US3472032A - Production and storage system for offshore oil wells - Google Patents

Production and storage system for offshore oil wells Download PDF

Info

Publication number
US3472032A
US3472032A US687244A US3472032DA US3472032A US 3472032 A US3472032 A US 3472032A US 687244 A US687244 A US 687244A US 3472032D A US3472032D A US 3472032DA US 3472032 A US3472032 A US 3472032A
Authority
US
United States
Prior art keywords
water
buoyant
riser
production
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US687244A
Inventor
George C Howard
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pan American Petroleum Corp
Original Assignee
Pan American Petroleum Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pan American Petroleum Corp filed Critical Pan American Petroleum Corp
Application granted granted Critical
Publication of US3472032A publication Critical patent/US3472032A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations

Definitions

  • the tank has a slight upward buoyancy. It 18 held in position by a long, preferably flexible, conduit connected to the well head in the floor of the body of water.
  • a smaller production conduit is positioned inside the large outer flexible conduit and is connected to the string of producing tubing in the well.
  • a narrow cylindrical neck extends from a large tank to above the surface of the water where it supports a work deck and helicopter deck.
  • a gas-oil separator and other treating equipment is carried within the large buoyant tank. Means are rovided to transport oil from the storage tank to a transport vessel.
  • This invention relates to the production of petroleum from a well drilled in a marine location.
  • this invention concerns a completion assembly for a well drilled to the bottom of a body of water.
  • a production tubing string in the well extends upwardly toward the surface of the body of water.
  • a conduit means larger than the production tubing string surrounds such production tubing.
  • the conduit means is secured to the floor of the body of water.
  • Buoyant means are attached near the upper end of the conduit means but be- 3,472,032 Patented Oct. 14, 1969 low the main action of waves.
  • the buoyant means preferably includes treating means for the oil and chambers for storing the oil after treatment.
  • a neck extends upwardly from the buoyant means to above the surface of the water.
  • a deck is supported by such neck.
  • FIGURE 1 of the drawing there is illustrated a well head or anchor base 10 in the bottom 12 of the body of water 14. Supported in body of water 14 is a buoyant storage means 16. Above the body of water is a work deck 18 and a helicopter port deck means 20.
  • buoyant storage tank 16 in position. This is provided by a conduit 22 which is connected to surface casing 24. Surface casing 24 is held in position by being cemented into the previously drilled well and attached to the well head base plate 10 in any well-known manner.
  • Riser conduit 22 flexibly connects tank 16 to such surface conduit casing 24. This flexibility can be built into riser 22 by making it of a flexible material such as rubber containing reinforcing steel wires therethrough to give it strength.
  • riser conduit means 22 can be made of high strength steel, which is that commonly used in riser pipes in offshore drilling operations, and the lower end thereof can contain a flexible joint 26 which can conveniently be a ball joint type connector.
  • Conduit 22 is connected at its lower end through autoconnect 28 to surface casing 24.
  • the upper end of riser conduit means 22 is connected to buoyant storage means 16. It is thus seen that storage tank means 16 is anchored to the ocean floor by the surface casing 24. This anchorage is not rigid but rather is flexible so that riser 22 and storage means 16 can give with the effects of currents and tides.
  • the storage tank 16 is spaced a suflicient distance below the surface of the water to minimize the effects of Wave action thereon.
  • the strength required in riser conduit means 22 can also be minimized.
  • a neck 30 extends from the center of buoyancy means 16 to well above the surface of the water, e.g., 20 to 30 feet.
  • Neck 30 supports lower work deck 18 and the helicopter port deck 20.
  • Access means are provided at the upper end of neck 30 so that it can be closed for most of the time but opened when it is necessary to have access to the interior thereof.
  • neck 30 can be in the order of 8-l0 feet in diameter and riser conduit means 22 may be in the order of 2 feet.
  • a tubing string 32 is suspended in production string 34 in the well bore.
  • a safety cutoff valve 36 is provided in tubing 32 below the ocean floor to shut in the well in event the upper production string is broken.
  • Tubing 32 is connected to tubing extension 32A which extends upwardly in the inside of riser means 22.
  • Tubing extension 32A extends on upwardly through neck 30 to above port deck 20 and it is provided with a well head assembly such as indicated by valve means 38.
  • the outlet of valve 38 is connected to a down pipe 40 which goes down to a treating means such as a gas-oil separator 42 located in buoyant storage means 16.
  • the outlet of gas-oil separator 42 is into one of the storage compartments of buoy ancy means 16.
  • Buoyancy mean 16 has a plurality of vertical baffle plates 86 which may or may not be provided with openings so that oil may freely flow one compartment to the other. It may be desirable to have a compartmental tank to minimize oil loss in event of damage.
  • the gas from the separator 42 goes through overflow pipe 48 where it can be flared or otherwise disposed of according to existing regulations.
  • This includes a discharge pipe 50 which extends from the interior storage compartments of buoyancy means 16 up through the supporting neck 30 and deck 18.
  • a pump 52 can conveniently be provided in the lower end of discharge pipe 50.
  • An outlet 54 is provided on the outer end of discharge conduit 50 so that a suitable hose can be connected thereto so that a ship can be loaded.
  • anchor lines 56 can be provided from the buoyancy means 16 to anchors in the ocean floor (at a spot not shown). These anchor lines 56 are in reality restraining lines instead of anchor lines and will ordinarily be slack as illustrated in the drawing.
  • buoyancy tank 16 and associated riser pipe 22, neck 30 and work deck 18 in the position shown in the drawing. Conveniently, this can be accomplished by making up buoyancy means 16, riser pipe means 22, neck 30, decks l8 and 20 and auto-connect 28 fabricated similarly as shown. These could be floated to location in a horizontal position.
  • winch lines 60 are connected at 62 to guide arms 64. Winch lines 60 extend from the guide arms 64 on the auto-connect 28 which is connected to riser pipe 22. Winch lines 60 extend on downwardly through pulleys 66 which are anchored to anchor block 10. The ends of the winch lines have previously been attached to buoys so that the lines can be recovered when needed for pulling the riser down.
  • winch lines 60 go to the surface where they are connected to winch lines or a tugboat or the like (not shown).
  • winch lines 60 By winch lines 60, the apparatus or completion system is moved to the position shown in the drawing and auto-connect 28 is drawn into line with its counterpart on surface casing 24.
  • the upper ends of winch lines 60 are disconnected from the tugboat and can be supported by buoys, not shown, in event it is necessary to use them again.
  • buoyancy tank 16 and associated equipment in the position shown in FIGURE 1 are possible.
  • One alternate method is to float the apparatus including the buoyant storage means 16, work deck 18, helicopter deck 20 and riser assembly 22 into place above the well head or surface casing 24 in a vertical orientation. This is accomplished by emptying buoyant means 16, and having it of sufficient buoyancy so that it floats on the surface.
  • buoyant means 16 is flooded. The tank is flooded and deflooded by well known means, not shown.
  • buoyant storage means 16 As the compartments of buoyant storage means 16 are flooded, the device is sinking into the water. Riser 22 and auto-connect 28 are guided into place using a sonic well head locator, for example. Lateral movement is effected by tugboat (not shown) moving the equipment to location.
  • Buoyant storage means 16 typically is about 15,000 bbl. capacity or days producing capacity of the well, whichever is larger. Transfer of the oil is preferably effected by pump 50 as explained above. Alternatively, it can be accomplished by allowing sea water to enter the compartments through inlets, not shown, and forcing the oil up through outlet pipe 50. If this system is used it is preferred to provide a minimum buoyancy by use of a floatation compartment 70 on the lower side of the storage means. This compartment can be filled with styrofoam, if desired. Another way of insuring a vertical buoyancy is to maintain a cushion of inert gas in the upper portion of buoyant storage means 16.
  • FIGURE 2 illustrates a modification of the system shown for moving the riser pipe down into proper engagement with the well head casing 24.
  • a buoyant means is secured by latching means 84, shown schematically, to riser pipe 22A.
  • Arms 64A from auto-connect 28A are provided with cable winches 78. These winches are provided power from the surface by electric cable 76.
  • Lines 60 from winches 78 extend downwardly to anchors which are secured to anchor base 10A.
  • Guide lines 60 are conveniently set and attached with base plate 10A when it is set. Thus line 60 could extend to the surface and be supported by buoys in a known manner.
  • lines 60 are connected to winches 78.
  • the riser pipe assembly is pulled into proper position.
  • Buoyant tanks 80 maintain tension on the riser pipe 22A. The pipe is thus pulled down against this upward force of buoyant means 80.
  • a completion assembly for a well drilled into the bottom of a body of water having:
  • buoyant means including an oil storage chamber connected to said production string;
  • riser conduit means larger than said production string and surrounding said production string, said riser conduit means being secured at one end to the floor of said body of water and at the other end to said buoyant means whereby said buoyant means exerts the only upward force on said riser conduit means, said riser conduit means including means flexibly connecting said buoyant means to the floor of said body of water.
  • An assembly as defined in claim 1 including means for connecting said production string to oil transport means.
  • An assembly as defined in claim 1 including winch means connected to said riser conduit means, cable means on said Winch means, and anchor means anchored to the ocean floor, said cable means connected to said anchor means.
  • buoyant means includes a plurality of compartments and further including means to flood and deflood each compartment with sea water.
  • An assembly as defined in claim 3 including an extension neck of larger size than said riser conduit means extending from said buoyant means to above the surface of the body of water and a working deck supported above said surface of water by said extension neck.
  • An assembly for a well head drilled in the floor of a body of water and in which casing anchored to the floor has been set which comprises:
  • riser conduit means extending from near the upper end of said casing toward surface of said body of water
  • buoyant storage means attached to said riser conduit means at its upper end below the surface of the body of water;
  • production conduit extending from said tubing to said buoyant storage means, said production conduit means including means for controlling from the surface the flow of fluid through such production conduit means;
  • An assembly as defined in claim 9 including a flexible joint connecting said riser conduit means to said casinganchor to the floor.
  • An assembly as defined in claim 10 including an extension rieck extending from said buoyant storage means to abojve' the surface of the water permitting ingress and egress to said buoyant storage means and including a work deck supported above the surface of the body of water by said extension neck.
  • An assembly as defined in claim 9 including pulleys anchored to the ocean floor adjacent said anchored cas- 111g;
  • winch lines extending from said guide arms through said pulleys to the surface of said body of water.
  • completion assembly for a well drilled into the bottom of a body of water and having:
  • riser conduit means larger than said production string and surrounding said production string, said riser conduit means being secured at one end to the floor of said body of water and at the other end to said buoyant means whereby said buoyant means exerts an upward force on said riser conduit means, said riser conduit means including means flexibly connecting said buoyant means to the floor of said body of water;

Description

Oct. 14, 1969 e. c. HOWARD 3,472,032
PRODUCTION AND STORAGE SYSTEM FoR OFFSHORE OIL WELLS Filed Dec. 1. 1967 34 I INVENTOR.
ll! gggEoReE c. HOWARD I BY M 5 ATTORNEY United States Patent 3,472,032 PRODUCTION AND STORAGE SYSTEM FOR OFFSHORE OIL WELLS George C. Howard, Tulsa, Okla., assignor to Pan American Petroleum Corporation, Tulsa, Okla., a corporation of Delaware Filed Dec. 1, 1967, Ser. No. 687,244 Int. Cl. E02d 21/00; E21c 19/00; E21]: 43/01 US. Cl. 61-46 13 Claims ABSTRACT OF THE DISCLOSURE A completion and producing system is described for a well drilled in an area covered by deep water. It includes a large buoyant storage tank positioned in the water below wave action. The tank has a slight upward buoyancy. It 18 held in position by a long, preferably flexible, conduit connected to the well head in the floor of the body of water. A smaller production conduit is positioned inside the large outer flexible conduit and is connected to the string of producing tubing in the well. A narrow cylindrical neck extends from a large tank to above the surface of the water where it supports a work deck and helicopter deck. A gas-oil separator and other treating equipment is carried within the large buoyant tank. Means are rovided to transport oil from the storage tank to a transport vessel.
SPECIFICATION This invention relates to the production of petroleum from a well drilled in a marine location.
BACKGROUND In recent years the search for oil and gas has extended into water-covered areas. At first this search was in relatively shallow water, tag, 50 to 100 feet. In water of this depth, either an island or a platform was built over the proposed well site and the well was drilled from the island using dry land techniques. The islands were formed by, for example, dredging up large amounts of gravel until the islands extended above the surface of the water. Platforms were ordinarily formed by driving piling or long columns of steel into the ocean floor and attaching the deck to the ends of the piling which extend above the surface of the body of water. If a commercial well was obtained, the well head was on the platform or the top of the island similarly as on dry land wells.
More recently, the search for oil and gas has extended into deeper waters, for example, up to depths of 400600 feet or more, and in a few instances even in excess of 1,000 feet. At these depths it is seldom feasible to build up an island or platform. Consequently, wells from this depth are drilled from large floating vessels. This drilling technique has advanced quite rapidly, and although there are still many problems associated therewith, the practice has been fairly successful. If production of oil is found in paying quantities, there must be some satisfactory way of completing the well. This area of exploitation is in its infant stage and is not nearly so well developed as that of drilling from floating vessels. It is with this completion stage that this invention is concerned.
BRIEF DESCRIPTION OF THE INVENTION Broadly speaking, this invention concerns a completion assembly for a well drilled to the bottom of a body of water. A production tubing string in the well extends upwardly toward the surface of the body of water. A conduit means larger than the production tubing string surrounds such production tubing. The conduit means is secured to the floor of the body of water. Buoyant means are attached near the upper end of the conduit means but be- 3,472,032 Patented Oct. 14, 1969 low the main action of waves. The buoyant means preferably includes treating means for the oil and chambers for storing the oil after treatment. A neck extends upwardly from the buoyant means to above the surface of the water. A deck is supported by such neck.
THE DRAWING DETAILED DESCRIPTION In FIGURE 1 of the drawing there is illustrated a well head or anchor base 10 in the bottom 12 of the body of water 14. Supported in body of water 14 is a buoyant storage means 16. Above the body of water is a work deck 18 and a helicopter port deck means 20.
I shall first consider means of positioning buoyant storage tank 16 in position. This is provided by a conduit 22 which is connected to surface casing 24. Surface casing 24 is held in position by being cemented into the previously drilled well and attached to the well head base plate 10 in any well-known manner. Riser conduit 22 flexibly connects tank 16 to such surface conduit casing 24. This flexibility can be built into riser 22 by making it of a flexible material such as rubber containing reinforcing steel wires therethrough to give it strength. Alternatively, riser conduit means 22 can be made of high strength steel, which is that commonly used in riser pipes in offshore drilling operations, and the lower end thereof can contain a flexible joint 26 which can conveniently be a ball joint type connector.
Conduit 22 is connected at its lower end through autoconnect 28 to surface casing 24. The upper end of riser conduit means 22 is connected to buoyant storage means 16. It is thus seen that storage tank means 16 is anchored to the ocean floor by the surface casing 24. This anchorage is not rigid but rather is flexible so that riser 22 and storage means 16 can give with the effects of currents and tides. The storage tank 16 is spaced a suflicient distance below the surface of the water to minimize the effects of Wave action thereon. Thus, by controlling the buoyancy of the floating tank, the strength required in riser conduit means 22 can also be minimized.
The structure above the water will next be discussed. A neck 30 extends from the center of buoyancy means 16 to well above the surface of the water, e.g., 20 to 30 feet. Neck 30 supports lower work deck 18 and the helicopter port deck 20. Access means are provided at the upper end of neck 30 so that it can be closed for most of the time but opened when it is necessary to have access to the interior thereof. By way of example, it is anticipated that neck 30 can be in the order of 8-l0 feet in diameter and riser conduit means 22 may be in the order of 2 feet.
Attention is next directed toward the oil producing tubing. A tubing string 32 is suspended in production string 34 in the well bore. A safety cutoff valve 36 is provided in tubing 32 below the ocean floor to shut in the well in event the upper production string is broken. Tubing 32 is connected to tubing extension 32A which extends upwardly in the inside of riser means 22. Tubing extension 32A extends on upwardly through neck 30 to above port deck 20 and it is provided with a well head assembly such as indicated by valve means 38. The outlet of valve 38 is connected to a down pipe 40 which goes down to a treating means such as a gas-oil separator 42 located in buoyant storage means 16. The outlet of gas-oil separator 42 is into one of the storage compartments of buoy ancy means 16. Buoyancy mean 16 has a plurality of vertical baffle plates 86 which may or may not be provided with openings so that oil may freely flow one compartment to the other. It may be desirable to have a compartmental tank to minimize oil loss in event of damage. The gas from the separator 42 goes through overflow pipe 48 where it can be flared or otherwise disposed of according to existing regulations.
Means for transferring oil from the storage tank will now be discussed. This includes a discharge pipe 50 which extends from the interior storage compartments of buoyancy means 16 up through the supporting neck 30 and deck 18. A pump 52 can conveniently be provided in the lower end of discharge pipe 50. An outlet 54 is provided on the outer end of discharge conduit 50 so that a suitable hose can be connected thereto so that a ship can be loaded.
If desired, anchor lines 56 can be provided from the buoyancy means 16 to anchors in the ocean floor (at a spot not shown). These anchor lines 56 are in reality restraining lines instead of anchor lines and will ordinarily be slack as illustrated in the drawing.
Attention will now be directed toward means of placing the buoyancy tank 16 and associated riser pipe 22, neck 30 and work deck 18 in the position shown in the drawing. Conveniently, this can be accomplished by making up buoyancy means 16, riser pipe means 22, neck 30, decks l8 and 20 and auto-connect 28 fabricated similarly as shown. These could be floated to location in a horizontal position. When over location, winch lines 60 are connected at 62 to guide arms 64. Winch lines 60 extend from the guide arms 64 on the auto-connect 28 which is connected to riser pipe 22. Winch lines 60 extend on downwardly through pulleys 66 which are anchored to anchor block 10. The ends of the winch lines have previously been attached to buoys so that the lines can be recovered when needed for pulling the riser down. From the pulleys 66, the winch lines 60 go to the surface where they are connected to winch lines or a tugboat or the like (not shown). By winch lines 60, the apparatus or completion system is moved to the position shown in the drawing and auto-connect 28 is drawn into line with its counterpart on surface casing 24. The upper ends of winch lines 60 are disconnected from the tugboat and can be supported by buoys, not shown, in event it is necessary to use them again.
Various other ways or methods of placing the buoyancy tank 16 and associated equipment in the position shown in FIGURE 1 are possible. One alternate method is to float the apparatus including the buoyant storage means 16, work deck 18, helicopter deck 20 and riser assembly 22 into place above the well head or surface casing 24 in a vertical orientation. This is accomplished by emptying buoyant means 16, and having it of sufficient buoyancy so that it floats on the surface. When the device is over surface casing 24, buoyant means 16 is flooded. The tank is flooded and deflooded by well known means, not shown.
As the compartments of buoyant storage means 16 are flooded, the device is sinking into the water. Riser 22 and auto-connect 28 are guided into place using a sonic well head locator, for example. Lateral movement is effected by tugboat (not shown) moving the equipment to location.
Buoyant storage means 16 typically is about 15,000 bbl. capacity or days producing capacity of the well, whichever is larger. Transfer of the oil is preferably effected by pump 50 as explained above. Alternatively, it can be accomplished by allowing sea water to enter the compartments through inlets, not shown, and forcing the oil up through outlet pipe 50. If this system is used it is preferred to provide a minimum buoyancy by use of a floatation compartment 70 on the lower side of the storage means. This compartment can be filled with styrofoam, if desired. Another way of insuring a vertical buoyancy is to maintain a cushion of inert gas in the upper portion of buoyant storage means 16.
FIGURE 2 illustrates a modification of the system shown for moving the riser pipe down into proper engagement with the well head casing 24. In this system a buoyant means is secured by latching means 84, shown schematically, to riser pipe 22A. Arms 64A from auto-connect 28A are provided with cable winches 78. These winches are provided power from the surface by electric cable 76. Lines 60 from winches 78 extend downwardly to anchors which are secured to anchor base 10A. Guide lines 60 are conveniently set and attached with base plate 10A when it is set. Thus line 60 could extend to the surface and be supported by buoys in a known manner. Then when it is desired to lower the riser pipe 22A and associated equipment, lines 60 are connected to winches 78. Upon actuation of winches 78, the riser pipe assembly is pulled into proper position. Buoyant tanks 80 maintain tension on the riser pipe 22A. The pipe is thus pulled down against this upward force of buoyant means 80.
While the above invention has been described with a great deal of detail, it is to be understood that various modifications thereof can be made without departing from the spirit or scope of the invention.
I claim:
1. A completion assembly for a well drilled into the bottom of a body of water and having:
(a) a production string inside said well and extending upwardly toward the surface of said body of water;
(b) buoyant means including an oil storage chamber connected to said production string;
(0) riser conduit means larger than said production string and surrounding said production string, said riser conduit means being secured at one end to the floor of said body of water and at the other end to said buoyant means whereby said buoyant means exerts the only upward force on said riser conduit means, said riser conduit means including means flexibly connecting said buoyant means to the floor of said body of water.
2. An assembly as defined in claim 1 in which said riser conduit means is made of a flexible material reinforced by a stronger flexible material.
3. An assembly as defined in claim 1 in which said buoyant means is positioned a sufficient distance below the surface of the body of water so as to be essentially free of effects of wave action.
4. An assembly as defined in claim 1 including means for connecting said production string to oil transport means.
5. An assembly as defined in claim 4 in which said buoyant means contains oil treating equipment.
6. An assembly as defined in claim 1 including winch means connected to said riser conduit means, cable means on said Winch means, and anchor means anchored to the ocean floor, said cable means connected to said anchor means.
7. An assembly as defined in claim 1 wherein said buoyant means includes a plurality of compartments and further including means to flood and deflood each compartment with sea water.
8. An assembly as defined in claim 3 including an extension neck of larger size than said riser conduit means extending from said buoyant means to above the surface of the body of water and a working deck supported above said surface of water by said extension neck.
9. An assembly for a well head drilled in the floor of a body of water and in which casing anchored to the floor has been set which comprises:
a riser conduit means extending from near the upper end of said casing toward surface of said body of water;
means for releasably latching the lower end of said riser conduit means to said casing in a sealing relationship therewith;
a buoyant storage means attached to said riser conduit means at its upper end below the surface of the body of water;
a string of tubing suspended within said well;
a production conduit extending from said tubing to said buoyant storage means, said production conduit means including means for controlling from the surface the flow of fluid through such production conduit means;
discharge means for removing oil from said buoyant storage means. 7
10. An assembly as defined in claim 9 including a flexible joint connecting said riser conduit means to said casinganchor to the floor.
11. An assembly as defined in claim 10 including an extension rieck extending from said buoyant storage means to abojve' the surface of the water permitting ingress and egress to said buoyant storage means and including a work deck supported above the surface of the body of water by said extension neck.
12. An assembly as defined in claim 9 including pulleys anchored to the ocean floor adjacent said anchored cas- 111g;
guide arms connected to the lower end of said riser conduit means;
winch lines extending from said guide arms through said pulleys to the surface of said body of water.
13. completion assembly for a well drilled into the bottom of a body of water and having:
(a) a production string inside said well and extending upwardly toward the surface of said body of water;
(b) buoyant means;
(c) riser conduit means larger than said production string and surrounding said production string, said riser conduit means being secured at one end to the floor of said body of water and at the other end to said buoyant means whereby said buoyant means exerts an upward force on said riser conduit means, said riser conduit means including means flexibly connecting said buoyant means to the floor of said body of water; 1
(d) a well head assembly attached to the upper end of said production string.
References Cited UNITED STATES PATENTS OTHER REFERENCES The Oil & Gas Journal of Jan. 25, 1960, pp. 122-123.
JACOB SHAPIRO, Primary Examiner US. Cl. X.R.
US687244A 1967-12-01 1967-12-01 Production and storage system for offshore oil wells Expired - Lifetime US3472032A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US68724467A 1967-12-01 1967-12-01

Publications (1)

Publication Number Publication Date
US3472032A true US3472032A (en) 1969-10-14

Family

ID=24759646

Family Applications (1)

Application Number Title Priority Date Filing Date
US687244A Expired - Lifetime US3472032A (en) 1967-12-01 1967-12-01 Production and storage system for offshore oil wells

Country Status (1)

Country Link
US (1) US3472032A (en)

Cited By (45)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3572043A (en) * 1969-02-24 1971-03-23 Ernest A Clara Underwater structure
US3590407A (en) * 1968-11-13 1971-07-06 Mobil Oil Corp Swivel tanker floating storage system
US3602302A (en) * 1969-11-10 1971-08-31 Westinghouse Electric Corp Oil production system
US3612177A (en) * 1969-10-29 1971-10-12 Gulf Oil Corp Deep water production system
US3656307A (en) * 1970-06-01 1972-04-18 Texaco Inc Subsea fluid processing facility
US3668875A (en) * 1969-07-23 1972-06-13 Mannesmann Ag Offshore terminal
US3670515A (en) * 1970-09-02 1972-06-20 Exxon Production Research Co Articulated structural support linkage
US3709307A (en) * 1970-10-05 1973-01-09 Phillips Petroleum Co Underwater drilling and production vessel
US3708811A (en) * 1971-01-06 1973-01-09 Exxon Research Engineering Co Single anchor leg single point mooring system
JPS4849184A (en) * 1971-10-25 1973-07-11
US3756293A (en) * 1970-02-20 1973-09-04 Cyrus Adler Loading terminal for tankers or other large ships with flowable cargo
US3779193A (en) * 1971-01-08 1973-12-18 H Hirata Floating oil storage installation
US3782458A (en) * 1971-08-04 1974-01-01 Gray Tool Co Upright, swivelable buoyed conduit for offshore system
US3841357A (en) * 1972-03-10 1974-10-15 Ihc Holland Nv Piping between a buoy and a stationary conduit
US3894567A (en) * 1969-12-18 1975-07-15 Texaco Inc Offshore vessel mooring
US4019213A (en) * 1972-11-09 1977-04-26 Coflexip Piping apparatus for a floating or semi-submersible platform
US4042990A (en) * 1975-11-21 1977-08-23 Donaldson Jr Glenn B Single point mooring terminal
US4044473A (en) * 1974-02-25 1977-08-30 Hydril Company Tilt detector and system
US4067202A (en) * 1976-04-30 1978-01-10 Phillips Petroleum Company Single point mooring buoy and transfer facility
FR2361524A1 (en) * 1976-08-11 1978-03-10 Fayren J OFFSHORE OPERATION OF UNDERWATER OIL DEPOSITS
US4098333A (en) * 1977-02-24 1978-07-04 Compagnie Francaise Des Petroles Marine production riser system
US4125162A (en) * 1977-05-13 1978-11-14 Otis Engineering Corporation Well flow system and method
JPS551575U (en) * 1979-05-02 1980-01-08
US4529334A (en) * 1984-01-30 1985-07-16 Exxon Production Research Co. Production riser assembly
US4604001A (en) * 1984-03-08 1986-08-05 Global Marine Inc. Jackdown tension leg platform
US4662786A (en) * 1985-10-03 1987-05-05 Cherbonnier T Dave Dynamic load compensating system
US4883388A (en) * 1985-10-03 1989-11-28 Cherbonnier T Dave Load compensating system
US4886397A (en) * 1987-08-27 1989-12-12 Cherbonnier T Dave Dynamic load compensating system
US4913238A (en) * 1989-04-18 1990-04-03 Exxon Production Research Company Floating/tensioned production system with caisson
US5135327A (en) * 1991-05-02 1992-08-04 Conoco Inc. Sluice method to take TLP to heave-restrained mode
US5147148A (en) * 1991-05-02 1992-09-15 Conoco Inc. Heave-restrained platform and drilling system
US5150987A (en) * 1991-05-02 1992-09-29 Conoco Inc. Method for installing riser/tendon for heave-restrained platform
WO1996021797A1 (en) * 1995-01-13 1996-07-18 Seahorse Equipment Corporation Method and apparatus for production of subsea hydrocarbon formations
WO2000066871A2 (en) * 1999-04-30 2000-11-09 Abb Lummus Global, Inc. Floating vessel for deep water drilling and production
WO2003078241A2 (en) * 2002-03-11 2003-09-25 Abb Lummus Global, Inc. Marine buoy for offshore support
US6786679B2 (en) 1999-04-30 2004-09-07 Abb Lummus Global, Inc. Floating stability device for offshore platform
US20060045628A1 (en) * 2004-09-02 2006-03-02 Petroleo Brasileiro S.A. - Petrobras Floating structure
US20060147272A1 (en) * 2003-03-14 2006-07-06 Arne Smedal Tank installation for the storage of liquids
US20060191461A1 (en) * 2001-01-02 2006-08-31 Chow Andrew W Minimized wave-zone buoyancy platform
US20110013989A1 (en) * 2008-03-26 2011-01-20 Zhirong Wu Liquid Storage, Loading and Offloading System
US8214993B1 (en) 2009-11-11 2012-07-10 Coastal Cargo Company, Inc. Method and apparatus for removing or reinstalling riser pipes of a riser bundle
US9920544B1 (en) * 2016-11-29 2018-03-20 Walter Judson Bennett Plunger wave generator apparatus for efficiently producing waves in a body of water
US10196114B2 (en) * 2015-05-13 2019-02-05 Crondall Energy Consultants Ltd. Floating production unit and method of installing a floating production unit
US10519679B1 (en) 2018-08-31 2019-12-31 Walter Judson Bennett Plunger artificial wave making apparatus
US20220372780A1 (en) * 2021-05-18 2022-11-24 Walter Judson Bennett Plunger wave making generator system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2777669A (en) * 1948-12-27 1957-01-15 Cornelius G Willis Marine well drilling apparatus
US3008599A (en) * 1958-06-19 1961-11-14 Phillips Petroleum Co Offshore crude oil lease tank battery
US3111692A (en) * 1960-12-14 1963-11-26 Shell Oil Co Floating production platform
US3196958A (en) * 1960-04-04 1965-07-27 Richfield Oil Corp Offshore drilling method and apparatus
US3221817A (en) * 1962-09-13 1965-12-07 Shell Oil Co Marine conductor pipe assembly
US3221816A (en) * 1961-12-07 1965-12-07 Shell Oil Co Underwater oil gathering installation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2777669A (en) * 1948-12-27 1957-01-15 Cornelius G Willis Marine well drilling apparatus
US3008599A (en) * 1958-06-19 1961-11-14 Phillips Petroleum Co Offshore crude oil lease tank battery
US3196958A (en) * 1960-04-04 1965-07-27 Richfield Oil Corp Offshore drilling method and apparatus
US3111692A (en) * 1960-12-14 1963-11-26 Shell Oil Co Floating production platform
US3221816A (en) * 1961-12-07 1965-12-07 Shell Oil Co Underwater oil gathering installation
US3221817A (en) * 1962-09-13 1965-12-07 Shell Oil Co Marine conductor pipe assembly

Cited By (59)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3590407A (en) * 1968-11-13 1971-07-06 Mobil Oil Corp Swivel tanker floating storage system
US3572043A (en) * 1969-02-24 1971-03-23 Ernest A Clara Underwater structure
US3668875A (en) * 1969-07-23 1972-06-13 Mannesmann Ag Offshore terminal
US3612177A (en) * 1969-10-29 1971-10-12 Gulf Oil Corp Deep water production system
US3602302A (en) * 1969-11-10 1971-08-31 Westinghouse Electric Corp Oil production system
US3894567A (en) * 1969-12-18 1975-07-15 Texaco Inc Offshore vessel mooring
US3756293A (en) * 1970-02-20 1973-09-04 Cyrus Adler Loading terminal for tankers or other large ships with flowable cargo
US3656307A (en) * 1970-06-01 1972-04-18 Texaco Inc Subsea fluid processing facility
US3670515A (en) * 1970-09-02 1972-06-20 Exxon Production Research Co Articulated structural support linkage
US3709307A (en) * 1970-10-05 1973-01-09 Phillips Petroleum Co Underwater drilling and production vessel
US3708811A (en) * 1971-01-06 1973-01-09 Exxon Research Engineering Co Single anchor leg single point mooring system
US3779193A (en) * 1971-01-08 1973-12-18 H Hirata Floating oil storage installation
US3782458A (en) * 1971-08-04 1974-01-01 Gray Tool Co Upright, swivelable buoyed conduit for offshore system
JPS4849184A (en) * 1971-10-25 1973-07-11
JPS5135034B2 (en) * 1971-10-25 1976-09-30
US3841357A (en) * 1972-03-10 1974-10-15 Ihc Holland Nv Piping between a buoy and a stationary conduit
US4019213A (en) * 1972-11-09 1977-04-26 Coflexip Piping apparatus for a floating or semi-submersible platform
US4044473A (en) * 1974-02-25 1977-08-30 Hydril Company Tilt detector and system
US4042990A (en) * 1975-11-21 1977-08-23 Donaldson Jr Glenn B Single point mooring terminal
US4067202A (en) * 1976-04-30 1978-01-10 Phillips Petroleum Company Single point mooring buoy and transfer facility
FR2361524A1 (en) * 1976-08-11 1978-03-10 Fayren J OFFSHORE OPERATION OF UNDERWATER OIL DEPOSITS
US4170266A (en) * 1976-08-11 1979-10-09 Fayren Jose M Apparatus and method for offshore drilling at great depths
US4098333A (en) * 1977-02-24 1978-07-04 Compagnie Francaise Des Petroles Marine production riser system
FR2381897A1 (en) * 1977-02-24 1978-09-22 Petroles Cie Francaise RISING COLUMN DEVICE FOR OFFSHORE PRODUCTION
US4125162A (en) * 1977-05-13 1978-11-14 Otis Engineering Corporation Well flow system and method
JPS551575U (en) * 1979-05-02 1980-01-08
US4529334A (en) * 1984-01-30 1985-07-16 Exxon Production Research Co. Production riser assembly
US4604001A (en) * 1984-03-08 1986-08-05 Global Marine Inc. Jackdown tension leg platform
US4662786A (en) * 1985-10-03 1987-05-05 Cherbonnier T Dave Dynamic load compensating system
US4883388A (en) * 1985-10-03 1989-11-28 Cherbonnier T Dave Load compensating system
US4886397A (en) * 1987-08-27 1989-12-12 Cherbonnier T Dave Dynamic load compensating system
US4913238A (en) * 1989-04-18 1990-04-03 Exxon Production Research Company Floating/tensioned production system with caisson
US5135327A (en) * 1991-05-02 1992-08-04 Conoco Inc. Sluice method to take TLP to heave-restrained mode
US5147148A (en) * 1991-05-02 1992-09-15 Conoco Inc. Heave-restrained platform and drilling system
US5150987A (en) * 1991-05-02 1992-09-29 Conoco Inc. Method for installing riser/tendon for heave-restrained platform
WO1996021797A1 (en) * 1995-01-13 1996-07-18 Seahorse Equipment Corporation Method and apparatus for production of subsea hydrocarbon formations
WO2000066871A3 (en) * 1999-04-30 2001-04-05 Abb Lummus Global Inc Floating vessel for deep water drilling and production
US6371697B2 (en) * 1999-04-30 2002-04-16 Abb Lummus Global, Inc. Floating vessel for deep water drilling and production
US6786679B2 (en) 1999-04-30 2004-09-07 Abb Lummus Global, Inc. Floating stability device for offshore platform
US6869251B2 (en) 1999-04-30 2005-03-22 Abb Lummus Global, Inc. Marine buoy for offshore support
WO2000066871A2 (en) * 1999-04-30 2000-11-09 Abb Lummus Global, Inc. Floating vessel for deep water drilling and production
US7101117B1 (en) * 2001-01-02 2006-09-05 Chow Andrew W Minimized wave-zone buoyancy platform
US20060191461A1 (en) * 2001-01-02 2006-08-31 Chow Andrew W Minimized wave-zone buoyancy platform
WO2003078241A2 (en) * 2002-03-11 2003-09-25 Abb Lummus Global, Inc. Marine buoy for offshore support
WO2003078241A3 (en) * 2002-03-11 2004-12-29 Abb Lummus Global Inc Marine buoy for offshore support
US20060147272A1 (en) * 2003-03-14 2006-07-06 Arne Smedal Tank installation for the storage of liquids
US7207284B2 (en) * 2003-03-14 2007-04-24 Sevan Marine As Tank installation for the storage of liquids
US20060045628A1 (en) * 2004-09-02 2006-03-02 Petroleo Brasileiro S.A. - Petrobras Floating structure
US7086810B2 (en) * 2004-09-02 2006-08-08 Petróleo Brasileiro S.A. - Petrobras Floating structure
US20110013989A1 (en) * 2008-03-26 2011-01-20 Zhirong Wu Liquid Storage, Loading and Offloading System
US8292546B2 (en) * 2008-03-26 2012-10-23 Zhirong Wu Liquid storage, loading and offloading system
US8214993B1 (en) 2009-11-11 2012-07-10 Coastal Cargo Company, Inc. Method and apparatus for removing or reinstalling riser pipes of a riser bundle
US8732931B1 (en) 2009-11-11 2014-05-27 Coastal Cargo Company, Inc. Method and apparatus for removing or reinstalling riser pipes of a riser bundle
US9849550B1 (en) 2009-11-11 2017-12-26 Coastal Cargo Company, L.L.C. Method and apparatus for removing or reinstalling riser pipes of a riser bundle
US10196114B2 (en) * 2015-05-13 2019-02-05 Crondall Energy Consultants Ltd. Floating production unit and method of installing a floating production unit
US9920544B1 (en) * 2016-11-29 2018-03-20 Walter Judson Bennett Plunger wave generator apparatus for efficiently producing waves in a body of water
US10519679B1 (en) 2018-08-31 2019-12-31 Walter Judson Bennett Plunger artificial wave making apparatus
US20220372780A1 (en) * 2021-05-18 2022-11-24 Walter Judson Bennett Plunger wave making generator system
US11686116B2 (en) * 2021-05-18 2023-06-27 Walter Judson Bennett Plunger wave making generator system

Similar Documents

Publication Publication Date Title
US3472032A (en) Production and storage system for offshore oil wells
US3572041A (en) Spar-type floating production facility
EP0494497B1 (en) Method and apparatus for production of subsea hydrocarbon formations
US3111926A (en) Apparatus for anchoring underwater vessels
US4907912A (en) Submersible production storage barge and method for transporting and installing a jack-up rig in a body of water
US3540396A (en) Offshore well apparatus and system
US2783027A (en) Method and apparatus for submerged well drilling
US5899637A (en) Offshore production and storage facility and method of installing the same
US3535884A (en) Offshore drilling and production structure
US2503516A (en) Method of and apparatus for exploiting oil or other mineral deposits underlying submerged areas
US3366173A (en) Subsea production system
US3433024A (en) Versatile marine structure
US3987638A (en) Subsea structure and method for installing the structure and recovering the structure from the sea floor
US4421436A (en) Tension leg platform system
US4062313A (en) Installation of vertically moored platforms
US3855809A (en) Underwater oil storage tank and method of submerging same
US3525388A (en) Subsea drilling apparatus
US3976021A (en) Installation of vertically moored platform
US3880102A (en) Method and apparatus for offshore submersible oil storage and drilling
US4170266A (en) Apparatus and method for offshore drilling at great depths
US4039025A (en) Apparatus for anchoring an offshore structure
US3612177A (en) Deep water production system
US3470838A (en) Buoyant wellhead structure
US3327780A (en) Connection of underwater wells
US3665721A (en) Submerged well platform