US3500913A - Method of recovering liquefiable components from a subterranean earth formation - Google Patents

Method of recovering liquefiable components from a subterranean earth formation Download PDF

Info

Publication number
US3500913A
US3500913A US771962A US3500913DA US3500913A US 3500913 A US3500913 A US 3500913A US 771962 A US771962 A US 771962A US 3500913D A US3500913D A US 3500913DA US 3500913 A US3500913 A US 3500913A
Authority
US
United States
Prior art keywords
fluid
fractures
fracture
well
boreholes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US771962A
Inventor
Ronald P Nordgren
Philip J Closmann
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shell USA Inc
Original Assignee
Shell Oil Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shell Oil Co filed Critical Shell Oil Co
Application granted granted Critical
Publication of US3500913A publication Critical patent/US3500913A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/17Interconnecting two or more wells by fracturing or otherwise attacking the formation
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection

Definitions

  • ABSTRACT OF THE DISCLOSURE A method of recovering liquefiable components from a normally impermeable subterranean earth formation by extending at least a pair of well boreholes into the formation and forming generally vertical fractures extending along generally parallel paths from each of the boreholes. Hot fluid is injected through at least one of the well boreholes until flow into at least one of the fractures therein is thermally closed by the swelling-shut of the walls of the fracture.
  • Fluid in at least one borehole in which fractures have been thermally closed is pressurized until at least one new fracture is formed and the steps of injecting hot fluid and pressurizing fluid are repeated at successively higher temperatures and pressures until the resultant fractures form a channel interconnecting the well boreholes through which channel fluid can flow from one well borehole to another.
  • hot fluid is circulated, by injection into one of the boreholes opening into the fracture channel, with fluid being produced from another of the boreholes opening into the fracture channel, at a temperature below that at which the last fracture was opened in the well borehole into which the circulating fluid is injected but above that at which the last fracture was thermally closed within the well borehole into which the circulating fluid is injected, so that most of the injected fluid is conveyed through fractures interconnecting the boreholes.
  • This invention relates to a method for recovering liquefiable components from a relatively impermeable subterranean earth formation, normally subjected to vertical fracturing.
  • a heating procedure can be utilized to cause the swelling tendencies of the earth formations to create horizontal stresses that exceed the vertical stresses.
  • pairs of wells can be interconnected by means of a horizontal fracture that can be kept open by hydrau- 3,500,913 Patented Mar. 17, 1970 lically lifting or compressing the overlying earth formations.
  • Such a procedure, in which the heating is accomplished by injecting a liquid while maintaining a specified rate of fluid flow and temperature increase, is described in a copending application to Matthews et al., Ser. No. 578,533 filed Sept. 12, 1966, now Patent No. 3,455,391.
  • the use of successively higher pressures and temperatures is apt to form a succession of numerous differently-oriented vertical fractures at pressures which do not become high enough to produce a horizontal fracture.
  • the pressure necessary to form a horizontal fracture is generally about equal to or slightly less than one p.s.i. per foot of depth.
  • a vertical fracture opening into a first well has been extended for a significant distance and at least one vertical fracture has been opened and then thermally closed in a second well
  • the formation and extension of a subsequent fracture from the second well is apt to cause the fractures to intersect so that fluid can flow from one well to the other.
  • the fluid pumped through such intersecting fractures is heated at or above the temperature at which the last fracture was formed, the walls of the fracture will swell and the flow path will close.
  • hot fluid is cirulated, by injecting into one of the boreholes opening no the fracture channel, with fluid being produced from nother of the boreholes opening intothe fracture chane1, at a temperature below that at which the last fracure was opened into the well borehole into which the irculating fluid is injected but above that which the last racture was thermally closed Within the well borehole 1to which the circulating fluid is injected so that most f the injected fluid is conveyed through fractures interonnecting the boreholes.
  • the path may be kept open by lowering the tem- Ierature of the fluid pumped through the path to a temuerature that is less than that at which the last fracture /as formed but greater than that at which the next preeding fracture was thermally closed.
  • the ffective permeability of the flow path between the well oreholes is then increased by circulating through it aizid that removes solid components from the walls of he fractures, the flow path is converted to one through vhich the flow of fluid from one well borehole to the other emains eflicient at whatever temperature is subsequently rnparted to the fluid.
  • the attainment of a significant increase in the effective Iermeability of such a flow path may be detected by an ncrease in the rate of flow in response to the injection ressure that was initially required to displace fluid from -ne well borehole to another. If the temperature of the ;irculating fluid is too high relative to the rate at which )ermeability is being increased, this may be detected by a 'eduction in the flow rate. If the temperature is too low elative to the rate at which the permeability is being ncreased, this may be detected by a decrease in the rate )f outflow from the production well borehole without a :orresponding decrease in rate of inflow into the injection vell borehole. Where the temperature is too high, the heremal closing of the last-opened fracture throttles the low and where the temperature is too low, a thermal )pening of previously closed fractures divert the flow )f the injected fluid.
  • FIGURE 1 is a top plan view of a preferred arrangenent of well boreholes extending into a subterranean :arth formation;
  • FIGURE 2 is a vertical sectional view of the well oreholes of FIGURE 1.
  • FIGURE 1 shows a air of well boreholes 11 and 12 extending into an earth Formation 13 overlying a normally impermeable suberranean earth formation such as an oil shale formation Knot shown).
  • Generally vertical fractures are first formed :xtending along generally parallel paths from each of vell boreholes 11 and 12 which open into the subterranean :arth formation.
  • Such fractures may be formed by any .echnique for applying a fluid pressure above the breaklown pressure of earth formation 13 but below the over- Jurden pressure of earth formation 13.
  • FIGURE 1 shows a plurality of such well bore- 1oles may be opened into the selected earth formation 1nd treated simultaneously or sequentially, in any order.
  • a vertical fracture 14 is extended from vell borehole 11 for a significant distance along a natural )13116 of weakness with the subterranean formation.
  • Conentional subterranean stress analyses techniques and/or techniques for measuring the orientation of fractures may )e utilized to determine the direction along which the fracture 14 is extended.
  • This fracture 14 is preferably propped by procedures well known in the the art.
  • Well borehole 12, preferably having been drilled after the formation of fracture 14 is preferably completed near an intersection of a preselected well borehole-to-well borehole spacing distance and the fracture 14 opening into well borehole 11.
  • the flow rate and the rate at which the inflowing liquid is heated to temperatures preferably increasingly greater than the earth formation temperature are correlated so that the liquid remains hotter than the fracture walls until the liquid has moved a significant distance away from the well.
