US20140195307A1 - Strategic planning management - Google Patents

Strategic planning management Download PDF

Info

Publication number
US20140195307A1
US20140195307A1 US14/208,252 US201414208252A US2014195307A1 US 20140195307 A1 US20140195307 A1 US 20140195307A1 US 201414208252 A US201414208252 A US 201414208252A US 2014195307 A1 US2014195307 A1 US 2014195307A1
Authority
US
United States
Prior art keywords
strategy
business
current state
computer
innovation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US14/208,252
Inventor
Steven D. Clement
Patricia Snow
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wells Fargo Bank NA
Original Assignee
Wells Fargo Bank NA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wells Fargo Bank NA filed Critical Wells Fargo Bank NA
Priority to US14/208,252 priority Critical patent/US20140195307A1/en
Publication of US20140195307A1 publication Critical patent/US20140195307A1/en
Assigned to WELLS FARGO BANK, N.A. reassignment WELLS FARGO BANK, N.A. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: SNOW, PATRICIA, CLEMENT, STEVEN D.
Abandoned legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management

Definitions

  • IT information technology
  • IT business strategy is business-driven, based upon a defined set of inputs and drivers. It describes how technology will support an organization's business goals and strategies.
  • One principal purpose is to create understanding, to promote interaction, and ultimately to receive IT governance approval.
  • Approval of capability and function strategies empowers the organizational leaders (e.g., Accountable Capability Leaders (ACLs) and Function Leaders) to execute on their strategies.
  • ACLs Accountable Capability Leaders
  • Function Leaders Function Leaders
  • the ACLs are usually accountable for the a large number of core capabilities of IT and work with other responsible leaders to ensure there are single processes, consolidated policies/standards, benchmarking measures and a strategic plan in place.
  • ACLs span across the IT organization.
  • the Function Leaders are leaders within Technology Services and organizationally accountable for the core functions of Tech Services.
  • IT strategic planning is a core capability of an organization's IT Operating Model (ITOM).
  • Strategy Development is a core step included in the ITOM lifecycle for capability improvement.
  • conventional approaches to IT strategic planning are manually intensive which leads to inefficiency and large expense.
  • traditional IT strategic planning approaches require human input and facilitation, they are also prone to human error, procrastination and mistake which increase inefficiency and expense.
  • the innovation disclosed and claimed herein in one aspect thereof, comprises IT (information technology) strategic management systems (and corresponding methodologies) that enhance efficiency and effectiveness of IT planning processes and projects.
  • the systems commence with a review of current IT state and strategy influencers.
  • the state is analyzed to establish (or alternatively, to update) a strategy summary.
  • the systems are enabled by specialized computer-implemented components that gather, search, retrieve, solicit, analyze, transform, present, and communicate information related to strategic IT summaries.
  • strategists participate in strategy collaboration sessions to refine and/or adapt strategies as desired or appropriate.
  • the strategy can be presented to leadership for approval and subsequently communicated or deployed to team members and/or stakeholders.
  • the subject innovation provides mechanisms and components by which organizations can improve efficiency, effectiveness, and performance in developing and implementing IT process strategies.
  • FIG. 1 illustrates an example strategic planning management system in accordance with aspects of the innovation.
  • FIG. 2 illustrates an example flow chart of procedures that facilitate assessment in accordance with an aspect of the innovation.
  • FIG. 3 illustrates an example flow chart of procedures that facilitate analysis in accordance with an aspect of the innovation.
  • FIG. 4 illustrates an example flow chart of procedures that facilitate summary management in accordance with an aspect of the innovation.
  • FIG. 5 illustrates an example flow chart of procedures that facilitate collaboration in accordance with an aspect of the innovation.
  • FIG. 6 illustrates an example flow chart of procedures that facilitate approval management in accordance with an aspect of the innovation.
  • FIG. 7 illustrates an example flow chart of procedures that facilitate deployment in accordance with an aspect of the innovation.
  • FIG. 8 illustrates an example team site home page in accordance with an aspect of the innovation.
  • FIG. 9 illustrates an example search user interface (UI) in accordance with an aspect of the innovation.
  • FIG. 10 illustrates an example strategy search in accordance with an aspect of the innovation.
  • FIGS. 11A & B illustrate an example UI for viewing strategies in accordance with an aspect of the innovation.
  • FIGS. 12A & B illustrate an example capabilities UI in accordance with an aspect of the innovation.
  • FIG. 13 illustrates an example UI instructions page for creating and editing strategy summaries in accordance with an aspect of the innovation.
  • FIG. 14 illustrates an example detail strategy view UI in accordance with aspects of the innovation.
  • FIG. 15 illustrates an example home page that illustrates documentation links in accordance with aspects of the innovation.
  • FIG. 16 illustrates an example portion of a strategy template in accordance with an aspect of the innovation.
  • FIG. 17 illustrates a block diagram of a computer operable to execute the disclosed architecture.
  • Artifact refers to an object produced or shaped by human craft. It is used in this documentation to refer to tools or documents.
  • Influencers refer to internal and external factors that influence IT (information technology) strategic planning decisions. Some examples of internal influencers are corporate goals, business partner goals, and security considerations. External influencers include industry trends, emerging technology, and peer comparisons, among others.
  • IT Operating Model refers to a model that represents a way enterprise IT operates as a high-performing services provider. It provides the foundational structures necessary for operating, managing, and evolving IT as the business and environment change.
  • IT Strategy refers to a business-driven strategy based on a predetermined, defined, or inferred set of inputs and drivers. It describes how technology will support enterprise business strategies. Some principal purposes are to create understanding, to promote interaction, and ultimately to receive IT governance approval. The success of the overall IT Strategy relies on the cumulative effect of multiple underlying supporting strategies produced by the IT Capability and Function groups.
  • IT Strategic Planning refers to a core capability of the IT Operating Model (ITOM), and Strategy Development is a core step included in the ITOM lifecycle for capability improvement.
  • IT defines the capability of IT Strategic Planning as the process of translating company priorities, in conjunction with business partner objectives, to build value-focused technology offerings that are aligned with business services.
  • the broad IT strategy will serve as a foundation for designing sound IT products and services.
  • Strategy refers to a long-term (or short-term) plan of action designed to achieve a set of business priorities or goals.
  • An organization's strategy can provide guidance for defining functional and divisional plans.
  • Strategic Planning generally refers to an organization's process of defining its strategy and making decisions on allocating its resources to pursue this strategy, including its capital and its people.
  • the IT Strategic Planning toolkit is a group of tools designed to facilitate the Strategic Planning Process.
  • the IT Strategic Planning toolkit can include at least five IT Strategic Planning components and two data repositories:
  • Vision Statement refers to a declaration of what the organization wants to become. IT's vision statement describes the future sought to create in support of the corporate priorities and business strategies, goals, and objectives.
  • Strategy Map is a diagram that describes how an organization creates value by connecting strategic objectives in explicit cause-and-effect relationship with each other in Balance ScoreCard objectives (e.g., financial, customer, processes, learning, and growth).
  • Balance ScoreCard objectives e.g., financial, customer, processes, learning, and growth.
  • IT Governance refers to the responsibility of the board of directors, leaders, and executive management. It consists of the leadership and organizational structures and processes that ensure IT sustains and extends the organization's strategies and objectives.
  • Capability refers to an activity that is important for IT to effectively plan, manage, and deliver technology solutions to business partners and customers. These activities span across the IT organization.
  • a component can be, but is not limited to being, a process running on a specialized processor, a processor, an object, an executable, a thread of execution, a program, a specialized machine and/or a computer.
  • a component can be, but is not limited to being, a process running on a specialized processor, a processor, an object, an executable, a thread of execution, a program, a specialized machine and/or a computer.
  • an application running on a server and the server can be a component.
  • One or more components can reside within a process and/or thread of execution, and a component can be localized on one computer and/or distributed between two or more computers.
  • the term to “infer” or “inference” refer generally to the process of reasoning about or inferring states of the system, environment, and/or user from a set of observations as captured via events and/or data. Inference can be employed to identify a specific context or action, or can generate a probability distribution over states, for example. The inference can be probabilistic—that is, the computation of a probability distribution over states of interest based on a consideration of data and events. Inference can also refer to techniques employed for composing higher-level events from a set of events and/or data. Such inference results in the construction of new events or actions from a set of observed events and/or stored event data, whether or not the events are correlated in close temporal proximity, and whether the events and data come from one or several event and data sources.
  • screen While certain ways of displaying information to users are shown and described with respect to certain figures as screenshots, those skilled in the relevant art will recognize that various other alternatives can be employed.
  • the terms “screen”, “web page”, and “page” are generally used interchangeably herein.
  • the pages or screens are stored and/or transmitted as display descriptions, as graphical user interfaces, or by other methods of depicting information on a screen (whether personal computer, PDA, mobile telephone, or other suitable device, for example) where the layout and information or content to be displayed on the page can be stored in memory, database, or another storage facility.
  • FIG. 1 illustrates a system 100 that enables IT strategic planning management in accordance with aspects of the innovation. While numerous components are illustrated in relation to the IT strategic planning management system 100 , it is to be understood that the innovation as described herein is not intended to be limited merely by the combination of all of the components shown in FIG. 1 . Rather, it is to be appreciated that the combination of components shown in FIG. 1 is but one aspect of the innovation. Similarly, it is to be understood that other aspects can employ a subset of the components (and corresponding processes)—these alternative aspects are to be included within the scope of the innovation and claims appended hereto.
  • system 100 can include an assessment component 102 , analysis component 104 , summary manager component 106 , collaboration component 108 , management approval component 110 , and a deployment component 112 .
  • these components 102 - 112 ) facilitate IT strategic planning management in accordance with aspects.
  • Each of these components ( 102 - 112 ) as well as their respective processes, features, functions and benefits will be described with regard to the figures set forth below. Additionally, it is to be understood that each of the described components can be enabled by way of specialized computers and associated user interfaces (UIs), processors, analyzers, renderings, etc.
  • UIs user interfaces
  • the assessment component 102 facilitates review of current state and strategy influencers. Essentially, this component 102 enables a thorough review of the existing current state and the strategy influencers. It will be understood that these inputs can influence the foundation of the strategy.
  • the analysis component 104 can be employed to evaluate the current state of a business situation. For example, in order to determine the primary focus of a two to three year strategy, an analysis of the current state can be performed to collect findings and priorities.
  • the summary manager component 106 can be used to create and/or update a strategy summary.
  • the summary management component 106 can provide an interface (or series of UIs) which facilitates strategy summary entry.
  • the interface can provide a series of forms and templates that guide a user through various components of an IT strategy summary, which can include:
  • the collaboration component 108 enables users to participate in strategy collaboration sessions. For example, strategists can present their strategies in multiple (e.g., two) sets of collaboration sessions, first with architecture, workforce management and process office representatives and second with capability and function leaders. Capability and function leaders can use information gathered in the sessions as input into their strategies. Here, capability and function leaders will be able to provide input into a subsequent period (e.g., next year's) strategies, for example via adaptable UIs.
  • the management approval component 110 enables users to present their strategy to leadership for approval.
  • leaders and management can have the ability to review strategies developed by the capability and function leaders. Once the strategy has been reviewed and approved, the IT leader can be empowered to execute on the strategy.
  • the deployment component 112 enables approved strategies to be communicated to interested parties.
  • the processes of the deployment component 112 can be employed to further communicate further to team members and stakeholders. Capability leaders will have their strategy linked to their ITOM capability page.
