US5207271A - Foam/steam injection into a horizontal wellbore for multiple fracture creation - Google Patents

Foam/steam injection into a horizontal wellbore for multiple fracture creation Download PDF

Info

Publication number
US5207271A
US5207271A US07/784,956 US78495691A US5207271A US 5207271 A US5207271 A US 5207271A US 78495691 A US78495691 A US 78495691A US 5207271 A US5207271 A US 5207271A
Authority
US
United States
Prior art keywords
steam
wellbore
fracture
foam
formation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US07/784,956
Inventor
J. Michael Sanchez
Bassem R. Alameddine
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ExxonMobil Oil Corp
Original Assignee
Mobil Oil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mobil Oil Corp filed Critical Mobil Oil Corp
Priority to US07/784,956 priority Critical patent/US5207271A/en
Assigned to MOBIL OIL CORPORATION A CORPORATION OF NEW YORK reassignment MOBIL OIL CORPORATION A CORPORATION OF NEW YORK ASSIGNMENT OF ASSIGNORS INTEREST. Assignors: ALAMEDDINE, BASSEM R., SANCHEZ, J. MICHAEL
Application granted granted Critical
Publication of US5207271A publication Critical patent/US5207271A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/2405Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection in association with fracturing or crevice forming processes
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/261Separate steps of (1) cementing, plugging or consolidating and (2) fracturing or attacking the formation

Definitions

  • This invention relates to a foam/steam method for producing viscous petroleum crude from a formation penetrated by a horizontal wellbore. More particularly, it is directed to a method for treating a subsurface permeable formation so as to create additional fractures along a horizontal wellbore during a foam/steam injection process to improve the efficiency for the removal of said crude.
  • Hydraulic fracturing with foam fluids or "foam fracturing” is described in U.S. Pat. No. 3,937,283. This process involves the generation of a foam of a desired quality. Various gases and liquids may be used to create the foam, but the usual foams are made from nitrogen or carbon dioxide and water in the presence of a suitable foaming agent. The foam is pumped into the formation at a temperature and pressure sufficient to cause a fracture in the subterranean formation.
  • Fracturing caused by a foam fracturing process is effective and has advantages over the known prior art methods. For example, foam fracturing can be carried out without significant fluid loss in comparison to treatments utilizing unfoamed liquids. Additionally, foam comes out of the well easily when pressure is removed from the wellhead, because of the expansion of the foam when the pressure is released.
  • a gelled foam fluid is injected into a wellbore under sufficient pressure to create at least one fracture in a subterranean formation.
  • An additional quantity is pumped into the formation after creation of the fracture to extend the length of the fracture.
  • pressure applied to the fluid is reduced whereby said foam is caused to collapse and deposit into the fracture a particulate present in the fluid thereby propping the fracture.
  • a foamable composition is injected into a horizontal wellbore in an admixture with steam injection so as to cause a foam to form in the wellbore.
  • the foam then enters an existing fracture or a created fracture.
  • steam injection pressure causes the foam to enter a fracture and close off that fracture thereby precluding additional steam entry into said fracture. Closing off the fracture by the foam causes an increase in steam pressure within the horizontal wellbore which causes another fracture to form at a different interval along said wellbore.
  • Foam injection is ceased while steam injection continues for heating formation or reservoir area adjacent to the fracture. Once the area has been heated to the extent desired, steam injection is ceased and hydrocarbonaceous fluids removed from that area.
  • the foam and steam injection process can be recommenced so as to close that fracture with foam. Closing that fracture with foam causes the foam to move to a different interval in the wellbore and create another fracture. This process can be continued until the formation encompassing the horizontal wellbore has been fractured and depleted of the desired volume of hydrocarbonaceous fluids.
  • the wellbore can be fractured to the extent desired along the wellbore until such time as it is desired to initiate a thermal or steam injection process so as to remove hydrocarbonaceous fluids from the wellbore.
  • FIG. 1 is a schematic drawing which shows the formation of a reservoir fracture via steam injection.
  • FIG. 2 is a schematic drawing of a horizontal wellbore wherein a fracture has been produced and subsequently filled with foam thereby creating a second fracture along the wellbore.
  • FIG. 3 is a schematic representation of a wellbore penetrating a formation wherein two fractures have been formed and filled with foam, thereby causing a third fracture to be created.
  • steam and foam are coinjected into a horizontal wellbore which penetrates a hydrocarbonaceous fluid containing formation or reservoir.
  • foam and steam enter the wellbore at pressure above the fracturing pressure of the formation, a fracture is created along the horizontal wellbore into the formation.
  • Foam then enters the created fracture, thereby filling it.
  • fracturing pressure in the wellbore begins to increase due to increased flow resistance in the first fracture, thereby creating a second fracture.
  • FIG. 1 This is shown in FIG. 1 wherein steam and foam enter injection tubing 14 located within the closed wellbore which has penetrated overburden 10 and an oil or hydrocarboneaceous fluid containing zone 12.
  • a first fracture 16 forms along the horizontal wellbore.
  • the fracture which forms is a function of the overburden pressure as well as other pressures within the formation.
  • the pressures existing therein will be such as to create vertical fractures which will most likely form perpendicular to the horizontal well.
  • Methods for fracturing a formation where foams have been used are known to those skilled in the art.
  • One such method is disclosed by Conway et al. in U.S. Pat. No. 4,453,596. This patent is hereby incorporated by reference herein.
  • first fracture 16 and heated zone 18 are created around fracture 16. As shown in FIG. 2, foam continues to enter first fracture 16 and foam 20 begins to fill fracture 16 and heated zone 18, thereby blocking that zone. Once first fracture 16 and heated zone 18 have been filled with foam and steam, pressure within the wellbore begins to rise due to increased flow resistance in first fracture 16. As the pressure continues to rise, another fracture 16 is formed at a different internal along the horizontal wellbore. Perforations (not shown) can be made along horizontal the wellbore to control where fracturing occurs.
  • Thermally stable surfactant systems such as comprising linear toluene sulfonates are commercially available. These surfactant systems can satisfy the requirements of foam stability at high temperatures of about 450° F.
  • One such system which can be utilized herein is Chaser ®SD1020 stable surfactant which is marketed by Chevron. This formulation contains 0.5 wt. % of active surfactant which is injected with water to make steam. Additionally, it contains about 0.5 to 0.17 mole fraction nitrogen when mixed with steam of 88% quality.
  • Another stable surfactant system which can be used herein is marketed by Shell under the trade name LTS ®18. When making foam for injection with the steam in this process, 0.5 wt.
  • % of the active surfactant is placed into water which will be used to make the steam.
  • the steam is mixed with 0.05 to about 0.17 mole fraction of nitrogen.
  • the steam which is injected along with the surfactant has a steam quality of about 80%.
  • the method as disclosed by Hutchinson in U.S. Pat. No. 4,470,462 can be used to inject a particulate matter along with the foam and steam. Once the particulate matter and foam enter the formation, a propped fracture is formed once the foam collapses.
  • steam can be injected along the with the foam and a first fracture made. Pressure can then be released on the formation thereby causing the foam to collapse. Thereafter, steam alone can be injected into the formation so as to heat the formation through the fracture which was formed. Hydrocarbonaceous fluids can then be removed from the formation, and produced to the surface. Thereafter, foam and steam can be injected into the formation, thereby closing the first formed fracture and creating a second fracture. Steam can then be injected into the second fracture while foam precludes steam entry into the first fracture.

Abstract

A foam/steam injection method for forming fractures is a for reservoir penetrated by a horizontal wellbore. Steam is injected into said wellbore at a pressure sufficient to fracture the formation. Water which is used to make the steam contains a foamable composition in an amount sufficient to make a foam upon contact with steam. Steam and foam enter the wellbore and create a fracture in an oil-rich zone. Thereafter, foam blocks further steam entry into the created fracture which causes another fracture to form at a second interval along the horizontal wellbore. These steps are repeated until a fracture system is made along the length of the wellbore.

Description

FIELD OF THE INVENTION
This invention relates to a foam/steam method for producing viscous petroleum crude from a formation penetrated by a horizontal wellbore. More particularly, it is directed to a method for treating a subsurface permeable formation so as to create additional fractures along a horizontal wellbore during a foam/steam injection process to improve the efficiency for the removal of said crude.
BACKGROUND OF THE INVENTION
Hydraulic fracturing with foam fluids or "foam fracturing" is described in U.S. Pat. No. 3,937,283. This process involves the generation of a foam of a desired quality. Various gases and liquids may be used to create the foam, but the usual foams are made from nitrogen or carbon dioxide and water in the presence of a suitable foaming agent. The foam is pumped into the formation at a temperature and pressure sufficient to cause a fracture in the subterranean formation.
Fracturing caused by a foam fracturing process is effective and has advantages over the known prior art methods. For example, foam fracturing can be carried out without significant fluid loss in comparison to treatments utilizing unfoamed liquids. Additionally, foam comes out of the well easily when pressure is removed from the wellhead, because of the expansion of the foam when the pressure is released.
In fracturing operations, as disclosed by Conway et al. in U.S. Pat. No. 4,453,596, a gelled foam fluid is injected into a wellbore under sufficient pressure to create at least one fracture in a subterranean formation. An additional quantity is pumped into the formation after creation of the fracture to extend the length of the fracture. Thereafter, pressure applied to the fluid is reduced whereby said foam is caused to collapse and deposit into the fracture a particulate present in the fluid thereby propping the fracture.
Long horizontal wells are increasingly becoming common in steam operations in heavy oil reservoirs. Non-uniform distribution of heat due to reservoir heterogeneities and pressure drop within the well, commonly results in poor oil production.
Therefore, what is needed is a foam/steam injection method for fracturing a formation containing a horizontal wellbore so as to obtain sequential fractures along its length and uniform heating along said wellbore.
SUMMARY
In the practice of this invention, a foamable composition is injected into a horizontal wellbore in an admixture with steam injection so as to cause a foam to form in the wellbore. The foam then enters an existing fracture or a created fracture. Once foam has entered into the wellbore, steam injection pressure causes the foam to enter a fracture and close off that fracture thereby precluding additional steam entry into said fracture. Closing off the fracture by the foam causes an increase in steam pressure within the horizontal wellbore which causes another fracture to form at a different interval along said wellbore. Foam injection is ceased while steam injection continues for heating formation or reservoir area adjacent to the fracture. Once the area has been heated to the extent desired, steam injection is ceased and hydrocarbonaceous fluids removed from that area. The foam and steam injection process can be recommenced so as to close that fracture with foam. Closing that fracture with foam causes the foam to move to a different interval in the wellbore and create another fracture. This process can be continued until the formation encompassing the horizontal wellbore has been fractured and depleted of the desired volume of hydrocarbonaceous fluids.
Alternatively, the wellbore can be fractured to the extent desired along the wellbore until such time as it is desired to initiate a thermal or steam injection process so as to remove hydrocarbonaceous fluids from the wellbore.
It is therefore an object of this invention to form multiple fractures along a horizontal wellbore so as to contact a reservoir's pay zone and obtain more efficient reservoir heating for the removal of hydrocarbonaceous fluids.
It is another object of this invention to form a series of perpendicular fractures along the length of a horizontal wellbore by coinjecting steam and foam at formation fracturing pressures.
It is still yet another object of this invention to have a process for forming multiple fractures along a horizontal wellbore either continuously or cyclically via a foam/steam injection fracturing method.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1 is a schematic drawing which shows the formation of a reservoir fracture via steam injection.
FIG. 2 is a schematic drawing of a horizontal wellbore wherein a fracture has been produced and subsequently filled with foam thereby creating a second fracture along the wellbore.
FIG. 3 is a schematic representation of a wellbore penetrating a formation wherein two fractures have been formed and filled with foam, thereby causing a third fracture to be created.
DESCRIPTION OF THE PREFERRED EMBODIMENTS
In the practice of this invention, steam and foam are coinjected into a horizontal wellbore which penetrates a hydrocarbonaceous fluid containing formation or reservoir. As the foam and steam enter the wellbore at pressure above the fracturing pressure of the formation, a fracture is created along the horizontal wellbore into the formation. Foam then enters the created fracture, thereby filling it. Once the fracture has been filled with foam, fracturing pressure in the wellbore begins to increase due to increased flow resistance in the first fracture, thereby creating a second fracture.
This is shown in FIG. 1 wherein steam and foam enter injection tubing 14 located within the closed wellbore which has penetrated overburden 10 and an oil or hydrocarboneaceous fluid containing zone 12. As pressure increases within the horizontal wellbore, a first fracture 16 forms along the horizontal wellbore. As those skilled in the art will recognize, the fracture which forms is a function of the overburden pressure as well as other pressures within the formation. However, it is anticipated that at the depths which the horizontal wellbore will penetrate an oil-rich zone 12, the pressures existing therein will be such as to create vertical fractures which will most likely form perpendicular to the horizontal well. Methods for fracturing a formation where foams have been used are known to those skilled in the art. One such method is disclosed by Conway et al. in U.S. Pat. No. 4,453,596. This patent is hereby incorporated by reference herein.
While foam and steam are entering fracture 16, a heated zone 18 is created around fracture 16. As shown in FIG. 2, foam continues to enter first fracture 16 and foam 20 begins to fill fracture 16 and heated zone 18, thereby blocking that zone. Once first fracture 16 and heated zone 18 have been filled with foam and steam, pressure within the wellbore begins to rise due to increased flow resistance in first fracture 16. As the pressure continues to rise, another fracture 16 is formed at a different internal along the horizontal wellbore. Perforations (not shown) can be made along horizontal the wellbore to control where fracturing occurs.
Steam and foam are continuously injected into injection tubing 14 so as to form first, second and third fractures. The creation of these additional fracture is shown in FIG. 3. These fractures are formed by repeating the process as mentioned above until a desired number of fractures have been created.
Methods for making and utilizing foam are disclosed in U.S. Pat. Nos. 4,453,596, 4,470,462, and 3,993,133 which issued to Conway et al, on Jun. 12, 1984, Hutchinson on Sep. 11, 1984, and Clampitt on Nov. 23, 1976, respectively. A steam foam process is disclosed by Muijs et al, in U.S. Pat. No. 4,693,311 which issued on Sep. 15, 1987. These patents are hereby incorporated by reference herein.
Thermally stable surfactant systems such as comprising linear toluene sulfonates are commercially available. These surfactant systems can satisfy the requirements of foam stability at high temperatures of about 450° F. One such system which can be utilized herein is Chaser ®SD1020 stable surfactant which is marketed by Chevron. This formulation contains 0.5 wt. % of active surfactant which is injected with water to make steam. Additionally, it contains about 0.5 to 0.17 mole fraction nitrogen when mixed with steam of 88% quality. Another stable surfactant system which can be used herein is marketed by Shell under the trade name LTS ®18. When making foam for injection with the steam in this process, 0.5 wt. % of the active surfactant is placed into water which will be used to make the steam. During the injection period, the steam is mixed with 0.05 to about 0.17 mole fraction of nitrogen. The steam which is injected along with the surfactant has a steam quality of about 80%.
Should it be desired to prop the formation, the method as disclosed by Hutchinson in U.S. Pat. No. 4,470,462 can be used to inject a particulate matter along with the foam and steam. Once the particulate matter and foam enter the formation, a propped fracture is formed once the foam collapses.
In another embodiment, instead of continuously coinjecting foam and steam together into the wellbore to form a number of fractures uninterruptedly, steam can be injected along the with the foam and a first fracture made. Pressure can then be released on the formation thereby causing the foam to collapse. Thereafter, steam alone can be injected into the formation so as to heat the formation through the fracture which was formed. Hydrocarbonaceous fluids can then be removed from the formation, and produced to the surface. Thereafter, foam and steam can be injected into the formation, thereby closing the first formed fracture and creating a second fracture. Steam can then be injected into the second fracture while foam precludes steam entry into the first fracture. Coinjection of foam with steam is then ceased and steam injection along is continued into the second foam fracture until the area or zone around that fracture is heated to a desired temperature sufficient to remove hydrocarbonaceous fluids or oil from the zone of interest. Hydrocarbonaceous fluids or oil are then produced to the surface by the wellbore. These steps can be repeated until fractures have been formed along the horizontal wellbore to the extent desired and hydrocarbonaceous fluids removed from the zones adjacent to said wellbore.
Although the present invention has been described with preferred embodiments, it is to be understood that modifications and variations may be resorted to without departing from the spirit and scope of this invention as those skilled in the art will readily understand. Such modifications and variations are considered to be within the purview and scope of the appended claims.

Claims (9)

What is claimed:
1. A foam and steam injection method for forming a fracture in a formation or reservoir penetrated by a horizontal wellbore comprising:
a) injecting steam into said wellbore at a pressure sufficient to fracture said formation where water used to form said steam contains a foamable composition in an amount sufficient to make a foam upon contact with said steam; and
b) fracturing said formation with said steam and foam thereby causing a fracture to form whereupon the foam enters said fracture thereby precluding further steam entry into said fracture.
2. The method as recited in claim 1 where steps a) and b) are repeated without releasing fracturing pressure until a desired number of fractures have been formed along said wellbore.
3. The method as recited in claim 1 where a particular matter is placed into said foamable composition which matter is deposited into said fracture thereby propping it when pressure is released on the wellbore.
4. The method as recited in claim 1 where said foamable composition comprises a gel and a surfactant.
5. The method as recited in claim 1 where steps a) and b) are repeated after releasing fracturing pressure on said wellbore until a desired number of fractures have been formed along said wellbore.
6. The method as recited in claim 1 where steps a) and b) are repeated after releasing fracturing pressure on said wellbore until a desired number of fractures have been formed along said wellbore, the formation heated, and a desired volume of hydrocarbonaceous fluids are removed from the formation.
7. A steam and foam injection method for forming multiple fractures in a formation or reservoir penetrated by a horizontal wellbore comprising:
a) injecting steam into said wellbore at a rate and pressure sufficient to fracture said formation;
b) allowing said steam to remain in said formation for a time sufficient to heat hydrocarbonaceous fluids therein via a fracture resultant from step a) so as to cause said fluids to flow from said formation into said wellbore;
c) removing said fluids from said wellbore to the surface;
d) thereafter injecting steam into said formation via said wellbore at a pressure sufficient to fracture said formation where water used to form said steam contains a foamable composition in an amount sufficient to make a foam upon contact with said steam; and
e) causing said steam and foam to enter the fracture thereby blocking it against further steam entry whereupon said steam and foam cause a fracture to form at a different interval along said wellbore.
8. The method as recited in claim 7 where after step e), steps c(, d), and e) are repeated until a desired volume of hydrocarbonaceous fluids have been removed from said formation.
9. A foam and steam injection method for forming multiple fractures in a formation or reservoir penetrated by a horizontal wellbore comprising:
a) injecting steam into said wellbore at a pressure sufficient to fracture said formation where water used to make said steam contains a foamable composition in an amount sufficient to make a foam upon contact with said steam where thereafter said foam enters an existing fracture, thereby precluding further steam entry therein which causes another fracture to form at another interval along said wellbore.
US07/784,956 1991-10-30 1991-10-30 Foam/steam injection into a horizontal wellbore for multiple fracture creation Expired - Lifetime US5207271A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US07/784,956 US5207271A (en) 1991-10-30 1991-10-30 Foam/steam injection into a horizontal wellbore for multiple fracture creation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US07/784,956 US5207271A (en) 1991-10-30 1991-10-30 Foam/steam injection into a horizontal wellbore for multiple fracture creation

Publications (1)

Publication Number Publication Date
US5207271A true US5207271A (en) 1993-05-04

Family

ID=25134051

Family Applications (1)

Application Number Title Priority Date Filing Date
US07/784,956 Expired - Lifetime US5207271A (en) 1991-10-30 1991-10-30 Foam/steam injection into a horizontal wellbore for multiple fracture creation

Country Status (1)

Country Link
US (1) US5207271A (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5314020A (en) * 1992-09-11 1994-05-24 Mobil Oil Corporation Technique for maximizing effectiveness of fracturing in massive intervals
US5626193A (en) * 1995-04-11 1997-05-06 Elan Energy Inc. Single horizontal wellbore gravity drainage assisted steam flooding process
US6216786B1 (en) * 1998-06-08 2001-04-17 Atlantic Richfield Company Method for forming a fracture in a viscous oil, subterranean formation
US20020096336A1 (en) * 1998-11-20 2002-07-25 Zupanick Joseph A. Method and system for surface production of gas from a subterranean zone
US20040050554A1 (en) * 2002-09-17 2004-03-18 Zupanick Joseph A. Accelerated production of gas from a subterranean zone
US20040108110A1 (en) * 1998-11-20 2004-06-10 Zupanick Joseph A. Method and system for accessing subterranean deposits from the surface and tools therefor
US20070068674A1 (en) * 2005-09-23 2007-03-29 Alberta Research Council, Inc. Toe-To-Heel Waterflooding With Progressive Blockage Of The Toe Region
US7360595B2 (en) * 2002-05-08 2008-04-22 Cdx Gas, Llc Method and system for underground treatment of materials
US20090229826A1 (en) * 2004-12-02 2009-09-17 East Jr Loyd E Hydrocarbon Sweep into Horizontal Transverse Fractured Wells
WO2010009025A2 (en) * 2008-07-14 2010-01-21 Services Petroliers Schlumberger Fracturing method for subterranean reservoirs
US8297350B2 (en) 1998-11-20 2012-10-30 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface
US8376039B2 (en) 1998-11-20 2013-02-19 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface and tools therefor
US8434568B2 (en) 1998-11-20 2013-05-07 Vitruvian Exploration, Llc Method and system for circulating fluid in a well system
WO2013074329A1 (en) * 2011-11-15 2013-05-23 Schlumberger Canada Limited System and method for performing treatments to provide multiple fractures
EP2998503A3 (en) * 2014-09-22 2016-06-22 John Edward Vandigriff Fracturing of shale and oil sands using a clean processing system and method
CN107246258A (en) * 2017-07-24 2017-10-13 新疆国利衡清洁能源科技有限公司 A kind of peupendicular hole insertion method and pass-through facility
CN108518214A (en) * 2018-04-12 2018-09-11 中北大学 A kind of rock high-temperature high-pressure overheat steam control crushing test method
US10851632B2 (en) 2013-01-08 2020-12-01 Conocophillips Company Heat scavenging method for thermal recovery process
WO2021126306A1 (en) * 2019-12-19 2021-06-24 Halliburton Energy Services, Inc. Method and system to non-intrusively determine properties of deposit in a fluidic channel

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3739852A (en) * 1971-05-10 1973-06-19 Exxon Production Research Co Thermal process for recovering oil
US3937283A (en) * 1974-10-17 1976-02-10 The Dow Chemical Company Formation fracturing with stable foam
US3993133A (en) * 1975-04-18 1976-11-23 Phillips Petroleum Company Selective plugging of formations with foam
US4445573A (en) * 1982-11-04 1984-05-01 Thermal Specialties Inc. Insulating foam steam stimulation method
US4453596A (en) * 1983-02-14 1984-06-12 Halliburton Company Method of treating subterranean formations utilizing foamed viscous fluids
US4470462A (en) * 1981-08-03 1984-09-11 Chevron Research Company Foam and particulate material with steam for permeability alteration in subsurface formations
US4665982A (en) * 1986-06-26 1987-05-19 Brown Billy R Formation fracturing technique using liquid proppant carrier followed by foam
US4951751A (en) * 1989-07-14 1990-08-28 Mobil Oil Corporation Diverting technique to stage fracturing treatments in horizontal wellbores
US5005645A (en) * 1989-12-06 1991-04-09 Mobil Oil Corporation Method for enhancing heavy oil production using hydraulic fracturing
US5074360A (en) * 1990-07-10 1991-12-24 Guinn Jerry H Method for repoducing hydrocarbons from low-pressure reservoirs
US5085276A (en) * 1990-08-29 1992-02-04 Chevron Research And Technology Company Production of oil from low permeability formations by sequential steam fracturing

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3739852A (en) * 1971-05-10 1973-06-19 Exxon Production Research Co Thermal process for recovering oil
US3937283A (en) * 1974-10-17 1976-02-10 The Dow Chemical Company Formation fracturing with stable foam
US3993133A (en) * 1975-04-18 1976-11-23 Phillips Petroleum Company Selective plugging of formations with foam
US4470462A (en) * 1981-08-03 1984-09-11 Chevron Research Company Foam and particulate material with steam for permeability alteration in subsurface formations
US4445573A (en) * 1982-11-04 1984-05-01 Thermal Specialties Inc. Insulating foam steam stimulation method
US4453596A (en) * 1983-02-14 1984-06-12 Halliburton Company Method of treating subterranean formations utilizing foamed viscous fluids
US4665982A (en) * 1986-06-26 1987-05-19 Brown Billy R Formation fracturing technique using liquid proppant carrier followed by foam
US4951751A (en) * 1989-07-14 1990-08-28 Mobil Oil Corporation Diverting technique to stage fracturing treatments in horizontal wellbores
US5005645A (en) * 1989-12-06 1991-04-09 Mobil Oil Corporation Method for enhancing heavy oil production using hydraulic fracturing
US5074360A (en) * 1990-07-10 1991-12-24 Guinn Jerry H Method for repoducing hydrocarbons from low-pressure reservoirs
US5085276A (en) * 1990-08-29 1992-02-04 Chevron Research And Technology Company Production of oil from low permeability formations by sequential steam fracturing

Cited By (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5314020A (en) * 1992-09-11 1994-05-24 Mobil Oil Corporation Technique for maximizing effectiveness of fracturing in massive intervals
US5626193A (en) * 1995-04-11 1997-05-06 Elan Energy Inc. Single horizontal wellbore gravity drainage assisted steam flooding process
US6216786B1 (en) * 1998-06-08 2001-04-17 Atlantic Richfield Company Method for forming a fracture in a viscous oil, subterranean formation
US8511372B2 (en) 1998-11-20 2013-08-20 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface
US20040108110A1 (en) * 1998-11-20 2004-06-10 Zupanick Joseph A. Method and system for accessing subterranean deposits from the surface and tools therefor
US8376039B2 (en) 1998-11-20 2013-02-19 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface and tools therefor
US8376052B2 (en) 1998-11-20 2013-02-19 Vitruvian Exploration, Llc Method and system for surface production of gas from a subterranean zone
US9551209B2 (en) 1998-11-20 2017-01-24 Effective Exploration, LLC System and method for accessing subterranean deposits
US20080060571A1 (en) * 1998-11-20 2008-03-13 Cdx Gas, Llc. Method and system for accessing subterranean deposits from the surface and tools therefor
US8469119B2 (en) 1998-11-20 2013-06-25 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface and tools therefor
US8464784B2 (en) 1998-11-20 2013-06-18 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface and tools therefor
US8813840B2 (en) 1998-11-20 2014-08-26 Efective Exploration, LLC Method and system for accessing subterranean deposits from the surface and tools therefor
US20020096336A1 (en) * 1998-11-20 2002-07-25 Zupanick Joseph A. Method and system for surface production of gas from a subterranean zone
US8291974B2 (en) 1998-11-20 2012-10-23 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface and tools therefor
US8297350B2 (en) 1998-11-20 2012-10-30 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface
US8297377B2 (en) 1998-11-20 2012-10-30 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface and tools therefor
US8316966B2 (en) 1998-11-20 2012-11-27 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface and tools therefor
US8505620B2 (en) 1998-11-20 2013-08-13 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface and tools therefor
US8371399B2 (en) 1998-11-20 2013-02-12 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface and tools therefor
US8479812B2 (en) 1998-11-20 2013-07-09 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface and tools therefor
US8434568B2 (en) 1998-11-20 2013-05-07 Vitruvian Exploration, Llc Method and system for circulating fluid in a well system
US7360595B2 (en) * 2002-05-08 2008-04-22 Cdx Gas, Llc Method and system for underground treatment of materials
US20040050554A1 (en) * 2002-09-17 2004-03-18 Zupanick Joseph A. Accelerated production of gas from a subterranean zone
US8333245B2 (en) 2002-09-17 2012-12-18 Vitruvian Exploration, Llc Accelerated production of gas from a subterranean zone
US20090229826A1 (en) * 2004-12-02 2009-09-17 East Jr Loyd E Hydrocarbon Sweep into Horizontal Transverse Fractured Wells
US20070068674A1 (en) * 2005-09-23 2007-03-29 Alberta Research Council, Inc. Toe-To-Heel Waterflooding With Progressive Blockage Of The Toe Region
US7328743B2 (en) * 2005-09-23 2008-02-12 Alberta Research Council, Inc. Toe-to-heel waterflooding with progressive blockage of the toe region
WO2010009025A3 (en) * 2008-07-14 2010-03-25 Services Petroliers Schlumberger Fracturing method for subterranean reservoirs
WO2010009025A2 (en) * 2008-07-14 2010-01-21 Services Petroliers Schlumberger Fracturing method for subterranean reservoirs
WO2013074329A1 (en) * 2011-11-15 2013-05-23 Schlumberger Canada Limited System and method for performing treatments to provide multiple fractures
US10851632B2 (en) 2013-01-08 2020-12-01 Conocophillips Company Heat scavenging method for thermal recovery process
EP2998503A3 (en) * 2014-09-22 2016-06-22 John Edward Vandigriff Fracturing of shale and oil sands using a clean processing system and method
CN107246258A (en) * 2017-07-24 2017-10-13 新疆国利衡清洁能源科技有限公司 A kind of peupendicular hole insertion method and pass-through facility
CN108518214A (en) * 2018-04-12 2018-09-11 中北大学 A kind of rock high-temperature high-pressure overheat steam control crushing test method
CN108518214B (en) * 2018-04-12 2022-02-18 中北大学 Rock high-temperature high-pressure superheated steam controlled fracturing test method
WO2021126306A1 (en) * 2019-12-19 2021-06-24 Halliburton Energy Services, Inc. Method and system to non-intrusively determine properties of deposit in a fluidic channel
GB2600343A (en) * 2019-12-19 2022-04-27 Halliburton Energy Services Inc Method and system to non-intrusively determine properties of deposit in a fluidic channel
US11448582B2 (en) 2019-12-19 2022-09-20 Halliburton Energy Services, Inc. Method and system for non-intrusively determining properties of deposit in a fluidic channel
GB2600343B (en) * 2019-12-19 2023-12-27 Halliburton Energy Services Inc Method and system to non-intrusively determine properties of deposit in a fluidic channel

Similar Documents

Publication Publication Date Title
US5207271A (en) Foam/steam injection into a horizontal wellbore for multiple fracture creation
US3822747A (en) Method of fracturing and repressuring subsurface geological formations employing liquified gas
US5320171A (en) Method of preventing gas coning and fingering in a high temperature hydrocarbon bearing formation
US4705113A (en) Method of cold water enhanced hydraulic fracturing
US5085276A (en) Production of oil from low permeability formations by sequential steam fracturing
CA2029817C (en) Method for improving sustained solids-free production from heavy oil reservoirs
US5425421A (en) Method for sealing unwanted fractures in fluid-producing earth formations
US4817717A (en) Hydraulic fracturing with a refractory proppant for sand control
CA2062071C (en) Control of flow and production of water and oil or bitumen from porous underground formations
US4387770A (en) Process for selective injection into a subterranean formation
CA1264147A (en) Heavy oil recovery process using intermittent steamflooding
US4476932A (en) Method of cold water fracturing in drainholes
CA1088861A (en) Viscous oil recovery method
US3303883A (en) Thermal notching technique
US4612989A (en) Combined replacement drive process for oil recovery
US5507342A (en) Method of selective treatment of open hole intervals in vertical and deviated wellbores
US4756369A (en) Method of viscous oil recovery
US4390068A (en) Carbon dioxide stimulated oil recovery process
US3353602A (en) Vertical fracture patterns for the recovery of oil of low mobility
US3386514A (en) Method for production of thin oil zones
US4484630A (en) Method for recovering heavy crudes from shallow reservoirs
US3858658A (en) Hydraulic fracturing method for low permeability formations
US4293035A (en) Solvent convection technique for recovering viscous petroleum
US4109722A (en) Thermal oil recovery method
US3330353A (en) Thermal soak zones by fluidized fractures in unconsolidated, petroleum producing reservoirs

Legal Events

Date Code Title Description
AS Assignment

Owner name: MOBIL OIL CORPORATION A CORPORATION OF NEW YORK

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNORS:SANCHEZ, J. MICHAEL;ALAMEDDINE, BASSEM R.;REEL/FRAME:005901/0662;SIGNING DATES FROM 19911015 TO 19911021

STCF Information on status: patent grant

Free format text: PATENTED CASE

CC Certificate of correction
FPAY Fee payment

Year of fee payment: 4

FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

FPAY Fee payment

Year of fee payment: 8

FPAY Fee payment

Year of fee payment: 12