US3166830A - Method of making prestressed girder - Google Patents

Method of making prestressed girder Download PDF

Info

Publication number
US3166830A
US3166830A US191966A US19196662A US3166830A US 3166830 A US3166830 A US 3166830A US 191966 A US191966 A US 191966A US 19196662 A US19196662 A US 19196662A US 3166830 A US3166830 A US 3166830A
Authority
US
United States
Prior art keywords
chord
girder
web
bars
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US191966A
Inventor
Greulich Gerald Gregory
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US191966A priority Critical patent/US3166830A/en
Priority to US333880A priority patent/US3260024A/en
Application granted granted Critical
Publication of US3166830A publication Critical patent/US3166830A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/293Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
    • E04C3/294Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete of concrete combined with a girder-like structure extending laterally outside the element
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49616Structural member making
    • Y10T29/49623Static structure, e.g., a building component
    • Y10T29/49625Openwork, e.g., a truss, joist, frame, lattice-type or box beam
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49826Assembling or joining
    • Y10T29/49863Assembling or joining with prestressing of part
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49826Assembling or joining
    • Y10T29/49863Assembling or joining with prestressing of part
    • Y10T29/49865Assembling or joining with prestressing of part by temperature differential [e.g., shrink fit]

Definitions

  • This invention relates to a method of making prestressed girders, and more particularly to one in which only the top chord is made from prestressed concrete.
  • Prestressed concrete construction has attained its present acceptance and widespread use because, by reducing dead loads or permitting the use of larger clear spans with the same dead load or weight, as well as greater stiffness of construction with less deflection, a less costly and more flexible building design is possible. It is also known that because prestressing uses concrete more fully, less of it is required for a given loading condition so that the benefits of a lighter building are obtained without sacrificing strength or rigidity. Lower overall weight naturally reduces column and foundation size requirements, with attendant reduction in their costs. The factor of lower deflection also reduces problems of fitting long rows of window frames or prefabricated partitions into buildings. Nevertheless, in spite of all of these advantages, prestressed concrete beams and girders are very heavy to transport and handle, while it is quite an undertaking to do the prestressing at the site of the construction.
  • the top chord of a girder is made from prestressed concrete. It is made separately from the rest of the girder before the girder is assembled. Also in a separate operation a metal web is secured to a metal bottom chord. Then the bottom chord, and preferably at least part of the web, are stretched lengthwise in suitable apparatus. While the bottom chord is maintained in its stretched condition, the metal web is rigidly secured to the top chord, such as to gusset plate means projecting from the concrete. Then the stretching apparatus is disconnected from the bottom chord and the girder is complete. The concrete upper chord of the girder is under material compression, due to the prestressing, and the lower chord is under material tension because of the pretensioning which is maintained by the web.
  • FIG. 1 is a side view of the top chord of my girder in inverted position in prestressing apparatus
  • FIG. 2 is a side view of the finished top chord right side up, with a portion broken away in section;
  • FIG. 3 is an enlarged cross section of the top chord taken on the line IIIIII of FIG. 2;
  • FIG. 4 is a side view of the bottom chord and the web secured to it;
  • FIG. 5 is an enlarged cross section taken on the line VV of FIG. 4;
  • FIG. 6 is a side view of the elements of the girder inverted in apparatus for prestressing the bottom chord;
  • FIG. 7 is a fragmentary side view of the finished girder
  • FIG. 8 is a view similar to FIG. 7 of a modification.
  • FIG. 9 is a vertical section taken on the line IX-IX of FIG. 8.
  • the top chord for my girder is made by molding concrete into the desired shape around cables or rods, hereinafter called tendons.
  • the tendons are disposed side by side in the mold and their ends are fastened to suitable tension jacks.
  • the jacks are actuated to stretch the tendons short of their elastic limit, and they are held in that condition until after the concrete sets. Then the tendons are released from the jacks, and their tendency to contract places the concrete under compression to form a prestressed chord.
  • FIG. 1 of the drawings some of the apparatus which can be used for carrying out this method is shown. It includes jacks I mounted in horizontally spaced anchor members 2 that may be held a fixed distance apart by a horizontal beam 3 joined to their lower ends.
  • Each anchor member supports one or more rows of the jacks, which are detachably secured in any suitable manner to the opposite ends of a plurality of parallel tendons 4. If desired, the jacks can be eliminated at one end and their places taken by fixed clamps.
  • the drawing shows the top chord after the concrete 5 has set and the forms have been removed, but before the tendons have beenreleased from the jacks. The chord is bottom side up.
  • a line of upwardly projecting metal gusset plates a should be embedded in the concrete.
  • the plates in the concrete may be provided with holes, through which extend dowel pins 7 that are likewise embedded in the concrete as shown in FIGS. 2 and 3.
  • the jacks are released from the tendons, which then will tend to contract to their original length. In doing so, they will compress the concrete lengthwise of the chord and thereby form a prestressed top chord for a girder. The projecting ends of the tendons will be cut off flush with the ends of the concrete member.
  • the web of the girder is secured to the bottom chord. Both of these parts are all metal.
  • the web and chord may take various wellknown forms, a very suitable form being shown in FIGS. 4 and 5. It will there be seen that the bottom chord is formed from parallel angle bars 10- riveted or welded to the opposite sides of a line of gusset plates 1.1.
  • the web is formed from short angle bars 12, preferably arranged in pairs, riveted or welded at one end to the opposite sides of the gusset plates. Some of the bars are vertical and some are inclined, the inclined bars at one side of the center of the web being inclined opposite to those at the other side of the center of the web. In the finished girder the vertical bars usually will be compression members and the inclined bars usually Will be tension members.
  • the next step is to secure the web bars 12 to the gusset plates 6 of the top cord.
  • a suitable support such as a long rigid beam or platform 13 having anchor members 14 at its opposite ends.
  • Mounted in one of the anchor members near its top is a pulling jack 15, while a similar jack 16 or a rigid clamp is mounted in the other anchor memher. They are clamped to the adjoining ends of the bottom chord, which is held by them in inverted position with the web bars extending down and straddling the lower row of gusset plates 6 projecting from the inverted top chord.
  • the jack or jacks are actuated to stretch the chord bars and hold them under tension. This spreads the lower ends of the Web bars farther apart. While the bottom chord of the girder is held in tension in this way, the web bars are riveted or welded to the lower gusset plates to form a complete girder.
  • the components of the girder will not change their lengths appreciably until loads greater than design loads are applied to them. Also, due to the greatly reduced deflection in such a prestressed girder, shallower girder depths can be used, thereby reducing the overall heights of buildings while maintaining the same clearance between floor and ceiling.
  • Girder deflection under load can be reduced still further by elongating the inclined web bars before fastening their free ends to the top chord.
  • the elongating can be done by applying heat in any suitable manner to the bars throughout their lengths.
  • it would be desirable to shorten the vertical web bars by chilling them throughout their lengths. While the web bars are longitudinally expanded and contracted in this manner, their free ends are secured to the gusset plates of the topchord. Then, when the web returns to room temperature, the inclined bars will be under greater tension than otherwise and the vertical bars will be under greater compression. Conseqeuntly, deflections under load, due to the web changing its dimensions, will be even less than if the web were not treated as just explained.
  • a big advantage of my method and the girder produced by it is that I can use a commercially produced prestressed top chord, instead of having to prestress at the building site. There is no waiting for concrete to set after the girder has been assembled. There is no prestressing to be done after the girder has been mounted in place in the structure, of which it is to form a part.
  • the concrete top chord can be made wide and massive enough to form a part of the floor slab.
  • the prestressed top chords, made at a manufacturing plant can be assembled with the web and bottom chord either at the same plant or at the location where the web and bottom chord are made. In case there are a sufiicient number of duplicate girders to be used on a given job to justify it, the assembly of the top chords with the preassembled webs and bottom chords could be done in assembling equipment at the job site.
  • Concrete is a most economical material for carrying compressive stresses, while steel is ideally suited for tension.
  • my girder the two materials are combined in their proper relationship to the greatest advantage.
  • Shipment of the girder is lower in cost than the shipment of all-concrete members, because the steel webs and bottom chords weigh appreciably less than the concrete webs and bottom chords or flanges of precast concrete beams or girders. This reduction in weight also makes my girder easier to handle and reduces building weights.
  • the web 20 of the girder is formed from a steel plate that may be solid or have sections punched out of it.
  • the concrete top chord is made and prestressed in the same way as the one previously described, except that instead of embedding a series of gusset plates in the concrete 21, it is preferred to embed a single continuous gusset plate 22.
  • the lower edge of the web plate is secured by means of welding rivets or bolts to the bottom chord of the girder. which may be formed from a single member or a pair of angle bars 23.
  • the top chord is laid bottom side up in tensioning apparatus similar to that shown in FIG. 6, and stretching apparatus is secured to both ends of the inverted bottom chord and the web plate above the top chord to stretch them.
  • the lower edge of the web plate may be welded to the long gusset plate 22 projecting from the top chord, or a line of holes may be drilled along the lower edge of the web plate to match holes previously drilled in the gusset plate.
  • This plate and the web then can be secured together by bolts 24 or the like.
  • the bottom chord and web then are released from the jacks and the girder is removed from the tensioning apparatus and may be turned right side up as shown in the drawings.
  • the prestressed top chord of the girder prevents the stretched Web and bottom chord from contracting longitudinally.
  • a solid web girder of this type is preferred where it is desired to use a girder having an unusually shallow depth.

Description

Jan. 26, 1965 G. G. GREULICH mamon OF MAKING PRESTRESSED GIRDER 2 Sheets-Sheet 2 Filed May 2, 1962 147' 7' OP/VEYS'.
65mm 6. GREUL/Ch' BY 8m, s oimu.
United States Patent METHOD 6F MAKING PRESTRESED GIRDER Geraid Gregory Greulich, 3018 NE. 20th Court, Fort Lauderdale, Fla.
Filed May 2, 1962, Ser. No. 191,966 Claims. (Cl. 29--155) This invention relates to a method of making prestressed girders, and more particularly to one in which only the top chord is made from prestressed concrete.
Prestressed concrete construction has attained its present acceptance and widespread use because, by reducing dead loads or permitting the use of larger clear spans with the same dead load or weight, as well as greater stiffness of construction with less deflection, a less costly and more flexible building design is possible. It is also known that because prestressing uses concrete more fully, less of it is required for a given loading condition so that the benefits of a lighter building are obtained without sacrificing strength or rigidity. Lower overall weight naturally reduces column and foundation size requirements, with attendant reduction in their costs. The factor of lower deflection also reduces problems of fitting long rows of window frames or prefabricated partitions into buildings. Nevertheless, in spite of all of these advantages, prestressed concrete beams and girders are very heavy to transport and handle, while it is quite an undertaking to do the prestressing at the site of the construction.
It is among the objects of this invention to provide a method of making a prestressed girder which is relatively easy to make, which can be constructed either at the prestressing plant or at the building site, and which expedites building.
In accordance with this invention only the top chord of a girder is made from prestressed concrete. It is made separately from the rest of the girder before the girder is assembled. Also in a separate operation a metal web is secured to a metal bottom chord. Then the bottom chord, and preferably at least part of the web, are stretched lengthwise in suitable apparatus. While the bottom chord is maintained in its stretched condition, the metal web is rigidly secured to the top chord, such as to gusset plate means projecting from the concrete. Then the stretching apparatus is disconnected from the bottom chord and the girder is complete. The concrete upper chord of the girder is under material compression, due to the prestressing, and the lower chord is under material tension because of the pretensioning which is maintained by the web.
The invention is illustrated in the accompanying drawings, in which FIG. 1 is a side view of the top chord of my girder in inverted position in prestressing apparatus;
FIG. 2 is a side view of the finished top chord right side up, with a portion broken away in section;
FIG. 3 is an enlarged cross section of the top chord taken on the line IIIIII of FIG. 2;
FIG. 4 is a side view of the bottom chord and the web secured to it;
FIG. 5 is an enlarged cross section taken on the line VV of FIG. 4;
FIG. 6 is a side view of the elements of the girder inverted in apparatus for prestressing the bottom chord;
FIG. 7 is a fragmentary side view of the finished girder;
FIG. 8 is a view similar to FIG. 7 of a modification; and
3,lhh,83h Patented Jan. 26, 1965 FIG. 9 is a vertical section taken on the line IX-IX of FIG. 8.
The top chord for my girder is made by molding concrete into the desired shape around cables or rods, hereinafter called tendons. The tendons are disposed side by side in the mold and their ends are fastened to suitable tension jacks. Before or after the concrete has been poured in the mold the jacks are actuated to stretch the tendons short of their elastic limit, and they are held in that condition until after the concrete sets. Then the tendons are released from the jacks, and their tendency to contract places the concrete under compression to form a prestressed chord. In FIG. 1 of the drawings, some of the apparatus which can be used for carrying out this method is shown. It includes jacks I mounted in horizontally spaced anchor members 2 that may be held a fixed distance apart by a horizontal beam 3 joined to their lower ends. Each anchor member supports one or more rows of the jacks, which are detachably secured in any suitable manner to the opposite ends of a plurality of parallel tendons 4. If desired, the jacks can be eliminated at one end and their places taken by fixed clamps. The drawing shows the top chord after the concrete 5 has set and the forms have been removed, but before the tendons have beenreleased from the jacks. The chord is bottom side up.
To enable the web of the girder to be readily connected to the concrete top chord, it is preferred that at the time of molding the chord a line of upwardly projecting metal gusset plates a should be embedded in the concrete.
To help anchor the plates in the concrete, they may be provided with holes, through which extend dowel pins 7 that are likewise embedded in the concrete as shown in FIGS. 2 and 3. After the concrete has set, the jacks are released from the tendons, which then will tend to contract to their original length. In doing so, they will compress the concrete lengthwise of the chord and thereby form a prestressed top chord for a girder. The projecting ends of the tendons will be cut off flush with the ends of the concrete member.
In an entirely separate operation, the web of the girder is secured to the bottom chord. Both of these parts are all metal. The web and chord may take various wellknown forms, a very suitable form being shown in FIGS. 4 and 5. It will there be seen that the bottom chord is formed from parallel angle bars 10- riveted or welded to the opposite sides of a line of gusset plates 1.1. The web is formed from short angle bars 12, preferably arranged in pairs, riveted or welded at one end to the opposite sides of the gusset plates. Some of the bars are vertical and some are inclined, the inclined bars at one side of the center of the web being inclined opposite to those at the other side of the center of the web. In the finished girder the vertical bars usually will be compression members and the inclined bars usually Will be tension members.
The next step is to secure the web bars 12 to the gusset plates 6 of the top cord. This is done by placing the inverted top chord on a suitable support, such as a long rigid beam or platform 13 having anchor members 14 at its opposite ends. Mounted in one of the anchor members near its top is a pulling jack 15, while a similar jack 16 or a rigid clamp is mounted in the other anchor memher. They are clamped to the adjoining ends of the bottom chord, which is held by them in inverted position with the web bars extending down and straddling the lower row of gusset plates 6 projecting from the inverted top chord. Before fastening the lower ends of the Web bars to the adjoining gusset plates, the jack or jacks are actuated to stretch the chord bars and hold them under tension. This spreads the lower ends of the Web bars farther apart. While the bottom chord of the girder is held in tension in this way, the web bars are riveted or welded to the lower gusset plates to form a complete girder.
It will be seen that when the bottom chord subsequently is released from the tensioning means, its longitudinal contraction will be restrained and largely prevented by the inclined web tension bars pulling against the prestressed top chord at their lower ends. The same action causes the inclined bars to help tendons 4- hold the top chord under longitudinal compression. When the girder is removed from the tensioning apparatus and turned right side up, it will appear as shown in FIG. 7, with a prestressed (compressed) top chord and a prestressed (tensioned) bottom chord. As has just been explained, both chords of the girder were prestressed before they are connected together. The resulting girder will be much stronger than an ordinary girder and therefore can be used in longer lengths without intermediate support. The components of the girder will not change their lengths appreciably until loads greater than design loads are applied to them. Also, due to the greatly reduced deflection in such a prestressed girder, shallower girder depths can be used, thereby reducing the overall heights of buildings while maintaining the same clearance between floor and ceiling.
Girder deflection under load can be reduced still further by elongating the inclined web bars before fastening their free ends to the top chord. The elongating can be done by applying heat in any suitable manner to the bars throughout their lengths. At the same time, where possible, it would be desirable to shorten the vertical web bars by chilling them throughout their lengths. While the web bars are longitudinally expanded and contracted in this manner, their free ends are secured to the gusset plates of the topchord. Then, when the web returns to room temperature, the inclined bars will be under greater tension than otherwise and the vertical bars will be under greater compression. Conseqeuntly, deflections under load, due to the web changing its dimensions, will be even less than if the web were not treated as just explained.
A big advantage of my method and the girder produced by it is that I can use a commercially produced prestressed top chord, instead of having to prestress at the building site. There is no waiting for concrete to set after the girder has been assembled. There is no prestressing to be done after the girder has been mounted in place in the structure, of which it is to form a part. The concrete top chord can be made wide and massive enough to form a part of the floor slab. The prestressed top chords, made at a manufacturing plant, can be assembled with the web and bottom chord either at the same plant or at the location where the web and bottom chord are made. In case there are a sufiicient number of duplicate girders to be used on a given job to justify it, the assembly of the top chords with the preassembled webs and bottom chords could be done in assembling equipment at the job site.
Concrete is a most economical material for carrying compressive stresses, while steel is ideally suited for tension. In my girder the two materials are combined in their proper relationship to the greatest advantage. Shipment of the girder is lower in cost than the shipment of all-concrete members, because the steel webs and bottom chords weigh appreciably less than the concrete webs and bottom chords or flanges of precast concrete beams or girders. This reduction in weight also makes my girder easier to handle and reduces building weights.
In the modification shown in FIGS. 8 and 9 the web 20 of the girder is formed from a steel plate that may be solid or have sections punched out of it. The concrete top chord is made and prestressed in the same way as the one previously described, except that instead of embedding a series of gusset plates in the concrete 21, it is preferred to embed a single continuous gusset plate 22. The lower edge of the web plate is secured by means of welding rivets or bolts to the bottom chord of the girder. which may be formed from a single member or a pair of angle bars 23. The top chord is laid bottom side up in tensioning apparatus similar to that shown in FIG. 6, and stretching apparatus is secured to both ends of the inverted bottom chord and the web plate above the top chord to stretch them. While thy are under tension, the lower edge of the web plate may be welded to the long gusset plate 22 projecting from the top chord, or a line of holes may be drilled along the lower edge of the web plate to match holes previously drilled in the gusset plate. This plate and the web then can be secured together by bolts 24 or the like. The bottom chord and web then are released from the jacks and the girder is removed from the tensioning apparatus and may be turned right side up as shown in the drawings. The prestressed top chord of the girder prevents the stretched Web and bottom chord from contracting longitudinally. A solid web girder of this type is preferred where it is desired to use a girder having an unusually shallow depth.
According to the provisions of the patents statutes, I have explained the principle of my invention and have illustrated and described what I now consider to represent its best embodiment. However, I desire to have it understood that, within the scope of the appended claims, the invention may be practiced otherwise than as specifically illustrated and described.
I claim:
1. The method of making a girder, comprising prestressing a separate concrete top chord to place it under permanent material compression, rigidly securing a metal web to a metal bottom chord, stretching the bottom chord lengthwise until it is under material tension and then rigidly securing the web to the top chord while maintaining the bottom chord stretched.
2. The method of making a girder, comprising prestressing a separate concrete top chord to place it under permanent material compression, rigidly securing one edge of a metal web plate to a metal bottom chord, stretching the plate and bottom chord lengthwise together until they are under material tension, and then rigidly securing the opposite edge of the web plate to the top chord while maintaining the plate and bottom chord stretched.
3. The method of making a girder, comprising prestressing a separate concrete top chord to place it under permanent material compression, rigidly securing one end of metal web bars to a metal bottom chord with some of the bars at each side of the center of that chord inclined therefrom outwardly toward its ends, and stretching the bottom chord lengthwise until it is under material tension and while stretched rigidly securing the opposite end of the bars to the top chord.
4. The method of making a girder, comprising prestressing a separate concrete top chord to place it under permanent material compression, rigidly securing one end of metal web tension bars and of metal web compression bars to a metal bottom chord, stretching the bottom chord lengthwise until it is under material tension, heating the tension bars to elongate them, and then rigidly securing the free ends of all of said bars to the top chord while the tension bars remain elongated and the bottom chord remains stretched.
5. The method of making a girder, comprising prestressing a separate concrete top chord to place it under permanent material compression, rigidly securing one end of metal Web tension bars and of metal web compression bars to a metal bottom chord, stretching the bottom chord lengthwise until it is under material tension, heating the tension bars to elongate them, chilling the compression bars to contract them, and then rigidly securing the free ends of all of the bars to the top chord While the tension 'bars remain elongated and the compression bars remain contracted and the bottom chord remains stretched. 5
References Cited by the Examiner UNITED STATES PATENTS 7/30 Leake 29447 Probeck 29-155 Davison et a1 50-128 Stump 50128 Dobell 29-155 Dean et a1. 29-155 WHITMORE A. WILTZ, Primary Examiner. RICHARD W. COOKE, THOMAS H. EAGER,
Examiners.

Claims (1)

1. THE METHOD OF MAKING A GIRDER, COMPRISING PRESTRESSING A SEPERATE CONCRETE TOP CHORD TO PLACE IT UNDER PERMANENT MATERIAL COMPRESSION, RIGIDLY SECURING A METAL WEB TO A METAL BOTTOM CHORD, STRETCHING THE BOTTOM CHORD LENGTHWISE UNTIL IT IS UNDER MATERIAL TENSION AND THEN RIGIDLY SECURING THE WEB TO THE TOP CHORD WHILE MAINTAING THE BOTTOM CHORD STRETCHED.
US191966A 1962-05-02 1962-05-02 Method of making prestressed girder Expired - Lifetime US3166830A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US191966A US3166830A (en) 1962-05-02 1962-05-02 Method of making prestressed girder
US333880A US3260024A (en) 1962-05-02 1963-12-27 Prestressed girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US191966A US3166830A (en) 1962-05-02 1962-05-02 Method of making prestressed girder

Publications (1)

Publication Number Publication Date
US3166830A true US3166830A (en) 1965-01-26

Family

ID=22707654

Family Applications (1)

Application Number Title Priority Date Filing Date
US191966A Expired - Lifetime US3166830A (en) 1962-05-02 1962-05-02 Method of making prestressed girder

Country Status (1)

Country Link
US (1) US3166830A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3385015A (en) * 1966-04-20 1968-05-28 Margaret S Hadley Built-up girder having metal shell and prestressed concrete tension flange and method of making the same
US4646493A (en) * 1985-04-03 1987-03-03 Keith & Grossman Leasing Co. Composite pre-stressed structural member and method of forming same
US4700516A (en) * 1981-11-25 1987-10-20 Keith And Grossman Leasing Company Composite, pre-stressed structural member and method of forming same

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1770933A (en) * 1929-05-17 1930-07-22 Arthur G Leake Method of strengthening structural members under load
US1770932A (en) * 1929-05-17 1930-07-22 Arthur G Leake Method of strengthening structural members under load
US2172806A (en) * 1938-06-14 1939-09-12 Fed Machine And Welder Company Method of making beams
US2178097A (en) * 1937-12-14 1939-10-31 Pierce John B Foundation Prestressed structural unit
US2850892A (en) * 1955-08-16 1958-09-09 Jr Charles W Stump Prestressed concrete structural element
US2887762A (en) * 1950-04-03 1959-05-26 Preload Co Inc Method of making prestressed structural member
US3007233A (en) * 1959-04-24 1961-11-07 Dean Method of prestressing tension bars of a lock gate

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1770933A (en) * 1929-05-17 1930-07-22 Arthur G Leake Method of strengthening structural members under load
US1770932A (en) * 1929-05-17 1930-07-22 Arthur G Leake Method of strengthening structural members under load
US2178097A (en) * 1937-12-14 1939-10-31 Pierce John B Foundation Prestressed structural unit
US2172806A (en) * 1938-06-14 1939-09-12 Fed Machine And Welder Company Method of making beams
US2887762A (en) * 1950-04-03 1959-05-26 Preload Co Inc Method of making prestressed structural member
US2850892A (en) * 1955-08-16 1958-09-09 Jr Charles W Stump Prestressed concrete structural element
US3007233A (en) * 1959-04-24 1961-11-07 Dean Method of prestressing tension bars of a lock gate

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3385015A (en) * 1966-04-20 1968-05-28 Margaret S Hadley Built-up girder having metal shell and prestressed concrete tension flange and method of making the same
US4700516A (en) * 1981-11-25 1987-10-20 Keith And Grossman Leasing Company Composite, pre-stressed structural member and method of forming same
US4646493A (en) * 1985-04-03 1987-03-03 Keith & Grossman Leasing Co. Composite pre-stressed structural member and method of forming same

Similar Documents

Publication Publication Date Title
US9765521B1 (en) Precast reinforced concrete construction elements with pre-stressing connectors
KR100423757B1 (en) Prestressed composite truss girder and construction method of the same
US5279093A (en) Composite girder with apparatus and method for forming the same
EP0211671B1 (en) Trussed girder and method of constructing the roof framing of a building using the trussed girder
EA006125B1 (en) Indirectly prestressed, concrete, roof-ceiling construction with flat soffit
US5305572A (en) Long span post-tensioned steel/concrete truss and method of making same
KR101885634B1 (en) Corrugated Steel Plate Web-PSC beam And Bridge Construction Method Thereof
JPS6114287B2 (en)
US3260024A (en) Prestressed girder
US3153302A (en) Building construction
US2859504A (en) Process of making prestressed concrete structures
RU160846U1 (en) PRELIMINARY-TENSIONED REINFORCED-MONOLITHIC REINFORCED CONCRETE PLATE OF THE ROADWAY OF THE UNRACKED STEEL-REINFORCED CONCRETE BRIDGE
US3166830A (en) Method of making prestressed girder
KR100274141B1 (en) Manufacturing method of preplex composite beem by divisional method
US3835607A (en) Reinforced girders of steel and concrete
KR101734304B1 (en) Manufacturing Method of Efficient Steel-Concrete Composite Girder, Construction Method of Continuous Bridges using such Composite Girder, and Continuous Bridges constructed by such Method
JP4036752B2 (en) Double prestressed composite roof ceiling structure with flat bottom plate structure
KR19980025917A (en) Multi-span prestressed steel composite continuous member and its construction method
KR100561034B1 (en) Connecting method for segmental prestressed preflex steel composite beam
KR102139851B1 (en) PSC Girder With Variable Cross Section And Slab Construction Method Using Thereof
US2898757A (en) Method of constructing reinforced concrete bridge
RU2621247C1 (en) Steel-concrete beam
US3175653A (en) Deck construction
US1141160A (en) Reinforced-concrete building construction.
RU2789683C1 (en) Hybrid beam