  • FIG. 2 illustrates an example methodology or process flow of an assessment component 102 in accordance with an aspect of the innovation. While, for purposes of simplicity of explanation, the one or more methodologies (or process flows) shown herein, e.g., in the form of a flow chart, are shown and described as a series of acts, it is to be understood and appreciated that the subject innovation is not limited by the order of acts, as some acts may, in accordance with the innovation, occur in a different order and/or concurrently with other acts from that shown and described herein. For example, those skilled in the art will understand and appreciate that a methodology could alternatively be represented as a series of interrelated states or events, such as in a state diagram. Moreover, not all illustrated acts may be required to implement a methodology in accordance with the innovation. Additionally, as described above, the features, functions, and benefits of each act of the process flows can be implemented by way of adaptable UIs and other data processing components.
  • the assessment component 102 enables a user to review a current strategy and to consider a set of influencers on the strategy early in the overall planning process. As illustrated, at 202 , it can be particularly helpful to review previous or existing strategy documentation and strategy performance metrics. This information identifies some basis for changes that should be incorporated in a new strategy. As the strategic planning process is adopted, a user should be able to review the previously documented strategy summary.
  • the current IT strategy can be produced by the strategic planning team and vetted with leadership.
  • the innovation can enhance IT vision, IT guiding principles, business-translated strategies, high-level strategic statements of IT capabilities and functions, and the architecture stack for new development.
  • strategy influencers are reviewed at 206 .
  • strategy influencers can include both internal and external influencers.
  • Example influencers are listed below:
  • a technology planning guide is reviewed at 208 . Given the breadth of technology used within many organizations, it is prudent to become familiar with current technologies. The information outlined in this guide highlights key technology projects and initiatives with the potential to impact planning for the next 6 to 12 months, or other designated time period.
  • the assessment component 102 provides for a search function to view other summaries, for example summaries on the IT strategic planning team site. The user can browse each of the strategies individually, or can perform searches of designated topics as desired.
  • FIG. 3 an example process flow diagram of an analysis component 104 is shown.
  • an analysis of the current situation can be performed.
  • one very effective method is a SWOT analysis (also known as TOWS analysis).
  • the SWOT analysis is a technique for understanding strengths and weaknesses, and for evaluating the opportunities and threats at issue.
  • SWOT so powerful is that it can help uncover opportunities that can be taken advantage of in the planning process. It is to be understood that by understanding the weaknesses of the business, one can manage and eliminate threats that would otherwise be caught unexpectedly. The SWOT analysis can also be applied to competitors. As this is completed, one will begin to see how and where competition is beneficial.
  • SWOT framework By using the SWOT framework to evaluate an organization and applicable competitors, one can start to craft a strategy that distinguishes the competitors. This strategy can assist to compete successfully in the market. Carrying out this analysis will often be illuminating—both in terms of pointing out what needs to be done, and in putting problems into perspective. Strengths and weaknesses are often internal to an organization. Opportunities and threats often relate to external factors. For at least these reasons, the SWOT analysis is sometimes referred to as Internal-External.
  • strengths of the current state are determined. For instance, interface input pages (e.g., adaptable UIs) facilitate entry of specific information.
  • interface input pages e.g., adaptable UIs
  • the following questions can help to determine strengths:
  • weaknesses of current state are determined. For instance, interface input pages facilitate entry of specific information. For example, the following questions will help to determine weaknesses:
  • Opportunities are determined or established at 306 .
  • the following questions can be asked to determine opportunities:
  • a useful approach to looking at opportunities is to look at strengths and determine whether any of the strengths lead to any opportunities. Alternatively, it is helpful to determine whether any opportunities can become available by eliminating weaknesses.
  • threats can be determined by gathering information, for example, by way of interface input screens, forms or templates.
  • queries can help to determine threats:
  • an example process flow of an example summary manager component 106 is shown.
  • a series of input screens and/or templates can be employed to gather information used to establish the summary.
  • the strategy summary template is developed by a team of responsible IT strategists. This team can establish templates that enable a good high-level strategy to be generated by documenting vision, rationale for change, current and future states, and the next-year initiatives and financial projections for the people, technology, process, and delivery dimensions. This example is illustrated in the process flow of FIG. 4 .
  • vision and rationale for change can be documented.
  • input screens, pages, forms, or templates can be provided in order to gather information used to establish the summary.
  • the vision can be a two- to three-year obtainable objective. For instance, what does ‘finished’ look like?
  • the vision can describe the target state of capability, function, or organization that can be accomplished in two to three years, or some other desired period.
  • People perspective is documented (or established) at 404 .
  • People/Workforce Management dimension of capability, function, or organization and using the inputs, drivers and priorities collected as described supra, the future state, the current state, the next-year initiatives, and the financial projections associated with the stated initiatives can be gathered or established.
  • a strategy timeline can be established or documented—the strategy timeline can lay out the initiatives planned for the upcoming year to achieve the documented future state.
  • the timeline can highlight most any dependencies associated with each of the initiatives.
  • the timeline can assist in socializing strategy with leadership and team members responsible for the capability, function, or organizational objectives.
  • strategy metrics can be documented at 414 .
  • metrics can be employed to measure strategies.
  • performance metrics can be employed to enhance effectiveness and success of the strategy.
  • FIG. 5 illustrates an example process flow in accordance with an aspect of the innovation.
  • the strategists, capability, and function leaders can have an opportunity to discuss and review the strategies, architecture, workforce, and process strategies in one or a series of collaboration sessions. These sessions can be facilitated, supplemented or otherwise enabled by way of data presentation (e.g., via UIs). In examples, the data can be organized, ranked, etc. based at least in part upon preference, policy, type, content, etc.
  • the strategists can include the input collected in their strategies for the next year (or other time period).
  • the capability and function leaders can include the input in their refreshed strategy that is to be completed by the end of the year (or other time period).
  • architecture, workforce, and process collaboration sessions can be held.
  • the first collaboration session will occur after the strategy has been approved by their business partner and before the strategies are communicated out more broadly to IT leadership. Most often, this session will include strategists, architecture, workforce and process representatives.
  • capability and function leader collaboration sessions can be held.
  • the strategists can update their strategies based on input collected in the first session before the second collaboration session. In aspects, there can be approximately one month (or other time period) between each collaboration session.
  • the second session will include strategists, capability leaders and function leaders.
  • capability leaders and function leaders will use the information collected as input into their strategies to be updated by the end of the year. In this session the capability and function leaders will have the opportunity to provide input into the subsequent (e.g., next year's) strategies for the different areas.
  • results are documented and updates (if applicable) are applied to the strategy.
  • the strategists, capability leaders, and function leaders will update their strategies based on the input collected (or otherwise determined) in each of the collaborations sessions ( 502 , 504 ).
  • FIG. 6 an example process flow of a management approval component 110 is shown.
  • the strategies developed can be reviewed with leadership for vetting and approval. Function leaders can review their strategies as part of their quarterly functional plan review. Once the strategies are approved, the strategy leader is empowered to execute on the two- to three-year (or other term) strategy and initiatives.
  • a summary presentation can be generated.
  • the strategy can be presented to leadership in a format that is easy to review and decision.
  • the innovation's strategy team site (for example, as shown in the figures that follow) is designed to allow a user to generate a report and an overview map from the strategy summary. Each strategy leader has the ability to enter the strategy content in different formats. Thus, after generating the full strategy report and map, the user can review what is generated to make sure it can be vetted and reviewed easily.
  • content can include bullets or other formatting for better or efficient review.
  • the innovation supports most any report configurations which provide the format for vetting and review. In addition to web-based input pages, it is possible for the content of the strategy summary to be placed in a word processing or other text-based template or form.
  • a summary timeline can be generated (and presented) at 604 .
  • the innovation can generate a timeline from the tasks listed in the initiatives portion of the strategy.
  • a spreadsheet template can be employed to generate a timeline of the initiatives planned to achieve the future strategy.
  • Milestones are summarized at 606 —either within the strategy summary, a word processor template, or in a separate document, important points to the strategy can be summarized. Here, the plans that are most critical to the success of the strategy can be highlighted to leadership.
  • the strategy can be presented to leadership at 608 .
  • the strategic planning team can produce a schedule for vetting and presenting the capability strategies to the CIO/CTO forum.
  • the CTO can have a quarterly review schedule for the functional plans, including the developed functional strategies.
  • the user can be proactive in determining when they will be required to review strategies so as to have adequate time to complete and socialize your strategy components.
  • Results are documented and updates applied at process stage 610 .
  • the strategy can be posted (or re-posted) to the strategic planning team site. Additionally, it is possible to verify or ensure that it can be accessed from the different access points.
  • each capability can have a capability site with a link to its strategy. The strategy link can connect to the strategy summary stored on the strategic planning team site. If it is decided to complete a detailed strategy document that too can be stored on the strategic planning team site—an example team site is shown in the figures that follow.
  • the deployment component 112 enables strategies to be communicated intra- and inter-organization as desired or appropriate. This communication can facilitate collaboration and enhance integration of strategies.
  • a strategy is posted, for example upon a team accessible site.
  • the site can be accessible via an enterprise intranet, the Internet, or other network.
  • the strategy can be posted to the team site, but if it was chosen to develop the strategy using another documentation tool (e.g., Web form, word processor template . . . ), the content can be posted into a strategy summary template or to the team site.
  • another documentation tool e.g., Web form, word processor template . . .
  • the content can be posted into a strategy summary template or to the team site. It will be understood that, by adding to the strategy summary repository, other IT leaders can search, retrieve, and view the strategy.
  • the strategy can be linked to accessible sites at 704 .
  • links could be added for the new or updated strategy.
  • metadata and other tags together with indexing can be applied to a strategy to facilitate effective search and retrieval.
  • a communications plan can be created and/or updated at 706 .
  • the plan can be communicated based upon a user or organizational preference or policy.
  • the user can develop a communication plan for communicating deliverables and changes, if applicable.
  • the method in which the user would like to communicate the strategy to leadership, team members, and more broadly in the organization can be added to the plan.
  • the communications plan can be executed—Following the communications plan, which should take into account the collaboration with other organizations, capabilities, and functions, appropriate communications can be sent out to appropriate stakeholders, leaders, etc.
  • the strategy can be communicated at 710 .
  • the strategic planning team can assist in communicating out the approved strategy by documenting and distributing the highlights in an IT communication (e.g., newsletter, group mailing, electronic mail, bulletin board . . . ).
  • each component ( 102 - 112 ) the functionality of each of these components ( 102 - 112 ) enable data collection, analysis, manipulation, transformation, search/retrieval, presentation, etc. as described with regard to each of the processes.
  • data can be automatically input and collected by way of templates and forms.
  • adaptable forms and templates can be incorporated.
  • the data can be analyzed whereby a strategy or summary can be generated, stored, and communicated as appropriate or desired.
  • the information can be generated, stored, and/or communicated based at least in part upon a preference, policy, or inference.
  • FIG. 8 illustrates a link on an example team site page 800 which launches instructions to create and edit strategy summaries.
  • a user is able to navigate the UI screens in order to establish strategy plans and summaries.
