US3842608A - Method and means for installing load bearing piles in situ - Google Patents

Method and means for installing load bearing piles in situ Download PDF

Info

Publication number
US3842608A
US3842608A US00310049A US31004972A US3842608A US 3842608 A US3842608 A US 3842608A US 00310049 A US00310049 A US 00310049A US 31004972 A US31004972 A US 31004972A US 3842608 A US3842608 A US 3842608A
Authority
US
United States
Prior art keywords
pile
core
cavity
earth
fluid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US00310049A
Inventor
L Turzillo
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US00310049A priority Critical patent/US3842608A/en
Priority to CA178,419A priority patent/CA984165A/en
Priority to JP48107052A priority patent/JPS49135408A/ja
Application granted granted Critical
Publication of US3842608A publication Critical patent/US3842608A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/56Screw piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/26Placing by using several means simultaneously

Definitions

  • ABSTRACT Method of installing a preformed load-bearing pile in an earth situs, utilizing core of predetermined length and having screw-like ridge means externally along the length thereof.
  • Pile core drilled into earth while supplying fluid jetting medium through said passage means to mix with drilled earth and to facilitate upward movement of earth, until pile cavity of requisite depth formed.
  • Pile core further rotated in place while pumping fluid, self-hardenable, cementitious material through passage means, to urge cementitious material along said screw means, thereby to enlarge girth of pile cavity and form generally tubular body about the pile core.
  • Tubular body sets and hardens with loadbearing pile core anchored therein, as composite pile body of correspondingly increased'load-bearing capacity.
  • Lee A. Turzillo US. Pat. No. 3,354,657 relates to forming concrete piles in the earth by drilling a hollow cylindrical casing into the situs, while simultaneously pumping pressurized flushing fluid through the casing and an apertured bit on the lower end thereof, until a cavity of predetermined depth was formed, and thereafter pumping cement mortar through the-casing to occupy voids around the bit and the casing, as well as to fill the casing.
  • the mortar which forms around the casing was limited in volume and shape, commensurate with the relatively low fluid pressures attainable in fluid cement mortar by prior art methods in general.
  • a preformed load-bearing pile core having an external helical thread means, is screwed into the earth of a situs while simultaneously jetting water into the drilled earth to define a cavity of predetermined or appropriate depth.
  • the thread means is adapted to convey the drilled earth material upwardly to the ground surface.
  • the jetting fluid mixes with the adjacent earth materials to make the same sufficiently fluid to flow upwardly, aided by the lifting action of the helical thread means, while at the same time enlarging the cavity to a substantial extent.
  • self-hardenable fluid cement mortar is pumped into the enlarged cavity around the pile core.
  • FIG. 1 is vertical cross-section in an earth situs, illustrating an initial step in the method of the invention by which a preformed, reinforced pile core has been screwed to given-depth of pile cavity formed thereby in the situs, said pile core being shown broken away and in section to illustrate the internal structure thereof.
  • FIG. 2 is a view corresponding to FIG. 1, illustrating intermediate fluid jetting step of the method, by which the formed pile cavity has been enlarged in girth around the pile core.
  • FIG. 3 is a view corresponding to FIG. 2, by which fluid, self-hardening cementitious material has been pumped through the pile core while rotating the core, further to enlarge the cavity and fill the same with cementitious material which hardens to form a sturdy, core-reinforced, concrete pile in the situs.
  • FIG. 4 is an enlarged cross section taken on the line 4-4 of FIG. 1.
  • FIG. 5 is an enlarged cross-section taken on the line 5-5 of FIG. 3, to illustrate the resultant formation of a relatively large, hardened concrete pile, which is reinforced by the concrete filled, cavity-forming pile core.
  • a preformed load-bearing core 10 of predetermined length For use in practicing the method of the invention, as for installing a load-bearing pile in an earth situs, a preformed load-bearing core 10 of predetermined length,
  • a radially outwardly presented, screw-like thread means 12 either formed in the pipe or welded spirally along the length thereof.
  • An axially centered metal conduit 13 is shown extending within the pipe 11 and connected to a drilling bit 14, affixed at the lower end of pipe 11, and a closure cap 15 may be affixed to the upper end of pipe 11.
  • Suitable means 17 may be provided for attaching the core 10 onto a drill rig of known type (not shown).
  • the closed space 18 defined between the pipe 11 and the conduit 13 within the fabricated core 10, is shown completely filled with a concrete mix 20, such as one part cement mortar to one part mason sand, which has been allowed to cure for about 48 hours, for example.
  • Passage means 21, 21 may be suitably provided between the central conduit 13 and the screw-threaded outer casing, for passage of fluid materials fed through said central conduit, in a manner to be described later, but particularly for passage of fluid jetting water and/or air, as well as fluid cement mortar, at points near the lower end of the core 10.
  • the pile core 10 serves as a preformed, reinforced pile body having a very substantial load-bearing capacity.
  • the preformed pile core 10 is connected to the leads of a drilling rig supporting an auger-type drive means (not shown), and a pump or other source of water under pressure is connected to the central conduit 13 of the pile core.
  • Rotation of the auger drive is started (at 52 RPM for example), simultaneously with operation of the water pump (approximately 20 GPM and 350 PSI), to drill the pile core into the earth situs to predetermined or appropriate depth as shown in-FIG. 1, whereby the screw means 12 carries the drilled earth material to the surface S and a cavity 23 is formed.
  • rotation of the pile core may be utilized to increase the depth of the cavity 23 if desired or necessary.
  • Rotation of the pile core 10 and pumping of the mortar may be continued, with or without increasing the cavity depth, until the enlarged pile cavity around the pile core is completely filled with fluid mortar, as evidenced by the appearance of fluid cement mortar at the top of the cavity.
  • such rotation of the pile core may be stopped while pumping of fluid mortar is continued for a short time, such as a few minutes, during which time the pile core 10 may be jetted downward a few more inches if desired.
  • the cavity 23a may be further enlarged, as indicated at 23b in FIGS. 3 and S, correspondingly to increase the girth and load-bearing capacity of the tinished composite, cast-in-place pile P, as shown in FIGS. 3 and 5.
  • the improved method is capable of use in a manner which greatly reduces the amount of time normally expended for installing load-bearing piles.
  • a method of installing a reinforced cast-in-place, load-bearing pile in an earth situs comprising: the steps of drilling into the earth of the situs with an elongated, rigid core having exterior screw means thereon, while supplying a pressurized fluid medium through passage means in the core to mix with the drilled earth, to facilitate upward discharge of earth along said screw means, until a pile cavity of requisite depth and girth is formed; further rotating said pile core in place within the formed cavity while pumping fluid, self-hardenable, cementitious material through said passage means to force cementitious material along said screw means, thereby to enlarge thegirth of the pile cavity, and form a generally tubular body about the rigid core; and allowing said formed generally tubular body to set and harden in the cavity with said rigid pile core anchored therein, as a composite, formed-in-place, pile body of correspondingly increased load-bearing capacity.
  • said rigid core includes a preformed rigid casing containing a filler body of hardened cementitious material adding to the loadbearing capacity of the resultant cast-in-place pile.
  • said rigid core includes a preformed generally tubular, rigid casing and passage means for conducting fluid materials from the exterior to at least the inner end of the rigid core for passage of the fluid materials along said screw means.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

Method of installing a preformed load-bearing pile in an earth situs, utilizing core of predetermined length and having screwlike ridge means externally along the length thereof. Pile core drilled into earth while supplying fluid jetting medium through said passage means to mix with drilled earth and to facilitate upward movement of earth, until pile cavity of requisite depth formed. Pile core further rotated in place while pumping fluid, self-hardenable, cementitious material through passage means, to urge cementitious material along said screw means, thereby to enlarge girth of pile cavity and form generally tubular body about the pile core. Tubular body sets and hardens with loadbearing pile core anchored therein, as composite pile body of correspondingly increased load-bearing capacity.

Description

12% ite States Turzillo l 11 3,842,608 [451 Oct. 22, 1974 [76] Inventor: LeeA. Turzillo, 2078 Glengary Rd.,
- Akron, Ohio 44313 [22] Filed: Nov. 28, 1972 [21] Appl. No: 310,049
[ 56] References Cited UNITED STATES PATENTS 8/1965 Phares et al. 61/63 X 3,636,718 1/1972 Keats 61/5374 3,664,139 5/1972 Sexauer 61/5374 FOREIGN PATENTS OR APPLICATIONS 619,600 1/1927 France ..6l/53.74
Primary Examiner.la cob Shapiro [57] ABSTRACT Method of installing a preformed load-bearing pile in an earth situs, utilizing core of predetermined length and having screw-like ridge means externally along the length thereof. Pile core drilled into earth while supplying fluid jetting medium through said passage means to mix with drilled earth and to facilitate upward movement of earth, until pile cavity of requisite depth formed. Pile core further rotated in place while pumping fluid, self-hardenable, cementitious material through passage means, to urge cementitious material along said screw means, thereby to enlarge girth of pile cavity and form generally tubular body about the pile core. Tubular body sets and hardens with loadbearing pile core anchored therein, as composite pile body of correspondingly increased'load-bearing capacity.
4 Claims, 5 Drawing Figures METHOD AND MEANS FOR INSTALLING LOAD BEARING PILES INSITU BACKGROUND OF THE INVENTION In the past, numerous methods and means have been devised in which tubular casings were driven into an ties defined by the driven casings. This condition was to some extent modified by either forming a bulbous concrete body at the inner end of the casing prior to removal of the latter, and/or by jetting water around the casing to enlarge the cavity, and then pouring mortar around the formed pile to fill the resultant space between the pile and the wall of the enlargement, without attaining requisite skin friction for the enlarged pile body.
Lee A. Turzillo US. Pat. No. 3,354,657, relates to forming concrete piles in the earth by drilling a hollow cylindrical casing into the situs, while simultaneously pumping pressurized flushing fluid through the casing and an apertured bit on the lower end thereof, until a cavity of predetermined depth was formed, and thereafter pumping cement mortar through the-casing to occupy voids around the bit and the casing, as well as to fill the casing. The mortar which forms around the casing, was limited in volume and shape, commensurate with the relatively low fluid pressures attainable in fluid cement mortar by prior art methods in general. Moreover, in order to provide cement-filled casings of the character described by prior methods, the load capacities of the finished piles were quite limited, and the periods required to produce the finished piles in condition for the intended load-bearing uses of the same were considerable, if not impractical for at least some purposes.
SUMMARY OF INVENTION In use of the method of the invention a preformed load-bearing pile core, having an external helical thread means, is screwed into the earth of a situs while simultaneously jetting water into the drilled earth to define a cavity of predetermined or appropriate depth. During this jetting procedure the thread means is adapted to convey the drilled earth material upwardly to the ground surface. The jetting fluid mixes with the adjacent earth materials to make the same sufficiently fluid to flow upwardly, aided by the lifting action of the helical thread means, while at the same time enlarging the cavity to a substantial extent. Upon discontinuance of the jetting procedure, self-hardenable fluid cement mortar is pumped into the enlarged cavity around the pile core. Continued rotation of the pile core, accompanied with such pumping of the mortar, is effective to increase the depth and/or the girth of the cavity. Rotation of the pile core can be continued with or without thereby producing a composite, reinforced pile body of high load-bearing capacity.
Objects of the invention will be manifest from the following brief description and the accompanying draw mgs.
Of the accompanying drawings:
FIG. 1 is vertical cross-section in an earth situs, illustrating an initial step in the method of the invention by which a preformed, reinforced pile core has been screwed to given-depth of pile cavity formed thereby in the situs, said pile core being shown broken away and in section to illustrate the internal structure thereof.
FIG. 2 is a view corresponding to FIG. 1, illustrating intermediate fluid jetting step of the method, by which the formed pile cavity has been enlarged in girth around the pile core.
FIG. 3 is a view corresponding to FIG. 2, by which fluid, self-hardening cementitious material has been pumped through the pile core while rotating the core, further to enlarge the cavity and fill the same with cementitious material which hardens to form a sturdy, core-reinforced, concrete pile in the situs.
FIG. 4 is an enlarged cross section taken on the line 4-4 of FIG. 1.
FIG. 5 is an enlarged cross-section taken on the line 5-5 of FIG. 3, to illustrate the resultant formation of a relatively large, hardened concrete pile, which is reinforced by the concrete filled, cavity-forming pile core.
For use in practicing the method of the invention, as for installing a load-bearing pile in an earth situs, a preformed load-bearing core 10 of predetermined length,
diameter, and load-supporting capacity is provided as ing an external pipe or casing 11 of heavy metal with increasing the cavity depth, until the enlarged pile cavity around the pile core is completely filled with fluid mortar to desired level in in reference to the top of the cavity. The fluid mortar, upon hardening in the formed cavity, is anchored to the earth and to the pile core,
radially outwardly presented, screw-like thread means 12, either formed in the pipe or welded spirally along the length thereof. An axially centered metal conduit 13 is shown extending within the pipe 11 and connected to a drilling bit 14, affixed at the lower end of pipe 11, and a closure cap 15 may be affixed to the upper end of pipe 11. Suitable means 17 may be provided for attaching the core 10 onto a drill rig of known type (not shown). The closed space 18 defined between the pipe 11 and the conduit 13 within the fabricated core 10, is shown completely filled with a concrete mix 20, such as one part cement mortar to one part mason sand, which has been allowed to cure for about 48 hours, for example. Passage means 21, 21 may be suitably provided between the central conduit 13 and the screw-threaded outer casing, for passage of fluid materials fed through said central conduit, in a manner to be described later, but particularly for passage of fluid jetting water and/or air, as well as fluid cement mortar, at points near the lower end of the core 10. The pile core 10 serves as a preformed, reinforced pile body having a very substantial load-bearing capacity.
In practice of the improved pile installing method, the preformed pile core 10, as best shown in FIGS. 1 and 4, is connected to the leads of a drilling rig supporting an auger-type drive means (not shown), and a pump or other source of water under pressure is connected to the central conduit 13 of the pile core. Rotation of the auger drive is started (at 52 RPM for example), simultaneously with operation of the water pump (approximately 20 GPM and 350 PSI), to drill the pile core into the earth situs to predetermined or appropriate depth as shown in-FIG. 1, whereby the screw means 12 carries the drilled earth material to the surface S and a cavity 23 is formed. When or if hard earth material is encountered in one way or another, it may be necessary to predrill a cavity of slightly smaller diameter than that to be drilled by the pile core.
In any event, when a said cavity 23 of requisite depth V and diameter has been formed by the rotating pile core (see FIG. 1), rotation of the pile core is continued while pumping jetting fluid through the conduit 21, and through jetting passages 21 at least adjacent the lower end of the pile core. This jetting fluid mixes with the adjacent earth materials to make the same sufficiently fluid to flow upwardly, aided by the lifting action of the helical screw threads 12, whereby the formed cavity 23 is substantially enlarged, as indicated at 230, in FIG. 2. After this jetting procedure is stopped, a concrete mix, including one part fluid cement mortar, one part mason sand, for example, may be pumped into the enlarged cavity 230, as shown in FIG. 2. In the latter method step continued rotation of the pile core, accompanied with pumping of the mortar, may be utilized to increase the depth of the cavity 23 if desired or necessary. Rotation of the pile core 10 and pumping of the mortar may be continued, with or without increasing the cavity depth, until the enlarged pile cavity around the pile core is completely filled with fluid mortar, as evidenced by the appearance of fluid cement mortar at the top of the cavity. At this point, such rotation of the pile core may be stopped while pumping of fluid mortar is continued for a short time, such as a few minutes, during which time the pile core 10 may be jetted downward a few more inches if desired. In this process of filling the enlarged pile cavity with cement mortar, it has been found that the cavity 23a may be further enlarged, as indicated at 23b in FIGS. 3 and S, correspondingly to increase the girth and load-bearing capacity of the tinished composite, cast-in-place pile P, as shown in FIGS. 3 and 5.
Because the pile core 10 can be completely preformed and conditioned in readiness for use as described above. the improved method is capable of use in a manner which greatly reduces the amount of time normally expended for installing load-bearing piles.
Modifications of the invention may be resorted to without departing from the spirit thereof or the scope of the appended claims.
What is claimed is:
l. A method of installing a reinforced cast-in-place, load-bearing pile in an earth situs, comprising: the steps of drilling into the earth of the situs with an elongated, rigid core having exterior screw means thereon, while supplying a pressurized fluid medium through passage means in the core to mix with the drilled earth, to facilitate upward discharge of earth along said screw means, until a pile cavity of requisite depth and girth is formed; further rotating said pile core in place within the formed cavity while pumping fluid, self-hardenable, cementitious material through said passage means to force cementitious material along said screw means, thereby to enlarge thegirth of the pile cavity, and form a generally tubular body about the rigid core; and allowing said formed generally tubular body to set and harden in the cavity with said rigid pile core anchored therein, as a composite, formed-in-place, pile body of correspondingly increased load-bearing capacity.
2. A method as in claim 1, wherein said rigid core includes a preformed rigid casing containing a filler body of hardened cementitious material adding to the loadbearing capacity of the resultant cast-in-place pile.
3. A method as in claim 1, wherein said rigid core includes a preformed generally tubular, rigid casing and passage means for conducting fluid materials from the exterior to at least the inner end of the rigid core for passage of the fluid materials along said screw means.
screw means toward the top of the cavity.

Claims (4)

1. A method of installing a reinforced cast-in-place, loadbearing pile in an earth situs, comprising: the steps of drilling into the earth of the situs with an elongated, rigid core having exterior screw means thereon, while supplying a pressurized fluid medium through passage means in the core to mix with the drilled earth, to facilitate upward discharge of earth along said screw means, until a pile cavity of requisite depth and girth is formed; further rotating said pile core in place within the formed cavity while pumping fluid, self-hardenable, cementitious material through said passage means to force cementitious material along said screw means, thereby to enlarge the girth of the pile cavity, and form a generally tubular body about the rigid core; and allowing said formed generally tubular body to set and harden in the cavity with said rigid pile core anchored therein, as a composite, formed-in-place, pile body of correspondingly increased load-bearing capacity.
2. A method as in claim 1, wherein said rigid core includes a preformed rigid casing containing a filler body of hardened cementitious material adding to the load-bearing capacity of the resultant cast-in-place pile.
3. A method as in claim 1, wherein said rigid core includes a preformed generally tubular, rigid casing and passage means for conducting fluid materials from the exterior to at least the inner end of the rigid core for passage of the fluid materials along said screw means.
4. A method as in claim 1, said upward movement of fluid cementitious material within the formed cavity being facilitated by rotation of the said rigid core forcibly to convey the fluid material upwardly along said screw means toward the top of the cavity.
US00310049A 1972-11-28 1972-11-28 Method and means for installing load bearing piles in situ Expired - Lifetime US3842608A (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US00310049A US3842608A (en) 1972-11-28 1972-11-28 Method and means for installing load bearing piles in situ
CA178,419A CA984165A (en) 1972-11-28 1973-08-09 Method and means for installing load-bearing piles in situ
JP48107052A JPS49135408A (en) 1972-11-28 1973-09-25

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US00310049A US3842608A (en) 1972-11-28 1972-11-28 Method and means for installing load bearing piles in situ

Publications (1)

Publication Number Publication Date
US3842608A true US3842608A (en) 1974-10-22

Family

ID=23200785

Family Applications (1)

Application Number Title Priority Date Filing Date
US00310049A Expired - Lifetime US3842608A (en) 1972-11-28 1972-11-28 Method and means for installing load bearing piles in situ

Country Status (3)

Country Link
US (1) US3842608A (en)
JP (1) JPS49135408A (en)
CA (1) CA984165A (en)

Cited By (47)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3924414A (en) * 1974-08-22 1975-12-09 Union Oil Co Pile for use in offshore areas having a shifting layer of mud
US3946570A (en) * 1973-10-02 1976-03-30 S.E.F.I. Sondages-Etanchements-Forages-Injections Support and foundation composite pile for various works and method for manufacturing the same
US3972198A (en) * 1974-08-22 1976-08-03 Union Oil Company Of California Method of protecting a pile imbedded in offshore areas having a shifting layer of mud
US4278363A (en) * 1979-06-21 1981-07-14 Conoco, Inc. Rock bolt and installation system
US4405262A (en) * 1980-01-08 1983-09-20 Masaya Nagashima Method for erection of a temporary bridge, and a pile means therefor
US4474243A (en) * 1982-03-26 1984-10-02 Exxon Production Research Co. Method and apparatus for running and cementing pipe
US4533279A (en) * 1983-05-12 1985-08-06 Fundemantum B.V. Method for making a foundation pile
US4637758A (en) * 1982-03-11 1987-01-20 Kabushiki Kaisha Komatsu Seisakusho Method of driving hollow piles into the ground
US4664555A (en) * 1985-03-05 1987-05-12 Dyckerhoff & Widmann Aktiengesellschaft Tension member for a rock anchor or the like
DE3617025A1 (en) * 1986-05-21 1987-11-26 Delmag Maschinenfabrik PRE-PREPARED CONCRETE PILE AND METHOD AND DEVICE FOR ITS PLACING INTO THE GROUND
DE3624943A1 (en) * 1986-07-23 1988-01-28 Delmag Maschinenfabrik PRE-PREPARED CONCRETE PART AND METHOD FOR PUTTING IT INTO THE GROUND
EP0311363A2 (en) * 1987-10-05 1989-04-12 Kawasaki Steel Corporation Hollow steel pile, manufacturing method and pile driving method
US4902171A (en) * 1987-02-09 1990-02-20 Soletanche Process for reinforcing a driven tubular piling, the piling obtained by this process, an arrangement for implementing the process
US4958962A (en) * 1989-06-28 1990-09-25 Halliburton Company Methods of modifying the structural integrity of subterranean earth situs
EP0542692A1 (en) * 1991-11-14 1993-05-19 Isolink Inc. Device for anchoring construction parts to the ground
GB2267926A (en) * 1992-06-18 1993-12-22 Elle Van A tube for forming a pile
US5396964A (en) * 1992-10-01 1995-03-14 Halliburton Company Apparatus and method for processing soil in a subterranean earth situs
US5575593A (en) * 1994-07-11 1996-11-19 Atlas Systems, Inc. Method and apparatus for installing a helical pier with pressurized grouting
US5586417A (en) * 1994-11-23 1996-12-24 Henderson; Allan P. Tensionless pier foundation
CN1039502C (en) * 1992-12-04 1998-08-12 张平潮 Reinforced concrete pile and its construction method
NL1018702C2 (en) * 2001-08-03 2003-02-04 Verstraeten Funderingstech Bv Method for installing a foundation pile in the soil, as well as a foundation pile and a chuck for this method, and a soil displacement drill.
US20030190195A1 (en) * 2002-04-03 2003-10-09 Liberty Offshore Limited Drilled pile
US6672023B2 (en) 2000-09-27 2004-01-06 Allan P. Henderson Perimeter weighted foundation for wind turbines and the like
US20070003377A1 (en) * 2003-07-29 2007-01-04 Cable-Lock Foundation pile having a spiral ridge and method of underpinning using same
US20070092339A1 (en) * 2005-10-20 2007-04-26 Gray Mullins Voided drilled shafts
EA008306B1 (en) * 2004-06-02 2007-04-27 Альберт Иванович Архипов Design of screw metal pile
US20070269273A1 (en) * 2003-12-15 2007-11-22 Henderson Allan P Post-tension pile anchor foundation and method therefor
US20070286687A1 (en) * 2006-06-12 2007-12-13 Cesare Melegari Method and equipment for constructing micropiles in soil
US20080008539A1 (en) * 2006-07-05 2008-01-10 Con-Tech Systems Ltd. Void form for constructing post-tensioned foundation piles
US20080273928A1 (en) * 2007-05-03 2008-11-06 Lrm Industries, Llc Molded pile
US7533505B2 (en) 2003-01-06 2009-05-19 Henderson Allan P Pile anchor foundation
US20100300752A1 (en) * 2009-06-01 2010-12-02 Massachusetts Institute Of Technology Method and apparatus for penetrating particulate substrates
RU2456408C1 (en) * 2011-02-17 2012-07-20 Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" Method to erect pile foundation
RU2468148C2 (en) * 2011-01-21 2012-11-27 Государственное образовательное учреждение высшего профессионального образования "Саратовский государственный технический университет" (СГТУ) Device for formation of wells for filling piles
RU2489548C2 (en) * 2011-11-01 2013-08-10 Юрий Семенович Флягин Screw injection anchor pile
US20130247693A1 (en) * 2011-09-28 2013-09-26 Hydrochina Huadong Engineering Corporation Method for Sampling Jointed Rock Mass
RU2558832C1 (en) * 2014-06-23 2015-08-10 Юрий Анатольевич Бровцин Method to erect screw pile in soil
RU2569654C1 (en) * 2014-06-23 2015-11-27 Юрий Анатольевич Бровцин Syringe-type screw pile
RU2570584C1 (en) * 2014-06-23 2015-12-10 Юрий Анатольевич Бровцин Screw pile
RU2571869C1 (en) * 2014-06-23 2015-12-27 Юрий Анатольевич Бровцин Screw pile in soil with detachable tip
RU2571873C1 (en) * 2014-06-23 2015-12-27 Юрий Анатольевич Бровцин Screw pile in soil
RU2603314C1 (en) * 2015-07-29 2016-11-27 Общество с ограниченной ответственностью "НПП СК МОСТ" Erection method of pile foundation for reinforcement
RU192324U1 (en) * 2019-05-07 2019-09-12 Федеральное государственное бюджетное образовательное учреждение образования "Владимирский Государственный Университет имени Александра Григорьевича и Николая Григорьевича Столетовых" (ВлГУ) Screw pile
RU2706499C1 (en) * 2018-07-26 2019-11-19 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Pile structure of pumping units foundation
US10738436B1 (en) 2019-02-15 2020-08-11 Montana Systems Inc. Tubular foundation for onshore wind turbine generators
US11441288B2 (en) * 2017-09-20 2022-09-13 Innogy Se Pile and method of installing
RU2804651C1 (en) * 2023-01-24 2023-10-03 Закрытое акционерное общество "Геотехника - С" Method for constructing bored pile in soil

Cited By (59)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3946570A (en) * 1973-10-02 1976-03-30 S.E.F.I. Sondages-Etanchements-Forages-Injections Support and foundation composite pile for various works and method for manufacturing the same
US3972198A (en) * 1974-08-22 1976-08-03 Union Oil Company Of California Method of protecting a pile imbedded in offshore areas having a shifting layer of mud
US3924414A (en) * 1974-08-22 1975-12-09 Union Oil Co Pile for use in offshore areas having a shifting layer of mud
US4278363A (en) * 1979-06-21 1981-07-14 Conoco, Inc. Rock bolt and installation system
US4405262A (en) * 1980-01-08 1983-09-20 Masaya Nagashima Method for erection of a temporary bridge, and a pile means therefor
US4637758A (en) * 1982-03-11 1987-01-20 Kabushiki Kaisha Komatsu Seisakusho Method of driving hollow piles into the ground
US4474243A (en) * 1982-03-26 1984-10-02 Exxon Production Research Co. Method and apparatus for running and cementing pipe
US4533279A (en) * 1983-05-12 1985-08-06 Fundemantum B.V. Method for making a foundation pile
US4664555A (en) * 1985-03-05 1987-05-12 Dyckerhoff & Widmann Aktiengesellschaft Tension member for a rock anchor or the like
DE3617025A1 (en) * 1986-05-21 1987-11-26 Delmag Maschinenfabrik PRE-PREPARED CONCRETE PILE AND METHOD AND DEVICE FOR ITS PLACING INTO THE GROUND
DE3624943A1 (en) * 1986-07-23 1988-01-28 Delmag Maschinenfabrik PRE-PREPARED CONCRETE PART AND METHOD FOR PUTTING IT INTO THE GROUND
US4902171A (en) * 1987-02-09 1990-02-20 Soletanche Process for reinforcing a driven tubular piling, the piling obtained by this process, an arrangement for implementing the process
EP0311363A2 (en) * 1987-10-05 1989-04-12 Kawasaki Steel Corporation Hollow steel pile, manufacturing method and pile driving method
EP0311363A3 (en) * 1987-10-05 1989-11-15 Kawasaki Steel Corporation Hollow steel pile, manufacturing method and pile driving method
US4958962A (en) * 1989-06-28 1990-09-25 Halliburton Company Methods of modifying the structural integrity of subterranean earth situs
EP0542692A1 (en) * 1991-11-14 1993-05-19 Isolink Inc. Device for anchoring construction parts to the ground
GB2267926A (en) * 1992-06-18 1993-12-22 Elle Van A tube for forming a pile
US5396964A (en) * 1992-10-01 1995-03-14 Halliburton Company Apparatus and method for processing soil in a subterranean earth situs
CN1039502C (en) * 1992-12-04 1998-08-12 张平潮 Reinforced concrete pile and its construction method
US5575593A (en) * 1994-07-11 1996-11-19 Atlas Systems, Inc. Method and apparatus for installing a helical pier with pressurized grouting
US5826387A (en) * 1994-11-23 1998-10-27 Henderson; Allan P. Pier foundation under high unit compression
US5586417A (en) * 1994-11-23 1996-12-24 Henderson; Allan P. Tensionless pier foundation
US6672023B2 (en) 2000-09-27 2004-01-06 Allan P. Henderson Perimeter weighted foundation for wind turbines and the like
US20040098935A1 (en) * 2000-09-27 2004-05-27 Henderson Allan P. Perimeter weighted foundation for wind turbines and the like
NL1018702C2 (en) * 2001-08-03 2003-02-04 Verstraeten Funderingstech Bv Method for installing a foundation pile in the soil, as well as a foundation pile and a chuck for this method, and a soil displacement drill.
WO2003012211A1 (en) * 2001-08-03 2003-02-13 Funderingstechnieken Verstraeten B.V. Method for making a foundation pile
US20040028480A1 (en) * 2001-08-03 2004-02-12 Verstraeten Alexander Julien Method for making a foundation pile
US7429148B2 (en) 2001-08-03 2008-09-30 Funderingstechnieken Verstraeten B.V. Method for making a foundation pile
US20030190195A1 (en) * 2002-04-03 2003-10-09 Liberty Offshore Limited Drilled pile
US7533505B2 (en) 2003-01-06 2009-05-19 Henderson Allan P Pile anchor foundation
US20070003377A1 (en) * 2003-07-29 2007-01-04 Cable-Lock Foundation pile having a spiral ridge and method of underpinning using same
US7618217B2 (en) 2003-12-15 2009-11-17 Henderson Allan P Post-tension pile anchor foundation and method therefor
US20070269273A1 (en) * 2003-12-15 2007-11-22 Henderson Allan P Post-tension pile anchor foundation and method therefor
EA008306B1 (en) * 2004-06-02 2007-04-27 Альберт Иванович Архипов Design of screw metal pile
US20070092339A1 (en) * 2005-10-20 2007-04-26 Gray Mullins Voided drilled shafts
US8206064B2 (en) * 2005-10-20 2012-06-26 University Of South Florida Voided drilled shafts
US20070286687A1 (en) * 2006-06-12 2007-12-13 Cesare Melegari Method and equipment for constructing micropiles in soil
US20080008539A1 (en) * 2006-07-05 2008-01-10 Con-Tech Systems Ltd. Void form for constructing post-tensioned foundation piles
US20080273928A1 (en) * 2007-05-03 2008-11-06 Lrm Industries, Llc Molded pile
US7517174B2 (en) 2007-05-03 2009-04-14 Lrm Industries, Llc Molded pile
US20100300752A1 (en) * 2009-06-01 2010-12-02 Massachusetts Institute Of Technology Method and apparatus for penetrating particulate substrates
US8496410B2 (en) 2009-06-01 2013-07-30 Massachusetts Institute Of Technology Method and apparatus for penetrating particulate substrates
RU2468148C2 (en) * 2011-01-21 2012-11-27 Государственное образовательное учреждение высшего профессионального образования "Саратовский государственный технический университет" (СГТУ) Device for formation of wells for filling piles
RU2456408C1 (en) * 2011-02-17 2012-07-20 Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" Method to erect pile foundation
EA020732B1 (en) * 2011-02-17 2015-01-30 Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" Method to erect pile foundation
US20130247693A1 (en) * 2011-09-28 2013-09-26 Hydrochina Huadong Engineering Corporation Method for Sampling Jointed Rock Mass
US8984967B2 (en) * 2011-09-28 2015-03-24 Powerchina Huadong Engineering Corporation Limited Method for sampling jointed rock mass
RU2489548C2 (en) * 2011-11-01 2013-08-10 Юрий Семенович Флягин Screw injection anchor pile
RU2571873C1 (en) * 2014-06-23 2015-12-27 Юрий Анатольевич Бровцин Screw pile in soil
RU2569654C1 (en) * 2014-06-23 2015-11-27 Юрий Анатольевич Бровцин Syringe-type screw pile
RU2570584C1 (en) * 2014-06-23 2015-12-10 Юрий Анатольевич Бровцин Screw pile
RU2571869C1 (en) * 2014-06-23 2015-12-27 Юрий Анатольевич Бровцин Screw pile in soil with detachable tip
RU2558832C1 (en) * 2014-06-23 2015-08-10 Юрий Анатольевич Бровцин Method to erect screw pile in soil
RU2603314C1 (en) * 2015-07-29 2016-11-27 Общество с ограниченной ответственностью "НПП СК МОСТ" Erection method of pile foundation for reinforcement
US11441288B2 (en) * 2017-09-20 2022-09-13 Innogy Se Pile and method of installing
RU2706499C1 (en) * 2018-07-26 2019-11-19 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Pile structure of pumping units foundation
US10738436B1 (en) 2019-02-15 2020-08-11 Montana Systems Inc. Tubular foundation for onshore wind turbine generators
RU192324U1 (en) * 2019-05-07 2019-09-12 Федеральное государственное бюджетное образовательное учреждение образования "Владимирский Государственный Университет имени Александра Григорьевича и Николая Григорьевича Столетовых" (ВлГУ) Screw pile
RU2804651C1 (en) * 2023-01-24 2023-10-03 Закрытое акционерное общество "Геотехника - С" Method for constructing bored pile in soil

Also Published As

Publication number Publication date
CA984165A (en) 1976-02-24
JPS49135408A (en) 1974-12-26

Similar Documents

Publication Publication Date Title
US3842608A (en) Method and means for installing load bearing piles in situ
US3354657A (en) Method for installing anchoring or supporting columns in situ
US3530675A (en) Method and means for stabilizing structural layer overlying earth materials in situ
US3962879A (en) Reinforced pile in earth situs and method of producing same
US3453832A (en) Cast-in-place casings for concrete piles
US3363422A (en) Method and apparatus for anchoring a tie-down bar in an earth situs
US3815368A (en) Method for installing concrete anchor piles in situ
WO2018210019A1 (en) Pile formation method for down-the-hole impact rotary jet composite piles
US3540225A (en) Construction pile and a method of producing same in situ
CN112746615B (en) Brine stratum mucky soil cast-in-place pile construction is with protecting a device
US2555359A (en) Pile structure and method of making same
WO1994002687A1 (en) Apparatus and method for forming piles
US3786641A (en) Means for stabilizing structural layer overlying earth materials in situ
CN106351585A (en) Hole collapse and shrinkage prevention bidirectional spiral extrusion and expansion drilling tool and construction technology thereof
CN108729440B (en) Spiral high-spraying wing-expanding stirring bottom-expanding stiffness composite pile, construction method thereof and drilling machine
US3512365A (en) Method of forming a pile in situ
US6120214A (en) Process for constructing reinforced subterranean columns
CN109183790A (en) A kind of Screw Pile and its construction tool and construction method
US3852971A (en) Pile structure
US3438212A (en) Apparatus for installing anchoring or supporting columns in situ
US3685303A (en) Means for stabilizing structural layer overlying earth materials in situ
JP4811176B2 (en) Construction method of ready-made piles
JP2782034B2 (en) Ground consolidation strengthening method
CN108049401A (en) A kind of screw thread rammed bulb pile and its construction method
US3254492A (en) Casting of piles in situ