US3537529A - Method of interconnecting a pair of wells extending into a subterranean oil shale formation - Google Patents

Method of interconnecting a pair of wells extending into a subterranean oil shale formation Download PDF

Info

Publication number
US3537529A
US3537529A US772993A US3537529DA US3537529A US 3537529 A US3537529 A US 3537529A US 772993 A US772993 A US 772993A US 3537529D A US3537529D A US 3537529DA US 3537529 A US3537529 A US 3537529A
Authority
US
United States
Prior art keywords
fracture
well
fluid
oil shale
fractures
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US772993A
Inventor
Elmer H Timmerman
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shell USA Inc
Original Assignee
Shell Oil Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shell Oil Co filed Critical Shell Oil Co
Application granted granted Critical
Publication of US3537529A publication Critical patent/US3537529A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/2405Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection in association with fracturing or crevice forming processes
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/243Combustion in situ
    • E21B43/247Combustion in situ in association with fracturing processes or crevice forming processes
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/261Separate steps of (1) cementing, plugging or consolidating and (2) fracturing or attacking the formation

Definitions

  • ABSTRACT A method of creating horizontal fractures and of interconnecting at least a pair of wells extending into a subterranean oil shale formation by fracturing each well and injecting a solidifiable fluid into at least one of the fractures and maintaining the fluid at substantially a fracture-extending pressure until the fluid solidifies and plugs the fracture.
  • At least one well in which at least one preceding fracture has been formed and plugged in like manner is refractured and at least one of the fractures is extended until the fractures intersect or intersect the wells so that fluid may be pumped through a fracture path from one of said wells to the other.
  • FIG. 3 INVENTORZ E. H. TIMMERMAN BYS/MJM HIS ATTORNEY Patented Nov. 3, 1970 3,537,529
  • Hydraulic fracturing is a conventional procedure that is often employed where the permeability of an earth formation is too low to permit fluid to flow into or out of the formation at a rate which is economically suitable in respect to the recovery of petroleum or other material from the earth formation.
  • a fluid is confined in a region in which it is in contact with a subterranean earth formation and the'pressure on the fluid is increased until a fracture is formed within the earth formation.
  • hydraulic fractures form along planes which are perpendicular to the least one of the three principal compressive stresses that exist along a vertical and two mutually perpendicular horizontal axes within any subterranean earth formation.
  • hydraulic fracturing produces a horizontal fracture.
  • the fracturing occurs when the pressure applied to the fracturing fluid exceeds a pressure that is equivalent to the effective weight of the overlying earth formations by an amount sufficient to overcome the tensile and/or shear strength of the earth formation, or rock.
  • the pressure which is equivalent to the effective weight of the overlying earth formations is commonly referred to as the overburden pressure. It is generally equal to, or slightly less than, about 1 pound per square inch per foot of depth.
  • the pressures required to cause a failure of a subsurface earth formation in situ is commonly referred to as the fracturing pressure and, in respect to vertical fractures, should be less than the overburden pressureunless skins present on the exposed' faces of the earth formations in the well cause a temporary increase which is reflected in the pressure required to break down or initiate the fracture.
  • the fracturing pressure is usually greater than the effective overburden pressure, since the overburden normally must be lifted or compressed in order to separate the layers of rock.
  • the vertical compressive stress isgreater than one or both of the compressive stresses that are perpendicular to each other within the horizontal plane.
  • the hydraulically induced fractures are usually vertical, and are oriented in a plane perpendicular to the weakest of the horizontal compressive stresses.
  • vertical stress often exceeds the horizontal stresses and, in such situations, fractures with vertical trend will form along directions perpendicular to the smallest horizontal stresses at fracturing pressures which are less than the overburden pressure.
  • a horizontal fracture is preferred to a vertical fracture in respect to both the distributing' of fluid over a region having a significant areal extent, and the interconnecting of a pair of wells.
  • horizontal fractures are formed in the oil shale at each well and extended to intersect one or more additional wells.
  • the benefits of the horizontal fracture may be derived without communication between wells.
  • FIG. 1 is a top plan schematic view of a well borehole being utilized in accordance with the teachings of my invention
  • FIG. 2 is a top plan schematic view of the well borehole of FIG. 1 at a later stage in the process;
  • FIG. 3 is a vertical sectional view of subsurface earth formations and the well borehole of FIG. 1 and two adjacent wells which are to be interconnected;
  • FIG. 4 is a top plan schematic view of a pair of well boreholes being utilized in accordance with the teachings of my invention prior to changing direction of a fracture;
  • FIG. 5 is a top plan schematic view of one method of inter-- connecting the well boreholes of FIG. 4 at a later stage in the fracturing process;
  • FIG. 6 is a vertical sectional view, partly diagrammatic, ofa preferred method of using my invention in pyrolysis of oil shale, coal, etc.;
  • FIGS. 7 through 9 are vertical sectional views, partly diagrammatic, of wells being utilized in a plurality of steps for carrying out my invention when connection of wells is derived and accomplished.
  • the method of my invention comprises the use of the pressurized plugging of at least one well borehole fracture with an impermeable solidifiable material, such as cement, to reorient directions along which at least one refracturing will occur in order to interconnect at least a pair of well boreholes by means of flow paths through fractures.
  • an impermeable solidifiable material such as cement
  • One way of accomplishing this is to form and extend a horizontal fracture untilit appears in both well boreholes.
  • Another way is to orient and extend fractures which may be vertical (or vertical, inclined and/or horizontal) until the fractures intersect and provide a flow path between the well boreholes.
  • FIGS. 1 through 5 A method is illustrated using pressurized fracture-plugging to form a fracture interconnecting well boreholes.
  • FIG. 1 an initial, vertical fracture 1 is formed extending from well borehole 2 at a pressure less than a pressure sufficient to form a horizontal fracture.
  • Well borehole 2 extends downwardly through earth formation 4 to penetrate oil shale formation 5 (FIG. 3).
  • Formation 5 is substantially impermeable and has a tendency to form vertical fractures.
  • vertical fracture 1 is then filled with a fluid capable of solidifying in situ to an impermeable compression-resistant solid.
  • a fluid such as cement or a resin-forming fluid
  • the solidifying fluid is preferably maintained at a pressure just less than that required to inject more cementing fluid until the solidifying fluid has solidified. This may be accomplished by conventional techniques such as those used in squeeze-cementing.
  • Any fluid which is capable of solidifying to relatively incompressible and impermeable solids also may be used and such fluids include cement, heat-sensitive organic resins, such as phenol-formaldehyde resins, epoxy resins, urea-formaldehyde resins, polyester resins, and the like.
  • the resin decomposition is advantageous since it exposes additional portions of oil shale to contact by the hot fluid.
  • the tendency for the fractures to close during the decomposition of the heat-sensitive resin can be inhibited by mixing propping materials with the solidifiable material at the time it is injected into the fracture during the pressurized-plugging of the fracture.
  • a subsequent vertical fracture 3 is formed at a pressure above that required for forming fracture 1.
  • Such refracturing is preferably repeated, with subsequent pressurized-plugging, as discussed hereinabove at successively higher pressure until a fracture is formed at a pressure sufficient to form a horizontal fracture 6 (FIG. 3).
  • Horizontal fracture 6 may be extended, by means well known in the art combined with this invention and to be discussed further hereinbelow, into a location selected for a downhole portion of at least one adjacent well borehole, as for example, well boreholes 7 and 8 of FIG. 3.
  • At least two well boreholes l3 and 14 are drilled into oil shale formation 11 (FIG. 6) with concurrent treatment of well boreholes l3 and 14 taking place within a common depth interval in which the horizontal fracture is to be formed.
  • the operations may be preferably conducted, simultaneously or sequentially, in at least two well boreholes (i.e., well boreholes 13 and 14, for example).
  • the initial vertical fracture is made.
  • successive fracture treatments are undertaken until the wells become interconnected.
  • a solidifiable fluid as discussed hereinabove with respect to FIGS. 1 through 3, is injected into at least one of the fractures (fracture 21, for example), and the fluid is maintained at substantially a fracture-extending pressure until the fluid solidifies and plugs the fracture.
  • the subsurface forces may be changed so that a single horizontal fracture, which connects well boreholes l3 and 14, may be attained in an oil shale formation which initially was capable of fracturing only in the vertical direction.
  • both well 13 and 14 may be similar.
  • each well borehole 13 and 14 has a casing 15 and 16, respectively, positioned in the borehole and sealed therein by a sealant l7 and 18, respectively, so as to maintain its location therein and prevent loss of fluids.
  • Wells 13 and 14 may be cased only to the depth of the earth formation over burden 10. The use of uncased well boreholes is feasible whenever the native oil shale is impermeable and when it is unnecessary to control the location ofthe fractures.
  • well boreholes 13 and 14 may be cased and perforated along part or all of the shale interval -as illustrated in FIG. 6.
  • well boreholes 13 and 14 may be cased and perforated along part or all of the shale interval -as illustrated in FIG. 6.
  • a single perforation 19 and 20 is shown in well boreholes 13 and 14, respectively, obviously a plurality of such perforations may be provided.
  • the wells in subsequent operations, to be discussed further hereinbelow, when a permeable channel formed by a horizontal fracture that extends between a pair of wells migrates upwardly through oil shale formation 11, the wells must be reentered in order to provide perforations at higher levels at which fluids will flow through the oil shale.
  • heat exchange and pumping equipment is used to inject afirst fluid down an injection well 13, through fracture 23 within oil shale formation 11 and out of production well 14 at which point circulating fluid is recovered for subsequent reinjection into well 13.
  • the heat also may be generated in the oil shale by pumping oxygen to support combustion of the kerogen.
  • wells 13 and 14 and the adjacent oil shale formation 11 may be notched in order to insure that a horizontal fracture 23 will be initiated at a selected depth and to provide an enlarged horizontal surface area to be acted upon by the pressure applied to the fracturing fluid.
  • a notching tool 22 is shown disposed in well 13 adjacent perforation 19.
  • Tool 22 is lowered into well 13 by means of a cable 22a of sufficient strength to raise and lower tool 22. Cable 23 may also include the necessary conduits for coupling tool 22 to a surface control unit 24.
  • Unit 24 in conjunction with a winch or pulley 25, serves to control the operation of tool 22 in the well 13.
  • a suitable tool for notching a subterranean oil shale formation is disclosed in a patent to Huitt et al., U.S. Pat. No. 3,050,l22.
  • tool 22 is actuated to form notch 26 in well 13 and oil shale formation 11.
  • a similar notch 27 is illustrated in FIG. 7 as having been previously formed in well 14 and the adjacent oil shale formation 11.
  • the notching may precede or follow a pressurized-plugging procedure of the type discussed in connection with FIGS. 1 through 3 but, in subsurface formations that tend to fracture vertically, a horizontal fracture will not result from the fracturing operations until after the subterranean stresses have been altered by the pressurized-plugging procedure.
  • the notch may also be created by using a drill pipe and a blade and by using sand blasting techniques which are both frequently used in oil well operations.
  • a hydraulic fracturing fluid is injected down well 13 and/or well 14 and into oil shale formation 11 at a pressure sufficient to form and extend the generally horizontal fracture 23 (FIG. 8) through oil shale formation 11.
  • the fluid injection pressure at formation face is such that it exceeds both the effective overburden pressure and the fracturing pressure of the earth formation.
  • the direction of the vertical fractures shown in FIG. 5 should change at pressures less than overburden pressure in most cases.
  • the fracture 23 may be extended and/or propped by techniques well known to those skilled in the art.
  • a kerogen-pyrolyzing fluid is circulated down well 13 through the fracture 23 of FIG. 8 and out of well 14, thereby forming a permeable channel 29 as illustrated in FIG. 9.
  • This fluid is heated to a temperature sufficient to pyrolyze the kerogen components of the oil shale in formation 11.
  • Al ternately the heat may be generated in situ by circulating oxygen containing fluids alone or combined with combustable materials.
  • Conventional equipment, as illustrated in FIG. 9, may be used for heating and circulating the kerogen-pyrolyzing fluid and subsequently separating the shale oil and gas components of the fluid circulating out of production well 14 as is well known in the art.
  • the permeability of channel 29 may be maintained by circulating a fluid having a gaseous component therein from one borehole 13 through the fracture 29 and out the other borehole 14 while maintaining a pressure on the fluid sufficient to lift or compress the overburden by an amount sufficient to maintain an opening through which fluid can flow.
  • the permeability of channel 29 is thus maintained by lifting the roof of the channel 29 to spatially separate the solid components of the oil shale formation 11.
  • Such fracture may also be propped with a solid.
  • the gaseous component of the circulating fluid is heated to a temperature sufficient to mobilize any organic components in the oil shale formation and theroof of the channel migrates up through the oil shale.
  • the depths of the boreholes 13 and 14 through which the heated circulated fluid is flowing are adjusted to correspond with the uppermost depth along which the fluid is circulating through the permeable channel 29.
  • the width of the cement-filled vertical fractures of FIGS. 2 and 5 required to increase the horizontal stresses by an amount 8 would be E L.
  • the amount of cement required to fill the fractures is 2E Lh, where h is the height of the cement-filled fractures.
  • a method for interconnecting at least a pair of well boreholes extending into a substantially impermeable subterranean earth formation including an oil shale comprising the steps of:
  • step of injecting said solidifiable fluid includes the step of injecting cement.
  • step of injecting said solidifiable fluid includes the step of filling said fracture with a heat-sensitive organic resin.
  • step of refracturing to form communication between said well boreholes includes the step of notching at least one of said well boreholes extending into said oil shale formation at a selected horizontal depth in said formation and subsequently extending such notch to obtain an intercommunicating fracture between said well boreholes.
  • the method of claim 1 including the step of recovering shale oil from the pyrolysis-inducing fluid circulating out of the other of said well boreholes.
  • step of injecting said solidifiable fluid includes the step of injecting a decomposable heat-sensitive organic resin whereby the subsequent circulation of said pyrolysis-inducing fluid decomposes the heat-sensitive resin thereby exposing additional portions of oil shale to contact by the pyrolysis-inducing fluid.

Description

United States Patent U.S. Cl.
METHOD OF INTERCONNEC'IING A PAIR OF WELLS EXTENDING INTO A SUBTERRANEAN OIL SHALE FORMATION 6 Claims, 9 Drawing Figs.
'Int. Cl ..E2lbi43/24,
. E2lb 43/26, E216 33/13 Field of Search 166/281, 308, 283, 271, 272, 303, 259, 256, 295
References Cited UNITED STATES PATENTS 2/1956 Scott et a1 166/283X .Primary ExaminerStephen J. Novosad Attorney- Louis J. Bovasso and .1 H. McCarthy ABSTRACT: A method of creating horizontal fractures and of interconnecting at least a pair of wells extending into a subterranean oil shale formation by fracturing each well and injecting a solidifiable fluid into at least one of the fractures and maintaining the fluid at substantially a fracture-extending pressure until the fluid solidifies and plugs the fracture. At least one well in which at least one preceding fracture has been formed and plugged in like manner is refractured and at least one of the fractures is extended until the fractures intersect or intersect the wells so that fluid may be pumped through a fracture path from one of said wells to the other.
Patented Nov. 3, 1970 3,537,529
Sheet 1 014 FIG. 2
FIG. 3 INVENTORZ E. H. TIMMERMAN BYS/MJM HIS ATTORNEY Patented Nov. 3, 1970 3,537,529
Sheet 2 014 FIG. 5
INVENTOR'. v
E. H. TIMMERMAN HIS ATTORNEY Patented Nov. 3, 1970 Sheet 3 of 4 FIG. 7
I F IG. 8
INVENTOR E. H. TIMMERMAN my a-m HIS ATTORNEY Patented Nov. 3,1970 3,537,529
Sheet or 4 SEPARATOR HEAT EXCHANGER HEATER EE vmymww WAV/IIX e xxx-29 w xy-34% INVENTOR E. H. TIMMERMAN BYZJWXW HIS ATTORNEY METHOD OF INTERCONNECTING A PAIR OF WELLS EXTENDING INTO A SUBTERRANEAN OIL SI-IALE FORMATION BACKGROUND OF THE INVENTION 1. Field of the Invention This invention relates to a method of interconnecting a pair of wells; and, more particularly, interconnecting wells by means of fractures that extend through a subterranean oil shale formation.
2. Description of the Prior Art Hydraulic fracturing is a conventional procedure that is often employed where the permeability of an earth formation is too low to permit fluid to flow into or out of the formation at a rate which is economically suitable in respect to the recovery of petroleum or other material from the earth formation. In a hydraulic fracturing operation, a fluid is confined in a region in which it is in contact with a subterranean earth formation and the'pressure on the fluid is increased until a fracture is formed within the earth formation.
It is generally recognized that hydraulic fractures form along planes which are perpendicular to the least one of the three principal compressive stresses that exist along a vertical and two mutually perpendicular horizontal axes within any subterranean earth formation. At shallow depths, where the vertical stress is least, hydraulic fracturing produces a horizontal fracture. In such a situation, the fracturing occurs when the pressure applied to the fracturing fluid exceeds a pressure that is equivalent to the effective weight of the overlying earth formations by an amount sufficient to overcome the tensile and/or shear strength of the earth formation, or rock.
The pressure which is equivalent to the effective weight of the overlying earth formations is commonly referred to as the overburden pressure. It is generally equal to, or slightly less than, about 1 pound per square inch per foot of depth. The pressures required to cause a failure of a subsurface earth formation in situ is commonly referred to as the fracturing pressure and, in respect to vertical fractures, should be less than the overburden pressureunless skins present on the exposed' faces of the earth formations in the well cause a temporary increase which is reflected in the pressure required to break down or initiate the fracture.
In respect to a horizontal fracture, the fracturing pressure is usually greater than the effective overburden pressure, since the overburden normally must be lifted or compressed in order to separate the layers of rock. In respect to a vertical fracture, the vertical compressive stress isgreater than one or both of the compressive stresses that are perpendicular to each other within the horizontal plane. In the latter type of situation, the hydraulically induced fractures are usually vertical, and are oriented in a plane perpendicular to the weakest of the horizontal compressive stresses. In subsurface earth formations, vertical stress often exceeds the horizontal stresses and, in such situations, fractures with vertical trend will form along directions perpendicular to the smallest horizontal stresses at fracturing pressures which are less than the overburden pressure.
When a fracture is to be used in fluid production, for example, in an oil-producing operation, it may at times be advantageous to use a horizontal fracture. A horizontal fracture is preferred to a vertical fracture in respect to both the distributing' of fluid over a region having a significant areal extent, and the interconnecting of a pair of wells. However, it has proven to be difficult to overcome the fracturing tendencies that are dictated by the regional tectonics and in many, if not most of the reservoirs in the United States, the least principal stress is horizontal. In such reservoirs, in order to form a horizontal fracture, it is necessary to either increase the horizontal compressive stresses or decrease the vertical compressive stress, or do both, until the vertical stress becomes the least of the three principal stresses.
Thus, it has been found that horizontal stresses are smaller than vertical stresses in many reservoirs, a condition that leads to the extension of generally parallel, nonintersecting, vertically-oriented fractures. In order to be able to extend a hydraulic fracture as a somewhat horizontal plane around the well, it is necessary to change the formation stresses so that the least principal stress is vertical.
SUMMARY OF THE INVENTION It is an object of this invention to provide a method for interconnecting wells extending into relatively impermeable subterranean earth formations, such as oil shale formations.
It is a further object of this invention to provide a method for forming horizontal fractures in a subterranean oil shale formation that is normally susceptible to vertical fracturing.
It is a further object of this invention to change the initial preferred direction of a vertical fracture so that vertical fractures created in two wells can be interconnected.
It is a further object of this invention to provide a method for economically producing horizontal hydraulic fractures and/or connecting vertical fractures in a relatively short period of time in formations that are normally susceptible to vertical fracturing.
It is a still further object of this invention to form a horizontal fracture and/or connecting vertical fractures within an oil shale formation in a manner which connects two or more wells so that pyrolysis of the oil shale is improved.
These and other objects may be accomplished by completing at least two wells into a substantially impermeable subterranean earth formation, fracturing each well and injecting a solidifiable fluid into at least one of the fractures and maintaining the fluid at substantially a fracture-extending pressure until the fluid solidifies and plugs the fracture. At least one well in which at least one preceding fracture has been formed and plugged is then refractured and at least one newly-formed fracture is extended until the fractures intersect each other, or the wells, so that fluid may be pumped through a fracture path from one well to another.
In a preferred embodiment, horizontal fractures are formed in the oil shale at each well and extended to intersect one or more additional wells. In oil and gas operations, the benefits of the horizontal fracture may be derived without communication between wells.
BRIEF DESCRIPTION OF THE DRAWING FIG. 1 is a top plan schematic view of a well borehole being utilized in accordance with the teachings of my invention;
FIG. 2 is a top plan schematic view of the well borehole of FIG. 1 at a later stage in the process;
FIG. 3 is a vertical sectional view of subsurface earth formations and the well borehole of FIG. 1 and two adjacent wells which are to be interconnected;
FIG. 4 is a top plan schematic view of a pair of well boreholes being utilized in accordance with the teachings of my invention prior to changing direction of a fracture;
FIG. 5 is a top plan schematic view of one method of inter-- connecting the well boreholes of FIG. 4 at a later stage in the fracturing process;
FIG. 6 is a vertical sectional view, partly diagrammatic, ofa preferred method of using my invention in pyrolysis of oil shale, coal, etc.; and
FIGS. 7 through 9 are vertical sectional views, partly diagrammatic, of wells being utilized in a plurality of steps for carrying out my invention when connection of wells is derived and accomplished.
DESCRIPTION OF THE PREFERRED EMBODIMENT The method of my invention comprises the use of the pressurized plugging of at least one well borehole fracture with an impermeable solidifiable material, such as cement, to reorient directions along which at least one refracturing will occur in order to interconnect at least a pair of well boreholes by means of flow paths through fractures. One way of accomplishing this is to form and extend a horizontal fracture untilit appears in both well boreholes. Another way is to orient and extend fractures which may be vertical (or vertical, inclined and/or horizontal) until the fractures intersect and provide a flow path between the well boreholes.
The method of accomplishing the foregoing is illustrated in FIGS. 1 through 5. A method is illustrated using pressurized fracture-plugging to form a fracture interconnecting well boreholes. Thus, in FIG. 1 an initial, vertical fracture 1 is formed extending from well borehole 2 at a pressure less than a pressure sufficient to form a horizontal fracture. Well borehole 2 extends downwardly through earth formation 4 to penetrate oil shale formation 5 (FIG. 3). Formation 5 is substantially impermeable and has a tendency to form vertical fractures. Referring now to FIG. 2, vertical fracture 1 is then filled with a fluid capable of solidifying in situ to an impermeable compression-resistant solid. This is accomplished by injecting a fluid, such as cement or a resin-forming fluid, down injection well 2, through oil shale formation 5 and into fracture 1 and allowing the solidification of the solidifiable fluid to occur at substantially the pressure required to extend fracture 1. The solidifying fluid is preferably maintained at a pressure just less than that required to inject more cementing fluid until the solidifying fluid has solidified. This may be accomplished by conventional techniques such as those used in squeeze-cementing. Any fluid which is capable of solidifying to relatively incompressible and impermeable solids also may be used and such fluids include cement, heat-sensitive organic resins, such as phenol-formaldehyde resins, epoxy resins, urea-formaldehyde resins, polyester resins, and the like.
When resins are used to plug vertical fractures and thereafter means are used to form horizontal fractures which interconnect a pattern of vwells and shale oil is produced by circulating oxygen to cause combustion or by circulating a fluid heated to a temperature sufficient to pyrolyze the kerogen and decompose the heat-sensitive resin, the resin decomposition is advantageous since it exposes additional portions of oil shale to contact by the hot fluid. The tendency for the fractures to close during the decomposition of the heat-sensitive resin can be inhibited by mixing propping materials with the solidifiable material at the time it is injected into the fracture during the pressurized-plugging of the fracture.
After the pressurized-plugging of fracture 1, as illustrated in FIG. 2, a subsequent vertical fracture 3 is formed at a pressure above that required for forming fracture 1. Such refracturing is preferably repeated, with subsequent pressurized-plugging, as discussed hereinabove at successively higher pressure until a fracture is formed at a pressure sufficient to form a horizontal fracture 6 (FIG. 3). Horizontal fracture 6 may be extended, by means well known in the art combined with this invention and to be discussed further hereinbelow, into a location selected for a downhole portion of at least one adjacent well borehole, as for example, well boreholes 7 and 8 of FIG. 3.
In a preferred embodiment of this invention, at least two well boreholes l3 and 14 are drilled into oil shale formation 11 (FIG. 6) with concurrent treatment of well boreholes l3 and 14 taking place within a common depth interval in which the horizontal fracture is to be formed. Thus, in a procedure for forming intersecting fractures which may be vertical or inclined, as illustrated in FIG. 5 where vertical fractures 21a and 24 extend between well boreholes 13 and 14, the operations may be preferably conducted, simultaneously or sequentially, in at least two well boreholes (i.e., well boreholes 13 and 14, for example). In one well, the initial vertical fracture is made. In the second well, successive fracture treatments are undertaken until the wells become interconnected.
As illustrated in FIG. 5, after forming fractures 21 and 21a, as shown in FIG. 4, a solidifiable fluid, as discussed hereinabove with respect to FIGS. 1 through 3, is injected into at least one of the fractures (fracture 21, for example), and the fluid is maintained at substantially a fracture-extending pressure until the fluid solidifies and plugs the fracture. At least one of the well boreholes in which at least one preceding fracture has been formed and plugged, illustrated herein as well borehole 13, is refractured and the fracture 24 so formed is extended, for example, by means well known in the art, until the fractures 21a and 24 intersect so that fluid may be pumped through a fracture path from one well borehole to another.
If the refracturing-solidification process is repeated a sufficient number of times, the subsurface forces may be changed so that a single horizontal fracture, which connects well boreholes l3 and 14, may be attained in an oil shale formation which initially was capable of fracturing only in the vertical direction.
Referring once again to FIG. 6, the illustrated construction of both well 13 and 14 may be similar. For example, in FIG. 6, wherein well boreholes 13 and 14 are similar to well boreholes 2,7 and 8 of FIG. 3, each well borehole 13 and 14 has a casing 15 and 16, respectively, positioned in the borehole and sealed therein by a sealant l7 and 18, respectively, so as to maintain its location therein and prevent loss of fluids. Wells 13 and 14 may be cased only to the depth of the earth formation over burden 10. The use of uncased well boreholes is feasible whenever the native oil shale is impermeable and when it is unnecessary to control the location ofthe fractures.
Alternatively, and for purposes of illustration only, well boreholes 13 and 14 may be cased and perforated along part or all of the shale interval -as illustrated in FIG. 6. Thus, although only a single perforation 19 and 20 is shown in well boreholes 13 and 14, respectively, obviously a plurality of such perforations may be provided. Also, in subsequent operations, to be discussed further hereinbelow, when a permeable channel formed by a horizontal fracture that extends between a pair of wells migrates upwardly through oil shale formation 11, the wells must be reentered in order to provide perforations at higher levels at which fluids will flow through the oil shale.
In the oil production operation, referring to FIG. 6, after establishing communication between well boreholes 13 and 14 as discussed hereinabove, heat exchange and pumping equipment is used to inject afirst fluid down an injection well 13, through fracture 23 within oil shale formation 11 and out of production well 14 at which point circulating fluid is recovered for subsequent reinjection into well 13. In oil shale, the heat also may be generated in the oil shale by pumping oxygen to support combustion of the kerogen.
Referring now to FIG. 7, wells 13 and 14 and the adjacent oil shale formation 11 (i.e., adjacent to wells 13 and 14 at perforations l9 and 20) may be notched in order to insure that a horizontal fracture 23 will be initiated at a selected depth and to provide an enlarged horizontal surface area to be acted upon by the pressure applied to the fracturing fluid. Thus, as illustrated in FIG. 7, prior to forming horizontal fracture 23, a notching tool 22 is shown disposed in well 13 adjacent perforation 19. Tool 22 is lowered into well 13 by means of a cable 22a of sufficient strength to raise and lower tool 22. Cable 23 may also include the necessary conduits for coupling tool 22 to a surface control unit 24. Unit 24, in conjunction with a winch or pulley 25, serves to control the operation of tool 22 in the well 13. A suitable tool for notching a subterranean oil shale formation is disclosed in a patent to Huitt et al., U.S. Pat. No. 3,050,l22. Thus, tool 22 is actuated to form notch 26 in well 13 and oil shale formation 11. A similar notch 27 is illustrated in FIG. 7 as having been previously formed in well 14 and the adjacent oil shale formation 11.
The notching may precede or follow a pressurized-plugging procedure of the type discussed in connection with FIGS. 1 through 3 but, in subsurface formations that tend to fracture vertically, a horizontal fracture will not result from the fracturing operations until after the subterranean stresses have been altered by the pressurized-plugging procedure. -The notch may also be created by using a drill pipe and a blade and by using sand blasting techniques which are both frequently used in oil well operations.
ln forming the horizontal fracture 23, a hydraulic fracturing fluid is injected down well 13 and/or well 14 and into oil shale formation 11 at a pressure sufficient to form and extend the generally horizontal fracture 23 (FIG. 8) through oil shale formation 11. The fluid injection pressure at formation face is such that it exceeds both the effective overburden pressure and the fracturing pressure of the earth formation. The direction of the vertical fractures shown in FIG. 5 should change at pressures less than overburden pressure in most cases. The fracture 23 may be extended and/or propped by techniques well known to those skilled in the art.
Finally, a kerogen-pyrolyzing fluid is circulated down well 13 through the fracture 23 of FIG. 8 and out of well 14, thereby forming a permeable channel 29 as illustrated in FIG. 9. This fluid is heated to a temperature sufficient to pyrolyze the kerogen components of the oil shale in formation 11. Al: ternately the heat may be generated in situ by circulating oxygen containing fluids alone or combined with combustable materials. Conventional equipment, as illustrated in FIG. 9, may be used for heating and circulating the kerogen-pyrolyzing fluid and subsequently separating the shale oil and gas components of the fluid circulating out of production well 14 as is well known in the art.
The permeability of channel 29 may be maintained by circulating a fluid having a gaseous component therein from one borehole 13 through the fracture 29 and out the other borehole 14 while maintaining a pressure on the fluid sufficient to lift or compress the overburden by an amount sufficient to maintain an opening through which fluid can flow. The permeability of channel 29 is thus maintained by lifting the roof of the channel 29 to spatially separate the solid components of the oil shale formation 11. Such fracture may also be propped with a solid. The gaseous component of the circulating fluid is heated to a temperature sufficient to mobilize any organic components in the oil shale formation and theroof of the channel migrates up through the oil shale. The depths of the boreholes 13 and 14 through which the heated circulated fluid is flowing are adjusted to correspond with the uppermost depth along which the fluid is circulating through the permeable channel 29.
EXAMPLE Modulus E 1.06 X p.s.i. For horizontal fractures in oil shale formation, we obtain:
Assuming a square pattern area of l. ft per well, the width of the cement-filled vertical fractures of FIGS. 2 and 5 required to increase the horizontal stresses by an amount 8 would be E L. Thus, the amount of cement required to fill the fractures (two fractures normal to each other per well pattern) is 2E Lh, where h is the height of the cement-filled fractures. Thus for a 21 gal/per ton oil shale formation, for example, the shale oil in place over the same vertical extent is:
From this, the amount of cement required per bb1. of shale oil in place is determined as:
Thus, even if an increase of 1,000 p.s.i. in the horizontal stresses were required to extend hydraulic fractures in a horizontal direction, the cement requirements would be only 0.02 ft bbl. The present cost of injecting cement in large quantities is about $2.00/ft It can then be seen that the state of stress in oil shale formations may be economically altered mechanically by the injection of cement and made conductive to the extension of horizontal fractures, all in the manner disclosed hereinabove, at a cost of only a few cents per bbl. of shale oil in situ.
lclaim:
l. A method for interconnecting at least a pair of well boreholes extending into a substantially impermeable subterranean earth formation including an oil shale comprising the steps of:
fracturing each of said well boreholes thereby forming at least one fracture at each of said well boreholes; injecting a solidifiable fluid into at least one of said fractures and maintaining the fluid at substantially a fracture-extending pressure until the fluid solidifies and plugs said fracture;
refracturing at least one well borehole in which at least one preceding fracture has been formed and plugged;
extending at least one fracture until said fractures intersect and form communication between said well boreholes through a fracture system; and
circulating a pyrolysis-inducing fluid from one of said well boreholes, heated to a temperature sufficient to pyrolyze kerogen components of said oil shale formation.
2. The method of claim 1 wherein the step of injecting said solidifiable fluid includes the step of injecting cement.
3. The method of claim 1 wherein the step of injecting said solidifiable fluid includes the step of filling said fracture with a heat-sensitive organic resin.
4. The method of claim 1 wherein the step of refracturing to form communication between said well boreholes includes the step of notching at least one of said well boreholes extending into said oil shale formation at a selected horizontal depth in said formation and subsequently extending such notch to obtain an intercommunicating fracture between said well boreholes.
5. The method of claim 1 including the step of recovering shale oil from the pyrolysis-inducing fluid circulating out of the other of said well boreholes.
6. The method of claim 1 wherein the step of injecting said solidifiable fluid includes the step of injecting a decomposable heat-sensitive organic resin whereby the subsequent circulation of said pyrolysis-inducing fluid decomposes the heat-sensitive resin thereby exposing additional portions of oil shale to contact by the pyrolysis-inducing fluid.
US772993A 1968-11-04 1968-11-04 Method of interconnecting a pair of wells extending into a subterranean oil shale formation Expired - Lifetime US3537529A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US77299368A 1968-11-04 1968-11-04

Publications (1)

Publication Number Publication Date
US3537529A true US3537529A (en) 1970-11-03

Family

ID=25096845

Family Applications (1)

Application Number Title Priority Date Filing Date
US772993A Expired - Lifetime US3537529A (en) 1968-11-04 1968-11-04 Method of interconnecting a pair of wells extending into a subterranean oil shale formation

Country Status (1)

Country Link
US (1) US3537529A (en)

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3709295A (en) * 1971-06-24 1973-01-09 Dow Chemical Co Fracturing of subterranean formations
US3863709A (en) * 1973-12-20 1975-02-04 Mobil Oil Corp Method of recovering geothermal energy
US3998271A (en) * 1975-10-31 1976-12-21 Exxon Production Research Company Multiple fracturing of subterranean formations
US4091869A (en) * 1976-09-07 1978-05-30 Exxon Production Research Company In situ process for recovery of carbonaceous materials from subterranean deposits
US4099567A (en) * 1977-05-27 1978-07-11 In Situ Technology, Inc. Generating medium BTU gas from coal in situ
US4718490A (en) * 1986-12-24 1988-01-12 Mobil Oil Corporation Creation of multiple sequential hydraulic fractures via hydraulic fracturing combined with controlled pulse fracturing
US4787449A (en) * 1987-04-30 1988-11-29 Mobil Oil Corporation Oil recovery process in subterranean formations
US4817714A (en) * 1987-08-14 1989-04-04 Mobil Oil Corporation Decreasing total fluid flow in a fractured formation
US5111881A (en) * 1990-09-07 1992-05-12 Halliburton Company Method to control fracture orientation in underground formation
US5273115A (en) * 1992-07-13 1993-12-28 Gas Research Institute Method for refracturing zones in hydrocarbon-producing wells
US20070125543A1 (en) * 2005-12-01 2007-06-07 Halliburton Energy Services, Inc. Method and apparatus for centralized well treatment
US20080083531A1 (en) * 2006-10-10 2008-04-10 Halliburton Energy Services, Inc. Methods and systems for well stimulation using multiple angled fracturing
US20080083532A1 (en) * 2006-10-10 2008-04-10 Surjaatmadja Jim B Methods for Maximizing Second Fracture Length
US20080236818A1 (en) * 2005-12-01 2008-10-02 Dykstra Jason D Method and Apparatus for Controlling the Manufacture of Well Treatment Fluid
WO2008116896A2 (en) * 2007-03-28 2008-10-02 Shell Internationale Research Maatschappij B.V. Method of interconnecting subterranean boreholes
US20090065198A1 (en) * 2007-09-04 2009-03-12 Terratek, Inc. Method and system for increasing production of a reservoir using lateral wells
US20090095482A1 (en) * 2007-10-16 2009-04-16 Surjaatmadja Jim B Method and System for Centralized Well Treatment
US20090194273A1 (en) * 2005-12-01 2009-08-06 Surjaatmadja Jim B Method and Apparatus for Orchestration of Fracture Placement From a Centralized Well Fluid Treatment Center
US20090283260A1 (en) * 2008-05-15 2009-11-19 Jim Surjaatmadja Methods of Initiating Intersecting Fractures Using Explosive and Cryogenic Means
US20110203792A1 (en) * 2009-12-15 2011-08-25 Chevron U.S.A. Inc. System, method and assembly for wellbore maintenance operations
US20130186625A1 (en) * 2012-01-20 2013-07-25 Baker Hughes Incorporated Refracturing Method for Plug and Perforate Wells
US20150083405A1 (en) * 2013-09-25 2015-03-26 Shell Oil Company Method of conducting diagnostics on a subterranean formation
WO2016004323A3 (en) * 2014-07-02 2016-03-17 Conway Energy, L.C. Laser based production of syngas from underground coal deposits
US10012064B2 (en) 2015-04-09 2018-07-03 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
WO2019074731A1 (en) * 2017-10-11 2019-04-18 Geodynamics, Inc. Refracturing in a multistring casing with constant entrance hole perforating gun system and method
US10344204B2 (en) 2015-04-09 2019-07-09 Diversion Technologies, LLC Gas diverter for well and reservoir stimulation
US10753183B2 (en) 2016-10-13 2020-08-25 Geodynamics, Inc. Refracturing in a multistring casing with constant entrance hole perforating gun system and method
US10774624B2 (en) 2016-10-13 2020-09-15 Geodynamics, Inc. Constant entrance hole perforating gun system and method
US10982520B2 (en) 2016-04-27 2021-04-20 Highland Natural Resources, PLC Gas diverter for well and reservoir stimulation
US11125472B2 (en) 2018-05-10 2021-09-21 Eavor Technologies Inc. Fluid for use in power production environments

Cited By (46)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3709295A (en) * 1971-06-24 1973-01-09 Dow Chemical Co Fracturing of subterranean formations
US3863709A (en) * 1973-12-20 1975-02-04 Mobil Oil Corp Method of recovering geothermal energy
US3998271A (en) * 1975-10-31 1976-12-21 Exxon Production Research Company Multiple fracturing of subterranean formations
US4091869A (en) * 1976-09-07 1978-05-30 Exxon Production Research Company In situ process for recovery of carbonaceous materials from subterranean deposits
US4099567A (en) * 1977-05-27 1978-07-11 In Situ Technology, Inc. Generating medium BTU gas from coal in situ
US4718490A (en) * 1986-12-24 1988-01-12 Mobil Oil Corporation Creation of multiple sequential hydraulic fractures via hydraulic fracturing combined with controlled pulse fracturing
US4787449A (en) * 1987-04-30 1988-11-29 Mobil Oil Corporation Oil recovery process in subterranean formations
US4817714A (en) * 1987-08-14 1989-04-04 Mobil Oil Corporation Decreasing total fluid flow in a fractured formation
US5111881A (en) * 1990-09-07 1992-05-12 Halliburton Company Method to control fracture orientation in underground formation
US5273115A (en) * 1992-07-13 1993-12-28 Gas Research Institute Method for refracturing zones in hydrocarbon-producing wells
US20070125543A1 (en) * 2005-12-01 2007-06-07 Halliburton Energy Services, Inc. Method and apparatus for centralized well treatment
US7841394B2 (en) 2005-12-01 2010-11-30 Halliburton Energy Services Inc. Method and apparatus for centralized well treatment
US7836949B2 (en) 2005-12-01 2010-11-23 Halliburton Energy Services, Inc. Method and apparatus for controlling the manufacture of well treatment fluid
US20080236818A1 (en) * 2005-12-01 2008-10-02 Dykstra Jason D Method and Apparatus for Controlling the Manufacture of Well Treatment Fluid
US20090194273A1 (en) * 2005-12-01 2009-08-06 Surjaatmadja Jim B Method and Apparatus for Orchestration of Fracture Placement From a Centralized Well Fluid Treatment Center
US7946340B2 (en) 2005-12-01 2011-05-24 Halliburton Energy Services, Inc. Method and apparatus for orchestration of fracture placement from a centralized well fluid treatment center
US7711487B2 (en) 2006-10-10 2010-05-04 Halliburton Energy Services, Inc. Methods for maximizing second fracture length
US7740072B2 (en) * 2006-10-10 2010-06-22 Halliburton Energy Services, Inc. Methods and systems for well stimulation using multiple angled fracturing
US20080083532A1 (en) * 2006-10-10 2008-04-10 Surjaatmadja Jim B Methods for Maximizing Second Fracture Length
US20080083531A1 (en) * 2006-10-10 2008-04-10 Halliburton Energy Services, Inc. Methods and systems for well stimulation using multiple angled fracturing
GB2461426A (en) * 2007-03-28 2010-01-06 Shell Int Research Method of interconnecting subterranean boreholes
WO2008116896A3 (en) * 2007-03-28 2008-11-13 Shell Int Research Method of interconnecting subterranean boreholes
WO2008116896A2 (en) * 2007-03-28 2008-10-02 Shell Internationale Research Maatschappij B.V. Method of interconnecting subterranean boreholes
US20100181114A1 (en) * 2007-03-28 2010-07-22 Bruno Best Method of interconnecting subterranean boreholes
US20090065198A1 (en) * 2007-09-04 2009-03-12 Terratek, Inc. Method and system for increasing production of a reservoir using lateral wells
US8646526B2 (en) * 2007-09-04 2014-02-11 Terratek, Inc. Method and system for increasing production of a reservoir using lateral wells
US20090095482A1 (en) * 2007-10-16 2009-04-16 Surjaatmadja Jim B Method and System for Centralized Well Treatment
US7931082B2 (en) 2007-10-16 2011-04-26 Halliburton Energy Services Inc., Method and system for centralized well treatment
US7730951B2 (en) * 2008-05-15 2010-06-08 Halliburton Energy Services, Inc. Methods of initiating intersecting fractures using explosive and cryogenic means
US20090283260A1 (en) * 2008-05-15 2009-11-19 Jim Surjaatmadja Methods of Initiating Intersecting Fractures Using Explosive and Cryogenic Means
US20110203792A1 (en) * 2009-12-15 2011-08-25 Chevron U.S.A. Inc. System, method and assembly for wellbore maintenance operations
US20130186625A1 (en) * 2012-01-20 2013-07-25 Baker Hughes Incorporated Refracturing Method for Plug and Perforate Wells
US8857513B2 (en) * 2012-01-20 2014-10-14 Baker Hughes Incorporated Refracturing method for plug and perforate wells
US20150083405A1 (en) * 2013-09-25 2015-03-26 Shell Oil Company Method of conducting diagnostics on a subterranean formation
WO2016004323A3 (en) * 2014-07-02 2016-03-17 Conway Energy, L.C. Laser based production of syngas from underground coal deposits
US10344204B2 (en) 2015-04-09 2019-07-09 Diversion Technologies, LLC Gas diverter for well and reservoir stimulation
US10012064B2 (en) 2015-04-09 2018-07-03 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
US10385258B2 (en) 2015-04-09 2019-08-20 Highlands Natural Resources, Plc Gas diverter for well and reservoir stimulation
US10385257B2 (en) 2015-04-09 2019-08-20 Highands Natural Resources, PLC Gas diverter for well and reservoir stimulation
US10982520B2 (en) 2016-04-27 2021-04-20 Highland Natural Resources, PLC Gas diverter for well and reservoir stimulation
US10753183B2 (en) 2016-10-13 2020-08-25 Geodynamics, Inc. Refracturing in a multistring casing with constant entrance hole perforating gun system and method
US10774624B2 (en) 2016-10-13 2020-09-15 Geodynamics, Inc. Constant entrance hole perforating gun system and method
US10837266B2 (en) 2016-10-13 2020-11-17 Geodynamics, Inc. Constant entrance hole perforating gun system and method
US11268357B2 (en) 2016-10-13 2022-03-08 Geodynamics, Inc. Constant entrance hole perforating gun system and method
WO2019074731A1 (en) * 2017-10-11 2019-04-18 Geodynamics, Inc. Refracturing in a multistring casing with constant entrance hole perforating gun system and method
US11125472B2 (en) 2018-05-10 2021-09-21 Eavor Technologies Inc. Fluid for use in power production environments

Similar Documents

Publication Publication Date Title
US3537529A (en) Method of interconnecting a pair of wells extending into a subterranean oil shale formation
US3501201A (en) Method of producing shale oil from a subterranean oil shale formation
US3500913A (en) Method of recovering liquefiable components from a subterranean earth formation
US4718490A (en) Creation of multiple sequential hydraulic fractures via hydraulic fracturing combined with controlled pulse fracturing
US5228510A (en) Method for enhancement of sequential hydraulic fracturing using control pulse fracturing
US5547023A (en) Sand control well completion methods for poorly consolidated formations
US4834181A (en) Creation of multi-azimuth permeable hydraulic fractures
US3682246A (en) Fracturing to interconnect wells
US6991037B2 (en) Multiple azimuth control of vertical hydraulic fractures in unconsolidated and weakly cemented sediments
US4589491A (en) Cold fluid enhancement of hydraulic fracture well linkage
US3613785A (en) Process for horizontally fracturing subsurface earth formations
US5036918A (en) Method for improving sustained solids-free production from heavy oil reservoirs
US4489783A (en) Viscous oil recovery method
US2970645A (en) Producing multiple fractures in a well
US2952449A (en) Method of forming underground communication between boreholes
CN101835953B (en) Well construction using small laterals
US3270816A (en) Method of establishing communication between wells
US3835928A (en) Method of creating a plurality of fractures from a deviated well
US4026359A (en) Producing shale oil by flowing hot aqueous fluid along vertically varied paths within leached oil shale
US2784787A (en) Method of suppressing water and gas coning in oil wells
US4793415A (en) Method of recovering oil from heavy oil reservoirs
US5072990A (en) Acceleration of hydrocarbon gas production from coal beds
US3353602A (en) Vertical fracture patterns for the recovery of oil of low mobility
US3907034A (en) Method of drilling and completing a well in an unconsolidated formation
US5226495A (en) Fines control in deviated wells