  • the components of system 100 of FIG. 1 are used to establish the appropriate interfaces as well as to effect the backend processing and transformations associated therewith.
  • FIG. 9 illustrates an example search UI 900 in accordance with aspects of the innovation.
  • One of the primary objectives of creating the strategy repository is to facilitate searches across strategy summaries and detailed strategy documents.
  • the search capability is located at the top right corner of the IT strategic planning team site as shown in FIG. 9 .
  • FIG. 10 An example search is illustrated in FIG. 10 .
  • a search screen 1000 illustrates a search for items (e.g., summaries and documents) that contain the word “Oxmoor”.
  • items e.g., summaries and documents
  • screen print 1000 a list of summary forms and documents that contain the search criteria (e.g., “Oxmoor”) are retrieved and rendered to the by way of the UI.
  • search, retrieval, and rendering functionality is effected by way of the components of system 100 of FIG. 1 .
  • FIGS. 11A & B and 12 A & B illustrate UI screen prints 1100 and 1200 respectively that relate to viewing, reporting, and printing strategies.
  • tabular views can be accessible from the home page.
  • a user can expand the types of strategies documented and view the core components of the strategy by selecting each of the view links.
  • the user can also view and print a full report of the strategy. Access to the strategy overview maps and strategy timeline can also be added to these views as desired.
  • FIG. 13 illustrates an example UI screen 1300 that facilitates creating and updating strategies in accordance with aspects of the innovation.
  • the Strategy Summary Creation & Updates link (UI 1300 ) on the home page can be used rather than the tabular views.
  • the team sites can be equipped with views set up specifically for creating and editing forms created within the team site as appropriate or desired. As will be understood, the navigation is often clearer using these views.
  • the tabular views provide access and viewing of the strategy content.
  • UI 1300 After the user selects the Strategy Summary Creation & Updates link on the left navigation menu (as illustrated in UI 1300 ), a list of strategies will appear. To access an existing strategy, the user can select the icon to the left of the strategy title. If it is desired to create a new strategy, the new item option at the top of the page above the list of strategies can be selected. The list shows the most recently updated strategies, thus, it is possible to be able to easily find a desired strategy. It is to be appreciated that the configuration and layout of UI 1300 (as well as other UIs described herein) are examples of the features, functions, and benefits of particular aspects of the innovation. As such, these specific aspects are not intended to limit the innovation in any manner. Rather, other aspects exist that include alternative content and configurations—these alternative aspects are to be included within the scope of the innovation and claims appended hereto.
  • FIG. 14 an example UI 1400 that facilitates viewing detailed strategies in accordance with aspects of the innovation is shown.
  • a user can select the Detailed Strategy Documents link located on the top left corner of the IT Strategic Planning team site as illustrated in UI 800 of FIG. 8 .
  • the detailed documents can be located in folders broken down by type of strategy.
  • FIG. 15 illustrates an example home page UI 1500 that makes available strategy documentation links.
  • a user can employ the links on the rightmost section of the IT Strategic Planning home page ( 1500 ). Additionally, other useful links can be added by selecting the Add new link option as shown in UI 1500 . The user can also communicate an additional request to one of the strategic planning contacts listed in the introduction of this document.
  • Web-based templates can be employed to enter or gather strategic planning data.
  • word processing or other text-based templates or forms can be employed to gather data related to IT planning.
  • An example portion ( 1600 ) of a template or form is illustrated in FIG. 16 .
  • FIG. 17 there is illustrated a block diagram of a computer operable to execute the disclosed architecture.
  • FIG. 17 and the following discussion are intended to provide a brief, general description of a suitable computing environment 1700 in which the various aspects of the innovation can be implemented. While the innovation has been described above in the general context of computer-executable instructions that may run on one or more computers, those skilled in the art will recognize that the innovation also can be implemented in combination with other program modules and/or as a combination of hardware and software.
  • program modules include routines, programs, components, data structures, etc., that perform particular tasks or implement particular abstract data types.
  • inventive methods can be practiced with other computer system configurations, including single-processor or multiprocessor computer systems, minicomputers, mainframe computers, as well as personal computers, hand-held computing devices, microprocessor-based or programmable consumer electronics, and the like, each of which can be operatively coupled to one or more associated devices.
  • the illustrated aspects of the innovation may also be practiced in distributed computing environments where certain tasks are performed by remote processing devices that are linked through a communications network.
  • program modules can be located in both local and remote memory storage devices.
  • Computer-readable media can be any available media that can be accessed by the computer and includes both volatile and nonvolatile media, removable and non-removable media.
  • Computer-readable media can comprise computer storage media and communication media.
  • Computer storage media includes both volatile and nonvolatile, removable and non-removable media implemented in any method or technology for storage of information such as computer-readable instructions, data structures, program modules, or other data.
  • Computer storage media includes, but is not limited to, RAM, ROM, EEPROM, flash memory or other memory technology, CD-ROM, digital versatile disk (DVD) or other optical disk storage, magnetic cassettes, magnetic tape, magnetic disk storage or other magnetic storage devices, or any other medium which can be used to store the desired information and which can be accessed by the computer.
  • Communication media typically embodies computer-readable instructions, data structures, program modules, or other data in a modulated data signal such as a carrier wave or other transport mechanism, and includes any information delivery media.
  • modulated data signal means a signal that has one or more of its characteristics set or changed in such a manner as to encode information in the signal.
  • communication media includes wired media such as a wired network or direct-wired connection, and wireless media such as acoustic, RF, infrared and other wireless media. Combinations of the any of the above should also be included within the scope of computer-readable media.
  • the exemplary environment 1700 for implementing various aspects of the innovation includes a computer 1702 , the computer 1702 including a processing unit 1704 , a system memory 1706 and a system bus 1708 .
  • the system bus 1708 couples system components including, but not limited to, the system memory 1706 to the processing unit 1704 .
  • the processing unit 1704 can be any of various commercially available processors. Dual microprocessors and other multi-processor architectures may also be employed as the processing unit 1704 .
  • the system bus 1708 can be any of several types of bus structure that may further interconnect to a memory bus (with or without a memory controller), a peripheral bus, and a local bus using any of a variety of commercially available bus architectures.
  • the system memory 1706 includes read-only memory (ROM) 1710 and random access memory (RAM) 1712 .
  • ROM read-only memory
  • RAM random access memory
  • a basic input/output system (BIOS) is stored in a non-volatile memory 1710 such as ROM, EPROM, EEPROM, which BIOS contains the basic routines that help to transfer information between elements within the computer 1702 , such as during start-up.
  • the RAM 1712 can also include a high-speed RAM such as static RAM for caching data.
  • the computer 1702 further includes an internal hard disk drive (HDD) 1714 (e.g., EIDE, SATA), which internal hard disk drive 1714 may also be configured for external use in a suitable chassis (not shown), a magnetic floppy disk drive (FDD) 1716 , (e.g., to read from or write to a removable diskette 1718 ) and an optical disk drive 1720 , (e.g., reading a CD-ROM disk 1722 or, to read from or write to other high capacity optical media such as the DVD).
  • the hard disk drive 1714 , magnetic disk drive 1716 , and optical disk drive 1720 can be connected to the system bus 1708 by a hard disk drive interface 1724 , a magnetic disk drive interface 1726 and an optical drive interface 1728 , respectively.
  • the interface 1724 for external drive implementations includes at least one or both of Universal Serial Bus (USB) and IEEE 1394 interface technologies. Other external drive connection technologies are within contemplation of the subject innovation.
  • the drives and their associated computer-readable media provide nonvolatile storage of data, data structures, computer-executable instructions, and so forth.
  • the drives and media accommodate the storage of any data in a suitable digital format.
  • computer-readable media refers to a HDD, a removable magnetic diskette, and a removable optical media such as a CD or DVD, it should be appreciated by those skilled in the art that other types of media which are readable by a computer, such as zip drives, magnetic cassettes, flash memory cards, cartridges, and the like, may also be used in the exemplary operating environment, and further, that any such media may contain computer-executable instructions for performing the methods of the innovation.
  • a number of program modules can be stored in the drives and RAM 1712 , including an operating system 1730 , one or more application programs 1732 , other program modules 1734 , and program data 1736 . All or portions of the operating system, applications, modules, and/or data can also be cached in the RAM 1712 . It is appreciated that the innovation can be implemented with various commercially available operating systems or combinations of operating systems.
  • a user can enter commands and information into the computer 1702 through one or more wired/wireless input devices, e.g., a keyboard 1738 and a pointing device, such as a mouse 1740 .
  • Other input devices may include a microphone, an IR remote control, a joystick, a game pad, a stylus pen, touch screen, or the like.
  • These and other input devices are often connected to the processing unit 1704 through an input device interface 1742 that is coupled to the system bus 1708 , but can be connected by other interfaces, such as a parallel port, an IEEE 1394 serial port, a game port, a USB port, an IR interface, etc.
  • a monitor 1744 or other type of display device is also connected to the system bus 1708 via an interface, such as a video adapter 1746 .
  • a computer typically includes other peripheral output devices (not shown), such as speakers, printers, etc.
  • the computer 1702 may operate in a networked environment using logical connections via wired and/or wireless communications to one or more remote computers, such as a remote computer(s) 1748 .
  • the remote computer(s) 1748 can be a workstation, a server computer, a router, a personal computer, portable computer, microprocessor-based entertainment appliance, a peer device, or other common network node, and typically includes many or all of the elements described relative to the computer 1702 , although, for purposes of brevity, only a memory/storage device 1750 is illustrated.
  • the logical connections depicted include wired/wireless connectivity to a local area network (LAN) 1752 and/or larger networks, e.g., a wide area network (WAN) 1754 .
  • LAN and WAN networking environments are commonplace in offices and companies, and facilitate enterprise-wide computer networks, such as intranets, all of which may connect to a global communications network, e.g., the Internet.
  • the computer 1702 When used in a LAN networking environment, the computer 1702 is connected to the local network 1752 through a wired and/or wireless communication network interface or adapter 1756 .
  • the adapter 1756 may facilitate wired or wireless communication to the LAN 1752 , which may also include a wireless access point disposed thereon for communicating with the wireless adapter 1756 .
  • the computer 1702 can include a modem 1758 , or is connected to a communications server on the WAN 1754 , or has other means for establishing communications over the WAN 1754 , such as by way of the Internet.
  • the modem 1758 which can be internal or external and a wired or wireless device, is connected to the system bus 1708 via the serial port interface 1742 .
  • program modules depicted relative to the computer 1702 can be stored in the remote memory/storage device 1750 . It will be appreciated that the network connections shown are exemplary and other means of establishing a communications link between the computers can be used.
  • the computer 1702 is operable to communicate with any wireless devices or entities operatively disposed in wireless communication, e.g., a printer, scanner, desktop and/or portable computer, portable data assistant, communications satellite, any piece of equipment or location associated with a wirelessly detectable tag (e.g., a kiosk, news stand, restroom), and telephone.
  • any wireless devices or entities operatively disposed in wireless communication e.g., a printer, scanner, desktop and/or portable computer, portable data assistant, communications satellite, any piece of equipment or location associated with a wirelessly detectable tag (e.g., a kiosk, news stand, restroom), and telephone.
  • the communication can be a predefined structure as with a conventional network or simply an ad hoc communication between at least two devices.
  • Wi-Fi Wireless Fidelity
  • Wi-Fi is a wireless technology similar to that used in a cell phone that enables such devices, e.g., computers, to send and receive data indoors and out; anywhere within the range of a base station.
  • Wi-Fi networks use radio technologies called IEEE 802.11(a, b, g, etc.) to provide secure, reliable, fast wireless connectivity.
  • a Wi-Fi network can be used to connect computers to each other, to the Internet, and to wired networks (which use IEEE 802.3 or Ethernet).
  • Wi-Fi networks operate in the unlicensed 2.4 and 5 GHz radio bands, at an 11 Mbps (802.11a) or 54 Mbps (802.11b) data rate, for example, or with products that contain both bands (dual band), so the networks can provide real-world performance similar to the basic 10BaseT wired Ethernet networks used in many offices.

