US3898441A - Multiple computer system for operating a power plant turbine with manual backup capability - Google Patents

Multiple computer system for operating a power plant turbine with manual backup capability Download PDF

Info

Publication number
US3898441A
US3898441A US413271A US41327173A US3898441A US 3898441 A US3898441 A US 3898441A US 413271 A US413271 A US 413271A US 41327173 A US41327173 A US 41327173A US 3898441 A US3898441 A US 3898441A
Authority
US
United States
Prior art keywords
computer
control
turbine
computers
generating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US413271A
Inventor
Guy E Davis
Ray C Hoover
Iii William D Ghrist
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CBS Corp
Original Assignee
Westinghouse Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Westinghouse Electric Corp filed Critical Westinghouse Electric Corp
Priority to US413271A priority Critical patent/US3898441A/en
Priority to CA212,865A priority patent/CA1031419A/en
Priority to DE19742452168 priority patent/DE2452168A1/en
Priority to GB47571/74A priority patent/GB1486199A/en
Priority to CH1480974A priority patent/CH601848A5/xx
Priority to FR7436742A priority patent/FR2257953B1/fr
Priority to ES431639A priority patent/ES431639A1/en
Priority to IT29124/74A priority patent/IT1025442B/en
Priority to JP49127271A priority patent/JPS5074718A/ja
Priority to SE7413954A priority patent/SE422118B/en
Application granted granted Critical
Publication of US3898441A publication Critical patent/US3898441A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/16Error detection or correction of the data by redundancy in hardware
    • G06F11/20Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements
    • G06F11/202Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements where processing functionality is redundant
    • G06F11/2038Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements where processing functionality is redundant with a single idle spare processing component
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/16Error detection or correction of the data by redundancy in hardware
    • G06F11/20Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements
    • G06F11/2097Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements maintaining the standby controller/processing unit updated
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/16Error detection or correction of the data by redundancy in hardware
    • G06F11/20Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements
    • G06F11/202Error detection or correction of the data by redundancy in hardware using active fault-masking, e.g. by switching out faulty elements or by switching in spare elements where processing functionality is redundant
    • G06F11/2023Failover techniques
    • G06F11/2028Failover techniques eliminating a faulty processor or activating a spare

Definitions

  • the electric power plant including a steam generator and a steam turbine is operated by a control system including two redundant digital computers.
  • Switching circuitry is provided for coupling one of the comput ers through interface equipment to the steam genera tor and the turbine and a generator according to pro grammed computer control.
  • a data link is established between the computers to transfer manual/automatic status and other needed data from the control computer to the standby computer.
  • a system is provided for detecting when certain hardware and software malfunctions have occurred and for responsively transferring control to the standby computer.
  • the standby computer is tracked to the control computer so that Control computer transfer can be made reliably without disturbing the electric power generation pro cess.
  • Manual backup controls are provided for the steam generator and the steam turbine and the system is organized to transfer particular or all control loops to manual operation manually under operator selection or automatically in response to the existence of certain conditions. The capability for transfer to man ual control is interfaced with the computer transfer system.
  • PROCESS TRANSDUCER CONTROL 5 ET POINT BUMPLESS TRANSFER VALVE POSITION RESET CCID'S STATION 2 9 AUTO CONVERT ERR TO CCQ TIME CCO Tl MED OUTPUT DIGITAL SCAN ROUTlNE DEC INC

Abstract

The electric power plant including a steam generator and a steam turbine is operated by a control system including two redundant digital computers. Switching circuitry is provided for coupling one of the computers through interface equipment to the steam generator and the turbine and a generator according to programmed computer control. A data link is established between the computers to transfer manual/automatic status and other needed data from the control computer to the standby computer. A system is provided for detecting when certain hardware and software malfunctions have occurred and for responsively transferring control to the standby computer. The standby computer is tracked to the control computer so that control computer transfer can be made reliably without disturbing the electric power generation process. Manual backup controls are provided for the steam generator and the steam turbine and the system is organized to transfer particular or all control loops to manual operation manually under operator selection or automatically in response to the existence of certain conditions. The capability for transfer to manual control is interfaced with the computer transfer system.

Description

Davis et a1.
1 1 MULTIPLE COMPUTER SYSTEM FOR OPERATING A POWER PLANT TURBINE WITH MANUAL BACKUP CAPABILITY [75] Inventors: Guy E. Davis, Martinez, Calif.; Ray
C. Hoover, Murrysville; William D. Ghrist, III, Washington, both of Pa,
[73] Assignee: Westinghouse Electric Corporation,
Pittsburgh, Pa,
[22] Filed: Nov. 6, 1973 [2]] Appl. No.: 413,271
[52] US. Cl 235/l5l.21; 444/1; 290/40 R;
[51] Int. Cl... Fld 17/02; Gb /00; G06f 15/06 [58] FieldofSearch ..235/151.21, 151.3,151;
[56] References Cited UNITED STATES PATENTS 3,552,872 l/197l Giras et a1. 415/17 3,555,251 1/1971 Shavit 235/151 3,561,216 2/1971 Moore,Jr.,, 60/73 3,564,273 2/1971 Cockrell 415/17 X 3,588,265 6/1971 Berry 415/17 X OTHER PUBLICATIONS Application of the Prodac 50 System to Direct Digital Control, J. C. Belz, G. .1. Kirk & P, S. Radcliffe, IEEE Intl. Conv. Rec. Part 3, 1965, pp. 102-122. Monitoring and Automatic Control in Steam Power Stations by Process Computer, E. Doetsch & G.
Aug. 5, 1975 Hirschberg, Siemens Review XXXV (1968), No. 12, pp. 471476.
[5 7} ABSTRACT The electric power plant including a steam generator and a steam turbine is operated by a control system including two redundant digital computers. Switching circuitry is provided for coupling one of the comput ers through interface equipment to the steam genera tor and the turbine and a generator according to pro grammed computer control. A data link is established between the computers to transfer manual/automatic status and other needed data from the control computer to the standby computer. A system is provided for detecting when certain hardware and software malfunctions have occurred and for responsively transferring control to the standby computer. The standby computer is tracked to the control computer so that Control computer transfer can be made reliably without disturbing the electric power generation pro cess. Manual backup controls are provided for the steam generator and the steam turbine and the system is organized to transfer particular or all control loops to manual operation manually under operator selection or automatically in response to the existence of certain conditions. The capability for transfer to man ual control is interfaced with the computer transfer system.
17 Claims, 4] Drawing Figures POWER DETECTOR DETECTOR so SPEED oerzcnou SYSTEM 44 f 2 HYDRAU L 1C ACTUATOR 46 HYDRAULIC ACTUATORS as as ZSESTEE ONTROLLER 5 DUE TOR CONTROL STE M DEV CESI T AM [22 seuisnme SYSTEM I I i 1" 1 I l I l 1 I I I I l L l TV4 STEAM 1 t sP 5P I 8 1 THROTTLE GOVER VALVE ALv'E POSITION u POSITION CONTROLS CONTROLS I ,40 I 42 %%%l%d "am VALVE VALVE ACTUATORS ACTUATORS t g HIGH pnsssuac HYDRAULIC FLUID SUPPLY PATENTED AUG 5|975 SHEET FIG. IB.
STEAM TO HP TURBINE U L N F INAL RPEATEATE TUBES TO IP TURBINE FROM HP TURBINE FEEDWATER ECONOMIZER RE HE ATER TU BES COMBUSTION PRODUCTS R MO G PATENTEU AUG 5% DL OOUNT=|O DL COUNT= DL COUNT 1 CALL SDLYU) DO IO I= 1.10 FIRST=LOC1(I) LAST =LOC2(I) IO CALL DATLNK(5,2,F,L)
CALL SDLYU) DO 20 I =1.1O F|RST=LOC1LU LAST=LOC2(H 20 CALL DATLNK(5,I,F,L
FIG. 8.
P20001 IN CONTROL (READ MODE) PZOOO-Z TRACKING PZOOO-Z IN CONTROL (WRITE MODE) PZOOO-i TRACKING PATENTEU 5975 3, 898,441
SHEET 1 2 FTWAR324 (326 [328 Y NOT STOP 0 o CONTACTS 0R HARDWARE DEAD --TOGGLING;DEACTIVATE MA L I I gIQN OK Aux SYNC FIG.9
DEAD
OK END 224 PUT M/A STATION ON M OR A PER DATA LINKS I DEMAND COMPUTER STATUS COMPUTE R AVAILABLE REJE T T SET MANSAL 0 RETRANSFER FIG '2 {368 INHIBIT BID BOILER CHASIS AND TURBINE LOGIC CLOSE DEH SPEED LOOP IF OPEN DEH DEMAND CCI SCAN ,sao
PROCESS GO AND HOLD PANEL PB I (END) PATENTEUMIB 51% SHEET FIG. IO
PROCESS TRANSDUCER CONTROL 5 ET POINT BUMPLESS TRANSFER VALVE POSITION RESET CCID'S STATION 2 9 AUTO CONVERT ERR TO CCQ TIME CCO Tl MED OUTPUT DIGITAL SCAN ROUTlNE DEC INC
m ml
MECHANICAL LINKAGE MOTOR PATENTEUAUB 51915 Ell-EH midi moEH 9w; 00m WI 5m nI Mom w: mom
NI wom m: mom
PDOwQ j s ss mom of hOm :I mom N I mom QI 05 XI :m
m I N m mi Em CI

Claims (17)

1. A control system for an electric power plant having at least one steam turbine and a steam generator, said control system comprising multiple digital computers including at least a first digital computer and a second digital computer, means for generating input signals representing predetermined process variables associated with said steam generator, means for generating input signals representing predetermined process variables associated with said steam turbine, means for coupling the input signals to both of said computers, each of said computers including substantially identical means for generating control outputs for operating controllable elements of said steam generator and throttle and governor valves of said steam turbine as a function of the input signals, means for sensing predetermined control system malfunctions, means for coupling the outputs of one of said computers to operate the steam generator controllable elements and turbine valves, means for substantially conforming the structure of the other computer to the structure of said one computer in real time including means for generating control outputs in the other computer substantially equal to those from said one computer, means for executing a transfer in the control of the steam generator and the turbine from said one computer to said other computer substantially without disturbing the power generation when said sensing means detects a control system malfunction, means for manually controlling the steam generator controllable elements, means for manually controlling the steam turbine valves, and means for transferring control to said manual control means when both of said computers have malfunctioned.
2. A control system as set forth in claim 1 wherein means are provided for generating operator manual/automatic mode select signals and means are provided for coupling the operator select signals to said computers and said manual control means to implement the operator mode selection signals.
3. A control system as set forth in claim 1 wherein means are provided for generating a signal when the computer in control fails, a timing circuit is provided for generating a signal a predeterMined amount of delay time after the computer fail signal is generated and a computer transfer has been initiated if the computer coming into control has not generated a signal indicating the transfer has been completed and the turbine has not returned to automatic control, and means for transferring the control of the turbine from the computer coming into control to the turbine manual control if the timing circuit signal is generated.
4. A control system as set forth in claim 3 wherein means are provided for generating operator manual/automatic mode select signals and means are provided for coupling the operator select signals to said computers and said manual control means to implement the operator mode selection signals.
5. A control system as set forth in claim 3 wherein said other computer includes tracking controls for conforming predetermined ones of its control outputs to like outputs of said one computer, and the time delay is sufficient to allow the tracked control loops in said other computer to return to automatic control after a transfer to the other computer under normal operating conditions.
6. A control system as set forth in claim 1 wherein said structure conforming means includes an intercomputer data link and said malfunction sensing means detects data link malfunctions, and said computers include means for inhibiting a return to automatic computer control and instituting manual control when a computer transfer is initiated after a data link malfunction.
7. A plant for generating electric power comprising at least a steam generator and a steam turbine, a plurality of throttle and governor valves for directing steam from said steam generator to said turbine, and a control system having at least a first digital computer and a second digital computer, means for generating input signals representing predetermined process variables associated with said steam generator, means for generating input signals representing predetermined process variables associated with said steam turbine, means for coupling the input signals to both of said computers, each of said computers including substantially identical means for generating control outputs for operating controllable elements of said steam generator and throttle and governor valves of said steam turbine as a function of the input signals, means for sensing predetermined control system malfunctions, means for coupling the outputs of one of said computers to operate the steam generator controllable elements and turbine valves, means for substantially conforming the structure of the other computer to the structure of said one computer in real time including means for generating control outputs in the other computer substantially equal to those from said one computer, means for executing a transfer in the control of the steam generator and the turbine from said one computer to said other computer substantially without disturbing the power generation when said sensing means detects a control system malfunction, means for manually controlling the steam generator controllable elements, means for manually controlling the steam turbine valves, and means for transferring control to said manual control means when both of said computers have malfunctioned.
8. An electric power plant as set forth in claim 7 wherein means are provided for generating a signal when the computer in control fails, a timing circuit is provided for generating a signal a predetermined amount of delay time after the computer fail signal is generated and a computer transfer has been initiated if the computer coming into control has not generated a signal indicating the transfer has been completed and the turbine has not returned to automatic control, and means for transferring the control of the turbine from the computer coming into control to the turbine manual control if the timing circuit signal is generated.
9. A steam turbine system operative to receive motive steam and drive an electric generator and produce electric pOwer, said turbine comprising a plurality of turbine sections, a plurality of throttle and governor valves for directing steam through said turbine sections, and a control system including multiple digital computers including at least a first digital computer and a second digital computer, means for generating input signals representing predetermined process variables associated with said steam turbine, means for coupling the input signals to both of said computers, each of said computers including substantially identical means for generating control outputs for operating said throttle and governor valves of said steam turbine as a function of the input signals, means for sensing predetermined control system malfunctions, means for coupling the outputs of one of said computers to operate said steam turbine valves, means for substantially conforming the structure of the other computer to the structure of said one computer in real time including means for generating control outputs in the other computer substantially equal to those from said one computer, and means for executing a transfer in the control of the steam turbine from said one computer to said other computer substantially without disturbing the power generation when said sensing means detects a control system malfunction, means for manually controlling the steam generator controllable elements, means for manually controlling the steam turbine valves, and means for transferring control to said manual control means when both of said computers have malfunctioned.
10. A steam turbine system as set forth in claim 9 wherein said structure conforming means includes an intercomputer data link and said malfunction sensing means detects data link malfunctions, and said computers include means for inhibiting a return to automatic computer control and instituting manual control when a computer transfer is initiated after a data link malfunction.
11. A steam turbine system as set forth in claim 9 wherein means are provided for generating operator manual/automatic mode select signals and means are provided for coupling the operator select signals to said computers and said manual control means to implement the operator mode selection signals.
12. A steam turbine system as set forth in claim 9 wherein means are provided for generating a signal when the computer in control fails, a timing circuit is provided for generating a signal a predetermined amount of delay time after the computer fail signal is generated and a computer transfer has been initiated if the computer coming into control has not generated a signal indicating the transfer has been completed and the turbine has not returned to automatic control, and means for transferring the control of the turbine from the computer coming into control to the turbine manual control if the timing circuit signal is generated.
13. A steam turbine as set forth in claim 12 wherein said other computer includes tracking controls for conforming its predetermined ones of control outputs to like outputs of said one computer, and the time delay is sufficient to allow the tracked control loops in said other computer to return to automatic control after a transfer to the other computer under normal operating conditions.
14. A turbine operative to drive a generator and produce electric power, said turbine comprising a rotor structure coupled to the generator and driven by motive fluid, means for controlling the flow of turbine motive fluid, and a control system including multiple digital computers including at least a first digital computer and a second digital computer, means for generating input signals representing predetermined process variables associated with said turbine, means for coupling the input signals to both of said computers, each of said computers including substantially identical means for generating control outputs for operating said flow controlling means of said turbine as a function of the input signals, means for sensing predetermined control system malfuNctions, means for coupling the outputs of one of said computers to operate said flow controlling means, means for substantially conforming the structure of the other computer to the structure of said one computer in real time including means for generating control outputs in the other computer substantially equal to those from said one computer, and means for executing a transfer in the control of the turbine from said one computer to said other computer substantially without disturbing the power generation when said sensing means detects a control system malfunction, means for manually controlling the steam generator controllable elements, means for manually controlling the steam turbine valves, and means for transferring control to said manual control means when both of said computers have malfunctioned.
15. A turbine as set forth in claim 14 wherein means are provided for generating a signal when the computer in control fails, a timing circuit is provided for generating a signal a predetermined amount of delay time after the computer fail signal is generated and a computer transfer has been initiated if the computer coming into control has not generated a signal indicating the transfer has been completed and the turbine has not returned to automatic control, and means for transferring the control of the turbine from the computer coming into control to the turbine manual control if the timing circuit signal is generated.
16. A method for operating an electric power plant having at least a steam generator and a steam turbine and a control system which includes at least two digital computers, the steps of said method comprising generating input signals representing predetermined process variables associated with said steam generator, generating input signals representing predetermined process variables associated with said steam turbine, coupling the input signals to both of said computers, operating said computers with substantially identical programs to generate control outputs for operating controllable elements of said steam generator and throttle and governor valves of said steam turbine, sensing predetermined control system malfunctions, coupling the outputs of one of said computers to operate the steam generator and controllable elements and turbine valves, substantially conforming the structure of the other computer to that of the one computer in real time including generating control outputs in the other computer substantially equal to those from said one computer, and executing a transfer in the control of the steam generator and the turbine from said one computer to said other computer substantially without disturbing the power generation when a control system malfunction is detected, manually controlling the steam generator controllable elements and the steam turbine valves when both of said computers have malfunctioned.
17. A control system for a boiler comprising multiple digital computers including at least a first digital computer and a second digital computer, means for generating input signals representing predetermined process variables associated with said boiler, means for coupling the input signals to both of said computers, each of said computers including substantially identical means for generating control outputs for operating controllable elements of said boiler as a function of the input signals, means for sensing predetermined control system malfunctions, means for coupling the outputs of one of said computers to operate the boiler controllable elements, means for substantially conforming the structure of the other computer to the structure of said one computer in real time including means for generating control outputs in the other computer substantially equal to those from said one computer, and means for executing a transfer in the control of the boiler from said one computer to said other computer substantially without disturbing the boiler process when said sensing means detects a control system malfunction, means are provided fOr generating a signal when the computer in control fails, a timing circuit is provided for generating a signal a predetermined amount of delay time after the computer fail signal is generated and a computer transfer has been initiated if the computer coming into control has not generated a signal indicating the transfer has been completed and the boiler has not returned to automatic control and means for transferring the control of the boiler from the computer coming into control to the boiler manual controls.
US413271A 1973-11-06 1973-11-06 Multiple computer system for operating a power plant turbine with manual backup capability Expired - Lifetime US3898441A (en)

Priority Applications (10)

Application Number Priority Date Filing Date Title
US413271A US3898441A (en) 1973-11-06 1973-11-06 Multiple computer system for operating a power plant turbine with manual backup capability
CA212,865A CA1031419A (en) 1973-11-06 1974-11-01 Multiple computer system for operating a power plant turbine with manual backup capability
DE19742452168 DE2452168A1 (en) 1973-11-06 1974-11-02 ELECTRIC POWER PLANT WITH FIRST AND SECOND COMPUTER TO CONTROL YOUR OPERATING PROCEDURES
GB47571/74A GB1486199A (en) 1973-11-06 1974-11-04 Electric power plant having a multiple computer system for redundant control of turbine and steam generator operation
CH1480974A CH601848A5 (en) 1973-11-06 1974-11-05
FR7436742A FR2257953B1 (en) 1973-11-06 1974-11-05
ES431639A ES431639A1 (en) 1973-11-06 1974-11-05 Improvements introduced in an electrical power plant. (Machine-translation by Google Translate, not legally binding)
IT29124/74A IT1025442B (en) 1973-11-06 1974-11-05 THERMOELECTRIC STATION WITH A PLANT WITH MORE COMPUTERS FOR A REDUNDANT CONTROL OF THE OPERATION OF TURBINES AND STEAM GENERATORS
JP49127271A JPS5074718A (en) 1973-11-06 1974-11-06
SE7413954A SE422118B (en) 1973-11-06 1974-11-06 COMPUTER CONTROLLED ELECTRIC POWER PLANT WITH TWO COMPUTERS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US413271A US3898441A (en) 1973-11-06 1973-11-06 Multiple computer system for operating a power plant turbine with manual backup capability

Publications (1)

Publication Number Publication Date
US3898441A true US3898441A (en) 1975-08-05

Family

ID=23636571

Family Applications (1)

Application Number Title Priority Date Filing Date
US413271A Expired - Lifetime US3898441A (en) 1973-11-06 1973-11-06 Multiple computer system for operating a power plant turbine with manual backup capability

Country Status (2)

Country Link
US (1) US3898441A (en)
CA (1) CA1031419A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3978659A (en) * 1975-02-19 1976-09-07 Westinghouse Electric Corporation Bumpless transfer in shifting control command between the primary and backup control systems of a gas turbine power plant
US4161027A (en) * 1976-10-04 1979-07-10 Electric Power Research Institute, Inc. Digital protection system for transmission lines and associated power equipment
FR2452738A1 (en) * 1979-03-30 1980-10-24 Beckman Instruments Inc AUTOMATIC TRANSFER DEVICE AND METHOD FOR MULTIPLE VARIABLE CONTROL UNITS
US4368520A (en) * 1980-09-29 1983-01-11 Westinghouse Electric Corp. Steam turbine generator control system
US4486148A (en) * 1979-10-29 1984-12-04 Michigan Consolidated Gas Company Method of controlling a motive power and fluid driving system
US4635209A (en) * 1984-10-31 1987-01-06 Westinghouse Electric Corp. Overspeed protection control arrangement for a steam turbine generator control system
US20050228545A1 (en) * 2002-03-28 2005-10-13 Toshihiko Tanaka Electric power plant general control system
US20060178762A1 (en) * 2005-02-08 2006-08-10 Pegasus Technologies, Inc. Method and apparatus for optimizing operation of a power generating plant using artificial intelligence techniques
US20110131995A1 (en) * 2007-04-13 2011-06-09 Honeywell International Inc. Steam-generator temperature control and optimization
US20120040299A1 (en) * 2010-08-16 2012-02-16 Emerson Process Management Power & Water Solutions, Inc. Dynamic matrix control of steam temperature with prevention of saturated steam entry into superheater
US20120253479A1 (en) * 2011-03-31 2012-10-04 Brad Radl System and Method for Creating a Graphical Control Programming Environment
US8340824B2 (en) 2007-10-05 2012-12-25 Neuco, Inc. Sootblowing optimization for improved boiler performance
US20150107497A1 (en) * 2013-10-22 2015-04-23 Anthony Hughey Solid waste incinerator system
US9163828B2 (en) 2011-10-31 2015-10-20 Emerson Process Management Power & Water Solutions, Inc. Model-based load demand control
US9328633B2 (en) 2012-06-04 2016-05-03 General Electric Company Control of steam temperature in combined cycle power plant
US9335042B2 (en) 2010-08-16 2016-05-10 Emerson Process Management Power & Water Solutions, Inc. Steam temperature control using dynamic matrix control
US9447963B2 (en) 2010-08-16 2016-09-20 Emerson Process Management Power & Water Solutions, Inc. Dynamic tuning of dynamic matrix control of steam temperature
US10240775B2 (en) * 2016-07-29 2019-03-26 Emerson Process Management Power & Water Solutions, Inc. Multi-objective steam temperature control

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3552872A (en) * 1969-04-14 1971-01-05 Westinghouse Electric Corp Computer positioning control system with manual backup control especially adapted for operating steam turbine valves
US3555251A (en) * 1967-12-06 1971-01-12 Honeywell Inc Optimizing system for a plurality of temperature conditioning apparatuses
US3561216A (en) * 1969-03-19 1971-02-09 Gen Electric Thermal stress controlled loading of steam turbine-generators
US3564273A (en) * 1967-11-09 1971-02-16 Gen Electric Pulse width modulated control system with external feedback and mechanical memory
US3588265A (en) * 1968-04-19 1971-06-28 Westinghouse Electric Corp System and method for providing steam turbine operation with improved dynamics

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3564273A (en) * 1967-11-09 1971-02-16 Gen Electric Pulse width modulated control system with external feedback and mechanical memory
US3555251A (en) * 1967-12-06 1971-01-12 Honeywell Inc Optimizing system for a plurality of temperature conditioning apparatuses
US3588265A (en) * 1968-04-19 1971-06-28 Westinghouse Electric Corp System and method for providing steam turbine operation with improved dynamics
US3561216A (en) * 1969-03-19 1971-02-09 Gen Electric Thermal stress controlled loading of steam turbine-generators
US3552872A (en) * 1969-04-14 1971-01-05 Westinghouse Electric Corp Computer positioning control system with manual backup control especially adapted for operating steam turbine valves

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3978659A (en) * 1975-02-19 1976-09-07 Westinghouse Electric Corporation Bumpless transfer in shifting control command between the primary and backup control systems of a gas turbine power plant
US4161027A (en) * 1976-10-04 1979-07-10 Electric Power Research Institute, Inc. Digital protection system for transmission lines and associated power equipment
FR2452738A1 (en) * 1979-03-30 1980-10-24 Beckman Instruments Inc AUTOMATIC TRANSFER DEVICE AND METHOD FOR MULTIPLE VARIABLE CONTROL UNITS
US4276593A (en) * 1979-03-30 1981-06-30 Beckman Instruments, Inc. Transfer system for multi-variable control units
US4486148A (en) * 1979-10-29 1984-12-04 Michigan Consolidated Gas Company Method of controlling a motive power and fluid driving system
US4368520A (en) * 1980-09-29 1983-01-11 Westinghouse Electric Corp. Steam turbine generator control system
US4635209A (en) * 1984-10-31 1987-01-06 Westinghouse Electric Corp. Overspeed protection control arrangement for a steam turbine generator control system
US20050228545A1 (en) * 2002-03-28 2005-10-13 Toshihiko Tanaka Electric power plant general control system
US7146257B2 (en) * 2002-03-28 2006-12-05 Kabushiki Kaisha Toshiba Electric power plant general control system
US20060178762A1 (en) * 2005-02-08 2006-08-10 Pegasus Technologies, Inc. Method and apparatus for optimizing operation of a power generating plant using artificial intelligence techniques
US7584024B2 (en) * 2005-02-08 2009-09-01 Pegasus Technologies, Inc. Method and apparatus for optimizing operation of a power generating plant using artificial intelligence techniques
US20110131995A1 (en) * 2007-04-13 2011-06-09 Honeywell International Inc. Steam-generator temperature control and optimization
US8973535B2 (en) * 2007-04-13 2015-03-10 Honeywell International Inc. Steam-generator temperature control and optimization
US8498746B2 (en) 2007-10-05 2013-07-30 Neuco, Inc. Sootblowing optimization for improved boiler performance
US8340824B2 (en) 2007-10-05 2012-12-25 Neuco, Inc. Sootblowing optimization for improved boiler performance
US20120040299A1 (en) * 2010-08-16 2012-02-16 Emerson Process Management Power & Water Solutions, Inc. Dynamic matrix control of steam temperature with prevention of saturated steam entry into superheater
US9217565B2 (en) * 2010-08-16 2015-12-22 Emerson Process Management Power & Water Solutions, Inc. Dynamic matrix control of steam temperature with prevention of saturated steam entry into superheater
US9335042B2 (en) 2010-08-16 2016-05-10 Emerson Process Management Power & Water Solutions, Inc. Steam temperature control using dynamic matrix control
US9447963B2 (en) 2010-08-16 2016-09-20 Emerson Process Management Power & Water Solutions, Inc. Dynamic tuning of dynamic matrix control of steam temperature
US20120253479A1 (en) * 2011-03-31 2012-10-04 Brad Radl System and Method for Creating a Graphical Control Programming Environment
US9058029B2 (en) * 2011-03-31 2015-06-16 Brad Radl System and method for creating a graphical control programming environment
US9163828B2 (en) 2011-10-31 2015-10-20 Emerson Process Management Power & Water Solutions, Inc. Model-based load demand control
US10190766B2 (en) 2011-10-31 2019-01-29 Emerson Process Management Power & Water Solutions, Inc. Model-based load demand control
US9328633B2 (en) 2012-06-04 2016-05-03 General Electric Company Control of steam temperature in combined cycle power plant
US20150107497A1 (en) * 2013-10-22 2015-04-23 Anthony Hughey Solid waste incinerator system
US10240775B2 (en) * 2016-07-29 2019-03-26 Emerson Process Management Power & Water Solutions, Inc. Multi-objective steam temperature control

Also Published As

Publication number Publication date
CA1031419A (en) 1978-05-16

Similar Documents

Publication Publication Date Title
US3898441A (en) Multiple computer system for operating a power plant turbine with manual backup capability
US4029952A (en) Electric power plant having a multiple computer system for redundant control of turbine and steam generator operation
CA1046140A (en) System for manually or automatically transferring control between computers without power generation disturbance in an electric power plant or steam turbine operated by a multiplecomputer control system
US3875384A (en) Protection system for transferring turbine and steam generator operation to a backup mode especially adapted for multiple computer electric power plant control systems
EP0322141B1 (en) Dual computer cross-checking system
US3630839A (en) System and method for operating a boiling water reactor-steam turbine plant
JPS6122803B2 (en)
US4635209A (en) Overspeed protection control arrangement for a steam turbine generator control system
CA1082057A (en) Boiler feed water pump control systems
US4053746A (en) System and method for operating a steam turbine with digital computer control having integrator limit
US4053747A (en) System for initializing a backup computer in a multiple computer electric power plant and turbine control system to provide turbine and plant operation with reduced time for backup computer availability
US5557545A (en) Automatic control for a power plant
US4205380A (en) System and method for operating a steam turbine with digital computer control with accelerating setpoint change
US3931503A (en) System for operating a boiling water reactor steam turbine power plant utilizing dual analog throttle pressure controllers
US4037088A (en) Wide load range system for transferring turbine or plant operation between computers in a multiple computer turbine and power plant control system
US4036011A (en) Multiple valve sequential control for a combined cycle power plant
US4554788A (en) Turbine valve control system
US3948054A (en) Steam turbine blade protection system and method especially for electric power plants
US3934128A (en) System and method for operating a steam turbine with improved organization of logic and other functions in a sampled data control
US4053745A (en) Valve contingency detection system for a turbine power plant
GB2226423A (en) Control system for a gas turbine engine
JPS61170802A (en) Autonomous distribution type control device
Hirata et al. Computerized Automatic Start-Up Control for Boiling Water Reactor Nuclear Power Plants
JP2999122B2 (en) Control equipment for complex plant
JPS6357801B2 (en)