  • the pressure at which the liquid is injected is increased as required in order to maintain an adequate rate of flow.
  • the heating and pumping of the liquid are continued until the pressure at which the liquid is injected exceeds the overburden pressure and produces a horizontal fracture within the subsurface earth formation.
  • hot fluid may be injected into well borehole 12 until the flow into at least one of the generally vertical fractures, such as fracture 15, is thermally closed by the swelling shut of the fracture walls. Fluid in well borehole 11 in which fracture 15 has been thermally closed is then pressurized until at least one new fracture, such as fracture 17, extending from well borehole 12, is formed;
  • a hot fluid such as hot water
  • injection of a hot fluid into fracture 15 results in a gradual closing of the fractures and loss of injectivity.
  • additional vertical fractures such as fractures 16 and/or 18 extending from well borehole 12, to form, since heating generally results in a horizontal stress comparable to or less than the vertical stress developed.
  • Additional injection of hot water may cause fractures such as fractures 16 or 18 extending from well borehole 12, to be developed. These fractures are formed radially extending from their respective well boreholes, but, at great distances from their respective well boreholes, they generally follow some preferential alignment in the oil field.
  • these steps are repeated at successively higher temperatures and pressures to the extent required to form the interconnecting fractures, such as fractures 16, 18, and 14, through which fluid may flow from well borehole 11 to well borehole 12.
  • Such fractures as for example fracture 18, may be on a plane at a generally right angle to fracture 15 and thus may be extended by means well known in the art to a position intersecting fracture 14.
  • a subsequent fracture from well borehole 12 intersects with one from well borehole 11, as for example fracture 18 in FIGURE 1, it is propped, with the propping agent being injected while circulating fluid at a controlled temperature.
  • the fluid is preferably circulated at a temperature below that at which the last fracture was open into the injection well borehole 11 but above that at which the last fracture was thermally closed within the injection well borehole 11 so that most of the injected fluid is conveyed through the interconnecting fractures.
  • the hot fluid may be any gas and/or liquid that is heated at the surface of the earth formation 13, in the well borehole and/or in situ, e.g., by underground combustion, in the subterranean earth formation.
  • the heated fluid may be the same as or different from the fracturing fluid and the heating may be initiated before or after the fracturing.
  • the circulation of such fluid may be continuous or intermittent and the circulated fluid may be any liquid or gas that is injected into or produced from either of any pair of well boreholes.
  • the temperature of the circulating fluid may be as low as desired.
  • the temperature of the hot fluid being injected to form and extend a subsequent fracture in a well borehole in which a preceding fracture was thermally closed is adjusted and a propping agent is mixed with the inflowing fluid.
  • hot fracturing fluid injection may be discontinued and a reacting fluid may be flowed therethrough.
  • the composition of the reaction fluid is preferably adjusted to the extent required to circulate fluid that removes solid materials from the walls of the interconnecting fractures without a significant reduction in the average rate of flow between well boreholes 11 and 12, so that the effective permeability of the interconnecting fractures, as for example fractures 14 and 16, is increased relative to fluid flowing between well boreholes 11 and 12.
  • Solid-materialremoving components may be incorporated into the react ing fluid being circulated through the interconnecting fractures without interrupting the flow to an extent that permits the fractures to close and reseal. In treating a subterranean oil shale formation, such components may comprise hot benzene, steam, or other solvent, or nitric acid, of a lower temperature than the hot fracturing fluid.
  • Nitric acid has the advantage of reacting with the organic matter as well as the carbonate present in the subterranean earth formation.
  • the injection of such a reacting fluid leaches out part of the kerogen adjoining the faces of the interconnecting fractures.
  • the injection at a lower temperature and at substantially the same injection pressure permits the fractures to open slightly for better passage of the fluids.
  • the temperature of the solid-material-removing fluid may be increased as the permeability of the interconnecting fractures, fractures 14 and 16, for example, is increased until the circulating fluid becomes hot enough to liquefy the liquefiable components of the subterranean earth formatron.
  • acid may be injected to react with part of the rock matrix along the fracture walls. This acid injection renders the channels even more permeable.
  • an underground combustion process as is well known in the art, which develops considerably higher temperatures, may be undertaken.
  • the steps of leaching out part of the kerogen and the rock generally make closure of the fracture paths during combustion very unlikely. In this manner, it is possible to treat a substantial part of the formation by underground combustion.
  • uniform temperature zones 21 and 22 may be seen surrounding well boreholes 11 and 12, respectively.
  • advancing combustion fronts 23 and 24, initiated and alternatingly advanced, for example, by means well known in the art, may be formed about well boreholes 11 and 12, respectively.
  • FIGURE 2 shows permeable channel 25 formed in the subterranean earth formation of FIGURE 1 by the foregoing method of this invention.
  • Injection well borehole 11 is preferably equipped with casing 23 cemented therein and sealed with cement.
  • a tubing string 29 is disposed in well borehole 11 and packed off at packer 34.
  • Conventional heating, pumping, heat exchanging and separating equipment are associated with well boreholes l1 and 12 for injecting fluid from well borehole 11 through perforations 31 in well borehole 11, through the permeable channel 25 created by intersecting fractures, such as 14 and 16, into well borehole 12 through perforations 33 therein.
  • Well borehole 12 preferably is cased with casing 34 surrounded by cement 24.
  • the method of this invention improves injectivity and fluid communication between two or more wells from a succession of vertical fractures.
  • the method of claim 1 including the step of adjusting the composition of said circulating hot fluid to the extent required to circulate fluid that removes solid materials from the walls of fractures interconnecting said well boreholes without a significant reduction in the'average rate of flow between the well boreholes so that the effective permeability of the fractures interconnecting said well boreholes is increased relative to that of other fractures.
  • the method of claim 2 including the step of increasing the temperature of the circulating fluid as the permeability of the interconnected fractures is increased, with the temperature being increased to the extent required to circulate fluid capable of liquefying the liquefiable components of the solid materials removed from the walls of the interconnecting fractures.
  • the method of claim 3 including the step of recovering hydrocarbons from the liquefiable components of the circulating fluid.
  • the method of claim 3 including the step of increasing the permeability of the interconnected fractures by injecting acid therethrough adapted to react with at least 1 portion of the rock matrix forming the walls of said fractures.
  • the method of claim 3 including the step of initiating an underground combustion Within said subterranean earth formation so as to effect recovery of petroleum materials.
  • step of adjusting the composition of said circulating fluid includes the step of incorporating acidic solid-material-removing components into said circulating fluid.
  • step of incorcirculating fields includes the step of incorporating nitric acid.

Description

Marsh 17,, 1970 NQFZDGREN EI'AL 3,5@Q,913 METHOD OF REGOVERING LIQUEFIABLE COMPONENTS FROM A SUBTERRANEAN EARTH FORMATION Filed 0G1.- 50, 1968 ULTIMATE COMMUNICATION l6 GAS Q AlR SEPARATOR 4 OIL um HEAT EXCHANGER INVENTORSI R. P. NORDGREN P. J. CLOSMANN THEIR ATTORNEY United States Patent U.S. Cl. 166-259 8 Claims ABSTRACT OF THE DISCLOSURE A method of recovering liquefiable components from a normally impermeable subterranean earth formation by extending at least a pair of well boreholes into the formation and forming generally vertical fractures extending along generally parallel paths from each of the boreholes. Hot fluid is injected through at least one of the well boreholes until flow into at least one of the fractures therein is thermally closed by the swelling-shut of the walls of the fracture. Fluid in at least one borehole in which fractures have been thermally closed is pressurized until at least one new fracture is formed and the steps of injecting hot fluid and pressurizing fluid are repeated at successively higher temperatures and pressures until the resultant fractures form a channel interconnecting the well boreholes through which channel fluid can flow from one well borehole to another. Finally, hot fluid is circulated, by injection into one of the boreholes opening into the fracture channel, with fluid being produced from another of the boreholes opening into the fracture channel, at a temperature below that at which the last fracture was opened in the well borehole into which the circulating fluid is injected but above that at which the last fracture was thermally closed within the well borehole into which the circulating fluid is injected, so that most of the injected fluid is conveyed through fractures interconnecting the boreholes.
BACKGROUND OF THE INVENTION Field of the invention This invention relates to a method for recovering liquefiable components from a relatively impermeable subterranean earth formation, normally subjected to vertical fracturing.
Description of the prior art It is known that it is extremely difficult to recover liquefiable components from depths of various subterranean impermeable formations such as oil shale, coral, bed deposits of cinnabar, etc., under conditions in which the deposits are normally present in these formations. Various proposals have been made, such as described in a U.S. Patent No. 3,284,281, to recover oil from oil shale. Therein oil shale is produced from an oil shale formation through fractures. However, under the conditions described therein, the fractures tend to close as their walls become heated and thermally expanded and oil recovery is stopped. Under conditions described, it is generally necessary to resort to a repeating sequence of fracturing, heating and expanding and refracturing operations until flow patterns are finally formed that will remain open while the desired components are being liquefied.
In certain situations, particularly at relatively shallow depths, a heating procedure can be utilized to cause the swelling tendencies of the earth formations to create horizontal stresses that exceed the vertical stresses. By such procedure, pairs of wells can be interconnected by means of a horizontal fracture that can be kept open by hydrau- 3,500,913 Patented Mar. 17, 1970 lically lifting or compressing the overlying earth formations. Such a procedure, in which the heating is accomplished by injecting a liquid while maintaining a specified rate of fluid flow and temperature increase, is described in a copending application to Matthews et al., Ser. No. 578,533 filed Sept. 12, 1966, now Patent No. 3,455,391.
However, in many situations, horizontal fractures cannot feasibly be formed by thermally increasing the horizontal stresses. Generally, the heating of oil shale formations causes the vertical stresses to increase at a rate comparable to that at which the horizontal stresses are increased, and this prevents the formation of a horizontal fracture. Although communication between wells might be established by repetitively heating and fracturing at successively higher pressures and temperatures, as proposed in the aforementioned U.S. patent, this would result in excessively high operating costs and the production and maintenance of higher pressures and temperatures than are actually required.
When the regional tectonics are such that vertical fractures form and propagate along generally parallel paths when fluid is injected into adjacent wells at about the nor mal subsurface temperature at pressures and rates suflicient to form and extend the fractures, the use of successively higher pressures and temperatures is apt to form a succession of numerous differently-oriented vertical fractures at pressures which do not become high enough to produce a horizontal fracture. The pressure necessary to form a horizontal fracture is generally about equal to or slightly less than one p.s.i. per foot of depth. When, for example, a vertical fracture opening into a first well has been extended for a significant distance and at least one vertical fracture has been opened and then thermally closed in a second well, the formation and extension of a subsequent fracture from the second well is apt to cause the fractures to intersect so that fluid can flow from one well to the other. However, if the fluid pumped through such intersecting fractures is heated at or above the temperature at which the last fracture was formed, the walls of the fracture will swell and the flow path will close.
SUMMARY OF THE INVENTION It is an object of this invention to provide a method of recovering liquefiable components from a normally impermeable subterranean earth formation by extending generally vertical fractures between wells extending into the formation.
It is a further object of this invention to provide a method of interconnecting wells extending into normally impermeable subterranean earth formations by forming generally vertical fractures between such wells.
It is a still further object of this invention to interconnect wells extending into subterranean earth formations by means of generally vertical fractures which remain open so that fluid flow remains unrestricted between such wells.
These objects are preferably attained by forming generally vertical fractures extending along generally parallel paths from at least a pair of well boreholes extending into a relatively impermeable subterranean earth formation by injecting a hot fluid through at least one of the Well boreholes until flow into at least one of the fractures therein is thermally closed by the swelling-shut of the walls of the fracture. The fluid in at least one borehole in which fractures have been thermally closed is pressurized until at least one new fracture is formed and the steps of injecting hot fluid and pressurizing fluid are repeated at successively higher temperatures and pressures until the resultant fractures form a channel interconnecting the well boreholes, through which channel fluid can flow from one borehole to another. Finally, hot fluid is cirulated, by injecting into one of the boreholes opening no the fracture channel, with fluid being produced from nother of the boreholes opening intothe fracture chane1, at a temperature below that at which the last fracure was opened into the well borehole into which the irculating fluid is injected but above that which the last racture was thermally closed Within the well borehole 1to which the circulating fluid is injected so that most f the injected fluid is conveyed through fractures interonnecting the boreholes.
When such a flow path is opened between a pair of vells, the path may be kept open by lowering the tem- Ierature of the fluid pumped through the path to a temuerature that is less than that at which the last fracture /as formed but greater than that at which the next preeding fracture was thermally closed. In addition, if the ffective permeability of the flow path between the well oreholes is then increased by circulating through it a luid that removes solid components from the walls of he fractures, the flow path is converted to one through vhich the flow of fluid from one well borehole to the other emains eflicient at whatever temperature is subsequently rnparted to the fluid.
The attainment of a significant increase in the effective Iermeability of such a flow path may be detected by an ncrease in the rate of flow in response to the injection ressure that was initially required to displace fluid from -ne well borehole to another. If the temperature of the ;irculating fluid is too high relative to the rate at which )ermeability is being increased, this may be detected by a 'eduction in the flow rate. If the temperature is too low elative to the rate at which the permeability is being ncreased, this may be detected by a decrease in the rate )f outflow from the production well borehole without a :orresponding decrease in rate of inflow into the injection vell borehole. Where the temperature is too high, the heremal closing of the last-opened fracture throttles the low and where the temperature is too low, a thermal )pening of previously closed fractures divert the flow )f the injected fluid.
BRIEF DESCRIPTION OF THE DRAWING FIGURE 1 is a top plan view of a preferred arrangenent of well boreholes extending into a subterranean :arth formation; and
FIGURE 2 is a vertical sectional view of the well oreholes of FIGURE 1.
DESCRIPTION OF THE PREFERRED EMBODIMENT Referring now to the drawing, FIGURE 1 shows a air of well boreholes 11 and 12 extending into an earth Formation 13 overlying a normally impermeable suberranean earth formation such as an oil shale formation Knot shown). Generally vertical fractures are first formed :xtending along generally parallel paths from each of vell boreholes 11 and 12 which open into the subterranean :arth formation. Such fractures may be formed by any .echnique for applying a fluid pressure above the breaklown pressure of earth formation 13 but below the over- Jurden pressure of earth formation 13. Of course, tlthough two such well boreholes 11 and 12 are illustrated n FIGURE 1, obviously a plurality of such well bore- 1oles may be opened into the selected earth formation 1nd treated simultaneously or sequentially, in any order.
In a preferred procedure for interconnecting well boreioles 11 and 12, a vertical fracture 14 is extended from vell borehole 11 for a significant distance along a natural )13116 of weakness with the subterranean formation. Conentional subterranean stress analyses techniques and/or techniques for measuring the orientation of fractures may )e utilized to determine the direction along which the fracture 14 is extended. This fracture 14 is preferably propped by procedures well known in the the art. Well borehole 12, preferably having been drilled after the formation of fracture 14, is preferably completed near an intersection of a preselected well borehole-to-well borehole spacing distance and the fracture 14 opening into well borehole 11. Of course, if suflicient communication between well borehole 11 and 12 results from drilling well borehole 12 with the intention of intersecting fracture 14, further fracturing is not necessary. However, in most cases, an initial fracture 15 must be then produced in Well borehole 12 and left unpropped and thermally closed, by the method discussed in a copending application to Matthews et al. Ser No. 578,533, filed Sept. 12, 1966, wherein a liquid is pumped into a fracture within a subsurface earth formation while heating the inflowing liquid as preferably a surface location and maintaining a flow rate that is adequate for transporting heat from the heating location to the fracture. The flow rate and the rate at which the inflowing liquid is heated to temperatures preferably increasingly greater than the earth formation temperature are correlated so that the liquid remains hotter than the fracture walls until the liquid has moved a significant distance away from the well. The pressure at which the liquid is injected is increased as required in order to maintain an adequate rate of flow. The heating and pumping of the liquid are continued until the pressure at which the liquid is injected exceeds the overburden pressure and produces a horizontal fracture within the subsurface earth formation.
Thus, hot fluid may be injected into well borehole 12 until the flow into at least one of the generally vertical fractures, such as fracture 15, is thermally closed by the swelling shut of the fracture walls. Fluid in well borehole 11 in which fracture 15 has been thermally closed is then pressurized until at least one new fracture, such as fracture 17, extending from well borehole 12, is formed;
The injection of a hot fluid, such as hot water, into fracture 15 results in a gradual closing of the fractures and loss of injectivity. Continued injection of hot water, however, at suflicient pressure may cause additional vertical fractures, such as fractures 16 and/or 18 extending from well borehole 12, to form, since heating generally results in a horizontal stress comparable to or less than the vertical stress developed. Additional injection of hot water may cause fractures such as fractures 16 or 18 extending from well borehole 12, to be developed. These fractures are formed radially extending from their respective well boreholes, but, at great distances from their respective well boreholes, they generally follow some preferential alignment in the oil field. It is likely, however, that two or more of these fractures from the two well boreholes 11 and 12, for example, intersect and provide fluid communication between well boreholes 11 and 12, if injection pressure is suflicient. The use of slant well boreholes may improve chances of intercommunication.
Thus, as illustrated in FIGURE 1, these steps are repeated at successively higher temperatures and pressures to the extent required to form the interconnecting fractures, such as fractures 16, 18, and 14, through which fluid may flow from well borehole 11 to well borehole 12. Such fractures, as for example fracture 18, may be on a plane at a generally right angle to fracture 15 and thus may be extended by means well known in the art to a position intersecting fracture 14. When a subsequent fracture from well borehole 12 intersects with one from well borehole 11, as for example fracture 18 in FIGURE 1, it is propped, with the propping agent being injected while circulating fluid at a controlled temperature. This is accomplished by circulating fluid, by injection into injection well borehole 11, for example, and producing it from production well borehole 12, again for example, which opens into an interconnecting fracture, such as fractures 14 and 16. The fluid is preferably circulated at a temperature below that at which the last fracture was open into the injection well borehole 11 but above that at which the last fracture was thermally closed within the injection well borehole 11 so that most of the injected fluid is conveyed through the interconnecting fractures.
In injecting hot fluid through well borehole 12 until flow into at least one of the generally vertical fractures, such as fracture 15, is thermally closed by the swelling shut of the fracture walls, the hot fluid may be any gas and/or liquid that is heated at the surface of the earth formation 13, in the well borehole and/or in situ, e.g., by underground combustion, in the subterranean earth formation. The heated fluid may be the same as or different from the fracturing fluid and the heating may be initiated before or after the fracturing.
In circulating fluid into injection well borehole 11 and producing it from production well borehole 12, the circulation of such fluid may be continuous or intermittent and the circulated fluid may be any liquid or gas that is injected into or produced from either of any pair of well boreholes. Where one well borehole of a pair of well boreholes is fractured only once, as for example well borehole 11 of FIGURE 1, and the circulating fluid is injected through it, the temperature of the circulating fluid may be as low as desired.
Preferably, the temperature of the hot fluid being injected to form and extend a subsequent fracture in a well borehole in which a preceding fracture was thermally closed, is adjusted and a propping agent is mixed with the inflowing fluid. Once inter-well communication has been established, hot fracturing fluid injection may be discontinued and a reacting fluid may be flowed therethrough.
The composition of the reaction fluid is preferably adjusted to the extent required to circulate fluid that removes solid materials from the walls of the interconnecting fractures without a significant reduction in the average rate of flow between well boreholes 11 and 12, so that the effective permeability of the interconnecting fractures, as for example fractures 14 and 16, is increased relative to fluid flowing between well boreholes 11 and 12. Solid-materialremoving components may be incorporated into the react ing fluid being circulated through the interconnecting fractures without interrupting the flow to an extent that permits the fractures to close and reseal. In treating a subterranean oil shale formation, such components may comprise hot benzene, steam, or other solvent, or nitric acid, of a lower temperature than the hot fracturing fluid. Nitric acid has the advantage of reacting with the organic matter as well as the carbonate present in the subterranean earth formation. The injection of such a reacting fluid leaches out part of the kerogen adjoining the faces of the interconnecting fractures. The injection at a lower temperature and at substantially the same injection pressure permits the fractures to open slightly for better passage of the fluids. The temperature of the solid-material-removing fluid may be increased as the permeability of the interconnecting fractures, fractures 14 and 16, for example, is increased until the circulating fluid becomes hot enough to liquefy the liquefiable components of the subterranean earth formatron.
Following or during the hot solvent injection as discussed hereinabove, acid may be injected to react with part of the rock matrix along the fracture walls. This acid injection renders the channels even more permeable.
After all the steps discussed hereinabove are carried out, an underground combustion process, as is well known in the art, which develops considerably higher temperatures, may be undertaken. The steps of leaching out part of the kerogen and the rock generally make closure of the fracture paths during combustion very unlikely. In this manner, it is possible to treat a substantial part of the formation by underground combustion.
Thus, as illustrated in FIGURE 1, uniform temperature zones 21 and 22 may be seen surrounding well boreholes 11 and 12, respectively. Also, advancing combustion fronts 23 and 24, initiated and alternatingly advanced, for example, by means well known in the art, may be formed about well boreholes 11 and 12, respectively.
FIGURE 2 shows permeable channel 25 formed in the subterranean earth formation of FIGURE 1 by the foregoing method of this invention. Injection well borehole 11 is preferably equipped with casing 23 cemented therein and sealed with cement. A tubing string 29 is disposed in well borehole 11 and packed off at packer 34. Conventional heating, pumping, heat exchanging and separating equipment are associated with well boreholes l1 and 12 for injecting fluid from well borehole 11 through perforations 31 in well borehole 11, through the permeable channel 25 created by intersecting fractures, such as 14 and 16, into well borehole 12 through perforations 33 therein. Well borehole 12 preferably is cased with casing 34 surrounded by cement 24. Since certain subterranean earth formations, such as oil and shale deposits in Colorado, Utah, and Wyoming, are practically impermeable except for certain natural vertical fractures, the method of this invention improves injectivity and fluid communication between two or more wells from a succession of vertical fractures.
We claim as our invention:
1. In a method of recovering liquefiable components from a normally impermeable subterranean earth formation comprising the steps of:
extending at least a pair of well boreholes into said earth formations;
forming generally vertical fractures extending along generally parallel paths from each of said pair of well boreholes;
injecting hot fluid through at least one of the well boreholes until flow into at least one of the fractures therein is thermally closed by the swelling-shut of the walls of said fracture;
pressurizing fluid in at least one well borehole in which at least one fracture has been thermally closed until at least one new fracture is formed; repeating the steps of injecting hot fluid and pressurizing fluid at successively higher temperatures and pressures until the resultant fractures form a channel interconnecting said well boreholes through which fluid flows from one well borehole to another; and
circulating hot fluid, by injection into one of said well boreholes opening into said fracture channel and production from another of said well boreholes opening into said fracture channel, at a temperature below that at which the last fracture was opened into the well borehole into which said hot fluid is injected but above that at which the last fracture was thermally closed within the well borehole into which said hot fluid is injected, so that most of the injected fluid is conveyed through said fracture channel from one well borehole to another.
2. The method of claim 1 including the step of adjusting the composition of said circulating hot fluid to the extent required to circulate fluid that removes solid materials from the walls of fractures interconnecting said well boreholes without a significant reduction in the'average rate of flow between the well boreholes so that the effective permeability of the fractures interconnecting said well boreholes is increased relative to that of other fractures.
3. The method of claim 2 including the step of increasing the temperature of the circulating fluid as the permeability of the interconnected fractures is increased, with the temperature being increased to the extent required to circulate fluid capable of liquefying the liquefiable components of the solid materials removed from the walls of the interconnecting fractures.
4. The method of claim 3 including the step of recovering hydrocarbons from the liquefiable components of the circulating fluid.
5. The method of claim 3 including the step of increasing the permeability of the interconnected fractures by injecting acid therethrough adapted to react with at least 1 portion of the rock matrix forming the walls of said fractures.
6. The method of claim 3 including the step of initiating an underground combustion Within said subterranean earth formation so as to effect recovery of petroleum materials.
7. The method of claim 2 wherein the step of adjusting the composition of said circulating fluid includes the step of incorporating acidic solid-material-removing components into said circulating fluid.
8. The method of claim 7 wherein the step of incorcirculating fields includes the step of incorporating nitric acid.
References Cited UNITED STATES PATENTS 2,813,583 11/1957 Marx et a1. 166-271 3,284,281 11/1966 Thomas 166-271 X 3,346,044 10/1967 Slusser 166259 X 3,379,250 4/1968 Matthews et a1 166-271 10 CHARLES E. OCONNELL, Primary Examiner I. A. CALVERT, Assistant Examiner US. Cl. X.R.
porating solid-material-removing components into said 15 166271, 272
US771962A 1968-10-30 1968-10-30 Method of recovering liquefiable components from a subterranean earth formation Expired - Lifetime US3500913A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US77196268A 1968-10-30 1968-10-30

Publications (1)

Publication Number Publication Date
US3500913A true US3500913A (en) 1970-03-17

Family

ID=25093468

Family Applications (1)

Application Number Title Priority Date Filing Date
US771962A Expired - Lifetime US3500913A (en) 1968-10-30 1968-10-30 Method of recovering liquefiable components from a subterranean earth formation

Country Status (1)

Country Link
US (1) US3500913A (en)

Cited By (49)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3565173A (en) * 1969-09-17 1971-02-23 Mobil Oil Corp Methods of selectively improving the fluid communication of earth formations
US3613785A (en) * 1970-02-16 1971-10-19 Shell Oil Co Process for horizontally fracturing subsurface earth formations
US3682246A (en) * 1971-01-19 1972-08-08 Shell Oil Co Fracturing to interconnect wells
US3706341A (en) * 1970-08-10 1972-12-19 Canadian Fina Oil Ltd Process for developing interwell communication in a tar sand
US3810510A (en) * 1973-03-15 1974-05-14 Mobil Oil Corp Method of viscous oil recovery through hydraulically fractured wells
US3863709A (en) * 1973-12-20 1975-02-04 Mobil Oil Corp Method of recovering geothermal energy
US3978925A (en) * 1974-06-21 1976-09-07 Texaco Exploration Canada Ltd. Method for recovery of bitumens from tar sands
US4006778A (en) * 1974-06-21 1977-02-08 Texaco Exploration Canada Ltd. Thermal recovery of hydrocarbon from tar sands
US4438976A (en) * 1982-08-06 1984-03-27 Occidental Research Corporation Method of repair of short circuits for in situ leaching
WO2005045192A1 (en) * 2003-11-03 2005-05-19 Exxonmobil Upstream Research Company Hydrocarbon recovery from impermeable oil shales
US20050164894A1 (en) * 2004-01-24 2005-07-28 Eoff Larry S. Methods and compositions for the diversion of aqueous injection fluids in injection operations
US20080087427A1 (en) * 2006-10-13 2008-04-17 Kaminsky Robert D Combined development of oil shale by in situ heating with a deeper hydrocarbon resource
WO2008048455A2 (en) * 2006-10-13 2008-04-24 Exxonmobil Upstream Research Company Enhanced shale oil production by in situ heating using hydraulically fractured producing wells
US20080173443A1 (en) * 2003-06-24 2008-07-24 Symington William A Methods of treating a subterranean formation to convert organic matter into producible hydrocarbons
US20080283241A1 (en) * 2007-05-15 2008-11-20 Kaminsky Robert D Downhole burner wells for in situ conversion of organic-rich rock formations
US20080289819A1 (en) * 2007-05-25 2008-11-27 Kaminsky Robert D Utilization of low BTU gas generated during in situ heating of organic-rich rock
US20090050319A1 (en) * 2007-05-15 2009-02-26 Kaminsky Robert D Downhole burners for in situ conversion of organic-rich rock formations
US20090145598A1 (en) * 2007-12-10 2009-06-11 Symington William A Optimization of untreated oil shale geometry to control subsidence
US20100089585A1 (en) * 2006-10-13 2010-04-15 Kaminsky Robert D Method of Developing Subsurface Freeze Zone
US20100089575A1 (en) * 2006-04-21 2010-04-15 Kaminsky Robert D In Situ Co-Development of Oil Shale With Mineral Recovery
US20100101793A1 (en) * 2008-10-29 2010-04-29 Symington William A Electrically Conductive Methods For Heating A Subsurface Formation To Convert Organic Matter Into Hydrocarbon Fluids
US20100218946A1 (en) * 2009-02-23 2010-09-02 Symington William A Water Treatment Following Shale Oil Production By In Situ Heating
US20100282460A1 (en) * 2009-05-05 2010-11-11 Stone Matthew T Converting Organic Matter From A Subterranean Formation Into Producible Hydrocarbons By Controlling Production Operations Based On Availability Of One Or More Production Resources
US20110132600A1 (en) * 2003-06-24 2011-06-09 Robert D Kaminsky Optimized Well Spacing For In Situ Shale Oil Development
US20110146982A1 (en) * 2009-12-17 2011-06-23 Kaminsky Robert D Enhanced Convection For In Situ Pyrolysis of Organic-Rich Rock Formations
US8087460B2 (en) 2007-03-22 2012-01-03 Exxonmobil Upstream Research Company Granular electrical connections for in situ formation heating
US8230929B2 (en) 2008-05-23 2012-07-31 Exxonmobil Upstream Research Company Methods of producing hydrocarbons for substantially constant composition gas generation
US20130140020A1 (en) * 2009-12-09 2013-06-06 Schlumberger Technology Corporation Method for increasing fracture area
US8616280B2 (en) 2010-08-30 2013-12-31 Exxonmobil Upstream Research Company Wellbore mechanical integrity for in situ pyrolysis
US8622133B2 (en) 2007-03-22 2014-01-07 Exxonmobil Upstream Research Company Resistive heater for in situ formation heating
US8622127B2 (en) 2010-08-30 2014-01-07 Exxonmobil Upstream Research Company Olefin reduction for in situ pyrolysis oil generation
US8701788B2 (en) 2011-12-22 2014-04-22 Chevron U.S.A. Inc. Preconditioning a subsurface shale formation by removing extractible organics
US8770284B2 (en) 2012-05-04 2014-07-08 Exxonmobil Upstream Research Company Systems and methods of detecting an intersection between a wellbore and a subterranean structure that includes a marker material
US8839860B2 (en) 2010-12-22 2014-09-23 Chevron U.S.A. Inc. In-situ Kerogen conversion and product isolation
US8851177B2 (en) 2011-12-22 2014-10-07 Chevron U.S.A. Inc. In-situ kerogen conversion and oxidant regeneration
US8875789B2 (en) 2007-05-25 2014-11-04 Exxonmobil Upstream Research Company Process for producing hydrocarbon fluids combining in situ heating, a power plant and a gas plant
US8992771B2 (en) 2012-05-25 2015-03-31 Chevron U.S.A. Inc. Isolating lubricating oils from subsurface shale formations
US9033033B2 (en) 2010-12-21 2015-05-19 Chevron U.S.A. Inc. Electrokinetic enhanced hydrocarbon recovery from oil shale
US9080441B2 (en) 2011-11-04 2015-07-14 Exxonmobil Upstream Research Company Multiple electrical connections to optimize heating for in situ pyrolysis
US9181467B2 (en) 2011-12-22 2015-11-10 Uchicago Argonne, Llc Preparation and use of nano-catalysts for in-situ reaction with kerogen
US9394772B2 (en) 2013-11-07 2016-07-19 Exxonmobil Upstream Research Company Systems and methods for in situ resistive heating of organic matter in a subterranean formation
US20160281480A1 (en) * 2013-11-15 2016-09-29 Nexen Energy Ulc Method for increasing gas recovery in fractures proximate fracture treated wellbores
US9512699B2 (en) 2013-10-22 2016-12-06 Exxonmobil Upstream Research Company Systems and methods for regulating an in situ pyrolysis process
US9644466B2 (en) 2014-11-21 2017-05-09 Exxonmobil Upstream Research Company Method of recovering hydrocarbons within a subsurface formation using electric current
US10012064B2 (en) 2015-04-09 2018-07-03 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
CN108571305A (en) * 2018-03-18 2018-09-25 西南石油大学 A kind of high temperature heat shock method promoting the microcrack creation of tight gas wells hydraulic fracture face
CN109736762A (en) * 2019-03-22 2019-05-10 吉林大学 A kind of method that oil shale in-situ catalytic oxidation extracts shale oil gas
US10344204B2 (en) 2015-04-09 2019-07-09 Diversion Technologies, LLC Gas diverter for well and reservoir stimulation
US10982520B2 (en) 2016-04-27 2021-04-20 Highland Natural Resources, PLC Gas diverter for well and reservoir stimulation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2813583A (en) * 1954-12-06 1957-11-19 Phillips Petroleum Co Process for recovery of petroleum from sands and shale
US3284281A (en) * 1964-08-31 1966-11-08 Phillips Petroleum Co Production of oil from oil shale through fractures
US3346044A (en) * 1965-09-08 1967-10-10 Mobil Oil Corp Method and structure for retorting oil shale in situ by cycling fluid flows
US3379250A (en) * 1966-09-09 1968-04-23 Shell Oil Co Thermally controlling fracturing

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2813583A (en) * 1954-12-06 1957-11-19 Phillips Petroleum Co Process for recovery of petroleum from sands and shale
US3284281A (en) * 1964-08-31 1966-11-08 Phillips Petroleum Co Production of oil from oil shale through fractures
US3346044A (en) * 1965-09-08 1967-10-10 Mobil Oil Corp Method and structure for retorting oil shale in situ by cycling fluid flows
US3379250A (en) * 1966-09-09 1968-04-23 Shell Oil Co Thermally controlling fracturing

Cited By (86)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3565173A (en) * 1969-09-17 1971-02-23 Mobil Oil Corp Methods of selectively improving the fluid communication of earth formations
US3613785A (en) * 1970-02-16 1971-10-19 Shell Oil Co Process for horizontally fracturing subsurface earth formations
US3706341A (en) * 1970-08-10 1972-12-19 Canadian Fina Oil Ltd Process for developing interwell communication in a tar sand
US3682246A (en) * 1971-01-19 1972-08-08 Shell Oil Co Fracturing to interconnect wells
US3810510A (en) * 1973-03-15 1974-05-14 Mobil Oil Corp Method of viscous oil recovery through hydraulically fractured wells
US3863709A (en) * 1973-12-20 1975-02-04 Mobil Oil Corp Method of recovering geothermal energy
US3978925A (en) * 1974-06-21 1976-09-07 Texaco Exploration Canada Ltd. Method for recovery of bitumens from tar sands
US4006778A (en) * 1974-06-21 1977-02-08 Texaco Exploration Canada Ltd. Thermal recovery of hydrocarbon from tar sands
US4438976A (en) * 1982-08-06 1984-03-27 Occidental Research Corporation Method of repair of short circuits for in situ leaching
US20100078169A1 (en) * 2003-06-24 2010-04-01 Symington William A Methods of Treating Suberranean Formation To Convert Organic Matter Into Producible Hydrocarbons
US20110132600A1 (en) * 2003-06-24 2011-06-09 Robert D Kaminsky Optimized Well Spacing For In Situ Shale Oil Development
US7631691B2 (en) 2003-06-24 2009-12-15 Exxonmobil Upstream Research Company Methods of treating a subterranean formation to convert organic matter into producible hydrocarbons
US8596355B2 (en) 2003-06-24 2013-12-03 Exxonmobil Upstream Research Company Optimized well spacing for in situ shale oil development
US20080173443A1 (en) * 2003-06-24 2008-07-24 Symington William A Methods of treating a subterranean formation to convert organic matter into producible hydrocarbons
US7441603B2 (en) 2003-11-03 2008-10-28 Exxonmobil Upstream Research Company Hydrocarbon recovery from impermeable oil shales
US20070023186A1 (en) * 2003-11-03 2007-02-01 Kaminsky Robert D Hydrocarbon recovery from impermeable oil shales
CN1875168B (en) * 2003-11-03 2012-10-17 艾克森美孚上游研究公司 Hydrocarbon recovery from impermeable oil shales
EP1689973A4 (en) * 2003-11-03 2007-05-16 Exxonmobil Upstream Res Co Hydrocarbon recovery from impermeable oil shales
AU2004288130B2 (en) * 2003-11-03 2009-12-17 Exxonmobil Upstream Research Company Hydrocarbon recovery from impermeable oil shales
EA010677B1 (en) * 2003-11-03 2008-10-30 Эксонмобил Апстрим Рисерч Компани Hydrocarbon recovery from impermeable oil shales
WO2005045192A1 (en) * 2003-11-03 2005-05-19 Exxonmobil Upstream Research Company Hydrocarbon recovery from impermeable oil shales
US7857056B2 (en) 2003-11-03 2010-12-28 Exxonmobil Upstream Research Company Hydrocarbon recovery from impermeable oil shales using sets of fluid-heated fractures
US20090038795A1 (en) * 2003-11-03 2009-02-12 Kaminsky Robert D Hydrocarbon Recovery From Impermeable Oil Shales Using Sets of Fluid-Heated Fractures
EP1689973A1 (en) * 2003-11-03 2006-08-16 ExxonMobil Upstream Research Company Hydrocarbon recovery from impermeable oil shales
US7563750B2 (en) * 2004-01-24 2009-07-21 Halliburton Energy Services, Inc. Methods and compositions for the diversion of aqueous injection fluids in injection operations
US20050164894A1 (en) * 2004-01-24 2005-07-28 Eoff Larry S. Methods and compositions for the diversion of aqueous injection fluids in injection operations
US20100089575A1 (en) * 2006-04-21 2010-04-15 Kaminsky Robert D In Situ Co-Development of Oil Shale With Mineral Recovery
US8641150B2 (en) 2006-04-21 2014-02-04 Exxonmobil Upstream Research Company In situ co-development of oil shale with mineral recovery
US20100089585A1 (en) * 2006-10-13 2010-04-15 Kaminsky Robert D Method of Developing Subsurface Freeze Zone
US7669657B2 (en) 2006-10-13 2010-03-02 Exxonmobil Upstream Research Company Enhanced shale oil production by in situ heating using hydraulically fractured producing wells
CN101558216A (en) * 2006-10-13 2009-10-14 埃克森美孚上游研究公司 Enhanced shale oil production by in situ heating using hydraulically fractured producing wells
CN101558216B (en) * 2006-10-13 2013-08-07 埃克森美孚上游研究公司 Enhanced shale oil production by in situ heating using hydraulically fractured producing wells
WO2008048455A3 (en) * 2006-10-13 2008-07-03 Exxonmobil Upstream Res Co Enhanced shale oil production by in situ heating using hydraulically fractured producing wells
US20100319909A1 (en) * 2006-10-13 2010-12-23 Symington William A Enhanced Shale Oil Production By In Situ Heating Using Hydraulically Fractured Producing Wells
WO2008048455A2 (en) * 2006-10-13 2008-04-24 Exxonmobil Upstream Research Company Enhanced shale oil production by in situ heating using hydraulically fractured producing wells
US20080087427A1 (en) * 2006-10-13 2008-04-17 Kaminsky Robert D Combined development of oil shale by in situ heating with a deeper hydrocarbon resource
US8151884B2 (en) 2006-10-13 2012-04-10 Exxonmobil Upstream Research Company Combined development of oil shale by in situ heating with a deeper hydrocarbon resource
US8104537B2 (en) 2006-10-13 2012-01-31 Exxonmobil Upstream Research Company Method of developing subsurface freeze zone
US8087460B2 (en) 2007-03-22 2012-01-03 Exxonmobil Upstream Research Company Granular electrical connections for in situ formation heating
US8622133B2 (en) 2007-03-22 2014-01-07 Exxonmobil Upstream Research Company Resistive heater for in situ formation heating
US9347302B2 (en) 2007-03-22 2016-05-24 Exxonmobil Upstream Research Company Resistive heater for in situ formation heating
US20080283241A1 (en) * 2007-05-15 2008-11-20 Kaminsky Robert D Downhole burner wells for in situ conversion of organic-rich rock formations
US8122955B2 (en) 2007-05-15 2012-02-28 Exxonmobil Upstream Research Company Downhole burners for in situ conversion of organic-rich rock formations
US8151877B2 (en) 2007-05-15 2012-04-10 Exxonmobil Upstream Research Company Downhole burner wells for in situ conversion of organic-rich rock formations
US20090050319A1 (en) * 2007-05-15 2009-02-26 Kaminsky Robert D Downhole burners for in situ conversion of organic-rich rock formations
US8146664B2 (en) 2007-05-25 2012-04-03 Exxonmobil Upstream Research Company Utilization of low BTU gas generated during in situ heating of organic-rich rock
US8875789B2 (en) 2007-05-25 2014-11-04 Exxonmobil Upstream Research Company Process for producing hydrocarbon fluids combining in situ heating, a power plant and a gas plant
US20080289819A1 (en) * 2007-05-25 2008-11-27 Kaminsky Robert D Utilization of low BTU gas generated during in situ heating of organic-rich rock
US20090145598A1 (en) * 2007-12-10 2009-06-11 Symington William A Optimization of untreated oil shale geometry to control subsidence
US8082995B2 (en) 2007-12-10 2011-12-27 Exxonmobil Upstream Research Company Optimization of untreated oil shale geometry to control subsidence
US8230929B2 (en) 2008-05-23 2012-07-31 Exxonmobil Upstream Research Company Methods of producing hydrocarbons for substantially constant composition gas generation
US20100101793A1 (en) * 2008-10-29 2010-04-29 Symington William A Electrically Conductive Methods For Heating A Subsurface Formation To Convert Organic Matter Into Hydrocarbon Fluids
US8616279B2 (en) 2009-02-23 2013-12-31 Exxonmobil Upstream Research Company Water treatment following shale oil production by in situ heating
US20100218946A1 (en) * 2009-02-23 2010-09-02 Symington William A Water Treatment Following Shale Oil Production By In Situ Heating
US8540020B2 (en) 2009-05-05 2013-09-24 Exxonmobil Upstream Research Company Converting organic matter from a subterranean formation into producible hydrocarbons by controlling production operations based on availability of one or more production resources
US20100282460A1 (en) * 2009-05-05 2010-11-11 Stone Matthew T Converting Organic Matter From A Subterranean Formation Into Producible Hydrocarbons By Controlling Production Operations Based On Availability Of One Or More Production Resources
US20130140020A1 (en) * 2009-12-09 2013-06-06 Schlumberger Technology Corporation Method for increasing fracture area
US9140109B2 (en) * 2009-12-09 2015-09-22 Schlumberger Technology Corporation Method for increasing fracture area
US20110146982A1 (en) * 2009-12-17 2011-06-23 Kaminsky Robert D Enhanced Convection For In Situ Pyrolysis of Organic-Rich Rock Formations
US8863839B2 (en) 2009-12-17 2014-10-21 Exxonmobil Upstream Research Company Enhanced convection for in situ pyrolysis of organic-rich rock formations
US8616280B2 (en) 2010-08-30 2013-12-31 Exxonmobil Upstream Research Company Wellbore mechanical integrity for in situ pyrolysis
US8622127B2 (en) 2010-08-30 2014-01-07 Exxonmobil Upstream Research Company Olefin reduction for in situ pyrolysis oil generation
US9033033B2 (en) 2010-12-21 2015-05-19 Chevron U.S.A. Inc. Electrokinetic enhanced hydrocarbon recovery from oil shale
US8936089B2 (en) 2010-12-22 2015-01-20 Chevron U.S.A. Inc. In-situ kerogen conversion and recovery
US8997869B2 (en) 2010-12-22 2015-04-07 Chevron U.S.A. Inc. In-situ kerogen conversion and product upgrading
US8839860B2 (en) 2010-12-22 2014-09-23 Chevron U.S.A. Inc. In-situ Kerogen conversion and product isolation
US9133398B2 (en) 2010-12-22 2015-09-15 Chevron U.S.A. Inc. In-situ kerogen conversion and recycling
US9080441B2 (en) 2011-11-04 2015-07-14 Exxonmobil Upstream Research Company Multiple electrical connections to optimize heating for in situ pyrolysis
US9181467B2 (en) 2011-12-22 2015-11-10 Uchicago Argonne, Llc Preparation and use of nano-catalysts for in-situ reaction with kerogen
US8701788B2 (en) 2011-12-22 2014-04-22 Chevron U.S.A. Inc. Preconditioning a subsurface shale formation by removing extractible organics
US8851177B2 (en) 2011-12-22 2014-10-07 Chevron U.S.A. Inc. In-situ kerogen conversion and oxidant regeneration
US8770284B2 (en) 2012-05-04 2014-07-08 Exxonmobil Upstream Research Company Systems and methods of detecting an intersection between a wellbore and a subterranean structure that includes a marker material
US8992771B2 (en) 2012-05-25 2015-03-31 Chevron U.S.A. Inc. Isolating lubricating oils from subsurface shale formations
US9512699B2 (en) 2013-10-22 2016-12-06 Exxonmobil Upstream Research Company Systems and methods for regulating an in situ pyrolysis process
US9394772B2 (en) 2013-11-07 2016-07-19 Exxonmobil Upstream Research Company Systems and methods for in situ resistive heating of organic matter in a subterranean formation
US20160281480A1 (en) * 2013-11-15 2016-09-29 Nexen Energy Ulc Method for increasing gas recovery in fractures proximate fracture treated wellbores
US10030491B2 (en) * 2013-11-15 2018-07-24 Nexen Energy Ulc Method for increasing gas recovery in fractures proximate fracture treated wellbores
US9644466B2 (en) 2014-11-21 2017-05-09 Exxonmobil Upstream Research Company Method of recovering hydrocarbons within a subsurface formation using electric current
US9739122B2 (en) 2014-11-21 2017-08-22 Exxonmobil Upstream Research Company Mitigating the effects of subsurface shunts during bulk heating of a subsurface formation
US10012064B2 (en) 2015-04-09 2018-07-03 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
US10344204B2 (en) 2015-04-09 2019-07-09 Diversion Technologies, LLC Gas diverter for well and reservoir stimulation
US10385257B2 (en) 2015-04-09 2019-08-20 Highands Natural Resources, PLC Gas diverter for well and reservoir stimulation
US10385258B2 (en) 2015-04-09 2019-08-20 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
US10982520B2 (en) 2016-04-27 2021-04-20 Highland Natural Resources, PLC Gas diverter for well and reservoir stimulation
CN108571305A (en) * 2018-03-18 2018-09-25 西南石油大学 A kind of high temperature heat shock method promoting the microcrack creation of tight gas wells hydraulic fracture face
CN109736762A (en) * 2019-03-22 2019-05-10 吉林大学 A kind of method that oil shale in-situ catalytic oxidation extracts shale oil gas

Similar Documents

Publication Publication Date Title
US3500913A (en) Method of recovering liquefiable components from a subterranean earth formation
US3501201A (en) Method of producing shale oil from a subterranean oil shale formation
US3682246A (en) Fracturing to interconnect wells
US4633948A (en) Steam drive from fractured horizontal wells
US3280909A (en) Method of producing an oil bearing formation
US3515213A (en) Shale oil recovery process using heated oil-miscible fluids
US3342258A (en) Underground oil recovery from solid oil-bearing deposits
US3455392A (en) Thermoaugmentation of oil production from subterranean reservoirs
US3741306A (en) Method of producing hydrocarbons from oil shale formations
US4019575A (en) System for recovering viscous petroleum from thick tar sand
US3994341A (en) Recovering viscous petroleum from thick tar sand
US3994340A (en) Method of recovering viscous petroleum from tar sand
US3513914A (en) Method for producing shale oil from an oil shale formation
US3386508A (en) Process and system for the recovery of viscous oil
US4037658A (en) Method of recovering viscous petroleum from an underground formation
US5036918A (en) Method for improving sustained solids-free production from heavy oil reservoirs
CA1170980A (en) Method of recovering viscous petroleum employing heated subsurface perforated casing containing a movable diverter
US4635720A (en) Heavy oil recovery process using intermittent steamflooding
US3739852A (en) Thermal process for recovering oil
US4718489A (en) Pressure-up/blowdown combustion - a channelled reservoir recovery process
US3455391A (en) Process for horizontally fracturing subterranean earth formations
US4008765A (en) Method of recovering viscous petroleum from thick tar sand
US4612989A (en) Combined replacement drive process for oil recovery
US3129758A (en) Steam drive oil production method
US5036917A (en) Method for providing solids-free production from heavy oil reservoirs