Abstract

An information technology (IT) strategic management system (and corresponding methodology) that enhances efficiency and effectiveness of IT planning processes and projects is provided. In particular aspects, the systems commence with a review of current IT state and strategy influencers. The state is analyzed to establish (or alternatively, to update) a strategy summary. The strategy summary can be presented for leadership approval and subsequently communicated to stakeholders for deployment.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application claims priority to and is a continuation of U.S. Non-Provisional patent application Ser. No. 12/342,052 (Attorney Docket No. 106750.34US) entitled “STRATEGIC PLANNING MANAGEMENT”, filed on Dec. 22, 2008. The entirety of the above-noted application is incorporated by reference herein.
  • BACKGROUND
  • Today, in many corporations, IT (information technology) defines the capability of IT strategic planning as a process of translating company priorities, in conjunction with business partner objectives, to build value-focused technology offerings that are aligned with business services. This broad IT strategy can serve as a foundation for designing sound IT products and services.
  • Most often, IT business strategy is business-driven, based upon a defined set of inputs and drivers. It describes how technology will support an organization's business goals and strategies. One principal purpose is to create understanding, to promote interaction, and ultimately to receive IT governance approval. Approval of capability and function strategies empowers the organizational leaders (e.g., Accountable Capability Leaders (ACLs) and Function Leaders) to execute on their strategies.
  • For example, the ACLs are usually accountable for the a large number of core capabilities of IT and work with other responsible leaders to ensure there are single processes, consolidated policies/standards, benchmarking measures and a strategic plan in place. ACLs span across the IT organization. The Function Leaders are leaders within Technology Services and organizationally accountable for the core functions of Tech Services.
  • IT strategic planning is a core capability of an organization's IT Operating Model (ITOM). Strategy Development is a core step included in the ITOM lifecycle for capability improvement. Unfortunately, conventional approaches to IT strategic planning are manually intensive which leads to inefficiency and large expense. Additionally, because traditional IT strategic planning approaches require human input and facilitation, they are also prone to human error, procrastination and mistake which increase inefficiency and expense.
  • SUMMARY
  • The following presents a simplified summary of the innovation in order to provide a basic understanding of some aspects of the innovation. This summary is not an extensive overview of the innovation. It is not intended to identify key/critical elements of the innovation or to delineate the scope of the innovation. Its sole purpose is to present some concepts of the innovation in a simplified form as a prelude to the more detailed description that is presented later.
  • The innovation disclosed and claimed herein, in one aspect thereof, comprises IT (information technology) strategic management systems (and corresponding methodologies) that enhance efficiency and effectiveness of IT planning processes and projects. In particular aspects, the systems commence with a review of current IT state and strategy influencers. The state is analyzed to establish (or alternatively, to update) a strategy summary. The systems are enabled by specialized computer-implemented components that gather, search, retrieve, solicit, analyze, transform, present, and communicate information related to strategic IT summaries.
  • Via specific components, strategists participate in strategy collaboration sessions to refine and/or adapt strategies as desired or appropriate. The strategy can be presented to leadership for approval and subsequently communicated or deployed to team members and/or stakeholders. The subject innovation provides mechanisms and components by which organizations can improve efficiency, effectiveness, and performance in developing and implementing IT process strategies.
  • To the accomplishment of the foregoing and related ends, certain illustrative aspects of the innovation are described herein in connection with the following description and the annexed drawings. These aspects are indicative, however, of but a few of the various ways in which the principles of the innovation can be employed and the subject innovation is intended to include all such aspects and their equivalents. Other advantages and novel features of the innovation will become apparent from the following detailed description of the innovation when considered in conjunction with the drawings.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • FIG. 1 illustrates an example strategic planning management system in accordance with aspects of the innovation.
  • FIG. 2 illustrates an example flow chart of procedures that facilitate assessment in accordance with an aspect of the innovation.
  • FIG. 3 illustrates an example flow chart of procedures that facilitate analysis in accordance with an aspect of the innovation.
  • FIG. 4 illustrates an example flow chart of procedures that facilitate summary management in accordance with an aspect of the innovation.
  • FIG. 5 illustrates an example flow chart of procedures that facilitate collaboration in accordance with an aspect of the innovation.
  • FIG. 6 illustrates an example flow chart of procedures that facilitate approval management in accordance with an aspect of the innovation.
  • FIG. 7 illustrates an example flow chart of procedures that facilitate deployment in accordance with an aspect of the innovation.
  • FIG. 8 illustrates an example team site home page in accordance with an aspect of the innovation.
  • FIG. 9 illustrates an example search user interface (UI) in accordance with an aspect of the innovation.
  • FIG. 10 illustrates an example strategy search in accordance with an aspect of the innovation.
  • FIGS. 11A & B illustrate an example UI for viewing strategies in accordance with an aspect of the innovation.
  • FIGS. 12A & B illustrate an example capabilities UI in accordance with an aspect of the innovation.
  • FIG. 13 illustrates an example UI instructions page for creating and editing strategy summaries in accordance with an aspect of the innovation.
  • FIG. 14 illustrates an example detail strategy view UI in accordance with aspects of the innovation.
  • FIG. 15 illustrates an example home page that illustrates documentation links in accordance with aspects of the innovation.
  • FIG. 16 illustrates an example portion of a strategy template in accordance with an aspect of the innovation.
  • FIG. 17 illustrates a block diagram of a computer operable to execute the disclosed architecture.
  • DETAILED DESCRIPTION
  • The following terms are used throughout the description, the definitions of which are provided herein to assist in understanding various aspects of the subject innovation.
  • Artifact refers to an object produced or shaped by human craft. It is used in this documentation to refer to tools or documents.
  • Influencers refer to internal and external factors that influence IT (information technology) strategic planning decisions. Some examples of internal influencers are corporate goals, business partner goals, and security considerations. External influencers include industry trends, emerging technology, and peer comparisons, among others.
  • IT Operating Model (ITOM) refers to a model that represents a way enterprise IT operates as a high-performing services provider. It provides the foundational structures necessary for operating, managing, and evolving IT as the business and environment change.
  • IT Strategy refers to a business-driven strategy based on a predetermined, defined, or inferred set of inputs and drivers. It describes how technology will support enterprise business strategies. Some principal purposes are to create understanding, to promote interaction, and ultimately to receive IT governance approval. The success of the overall IT Strategy relies on the cumulative effect of multiple underlying supporting strategies produced by the IT Capability and Function groups.
  • IT Strategic Planning refers to a core capability of the IT Operating Model (ITOM), and Strategy Development is a core step included in the ITOM lifecycle for capability improvement. IT defines the capability of IT Strategic Planning as the process of translating company priorities, in conjunction with business partner objectives, to build value-focused technology offerings that are aligned with business services. The broad IT strategy will serve as a foundation for designing sound IT products and services.
  • Strategy refers to a long-term (or short-term) plan of action designed to achieve a set of business priorities or goals. An organization's strategy can provide guidance for defining functional and divisional plans.
  • Strategic Planning generally refers to an organization's process of defining its strategy and making decisions on allocating its resources to pursue this strategy, including its capital and its people.
  • Toolkit is a group of tools designed to facilitate the Strategic Planning Process. In aspects, the IT Strategic Planning toolkit can include at least five IT Strategic Planning components and two data repositories:
      • IT Strategic Planning Introduction
      • IT Strategic Planning Toolkit
      • IT Strategy
      • IT Strategy Influencers
      • Technology Planning Guide
      • IT Strategy Summaries
      • Detailed IT Strategies
  • Vision Statement refers to a declaration of what the organization wants to become. IT's vision statement describes the future sought to create in support of the corporate priorities and business strategies, goals, and objectives.
  • Strategy Map is a diagram that describes how an organization creates value by connecting strategic objectives in explicit cause-and-effect relationship with each other in Balance ScoreCard objectives (e.g., financial, customer, processes, learning, and growth).
  • IT Governance refers to the responsibility of the board of directors, leaders, and executive management. It consists of the leadership and organizational structures and processes that ensure IT sustains and extends the organization's strategies and objectives.
  • Capability refers to an activity that is important for IT to effectively plan, manage, and deliver technology solutions to business partners and customers. These activities span across the IT organization.
  • The innovation is now described with reference to the drawings, wherein like reference numerals are used to refer to like elements throughout. In the following description, for purposes of explanation, numerous specific details are set forth in order to provide a thorough understanding of the subject innovation. It may be evident, however, that the innovation can be practiced without these specific details. In other instances, well-known structures and devices are shown in block diagram form in order to facilitate describing the innovation.
  • As used in this application, the terms “component” and “system” are intended to refer to a computer-related entity, either hardware, a combination of hardware and software, software, or software in execution. For example, a component can be, but is not limited to being, a process running on a specialized processor, a processor, an object, an executable, a thread of execution, a program, a specialized machine and/or a computer. By way of illustration, both an application running on a server and the server can be a component. One or more components can reside within a process and/or thread of execution, and a component can be localized on one computer and/or distributed between two or more computers.
  • As used herein, the term to “infer” or “inference” refer generally to the process of reasoning about or inferring states of the system, environment, and/or user from a set of observations as captured via events and/or data. Inference can be employed to identify a specific context or action, or can generate a probability distribution over states, for example. The inference can be probabilistic—that is, the computation of a probability distribution over states of interest based on a consideration of data and events. Inference can also refer to techniques employed for composing higher-level events from a set of events and/or data. Such inference results in the construction of new events or actions from a set of observed events and/or stored event data, whether or not the events are correlated in close temporal proximity, and whether the events and data come from one or several event and data sources.
  • While certain ways of displaying information to users are shown and described with respect to certain figures as screenshots, those skilled in the relevant art will recognize that various other alternatives can be employed. The terms “screen”, “web page”, and “page” are generally used interchangeably herein. The pages or screens are stored and/or transmitted as display descriptions, as graphical user interfaces, or by other methods of depicting information on a screen (whether personal computer, PDA, mobile telephone, or other suitable device, for example) where the layout and information or content to be displayed on the page can be stored in memory, database, or another storage facility.
  • Referring initially to the drawings, FIG. 1 illustrates a system 100 that enables IT strategic planning management in accordance with aspects of the innovation. While numerous components are illustrated in relation to the IT strategic planning management system 100, it is to be understood that the innovation as described herein is not intended to be limited merely by the combination of all of the components shown in FIG. 1. Rather, it is to be appreciated that the combination of components shown in FIG. 1 is but one aspect of the innovation. Similarly, it is to be understood that other aspects can employ a subset of the components (and corresponding processes)—these alternative aspects are to be included within the scope of the innovation and claims appended hereto.
  • Generally, system 100 can include an assessment component 102, analysis component 104, summary manager component 106, collaboration component 108, management approval component 110, and a deployment component 112. Together, these components (102-112) facilitate IT strategic planning management in accordance with aspects. Each of these components (102-112) as well as their respective processes, features, functions and benefits will be described with regard to the figures set forth below. Additionally, it is to be understood that each of the described components can be enabled by way of specialized computers and associated user interfaces (UIs), processors, analyzers, renderings, etc.
  • The assessment component 102 facilitates review of current state and strategy influencers. Essentially, this component 102 enables a thorough review of the existing current state and the strategy influencers. It will be understood that these inputs can influence the foundation of the strategy.
  • The analysis component 104 can be employed to evaluate the current state of a business situation. For example, in order to determine the primary focus of a two to three year strategy, an analysis of the current state can be performed to collect findings and priorities.
  • The summary manager component 106 can be used to create and/or update a strategy summary. In operation, the summary management component 106 can provide an interface (or series of UIs) which facilitates strategy summary entry. Essentially, the interface can provide a series of forms and templates that guide a user through various components of an IT strategy summary, which can include:
      • Vision and Rationale for Change;
      • Current State as it relates to People, Technology, Process & Delivery;
      • Future State as it relates to People, Technology, Process & Delivery;
      • Upcoming Year Initiatives and Financial Projections as they relate to People, Technology, Process & Delivery;
      • Strategy Timeline Strategy Overview for presentation; and
      • Strategy Metrics.
  • It is to be understood that the series of forms, templates and UIs used in connection with the innovation as described herein can adapt based upon user input and analysis thereof. In other words, as a user inputs data, subsequent UIs can be selected based at least in part upon the content of the date inputted into a previous UI.
  • The collaboration component 108 enables users to participate in strategy collaboration sessions. For example, strategists can present their strategies in multiple (e.g., two) sets of collaboration sessions, first with architecture, workforce management and process office representatives and second with capability and function leaders. Capability and function leaders can use information gathered in the sessions as input into their strategies. Here, capability and function leaders will be able to provide input into a subsequent period (e.g., next year's) strategies, for example via adaptable UIs.
  • The management approval component 110 enables users to present their strategy to leadership for approval. In other words, leaders and management can have the ability to review strategies developed by the capability and function leaders. Once the strategy has been reviewed and approved, the IT leader can be empowered to execute on the strategy.
  • The deployment component 112 enables approved strategies to be communicated to interested parties. Here, once the strategy has been approved by leadership, the processes of the deployment component 112 can be employed to further communicate further to team members and stakeholders. Capability leaders will have their strategy linked to their ITOM capability page.
  • FIG. 2 illustrates an example methodology or process flow of an assessment component 102 in accordance with an aspect of the innovation. While, for purposes of simplicity of explanation, the one or more methodologies (or process flows) shown herein, e.g., in the form of a flow chart, are shown and described as a series of acts, it is to be understood and appreciated that the subject innovation is not limited by the order of acts, as some acts may, in accordance with the innovation, occur in a different order and/or concurrently with other acts from that shown and described herein. For example, those skilled in the art will understand and appreciate that a methodology could alternatively be represented as a series of interrelated states or events, such as in a state diagram. Moreover, not all illustrated acts may be required to implement a methodology in accordance with the innovation. Additionally, as described above, the features, functions, and benefits of each act of the process flows can be implemented by way of adaptable UIs and other data processing components.
  • Generally, the assessment component 102 enables a user to review a current strategy and to consider a set of influencers on the strategy early in the overall planning process. As illustrated, at 202, it can be particularly helpful to review previous or existing strategy documentation and strategy performance metrics. This information identifies some basis for changes that should be incorporated in a new strategy. As the strategic planning process is adopted, a user should be able to review the previously documented strategy summary.
  • At 204, the current IT strategy can be produced by the strategic planning team and vetted with leadership. As described herein, the innovation can enhance IT vision, IT guiding principles, business-translated strategies, high-level strategic statements of IT capabilities and functions, and the architecture stack for new development.
  • Strategy influencers are reviewed at 206. Here, it is to be understood that strategy influencers can include both internal and external influencers. Example influencers are listed below:
  • Internal Influencer Checklist:
      • Corporate Priorities, Business Strategies and IT Goals & Objectives;
      • Recent IT Performance;
      • Current IT Challenges;
      • Capability & Function Analysis;
      • Risk Analysis:
      • Financial Analysis;
      • Workforce Management Analysis;
      • Application Portfolio Analysis;
      • Policies & Standards;
      • Quality Management; and
      • Existing Future State Process Models.
  • External Influencer Checklist:
      • Industry Trends & Emerging Technology;
      • Globalization;
      • Vendor Management; and
      • Benchmarking.
  • A technology planning guide is reviewed at 208. Given the breadth of technology used within many organizations, it is prudent to become familiar with current technologies. The information outlined in this guide highlights key technology projects and initiatives with the potential to impact planning for the next 6 to 12 months, or other designated time period.
  • Finally, with regard to the assessment component 102, related strategy summaries can be reviewed at 210. To understand the perspective and future state plans of closely related capabilities and functions, a user should review their strategy summaries. Accordingly, the assessment component 102 provides for a search function to view other summaries, for example summaries on the IT strategic planning team site. The user can browse each of the strategies individually, or can perform searches of designated topics as desired.
  • Turning now to FIG. 3, an example process flow diagram of an analysis component 104 is shown. To determine the primary focus (e.g., priorities) of the future state, an analysis of the current situation can be performed. In one aspect of the innovation, one very effective method is a SWOT analysis (also known as TOWS analysis). The SWOT analysis is a technique for understanding strengths and weaknesses, and for evaluating the opportunities and threats at issue.
  • What makes SWOT particularly powerful is that it can help uncover opportunities that can be taken advantage of in the planning process. It is to be understood that by understanding the weaknesses of the business, one can manage and eliminate threats that would otherwise be caught unexpectedly. The SWOT analysis can also be applied to competitors. As this is completed, one will begin to see how and where competition is beneficial.
  • By using the SWOT framework to evaluate an organization and applicable competitors, one can start to craft a strategy that distinguishes the competitors. This strategy can assist to compete successfully in the market. Carrying out this analysis will often be illuminating—both in terms of pointing out what needs to be done, and in putting problems into perspective. Strengths and weaknesses are often internal to an organization. Opportunities and threats often relate to external factors. For at least these reasons, the SWOT analysis is sometimes referred to as Internal-External.
  • At 302, strengths of the current state are determined. For instance, interface input pages (e.g., adaptable UIs) facilitate entry of specific information. By way of example, the following questions can help to determine strengths:
      • What advantages does your organization, capability, or function have?
      • What do you do better than anyone else?
      • What unique or lowest-cost resources do you have access to?
      • What do people in your market see as your strengths?
  • These questions can be considered from an internal perspective, and from the point of view of customers and people in the market. It is to be appreciated that, in looking at strengths, it is beneficial to think about them in relation to competitors. For example, if all competitors provide high-quality products, then a high-quality production process is not a strength in the market; it is often considered a necessity.
  • At 304, weaknesses of current state are determined. For instance, interface input pages facilitate entry of specific information. For example, the following questions will help to determine weaknesses:
      • What could you improve?
      • What should you avoid?
      • What are people in your market likely to see as weaknesses?
  • Similar to strengths, weaknesses can be considered from an internal and external basis—for example, do other people seem to perceive weaknesses that you do not see? Are your competitors doing any better than you? In establishing a planning strategy, it is particularly helpful to be realistic upon the planning stage to therefore face any unpleasant truths early in the process.
  • Opportunities are determined or established at 306. Here, the following questions can be asked to determine opportunities:
      • Where are the good opportunities facing you?
      • What interesting trends are you aware of?
  • It will be understood that useful opportunities can come from:
      • Changes in technology and markets on both a broad and narrow scale;
      • Changes in government policy related to your field;
      • Changes in social patterns, population profiles, lifestyle changes, etc.; and
      • Local events.
  • A useful approach to looking at opportunities is to look at strengths and determine whether any of the strengths lead to any opportunities. Alternatively, it is helpful to determine whether any opportunities can become available by eliminating weaknesses.
  • Continuing with the discussion of the example process flow of the analysis component 104, at 308, threats can be determined by gathering information, for example, by way of interface input screens, forms or templates. In one aspect, the following queries can help to determine threats:
      • What obstacles do you face?
      • What is your competition doing?
      • Are the required specifications for your job, products or services changing?
      • Is changing technology threatening your position?
      • Are there issues with the costs of your services?
      • Could any of your weaknesses seriously threaten your business?
  • After reviewing all the inputs and drivers of the strategy, a list of the key goals and objectives or priorities that are sought to achieve in the next two to three years (or other time period) can be compiled at 310. This list of priorities will aid in the creation of the future state strategy statements.
  • Referring now to FIG. 4, an example process flow of an example summary manager component 106 is shown. In accordance with the summary manager component 106, a series of input screens and/or templates can be employed to gather information used to establish the summary. In one aspect, the strategy summary template is developed by a team of responsible IT strategists. This team can establish templates that enable a good high-level strategy to be generated by documenting vision, rationale for change, current and future states, and the next-year initiatives and financial projections for the people, technology, process, and delivery dimensions. This example is illustrated in the process flow of FIG. 4.
  • At 402, vision and rationale for change can be documented. In an example, input screens, pages, forms, or templates can be provided in order to gather information used to establish the summary. The vision can be a two- to three-year obtainable objective. For instance, what does ‘finished’ look like? The vision can describe the target state of capability, function, or organization that can be accomplished in two to three years, or some other desired period.
  • People perspective is documented (or established) at 404. Considering the People/Workforce Management dimension of capability, function, or organization and using the inputs, drivers and priorities collected as described supra, the future state, the current state, the next-year initiatives, and the financial projections associated with the stated initiatives can be gathered or established.
      • The future state describes major changes required to enable target workforce objectives to become a reality;
      • The current state describes the current situation with regard to workforce;
      • The next-year initiatives articulate the high-level tasks that will lead to tangible results, ultimately achieving the target/future state (e.g., consider 90-day increments); and
      • The financial projections include the statements of costs and savings, depicting the projected efficiencies or costs related to workforce throughout the vision cycle.
  • Considering the technology dimension of capability, function, or organization and using the inputs, drivers, and priorities collected in the previous section of this document, the future state, current state, next-year initiatives, and the financial projections associated with the stated initiatives at 406, information can be gathered to assist in development of the summary. For example:
      • The future state should describe the major changes required to enable target technology objectives to become a reality;
      • The current state describes the current situation with regards to technology;
      • The next-year initiatives articulate the high-level tasks that will lead to tangible results, ultimately achieving the target/future state (e.g., consider 90-day increments); and
      • The financial projections include the statements of costs and savings, depicting the projected efficiencies or costs related to technology throughout the vision cycle.
  • At 408, considering the process dimension of capability, function, or organization and using the inputs, drivers, and priorities collected in the previous section of this document, list the future state, current state, next-year initiatives, the financial projections associated with the stated initiatives can be gathered to assist in generation of a summary. For example:
      • The future state should describe the major changes required to enable target process objectives to become a reality;
      • The current state describes the current situation with regards to process;
      • The next-year initiatives articulate the high-level tasks that will lead to tangible results, ultimately achieving the target/future state (e.g., consider 90-day increments); and
      • The financial projections include the statements of costs and savings, depicting the projected efficiencies or costs related to process throughout the vision cycle.
  • Considering the delivery dimension of capability, function, or organization at 410 and using the inputs, drivers, and priorities collected in the previous section of this document, the future state, current state, next-year initiatives, the financial projections associated with the stated initiatives can be gathered to assist in establishment of the summary. For example:
      • The future state should describe the major changes required to enable target customer delivery objectives to become a reality;
      • The current state describes the current situation with regards to customer delivery and roll-out;
      • The next-year initiatives articulate the high-level tasks that will lead to tangible results, ultimately achieving the target/future state (e.g., consider 90-day increments); and
      • The financial projections include the statements of costs and savings, depicting the projected efficiencies or costs related to customer delivery and roll-out throughout the vision cycle.
  • At 412, a strategy timeline can be established or documented—the strategy timeline can lay out the initiatives planned for the upcoming year to achieve the documented future state. The timeline can highlight most any dependencies associated with each of the initiatives. The timeline can assist in socializing strategy with leadership and team members responsible for the capability, function, or organizational objectives.
  • Finally, strategy metrics can be documented at 414. As part of an ongoing effort to improve the strategic planning process, metrics can be employed to measure strategies. When establishing a strategy, performance metrics can be employed to enhance effectiveness and success of the strategy.
  • Turning now to a discussion of the collaboration component 108, FIG. 5 illustrates an example process flow in accordance with an aspect of the innovation. Here, the strategists, capability, and function leaders can have an opportunity to discuss and review the strategies, architecture, workforce, and process strategies in one or a series of collaboration sessions. These sessions can be facilitated, supplemented or otherwise enabled by way of data presentation (e.g., via UIs). In examples, the data can be organized, ranked, etc. based at least in part upon preference, policy, type, content, etc. The strategists can include the input collected in their strategies for the next year (or other time period). The capability and function leaders can include the input in their refreshed strategy that is to be completed by the end of the year (or other time period).
  • At 502, architecture, workforce, and process collaboration sessions can be held. In one example, the first collaboration session will occur after the strategy has been approved by their business partner and before the strategies are communicated out more broadly to IT leadership. Most often, this session will include strategists, architecture, workforce and process representatives.
  • At 504, capability and function leader collaboration sessions can be held. Here, the strategists can update their strategies based on input collected in the first session before the second collaboration session. In aspects, there can be approximately one month (or other time period) between each collaboration session. The second session will include strategists, capability leaders and function leaders. In the example, capability leaders and function leaders will use the information collected as input into their strategies to be updated by the end of the year. In this session the capability and function leaders will have the opportunity to provide input into the subsequent (e.g., next year's) strategies for the different areas.
  • Finally, at 506, results are documented and updates (if applicable) are applied to the strategy. Here, the strategists, capability leaders, and function leaders will update their strategies based on the input collected (or otherwise determined) in each of the collaborations sessions (502, 504).
  • Turning now to FIG. 6, an example process flow of a management approval component 110 is shown. The strategies developed can be reviewed with leadership for vetting and approval. Function leaders can review their strategies as part of their quarterly functional plan review. Once the strategies are approved, the strategy leader is empowered to execute on the two- to three-year (or other term) strategy and initiatives.
  • At 602, a summary presentation can be generated. The strategy can be presented to leadership in a format that is easy to review and decision. The innovation's strategy team site (for example, as shown in the figures that follow) is designed to allow a user to generate a report and an overview map from the strategy summary. Each strategy leader has the ability to enter the strategy content in different formats. Thus, after generating the full strategy report and map, the user can review what is generated to make sure it can be vetted and reviewed easily. In aspects, content can include bullets or other formatting for better or efficient review. Essentially, the innovation supports most any report configurations which provide the format for vetting and review. In addition to web-based input pages, it is possible for the content of the strategy summary to be placed in a word processing or other text-based template or form.
  • A summary timeline can be generated (and presented) at 604. For example, the innovation can generate a timeline from the tasks listed in the initiatives portion of the strategy. In other aspects a spreadsheet template can be employed to generate a timeline of the initiatives planned to achieve the future strategy.
  • Milestones are summarized at 606—either within the strategy summary, a word processor template, or in a separate document, important points to the strategy can be summarized. Here, the plans that are most critical to the success of the strategy can be highlighted to leadership.
  • The strategy can be presented to leadership at 608. The strategic planning team can produce a schedule for vetting and presenting the capability strategies to the CIO/CTO forum. In one aspect, the CTO can have a quarterly review schedule for the functional plans, including the developed functional strategies. The user can be proactive in determining when they will be required to review strategies so as to have adequate time to complete and socialize your strategy components.
  • Results are documented and updates applied at process stage 610. After the strategy is vetted and reviewed by leadership, one should allow time for rework and updates based on the input received from leadership. After the updates are complete, the strategy can be posted (or re-posted) to the strategic planning team site. Additionally, it is possible to verify or ensure that it can be accessed from the different access points. For example, each capability can have a capability site with a link to its strategy. The strategy link can connect to the strategy summary stored on the strategic planning team site. If it is decided to complete a detailed strategy document that too can be stored on the strategic planning team site—an example team site is shown in the figures that follow.
  • Referring now to FIG. 7, an example process flow of a deployment component 112 is shown in accordance with an aspect of the innovation. Essentially, the deployment component 112 enables strategies to be communicated intra- and inter-organization as desired or appropriate. This communication can facilitate collaboration and enhance integration of strategies.
  • At 702, a strategy is posted, for example upon a team accessible site. It is to be understood that the site can be accessible via an enterprise intranet, the Internet, or other network. In one aspect, the strategy can be posted to the team site, but if it was chosen to develop the strategy using another documentation tool (e.g., Web form, word processor template . . . ), the content can be posted into a strategy summary template or to the team site. It will be understood that, by adding to the strategy summary repository, other IT leaders can search, retrieve, and view the strategy.
  • The strategy can be linked to accessible sites at 704. Continuing with the example, using the Web site in which the process and strategy documents were posted, links could be added for the new or updated strategy. Additionally, it is to be appreciated that metadata and other tags together with indexing can be applied to a strategy to facilitate effective search and retrieval.
  • A communications plan can be created and/or updated at 706. Here, the plan can be communicated based upon a user or organizational preference or policy. The user can develop a communication plan for communicating deliverables and changes, if applicable. Additionally, the method in which the user would like to communicate the strategy to leadership, team members, and more broadly in the organization can be added to the plan.
  • At 708, the communications plan can be executed—Following the communications plan, which should take into account the collaboration with other organizations, capabilities, and functions, appropriate communications can be sent out to appropriate stakeholders, leaders, etc.
  • Finally, the strategy can be communicated at 710. For example, the strategic planning team can assist in communicating out the approved strategy by documenting and distributing the highlights in an IT communication (e.g., newsletter, group mailing, electronic mail, bulletin board . . . ).
  • In accordance with the example process flows of each component (102-112) described supra, it is to be understood that the functionality of each of these components (102-112) enable data collection, analysis, manipulation, transformation, search/retrieval, presentation, etc. as described with regard to each of the processes. For example, data can be automatically input and collected by way of templates and forms. Additionally, as described above, adaptable forms and templates can be incorporated. As well, the data can be analyzed whereby a strategy or summary can be generated, stored, and communicated as appropriate or desired. For instance, the information can be generated, stored, and/or communicated based at least in part upon a preference, policy, or inference.
  • Following is a discussion of an example IT strategic planning team site to create, update, search and view summaries and detailed strategy documents. FIG. 8 illustrates a link on an example team site page 800 which launches instructions to create and edit strategy summaries. As shown in the screen shot 800 of FIG. 8, a user is able to navigate the UI screens in order to establish strategy plans and summaries. It is to be understood that the components of system 100 of FIG. 1 are used to establish the appropriate interfaces as well as to effect the backend processing and transformations associated therewith.
  • FIG. 9 illustrates an example search UI 900 in accordance with aspects of the innovation. One of the primary objectives of creating the strategy repository is to facilitate searches across strategy summaries and detailed strategy documents. In the example, the search capability is located at the top right corner of the IT strategic planning team site as shown in FIG. 9.
  • An example search is illustrated in FIG. 10. As illustrated in the example of FIG. 10, a search screen 1000 illustrates a search for items (e.g., summaries and documents) that contain the word “Oxmoor”. As shown in screen print 1000, a list of summary forms and documents that contain the search criteria (e.g., “Oxmoor”) are retrieved and rendered to the by way of the UI. It will be understood that the search, retrieval, and rendering functionality is effected by way of the components of system 100 of FIG. 1.
  • FIGS. 11A & B and 12A & B illustrate UI screen prints 1100 and 1200 respectively that relate to viewing, reporting, and printing strategies. For ease of viewing strategies across CIO groups, capabilities, and functions, tabular views can be accessible from the home page. Within each of the tabs, a user can expand the types of strategies documented and view the core components of the strategy by selecting each of the view links. The user can also view and print a full report of the strategy. Access to the strategy overview maps and strategy timeline can also be added to these views as desired.
  • FIG. 13 illustrates an example UI screen 1300 that facilitates creating and updating strategies in accordance with aspects of the innovation. For creating and updating strategies, the Strategy Summary Creation & Updates link (UI 1300) on the home page can be used rather than the tabular views. The team sites can be equipped with views set up specifically for creating and editing forms created within the team site as appropriate or desired. As will be understood, the navigation is often clearer using these views. The tabular views provide access and viewing of the strategy content.
  • After the user selects the Strategy Summary Creation & Updates link on the left navigation menu (as illustrated in UI 1300), a list of strategies will appear. To access an existing strategy, the user can select the icon to the left of the strategy title. If it is desired to create a new strategy, the new item option at the top of the page above the list of strategies can be selected. The list shows the most recently updated strategies, thus, it is possible to be able to easily find a desired strategy. It is to be appreciated that the configuration and layout of UI 1300 (as well as other UIs described herein) are examples of the features, functions, and benefits of particular aspects of the innovation. As such, these specific aspects are not intended to limit the innovation in any manner. Rather, other aspects exist that include alternative content and configurations—these alternative aspects are to be included within the scope of the innovation and claims appended hereto.
  • Turning now to FIG. 14, an example UI 1400 that facilitates viewing detailed strategies in accordance with aspects of the innovation is shown. In a particular aspect, for access to the detailed strategy documents, a user can select the Detailed Strategy Documents link located on the top left corner of the IT Strategic Planning team site as illustrated in UI 800 of FIG. 8. As shown in FIG. 14 and UI 1400, the detailed documents can be located in folders broken down by type of strategy.
  • With reference now to FIG. 15, the CIO Strategy Documentation Links can be employed to reference related topics. FIG. 15 illustrates an example home page UI 1500 that makes available strategy documentation links. In other words, to reference related topics, a user can employ the links on the rightmost section of the IT Strategic Planning home page (1500). Additionally, other useful links can be added by selecting the Add new link option as shown in UI 1500. The user can also communicate an additional request to one of the strategic planning contacts listed in the introduction of this document.
  • As described supra, in aspects, Web-based templates can be employed to enter or gather strategic planning data. In alternative aspects, word processing or other text-based templates or forms can be employed to gather data related to IT planning. An example portion (1600) of a template or form is illustrated in FIG. 16.
  • Referring now to FIG. 17, there is illustrated a block diagram of a computer operable to execute the disclosed architecture. In order to provide additional context for various aspects of the subject innovation, FIG. 17 and the following discussion are intended to provide a brief, general description of a suitable computing environment 1700 in which the various aspects of the innovation can be implemented. While the innovation has been described above in the general context of computer-executable instructions that may run on one or more computers, those skilled in the art will recognize that the innovation also can be implemented in combination with other program modules and/or as a combination of hardware and software.
  • Generally, program modules include routines, programs, components, data structures, etc., that perform particular tasks or implement particular abstract data types. Moreover, those skilled in the art will appreciate that the inventive methods can be practiced with other computer system configurations, including single-processor or multiprocessor computer systems, minicomputers, mainframe computers, as well as personal computers, hand-held computing devices, microprocessor-based or programmable consumer electronics, and the like, each of which can be operatively coupled to one or more associated devices.
  • The illustrated aspects of the innovation may also be practiced in distributed computing environments where certain tasks are performed by remote processing devices that are linked through a communications network. In a distributed computing environment, program modules can be located in both local and remote memory storage devices.
  • A computer typically includes a variety of computer-readable media. Computer-readable media can be any available media that can be accessed by the computer and includes both volatile and nonvolatile media, removable and non-removable media. By way of example, and not limitation, computer-readable media can comprise computer storage media and communication media. Computer storage media includes both volatile and nonvolatile, removable and non-removable media implemented in any method or technology for storage of information such as computer-readable instructions, data structures, program modules, or other data. Computer storage media includes, but is not limited to, RAM, ROM, EEPROM, flash memory or other memory technology, CD-ROM, digital versatile disk (DVD) or other optical disk storage, magnetic cassettes, magnetic tape, magnetic disk storage or other magnetic storage devices, or any other medium which can be used to store the desired information and which can be accessed by the computer.
  • Communication media typically embodies computer-readable instructions, data structures, program modules, or other data in a modulated data signal such as a carrier wave or other transport mechanism, and includes any information delivery media. The term “modulated data signal” means a signal that has one or more of its characteristics set or changed in such a manner as to encode information in the signal. By way of example, and not limitation, communication media includes wired media such as a wired network or direct-wired connection, and wireless media such as acoustic, RF, infrared and other wireless media. Combinations of the any of the above should also be included within the scope of computer-readable media.
  • With reference again to FIG. 17, the exemplary environment 1700 for implementing various aspects of the innovation includes a computer 1702, the computer 1702 including a processing unit 1704, a system memory 1706 and a system bus 1708. The system bus 1708 couples system components including, but not limited to, the system memory 1706 to the processing unit 1704. The processing unit 1704 can be any of various commercially available processors. Dual microprocessors and other multi-processor architectures may also be employed as the processing unit 1704.
  • The system bus 1708 can be any of several types of bus structure that may further interconnect to a memory bus (with or without a memory controller), a peripheral bus, and a local bus using any of a variety of commercially available bus architectures. The system memory 1706 includes read-only memory (ROM) 1710 and random access memory (RAM) 1712. A basic input/output system (BIOS) is stored in a non-volatile memory 1710 such as ROM, EPROM, EEPROM, which BIOS contains the basic routines that help to transfer information between elements within the computer 1702, such as during start-up. The RAM 1712 can also include a high-speed RAM such as static RAM for caching data.
  • The computer 1702 further includes an internal hard disk drive (HDD) 1714 (e.g., EIDE, SATA), which internal hard disk drive 1714 may also be configured for external use in a suitable chassis (not shown), a magnetic floppy disk drive (FDD) 1716, (e.g., to read from or write to a removable diskette 1718) and an optical disk drive 1720, (e.g., reading a CD-ROM disk 1722 or, to read from or write to other high capacity optical media such as the DVD). The hard disk drive 1714, magnetic disk drive 1716, and optical disk drive 1720 can be connected to the system bus 1708 by a hard disk drive interface 1724, a magnetic disk drive interface 1726 and an optical drive interface 1728, respectively. The interface 1724 for external drive implementations includes at least one or both of Universal Serial Bus (USB) and IEEE 1394 interface technologies. Other external drive connection technologies are within contemplation of the subject innovation.
  • The drives and their associated computer-readable media provide nonvolatile storage of data, data structures, computer-executable instructions, and so forth. For the computer 1702, the drives and media accommodate the storage of any data in a suitable digital format. Although the description of computer-readable media above refers to a HDD, a removable magnetic diskette, and a removable optical media such as a CD or DVD, it should be appreciated by those skilled in the art that other types of media which are readable by a computer, such as zip drives, magnetic cassettes, flash memory cards, cartridges, and the like, may also be used in the exemplary operating environment, and further, that any such media may contain computer-executable instructions for performing the methods of the innovation.
  • A number of program modules can be stored in the drives and RAM 1712, including an operating system 1730, one or more application programs 1732, other program modules 1734, and program data 1736. All or portions of the operating system, applications, modules, and/or data can also be cached in the RAM 1712. It is appreciated that the innovation can be implemented with various commercially available operating systems or combinations of operating systems.
  • A user can enter commands and information into the computer 1702 through one or more wired/wireless input devices, e.g., a keyboard 1738 and a pointing device, such as a mouse 1740. Other input devices (not shown) may include a microphone, an IR remote control, a joystick, a game pad, a stylus pen, touch screen, or the like. These and other input devices are often connected to the processing unit 1704 through an input device interface 1742 that is coupled to the system bus 1708, but can be connected by other interfaces, such as a parallel port, an IEEE 1394 serial port, a game port, a USB port, an IR interface, etc.
  • A monitor 1744 or other type of display device is also connected to the system bus 1708 via an interface, such as a video adapter 1746. In addition to the monitor 1744, a computer typically includes other peripheral output devices (not shown), such as speakers, printers, etc.
  • The computer 1702 may operate in a networked environment using logical connections via wired and/or wireless communications to one or more remote computers, such as a remote computer(s) 1748. The remote computer(s) 1748 can be a workstation, a server computer, a router, a personal computer, portable computer, microprocessor-based entertainment appliance, a peer device, or other common network node, and typically includes many or all of the elements described relative to the computer 1702, although, for purposes of brevity, only a memory/storage device 1750 is illustrated. The logical connections depicted include wired/wireless connectivity to a local area network (LAN) 1752 and/or larger networks, e.g., a wide area network (WAN) 1754. Such LAN and WAN networking environments are commonplace in offices and companies, and facilitate enterprise-wide computer networks, such as intranets, all of which may connect to a global communications network, e.g., the Internet.
  • When used in a LAN networking environment, the computer 1702 is connected to the local network 1752 through a wired and/or wireless communication network interface or adapter 1756. The adapter 1756 may facilitate wired or wireless communication to the LAN 1752, which may also include a wireless access point disposed thereon for communicating with the wireless adapter 1756.
  • When used in a WAN networking environment, the computer 1702 can include a modem 1758, or is connected to a communications server on the WAN 1754, or has other means for establishing communications over the WAN 1754, such as by way of the Internet. The modem 1758, which can be internal or external and a wired or wireless device, is connected to the system bus 1708 via the serial port interface 1742. In a networked environment, program modules depicted relative to the computer 1702, or portions thereof, can be stored in the remote memory/storage device 1750. It will be appreciated that the network connections shown are exemplary and other means of establishing a communications link between the computers can be used.
  • The computer 1702 is operable to communicate with any wireless devices or entities operatively disposed in wireless communication, e.g., a printer, scanner, desktop and/or portable computer, portable data assistant, communications satellite, any piece of equipment or location associated with a wirelessly detectable tag (e.g., a kiosk, news stand, restroom), and telephone. This includes at least Wi-Fi and Bluetooth™ wireless technologies. Thus, the communication can be a predefined structure as with a conventional network or simply an ad hoc communication between at least two devices.
  • Wi-Fi, or Wireless Fidelity, allows connection to the Internet from a couch at home, a bed in a hotel room, or a conference room at work, without wires. Wi-Fi is a wireless technology similar to that used in a cell phone that enables such devices, e.g., computers, to send and receive data indoors and out; anywhere within the range of a base station. Wi-Fi networks use radio technologies called IEEE 802.11(a, b, g, etc.) to provide secure, reliable, fast wireless connectivity. A Wi-Fi network can be used to connect computers to each other, to the Internet, and to wired networks (which use IEEE 802.3 or Ethernet). Wi-Fi networks operate in the unlicensed 2.4 and 5 GHz radio bands, at an 11 Mbps (802.11a) or 54 Mbps (802.11b) data rate, for example, or with products that contain both bands (dual band), so the networks can provide real-world performance similar to the basic 10BaseT wired Ethernet networks used in many offices.
  • What has been described above includes examples of the innovation. It is, of course, not possible to describe every conceivable combination of components or methodologies for purposes of describing the subject innovation, but one of ordinary skill in the art may recognize that many further combinations and permutations of the innovation are possible. Accordingly, the innovation is intended to embrace all such alterations, modifications, and variations that fall within the spirit and scope of the appended claims. Furthermore, to the extent that the term “includes” is used in either the detailed description or the claims, such term is intended to be inclusive in a manner similar to the term “comprising” as “comprising” is interpreted when employed as a transitional word in a claim.

Claims (21)

1-20. (canceled)
21. A method for strategic planning, comprising:
evaluating a current state of a business, wherein the current state of the business is associated with one or more criteria of the business;
establishing a focus strategy based on one or more of the criteria of the business;
collecting information from one or more forms pertaining to one or more criteria of the business or the focus strategy; and
generating a strategy summary based on a subset of the collected information from one or more of the forms and on information associated with one or more prior strategies,
wherein the evaluating, the establishing, the collecting, or the generating is implemented at least in part via a processing unit.
22. The method of claim 21, comprising reviewing one or more of the prior strategies.
23. The method of claim 21, comprising reviewing one or more strategy influencers.
24. The method of claim 21, comprising reviewing one or more technology planning guides.
25. The method of claim 21, comprising reviewing one or more related strategies.
26. The method of claim 21, comprising updating the strategy summary.
27. The method of claim 21, wherein the strategy summary comprises one or more strategy metrics.
28. The method of claim 21, comprising rendering the strategy summary in a strategy collaboration session.
29. The method of claim 21, comprising determining one or more opportunities associated with the current state of the business.
30. The method of claim 21, comprising determining one or more threats associated with the current state of the business.
31. A system for strategic planning, comprising:
an assessment component generating one or more queries associated with a current state of a business; and
an analysis component:
evaluating the current state of the business, wherein the current state of the business is associated with one or more strategy influencers; and
generating one or more findings and priorities based on one or more inputs identified by responses to one or more of the queries,
wherein at the analysis component or the assessment component is implemented at least in part via a processing unit.
32. The system of claim 31, comprising a summary manager component generating one or more forms for one or more of the queries or one or more of the inputs.
33. The system of claim 31, comprising a collaboration component receiving input from one or more users during a collaboration session.
34. The system of claim 31, comprising a management approval component rendering one or more of the findings and priorities for presentation.
35. The system of claim 31, comprising a deployment component communicating one or more of the findings and priorities to one or more parties.
36. The system of claim 31, wherein the analysis component evaluates the current state of the business based on an information technology operating model (ITOM).
37. A computer-readable storage medium comprising computer-executable instructions, which when executed at least in part via a processing unit on a computer performs acts, comprising:
establishing a current state of a business function based on one or more strategy influencers;
determining a primary focus based on the current state of the business function;
updating a strategy summary as a function of the primary focus of the business, wherein the strategy summary identifies one or more strategic objectives and is based on the primary focus and one or more dimensions comprising one or more of a workforce management dimension, a technology dimension, a process dimension, or a delivery dimension; and
generating a strategy map that connects one or more of the strategic objectives to one or more other strategic objectives via one or more cause-and-effect relationships.
38. The computer-readable storage medium of claim 37, comprising soliciting comments or revisions to the strategy summary from one or more leaders.
39. The computer-readable storage medium of claim 37, comprising obtaining approval for the strategy summary.
40. The computer-readable storage medium of claim 37, comprising communicating the strategy summary to one or more stakeholders.
US14/208,252 2008-12-22 2014-03-13 Strategic planning management Abandoned US20140195307A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US14/208,252 US20140195307A1 (en) 2008-12-22 2014-03-13 Strategic planning management

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US12/342,052 US8712812B2 (en) 2008-12-22 2008-12-22 Strategic planning management
US14/208,252 US20140195307A1 (en) 2008-12-22 2014-03-13 Strategic planning management

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US12/342,052 Continuation US8712812B2 (en) 2008-12-22 2008-12-22 Strategic planning management

Publications (1)

Publication Number Publication Date
US20140195307A1 true US20140195307A1 (en) 2014-07-10

Family

ID=42267382

Family Applications (2)

Application Number Title Priority Date Filing Date
US12/342,052 Active 2031-06-04 US8712812B2 (en) 2008-12-22 2008-12-22 Strategic planning management
US14/208,252 Abandoned US20140195307A1 (en) 2008-12-22 2014-03-13 Strategic planning management

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US12/342,052 Active 2031-06-04 US8712812B2 (en) 2008-12-22 2008-12-22 Strategic planning management

Country Status (1)

Country Link
US (2) US8712812B2 (en)

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8712812B2 (en) * 2008-12-22 2014-04-29 Wells Fargo Bank, N.A. Strategic planning management
US11676090B2 (en) 2011-11-29 2023-06-13 Model N, Inc. Enhanced multi-component object-based design, computation, and evaluation
US20140058798A1 (en) * 2012-08-24 2014-02-27 o9 Solutions, Inc. Distributed and synchronized network of plan models
US10373066B2 (en) 2012-12-21 2019-08-06 Model N. Inc. Simplified product configuration using table-based rules, rule conflict resolution through voting, and efficient model compilation
US9466026B2 (en) 2012-12-21 2016-10-11 Model N, Inc. Rule assignments and templating
US11074643B1 (en) 2012-12-21 2021-07-27 Model N, Inc. Method and systems for efficient product navigation and product configuration
US20140379435A1 (en) * 2013-05-07 2014-12-25 Isam Yahia AL-FILALI Reyada system and method for performance management, communication, strategic planning, and strategy execution
US20140358611A1 (en) * 2013-05-31 2014-12-04 Alok Datta Organizational task management software system
US11216765B2 (en) 2014-06-27 2022-01-04 o9 Solutions, Inc. Plan modeling visualization
US10614400B2 (en) 2014-06-27 2020-04-07 o9 Solutions, Inc. Plan modeling and user feedback
US11379781B2 (en) 2014-06-27 2022-07-05 o9 Solutions, Inc. Unstructured data processing in plan modeling
US11216478B2 (en) 2015-10-16 2022-01-04 o9 Solutions, Inc. Plan model searching
EP3211573A1 (en) 2016-02-23 2017-08-30 Tata Consultancy Services Limited Systems and methods for generating strategic competitive intelligence data relevant for an entity
CN109476148B (en) 2016-05-29 2021-06-15 斯特拉塔西斯公司 Method for producing rubber-like material by lamination
US10664498B2 (en) 2018-04-20 2020-05-26 Bank Of America Corporation Interconnected graph structured database for identifying and remediating conflicts in resource deployment
WO2019215855A1 (en) * 2018-05-09 2019-11-14 三菱電機株式会社 Information technology utilization evaluation device, information technology utilization evaluation system, and information technology utilization evaluation method
US10757169B2 (en) 2018-05-25 2020-08-25 Model N, Inc. Selective master data transport
US11122059B2 (en) 2018-08-20 2021-09-14 Bank Of America Corporation Integrated resource landscape system
US10459766B1 (en) 2018-08-20 2019-10-29 Bank Of America Corporation System for optimizing resource prioritization based on services efficiency
CN110633893B (en) * 2019-08-14 2023-06-23 创新先进技术有限公司 Policy effectiveness monitoring method and device and computer equipment
CN111400640B (en) * 2020-04-10 2023-09-22 中国铁塔股份有限公司 Site holographic information management system, construction method and construction device

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020042731A1 (en) * 2000-10-06 2002-04-11 King Joseph A. Method, system and tools for performing business-related planning
US20020169658A1 (en) * 2001-03-08 2002-11-14 Adler Richard M. System and method for modeling and analyzing strategic business decisions
US20030093310A1 (en) * 2001-11-09 2003-05-15 Macrae David G. Business management process
US20030216926A1 (en) * 2001-08-23 2003-11-20 Chris Scotto Method for guiding a business after an initial funding state to an initial public offering readiness state
US20040054565A1 (en) * 2002-09-17 2004-03-18 Nemecek Carole M. Enterprise management using an enterprise program office (EPO)
US20040143470A1 (en) * 1999-08-20 2004-07-22 Myrick Conrad B. Structure and method of modeling integrated business and information technology frameworks and architecture in support of a business
US20050096950A1 (en) * 2003-10-29 2005-05-05 Caplan Scott M. Method and apparatus for creating and evaluating strategies
US20060143219A1 (en) * 2004-12-29 2006-06-29 Smith Laurence T Business change lifecycle framework
US20070016495A1 (en) * 2005-06-28 2007-01-18 Duncanville Independent School District Systems, program products, and methods of enhancing financial budgeting of an organization
US20080109291A1 (en) * 2006-11-07 2008-05-08 Montes De Oca Group, Inc. Executing and Tracking Strategic Plans
US20080208648A1 (en) * 2007-02-23 2008-08-28 Accenture Global Services Gmbh Constraints-based analysis and strategy planning methods and tools
US20080255912A1 (en) * 2007-04-12 2008-10-16 Electronic Data Systems Corporation Framework System and Method for Determining Deliverables Required to Implement a Technology-Enabled Business Change
US20080270205A1 (en) * 2006-11-21 2008-10-30 Infosys Technologies Limited Program management systems and method thereof
US20080281651A1 (en) * 2007-05-10 2008-11-13 Anthony Clive Lincoln Brennan Method and system for managing a strategic plan via defining and aligning strategic plan elements
US20090037241A1 (en) * 2007-07-31 2009-02-05 M3 Planning, Inc. Automated strategic planning system and method
US20090192867A1 (en) * 2008-01-24 2009-07-30 Sheardigital, Inc. Developing, implementing, transforming and governing a business model of an enterprise
US8712812B2 (en) * 2008-12-22 2014-04-29 Wells Fargo Bank, N.A. Strategic planning management

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070078831A1 (en) * 2005-09-30 2007-04-05 Accenture Global Services Gmbh Enterprise performance management tool

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040143470A1 (en) * 1999-08-20 2004-07-22 Myrick Conrad B. Structure and method of modeling integrated business and information technology frameworks and architecture in support of a business
US20020042731A1 (en) * 2000-10-06 2002-04-11 King Joseph A. Method, system and tools for performing business-related planning
US20020169658A1 (en) * 2001-03-08 2002-11-14 Adler Richard M. System and method for modeling and analyzing strategic business decisions
US20030216926A1 (en) * 2001-08-23 2003-11-20 Chris Scotto Method for guiding a business after an initial funding state to an initial public offering readiness state
US20030093310A1 (en) * 2001-11-09 2003-05-15 Macrae David G. Business management process
US20040054565A1 (en) * 2002-09-17 2004-03-18 Nemecek Carole M. Enterprise management using an enterprise program office (EPO)
US20050096950A1 (en) * 2003-10-29 2005-05-05 Caplan Scott M. Method and apparatus for creating and evaluating strategies
US20060143219A1 (en) * 2004-12-29 2006-06-29 Smith Laurence T Business change lifecycle framework
US20070016495A1 (en) * 2005-06-28 2007-01-18 Duncanville Independent School District Systems, program products, and methods of enhancing financial budgeting of an organization
US20080109291A1 (en) * 2006-11-07 2008-05-08 Montes De Oca Group, Inc. Executing and Tracking Strategic Plans
US20080270205A1 (en) * 2006-11-21 2008-10-30 Infosys Technologies Limited Program management systems and method thereof
US20080208648A1 (en) * 2007-02-23 2008-08-28 Accenture Global Services Gmbh Constraints-based analysis and strategy planning methods and tools
US20080255912A1 (en) * 2007-04-12 2008-10-16 Electronic Data Systems Corporation Framework System and Method for Determining Deliverables Required to Implement a Technology-Enabled Business Change
US20080281651A1 (en) * 2007-05-10 2008-11-13 Anthony Clive Lincoln Brennan Method and system for managing a strategic plan via defining and aligning strategic plan elements
US20090037241A1 (en) * 2007-07-31 2009-02-05 M3 Planning, Inc. Automated strategic planning system and method
US20090192867A1 (en) * 2008-01-24 2009-07-30 Sheardigital, Inc. Developing, implementing, transforming and governing a business model of an enterprise
US8712812B2 (en) * 2008-12-22 2014-04-29 Wells Fargo Bank, N.A. Strategic planning management

Also Published As

Publication number Publication date
US8712812B2 (en) 2014-04-29
US20100161360A1 (en) 2010-06-24

Similar Documents

Publication Publication Date Title
US8712812B2 (en) Strategic planning management
US11443281B2 (en) Collaboration tool
US9928241B2 (en) Systems and methods for analyzing electronic communications to dynamically improve efficiency and visualization of collaborative work environments
US8977689B2 (en) Managing collaborative activity
US20080115103A1 (en) Key performance indicators using collaboration lists
Irani et al. Linking knowledge transformation to information systems evaluation
US20020161764A1 (en) Network based system and method for marketing management
CA2829469A1 (en) Computer system and method for providing a multi-user transaction platform accessible using a mobile device
US20230054383A1 (en) Unstructured data processing in plan modeling
US8954342B2 (en) Publishing an industry business architecture model
US20120191507A1 (en) System for unifying and collaborating new product development activities across a disparate set of users
US7512451B2 (en) System and method for interactive process management
JP2007058755A (en) Electronic bulletin board system, server for electronic bulletin board, thread display processing method for client of electronic bulletin board system, and program
US20100241610A1 (en) Methods and systems for preserving and accessing information related to decision-making
Watson Information systems
US20180293525A1 (en) Store service workbench
Rafla et al. A method to elicit architecturally sensitive usability requirements: its integration into a software development process
Mat et al. Development of collaboration model by integrating information and communication technology (ICT) tools in Higher Education Institutions (HEI)
Limburg et al. Integrated performance management using information technology: a study of UK charities
US7996299B2 (en) Trade services management system
Jongeling Identifying And Prioritizing Suitable RPA Candidates in ITSM Using Process Mining Techniques: Developing the PLOST Framework
US11113322B2 (en) Dynamically generating strategic planning datasets based on collecting, aggregating, and filtering distributed data collections
Antonsson Digital Co-production for Users Through Feedback Loops: A descriptive and applied study in the digital automation industry
Samsuddin Innovative Management Reporting for Real Time Dynamic Decision Making
Sjödin Visualizing project information from the perspective of a client: How do you present information in a user friendly manner?

Legal Events

Date Code Title Description
AS Assignment

Owner name: WELLS FARGO BANK, N.A., NORTH CAROLINA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:CLEMENT, STEVEN D.;SNOW, PATRICIA;SIGNING DATES FROM 20081208 TO 20081215;REEL/FRAME:037499/0419

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION