickover tool
US5018575A (en) * 1988-10-25 1991-05-28 Mandrels, Inc. Apparatus for reducing abrasion and corrosion in mandrels
US4951752A (en) * 1989-04-20 1990-08-28 Exxon Production Research Company Standing valve
US4962815A (en) * 1989-07-17 1990-10-16 Halliburton Company Inflatable straddle packer
US5297634A (en) * 1991-08-16 1994-03-29 Baker Hughes Incorporated Method and apparatus for reducing wellbore-fluid pressure differential forces on a settable wellbore tool in a flowing well
US5291947A (en) * 1992-06-08 1994-03-08 Atlantic Richfield Company Tubing conveyed wellbore straddle packer system
US5743497A (en) * 1996-02-13 1998-04-28 Michael; Douglas C. Wire installation strip
US6334486B1 (en) * 1996-04-01 2002-01-01 Baker Hughes Incorporated Downhole flow control devices
US5896928A (en) * 1996-07-01 1999-04-27 Baker Hughes Incorporated Flow restriction device for use in producing wells
US6112817A (en) * 1997-05-06 2000-09-05 Baker Hughes Incorporated Flow control apparatus and methods
US20010040033A1 (en) * 1999-06-18 2001-11-15 Halliburton Energy Services, Inc. Self-regulating lift fluid injection tool and method for use of same
US6382569B1 (en) * 2000-01-12 2002-05-07 Graydon Products, Inc. Line holder apparatus
US20090012064A1 (en) * 2000-06-16 2009-01-08 Kazuyoshi Sagara Compositions controlling pH range of release and/or release rate
US7255178B2 (en) * 2000-06-30 2007-08-14 Bj Services Company Drillable bridge plug
US20020020534A1 (en) * 2000-08-17 2002-02-21 Wilson James B. Flow control device
US7222676B2 (en) * 2000-12-07 2007-05-29 Schlumberger Technology Corporation Well communication system
US6883610B2 (en) * 2000-12-20 2005-04-26 Karol Depiak Straddle packer systems
US6619392B2 (en) * 2001-03-20 2003-09-16 Fast S.R.L. Blast joint assembly
US6883613B2 (en) * 2001-04-25 2005-04-26 Weatherford/Lamb, Inc. Flow control apparatus for use in a wellbore
US6810955B2 (en) * 2002-08-22 2004-11-02 Baker Hughes Incorporated Gas lift mandrel
US7273106B2 (en) * 2003-03-28 2007-09-25 Shell Oil Company Surface flow controlled valve and screen
US20080035350A1 (en) * 2004-07-30 2008-02-14 Baker Hughes Incorporated Downhole Inflow Control Device with Shut-Off Feature
US7261155B1 (en) * 2004-08-23 2007-08-28 Varco I/P Cable side-entry sub with grease injection flow tubes
US20080190608A1 (en) * 2005-01-14 2008-08-14 Baker Hughes Incorporated Gravel pack multi-pathway tube with control line retention and method for retaining control line
US20070181312A1 (en) * 2006-02-03 2007-08-09 Baker Hughes Incorporated Barrier orifice valve for gas lift
US20080004158A1 (en) * 2006-06-30 2008-01-03 Harley-Davidson Motor Company Group, Inc. Cylinder deactivation for a motorcycle engine
US20080041581A1 (en) * 2006-08-21 2008-02-21 William Mark Richards Apparatus for controlling the inflow of production fluids from a subterranean well
US20080047703A1 (en) * 2006-08-23 2008-02-28 Stoesz Carl W Annular electrical wet connect
US20090120647A1 (en) * 2006-12-06 2009-05-14 Bj Services Company Flow restriction apparatus and methods
US20090008078A1 (en) * 2007-03-13 2009-01-08 Schlumberger Technology Corporation Flow control assembly having a fixed flow control device and an adjustable flow control device
US20080283238A1 (en) * 2007-05-16 2008-11-20 William Mark Richards Apparatus for autonomously controlling the inflow of production fluids from a subterranean well
US20090095468A1 (en) * 2007-10-12 2009-04-16 Baker Hughes Incorporated Method and apparatus for determining a parameter at an inflow control device in a well
US20110000679A1 (en) * 2009-07-02 2011-01-06 Baker Hughes Incorporated Tubular valve system and method
US20110000660A1 (en) * 2009-07-02 2011-01-06 Baker Hughes Incorporated Modular valve body and method of making

