Número de publicaciónUS3706347 A
Tipo de publicaciónConcesión
Fecha de publicación19 Dic 1972
Fecha de presentación18 Mar 1971
Fecha de prioridad18 Mar 1971
Número de publicaciónUS 3706347 A, US 3706347A, US-A-3706347, US3706347 A, US3706347A
InventoresBrown Cicero C
Cesionario originalBrown Oil Tools, Brown Cicero C
Exportar citaBiBTeX, EndNote, RefMan
Enlaces externos: USPTO, Cesión de USPTO, Espacenet
Pipe handling system for use in well drilling
US 3706347 A
Resumen
A pipe handling system for use in well drilling. The system includes pipe storage racks, power-operated conveyor means for advancing the pipe sections to a drilling derrick and for transferring the pipe sections from the storage racks to the conveyor means; power swivel means supported by the derrick hoist adapted for connection to the pipe sections, and power-actuated pivoting means connecting the power swivel means to the hoist to enable angular movement of the swivel means as required to effect alignment thereof with the forward ends of the pipe sections entering the derrick from the conveyor means.
Imágenes(13)
Previous page
Next page
Reclamaciones  disponible en
Descripción  (El texto procesado por OCR puede contener errores)

United States Patent Brown [72] Inventor:

Cicero C. Brown, c/o Brown Oil Tools, Inc., P. O. Box l9236,

Houston, Tex. 77024 [22] Filed: March 18, 1971 [21] Appl.No.: 125,740

[52] [1.8. CI. ..175/85, 173/164, 2l4/2.5 {5|} Int. Cl. ..E2lb 19/14 [58] Field of Search ..l7S/52, 85; 173/57, I64. 28

[56] References Cited UNITED STATES PATENTS 2,848,l96 B/l958 Simmonds ..l75/52 3,l77,944 4/l965 Knights ....l75/8S X 3,266,582 8/l966 Homanick. ....l75/3$ X 3.3l2,294 4/l967 Wilson........... ....175/85 X 3,3l5,822 4/l967 Wils0n.... ....l75/85 X 3,340,938 9/l967 Wilson ..l73/28 1 Dec. 19, 1972 Primary Examiner-David H. Brown Attorney-R. Werlin [57] ABSTRACT A pipe handling system for use in well drilling. The system includes pipe storage racks, power-operated conveyor means for advancing the pipe sections to a drilling derrick and for transferring the pipe sections from the storage racks to the conveyor means; power swivel means supported by the derrick hoist adapted for connection to the pipe sections, and power-actuated pivoting means connecting the power swivel means to the hoist to enable angular movement of the swivel means as required to effect alignment thereof with the forward ends of the pipe sections entering the derrick from the conveyor means.

16 Claims, 29 Drawing Figures SHEU 010F 13 PATENTEDMC 19 I972 3 W Q Q .4 TTOENE) .3 NM Q \w a u i Q IQ Q PMENTEMEB I9 m2 3. 706, 347 sum near 13 m I II u I l 1 1 A TTORNE Y WENT-{Bum 19 m2 SHEET USBF 13 PATENTED E 19 3. 706, 347 saw on HF 13 H mm ma r Ms! v B Y A TTKJPNEY PATENIED E 1 2 3.706. 347 sum as nr 13 clcaeo a. snow N mwwnwif I! 1;! BY

ATTORNFY PATENTED DEC I 9 I972 sum 07 or 15 PATENTED HEB I97? 3. 706. 347 SHEET 11 or 13 JzLzz l0 8 a "3%EN1SE A TTORNEY PATENTEDMM I972 3.706.347 sum 12 or 13 wfiew BY ML.

A TTOBVE Y PIPE HANDLING SYSTEM FOR USE IN WELL DRILLING BACKGROUND OF THE INVENTION In the rotary drilling of oil and gas wells, the drilling string is made up of pipe sections, commonly stored at one side of the derrick floor, by picking up the sections individually by conventional hoist means mounted in the derrick and screwing them successively into the string of pipe already suspended in the well bore. In withdrawing the drilling string the procedure is reversed, the pipe sections or stands being broken out as the string is withdrawn from the well and returned to the storage rack. conventionally, these operations require considerable manual labor and expenditure of time in making so-called round-trip.

DESCRIPTION OF THE INVENTION The present invention is directed to improvements in pipe handling systems for well drilling which embody power-operated means for transferring the pipe sections from the storage racks to the derrick; a poweroperated swivel supported by the derrick hoist means for moving the pipe sections into and out of connection with the drilling string and for rotating the same. The various power-operated elements of the system are arranged to be made largely automatic, thereby greatly reducing much of the manual effort as well as the time and expense ordinarily required.

The invention is particularly adapted for use with drilling systems employing relatively large diameter casing as the drill pipe, where the diameter of the casing ordinarily precludes stacking of the stands vertically inside the derrick and requires that the stands be laid horizontally on storage racks at one side of the derrick. Some casing drilling systems to which the present invention is particularly adaptable are disclosed in my U.S. Pat. Nos. 3,552,507, 3,552,508, 3,552,509 and 3,552,5 I0.

In accordance with a preferred embodiment, the invention contemplates a pair of storage racks for the pipe stands or sections disposed in parallel on opposite sides of a pivotally mounted elongate conveyor unit tiltable from side to side to receive pipe sections transferred alternately from the storage racks in an automatic manner. The conveyor unit is provided with power-operated endless-belt means for advancing the pipe sections to the well derrick. The latter carries a conventional hoist system including crown and travelling blocks. The travelling block supports a power-operated swivel carrying a suitable pipe-connector element. The swivel is pivotally mounted to the travelling block and connected thereto by powered piston-cylinder means to enable angular movement of the swivel and the connector element for alignment with and connection to the pipe sections entering the derrick from the conveyor unit. A suitably disposed pipe clamp, either manual or power-operated, is arranged to grip the pipe sections entering or leaving the derrick to act as a back-up while the pipe connector element is connected to or disconnected from the pipe sections as may be required in operation of the system. The system may include auxiliary pipe storage racks located alongside the primary storage racks and provided with power-operated means for transferring pipe sections between the auxiliary and primary storage racks as may be required.

Other features and other and more specific objects and advantages of this invention will become more readily apparent from the following detailed description when read in conjunction with the accompanying drawings which illustrate useful embodiments of this invention.

In the drawings:

FIG. I is a plan view of a pair of empty pipe storage racks and the conveyor system disposed between them 0 in position adjacent a drilling derrick;

FIG. 2 is a plan view similar to FIG. I showing the racks with pipe sections in place thereon, one pipe section being shown loaded on the conveyor preparatory to being advanced to the derrick;

FIG. 3 is a plan view similar to FIG. 2, showing a later stage in advancement of a pipe section to the derrick;

FIGS. 4A and 43, together, comprise a side elevational view of the conveyor elements taken generally along line 4-4 of FIG. 1;

FIG. 5 is a side elevational view of the forward articulated section of the conveyor system taken generally on line 55 of FIG. 3;

FIG. 6 is a cross-sectional view taken on line 6-6 of FIG. 48, showing the forward section of pipe-receiving cradle of the conveyor system in vertical position;

FIG. 7 is a view similar to FIG. 6 showing the cradle tilted toward one of the pipe racks;

FIGS. 8 and 9 are cross-sectional views taken on line 8-8 of FIG. 4A showing the upright and tilted positions, respectively, of the rearward section of the transfer and conveyor system;

FIG. 10 is a transverse cross-sectional view taken on line I0-l0 ofFIG. I;

FIG. 10A illustrates a detail of a modification of the system;

FIGS. II, 12, I3 and 14 are views partly in elevation and partly in section illustrating steps in the procedures for picking up a pipe section entering the derrick from the pipe rack with the power swivel carried by the derrick hoist and making it up into the drilling string;

FIGS. l5, l6 and I7 are views partly in elevation and partly in vertical section of a split back-up clamp having manually operable jaws for releasably holding the pipe sections against rotation relative to the swivel connection and mounted on a power-operated pedestal for varying its elevation;

FIGS. l8, l9 and 20 are views generally similar to FIGS. 15, I6 and 17, respectively, showing a modified form of back-up clamp whose jaws are power-operated;

FIGS. 21 and 22 are vertical, partly sectional views of a powered pivoting linkage between the power swivel and the travelling block of the derrick hoist for aligning the power swivel with the pipe section entering the derrick;

FIG. 23 is a side elevational view of an auxiliary pipe storage rack adapted to be positioned alongside one or both of the primary pipe racks shown in FIGS. 1, 2 and 3- FIG. 24 is an end elevational view taken on line 24- 24 of FIG. 23;

FIG. 25 is a vertical sectional view of one of the rackand-pinion type transfer units for transferring pipe sections between the auxiliary pipe racks and the primary pipe racks, the transfer element being shown in the down or inactive positions;

FIG. 26 is a view similar to FIG. 25 showing the transfer elements in the raised or active pipe transferring positions; and

FIG. 27 is a cross-sectional view taken on line 27- 27 of FIG. 25.

Referring to the drawing, FIGS. 1 to illustrate the pipe rack means for storing pipe sections P, the conveyor means C for moving the pipe sections to and from the derrick D, and the transfer means for transferring the pipe sections between the rack means and the conveyor means.

The rack means comprises a skid-mounted frame, designated generally by the numeral 10, which includes a pair of parallel spaced apart skid members 11, surmounted by a plurality of longitudinally spaced apart upright cross plates 12 extending transversely of the skids. A plurality of horizontally disposed, longitudinally spaced apart rack bars 13a, 13b, and 13c (front to rear) extend to opposite sides of the frame with their inner ends spaced apart and pivotally mounted to the upper ends of support brackets 14 (FIG. 10) which, in turn, have their lower ends pivotally mounted at 15 to the upper ends of cross plates 12. The outer ends of the several rack bars are supported from pedestals 16 for vertical adjustment by means of threaded posts 17 which are screwed into the tops of the pedestals and with support caps 18 underlying the outer ends of the rack bars. Antifriction bearings 19 are suitably arranged between caps 18 and the upper ends of posts 17. By means of these pivoted and adjustable supports the rack bars may be tilted between positions inclined downwardly toward their inner or outer ends for purposes which will appear subsequently.

The conveyor means, designated generally by the letter C, is disposed longitudinally and centrally of frame 10 in the space between the inner ends of the rack bars and includes an elongate articulated frame member comprising a rearward conveyor support section 20 and a forward discharge section 21. The sections are pivotally connected by means (FIGS. 48 and 5) which includes a clevis 22 and cooperating lug 23 on the adjacent ends of the respective sections and a pivot pin 24 extending transversely through the clevis and lug. By means of this connection forward section 21 may be angularly raised and lowered relative to conveyor section 20.

As best seen in FIGS. 6 to 9, inclusive, each of the sections 20 and 21 is fabricated from H-beam members 25 and 26, respectively, on which are mounted downwardly curved arcuate cradles 27 and 28, respectively, which are adapted to receive pipe sections P from the pipe rack means located along opposite sides of the conveyor means. Conveyor section 20 is provided at its opposite ends with stub shafts 29 and 30 which are journalled in appropriate ones of cross plates 12 to permit rocking or tilting movement of section 20 about its longitudinal axis. By means of the connection provided by clevis 22 and ing 23 between sections 20 and 21 both sections will rock in unison when section 21 is in the horizontal position, as seen in FIGS. 48, 6 and 7.

Rocking of section 20 for transferring pipe sections between the pipe racks and the cradles is effected by means of fluid pressure-actuated jacks 31 and 32, as best seen in FIGS. 8 and 9. Jack 31 functions as the tilt- 5 jack 32 comprises a cylinder 38 hingedly secured at 39 to a lug 40 attached to cross plate 12 and a piston 41 pivotally connected at 42 to a centering lug 43 secured to the bottom of I-I-beam member 25. By appropriate direction of pressure fluid to jack 31, section 20 may be tilted toward either the right hand rack or the left-hand rack (FIG. 9), as may be desired, while jack 32 may be appropriately actuated to hold the conveyor section in the upright or centered position after receiving a pipe section (FIG. 8).

Conveyor section 20 is provided with an endless cable 45 (FIG. 4A) which is trained over a plurality of suitably positioned idler and tensioning pulleys, including a drive pulley 46 connected to a conventional reversible motor 47 (FIG. 1) which may be driven by air, hydraulic fluid, or electricity. A pusher lug 48 is mounted on cable 45 for reciprocating sliding movement in a longitudinal slot 49 provided in the bottom of cradle 27 (FIGS. 1, 8 and 9).

A jack 50 (FIGS. 48 to 7, inclusive) is positioned beneath the center of forward section 21 intermediate its ends and the upper end ofits piston 51 is secured by a pivot link 52 to a cross pivot 53 carried between the bottom flanges of l-I-beam 26. A pair of forwardly extending idler jacks 54, each comprising a cylinder 55 and a piston 56, are positioned on opposite sides forward section 21. The cylinders are rigidly connected by cross-bracing 57 and have their ends pivotally secured at 57a to floor lugs 57b attached to skid members 11. The upper ends of pistons 56 are connected by a crosshead 58 which extends transversely of section 20 forwardly of jack 50. The center of crosshead 58 is also linked by a pivoted link 59 and a cross-pivot 60 to the bottom of I-I-beam 26. While jack 50 functions to raise and lower forward section 21, as required, idler jacks 54 provide stabilizing support for the forward end portion of this section as it is raised and lowered in the course of operation. The double-pivoted linkages to section 21 of piston 51 and cross-head 58 enable forward section 21 to be rocked from side to side in concert with rearward section 20, as when receiving pipe sections from the pipe racks or when returning pipe sections to the racks, as will be described subsequently. Also the transverse pivots accommodate the raising and lowering movements of section 21 about pivot pin 24.

The mechanism for transferring sections of pipe P between the pipe racks and conveyor means C is best seen in FIGS. 8, 9 and 10. The mechanism includes a detent 61 pivotally mounted to the inner end of each of the rack bars 13b and (only one shown). The forward end of each detent is formed with an upwardly curving lip 63 and the rearward end 63a of the detent is connected by a spring 64 to an arm 65 extending downwardly from the rack bar. Spring 64 normally urges lip 63 upwardly into the path of movement of the pipe sections P to hold the pipe sections in place until the detent is depressed. Rearward conveyor section 20 is provided on each side thereof at points opposite the several detents 61 with laterally projecting fingers or pawls 66 constructed and arranged to effect downward l060ll 0525 engagement with the respective lips 63 when the conveyor section is tilted to one side or the other, as best seen in FIG. 9 and to depress lips 63 out of the path of movement of the innermost pipe section P which is thus freed to roll by gravity on to cradle 27, the rack bars being tilted downwardly toward the conveyor section by appropriate adjustment of posts 17. Simultaneously, the rearward ends 63a of the detents are rotated upwardly into the path of movement of the next section of pipe I to thereby prevent that next section and the other pipe sections behind it on the rack from rolling forward until conveyor section 20 has been returned to its centered or upright position (FIGS. 8 and at which pawls 66 will have been rocked out of engagement with lips 63. Springs 64 will then return the detents to the positions shown in FIGS. 8 and 10 allowing the next pipe section I to roll forward against lips 63 in position for transfer to the cradle. By suitable operation of jacks 31 and 32 successive sections of pipe P may be transferred to the conveyor means either alternately from the pipe racks on opposite sides of the conveyor means or successively from one or the other of the pipe racks.

As each pipe section is received on the conveyor means, pusher lug 48 will be in the retracted position on conveyor section 20 (FIGS. 2 and 4A) to engage the rearward end of the pipe section whereupon actuation of motor 47 will cause lug 48 to push the pipe section forwardly over discharge section 21 which will be raised upwardly by means ofjack 51 to direct the forward end of the pipe section toward the floor of derrick D for further movement, as will be more fully described hereinafter.

As pusher lug 48 pushes pipe section I forwardly, jack 50 is activated to raise forward conveyor section 21 upwardly to direct the forward end of the pipe section into derrick D above the level of the derrick floor (FIGS. 5 and 11 and 13), the forward end of the pipe section passing over a transverse roller 67 carried by the forward end of conveyor section 2].

Referring now to FIGS. 11 to 14, a split clamp, designated generally by the letter B, is shown mounted on the floor F of derrick D for alignment with the forward end of pipe section P being discharged from forward conveyor section 21. One embodiment of clamp E is shown in FIGS. 15, 16 and 17, and a second embodiment in FIGS. 18, 19 and 20.

As shown in FIGS. to 17, inclusive, clamp E comprises a pair of semi-circular jaws 70-71, each hingedly connected at one end to a hinge block 72 mounted on a piston 73 reciprocably received in a cylinder 74 secured firmly to derrick floor F. The piston and cylinder are provided with mating flanges 75 and 76, respectively, having registering openings 78 and 79, respectively, therethrough for the reception of elongate headed guide rods 80 which prevent relative rotation between the clamp and cylinder while permitting relative axial movement of the clamp. Conduit means 81 provides fluid communication with cylinder 74 beneath piston 73 for raising and lowering the clamp for purposes of aligning the pipe sections with the derrick hoist as will appear subsequently.

Jaws 70 and 71 are fitted with pipe gripping dies 82. The free end of jaw 70 is provided with a hook 73a and the free end ofjaw 71 with a hinged link 740 which is adapted to be swung over hook 73a to close the jaws about the forward or box end of a pipe section to serve as a back-up when making up a threaded member into the box of the pipe section as will be described hereinafter.

In the embodiment illustrated in FIGS. 18 to 20, inclusive, the split clamp comprises the die-carrying jaws 83-83 hingedly connected at one end to a hinge block 84 mounted on the upper end of a cylinder 85 which is reciprocable over a hollow piston 86 closed at its upper end by a head 87 and which has its lower end bolted to a pedestal 87a secured to the derrick floor F. A fluid pressure line 88 communicates through head 87 with the interior of cylinder 85 for raising and lowering the clamp as may be required.

A sleeve 89 is slidably mounted about cylinder 85 and these members are fitted with spaced seals 90-91 to define a second cylinder 92 (FIG. 20) to which is connected a line 93 for introducing and discharging fluid pressure employed to raise and lower sleeve 89 relative to cylinder 85. The lower end of sleeve 89 is provided with a seal 91a forming with seal 90 a second cylinder communicating with a fluid pressure line 93a through which fluid pressure may be introduced to reopen the clamp by returning the parts to the position shown in FIG. 19. Sleeve 89 is provided on opposite sides thereof with ears 94 to which hinge links 95-95 are connected at one end by hinge pins 96-96. The other ends of the links are hingedly connected by hinge pins 97-97 to ears 98-98 on the respective jaws 83-83.

In the embodiment illustrated in FIGS. 18 to 20, inclusive, both vertical adjustments of the clamp and opening and closing of the jaws about a pipe section thus may be accomplished by fluid pressure actuation.

Referring now to FIGS. 11 to 14, 21 and 22, the portions of the pipe-handling system are shown for moving the pipe sections, being fed to the derrick by the conveyor means C, into and out of the well drilling string A and for rotating the drilling string. These portions include the derrick-supported hoist means, designated generally by the letter H, which include a conventional travelling block B, connected by the cables G which are strung over the usual derrick crown block (not shown) under the control of the conventional drawworks (not shown). Travelling block B is pivotally connected at M to a conventional hose swivel S and conduit T, through which drilling fluids may be fed, in the well-known manner, to the drilling string for circulation through the well during drilling. Connected to conduit T below the hose swivel is a power sub or swivel] which may be of any suitable construction adapted for rotating the pipe string in the well. One such power swivel is disclosed in my U.S. Pat. No. 3,467,202. The power swivel is drivingly connected to a hollow drive connection, such as a spear K, which may be of the type disclosed in my U.S. Pat. No. 3,552,507, adapted to be inserted into the bore of the upper end of a pipe section P and rotationally secured thereto by means of a non-threaded connection. Instead of a spear-type connection such as connection K, which is preferably used when pipe sections P comprise relatively large diameter casing, as when casing is used as the drill pipe, the connection may comprise a more conventional threaded pin-type sub K (FIG. 10A) which can be screwed directly into the threads of the box conventionally carried by the forward ends of pipe sections P.

moon oszs An aligning jack, designated generally by the letter L, and shown in greater detail in FIGS. 21 and 22, cffectively connects travelling block B to power swivel .l to effect relative angular movement therebetween to enable alignment of spear K (or sub K with pipe sections P as the latter enter the derrick in a sloping or non-vertical position through clamp B. As best seen in FIGS. 21 and 22, jack L comprises a cylinder 100 closed at its upper end by a head 101 carrying an upstanding flat lug 102 pierced by a bolt hole [020. The lower end of cylinder 100 encloses a dual or compound piston comprising a hollow piston 103 carrying a head 104 slidable in the bore of cylinder 100 and a solid piston 105 carrying a head 106 slidable in the bore of hollow piston 103. Spaced seals 107 and 108 are provided on head 104 to seal between cylinder 100 and hollow piston 103, defining a pressure cylinder 109 therebetween in communication with a fluid pressure supply and vent pipe 110. Spaced seals 111 and 112 are provided on head 106 to seal between pistons 103 and 105 defining a pressure cylinder 113 therebetween in communication with a fluid pressure supply and vent pipe 114. A pressure fluid connection 115 is provided through head 101 communicating with the interior or cylinder 100. By means of these several pressure fluid connections to the several cylinders it will be evident that the jack may be extended or retracted as required.

Lug 102 is adapted to be hingedly secured to a mating lug 116 secured to one side of travelling block B (FIGS. 11 to 14) and the lower end of piston 105 is adapted to be hingedly secured by means of a hinge pin 117 to a laterally extending arm 118, which is fixedly secured to a portion of the casing of power swivel J.

As will be evident from the foregoing, jack L will be operable to swing power swivel .l and spear K about pivot M to any angle necessary to align spear K with the incoming end of pipe section P (F10. 12), so that the spear may be inserted in the bore of the pipe section (FIG. 13) and connected thereto to enable the pipe section to be pulled up into the derrick and aligned with upper end of the pipe string A in place in the well bore and projecting upwardly above the derrick floor (FIG. 14). Pipe string A will be releasably supported in conventional automatic slips N, the details of which do not form a part of this invention.

FIGS. 23 to 27 illustrate a supplementary pipe storage and supply system adapted for arrangement along side one or both of pipe racks 10, for supplying sections of pipe in addition to those which can be stored in a single layer on each of the pipe racks, as where the latter quantity of pipe is insufficient to meet the total depth requirements of the well being drilled. Such supplementary storage systems are most often necessary where the pipe is relatively large diameter casing for which the capacity of pipe racks may be substantially limited.

The supplementary system includes a rack, designated generally R comprising transverse floor beams 120 pivotally connected at their inner ends by pivots 122 to inner supporting posts 123, the rearward or outer ends of the floor beams being supported on outer posts 124 carrying vertically adjustable screw caps 125 operable to tilt the floor beams toward or away from their inner ends. Additional sections of pipe P may be stored on rack R in several layers (FIG. 24) separated by transverse spacer bars 126 which will provide level surfaces over which the pipe sections will roll readily toward or away from the inner edge of the rack depending on the tilt angle of rack R,.

Transfer means for transferring pipe sections from rack R, to the adjacent rack 10 is provided between the outer longitudinal edge of the latter and the inner longitudinal edge of rack R, and comprises a plurality of longitudinally spaced, vertically disposed tubular posts designated generally by the numerals 127, mounted on foot plates 128.

Each of the posts 128 comprises a tubular shell 129 open at its upper end and having a vertical slot 130 in the portion adjacent the inner end of rack R extending from about the midpoint of the shell to its upper end. A second vertical slot 131 is provided in the opposite portion of the shell wall in registration with slot 130 but closed at its upper end. A toothed rack 132 is disposed for vertical movement inside shell 129 and is driven by a pinion 133 which is mounted on a horizontally disposed drive shaft 134 journalled in bearings 135 and driven by a motor 136 of any conventional design, which may be powered by electricity, hydraulic fluid or air. Shaft 134 is connected to the several pinions 133 so that the racks in the several posts will be raised and iowered in unison during operation of the device.

Mounted on the upper end of each rack 132 is a tubular cap 137 having an open vertical slot 138 registering with slot 130 and an opposite slot 139 closed at its upper end and registering with slot 131. A pick-up bar 140 extends transversely through cap 137 and is pivotally mounted therein on a cross pivot pin 141. One end of bar 140 extends through slots 138 and 130 and terminates in an upwardly curved finger 142 which pro jects externally of shell 129. The opposite end 143 of bar 140 extends through slots 139 and 131 and projects externally of shell 129. The upper ends of shell 129 and cap 137 are cut off at an angle to form the respective end surfaces 144 and 145 which slope downwardly toward the outer edge of rack 10.

OPERATION OF THE SYSTEM in accordance with one method of operation of the system, pipe racks 10 loaded with pipe sections P as seen in FIG. 2 will be tilted downwardly toward conveyor means C to allow the pipe sections to roll by gravity to the conveyor section when detents 61 are released. Initially both sections 20 and 21 of the conveyor means will be in the horizontal level position (FIGS. 4A and 4B) and pusher lug 48 will be in its retracted position as seen in FIG. 4A. Actuation of jacks 31 and 32 will be effected to cause the sections of the conveyor to tilt about their longitudinal axis bringing fingers 66 into downward contact with lips 63 of the detents, depressing the lips of the detents and releasing the first section of pipe P, which will then roll on to cradles 27 and 28. At the same time the rotation of detent 61 will raise its rearward end 630 into the path of movement of the next section of pipe P holding it and those behind it temporarily against forward movement. Further actuation of jacks 31 and 32 will be effected to return the cradle to its centered position (P16. 8) with the rearward end of the pipe section in engagement with pusher lug 48. When the cradle is returned to the centered position, finger 66 will have released lip 63 allowing the detents to be rotated back to their original positions releasing the next section of pipe P to roll down into position for subsequent transfer to the conveyor.

With the pipe section in centered position on the conveyor means, pusher lug 48 will be actuated by means of motor 46 to move the pipe section P forwardly over conveyor sections 20 and 21. At the same time, the latter section will be raised by operation of jack 50 to elevate the forward end of the pipe section as pusher lug 48 moves it forwardly over the conveyor sections. The elevation of the forward end of the pipe section P (FIG. will raise it above the level of derrick floor F and project it between the jaws of clamp E, the latter, whether of the manually operated form (FIGS. to 17) or the power-operated form (FIGS. 18 to 20), will then be closed about the pipe section as a back-up while travelling block B is lowered and jack L operated to align spear K axially with pipe section P (FIG. 12). As the spear is introduced into the end of pipe P, operation of power sub I will secure the spear to the pipe section by relative rotation, clamp E serving as a back-up. With the spear in place in pipe section P, clamp B may be opened and operation of the hoist system employed to swing the pipe section into the derrick. Jack L will be actuated to permit the suspended pipe section and the power sub and intervening connections to the travelling block to be straightened to a vertical position above the upper end of pipe string A in place in the well (FIG. 14). Thereupon the pipe section will be lowered until its threads are inserted into the box of the upper end of pipe string A and made up therein by appropriate rotation effected by means of the power swivel. Pipe string A will be held stationary to permit this operation by the power slips N in the well-known manner. When the pipe section has been made up into the well string, the power slips will be released and operation of the hoist mechanism effected to lower the string by a distance corresponding to the length of the added pipe section P. Where the added section is to be drilled off, power swivel .I may be operated in the known manner to rotate the entire drilling string, power slips N having been raised to release the string for rotation.

The just described series of operations will be repeated as additional pipe sections P are introduced into the drilling string. The pipe sections may be taken alternately from each of the racks C or may be taken in sequence from one side until the rack on that side is emptied and then in sequence from the rack on the opposite side of the conveyor system.

As a pipe section is hauled up into the derrick off of forward section 21 of the conveyor means, forward section 21 will be lowered to the position level with conveyor section 20 and pusher lug 48 retracted into position to receive the next section of pipe P and the sequence of operations may be repeated as may be required either to return pipe withdrawn from the well or to add pipe as the drilling proceeds.

The sequence of operations is reversed when withdrawing the pipe from the well. It will be evident that as a section is removed from the drilling string, cooperating movements of the hoist mechanism and jack L will be effected to direct a pipe section P through clamp E to forward section 21 of the conveyor means. With clamp E secured about the pipe in the position seen in FIG. 13, spear K may be released and withdrawn from the pipe section, whereupon retraction of pusher lug E will allow the removed section of the pipe to slide down forward section 21 of the conveyor means on to rearward section 20 to a position opposite one of the pipe racks. Forward section 21 will be lowered to the level position and by actuation of jacks 31 and 32, the pipe section may be returned to the pipe racks C which in this situation will have been tilted so that the pipe section tends to roll down toward the outer edge of the pipe rack.

This sequence of operations for removing the pipe from the' well will be continued with the sections delivered first to one or the other side of the racks as may be desired until all of the pipe has been removed from the well.

Where racks C do not have sufficient capacity to hold all of the pipe required to attain the desired depth in the well, storage racks R may be employed and additional pipe sections delivered to racks C by actuation of the rack and pinion device illustrated in FIGS. 24 to 27, inclusive. Where the storage racks are thus employed, they will be tilted downwardly toward racks C and by appropriate actuation of the rack and pinion mechanism previously described, fingers will be caused to pick up the pipe section immediately adjacent casings 129 and raise them to the top of the casings, whereupon pick-up bars 140 will be tripped by engagement of outer ends 143 with the upper walls of slots 131 to deliver the pipe section on to surfaces 144 of the casings, whereupon the pipe section will now be free to roll by gravity on to the rack bars forming pipe rack C on which the pipe will now roll to a position to be picked up by the conveyor cradle, in the manner previously described.

As many sections of pipe P can thus be delivered from racks R as may be required to make up the drilling string required for the drilling of the well.

To return the pipe sections to storage rack R, the sections will first be returned to racks C as previously described, the racks being tilted downwardly toward the outer edges and the pipe sections thus deposited on rack C will roll by gravity downwardly along the racks and thence on to racks R,. The latter will also be tilted downwardly toward their outer edges to allow the pipe sections to be stored thereon successively as received from racks C.

The system as described may be employed to handle either conventional drill pipe as the drilling string or when using casing as the drill pipe. In the former case, spear K will be replaced by the connector K, (FIG. 10A), which is adapted for direct threaded connection into the boxes of the drill pipe sections. Otherwise the operations are substantially the same as has been previously described, which was applicable primarily to the handling of casing.

It will be understood that various changes and modifications may be made in the illustrative embodiments heretofore described within the scope of the appended claims but without departing from the spirit of this invention.

What I claim is:

l. A pipe handling system for wells comprising in combination with a derrick and hoist means supported thereby;

a. elongate conveyor means adapted to receive pipe sections and to advance them into said derrick;

I060l I 0528 b. primary pipe rack means alongside said conveyor means for horizontally supporting a plurality of pipe sections in parallel relation to each other and to said conveyor means;

c. means operably arranged between said rack means and said conveyor means for successively transferring said pipe sections laterally from the rack means to the conveyor means;

. power-driven swivel means supported by said hoist means;

e. connector means carried by the swivel means adapted for rotatable connection of said swivel means to the forward end of the pipe section entering the derrick; and

f. pivoting means connecting said swivel means to said hoist means to enable angular movement of said swivel means to effect alignment of said connector means with said forward end of the pipe section.

2. A system according to claim 1 wherein said con veyor means comprises:

a. a horizontally disposed rearward section pivoted for tilting movement about its longitudinal axis;

b. a forward section pivotally connected to the forward end of said rearward section for vertical angular movement relative thereto; and

c. power-operated pusher means mounted for movement longitudinally of said rearward section and thrustingly engageable with the rearward end of a pipe section.

3. A pipe handling system according to claim 1 wherein said hoist means includes a cable-supported travelling block, and wherein said pivoting means comprises:

a. a fluid pressure-actuated extensible jack means including telescoping cylinder and piston members;

b. means pivotally connecting the cylinder member to said travelling block; and

c. means pivotally connecting said piston member to said power swivel means.

4. A pipe handling system according to claim 1 wherein said connector means comprises a spear-type member releasably insertible into the bore of said pipe section into non-threaded gripping engagement therewith.

5. A pipe handling system according to claim I wherein said connector means comprises a threaded pin member adapted for threaded connection with the box member of said pipe section.

6. A pipe handling system according to claim 1 including a pipe rack means along both sides of said conveyor means.

7. A pipe handling system according to claim 1 wherein said pipe rack means includes:

a. a plurality of longitudinally spaced apart, horizontally disposed pipe-supporting bars;

b. means pivotally mounting the inner ends of the bars adjacent said conveyor means; and

e. vertically adjustable means supporting the outer ends of said rack bars.

8. A system according to claim 1 wherein said rack means comprises platform means disposed on at least one side of said conveyor means tiltable about an axis parallel to said conveyor means.

9. A system according to claim 3 including adjustable means secured to said platform means for varying the angle of tilt thereof.

KII

p i l2 10. A pipe handling system according to claim 1 including back-up clamp means positioned adjacent the derrick to grasp said forward end of the pipe section.

ll. A pipe handling system according to claim 5 wherein said clamp means includes:

a. a pair of arcuate jaw members hingedly connected together at one end;

b. hook means for clamping the free ends of the jaw members about a pipe section; and

c. a power-operated support means for raising and lowering said clamp.

12. A pipe handling system according to claim 5 wherein said clamp means includes:

a. a pair of arcuate jaw members hingedly connected together at one end;

b. a power-operated support means for raising and lowering said clamp means; and

c. power-operated means mounted on said support means operable to open and close said jaw members about a pipe section.

13. A pipe handling system for wells comprising in combination with a derrick and hoist means supported thereby;

a. primary pipe rack means for horizontally supporting a plurality of pipe sections in parallel relation to each other and pivotable about its longitudinal axis;

b. elongate conveyor means disposed alongside said rack means and tiltable about its longitudinal axis to receive pipe sections from said rack means;

c. pivoted detent means initially holding said pipe sections on said rack means and releasable in response to tilting of said conveyor means to free said pipe sections for rolling movement on to said conveyor means;

d. means mounted on said conveyor means for advancing the pipe sections into the derrick;

e. power-driven swivel means supported by said hoist means;

f. connector means carried by said swivel means adapted for rotatable connection of said swivel means to the forward end of the pipe section entering the derrick; and

g. pivoting means connecting said swivel means to said hoist means to enable angular movement of said swivel means to effect alignment of said connector means with said forward end of the pipe section.

14. A pipe handling system according to claim 13 wherein said conveyor means is articulated to provide a rearward section and a forward section pivotally connected to the forward end of said rearward section for vertical angular movement relative thereto.

15. A pipe handling system according to claim 13 including:

a. auxiliary pipe rack means disposed alongside said primary pipe rack means arranged to store additional pipe sections in parallel horizontal relation thereto; and

b. power-operated pipe transfer means positioned between said primary pipe rack means and said auxiliary pipe rack means and operable to transfer pipe sections from said auxiliary pipe rack means to said primary pipe rack means.

16. A pipe handling system according to claim 15,

wherein said power'operated pipe transfer means includes:

Citas de patentes
Patente citada Fecha de presentación Fecha de publicación Solicitante Título
US26285 *29 Nov 1859 Paper-file
US2848196 *17 Oct 195519 Ago 1958John H LucasPortable drilling rig
US3177944 *1 Jun 196013 Abr 1965Dowty Rotol LtdRacking mechanism for earth boring equipment
US3266582 *24 Ago 196216 Ago 1966Leyman CorpDrilling system
US3312294 *4 Ago 19644 Abr 1967Wilson MfgPipe handling device
US3315822 *4 Oct 196525 Abr 1967Wilson Mfg CoDrill stem and pipe positioner device
US3340938 *22 Dic 196412 Sep 1967Wilson Mfg CoSemi-automated drilling rig
US3404741 *20 Dic 19638 Oct 1968Ministerul Ind Petrolui Si ChiAutomated system and drilling rig for continuously and automatically pulling and running a drill-pipe string
US3499498 *11 Mar 196810 Mar 1970Kendrick Cattle CoPipe racking and transfer assembly
Citada por
Patente citante Fecha de presentación Fecha de publicación Solicitante Título
US3804183 *1 May 197216 Abr 1974Rucker CoDrill string compensator
US3916500 *16 Ene 19744 Nov 1975Brown Cicero CPipe handling apparatus
US3964552 *23 Ene 197522 Jun 1976Brown Oil Tools, Inc.Drive connector with load compensator
US4347028 *17 Sep 197931 Ago 1982Automatic Pipe Racker, Inc.Pipe handling apparatus
US4403897 *29 Ago 198013 Sep 1983Walker-Neer Manufacturing Co., Inc.Self-centering clamp for down-hole tubulars
US4470740 *9 Nov 198211 Sep 1984Ingram CorporationApron for pipe handling system
US4494899 *28 Abr 198222 Ene 1985Tri-Star Enterprises, Inc.Pipe trough for transporting pipe between upper and lower positions
US4684314 *24 Sep 19844 Ago 1987Weatherford/Lamb, Inc.Pipe handling apparatus
US5122023 *13 Feb 199116 Jun 1992Nabors Industries, Inc.Fully articulating ramp extension for pipe handling apparatus
US6079925 *19 Jun 199827 Jun 2000Morgan; CarlMethod and apparatus for lifting oilfield goods to a derrick floor
US643528024 Dic 199720 Ago 2002Well Engineering Partners B.V.Making and breaking of couplings between pipe sections in a drilling rig
US65274935 Dic 19974 Mar 2003Varco I/P, Inc.Handling of tube sections in a rig for subsoil drilling
US6533519 *20 Jul 200018 Mar 2003Hydra-Walk, Inc.Pipe handling apparatus
US654355122 Feb 20008 Abr 2003The Charles Machine Works, Inc.Pipe handling device
US671951514 Mar 200313 Abr 2004Hydra-Walk, Inc.Pipe handling apparatus
US69387093 Jul 20026 Sep 2005Varco International, Inc.Pipe running tool
US69692236 Abr 200429 Nov 2005Hydra-Walk, Inc.Pipe handling apparatus
US709697720 Ene 200529 Ago 2006Varco I/P, Inc.Pipe running tool
US714044310 Nov 200328 Nov 2006Tesco CorporationPipe handling device, method and system
US728158730 Mar 200616 Oct 2007Weatherford/Lamb, Inc.Apparatus and methods for tubular makeup interlock
US735388015 Nov 20068 Abr 2008Weatherford/Lamb, Inc.Method and apparatus for connecting tubulars using a top drive
US737732414 Ago 200627 May 2008Tesco CorporationPipe handling device, method and system
US74484561 Feb 200611 Nov 2008Weatherford/Lamb, Inc.Adjustable rotating guides for spider or elevator
US745182615 Ago 200618 Nov 2008Weatherford/Lamb, Inc.Apparatus for connecting tubulars using a top drive
US747306520 Jun 20056 Ene 2009Kerry WellsOilfield pipe-handling apparatus
US751000624 Jun 200531 Mar 2009Varco I/P, Inc.Pipe running tool having a cement path
US751330020 Mar 20077 Abr 2009Weatherford/Lamb, Inc.Casing running and drilling system
US7568533 *16 Nov 20074 Ago 2009Rodger Lawrence FeltPipehandler
US759130424 Jun 200522 Sep 2009Varco I/P, Inc.Pipe running tool having wireless telemetry
US761449213 Nov 200610 Nov 2009Pop's Laydown Service, L.L.C.Methods and systems of handling pipe
US763524923 Jun 200522 Dic 2009Guidroz Perry JPipe pick-up and laydown apparatus
US76543138 Feb 20072 Feb 2010Tesco CorporationMethod and assembly for casing handling using a kelly rig
US765432531 Oct 20072 Feb 2010Weatherford/Lamb, Inc.Methods and apparatus for handling and drilling with tubulars or casing
US766553115 Nov 200623 Feb 2010Weatherford/Lamb, Inc.Apparatus for facilitating the connection of tubulars using a top drive
US766594411 May 200723 Feb 2010Guidroz Perry JPipe pick-up and laydown apparatus and method
US766966220 Jul 20052 Mar 2010Weatherford/Lamb, Inc.Casing feeder
US76736759 May 20069 Mar 2010Tesco CorporationPipe handling device and safety mechanism
US769474412 Ene 200613 Abr 2010Weatherford/Lamb, Inc.One-position fill-up and circulating tool and method
US769912124 Jun 200520 Abr 2010Varco I/P, Inc.Pipe running tool having a primary load path
US771252314 Mar 200311 May 2010Weatherford/Lamb, Inc.Top drive casing system
US7736119 *19 Jul 200615 Jun 2010National Oilwell Varco, L.P.Horizontal pipe handling system
US775313824 Jun 200513 Jul 2010Varco I/P, Inc.Pipe running tool having internal gripper
US775775927 Abr 200720 Jul 2010Weatherford/Lamb, Inc.Torque sub for use with top drive
US777065423 May 200810 Ago 2010Tesco CorporationPipe handling device, method and system
US779371931 Oct 200714 Sep 2010Weatherford/Lamb, Inc.Top drive casing system
US78329741 Jun 200516 Nov 2010Canrig Drilling Technology Ltd.Pipe-handling apparatus
US784541818 Ene 20067 Dic 2010Weatherford/Lamb, Inc.Top drive torque booster
US787435212 Dic 200625 Ene 2011Weatherford/Lamb, Inc.Apparatus for gripping a tubular on a drilling rig
US788290215 Nov 20078 Feb 2011Weatherford/Lamb, Inc.Top drive interlock
US789608415 Oct 20071 Mar 2011Weatherford/Lamb, Inc.Apparatus and methods for tubular makeup interlock
US791827323 Ene 20035 Abr 2011Weatherford/Lamb, Inc.Top drive casing system
US80165364 Abr 200813 Sep 2011Canrig Drilling Technology Ltd.Pipe-handling apparatus and methods
US803377931 Ene 200811 Oct 2011Canrig Drilling Technology Ltd.Pipe handling apparatus and methods
US80379326 Ene 201018 Oct 2011Tesco CorporationPipe handling device and safety mechanism
US803794916 Abr 201018 Oct 2011Varco I/P, Inc.Pipe running tool
US805236925 Sep 20068 Nov 2011Fred Olsen Energy AsaDevice for storing tubulars and devices for handling of tubulars
US811376211 Oct 200714 Feb 2012National Oilwell Varco, L.P.Horizontal pipe storage and handling system
US82158871 Nov 201010 Jul 2012Canrig Drilling Technology Ltd.Pipe-handling apparatus and methods
US825115117 Feb 201128 Ago 2012Weatherford/Lamb, Inc.Apparatus and methods for tubular makeup interlock
US837179012 Mar 200912 Feb 2013T&T Engineering Services, Inc.Derrickless tubular servicing system and method
US841933514 Feb 200916 Abr 2013T&T Engineering Services, Inc.Pipe handling apparatus with stab frame stiffening
US84542967 Oct 20114 Jun 2013Canrig Drilling Technology Ltd.Pipe-handling apparatus and methods
US8469085 *4 Ago 201025 Jun 2013T&T Engineering Services, Inc.Pipe stand
US846964827 Oct 200825 Jun 2013T&T Engineering ServicesApparatus and method for pre-loading of a main rotating structural member
US850622931 Mar 201113 Ago 2013T&T Engineering Services, Inc.Pipe handling apparatus and method
US85170901 Ago 201227 Ago 2013Weatherford/Lamb, Inc.Apparatus and methods for tubular makeup interlock
US856751219 Ene 201129 Oct 2013Weatherford/Lamb, Inc.Apparatus for gripping a tubular on a drilling rig
US8845260 *29 Jul 201030 Sep 2014Markwater Handling Systems Ltd.Apparatus and method for handling pipe
US888843210 Jun 201118 Nov 2014Perry GuidrozTubular delivery apparatus and system
US89056995 Jun 20129 Dic 2014T&T Engineering Services, Inc.Alignment apparatus and method for a boom of a pipe handling system
US9080693 *5 Oct 201214 Jul 2015Yeti Pipeline Equipment, LlcAutomated system for laying pipe
US909112819 Nov 201228 Jul 2015T&T Engineering Services, Inc.Drill floor mountable automated pipe racking system
US90970728 Jun 20094 Ago 2015Hawk Industries, Inc.Self-adjusting pipe spinner
US919419313 Ago 201324 Nov 2015T&T Engineering Services, Inc.Pipe handling apparatus and method
US9422779 *27 Jun 201323 Ago 2016Justin BunchPipe handling assembly
US947626715 Mar 201325 Oct 2016T&T Engineering Services, Inc.System and method for raising and lowering a drill floor mountable automated pipe racking system
US95566899 Dic 201431 Ene 2017Schlumberger Technology CorporationAlignment apparatus and method for a boom of a pipe handling system
US962505611 May 201518 Abr 2017Isco Industries, Inc.Automated system for laying pipe
US20030066654 *3 Jul 200210 Abr 2003Daniel JuhaszPipe running tool
US20030196791 *25 Feb 200323 Oct 2003N-I Energy Development, Inc.Tubular handling apparatus and method
US20040197166 *6 Abr 20047 Oct 2004Tolman E. KentPipe handling apparatus
US20050098352 *10 Nov 200312 May 2005Tesco Corporation.Pipe handling device, method and system
US20050238463 *30 Jul 200427 Oct 2005Smith Harlan BMethod and apparatus for handling pipe and other materials
US20060000601 *8 Sep 20055 Ene 2006Weatherford/Lamb, Inc.Methods and apparatus for connecting tubulars using a top drive
US20060005962 *20 Ene 200512 Ene 2006Varco International, Inc.Pipe running tool
US20060045654 *23 Jun 20052 Mar 2006Guidroz Perry JPipe pick-up and laydown apparatus
US20060045655 *20 Jun 20052 Mar 2006Kerry WellsOilfield pipe-handling apparatus
US20060118293 *24 Jun 20058 Jun 2006Daniel JuhaszPipe running tool having internal gripper
US20060124293 *24 Jun 200515 Jun 2006Daniel JuhaszPipe running tool having a primary load path
US20060124305 *24 Jun 200515 Jun 2006Daniel JuhaszPipe running tool having a cement path
US20060124353 *24 Jun 200515 Jun 2006Daniel JuhaszPipe running tool having wireless telemetry
US20060124356 *30 Ago 200515 Jun 2006Gust Cheryl JApparatus and method for handling wellbore tubulars
US20060285941 *1 Jun 200521 Dic 2006Pragma Engineering Ltd.Pipe-handling apparatus
US20070031215 *19 Jul 20068 Feb 2007National-Oilwell, L.P.Horizontal pipe handling system
US20070114113 *13 Nov 200624 May 2007Pop's Laydown Service, L.L.C.Methods and Systems of Handling Pipe
US20070209805 *8 Feb 200713 Sep 2007Tesco CorporationMethod and assembly for casing handling using a kelly rig
US20070251700 *28 Abr 20061 Nov 2007Mason David BTubular running system
US20080038094 *11 May 200714 Feb 2008Pjg Enterprises, LlcPipe pick-up and laydown apparatus and method
US20080101891 *11 Oct 20071 May 2008National Oilwell Varco, L.P.Horizontal pipe storage and handling system
US20080138174 *7 Feb 200612 Jun 2008Hawkins Samuel PPick-up and lay-down system and method
US20080302525 *23 May 200811 Dic 2008Beierbach K EvertPipe handling device, method and system
US20090101361 *22 Oct 200823 Abr 2009David Brian MasonTubular running system
US20090127001 *16 Nov 200721 May 2009Rodger Lawrence FeltPipehandler
US20090136327 *25 Sep 200628 May 2009Ola OftenDevice for Storing Tubulars and Devices for Handling of Tubulars
US20090196711 *31 Ene 20086 Ago 2009Nabors Global Holdings Ltd.Pipe Handling Apparatus and Methods
US20090252576 *4 Abr 20088 Oct 2009Nabors Global Holdings Ltd.Pipe-handling apparatus and methods
US20090314137 *8 Jun 200924 Dic 2009Hawk Industries, Inc.Self-adjusting pipe spinner
US20100032213 *27 Oct 200811 Feb 2010T&T Engineering ServicesApparatus and method for pre-loading of a main rotating structural member
US20100155140 *1 Mar 201024 Jun 2010Varco I/P, Inc.Pipe running tool having a primary load path
US20100200215 *16 Abr 201012 Ago 2010Varco I/P, Inc.Pipe running tool
US20100230166 *12 Mar 200916 Sep 2010T&T Engineering ServicesDerrickless tubular servicing system and method
US20110030942 *4 Ago 201010 Feb 2011T&T Engineering Services, Inc.Pipe stand
US20110044787 *1 Nov 201024 Feb 2011Canrig Drilling Technology Ltd.Pipe-handling apparatus and methods
US20110174483 *19 Ene 201121 Jul 2011Odell Ii Albert CApparatus for gripping a tubular on a drilling rig
US20110200412 *31 Mar 201118 Ago 2011T&T Engineering ServicesPipe Handling Apparatus and Method
US20120118639 *29 Jul 201017 May 2012Markwater Handling Systems Ltd.Apparatus and method for handling pipe
US20130129458 *5 Oct 201223 May 2013Shaun Aird CheneyAutomated system for laying pipe
CN101405473B25 Sep 200619 Jun 2013弗雷德·奥尔森能源公司Device for storing tubulars and devices for handling of tubulars
CN101769131B27 Ene 20103 Oct 2012成都世唯科技有限公司Conveying mechanism used for oil drilling
EP1828536A1 *1 Dic 20055 Sep 2007Sense Edm AsA system for handling pipes between a pipe rack and a derrick, and also a device for assembling and disassembling pipe stands
EP1828536A4 *1 Dic 200518 Feb 2015Sense Edm AsA system for handling pipes between a pipe rack and a derrick, and also a device for assembling and disassembling pipe stands
WO1983003118A1 *2 Mar 198215 Sep 1983Ingram CorpPipe handling machine
WO1999030000A1 *5 Dic 199717 Jun 1999Deutsche Tiefbohr AktiengesellschaftHandling of tube sections in a rig for subsoil drilling
WO1999034089A1 *24 Dic 19978 Jul 1999Well Engineering Partners B.V.Making and breaking of couplings between pipe sections in a drilling rig
WO2001088325A1 *15 May 200122 Nov 2001Voest-Alpine Bergtechnik__Gesellschaft M.B.H.Device for extending or shortening a network of pipes
WO2007035113A1 *25 Sep 200629 Mar 2007Fred. Olsen Energy AsaDevice for storing tubulars and devices for handling of tubulars
WO2007079286A2 *14 Nov 200612 Jul 2007Pop's Laydown Service, L.L.C.Methods and systems of handling pipe
WO2007079286A3 *14 Nov 200624 Sep 2009Pop's Laydown Service, L.L.C.Methods and systems of handling pipe
WO2009149469A1 *8 Jun 200910 Dic 2009Hawk Industries, Inc.Self-adjusting pipe spinner
WO2013149302A1 *4 Abr 201310 Oct 2013John Nitschke Nominees Pty LtdConveyor for use with a drill pipe storage sloop
WO2014003647A1 *25 Jun 20133 Ene 2014Atlas Copco Craelius AbHandling device and method for handling drill string components in rock drilling and rock drill rig
WO2014172690A3 *18 Abr 20147 May 2015Liberty Holdings, LLCPipe handler
Clasificaciones
Clasificación de EE.UU.175/85, 414/22.57, 414/22.58, 414/22.52, 173/164
Clasificación internacionalE21B19/15, E21B19/20, E21B19/00
Clasificación cooperativaE21B19/15, E21B19/20, E21B19/155
Clasificación europeaE21B19/20, E21B19/15B, E21B19/15
Eventos legales
FechaCódigoEventoDescripción
5 Abr 1982ASAssignment
Owner name: HUGHES TOOL COMPANY A CORP. OF DE
Free format text: MERGER;ASSIGNOR:BROWN OIL TOOLS, INC. A TX CORP.;REEL/FRAME:003967/0348
Effective date: 19811214