US5456450A - Method and apparatus for installing transmission lines - Google Patents

Method and apparatus for installing transmission lines Download PDF

Info

Publication number
US5456450A
US5456450A US07/970,464 US97046492A US5456450A US 5456450 A US5456450 A US 5456450A US 97046492 A US97046492 A US 97046492A US 5456450 A US5456450 A US 5456450A
Authority
US
United States
Prior art keywords
cable
duct
pathway
fibre
transmission line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
US07/970,464
Inventor
Michael H. Reeve
Stephen A. Cassidy
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
British Telecommunications PLC
Original Assignee
British Telecommunications PLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from GB838309671A external-priority patent/GB8309671D0/en
Priority claimed from US06848950 external-priority patent/US4691896C1/en
Priority claimed from US07086849 external-priority patent/US4948097C1/en
Priority to US07970464 priority Critical patent/US5456450C1/en
Application filed by British Telecommunications PLC filed Critical British Telecommunications PLC
Priority to US08460268 priority patent/US5645267C1/en
Publication of US5456450A publication Critical patent/US5456450A/en
Application granted granted Critical
Priority to US08/852,956 priority patent/US6173107B1/en
Priority to US09/543,555 priority patent/US6328283B1/en
Publication of US5456450C1 publication Critical patent/US5456450C1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/44Mechanical structures for providing tensile strength and external protection for fibres, e.g. optical transmission cables
    • G02B6/4479Manufacturing methods of optical cables
    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/44Mechanical structures for providing tensile strength and external protection for fibres, e.g. optical transmission cables
    • G02B6/4401Optical cables
    • G02B6/4429Means specially adapted for strengthening or protecting the cables
    • G02B6/4438Means specially adapted for strengthening or protecting the cables for facilitating insertion by fluid drag in ducts or capillaries
    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/44Mechanical structures for providing tensile strength and external protection for fibres, e.g. optical transmission cables
    • G02B6/4439Auxiliary devices
    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/46Processes or apparatus adapted for installing or repairing optical fibres or optical cables
    • G02B6/50Underground or underwater installation; Installation through tubing, conduits or ducts
    • G02B6/52Underground or underwater installation; Installation through tubing, conduits or ducts using fluid, e.g. air

Definitions

  • This invention generally relates to optical fibre and other lightweight and flexible transmission lines. More particularly, the invention relates to a method and apparatus for installing such communications media.
  • Optical fibre cables carrying optical fibre transmission lines have heretofore been installed by the same methods as conventional metal conductor cables. Such methods usually involve pulling the cable with a pulling rope through a previously laid cable duct. Frequently the cable duct already contains one or more conventional cables at the time of installing the optical fibre cable.
  • the optical fibres are easily damaged by tensile stress. Such stress may, for example, propagate micro-cracks, leading to fibre breakage in the long term. It is, therefore, standard practice to reinforce optical fibre cables by providing a central strength member, usually one or more steel tension wires, about which the optical fibres are disposed. The strength member takes up, and thus increases the ability of the cable to withstand, tensile stresses accompanying installation of the cable.
  • the central strength member usually provides insufficient protection against local stresses caused by pulling a further cable through the same duct.
  • the conventional approach of installing at the outset optical fibre cables containing sufficiently large numbers of optical fibres to satisfy foreseeable future traffic demands is a way of overcoming this problem.
  • first time installation of optical fibre cables containing dozens or even hundreds of optical fibres are currently envisaged despite the fact that to begin with a small fraction of the installed fibres would provide ample traffic carrying capacity.
  • a further reason for installing optical fibre cables of comparatively large dimension is that the smaller the cross section of the cable the more prone the cable becomes to wedging in between those cables already present in the duct.
  • the method just referred to does deal with some of the problems discussed above, but only to a very limited extend.
  • it enables fibre capacity to be increased in up to three stages, and separates the optical fibre cables from those cables already in the duct, thereby greatly reducing the likelihood of jamming, and hence overstressing, of the optical fibre cable.
  • the transmission lines may comprise one or more of the following, in any combination: optical fibres, wires or other electrical conducting media, other dielectric transmission media, or any other medium capable of carrying data.
  • the only other requirement is that the transmission medium should be sufficiently lightweight and flexible for installation by the method of the invention.
  • transmission line as used hereinafter in this specification and claims shall be construed to mean transmission lines as defined above.
  • a method of advancing a lightweight and flexible transmission line along a tubular pathway comprises inserting the free end of such a line into a previously installed pathway, and propelling the line along the pathway by fluid drag of a gaseous medium passed through the pathway in the desired direction of advance.
  • the gaseous medium has to be passed through the pathway with a flow velocity much higher than the desired rate of advance.
  • the flow velocity of the gaseous medium may be steady or may be suitably varied, for example either between a first velocity producing no, or insufficient, fluid drag to propel the fibre or wire member, and a second velocity producing sufficient fluid drag to propel the fibre or wire member, or between a first and second velocity both producing sufficient fluid drag for propelling the fibre or wire member.
  • the variations in velocity take the form of repeated abrupt changes between the first and second velocity.
  • the aforementioned variations in flow velocity may include periods during which the flow is reversed with respect to the desired direction of advance of the transmission line.
  • a transmission line may, for example, comprise a single optical fibre or wire, protected by at least a primary coating but preferably contained within an outer envelope.
  • a fibre or wire member may comprise a plurality of optical fibres or wires contained within a common envelope.
  • the envelope may loosely or tightly surround the fibre (wire), or fibres (wires).
  • the method may be used for insertion of an optical fibre or wire member into, or its withdrawal from, the pathway.
  • the gaseous medium is chosen to be compatible with the environment in which the invention is performed, and in ordinary environments will be a non-hazardous gas or gas mixture. With the proviso about compatibility with the environment, the gaseous medium is preferably air or nitrogen.
  • tubular pathways and/or the fibre or wire members are conveniently but not necessarily of circular cross-section, and the fibre or wire member is always smaller than the pathway.
  • the pathway internal diameter will generally be greater, and frequently much greater than 1 mm, and the external diameter of the fibre member greater than 0.5 min.
  • a preferred range of diameters for the pathway is 1 to 10 mm, conveniently between 3 and 7 mm, and a preferred range of diameters for the fibre members is 1 to 4 mm, although much larger diameters may be used provided the fibre member is sufficiently lightweight and flexible.
  • the diameter of the fibre members is preferably chosen to be greater than one tenth, and conveniently to be about one half of the pathway diameter or greater (and appropriately less, of course, if more than one fibre member is to be propelled through the same pathway).
  • Insertion of a fibre (or wire) member by means of the fluid drag of a gas passing over the fibre member has several advantages over methods involving pulling an optical fibre (wire) cable with a pull cord.
  • the fluid drag of a gaseous medium produces a distributed pulling force on the fibre (wire) member. This is particularly advantageous if the installation route contains one or more bends. If, as would be the case with a pulling cord, the pulling force were concentrated at the leading end of the fibre member, any deviation of the pathway from a straight line would greatly increase friction between the fibre member and the internal walls of the pathway, and only a few bends would be sufficient to cause locking of the fibre.
  • the distributed pulling force produced by the fluid drag enables bends to be negotiated fairly easily, and the number of bends in a given installation is no longer of much significance.
  • the fluid drag substantially reduces overall pulling stress on the fibre (or wire) member and so permits the fibre (or wire) member to be of relatively simple and cheap construction.
  • the fibre member is not subjected to any substantial pulling stress during installation, little allowance, if any, needs to be made for subsequent relaxation.
  • a method of installing a transmission line comprises installing a conduit having one or more ductlets providing tubular pathways.
  • the communications route may be initially designed and upgraded according to a customer's needs or desires. For example, after installation of the conduit, wire members containing one or more lightweight and flexible wires initially may be propelled through a pathway using fluid drag. Thereafter, the route may be upgraded by installing further wire members and/or inserting, by the aforesaid method using fluid drag, one or more fibre members into the associated ductlets as required.
  • conduit is installed without containing any optical fibres, conventional rope pulling and similar techniques may be freely employed for installing the conduit.
  • the capacity can readily be adapted to requirements.
  • the conduit may contain a much larger number of ductlets than are required at the time of installation, and further fibre members may be inserted later on as and when needed.
  • the conduit of the present invention is cheap compared to the cost of the fibres, and spare ductlets to accommodate further fibres and/or wires as and when extra capacity is required can thus be readily incorporated without adding more than a small fraction to overall costs.
  • the method of the present invention also permits the installation of improved later generations of transmission lines. It is possible, for example, to install at first one or more fibre members incorporating multimode fibres, and at a later date add, or replace the installed multimode fibre members with fibre members incorporating monomode fibres. Installed fibre members may conveniently be withdrawn from the ductlet, and replacement fibre members be inserted by using the aforesaid method of propelling by fluid drag of a gaseous medium.
  • an optical fibre cable comprises a conduit including one or more ductlets forming tubular pathways and capable of loosely accommodating an optical fibre member, and at least one optical fibre member inserted by the aforementioned method using fluid drag.
  • the conduit may be rigid or flexible.
  • conduit includes more than one ductlet
  • the ductlets are conveniently formed by bores in the material of the conduit.
  • the term “bore”, like the word “tubular” is understood in this context to include circular and other suitable shapes of cross-sectional area.
  • the conduit may comprise a plurality of individual tubes enveloped by a common outer sheath.
  • the present invention largely avoids the risk, inherent in handling optical fibre cables with a large number of fibres, of accidentally damaging before or during installation in a single event a large number of expensive optical fibres.
  • the present invention also enables the installation of continuous optical fibres over several installation lengths without joints.
  • FIG. 1 is a cross section through a conduit suitable for implementing the invention
  • FIGS. 2 and 3 are relatively enlarged cross sections through fibre members
  • FIG. 4 is a schematic diagram of apparatus for inserting fibre members into ductlets by fluid drag
  • FIG. 5 is a schematic drawing of a junction between a trunk and a branch conduit
  • FIG. 6 is a schematic diagram to illustrate the notation used in drag force calculations
  • FIG. 7 is a schematic section of a modified drive unit.
  • FIG. 8 is a graph of drag force vs pressure.
  • FIG. 9 is a schematic diagram of a tandem arrangement of drive units.
  • FIG. 1 there is shown a conduit 11 incorporating six ductlets 12, one of which Contains a transmission line in the form of a fibre or wire member; 14, and a core 13.
  • the conduit 11 is made of extruded polymer or other suitable material, the ductlets, or bores, 12 being formed in the conduit during its extrusion.
  • the central core 13 contains copper wire pairs required for testing operations during and after installation, repeater supervision, power supply, and the like. Alternatively, or additionally, the core 13 may incorporate reinforcements, for example tension wires, to take up the tension forces during installation of the conduit. Where required, the conduit may be surrounded by a water barrier (not shown).
  • the copper wire pair for testing can be omitted from the core 13 if suitable alternative testing facilities are available, such as, for example, testing methods using optical fibre or wire members inserted subsequently into the conduit as described below.
  • FIG. 2 is a cross-section through a fibre or wire member 21 which is in a form particularly suited for installation by fluid drag.
  • the member 21 may comprise several optical fibres 22 lying loosely in a polymer sheath 24.
  • the fibre member 21 does not require reinforcement.
  • the relatively simple construction also leads to lower production costs, as well as making the fibre member 21 comparatively light, thereby enabling easy installation by fluid drag.
  • FIG. 3 is a cross-section through such a fibre member 31 which, provided it is made light enough and flexible enough, is suitable for insertion by fluid drag into a ductlet 12 of the conduit 11 in FIG. 1.
  • the fibre member 31 consists of a plurality of optical fibres 32 arranged around a strength member 33 and enclosed in a polymer sheath 34.
  • a wire bundle may be formed in a similar manner. For example, two seven-strand copper wires may be encased in a foamed coating. The completed unit typically would have a resistance of around 108 ohm/km. Such a unit may be installed in a duct by the drag method described below.
  • the flexible conduit 11 is installed into an existing duct (not shown) by conventional methods such as pulling with a pulling rope.
  • conduit 11 does not contain any optical fibres at this stage, the conduit 11 can be handled in the same way as an ordinary cable, and no special care needs to be taken over and above that customary in installing conventional metal conductor cables. If required, it is also possible at this stage, that is before the conduit contains any optical fibres, to pull a further conduit through the duct to provide spare capacity.
  • conduit can readily be made of an external diameter matching that of cables already in the duct, wedging is less likely to occur than with a standard, smaller diameter optical fibre cable.
  • the communications route may be, for example, initially comprised of conventional copper cables, installed by conventional (e.g., pulling) techniques or alternatively one or more wires encased in bundles (such as shown in FIGS. 2 or 3), which have been propelled through the conduit using the fluid drag technique described in detail below.
  • the communications route may be upgraded by using the blowing technique to install in any desired combination copper wire and/or fibre bundles.
  • a telecommunications route to a customer, or a network in an existing building may be upgraded by installing a new copper pair by the fluid drag technique.
  • the route may be further upgraded by installing fibre optic members in, for example, different ductlets then those housing the wire members.
  • optical fibre members such as 21 and 31 are inserted into as many of the ductlets 12 as is required.
  • the fibre members may, for example, be so-called ribbons, in which a thin, wide sheath encloses an optical fibre or a plurality of optical fibres lying in the same plane.
  • conduit 11 Manufacture of the conduit 11 is cheap compared to the optical fibres in the fibre members 21 or 31 which it is designed to carry, and spare ductlets 12 for future expansion can readily be incorporated at the extrusion stage of the conduit 11 without adding unduly to the overall cost.
  • the conduit may be manufactured by adapting conventional cable manufacturing processes such as, for example, extrusion.
  • a gas flowing past the surface of a solid object produces a drag force which largely depends on the velocity of the gas relative to the surface.
  • This drag force can be made sufficiently large to pull a lightweight optical fibre (or wire) member 21, or 31 into a tubular pathway such as, for example, a ductlet 12 of the aforementioned conduit 11.
  • the flow rate varies with the size of the free cross sectional area of the bore, while the drag force on a fibre member present in a bore varies with the flow rate and the surface area of the fibre member.
  • the member may be propelled by the drag force over an extensive distance.
  • the drag force has been optimized in experiments by varying these parameters and, in particular, by choosing an appropriate ratio of bore diameter to fibre member diameter.
  • FIG. 4 illustrates apparatus for feeding fibre (or wire) members into tubular pathways such as the ductlets 12 of the conduit 11 of FIG. 1.
  • the apparatus consists of a feedhead 41 which contains a straight bore 44 connected at one end, its outlet end 42, to a flexible tube 49, and at the other end, its inlet end 43, to a supply reel (not shown).
  • the head 41 also contains an inlet 45 for air.
  • the outlet end 42 and the bore 44 are substantially larger in cross sectional area than fibre member 46.
  • the aperture of the inlet end 43 is only slightly larger in cross sectional area than that of the fibre member 46.
  • This arrangement forms an air block which presents a relatively large flow resistance to air and helps prevent air escaping through the inlet duct 43.
  • the tube 49 is inserted into one of the ductlets of the conduit 11. Suitable seals between the feedhead 41 and the tube 49, and the ductlet 12 prevent undesirable escape of the air.
  • the fibre member 46 is fed into the inlet end 43 of the feedhead 41 by means of a pair of rubber drive wheels 47 and 48, driven by a constant torque driving mechanism (not shown).
  • a constant torque driving mechanism (not shown).
  • the insertion force provided by the driving mechanism is an important element in this embodiment of the present invention since a free end of the fibre (or wire) member must be introduced in the tubular pathway from an area at atmospheric pressure into a high pressure region, so there is a steep positive pressure gradient resisting entry.
  • FIG. 5 shows a branching connection between an optical fibre trunk line 51 and a branch line 52, each comprising a conduit 53 and 54 respectively and one or more fibre members 55 and 56. Since, as described above, the fibre members are individually introduced into the ductlets of the trunkline conduit 53, individual fibre members 55 can be routed from the trunk conduit 53 into the branch conduit 54 as required, while other fibre members 56 continue to the adjacent section 53a of the trunkline conduit.
  • the drag force on the fibre member 64 within the bore 63 of a ductlet, or tube, 62 on account of turbulent air flow through the bore 63 can be calculated as discussed below.
  • fluid drag or drag force is, in fact, a composite force, of which the major proportion is normally due to viscous drag, and at least one other important component due to a hydrostatic force, f' as discussed below. It will be appreciated that the exact composition of the drag force does not affect the principles of the invention but the more detailed analysis below can be used to optimize the parameters involved in carrying out the invention, and to obtain some guidance for trial and error experiments.
  • the pressure difference between the tube ends can be equated to a shear force distributed over the inner surface of the bore 63 and the outer surface of the fibre member 64.
  • Equation 5 is then plotted, for the case of the 6 mm bore diameter with 2.5 mm O.D. fibre member, in FIG. 8, for a length of 300 m. Since pressure is normally quoted in psi it has been retained here for the sake of convenience.
  • FIG. 7 shows in diagrammatic form the arrangement of the modified drive unit discussed with reference to FIG. 4, in which the only major change lies in incorporating the drive wheels 77 and 78 within the feedhead 71.
  • the viscous drag force is accompanied by a hydrostatic force, the force f' of equation 5 above.
  • This force f' has been found to oppose the insertion of the fibre member into the drive unit, making the incorporation of the drive wheels 77 and 78 into the drive unit preferable.
  • the force f' referred to above as the hydrostatic potential must be overcome when introducing the fibre member into the pressurized areas. The drive wheels would be driven by a torque just sufficient to overcome this potential.
  • this force may be viewed as being that force necessary to overcome the pressure acting on the free end of the fibre (or wire) member. It will thus decrease as the unit is installed and the free end proceeds to regions of lower pressure. It is therefore possible to reduce the insertion force as installation proceeds.
  • the particular point along a communications route at which the insertion force may be completely removed may be calculated as follows.
  • f 1 force on fibre unit at a position l from the start of the duct
  • r 1 inner tube external radius (See FIG. 6)
  • the drive wheels 77, 78 are incorporated into the pressurized cavity 74 and thus the force on the fibre member necessary to overcome the hydrostatic potential is tensile. If the wheels were outside the drive unit, this force would be compressive, and there would be tendency for the fibre member to buckle. As will be recognized by those skilled in the art, upon the occurrence of such a buckle (due, for example, to an excessive insertion force), the insertion force would need to be briefly interrupted until the buckle disappears. Thus, even before the point along the communications route is reached where the insertion force may be completely removed, there are circumstances which may require the insertion force to rise or fall during installation.
  • the drive unit may be made to split along the fibre member axis, and perpendicular to the diagram, or in some other plane.
  • the air seals, 72, 73 may be, for example, rubber lips, or narrow channels.
  • a fibre member 76 fed into the drive unit would be automatically taken up by the drive wheels with just enough force to overcome the hydrostatic potential, and fed on along the ductlet 12.
  • the fluid drag of the air flowing down the ductlet 12 causes the fibre member 76 to be pulled along the ductlet 12 as the installation proceeds.
  • This means that such a drive unit can be placed between two adjoining sections of conduit so that a fibre member emerging from a ductlet in the first conduit can be fed into the appropriate ductlet of the second.
  • an installation could consist of a fibre member 76 running through a number of conduits using two or more drive units in tandem, possibly without supervision.
  • a tandem arrangement units 14-1 and 14-2 of the type illustrated in FIG. 4 is shown in FIG. 9.
  • Powdered talc is an example of a suitable lubricant.
  • the ductlets may, for example, also be formed in a power cable, or in a conventional subscriber line, to allow subsequent installation of optical fibre members. In the latter case, to avoid ingress of water, the ductlet may be sealed until the time of installation of the fibre members.
  • FIGS. 4 and 7 are exemplary only. Other means of introduction may be provided instead, and in such circumstances it is possible that there will be no positive pressure gradient (i.e., hydrostatic force), and thus no specific insertion force would be necessary.

Abstract

A transmission line, such as an optical fibre (or wire) transmission line, is installed by first installing a conduit having one or more bores and subsequently inserting flexible, lightweight optical fibre members containing the optical fibres into the bores. The optical fibre members are propelled by employing the fluid drag of air, or another suitable gas, passed at high velocity through the bores.

Description

RELATED APPLICATIONS
This application is a divisional of application Ser. No. 07/554,927, filed Jul. 20, 1990 (now U.S. Pat. No. 5,169,126), which is a continuation of application Ser. No. 07/086,849, filed Aug. 19, 1987 (now U.S. Pat. No. 4,948,097) which is a continuation-in-part of application Ser. No. 06/848,950, filed Apr. 7, 1986 (now U.S. Pat. No. 4,691,896) which is a continuation of application Ser. No. 06/551,640 filed Nov. 8, 1983 (now abandoned).
FIELD OF THE INVENTION
This invention generally relates to optical fibre and other lightweight and flexible transmission lines. More particularly, the invention relates to a method and apparatus for installing such communications media.
BACKGROUND OF THE INVENTION
Optical fibre cables carrying optical fibre transmission lines have heretofore been installed by the same methods as conventional metal conductor cables. Such methods usually involve pulling the cable with a pulling rope through a previously laid cable duct. Frequently the cable duct already contains one or more conventional cables at the time of installing the optical fibre cable.
Unlike the metal conductors of a conventional cable, the optical fibres are easily damaged by tensile stress. Such stress may, for example, propagate micro-cracks, leading to fibre breakage in the long term. It is, therefore, standard practice to reinforce optical fibre cables by providing a central strength member, usually one or more steel tension wires, about which the optical fibres are disposed. The strength member takes up, and thus increases the ability of the cable to withstand, tensile stresses accompanying installation of the cable.
Unfortunately, the central strength member usually provides insufficient protection against local stresses caused by pulling a further cable through the same duct. The conventional approach of installing at the outset optical fibre cables containing sufficiently large numbers of optical fibres to satisfy foreseeable future traffic demands is a way of overcoming this problem. In consequence, first time installation of optical fibre cables containing dozens or even hundreds of optical fibres are currently envisaged despite the fact that to begin with a small fraction of the installed fibres would provide ample traffic carrying capacity. A further reason for installing optical fibre cables of comparatively large dimension is that the smaller the cross section of the cable the more prone the cable becomes to wedging in between those cables already present in the duct.
The first time installation of large diameter optical fibre cables with high numbers of optical fibres, is, however, undesirable for a variety of reasons. Firstly, there are problems of a technical nature inherent in such cables, such as, for example, the difficulty of forming joints and of achieving the required high strength-to-weight ratios. Secondly, there are clear economical drawbacks in committing large resources to install initially unused fibre capacity, particularly in view of the comparatively recent origins of optical fibre technology which lead one to expect continued substantial reductions in the price and improvement in the quality of optical fibres. Thirdly, there is the serious risk of damaging in a single incident very large numbers of expensive optical fibres. Finally, there is an appreciable loss in flexibility when routing high density optical fibre transmission lines.
A method of installing optical fibres with pulling ropes and pull chords is described in "Sub-ducts: The Answer to Honolulu's Growing Pains", Herman S L Hu and Ronald T. Miyahara, Telephony, 7 April 1980, pp 23 to 35. The installation method described there proceeds as follows: a section of existing 4-inch (100 mm) duct is rodded and thereafter between one and three individual 1-inch (25 mm) polyethylene tubes are inserted into the duct using pulling ropes. The polyethylene tubes form subducts into which an optical fibre cable can be pulled with the aid of a nylon pull chord which has previously been inserted into the subduct by means of a parachute attached to its leading end and pushed through the subduct with compressed air,
The method just referred to does deal with some of the problems discussed above, but only to a very limited extend. Thus, it enables fibre capacity to be increased in up to three stages, and separates the optical fibre cables from those cables already in the duct, thereby greatly reducing the likelihood of jamming, and hence overstressing, of the optical fibre cable.
OBJECTS AND SUMMARY OF THE INVENTION
It is an object of the present invention to overcome, or at least appreciably mitigate the majority of the aforementioned problems of installing optical fibre transmission lines.
It is another object to provide a method of installing optical fibre transmission lines which is comparatively simple and yet flexible and economical. Moreover, it is an object of the present invention to utilize this same method to install other lightweight and flexible wire transmission lines as well. The transmission lines may comprise one or more of the following, in any combination: optical fibres, wires or other electrical conducting media, other dielectric transmission media, or any other medium capable of carrying data. The only other requirement is that the transmission medium should be sufficiently lightweight and flexible for installation by the method of the invention. The term "transmission line" as used hereinafter in this specification and claims shall be construed to mean transmission lines as defined above.
According to the present invention, a method of advancing a lightweight and flexible transmission line along a tubular pathway comprises inserting the free end of such a line into a previously installed pathway, and propelling the line along the pathway by fluid drag of a gaseous medium passed through the pathway in the desired direction of advance.
It will be appreciated that to generate sufficient fluid drag to propel the transmission line, the gaseous medium has to be passed through the pathway with a flow velocity much higher than the desired rate of advance.
The terms "lightweight and flexible" with respect to the transmission line are to be understood as meaning "sufficiently lightweight and flexible" for the transmission line to be propelled by the fluid drag.
Whether the transmission line is sufficiently lightweight and flexible and the flow velocity sufficiently high is readily determinable by a simple trial and error experiment, guided, if necessary, by the theoretical model discussed below.
The flow velocity of the gaseous medium may be steady or may be suitably varied, for example either between a first velocity producing no, or insufficient, fluid drag to propel the fibre or wire member, and a second velocity producing sufficient fluid drag to propel the fibre or wire member, or between a first and second velocity both producing sufficient fluid drag for propelling the fibre or wire member. Conveniently the variations in velocity take the form of repeated abrupt changes between the first and second velocity.
The aforementioned variations in flow velocity may include periods during which the flow is reversed with respect to the desired direction of advance of the transmission line.
It is to be understood that more than one transmission line may be propelled along the same tubular pathway.
A transmission line may, for example, comprise a single optical fibre or wire, protected by at least a primary coating but preferably contained within an outer envelope. Alternatively, a fibre or wire member may comprise a plurality of optical fibres or wires contained within a common envelope. The envelope may loosely or tightly surround the fibre (wire), or fibres (wires).
The method may be used for insertion of an optical fibre or wire member into, or its withdrawal from, the pathway.
The gaseous medium is chosen to be compatible with the environment in which the invention is performed, and in ordinary environments will be a non-hazardous gas or gas mixture. With the proviso about compatibility with the environment, the gaseous medium is preferably air or nitrogen.
The tubular pathways and/or the fibre or wire members are conveniently but not necessarily of circular cross-section, and the fibre or wire member is always smaller than the pathway.
In practice, when installing an optical fibre member, the pathway internal diameter will generally be greater, and frequently much greater than 1 mm, and the external diameter of the fibre member greater than 0.5 min.
A preferred range of diameters for the pathway is 1 to 10 mm, conveniently between 3 and 7 mm, and a preferred range of diameters for the fibre members is 1 to 4 mm, although much larger diameters may be used provided the fibre member is sufficiently lightweight and flexible. The diameter of the fibre members is preferably chosen to be greater than one tenth, and conveniently to be about one half of the pathway diameter or greater (and appropriately less, of course, if more than one fibre member is to be propelled through the same pathway).
Insertion of a fibre (or wire) member by means of the fluid drag of a gas passing over the fibre member has several advantages over methods involving pulling an optical fibre (wire) cable with a pull cord.
Firstly, the extra step of providing a pull cord is eliminated.
Secondly, using the fluid drag of a gaseous medium produces a distributed pulling force on the fibre (wire) member. This is particularly advantageous if the installation route contains one or more bends. If, as would be the case with a pulling cord, the pulling force were concentrated at the leading end of the fibre member, any deviation of the pathway from a straight line would greatly increase friction between the fibre member and the internal walls of the pathway, and only a few bends would be sufficient to cause locking of the fibre. The distributed pulling force produced by the fluid drag, on the other hand, enables bends to be negotiated fairly easily, and the number of bends in a given installation is no longer of much significance.
Thirdly, the fluid drag substantially reduces overall pulling stress on the fibre (or wire) member and so permits the fibre (or wire) member to be of relatively simple and cheap construction.
Furthermore, because the fibre member is not subjected to any substantial pulling stress during installation, little allowance, if any, needs to be made for subsequent relaxation.
According to a further aspect of the present invention, a method of installing a transmission line comprises installing a conduit having one or more ductlets providing tubular pathways. The communications route may be initially designed and upgraded according to a customer's needs or desires. For example, after installation of the conduit, wire members containing one or more lightweight and flexible wires initially may be propelled through a pathway using fluid drag. Thereafter, the route may be upgraded by installing further wire members and/or inserting, by the aforesaid method using fluid drag, one or more fibre members into the associated ductlets as required.
Installing optical fibre and/or wire transmission lines by this method has several advantages over conventional techniques.
First, since the conduit is installed without containing any optical fibres, conventional rope pulling and similar techniques may be freely employed for installing the conduit.
Second, the capacity can readily be adapted to requirements. Thus, while initially only one or two fibre or wire members may be sufficient to carry the traffic, the conduit may contain a much larger number of ductlets than are required at the time of installation, and further fibre members may be inserted later on as and when needed. The conduit of the present invention is cheap compared to the cost of the fibres, and spare ductlets to accommodate further fibres and/or wires as and when extra capacity is required can thus be readily incorporated without adding more than a small fraction to overall costs.
The method of the present invention also permits the installation of improved later generations of transmission lines. It is possible, for example, to install at first one or more fibre members incorporating multimode fibres, and at a later date add, or replace the installed multimode fibre members with fibre members incorporating monomode fibres. Installed fibre members may conveniently be withdrawn from the ductlet, and replacement fibre members be inserted by using the aforesaid method of propelling by fluid drag of a gaseous medium.
According to yet another aspect of the present invention, an optical fibre cable comprises a conduit including one or more ductlets forming tubular pathways and capable of loosely accommodating an optical fibre member, and at least one optical fibre member inserted by the aforementioned method using fluid drag. The conduit may be rigid or flexible.
Where the conduit includes more than one ductlet, the ductlets are conveniently formed by bores in the material of the conduit. The term "bore", like the word "tubular" is understood in this context to include circular and other suitable shapes of cross-sectional area.
Alternatively, the conduit may comprise a plurality of individual tubes enveloped by a common outer sheath.
It will be appreciated that the present invention largely avoids the risk, inherent in handling optical fibre cables with a large number of fibres, of accidentally damaging before or during installation in a single event a large number of expensive optical fibres.
The present invention also enables the installation of continuous optical fibres over several installation lengths without joints.
Furthermore, individual fibre members routed through the conduit can be routed, without requiring fibre joints, into different branch conduits at junction points.
BRIEF DESCRIPTION OF THE DRAWINGS
The present invention will now be explained further by way of example and with reference to the accompanying drawings of which:
FIG. 1 is a cross section through a conduit suitable for implementing the invention;
FIGS. 2 and 3 are relatively enlarged cross sections through fibre members;
FIG. 4 is a schematic diagram of apparatus for inserting fibre members into ductlets by fluid drag;
FIG. 5 is a schematic drawing of a junction between a trunk and a branch conduit;
FIG. 6 is a schematic diagram to illustrate the notation used in drag force calculations;
FIG. 7 is a schematic section of a modified drive unit; and
FIG. 8 is a graph of drag force vs pressure.
FIG. 9 is a schematic diagram of a tandem arrangement of drive units.
DETAILED DESCRIPTION OF INVENTION
Referring first to FIG. 1, there is shown a conduit 11 incorporating six ductlets 12, one of which Contains a transmission line in the form of a fibre or wire member; 14, and a core 13.
The conduit 11 is made of extruded polymer or other suitable material, the ductlets, or bores, 12 being formed in the conduit during its extrusion. The central core 13 contains copper wire pairs required for testing operations during and after installation, repeater supervision, power supply, and the like. Alternatively, or additionally, the core 13 may incorporate reinforcements, for example tension wires, to take up the tension forces during installation of the conduit. Where required, the conduit may be surrounded by a water barrier (not shown).
The copper wire pair for testing can be omitted from the core 13 if suitable alternative testing facilities are available, such as, for example, testing methods using optical fibre or wire members inserted subsequently into the conduit as described below.
FIG. 2 is a cross-section through a fibre or wire member 21 which is in a form particularly suited for installation by fluid drag. For example, the member 21 may comprise several optical fibres 22 lying loosely in a polymer sheath 24. In view of the virtual absence of any pulling stress during installation of a fibre member by fluid drag, the fibre member 21 does not require reinforcement. The relatively simple construction also leads to lower production costs, as well as making the fibre member 21 comparatively light, thereby enabling easy installation by fluid drag.
In certain circumstances it may be desirable to provide a reinforced fibre member, and FIG. 3 is a cross-section through such a fibre member 31 which, provided it is made light enough and flexible enough, is suitable for insertion by fluid drag into a ductlet 12 of the conduit 11 in FIG. 1. The fibre member 31 consists of a plurality of optical fibres 32 arranged around a strength member 33 and enclosed in a polymer sheath 34.
A wire bundle may be formed in a similar manner. For example, two seven-strand copper wires may be encased in a foamed coating. The completed unit typically would have a resistance of around 108 ohm/km. Such a unit may be installed in a duct by the drag method described below.
The installation of an optical and/or wire transmission line proceeds as follows:
The flexible conduit 11 is installed into an existing duct (not shown) by conventional methods such as pulling with a pulling rope.
Because the conduit 11 does not contain any optical fibres at this stage, the conduit 11 can be handled in the same way as an ordinary cable, and no special care needs to be taken over and above that customary in installing conventional metal conductor cables. If required, it is also possible at this stage, that is before the conduit contains any optical fibres, to pull a further conduit through the duct to provide spare capacity.
Furthermore, since the conduit can readily be made of an external diameter matching that of cables already in the duct, wedging is less likely to occur than with a standard, smaller diameter optical fibre cable.
Depending upon the needs of a particular customer, the communications route may be, for example, initially comprised of conventional copper cables, installed by conventional (e.g., pulling) techniques or alternatively one or more wires encased in bundles (such as shown in FIGS. 2 or 3), which have been propelled through the conduit using the fluid drag technique described in detail below. At a later point in time, the communications route may be upgraded by using the blowing technique to install in any desired combination copper wire and/or fibre bundles.
For example, a telecommunications route to a customer, or a network in an existing building may be upgraded by installing a new copper pair by the fluid drag technique. At any desired point in time the route may be further upgraded by installing fibre optic members in, for example, different ductlets then those housing the wire members.
It should be recognized that while the description which follows will focus on propelling optical fibre members through a previously installed tubular pathway, the same mathematical analysis and scientific principles apply to propelling other lightweight and flexible transmission lines such as wire or wire bundles through such a pathway.
Turning back to FIGS. 2 and 3, once a conduit is installed, optical fibre members such as 21 and 31 are inserted into as many of the ductlets 12 as is required. Instead of the afore-described fibre members 21 and 31 of near circular cross-section, the fibre members may, for example, be so-called ribbons, in which a thin, wide sheath encloses an optical fibre or a plurality of optical fibres lying in the same plane.
Manufacture of the conduit 11 is cheap compared to the optical fibres in the fibre members 21 or 31 which it is designed to carry, and spare ductlets 12 for future expansion can readily be incorporated at the extrusion stage of the conduit 11 without adding unduly to the overall cost. The conduit may be manufactured by adapting conventional cable manufacturing processes such as, for example, extrusion.
A gas flowing past the surface of a solid object produces a drag force which largely depends on the velocity of the gas relative to the surface. The applicants have found that this drag force can be made sufficiently large to pull a lightweight optical fibre (or wire) member 21, or 31 into a tubular pathway such as, for example, a ductlet 12 of the aforementioned conduit 11.
In experiments, the flow velocity, or the flow rate, of air through a given pathway has been found to depend approximately linearly on the pressure difference between opposite ends of the pathway, with the slope of the dependency indicating that flow at useful flow rates is predominantly turbulent.
For a given pressure difference, the flow rate varies with the size of the free cross sectional area of the bore, while the drag force on a fibre member present in a bore varies with the flow rate and the surface area of the fibre member. By selecting a lightweight member having a relatively large surface area, the member may be propelled by the drag force over an extensive distance. The drag force has been optimized in experiments by varying these parameters and, in particular, by choosing an appropriate ratio of bore diameter to fibre member diameter.
Experiments have been performed using a bore diameter of 7 mm. The optimum fibre member diameter for this bore size has been found to lie between 2.5 and 4 mm. A pressure below 80 p.s.i. (approximately 5.6 kgs/cm2), usually about 40 p.s.i. has been found sufficient to insert fibre members of up to 3.5 gram per meter (gr/m) over lengths of 200 meters. A fibre member of 2 gr/m is easily installed over this length.
The theoretical value for the drag forces for these dimensions has been calculated in the manner described below with reference to FIG. 6 to be 2.5 gr/m. Lower practical values are believed to be due to the tendency of the fibre members 21, 31 to acquire "set" while on the supply reel. This set would appear to force the fibre member 21, 31 against the wall of the bore 12, thereby increasing friction. Suitable texturing or shaping of the fibre member surface may lead to drag forces higher than those presently experienced.
It should be noted here that using fluid drag to insert fibre members into tubular pathways differs significantly from the method described in the above mentioned article of inserting pull cords by means of parachutes. The parachute is propelled by the pressure difference between the air in front of and the air behind the parachute, and the velocity of the air relative to the advancing cord is only minimal and the pulling force is localized at the point of attachment of the parachute. In contrast, using fluid drag requires a much higher flow velocity of fluid than the speed of advancement of the fibre members.
Also, unlike the use of parachutes or potential other methods of inserting fibre members into the tubular pathways, using fluid drag produces a uniformly distributed pulling force on the fibre member. This reduces the strain on the optical fibres within the fibre member to very low values.
In ordinarily pulling a fibre member through a bend enclosing an angle θ, the tension of the leading end, T2 is related to the tension T1 at the trailing end T2 /T1 =e.sup.μθ, where μ is the coefficient of friction. Even a small number of bends in the pathway may therefore result in an unacceptably high force being required at the leading end if locking of the fibre member is to be avoided. In contrast, the distributed pulling force produced by fluid drag is applied evenly along the fibre member, including in bends, and permits a large number of bends to be easily and speedily negotiated without any undue stress on the fibre member.
FIG. 4 illustrates apparatus for feeding fibre (or wire) members into tubular pathways such as the ductlets 12 of the conduit 11 of FIG. 1. The apparatus consists of a feedhead 41 which contains a straight bore 44 connected at one end, its outlet end 42, to a flexible tube 49, and at the other end, its inlet end 43, to a supply reel (not shown). The head 41 also contains an inlet 45 for air. The outlet end 42 and the bore 44 are substantially larger in cross sectional area than fibre member 46. The aperture of the inlet end 43 is only slightly larger in cross sectional area than that of the fibre member 46. This arrangement forms an air block which presents a relatively large flow resistance to air and helps prevent air escaping through the inlet duct 43. The tube 49 is inserted into one of the ductlets of the conduit 11. Suitable seals between the feedhead 41 and the tube 49, and the ductlet 12 prevent undesirable escape of the air.
In use the fibre member 46 is fed into the inlet end 43 of the feedhead 41 by means of a pair of rubber drive wheels 47 and 48, driven by a constant torque driving mechanism (not shown). As will be explained further below,the insertion force provided by the driving mechanism is an important element in this embodiment of the present invention since a free end of the fibre (or wire) member must be introduced in the tubular pathway from an area at atmospheric pressure into a high pressure region, so there is a steep positive pressure gradient resisting entry.
As shown in FIG. 4, air is fed into the bore 44 through the air inlet 45 and hence is directed through the tube 49 into the ductlet 12. The optical fibre member 46 is pushed through the inlet end 43 of the feedhead into the bore 44 and onwards into the tube 49. Pushing of the fibre member 46 continues until the surface area of the fibre member which is exposed to the air flow is sufficiently large to produce a drag force to cause the further advance of the fibre member 46 through the tube 49 and the ductlet 12, while the rate of feed is controlled by means of the aforementioned rubber drive wheels 47 and 48.
FIG. 5 shows a branching connection between an optical fibre trunk line 51 and a branch line 52, each comprising a conduit 53 and 54 respectively and one or more fibre members 55 and 56. Since, as described above, the fibre members are individually introduced into the ductlets of the trunkline conduit 53, individual fibre members 55 can be routed from the trunk conduit 53 into the branch conduit 54 as required, while other fibre members 56 continue to the adjacent section 53a of the trunkline conduit.
Referring now also to FIG. 6, the drag force on the fibre member 64 within the bore 63 of a ductlet, or tube, 62 on account of turbulent air flow through the bore 63 can be calculated as discussed below.
These calculations show that what has been called fluid drag or drag force above is, in fact, a composite force, of which the major proportion is normally due to viscous drag, and at least one other important component due to a hydrostatic force, f' as discussed below. It will be appreciated that the exact composition of the drag force does not affect the principles of the invention but the more detailed analysis below can be used to optimize the parameters involved in carrying out the invention, and to obtain some guidance for trial and error experiments.
The pressure difference between the tube ends can be equated to a shear force distributed over the inner surface of the bore 63 and the outer surface of the fibre member 64. Thus, one has, for a small element of length Δ1 producing a pressure drop Δp
Δpπ(r.sub.2.sup.2 -r.sub.1.sup.2)=F               (1)
where r2 =outer tube bore radius, r1 =inner tube radius and F is the viscous drag force on the inner and outer walls of the elemental length.
If it is now assumed that the force F is distributed evenly over the area of the inner and outer walls, that is to say the external wall of the fibre member and the internal wall of the ductlet respectively, the drag force, f, on the fibre member per unit length is: ##EQU1## which gives, in the limit, the drag force on the fibre member per unit length, ##EQU2##
In addition, we must consider the hydrostatic force produced by the pressure difference acting on the cross-sectional area of the fibre member. This is locally proportional to the pressure gradient and therefore is distributed over the installed length of the fibre member in the same way as the viscous drag force, leading to an additional force ##EQU3## giving a total force per unit length of ##EQU4##
In order to get an initial estimate of this it is assumed that the pressure drops linearly over the length of the bore, whether filled by the fibre member or not. Equation 5 is then plotted, for the case of the 6 mm bore diameter with 2.5 mm O.D. fibre member, in FIG. 8, for a length of 300 m. Since pressure is normally quoted in psi it has been retained here for the sake of convenience.
Coefficients of friction of around 0.5 have been measured for the polyethylene and polypropylene fibre members against a polyethylene and polypropylene fibre members against a polyethylene bore wall. Therefore, with a fibre member weighing 3 gms/m we could expect to install a 300 m length with around 55 psi pressure. Any extra drag force over that required to overcome friction would appear at the start end as a gradually increasing tension in the fibre member as installation proceeds.
FIG. 7 shows in diagrammatic form the arrangement of the modified drive unit discussed with reference to FIG. 4, in which the only major change lies in incorporating the drive wheels 77 and 78 within the feedhead 71.
As the foregoing discussion with reference to FIG. 6 has illustrated, the viscous drag force is accompanied by a hydrostatic force, the force f' of equation 5 above. This force f' has been found to oppose the insertion of the fibre member into the drive unit, making the incorporation of the drive wheels 77 and 78 into the drive unit preferable. The force f', referred to above as the hydrostatic potential must be overcome when introducing the fibre member into the pressurized areas. The drive wheels would be driven by a torque just sufficient to overcome this potential.
Focusing on the insertion force necessary to overcome the hydrostatic potential, this force may be viewed as being that force necessary to overcome the pressure acting on the free end of the fibre (or wire) member. It will thus decrease as the unit is installed and the free end proceeds to regions of lower pressure. It is therefore possible to reduce the insertion force as installation proceeds. In fact, the particular point along a communications route at which the insertion force may be completely removed may be calculated as follows.
In the event the installation force (viscous drag) just matches the force necessary to move the unit through the duct against friction (the product of the weight of the unit and the coefficient of friction) then the insertion force must be maintained to balance the end force (hydrostatic force).
However, if the viscous drag forces are such as to exceed the frictional forces then the excess can serve to overcome the end force, thus obviating the need for the insertion force.
This is most likely to be the case for a completely straight route, whereby excess drag force can be completely fed back to the blowing head, and is not lost by tightening into bends.
In this circumstance the force F on the end of the unit is ##EQU5## where: L=the length of the tube in which the fibre is to be installed
f1 =force on fibre unit at a position l from the start of the duct
r1 =inner tube external radius (See FIG. 6)
r2 =outer tube bore radius (See FIG. 6)
p=the static pressure a distance from the blowing head
p1 =the supply pressure
p2 =atmospheric pressure
ω=weight/unit length
μ=coefficient of friction
When these are equal the insertion force can be removed. ##EQU6## Assuming linear pressure gradient ##EQU7## For a typical case of L=500 m
P1 -P2 =150 psi
r1 =1 mm
r2 =3 mm
ω=2 gm/m
μ=0.5
Then l=200 m. It is therefore possible, in this example, to completely remove the insertion force provided, for example, by the drive wheels after roughly half the fibre member has been installed. Thus, when the fibre member reaches the 200 m point of such a pathway (or shortly thereafter), a control/switching means may be used to simply de-energize the drive wheels and move them out of contact with the fiber member in a manner well understood by those skilled in the art. It should also be recognized that, since the hydrostatic force decreases as the free end of the fibre proceeds to regions of lower pressure (as indicated by the above mathematical analysis), more sophisticated electronic control over the insertion force producing drive wheels may be exercised, e.g., by varying the drive wheel motor speed.
As shown in FIG. 7, the drive wheels 77, 78 are incorporated into the pressurized cavity 74 and thus the force on the fibre member necessary to overcome the hydrostatic potential is tensile. If the wheels were outside the drive unit, this force would be compressive, and there would be tendency for the fibre member to buckle. As will be recognized by those skilled in the art, upon the occurrence of such a buckle (due, for example, to an excessive insertion force), the insertion force would need to be briefly interrupted until the buckle disappears. Thus, even before the point along the communications route is reached where the insertion force may be completely removed, there are circumstances which may require the insertion force to rise or fall during installation.
For convenience, the drive unit may be made to split along the fibre member axis, and perpendicular to the diagram, or in some other plane. The air seals, 72, 73 may be, for example, rubber lips, or narrow channels.
In operation, a fibre member 76 fed into the drive unit would be automatically taken up by the drive wheels with just enough force to overcome the hydrostatic potential, and fed on along the ductlet 12. The fluid drag of the air flowing down the ductlet 12 causes the fibre member 76 to be pulled along the ductlet 12 as the installation proceeds. This means that such a drive unit can be placed between two adjoining sections of conduit so that a fibre member emerging from a ductlet in the first conduit can be fed into the appropriate ductlet of the second. Thus, an installation could consist of a fibre member 76 running through a number of conduits using two or more drive units in tandem, possibly without supervision. A tandem arrangement units 14-1 and 14-2 of the type illustrated in FIG. 4 is shown in FIG. 9.
It will be appreciated that it is possible to blow compounds in liquid or powder form along the ductlet prior to, or during installation in order to provide lubrication for the fibre members. Powdered talc is an example of a suitable lubricant.
The ductlets may, for example, also be formed in a power cable, or in a conventional subscriber line, to allow subsequent installation of optical fibre members. In the latter case, to avoid ingress of water, the ductlet may be sealed until the time of installation of the fibre members.
It will be appreciated that the embodiments of apparatus for introducing a transmission line as shown in FIGS. 4 and 7 are exemplary only. Other means of introduction may be provided instead, and in such circumstances it is possible that there will be no positive pressure gradient (i.e., hydrostatic force), and thus no specific insertion force would be necessary.
While the invention has been described in connection with what is presently considered to be the most practical and preferred embodiment, it is to be understood that the invention is not to be limited to the disclosed embodiment, but on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the appended claims.

Claims (16)

We claim:
1. Apparatus for introducing a cable into a cable duct, wherein a flow of gas can be effected from an inlet of the duct and directed to an exit end of the duct and a cable can be led into the inlet end of the duct, comprising:
a cable injection means having;
a hollow, substantially rectilinear cable lead-through channel in said injection means with an entrance end and an exit end for leading in and leading out a cable which has to be injected into the duct;
at least one pair of wheels mounted opposite to each other for propelling a cable disposed between said wheels of said at least one pair into said duct in a direction of said exit end, and a motor coupled to at least one of said wheels for providing a driving couple thereto; and
gas inserting means including a gas channel, which opens into said cable lead-through channel and which is adapted for inserting compressed gas into said lead-through channel between said wheels and the exit end of said lead-through channel;
wherein the motor is capable of providing a driving couple, which driving couple is larger than the force which has to act on the cable to compensate the difference between the pressure inside and the pressure outside the cable lead-through channel, so that pushing forces can be exerted by the wheels on the cable as a consequence of the cooperative effect of the driving couple;
gas introduced through said gas channel passing, in use, into and along said cable duct, in the desired direction of travel of the cable, the gas flowing at a high relative flow velocity with respect to the cable whereby viscous drag forces are exerted upon said cable in the desired direction of advance, the combined effect of said viscous drag forces and the pushing forces exerted by the wheels serving to install said cable in said duct.
2. Apparatus as claimed in claim 1, wherein the apparatus is splittable longitudinally to enable the apparatus to be removed from about an installed cable.
3. Apparatus as claimed in claim 1, including means to regulate the drive force applied to the cable by the drive wheels.
4. Apparatus as claimed in claim 1, including a motor speed control.
5. Apparatus as claimed in claim 1, connected in tandem with a second apparatus according to claim 1, the two apparatus being arranged such that a first apparatus feeds a cable along the cable duct to the second apparatus so that the second apparatus operates to advance the cable along a further cable duct wherein the further cable duct is sealingly connected to the second apparatus.
6. Apparatus as claimed in claim 1, wherein the cable injection means has a first sealing arrangement to seal about a cable which is to be advanced, and a second sealing arrangement for sealing engagement to the inlet of the cable duct.
7. Apparatus as claimed in claim 6, wherein the first and second sealing arrangements are respectively suitable for sealing to a cable having a diameter about half that of the cable duct bore.
8. Apparatus for installing a lightweight and flexible communications transmission line into and along a length of previously installed open ended tubular pathway between first and second ends of the pathway, said apparatus being detachably connected to the pathway and comprising means for inserting a compressed gaseous medium into said pathway and means for flowing said gaseous medium within said pathway toward said second end at a flow velocity substantially higher than the desired transmission line advancement rate; said gaseous medium acting to propel said communications transmission line through said tubular pathway by producing viscous drag forces distributed along the advancing length of the transmission line then disposed within the pathway while the transmission line advances at a velocity substantially less than the gaseous flow velocity until a free end of the transmission line reaches said second end of the pathway.
9. Apparatus as in claim 8, wherein said apparatus includes:
an area of positive pressure radiantly resisting insertions of the free end into the pathway; and means for inserting said transmission line through said area;
said insertion means applying an insertion force to an advancing section of the transmission line situated in the vicinity of said first end which is of sufficient magnitude to overcome hydrostatic pressure forces in the gaseous medium resisting insertion of the free end into said pathway.
10. Apparatus as in claim 8, where said means for inserting comprises means for producing repeated discontinuous flows of said gaseous medium.
11. Apparatus an in claim 8, wherein said transmission line includes a plurality of transmission media disposed within a lightweight and flexible outer envelope dimensioned with respect to internal dimensions of said tubular pathway so as to facilitate advancement of the transmission line along said pathway by said distributed viscous drag forces.
12. Apparatus as in claim 8, wherein said means for flowing generates viscous drag forces of sufficient magnitude to advance said transmission line along a tubular pathway having a length of as much as several hundred meters.
13. Apparatus as in claim 8, wherein said transmission line comprises an optical fibre member including at least one optical fibre.
14. Apparatus as in claim 8, wherein said transmission line includes at least one electrical conductor.
15. Apparatus according to claim 9, wherein said insertion means includes means for discontinuing the application of said insertion force, whereby said insertion force may be discontinued after it is no longer necessary to apply such an insertion force to continue propelling the transmission line through said pathway.
16. Apparatus for advancing a communications cable, which cable includes at least one optical fibre and at least one strength member each extending along the length of the cable, along a previously installed tubular duct in situ by propelling the cable along the tubular pathway through the use of the fluid drag of a gaseous medium passed along the pathway in the desired direction of advance and said gaseous medium having substantially higher velocity than said fibre member throughout the length of the pathway, said apparatus comprising:
a housing having a hollow cable lead-through channel with an entrance end and an exit end for leading in and leading out a cable which is to be injected into the relevant duct;
a motor operatively connected to rotatable drive elements within said channel, which drive elements serve to propel a cable within said channel towards said exit end;
a gas inlet to feed compressed gas into the cable lead-through channel;
a sealing arrangement for sealing engagement between the housing and the duct into which the cable is to be installed, so that gas introduced into said cable lead-through channel passes into said duct to produce said fluid drag;
the arrangement being such that a cable which extends from said channel into said duct is advanced along the duct by the action of said rotatable drive elements in combination with fluid drag within said duct.
US07970464 1982-11-08 1992-11-02 Method and apparatus for installing transmission lines Expired - Fee Related US5456450C1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US07970464 US5456450C1 (en) 1982-11-08 1992-11-02 Method and apparatus for installing transmission lines
US08460268 US5645267C1 (en) 1982-11-08 1995-06-02 Method and apparatus for installing transmission lines
US08/852,956 US6173107B1 (en) 1982-11-08 1997-05-08 Method and apparatus for installing transmissions
US09/543,555 US6328283B1 (en) 1982-11-08 2000-04-05 Method and apparatus for installing transmission lines

Applications Claiming Priority (9)

Application Number Priority Date Filing Date Title
GB8231840 1982-11-08
GB8231480 1982-11-08
GB8309671 1983-04-08
GB838309671A GB8309671D0 (en) 1982-11-08 1983-04-08 Optical fibre transmission lines
US55164083A 1983-11-08 1983-11-08
US06848950 US4691896C1 (en) 1982-11-08 1986-04-07 Optical fibre transmission line
US07086849 US4948097C1 (en) 1982-11-08 1987-08-19 Method and apparatus for installing transmission lines
US07554927 US5169126C1 (en) 1982-11-08 1990-07-20 Method and apparatus for installing transmission lines
US07970464 US5456450C1 (en) 1982-11-08 1992-11-02 Method and apparatus for installing transmission lines

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US07554927 Division US5169126C1 (en) 1982-11-08 1990-07-20 Method and apparatus for installing transmission lines

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US08460268 Division US5645267C1 (en) 1982-11-08 1995-06-02 Method and apparatus for installing transmission lines

Publications (2)

Publication Number Publication Date
US5456450A true US5456450A (en) 1995-10-10
US5456450C1 US5456450C1 (en) 2001-05-08

Family

ID=27516494

Family Applications (5)

Application Number Title Priority Date Filing Date
US07554927 Expired - Lifetime US5169126C1 (en) 1982-11-08 1990-07-20 Method and apparatus for installing transmission lines
US07970464 Expired - Fee Related US5456450C1 (en) 1982-11-08 1992-11-02 Method and apparatus for installing transmission lines
US08460268 Expired - Fee Related US5645267C1 (en) 1982-11-08 1995-06-02 Method and apparatus for installing transmission lines
US08/852,956 Expired - Fee Related US6173107B1 (en) 1982-11-08 1997-05-08 Method and apparatus for installing transmissions
US09/543,555 Expired - Fee Related US6328283B1 (en) 1982-11-08 2000-04-05 Method and apparatus for installing transmission lines

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US07554927 Expired - Lifetime US5169126C1 (en) 1982-11-08 1990-07-20 Method and apparatus for installing transmission lines

Family Applications After (3)

Application Number Title Priority Date Filing Date
US08460268 Expired - Fee Related US5645267C1 (en) 1982-11-08 1995-06-02 Method and apparatus for installing transmission lines
US08/852,956 Expired - Fee Related US6173107B1 (en) 1982-11-08 1997-05-08 Method and apparatus for installing transmissions
US09/543,555 Expired - Fee Related US6328283B1 (en) 1982-11-08 2000-04-05 Method and apparatus for installing transmission lines

Country Status (1)

Country Link
US (5) US5169126C1 (en)

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5645267A (en) * 1982-11-08 1997-07-08 British Telecommunications Public Limited Company Method and apparatus for installing transmission lines
US5762321A (en) * 1992-10-20 1998-06-09 Meab Mobile Equipment Ab Method of inserting cables into tubing
US6012621A (en) * 1997-09-04 2000-01-11 Condux International, Inc. Cable conveying apparatus
US6089546A (en) * 1996-07-25 2000-07-18 Koninklijke Kpn N.V. Apparatus and method for removing cables from tubes
US6116578A (en) * 1997-10-01 2000-09-12 Pruett; Phillip E. Method for inserting a cable in a duct
US6349460B1 (en) 1999-01-21 2002-02-26 At&T Corp Fiber installation method and apparatus
US6364290B1 (en) 1996-09-19 2002-04-02 British Telecommunications Public Limited Company Blowing head including a buckle detector
US6402123B1 (en) * 2000-03-31 2002-06-11 Marais Sa Method for propelling a cable or the like into a duct
US6405998B1 (en) * 1997-10-06 2002-06-18 Koninklijke Kpn N.V. Method for installing cables in tubes and apparatus for practicing this method
US6694085B2 (en) * 1999-02-22 2004-02-17 Telefonaktiebolaget Lm Ericsson (Publ) Device for feeding optical fibres into a duct
US20040231401A1 (en) * 2003-05-21 2004-11-25 Pirelli General Plc. Blown installation of optical fibres and method and apparatus for determining the length of a passage along which an optical fibre is to be blown
US20050265687A1 (en) * 2004-05-21 2005-12-01 Ralph Sutehall Blown installation of optical fibres and method and apparatus for determining the length of a passage along which an optical fibre is to be blown
US20060284149A1 (en) * 2005-06-16 2006-12-21 Watkins Charles W Apparatus and method for installing lines in conduits
US20060284148A1 (en) * 2005-06-16 2006-12-21 Watkins Charles W Apparatus and method for installing lines in conduits
US20080013893A1 (en) * 2006-07-14 2008-01-17 Tenvera, Inc. Optical Fiber Ferrule and Ferrule Receiver, and Method for Manufacturing the Same
US20080011514A1 (en) * 2006-07-14 2008-01-17 Tenvera, Inc. Optical Fiber Distribution Apparatus and Method
US20080013907A1 (en) * 2006-07-14 2008-01-17 Tenvera, Inc. Optical Fiber Blowing Device and Method
US20080013909A1 (en) * 2006-07-14 2008-01-17 Tenvera, Inc. Modular Optical Fiber Network Interface
US20080013956A1 (en) * 2006-07-14 2008-01-17 Tenvera, Inc. Provisioning of Services Via an Optical Fiber Network
US20080013957A1 (en) * 2006-07-14 2008-01-17 Tenvera, Inc. Service Aggregation Gateway
US20080011990A1 (en) * 2006-07-14 2008-01-17 Tenvera, Inc. Installation of Fiber Optic Cables
US20080061101A1 (en) * 2006-09-12 2008-03-13 Baker Hughes Incorporated Filamentous member injector and method for injecting filamentous members
US20090065753A1 (en) * 2005-03-31 2009-03-12 Nitzan Gonen Optical Fibre Installation Apparatus
US20090166597A1 (en) * 2007-12-28 2009-07-02 Verizon Services Corp. Fiber drop installation device
US20090242860A1 (en) * 2006-04-03 2009-10-01 Barker Philip A Cable installation

Families Citing this family (42)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5749565A (en) * 1994-03-02 1998-05-12 British Telecommunications Public Limited Company Optical fibre installation tool
US5813658A (en) * 1994-11-23 1998-09-29 Arnco Corporation Cable feeding apparatus
GB2308019B (en) * 1995-10-24 1999-09-22 Pirelli General Plc Installing an optical fibre line in a duct
NL1010270C2 (en) 1998-10-08 2000-04-11 Koninkl Kpn Nv A method of installing cables in tubes by means of a pressurized fluid and apparatus for carrying out this method.
GB9909912D0 (en) * 1999-04-29 1999-06-30 Pirelli General Plc Method of blowing cable into a duct
US6666810B1 (en) * 1999-06-11 2003-12-23 Honeywell International Inc. Device for controllable stretching of thin materials
US6511047B1 (en) 1999-12-15 2003-01-28 Newport News Shipbuilding And Dry Dock Company Apparatus for making a plurality of blown optical fiber insertions into a duct
NL1016894C2 (en) * 2000-12-18 2002-06-19 Koninkl Kpn Nv Method for installing a duct; device for performing this method, and a band-shaped element for use with this method.
US6572081B2 (en) 2000-12-27 2003-06-03 Nkf Kabel B.V. Installation of guide tubes in a protective duct
US20020158239A1 (en) 2001-03-30 2002-10-31 Nkf Kabel B.V. Optical cable installation with mini-bend reduction
US6711328B2 (en) * 2001-07-12 2004-03-23 Nkf Kabel B.V. Installation bundle with spacer
US7100274B2 (en) * 2001-11-02 2006-09-05 Neptco Incorporated Apparatus for applying media to a conduit
WO2003039757A2 (en) * 2001-11-02 2003-05-15 Neptco Inc. Apparatus and methods for applying media to a conduit
AT412365B (en) * 2002-06-18 2005-01-25 Hygrama Ag VALVE
US6811307B2 (en) * 2002-07-10 2004-11-02 Kenneth J. Crowe DTS measurement of HV cable temperature profile
US6848541B2 (en) * 2002-07-11 2005-02-01 Nkf Kabel B.V. Optical cable installation with cable lubricator
US7992685B2 (en) * 2002-07-11 2011-08-09 Draka Comteq B.V. Optical cable lubricator with reservoir
KR20050118279A (en) * 2003-03-07 2005-12-16 브리티쉬 텔리커뮤니케이션즈 파블릭 리미티드 캄퍼니 An optical fiber cable and blowing installation technique
US7241953B2 (en) * 2003-04-15 2007-07-10 Cable Components Group, Llc. Support-separators for high performance communications cable with optional hollow tubes for; blown optical fiber, coaxial, and/or twisted pair conductors
WO2004109343A2 (en) * 2003-06-04 2004-12-16 Sempra Fiber Links Methods for installing fiber optic cable in a building
WO2006025812A1 (en) * 2004-07-16 2006-03-09 Charles Glew Hollow support separators for communications cable
WO2008011737A1 (en) * 2006-07-24 2008-01-31 Plumettaz Sa Device for installing a wire in a conduit
US20080054236A1 (en) * 2006-08-31 2008-03-06 Morris David D Method of installing a conduit, innerduct, and cable
CH701061B1 (en) * 2006-10-06 2010-11-30 Plumettaz Sa Apparatus for laying a cable.
EP1914577A1 (en) * 2006-10-17 2008-04-23 British Telecommunications Public Limited Company Optical fibre installation apparatus
US8459611B2 (en) * 2007-08-30 2013-06-11 Wesco Distribution, Inc. System for the simultaneous introduction of two items into a conduit
US8387954B2 (en) * 2007-08-30 2013-03-05 Wesco Distribution, Inc. System for the simultaneous introduction of two items into a conduit
EP2075606A1 (en) * 2007-12-28 2009-07-01 British Telecmmunications public limited campany Cable installation using induction
EP2075608A1 (en) * 2007-12-28 2009-07-01 British Telecmmunications public limited campany Cable installation using optical detection
GB0817639D0 (en) * 2008-09-26 2008-11-05 British Telecomm Cable installation apparatus
KR101342335B1 (en) * 2008-12-10 2013-12-19 가부시키가이샤 아루박 Seal mechanism and treatment device
EP2230545A1 (en) 2009-03-19 2010-09-22 BRITISH TELECOMMUNICATIONS public limited company Passive remote air flow and cable detection
GB0905590D0 (en) 2009-03-31 2009-05-13 British Telecomm Blown cable apparatus
US8167272B2 (en) * 2009-07-09 2012-05-01 Toyota Motor Engineering & Manufacturing North America, Inc. Lubricating systems, lubricant atomizing devices and methods of using the same
DE112010003274T5 (en) 2009-08-12 2012-12-27 Ulvac, Inc. Method for producing a sputtering target and sputtering target
EP2369388A1 (en) 2010-03-26 2011-09-28 British Telecommunications public limited company Optical fibre splice tray assembly
EP2657740A1 (en) * 2012-04-23 2013-10-30 British Telecommunications public limited company Cable
US9359833B2 (en) * 2013-02-20 2016-06-07 Halliburton Energy Services, Inc. Method for installing multiple fiber optic cables in coiled tubing
US9359834B2 (en) * 2013-02-20 2016-06-07 Halliburton Energy Services, Inc. Method for installing multiple sensors in unrolled coiled tubing
WO2014189567A2 (en) 2013-02-28 2014-11-27 Adc Telecommunications, Inc. Power cable with ability to provide optical fiber upgrade
US9518433B2 (en) * 2013-11-15 2016-12-13 Baker Hughes Incorporated Tubewire injection buckling mitigation
US10207426B2 (en) 2015-10-14 2019-02-19 Northrop Grumman Systems Corporation Continuous fiber filament for fused deposition modeling (FDM) additive manufactured (AM) structures

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU250437A (en) * 1937-06-17 1938-06-30 Bio Lite, Inc Display device
GB747706A (en) * 1953-02-12 1956-04-11 Philips Nv Improvements in or relating to regenerators for use in hot-gas reciprocating enginesand in refrigerators and heat pumps operating on the reversed hot-gas engine principle
GB817938A (en) * 1955-09-08 1959-08-06 Philips Nv Improvements in or relating to a method of manufacturing heat regenerators, regenerators manufactured by this method and device for carrying out this method
US3610582A (en) * 1967-10-25 1971-10-05 Icomag Trust Reg Motor-driven apparatus for drawing conductor wires into conduits
JPS5176592A (en) * 1974-12-27 1976-07-02 Sumitomo Electric Industries
CH587575A5 (en) * 1974-10-02 1977-05-13 Meier Josef Blower for electrical cable bores - has pilot line released by brake jaw only after air supply to concrete boring nozzle is initiated
JPS52100994A (en) * 1976-01-19 1977-08-24 Avco Everett Res Lab Inc Method of controlling interference electromagnetic ray
JPS54145181A (en) * 1978-04-30 1979-11-13 Ishikawajima Harima Heavy Ind Feeder for sensor for testing bent pipe
JPS5594157A (en) * 1979-01-12 1980-07-17 Ishikawajima Harima Heavy Ind Co Ltd Apparatus for inserting and recovering cable
GB2060966A (en) * 1979-08-07 1981-05-07 Ci Ka Ra Srl Intrusion warning wire-lattice
JPS5743005A (en) * 1980-08-28 1982-03-10 Tokyo Shibaura Electric Co Flange clamping device
DE3045388A1 (en) * 1980-12-02 1982-07-01 Deutsche Bundespost, vertreten durch den Präsidenten des Fernmeldetechnischen Zentralamtes, 6100 Darmstadt Telecommunications cable with optical fibres laying assembly - uses underground duct with several tubes of smaller dia.
JPS5822516A (en) * 1981-07-29 1983-02-09 バブコツク日立株式会社 Device for inserting cable with cable feeding mechanism
US4691896A (en) * 1982-11-08 1987-09-08 British Telecommunications Optical fibre transmission line
JPH05115697A (en) * 1991-10-24 1993-05-14 Sanyo Electric Co Ltd Clothes dryer

Family Cites Families (64)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE250783C (en) *
US2515953A (en) 1947-01-08 1950-07-18 Dufresne Joseph Eugene Rodding machine
US2690002A (en) 1949-11-18 1954-09-28 Olin Ind Inc Method of making hollow sheet metal fabrications having a plurality of interconnected passageways
GB846310A (en) 1956-11-19 1960-08-31 Sunbeam Corp Process of manufacturing electrically heated devices
FR1179521A (en) 1957-07-01 1959-05-26 Acec Fire-extinguishing power electric cables
US3374535A (en) 1960-03-09 1968-03-26 Olin Mathieson Method of making electric heaters
US3283123A (en) 1964-03-18 1966-11-01 Mobil Oil Corp Pipeline heating system and method for installing same
DE1209628B (en) 1965-07-07 1966-01-27 Bosch Gmbh Robert Process for inserting electrical lines into narrow channels and device for carrying out the process
GB1217683A (en) 1967-05-05 1970-12-31 British Oxygen Co Ltd Improvements in or relating to wire feeding
DE1934818A1 (en) * 1969-07-09 1971-01-14 Siemens Ag Device for the torsion-free transport of endless, thin wire
US3793732A (en) * 1970-07-29 1974-02-26 Jet Line Prod Inc Method and apparatus for installing heavy electrical conductor lines in conduits
DE2432848C2 (en) 1974-07-09 1984-01-26 Hauni-Werke Körber & Co KG, 2050 Hamburg Method and device for drying tobacco
GB1479427A (en) * 1975-02-05 1977-07-13 Bicc Ltd Opticle cables
DE2507583C2 (en) 1975-02-19 1984-08-30 Siemens AG, 1000 Berlin und 8000 München Communication cables with light guides or light guide bundles as transmission elements
FR2326714A1 (en) * 1975-09-19 1977-04-29 Cables De Lyon Geoffroy Delore PROTECTION AND MECHANICAL REINFORCEMENT OF OPTICAL FIBERS
FR2339231A1 (en) 1976-01-22 1977-08-19 Commissariat Energie Atomique PNEUMATIC DRIVE DEVICE FOR EDDY CURRENT MEASURING PROBES
US4105284A (en) * 1976-05-10 1978-08-08 Corning Glass Works Buffered optical waveguide fiber
US4082423A (en) * 1976-08-19 1978-04-04 The United States Of America As Represented By The Secretary Of The Navy Fiber optics cable strengthening method and means
US4181403A (en) * 1976-12-30 1980-01-01 Pedro Buarque De Macedo Optical fiber with compression surface layer
US4185809A (en) * 1978-01-27 1980-01-29 Nelson Jonnes Method and apparatus for pulling lightweight cable
IT1165926B (en) * 1979-01-08 1987-04-29 Cise Spa PROCEDURE AND EQUIPMENT TO BUILD A PERFECTLY WATERPROOF FIBER OPTIC CABLE, RESISTANT TO HIGH TEMPERATURE, AND CABLE WITH SUCH PROCEDURE
US4248035A (en) * 1979-04-02 1981-02-03 Northern Telecom Limited Apparatus and method used in the assembly of fibre optic cables
GB2081764B (en) * 1980-06-04 1984-05-23 Ass Elect Ind Coiling of filament
JPS5754636U (en) * 1980-09-16 1982-03-30
JPS587362Y2 (en) * 1980-10-24 1983-02-09 住友電気工業株式会社 plastic fiber
US4408378A (en) * 1980-11-21 1983-10-11 Associated Electrical Industries Limited Apparatus for forming a filament coil of figure of eight conformation
US4372792A (en) * 1981-10-15 1983-02-08 Bicc Limited Manufacture of a flexible stranded optical fiber body
GB2122367B (en) * 1982-05-06 1987-05-13 Standard Telephones Cables Ltd Laying cables
GB2119949B (en) * 1982-05-06 1986-01-08 Standard Telephones Cables Ltd Laying cables
GB2122370B (en) * 1982-05-28 1985-09-11 Ass Elect Ind Mineral insulated electric cable
JPS589359A (en) 1982-06-28 1983-01-19 Toshiba Corp Mos integrated circuit
US4446686A (en) * 1982-09-02 1984-05-08 At&T Technologies, Inc. Methods of and apparatus for controlling core-to-sheath length ratio in lightguide fiber cable and cable produced by the methods
GB2127869B (en) * 1982-09-22 1986-04-30 Standard Telephones Cables Ltd Optical fibre cable manufacture
US4740053A (en) * 1984-03-29 1988-04-26 British Telecommunications Plc Sheathed optical fiber cable
US5169126C1 (en) 1982-11-08 2001-05-08 British Telecomm Method and apparatus for installing transmission lines
ATE134046T1 (en) * 1982-11-08 1996-02-15 British Telecomm OPTICAL CABLE
US4948097C1 (en) * 1982-11-08 2001-05-01 British Telecomm Method and apparatus for installing transmission lines
DE3328358A1 (en) 1983-05-02 1985-02-21 Hubert Dipl.-Ing. 4408 Dülmen Hergeth WIDTH DISTRIBUTION SYSTEM IN A SLEEVE
DE3318233C2 (en) * 1983-05-19 1985-10-31 Philips Patentverwaltung Gmbh, 2000 Hamburg Optical cable element or cable and method for its manufacture
JPS6044675A (en) 1983-08-20 1985-03-09 株式会社日立製作所 Shifter in hollow bent piping and working method in piping using said shifter
DE3340972A1 (en) * 1983-11-11 1985-05-23 Siemens AG, 1000 Berlin und 8000 München Method for inserting an optical fibre into a protective cover
DE3409376A1 (en) * 1984-03-14 1985-12-05 Siemens AG, 1000 Berlin und 8000 München METHOD FOR THE SPEED METERING OF A LENGTH-MOVING FIBER, AND DEVICE FOR IMPLEMENTING THE METHOD
GB8408156D0 (en) * 1984-03-29 1984-05-10 Bicc Plc Manufacture of optical cable
US4640576A (en) * 1984-06-26 1987-02-03 Canada Wire And Cable Limited Method and apparatus for tubing optical fibers
FR2577724B1 (en) * 1985-02-14 1987-03-06 Lignes Telegraph Telephon METHOD FOR PNEUMATICALLY PLACING A ROPE IN A SLEEVE AND DEVICE FOR IMPLEMENTING IT
US4664791A (en) 1986-02-07 1987-05-12 Mcclain Ray Padding machines
DE3785890T2 (en) 1986-07-16 1993-09-16 British Telecomm METHOD AND DEVICE FOR TUNING.
US4756510A (en) * 1986-08-11 1988-07-12 Atlantic Richfield Company Method and system for installing fiber optic cable and the like in fluid transmission pipelines
GB8706803D0 (en) * 1987-03-23 1987-04-29 British Telecomm Optical fibre installation
NL193126B (en) 1987-04-28 1998-07-01 Nederland Ptt Method and device for arranging a cable in a cable guide tube.
GB2205916B (en) 1987-06-04 1991-04-17 British Pipeline Agency Pipeline systems
GB8727579D0 (en) * 1987-11-25 1987-12-31 Bicc Plc Method & apparatus for conveying optical fibre member
GB8727581D0 (en) * 1987-11-25 1987-12-31 Optical Fibres Method and apparatus for blowing optical fibre member
US5065928A (en) * 1987-11-25 1991-11-19 Bicc Plc. Method and apparatus for blowing an optical fibre member
GB8809594D0 (en) * 1988-04-22 1988-05-25 Bicc Plc Method of conveying optical fibre member
CA1306241C (en) 1988-08-11 1992-08-11 Nobuo Araki Method and apparatus for inserting thread into tube
JP2585823B2 (en) 1989-02-08 1997-02-26 住友電気工業株式会社 Optical fiber unit
GB2236589B (en) 1989-10-07 1993-05-05 Stc Plc Laying cables
US5533711A (en) * 1990-06-04 1996-07-09 J.P. Patent Holdings, L.L.C. Apparatus and method for pulling cable
US5215953A (en) * 1990-06-08 1993-06-01 Degussa Aktiengesellschaft Catalyst for the oxidation of sulfur dioxide and method for the production of the catalyst
US5234198A (en) * 1991-06-25 1993-08-10 At&T Bell Laboratories Apparatus for installing optical fiber in conduit
US5677974A (en) * 1995-08-28 1997-10-14 Southern New England Telephone Company Hybrid communications and power cable and distribution method and network using the same
NL1001961C2 (en) * 1995-12-21 1997-06-24 Nederland Ptt A method of installing a tubing with taps for telecommunication cables, as well as a tapping element for use in that method.
NL1001960C2 (en) 1995-12-21 1997-06-24 Nederland Ptt Method of installing a tube or bundle of tubes in an existing tubular channel.

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU250437A (en) * 1937-06-17 1938-06-30 Bio Lite, Inc Display device
GB747706A (en) * 1953-02-12 1956-04-11 Philips Nv Improvements in or relating to regenerators for use in hot-gas reciprocating enginesand in refrigerators and heat pumps operating on the reversed hot-gas engine principle
GB817938A (en) * 1955-09-08 1959-08-06 Philips Nv Improvements in or relating to a method of manufacturing heat regenerators, regenerators manufactured by this method and device for carrying out this method
US3610582A (en) * 1967-10-25 1971-10-05 Icomag Trust Reg Motor-driven apparatus for drawing conductor wires into conduits
CH587575A5 (en) * 1974-10-02 1977-05-13 Meier Josef Blower for electrical cable bores - has pilot line released by brake jaw only after air supply to concrete boring nozzle is initiated
JPS5176592A (en) * 1974-12-27 1976-07-02 Sumitomo Electric Industries
JPS52100994A (en) * 1976-01-19 1977-08-24 Avco Everett Res Lab Inc Method of controlling interference electromagnetic ray
JPS54145181A (en) * 1978-04-30 1979-11-13 Ishikawajima Harima Heavy Ind Feeder for sensor for testing bent pipe
JPS5594157A (en) * 1979-01-12 1980-07-17 Ishikawajima Harima Heavy Ind Co Ltd Apparatus for inserting and recovering cable
GB2060966A (en) * 1979-08-07 1981-05-07 Ci Ka Ra Srl Intrusion warning wire-lattice
JPS5743005A (en) * 1980-08-28 1982-03-10 Tokyo Shibaura Electric Co Flange clamping device
DE3045388A1 (en) * 1980-12-02 1982-07-01 Deutsche Bundespost, vertreten durch den Präsidenten des Fernmeldetechnischen Zentralamtes, 6100 Darmstadt Telecommunications cable with optical fibres laying assembly - uses underground duct with several tubes of smaller dia.
JPS5822516A (en) * 1981-07-29 1983-02-09 バブコツク日立株式会社 Device for inserting cable with cable feeding mechanism
US4691896A (en) * 1982-11-08 1987-09-08 British Telecommunications Optical fibre transmission line
US4691896C1 (en) * 1982-11-08 2001-05-08 British Telecomm Optical fibre transmission line
JPH05115697A (en) * 1991-10-24 1993-05-14 Sanyo Electric Co Ltd Clothes dryer

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6173107B1 (en) 1982-11-08 2001-01-09 British Telecommunications Public Limited Company Method and apparatus for installing transmissions
US6328283B1 (en) 1982-11-08 2001-12-11 British Telecommunications Public Limited Company Method and apparatus for installing transmission lines
US5645267A (en) * 1982-11-08 1997-07-08 British Telecommunications Public Limited Company Method and apparatus for installing transmission lines
US5762321A (en) * 1992-10-20 1998-06-09 Meab Mobile Equipment Ab Method of inserting cables into tubing
US6089546A (en) * 1996-07-25 2000-07-18 Koninklijke Kpn N.V. Apparatus and method for removing cables from tubes
US6364290B1 (en) 1996-09-19 2002-04-02 British Telecommunications Public Limited Company Blowing head including a buckle detector
US6012621A (en) * 1997-09-04 2000-01-11 Condux International, Inc. Cable conveying apparatus
US6264171B1 (en) 1997-09-04 2001-07-24 Condux International, Inc. Cable conveying apparatus and method
US6116578A (en) * 1997-10-01 2000-09-12 Pruett; Phillip E. Method for inserting a cable in a duct
US6405998B1 (en) * 1997-10-06 2002-06-18 Koninklijke Kpn N.V. Method for installing cables in tubes and apparatus for practicing this method
US6349460B1 (en) 1999-01-21 2002-02-26 At&T Corp Fiber installation method and apparatus
US6694085B2 (en) * 1999-02-22 2004-02-17 Telefonaktiebolaget Lm Ericsson (Publ) Device for feeding optical fibres into a duct
US6402123B1 (en) * 2000-03-31 2002-06-11 Marais Sa Method for propelling a cable or the like into a duct
US20040231401A1 (en) * 2003-05-21 2004-11-25 Pirelli General Plc. Blown installation of optical fibres and method and apparatus for determining the length of a passage along which an optical fibre is to be blown
US7207208B2 (en) * 2003-05-21 2007-04-24 Prysmian Cables & Systems Limited Blown installation of optical fibres and method and apparatus for determining the length of a passage along which an optical fibre is to be blown
US20050265687A1 (en) * 2004-05-21 2005-12-01 Ralph Sutehall Blown installation of optical fibres and method and apparatus for determining the length of a passage along which an optical fibre is to be blown
US7204126B2 (en) * 2004-05-21 2007-04-17 Prysmian Cables & Systems Limited Blown installation of optical fibres and method and apparatus for determining the length of a passage along which an optical fibre is to be blown
US8550435B2 (en) * 2005-03-31 2013-10-08 British Telecommunications Public Limited Company Optical fibre installation apparatus
US20090065753A1 (en) * 2005-03-31 2009-03-12 Nitzan Gonen Optical Fibre Installation Apparatus
US20060284148A1 (en) * 2005-06-16 2006-12-21 Watkins Charles W Apparatus and method for installing lines in conduits
US7360752B2 (en) 2005-06-16 2008-04-22 Watkins Charles W Apparatus and method for installing lines in conduits
US20060284149A1 (en) * 2005-06-16 2006-12-21 Watkins Charles W Apparatus and method for installing lines in conduits
US20090242860A1 (en) * 2006-04-03 2009-10-01 Barker Philip A Cable installation
US20080013907A1 (en) * 2006-07-14 2008-01-17 Tenvera, Inc. Optical Fiber Blowing Device and Method
US20080013909A1 (en) * 2006-07-14 2008-01-17 Tenvera, Inc. Modular Optical Fiber Network Interface
US20080013956A1 (en) * 2006-07-14 2008-01-17 Tenvera, Inc. Provisioning of Services Via an Optical Fiber Network
US20080013957A1 (en) * 2006-07-14 2008-01-17 Tenvera, Inc. Service Aggregation Gateway
US20080011990A1 (en) * 2006-07-14 2008-01-17 Tenvera, Inc. Installation of Fiber Optic Cables
US20080011514A1 (en) * 2006-07-14 2008-01-17 Tenvera, Inc. Optical Fiber Distribution Apparatus and Method
US20080013893A1 (en) * 2006-07-14 2008-01-17 Tenvera, Inc. Optical Fiber Ferrule and Ferrule Receiver, and Method for Manufacturing the Same
US20080061101A1 (en) * 2006-09-12 2008-03-13 Baker Hughes Incorporated Filamentous member injector and method for injecting filamentous members
US8413964B2 (en) * 2007-12-28 2013-04-09 Verizon Patent And Licensing Inc. Fiber drop installation device
US20090166597A1 (en) * 2007-12-28 2009-07-02 Verizon Services Corp. Fiber drop installation device

Also Published As

Publication number Publication date
US5456450C1 (en) 2001-05-08
US5645267C1 (en) 2001-05-01
US6173107B1 (en) 2001-01-09
US5169126A (en) 1992-12-08
US6328283B1 (en) 2001-12-11
US5169126C1 (en) 2001-05-08
US5645267A (en) 1997-07-08

Similar Documents

Publication Publication Date Title
US5456450A (en) Method and apparatus for installing transmission lines
US4948097A (en) Method and apparatus for installing transmission lines
US4691896A (en) Optical fibre transmission line
US4796970A (en) Optical fibre transmission lines
JPH0222921B2 (en)
US5123075A (en) Overhead electric and optical transmission systems
US5121901A (en) Sheathed optical fibres and method of installing such fibres
EP0186753B1 (en) Optical fibre transmission lines
US5234198A (en) Apparatus for installing optical fiber in conduit
EP0410736A2 (en) Electric cable installation
CA1258390A (en) Optical fibre cable structure

Legal Events

Date Code Title Description
CC Certificate of correction
FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

FPAY Fee payment

Year of fee payment: 4

REMI Maintenance fee reminder mailed
RR Request for reexamination filed

Effective date: 19990818

B1 Reexamination certificate first reexamination

Free format text: THE PATENTABILITY OF CLAIMS 1-16 IS CONFIRMED.

C1 Reexamination certificate (1st level)
FPAY Fee payment

Year of fee payment: 8

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20071010