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10323476B2 (en) * 2014-11-12 2019-06-18 Halliburton Energy Services, Inc. Internally trussed high-expansion support for inflow control device sealing applications
US10570696B2 (en) 2016-12-06 2020-02-25 Saudi Arabian Oil Company Thru-tubing retrievable intelligent completion system
US10781660B2 (en) 2016-12-06 2020-09-22 Saudi Arabian Oil Company Thru-tubing retrievable intelligent completion system
WO2018106638A1 (en) * 2016-12-06 2018-06-14 Saudi Arabian Oil Company Modular thru-tubing subsurface completion unit
WO2018106637A1 (en) * 2016-12-06 2018-06-14 Saudi Arabian Oil Company Thru-tubing retrievable subsurface completion system
US20180156008A1 (en) * 2016-12-06 2018-06-07 Saudi Arabian Oil Company Modular Thru-Tubing Subsurface Completion Unit
CN110268131A (en) * 2016-12-06 2019-09-20 沙特阿拉伯石油公司 Modularization crosses oil pipe underground well completion unit
CN110337526A (en) * 2016-12-06 2019-10-15 沙特阿拉伯石油公司 Using the oil pipe underground well completion unit excessively that can separate anchor seal
US10533393B2 (en) * 2016-12-06 2020-01-14 Saudi Arabian Oil Company Modular thru-tubing subsurface completion unit
JP2020501053A (en) * 2016-12-06 2020-01-16 サウジ アラビアン オイル カンパニー Underground finishing system capable of collecting through tubing
JP2020501054A (en) * 2016-12-06 2020-01-16 サウジ アラビアン オイル カンパニー Modular through tubing underground finishing unit
JP2020501052A (en) * 2016-12-06 2020-01-16 サウジ アラビアン オイル カンパニー Through-tubing underground finishing unit with removable fixed seal
US20200040698A1 (en) * 2016-12-06 2020-02-06 Saudi Arabian Oil Company Thru-tubing retrievable subsurface completion system
US10563478B2 (en) 2016-12-06 2020-02-18 Saudi Arabian Oil Company Thru-tubing retrievable subsurface completion system
US20180156009A1 (en) * 2016-12-06 2018-06-07 Saudi Arabian Oil Company Thru-Tubing Subsurface Completion Unit Employing Detachable Anchoring Seals
US10724329B2 (en) * 2016-12-06 2020-07-28 Saudi Arabian Oil Company Thru-tubing retrievable subsurface completion system
US11156059B2 (en) * 2016-12-06 2021-10-26 Saudi Arabian Oil Company Thru-tubing subsurface completion unit employing detachable anchoring seals
US10641060B2 (en) 2016-12-06 2020-05-05 Saudi Arabian Oil Company Thru-tubing retrievable subsurface completion system
US10655429B2 (en) 2016-12-06 2020-05-19 Saudi Arabian Oil Company Thru-tubing retrievable intelligent completion system
US10584556B2 (en) * 2016-12-06 2020-03-10 Saudi Arabian Oil Company Thru-tubing subsurface completion unit employing detachable anchoring seals
WO2018106635A1 (en) * 2016-12-06 2018-06-14 Saudi Arabian Oil Company Thru-tubing subsurface completion unit employing detachable anchoring seals
US10907442B2 (en) * 2016-12-06 2021-02-02 Saudi Arabian Oil Company Thru-tubing retrievable subsurface completion system
US11078751B2 (en) 2016-12-06 2021-08-03 Saudi Arabian Oil Company Thru-tubing retrievable intelligent completion system
US11125026B2 (en) 2018-10-24 2021-09-21 Saudi Arabian Oil Company Completing slim-hole horizontal wellbores
WO2020086656A1 (en) * 2018-10-24 2020-04-30 Saudi Arabian Oil Company Completing slim-hole horizontal wellbores
US10927654B2 (en) 2019-05-23 2021-02-23 Saudi Arabian Oil Company Recovering hydrocarbons in multi-layer reservoirs with coiled tubing
WO2022225592A1 (en) * 2021-04-23 2022-10-27 Halliburton Energy Services, Inc. Extensible transition joint for control line protection
GB2617758A (en) * 2021-04-23 2023-10-18 Halliburton Energy Services Inc Extensible transition joint for control line protection
US20230287759A1 (en) * 2022-03-09 2023-09-14 Saudi Arabian Oil Company Methods and systems for cemented open hole intelligent completions in multilateral wells requiring full isolation of gas cap, fractures and / or water bearing boundaries

Also Published As

Publication number Publication date
WO2011005517A2 (en) 2011-01-13
EP2446105A4 (en) 2015-11-18
WO2011005517A3 (en) 2011-04-07
EP2446105A2 (en) 2012-05-02
BRPI1011984A2 (en) 2016-04-26

Similar Documents

Publication Publication Date Title
US7409999B2 (en) Downhole inflow control device with shut-off feature
US20100319928A1 (en) Through tubing intelligent completion and method
US6302216B1 (en) Flow control and isolation in a wellbore
US10145223B2 (en) Autonomous flow control system and methodology
US7185706B2 (en) Arrangement for and method of restricting the inflow of formation water to a well
US8157016B2 (en) Fluid metering device and method for well tool
US20110073308A1 (en) Valve apparatus for inflow control
US8418768B2 (en) Bypass gaslift system, apparatus, and method for producing a multiple zones well
US20050263287A1 (en) Flow Control in Conduits from Multiple Zones of a Well
GB2314866A (en) Flow restriction device for use in producing wells
GB2463187A (en) A method of deploying a completion system into a multilateral well
US8196668B2 (en) Method and apparatus for completing a well
US20060289156A1 (en) Lateral control system
US11781407B2 (en) Multi stage chemical injection
US11280417B2 (en) Chemical injection system with jay-selector
NO20200196A1 (en) Chemical injection system
US20220235630A1 (en) Low power consumption electro-hydraulic valve controller
US2808781A (en) Well apparatus and system
US11434704B2 (en) Alternate path for borehole junction
MX2009001648A (en) A fluid loss control system and method for controlling fluid loss.
US10544644B2 (en) Apparatus with crossover assembly to control flow within a well

Legal Events

Date Code Title Description
AS Assignment

Owner name: BAKER HUGHES INCORPORATED, TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:BUSSEAR, TERRY R.;CONSTANTINE, JESSE J.;SIGNING DATES FROM 20090626 TO 20090727;REEL/FRAME:023086/0594

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION