US7640977B2 - System and method for connecting multiple stage completions - Google Patents

System and method for connecting multiple stage completions Download PDF

Info

Publication number
US7640977B2
US7640977B2 US11/561,546 US56154606A US7640977B2 US 7640977 B2 US7640977 B2 US 7640977B2 US 56154606 A US56154606 A US 56154606A US 7640977 B2 US7640977 B2 US 7640977B2
Authority
US
United States
Prior art keywords
communication line
completion
sleeve
completion stage
line connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active, expires
Application number
US11/561,546
Other versions
US20070144746A1 (en
Inventor
Jason K. Jonas
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schlumberger Technology Corp
Original Assignee
Schlumberger Technology Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Technology Corp filed Critical Schlumberger Technology Corp
Priority to US11/561,546 priority Critical patent/US7640977B2/en
Assigned to SCHLUMBERGER TECHNOLOGY CORPORATION reassignment SCHLUMBERGER TECHNOLOGY CORPORATION ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: JONAS, JASON K.
Priority to NO20065486A priority patent/NO343852B1/en
Publication of US20070144746A1 publication Critical patent/US20070144746A1/en
Priority to US12/554,674 priority patent/US20090321069A1/en
Application granted granted Critical
Publication of US7640977B2 publication Critical patent/US7640977B2/en
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/02Couplings; joints
    • E21B17/04Couplings; joints between rod or the like and bit or between rod and rod or the like
    • E21B17/046Couplings; joints between rod or the like and bit or between rod and rod or the like with ribs, pins, or jaws, and complementary grooves or the like, e.g. bayonet catches
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/02Couplings; joints
    • E21B17/028Electrical or electro-magnetic connections
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/02Couplings; joints
    • E21B17/08Casing joints
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/10Setting of casings, screens, liners or the like in wells

Definitions

  • a lower stage of the completion is moved downhole on a running string and may comprise either a stand-alone screen or a screen with a gravel pack in the annulus between the screen and the open hole or casing. After the lower completion running string is retrieved, an upper stage of the completion is deployed.
  • a fiber optic cable can be placed in the annulus between the screen and the open or cased hole.
  • a wet-mate connection is needed between the upper and lower completion equipment.
  • Optical, electrical and fluid wet-mate connectors typically are designed as discrete stand-alone components.
  • the stand-alone connectors are mated in a downhole environment that can be full of debris and contaminants. For instance, the mating can take place after an open hole gravel pack which creates a high probability for substantial amounts of debris and contaminants in the wellbore at the vicinity of the connectors during the mating sequence.
  • Existing discrete optical, electrical and fluid wet-mate connectors have proven to be very susceptible to contamination by debris during the mating process.
  • the discrete nature of the connectors results in an unfavorable geometry that can be difficult to integrate into the completion equipment.
  • the outer diameter of the completion equipment must fit within the inner casing diameter.
  • a centralized, large diameter inner port also is needed to provide access for service equipment into the lower completion and to provide a large flow area for production or injection of fluids.
  • the remaining annular space is not well suited to the typical circular cross section of discrete connectors. This limitation compromises the overall design of the completion equipment and also limits the total number of channels that can be accommodated within a given envelope.
  • the geometry of the discrete connectors also increases the difficulty of adequate flushing and debris removal from within and around the connectors prior to and during the mating sequence. Attempts to protect the connectors from debris and/or to provide adequate flushing have lead to completion equipment designs that have great complexity with an undesirable number of failure modes.
  • the present invention provides a system and method for coupling control line connectors during engagement of multiple stage completions.
  • a first completion stage has a communication line protected from debris and other contaminants.
  • a subsequent completion stage has a communication line protected from debris and other contaminants.
  • the subsequent completion stage is moved into engagement with the first completion stage.
  • the communication lines are coupled.
  • FIG. 1 is a schematic view of a wellbore with a multiple stage completion having completion stages being moved into engagement, according to an embodiment of the present invention
  • FIG. 2 is a schematic view similar to that of FIG. 1 but showing the first and second completion stages during a different period of the engagement process, according to an embodiment of the present invention
  • FIG. 3 is a schematic view similar to that of FIG. 1 but showing the first and second completion stages during another period of the engagement process, according to an embodiment of the present invention
  • FIG. 4 is a schematic view similar to that of FIG. 1 but showing the first and second completion stages during another period of the engagement process, according to an embodiment of the present invention
  • FIG. 5 is a schematic view similar to that of FIG. 1 but showing the first and second completion stages during another period of the engagement process, according to an embodiment of the present invention
  • FIG. 6 is a schematic view similar to that of FIG. 1 but showing the first and second completion stages during another period of the engagement process, according to an embodiment of the present invention
  • FIG. 7 is a schematic view similar to that of FIG. 1 but showing the first and second completion stages during another period of the engagement process, according to an embodiment of the present invention.
  • FIG. 8 is a schematic view similar to that of FIG. 1 but showing the first and second completion stages during another period of the engagement process, according to an embodiment of the present invention
  • FIG. 9 is a schematic view similar to that of FIG. 1 but showing the first and second completion stages during another period of the engagement process, according to an embodiment of the present invention.
  • FIG. 10 is a schematic view illustrating full engagement of the first and second completion stages, according to an embodiment of the present invention.
  • FIG. 11 is a cross-sectional view of an alternate embodiment of a multiple stage completion, according to another embodiment of the present invention.
  • FIG. 12 is a schematic view of another embodiment of a multiple stage completion having completion stages moved into engagement, according to an alternate embodiment of the present invention.
  • FIG. 13 is a schematic view of another embodiment of a multiple stage completion having completion stages moved into engagement, according to an alternate embodiment of the present invention.
  • FIG. 14 is a schematic view of another embodiment of a multiple stage completion having completion stages moved into engagement, according to an alternate embodiment of the present invention.
  • FIG. 15 is an elevation view of one example of a completion system utilizing a multiple stage connection system, according to an embodiment of the present invention.
  • the present invention relates to a system and methodology for connecting multiple stage completions in a wellbore environment.
  • the system and methodology enable protection of communication line connectors during deployment and engagement of completion stages.
  • the communication line connectors associated with each completion stage are enclosed for protection from debris and other contaminants that can occur during certain wellbore procedures, e.g. gravel packing procedures.
  • Protecting the communication line connectors facilitates coupling of the connectors upon the engagement of the separate stages at a downhole location.
  • the design of the stages and communication line connectors provides a desirable geometry that does not interfere with or limit operation of the completion equipment.
  • the system enables the deployment of a lower assembly in a wellbore and the subsequent engagement of an upper assembly and one or more control lines.
  • the system is capable of deploying and connecting a fixed fiber optic sensor network in a two-stage completion.
  • a continuous optical path is established from a surface location to the bottom of an open hole formation and back to the surface location to complete an optical loop.
  • the connection also may be established for other control lines, such as electrical control lines or fluid control lines in various combinations.
  • the control line connections may be established, broken and reestablished repeatedly. This type of system may be used for land applications, offshore platform applications, or subsea deployments in a variety of environments and with a variety of downhole components.
  • the system may utilize fiber sensing systems and the deployment of fiber optic sensors in sand control components, perforating components, formation fracturing components, flow control components, or other components used in various well operations including well drilling operations, completion operations, maintenance operations, and/or production operations.
  • the system also may be used to connect fiber-optic lines, electric lines and/or fluid communication lines below an electric submersible pump to control flow control valves or other devices while allowing the electric submersible pump to be removed from the wellbore and replaced.
  • the system may comprise a well operations system for installation in a well in two or more stages.
  • the well operations system may comprise a lower assembly, an upper assembly, and a connector for connecting a control line in the upper assembly to a corresponding control line in the lower assembly.
  • This type of connection system and methodology can be used to connect a variety of downhole control lines, including communication lines, power lines, electrical lines, fiber optic lines, hydraulic conduits, fluid communication lines, and other control lines.
  • the upper and lower assemblies may comprise a variety of components and assemblies for multistage well operations, including completion assemblies, drilling assemblies, well testing assemblies, well intervention assemblies, production assemblies and other assemblies used in various well operations.
  • the upper and lower assemblies also may comprise a variety of components depending on the application, including tubing, casing, liner hangers, formation isolation valves, safety valves, other well flow/control valves, perforating and other formation fracturing tools, well sealing elements, e.g. packers, polish bore receptacles, sand control components, e.g. sand screens and gravel packing tools, artificial lift mechanisms, e.g. electric submersible pumps or other pumps/gas lift valves and related accessories, drilling tools, bottom hole assemblies, diverter tools, running tools and other downhole components.
  • components including tubing, casing, liner hangers, formation isolation valves, safety valves, other well flow/control valves, perforating and other formation fracturing tools, well sealing elements, e.g. packers, polish bore receptacles, sand control components, e.g. sand screens and gravel packing tools, artificial lift mechanisms, e.g. electric submersible pumps or other pumps/gas lift valves and related
  • the term “lower” also can refer to the first or lead equipment/assembly moved downhole.
  • the term “upper” can refer to the second or later equipment/assembly moved downhole into engagement with the lower unit. In a horizontal wellbore, for example, the lower equipment/assembly is run downhole first prior to the upper equipment/assembly.
  • a completion 26 is illustrated in cross-sectional profile as having a first or lower completion stage 28 and a second or upper completion stage 30 .
  • the lower completion stage generally is the stage deployed first into either a vertical or deviated wellbore.
  • the lower completion stage 28 and the upper completion stage 30 may comprise a variety of completion types depending on the specific wellbore application for which the multiple stage completion is designed.
  • the lower stage completion may be designed with sand screens or screens with gravel pack components.
  • the lower completion stage 28 has been moved to a desired downhole location with a service tool or with other deployment or running equipment, as known to those of ordinary skill in the art.
  • the next completion stage 30 can be moved downhole toward engagement with the lower completion stage, as illustrated, to ultimately form a connection.
  • the lower completion stage 28 comprises a housing 32 that forms a receptacle 34 which is run into the wellbore and remains in the wellbore with lower completion stage 28 when the service tool is removed.
  • Housing 32 comprises a lower body section 35 and a shroud 36 , e.g. a helical shroud or muleshoe, having an alignment slot 38 and a flush port 40 .
  • Lower completion stage 28 also comprises a passageway 42 through housing 32 for routing of a communication line 44 to a communication line connector 46 integrated with the lower completion stage.
  • Communication line 44 may comprise, for example, a fiber optic line, an electric line, an auxiliary conduit or control line for transmitting hydraulic or other fluids, or a tubing for receiving a fiber optic line.
  • communication line connector 46 may comprise a fiber optic connector, an electric line connector, a hydraulic connector, or a tubing connector through which a fiber optic line is deployed.
  • communication line connector 46 comprises a fiber optic ferrule receptacle;
  • communication line 44 comprises an optical fiber disposed within a flexible protected tube;
  • passageway 42 comprises an optical fluid chamber.
  • the optical fluid chamber can be compensated to equal or near hydrostatic pressure in the wellbore, or the chamber can be at atmospheric pressure or another pressure.
  • the lower completion stage 28 further comprises a displaceable member 48 movably disposed along a surface of receptacle 34 to enclose communication line connector 46 .
  • Enclosing communication line connector 46 protects the connector from wellbore debris and other contaminants prior to completing engagement of upper completion stage 30 with the lower completion stage.
  • displaceable member 48 is a sleeve, such as a spring loaded sleeve biased toward a position enclosing communication line connector 46 .
  • Displaceable member, e.g. sleeve, 48 may be sealed to housing 32 via at least one lower seal 50 and at least one upper seal 52 .
  • sleeve 48 also may comprise one or more debris exclusion slots 54 .
  • the upper completion stage 30 comprises an upper completion housing 56 that forms a stinger 58 designed for insertion into and engagement with receptacle 34 .
  • Housing 56 may comprise an inner tubing 60 , a surrounding upper body portion 62 , and an alignment key 64 .
  • the inner tubing 60 has any interior 66 for conducting fluid flow and one or more radial flush ports 68 through which a flushing fluid can be conducted from interior 66 to the exterior of stinger 58 .
  • the surrounding upper body portion 62 may comprise a passageway 70 for routing of a communication line 72 to a communication line connector 74 integrated with the upper completion stage.
  • the communication line may comprise, for example, a fiber optic line, an electric line, an auxiliary conduit or control line for transmitting hydraulic or other fluids, or a tubing for receiving a fiber optic line.
  • communication line connector 74 may comprise a fiber optic connector, an electric line connector, a hydraulic connector, or a tubing connector through which a fiber optic line is deployed.
  • communication line connector 74 comprises a fiber optic ferrule plug or receptacle;
  • communication line 72 comprises an optical fiber disposed within a flexible, protected tube that is extensible;
  • passageway 70 comprises an optical fluid chamber.
  • the optical fluid chamber can be compensated to equal or near hydrostatic pressure in the wellbore, or the chamber can be at atmospheric pressure or another pressure.
  • the upper completion stage 30 further comprises an upper completion displaceable member 76 movably disposed along an outer surface of housing 56 to enclose communication line connector 74 .
  • Enclosing communication line connector 74 protects the connector from wellbore debris and other contaminants prior to completing engagement of upper completion stage 30 with the lower completion stage 28 .
  • upper completion displaceable member 76 may be formed as a movable sleeve, such as a spring loaded sleeve biased toward a position enclosing communication line connector 74 .
  • Displaceable member, e.g. sleeve, 76 may be sealed to housing 56 via at least one lower seal 78 and at least one upper seal 80 .
  • sleeve 76 also may comprise one or more debris exclusion slots 82 .
  • alignment key 64 engages alignment slot 38 , as illustrated best in FIG. 2 .
  • alignment key 64 and alignment slot 38 cooperate to orient the upper completion stage 30 with respect to the lower completion stage 28 such that the lower communication line connector 46 and upper communication line connector 74 are properly aligned when the upper and lower completion stages are fully landed, i.e. engaged.
  • a flushing fluid is circulated continuously from the interior 66 of tubing 60 through a bottom opening 84 of tubing 60 and through radial flush ports 68 . From radial flush ports 68 , the fluid can circulate outwardly through flush ports 40 of lower completion stage 28 along a flushing flow path 86 , as best illustrated in FIG. 3 .
  • the fluid velocity and flushing effectiveness increases as the gap narrows between upper completion stage 30 and lower completion stage 28 .
  • the completion may be designed such that seals on the upper completion stage 30 engage the lower completion stage 28 in a manner that blocks further flow through bottom opening 84 . This forces all of the flushing fluid flow through radial flush ports 68 and 40 to further increase the flushing effectiveness in the vicinity of communication line connectors 46 and 74 .
  • the upper sleeve 76 contacts the lower sleeve 48 , as illustrated best in FIG. 4 .
  • the contact between sleeve 76 and sleeve 48 blocks further flow of flushing fluid from port 68 to port 40 .
  • the upper completion stage 30 is then allowed to move further into lower completion stage 28 . This movement causes the upper sleeve 76 to retract and seals 78 to engage and move along the lower sleeve 48 until the upper body portion 62 reaches a mechanical stop 88 , as illustrated best in FIG. 5 .
  • displaceable members 48 and 76 are being described as spring biased sleeves that are biased in a direction toward enclosing the communication line connector ends in a sealed environment.
  • the retraction of lower sleeve 48 enables the upper sleeve 76 to continually move downward, creating a seal against lower body 35 in receptacle 34 , until a mechanical stop 90 is reached. At this point, the upper completion stage 30 has become sealingly engaged with the lower completion stage 28 .
  • the mechanical stops 88 and 90 determine the relative locations between upper body portion 62 and lower sleeve 48 and between upper sleeve 76 and lower body portion 35 . Those relative locations remain fixed throughout the remainder of the landing/engagement sequence. Relative spring rates on spring biased sleeves 48 , 76 can be used to control the opening sequence by determining which of the two sleeves retracts first.
  • lower sleeve 48 and upper sleeve 76 continue to retract, as illustrated best in FIG. 7 .
  • the continued retraction of the lower and upper sleeve creates a communication line connection chamber 92 that is sealed between upper body portion 62 , lower body portion 35 , upper sleeve 76 and lower sleeve 48 .
  • Continued insertion of upper completion stage 30 into lower completion stage 28 expands the size of chamber 92 until communication line connectors 46 and 74 are exposed to communication line connector chamber 92 , as illustrated best in FIG. 8 .
  • One or both of the communication line connectors can be moved into chamber 92 for coupling with the other connector.
  • communication line connector 74 is moved into and through chamber 92 .
  • upper body portion 62 is formed as a telescoping body having a first component 96 and a second component 98 that can be moved together to force communication line 72 through passageway 70 of first component 96 .
  • the movement of communication line 72 pushes communication line connector 74 into chamber 92 , as illustrated best in FIG. 9 .
  • the telescoping movement of upper body portion 62 pushes connector 74 into full engagement with connector 46 , e.g. into full engagement of a ferrule plug with a ferrule receptacle.
  • a telescoping spring (not shown) can be used to hold telescoping body 62 in an open position to ensure that sleeves 48 and 76 are retracted and chamber 92 is fully opened before the telescoping process begins. Relative spring rates between the telescoping spring and the spring biased sleeves can be used to control this mating sequence.
  • Telescoping body 62 can be designed in a variety of configurations.
  • the telescoping body 62 can be attached to upper completion stage 30 such that allowing the upper completion stage to move further downhole automatically compresses a telescoping spring and cause movement of second component 98 toward first component 96 .
  • a piston chamber can be ported to the interior of tubing 60 on one side and to annulus pressure on the other side.
  • a piston within the piston chamber can be used to compress a telescoping spring by increasing tubing pressure above annulus pressure.
  • the piston chamber can be ported to a control line extending to the surface instead of to the interior of tubing 60 . Pressure within the control line can be increased above annulus pressure to compress the telescoping spring.
  • both sides of the piston chamber can be ported to control lines run to a surface location. Increasing control line pressure in one control line and taking returns with the other control line can be used to again compress the telescoping spring and move second component 98 toward first component 96 . These and other configurations can be used to move one or both of the control line connectors into and through chamber 92 in forming a control line coupling.
  • lower completion stage 28 and upper completion stage 30 enables efficient and thorough flushing and cleaning of the area around and between the communication line connection components prior to initiating the mating of the two completion stages. Additionally, the communication line connectors and communication lines are fully sealed from wellbore fluids during running of the lower completion stage and the upper completion stage in hole, during the mating sequence, and after the wet-mate connection has been established.
  • the seals used e.g. seals 52 and 78 , can be high-pressure seals that are durable in downhole applications.
  • the sleeve members 48 and 76 and other members forming chamber 92 can be correspondingly sized to withstand high pressures, e.g. the maximum hydrostatic pressure plus injection pressure expected in the wellbore, while the sealed chamber remains at atmospheric pressure.
  • connection assembly an alternate embodiment of the connection assembly is illustrated.
  • the cross-sectional view of FIG. 11 is taken at to different levels to show a plurality of integrated lower stage communication lines 44 , e.g. control lines, coupled with a plurality of upper completion stage communication lines 72 , e.g. control lines.
  • This approach accommodates multiple communication channels along the completion.
  • the plurality of communication channels formed by corresponding communication lines 44 , 72 are spaced circumferentially around completion 26 , although the communication channels can be located or spaced differently depending on the application.
  • connection assembly additional alternate embodiments of the connection assembly are illustrated.
  • the communication line connectors also are integrated into the completion stages and thereby protected from debris and other contaminants to improve the connections formed.
  • the connections may be formed by bringing the appropriate components, e.g. ferrules, contacts or ports, into alignment with each other axially and radially. The connection does not require lateral travel of the ferrules or other components.
  • each of the communication lines e.g. hydraulic ports, is sealed individually and isolated from each other in addition to the circumferential sleeve seals used to isolate ports from the wellbore.
  • FIG. 12 one alternate configuration is illustrated that is suitable for hydraulic connections but can also be used for optical or electrical connections.
  • a plurality of communication lines 44 e.g. hydraulic ports
  • the communication lines 44 are integrated with the lower completion stage and are coupled with communication line connectors 46 .
  • a plurality of communication lines 72 e.g. hydraulic ports, is provided and the ports are located sequentially in an axial direction along upper completion stage 30 .
  • the communication lines 72 are integrated with the upper completion stage and comprise communication line connectors 74 that engage connectors 46 .
  • the sequential ports are hydraulically isolated by circumferential sleeve seals 102 .
  • the communication lines/ports are not located in the same axial plane but are spaced from each other. Once the connection is made and each set of integrated ports is aligned, optical fiber can be pumped through the connection system in applications utilizing optical fibers. Additionally, this embodiment as well as other illustrated embodiments can utilize a combination alignment system in which key 64 and alignment groove 38 provide for coarse alignment. However, a separate fine alignment key 104 and corresponding fine alignment slot 106 can be used to provide fine alignment of the lower and upper completion stages.
  • connection system has integrated control line connectors 46 / 74 that do not require rotational alignment.
  • the communication line connections are accomplished by features that extend around the circumference of stinger 58 and receptacle 34 .
  • the communication lines 72 are coupled to circumferential features 108 that engage with corresponding circumferential features 110 coupled to communication lines 44 . Because the features are circumferential, the rotational position of the upper completion stage can vary relative to the lower completion stage.
  • circumferential features 108 and corresponding circumferential features 110 may be formed as grooves on the outside of the stinger body and the inside of the receptacle body, respectively, to create flow paths for fluids.
  • the circumferential features can comprise conductors or other suitable elements extending circumferentially to enable the communication of appropriate signals.
  • connection assembly comprises a compensation system 112 , as illustrated in FIG. 14 .
  • Compensation system 112 can be used to prevent wellbore fluids from being transmitted to the internal components and connectors in the overall system while still allowing the internal components and connectors to be referenced to hydrostatic pressure. This approach reduces the pressure differential to which the seals are subjected without exposing the components and connectors to debris or other corrosive or harmful effects of the wellbore fluids.
  • the compensation system comprises a compensator piston 114 that is sealed within and moves within a chamber 116 , e.g. a bore. On one side of compensator piston 114 , chamber 116 contains uncontaminated fluid 118 in fluid communication with, for example, fluid communication lines 72 .
  • chamber 116 is referenced to the surrounding wellbore by an external port 119 that extends either to the annulus or the tubing.
  • a spring 120 can be used on either side of compensator piston 114 to keep fluid 118 at a pressure significantly or slightly above or below the hydrostatic pressure in the wellbore.
  • the compensator piston 114 moves back and forth in chamber 116 to accommodate changes in wellbore pressure as well as the expansion and compression of internal fluids due to temperature changes.
  • a relief valve 122 also can be utilized to limit the maximum pressure differential.
  • a single compensation system 112 is located in a running tool and connected to a plurality of hydraulic ports or passageways to equalize pressure acting on the communication lines in receptacle 34 and the lower completion assembly during installation.
  • separate compensation systems 112 can be connected to individual communication line passageways. Additional flexibility can be added by providing single or multiple lines connected from the running tool to the surface to allow pressure inside the lines/passageways to be actively controlled either collectively or individually from a surface location during installation of receptacle 34 .
  • the compensation system can be combined with the various connector assembly embodiments described herein.
  • FIG. 15 one example of a completion system 124 utilizing a multiple stage connection assembly 126 is illustrated. It should be noted that the multiple stage connection assembly 126 is representative of the several embodiments described above. Additionally, the completion system 124 is representative of a variety of completion systems, and the components and arrangement of components can vary substantially from one well application to another.
  • completion system 124 comprises a wellbore assembly 128 deployed in a wellbore 130 extending downwardly from a wellhead 132 .
  • wellbore assembly 128 may comprise an upper completion assembly or stage, e.g. stage 30 , having a ported production packer 133 and a contraction joint 132 .
  • a communication line, e.g. communication line 72 in the form of a cable, conduit or other suitable communication line extends downwardly to the multiple stage connection assembly.
  • the wellbore assembly 128 also comprises a lower completion assembly or stage, e.g. stage 28 , having a variety of components.
  • the lower completion assembly comprises a gravel pack packer 134 , a gravel pack circulation housing 136 , a formation isolation valve 138 , one or more gravel pack screens 140 , and a turnaround loop 142 .
  • a communication line e.g. communication line 44
  • multiple stage connection assembly 126 can be utilized in many other locations within completion system 124 and with other types of completion systems.
  • the multiple stage connection assembly can be placed above or below gravel pack packer 134 .
  • the multiple stage connection assembly 126 can be used for connecting many types of communication lines, including fluid lines, electrical lines, optical lines and other types of communication lines.
  • the multiple stage connection assembly can be used to form communication line connections utilized in controlling the operation of flow control components incorporated into completion system 124 or located within wellbore 130 at locations separate from the completion system.
  • the multiple stage completions have been described in terms of connecting previously installed electric, fiber optic, fluid, or other communication lines.
  • These communication lines or cables can be used for variety of purposes including communication of data.
  • the lines themselves also can be used as sensors or for other purposes.
  • the communication line connectors can be designed for connecting a blank control line in the lower completion stage with a blank control line in the upper completion stage.
  • This control line can then be used to control valves or other devices located in the lower completion. It can also be used to transmit fluids for release into the lower completion in chemical injection or scale inhibitor applications.
  • An optical fiber or other communication line can then be pumped through the coupled blank control line to form a continuous communication line through the multiple stage completion.
  • the mating sequence may be adjusted to form the communication line coupling prior to completing the landing of the upper completion stage in the lower completion stage.
  • Other adjustments also can be made to the mating sequence depending on the specific well application.
  • a variety of additional or alternate components can be incorporated into the lower completion stage and/or the upper completion stage to accommodate various well procedures.

Abstract

A technique is provided to facilitate connection of multiple stage completions. A first completion stage is deployed at a wellbore location. Subsequently, the next completion stage is moved downhole into engagement with the first completion stage. The completion stages each have communication lines that are coupled together downhole via movement of the completion stages into engagement.

Description

CROSS-REFERENCE TO RELATED APPLICATION
The present document is based on and claims priority to U.S. provisional application Ser. No. 60/597,402, filed Nov. 29, 2005.
BACKGROUND
Many types of wells, e.g. oil and gas wells, are completed in multiple stages. A lower stage of the completion is moved downhole on a running string and may comprise either a stand-alone screen or a screen with a gravel pack in the annulus between the screen and the open hole or casing. After the lower completion running string is retrieved, an upper stage of the completion is deployed.
In many applications, it is desirable to instrument the lower completion with electrical or optical sensors or to provide for transmission of fluids to devices in the lower completion. For example, a fiber optic cable can be placed in the annulus between the screen and the open or cased hole. To enable communication of signals between the sensor in the lower completion and the surface or seabed, a wet-mate connection is needed between the upper and lower completion equipment.
Optical, electrical and fluid wet-mate connectors typically are designed as discrete stand-alone components. The stand-alone connectors are mated in a downhole environment that can be full of debris and contaminants. For instance, the mating can take place after an open hole gravel pack which creates a high probability for substantial amounts of debris and contaminants in the wellbore at the vicinity of the connectors during the mating sequence. Existing discrete optical, electrical and fluid wet-mate connectors have proven to be very susceptible to contamination by debris during the mating process.
Furthermore, the discrete nature of the connectors results in an unfavorable geometry that can be difficult to integrate into the completion equipment. The outer diameter of the completion equipment must fit within the inner casing diameter. A centralized, large diameter inner port also is needed to provide access for service equipment into the lower completion and to provide a large flow area for production or injection of fluids. The remaining annular space is not well suited to the typical circular cross section of discrete connectors. This limitation compromises the overall design of the completion equipment and also limits the total number of channels that can be accommodated within a given envelope.
The geometry of the discrete connectors also increases the difficulty of adequate flushing and debris removal from within and around the connectors prior to and during the mating sequence. Attempts to protect the connectors from debris and/or to provide adequate flushing have lead to completion equipment designs that have great complexity with an undesirable number of failure modes.
SUMMARY
In general, the present invention provides a system and method for coupling control line connectors during engagement of multiple stage completions. A first completion stage has a communication line protected from debris and other contaminants. Similarly, a subsequent completion stage has a communication line protected from debris and other contaminants. Following deployment of the first completion stage to a downhole location, the subsequent completion stage is moved into engagement with the first completion stage. During the engagement process, the communication lines are coupled.
BRIEF DESCRIPTION OF THE DRAWINGS
Certain embodiments of the invention will hereafter be described with reference to the accompanying drawings, wherein like reference numerals denote like elements, and:
FIG. 1 is a schematic view of a wellbore with a multiple stage completion having completion stages being moved into engagement, according to an embodiment of the present invention;
FIG. 2 is a schematic view similar to that of FIG. 1 but showing the first and second completion stages during a different period of the engagement process, according to an embodiment of the present invention;
FIG. 3 is a schematic view similar to that of FIG. 1 but showing the first and second completion stages during another period of the engagement process, according to an embodiment of the present invention;
FIG. 4 is a schematic view similar to that of FIG. 1 but showing the first and second completion stages during another period of the engagement process, according to an embodiment of the present invention;
FIG. 5 is a schematic view similar to that of FIG. 1 but showing the first and second completion stages during another period of the engagement process, according to an embodiment of the present invention;
FIG. 6 is a schematic view similar to that of FIG. 1 but showing the first and second completion stages during another period of the engagement process, according to an embodiment of the present invention;
FIG. 7 is a schematic view similar to that of FIG. 1 but showing the first and second completion stages during another period of the engagement process, according to an embodiment of the present invention;
FIG. 8 is a schematic view similar to that of FIG. 1 but showing the first and second completion stages during another period of the engagement process, according to an embodiment of the present invention;
FIG. 9 is a schematic view similar to that of FIG. 1 but showing the first and second completion stages during another period of the engagement process, according to an embodiment of the present invention;
FIG. 10 is a schematic view illustrating full engagement of the first and second completion stages, according to an embodiment of the present invention;
FIG. 11 is a cross-sectional view of an alternate embodiment of a multiple stage completion, according to another embodiment of the present invention;
FIG. 12 is a schematic view of another embodiment of a multiple stage completion having completion stages moved into engagement, according to an alternate embodiment of the present invention;
FIG. 13 is a schematic view of another embodiment of a multiple stage completion having completion stages moved into engagement, according to an alternate embodiment of the present invention;
FIG. 14 is a schematic view of another embodiment of a multiple stage completion having completion stages moved into engagement, according to an alternate embodiment of the present invention; and
FIG. 15 is an elevation view of one example of a completion system utilizing a multiple stage connection system, according to an embodiment of the present invention.
DETAILED DESCRIPTION
In the following description, numerous details are set forth to provide an understanding of the present invention. However, it will be understood by those of ordinary skill in the art that the present invention may be practiced without these details and that numerous variations or modifications from the described embodiments may be possible.
The present invention relates to a system and methodology for connecting multiple stage completions in a wellbore environment. The system and methodology enable protection of communication line connectors during deployment and engagement of completion stages. The communication line connectors associated with each completion stage are enclosed for protection from debris and other contaminants that can occur during certain wellbore procedures, e.g. gravel packing procedures. Protecting the communication line connectors facilitates coupling of the connectors upon the engagement of the separate stages at a downhole location. Additionally, the design of the stages and communication line connectors provides a desirable geometry that does not interfere with or limit operation of the completion equipment.
For example, the system enables the deployment of a lower assembly in a wellbore and the subsequent engagement of an upper assembly and one or more control lines. In one embodiment, the system is capable of deploying and connecting a fixed fiber optic sensor network in a two-stage completion. In this embodiment, once the connection is established, a continuous optical path is established from a surface location to the bottom of an open hole formation and back to the surface location to complete an optical loop. The connection also may be established for other control lines, such as electrical control lines or fluid control lines in various combinations. The control line connections may be established, broken and reestablished repeatedly. This type of system may be used for land applications, offshore platform applications, or subsea deployments in a variety of environments and with a variety of downhole components. By way of example, the system may utilize fiber sensing systems and the deployment of fiber optic sensors in sand control components, perforating components, formation fracturing components, flow control components, or other components used in various well operations including well drilling operations, completion operations, maintenance operations, and/or production operations. The system also may be used to connect fiber-optic lines, electric lines and/or fluid communication lines below an electric submersible pump to control flow control valves or other devices while allowing the electric submersible pump to be removed from the wellbore and replaced.
In other embodiments, the system may comprise a well operations system for installation in a well in two or more stages. The well operations system may comprise a lower assembly, an upper assembly, and a connector for connecting a control line in the upper assembly to a corresponding control line in the lower assembly. This type of connection system and methodology can be used to connect a variety of downhole control lines, including communication lines, power lines, electrical lines, fiber optic lines, hydraulic conduits, fluid communication lines, and other control lines. Additionally, the upper and lower assemblies may comprise a variety of components and assemblies for multistage well operations, including completion assemblies, drilling assemblies, well testing assemblies, well intervention assemblies, production assemblies and other assemblies used in various well operations. The upper and lower assemblies also may comprise a variety of components depending on the application, including tubing, casing, liner hangers, formation isolation valves, safety valves, other well flow/control valves, perforating and other formation fracturing tools, well sealing elements, e.g. packers, polish bore receptacles, sand control components, e.g. sand screens and gravel packing tools, artificial lift mechanisms, e.g. electric submersible pumps or other pumps/gas lift valves and related accessories, drilling tools, bottom hole assemblies, diverter tools, running tools and other downhole components.
It also should be noted that within this description, the term “lower” also can refer to the first or lead equipment/assembly moved downhole. Furthermore, the term “upper” can refer to the second or later equipment/assembly moved downhole into engagement with the lower unit. In a horizontal wellbore, for example, the lower equipment/assembly is run downhole first prior to the upper equipment/assembly.
Referring generally to FIG. 1, a portion of a wellbore 20 is illustrated between a wellbore wall 22 and a wellbore centerline 24. A completion 26 is illustrated in cross-sectional profile as having a first or lower completion stage 28 and a second or upper completion stage 30. The lower completion stage generally is the stage deployed first into either a vertical or deviated wellbore. Also, the lower completion stage 28 and the upper completion stage 30 may comprise a variety of completion types depending on the specific wellbore application for which the multiple stage completion is designed. For example, the lower stage completion may be designed with sand screens or screens with gravel pack components. In FIG. 1, the lower completion stage 28 has been moved to a desired downhole location with a service tool or with other deployment or running equipment, as known to those of ordinary skill in the art. Once lower completion stage 28 is positioned in the wellbore and the deployment equipment is retrieved, the next completion stage 30 can be moved downhole toward engagement with the lower completion stage, as illustrated, to ultimately form a connection.
The lower completion stage 28 comprises a housing 32 that forms a receptacle 34 which is run into the wellbore and remains in the wellbore with lower completion stage 28 when the service tool is removed. Housing 32 comprises a lower body section 35 and a shroud 36, e.g. a helical shroud or muleshoe, having an alignment slot 38 and a flush port 40. Lower completion stage 28 also comprises a passageway 42 through housing 32 for routing of a communication line 44 to a communication line connector 46 integrated with the lower completion stage. Communication line 44 may comprise, for example, a fiber optic line, an electric line, an auxiliary conduit or control line for transmitting hydraulic or other fluids, or a tubing for receiving a fiber optic line. Correspondingly, communication line connector 46 may comprise a fiber optic connector, an electric line connector, a hydraulic connector, or a tubing connector through which a fiber optic line is deployed. By way of specific example, communication line connector 46 comprises a fiber optic ferrule receptacle; communication line 44 comprises an optical fiber disposed within a flexible protected tube; and passageway 42 comprises an optical fluid chamber. The optical fluid chamber can be compensated to equal or near hydrostatic pressure in the wellbore, or the chamber can be at atmospheric pressure or another pressure.
In this embodiment, the lower completion stage 28 further comprises a displaceable member 48 movably disposed along a surface of receptacle 34 to enclose communication line connector 46. Enclosing communication line connector 46 protects the connector from wellbore debris and other contaminants prior to completing engagement of upper completion stage 30 with the lower completion stage. In the embodiment illustrated, displaceable member 48 is a sleeve, such as a spring loaded sleeve biased toward a position enclosing communication line connector 46. Displaceable member, e.g. sleeve, 48 may be sealed to housing 32 via at least one lower seal 50 and at least one upper seal 52. As illustrated, sleeve 48 also may comprise one or more debris exclusion slots 54.
The upper completion stage 30 comprises an upper completion housing 56 that forms a stinger 58 designed for insertion into and engagement with receptacle 34. Housing 56 may comprise an inner tubing 60, a surrounding upper body portion 62, and an alignment key 64. The inner tubing 60 has any interior 66 for conducting fluid flow and one or more radial flush ports 68 through which a flushing fluid can be conducted from interior 66 to the exterior of stinger 58. The surrounding upper body portion 62 may comprise a passageway 70 for routing of a communication line 72 to a communication line connector 74 integrated with the upper completion stage. As with lower completion stage 28, the communication line may comprise, for example, a fiber optic line, an electric line, an auxiliary conduit or control line for transmitting hydraulic or other fluids, or a tubing for receiving a fiber optic line. Correspondingly, communication line connector 74 may comprise a fiber optic connector, an electric line connector, a hydraulic connector, or a tubing connector through which a fiber optic line is deployed. By way of specific example, communication line connector 74 comprises a fiber optic ferrule plug or receptacle; communication line 72 comprises an optical fiber disposed within a flexible, protected tube that is extensible; and passageway 70 comprises an optical fluid chamber. The optical fluid chamber can be compensated to equal or near hydrostatic pressure in the wellbore, or the chamber can be at atmospheric pressure or another pressure.
The upper completion stage 30 further comprises an upper completion displaceable member 76 movably disposed along an outer surface of housing 56 to enclose communication line connector 74. Enclosing communication line connector 74 protects the connector from wellbore debris and other contaminants prior to completing engagement of upper completion stage 30 with the lower completion stage 28. Similar to displaceable member 48, upper completion displaceable member 76 may be formed as a movable sleeve, such as a spring loaded sleeve biased toward a position enclosing communication line connector 74. Displaceable member, e.g. sleeve, 76 may be sealed to housing 56 via at least one lower seal 78 and at least one upper seal 80. As illustrated, sleeve 76 also may comprise one or more debris exclusion slots 82.
As stinger 58 is moved into receptacle 34, alignment key 64 engages alignment slot 38, as illustrated best in FIG. 2. As the stinger continues to move into receptacle 34, alignment key 64 and alignment slot 38 cooperate to orient the upper completion stage 30 with respect to the lower completion stage 28 such that the lower communication line connector 46 and upper communication line connector 74 are properly aligned when the upper and lower completion stages are fully landed, i.e. engaged.
While the upper completion stage 30 is lowered into the wellbore and into engagement with lower completion stage 28, a flushing fluid is circulated continuously from the interior 66 of tubing 60 through a bottom opening 84 of tubing 60 and through radial flush ports 68. From radial flush ports 68, the fluid can circulate outwardly through flush ports 40 of lower completion stage 28 along a flushing flow path 86, as best illustrated in FIG. 3. The fluid velocity and flushing effectiveness increases as the gap narrows between upper completion stage 30 and lower completion stage 28. The completion may be designed such that seals on the upper completion stage 30 engage the lower completion stage 28 in a manner that blocks further flow through bottom opening 84. This forces all of the flushing fluid flow through radial flush ports 68 and 40 to further increase the flushing effectiveness in the vicinity of communication line connectors 46 and 74.
As the upper completion stage 30 is continually lowered, the upper sleeve 76 contacts the lower sleeve 48, as illustrated best in FIG. 4. The contact between sleeve 76 and sleeve 48 blocks further flow of flushing fluid from port 68 to port 40. The upper completion stage 30 is then allowed to move further into lower completion stage 28. This movement causes the upper sleeve 76 to retract and seals 78 to engage and move along the lower sleeve 48 until the upper body portion 62 reaches a mechanical stop 88, as illustrated best in FIG. 5.
Further movement of the upper completion stage 30 causes the lower sleeve 48 to retract, as illustrated best in FIG. 6. It should be noted that in the embodiment illustrated, displaceable members 48 and 76 are being described as spring biased sleeves that are biased in a direction toward enclosing the communication line connector ends in a sealed environment. The retraction of lower sleeve 48 enables the upper sleeve 76 to continually move downward, creating a seal against lower body 35 in receptacle 34, until a mechanical stop 90 is reached. At this point, the upper completion stage 30 has become sealingly engaged with the lower completion stage 28.
The mechanical stops 88 and 90 determine the relative locations between upper body portion 62 and lower sleeve 48 and between upper sleeve 76 and lower body portion 35. Those relative locations remain fixed throughout the remainder of the landing/engagement sequence. Relative spring rates on spring biased sleeves 48, 76 can be used to control the opening sequence by determining which of the two sleeves retracts first.
As the insertion of upper completion stage 30 into lower completion stage 28 continues, lower sleeve 48 and upper sleeve 76 continue to retract, as illustrated best in FIG. 7. The continued retraction of the lower and upper sleeve creates a communication line connection chamber 92 that is sealed between upper body portion 62, lower body portion 35, upper sleeve 76 and lower sleeve 48. Continued insertion of upper completion stage 30 into lower completion stage 28 expands the size of chamber 92 until communication line connectors 46 and 74 are exposed to communication line connector chamber 92, as illustrated best in FIG. 8.
One or both of the communication line connectors can be moved into chamber 92 for coupling with the other connector. In the embodiment illustrated, however, communication line connector 74 is moved into and through chamber 92. In this embodiment, upper body portion 62 is formed as a telescoping body having a first component 96 and a second component 98 that can be moved together to force communication line 72 through passageway 70 of first component 96. The movement of communication line 72 pushes communication line connector 74 into chamber 92, as illustrated best in FIG. 9. Ultimately, the telescoping movement of upper body portion 62 pushes connector 74 into full engagement with connector 46, e.g. into full engagement of a ferrule plug with a ferrule receptacle. The coupling of connectors is accomplished without exposing either of the communication line connectors to detrimental debris or contaminants from the surrounding environment. Also, a telescoping spring (not shown) can be used to hold telescoping body 62 in an open position to ensure that sleeves 48 and 76 are retracted and chamber 92 is fully opened before the telescoping process begins. Relative spring rates between the telescoping spring and the spring biased sleeves can be used to control this mating sequence.
Telescoping body 62 can be designed in a variety of configurations. For example, the telescoping body 62 can be attached to upper completion stage 30 such that allowing the upper completion stage to move further downhole automatically compresses a telescoping spring and cause movement of second component 98 toward first component 96. In another configuration, a piston chamber can be ported to the interior of tubing 60 on one side and to annulus pressure on the other side. A piston within the piston chamber can be used to compress a telescoping spring by increasing tubing pressure above annulus pressure. In another configuration, the piston chamber can be ported to a control line extending to the surface instead of to the interior of tubing 60. Pressure within the control line can be increased above annulus pressure to compress the telescoping spring. Alternatively, both sides of the piston chamber can be ported to control lines run to a surface location. Increasing control line pressure in one control line and taking returns with the other control line can be used to again compress the telescoping spring and move second component 98 toward first component 96. These and other configurations can be used to move one or both of the control line connectors into and through chamber 92 in forming a control line coupling.
The geometry of lower completion stage 28 and upper completion stage 30 enables efficient and thorough flushing and cleaning of the area around and between the communication line connection components prior to initiating the mating of the two completion stages. Additionally, the communication line connectors and communication lines are fully sealed from wellbore fluids during running of the lower completion stage and the upper completion stage in hole, during the mating sequence, and after the wet-mate connection has been established. The seals used, e.g. seals 52 and 78, can be high-pressure seals that are durable in downhole applications. The sleeve members 48 and 76 and other members forming chamber 92 can be correspondingly sized to withstand high pressures, e.g. the maximum hydrostatic pressure plus injection pressure expected in the wellbore, while the sealed chamber remains at atmospheric pressure.
Referring generally to FIG. 11, an alternate embodiment of the connection assembly is illustrated. The cross-sectional view of FIG. 11 is taken at to different levels to show a plurality of integrated lower stage communication lines 44, e.g. control lines, coupled with a plurality of upper completion stage communication lines 72, e.g. control lines. This approach accommodates multiple communication channels along the completion. In the embodiment illustrated, the plurality of communication channels formed by corresponding communication lines 44, 72 are spaced circumferentially around completion 26, although the communication channels can be located or spaced differently depending on the application.
Referring generally to FIGS. 12-14, additional alternate embodiments of the connection assembly are illustrated. In these embodiments, the communication line connectors also are integrated into the completion stages and thereby protected from debris and other contaminants to improve the connections formed. The connections may be formed by bringing the appropriate components, e.g. ferrules, contacts or ports, into alignment with each other axially and radially. The connection does not require lateral travel of the ferrules or other components. To form such a connection, each of the communication lines, e.g. hydraulic ports, is sealed individually and isolated from each other in addition to the circumferential sleeve seals used to isolate ports from the wellbore.
In FIG. 12, one alternate configuration is illustrated that is suitable for hydraulic connections but can also be used for optical or electrical connections. In this embodiment, a plurality of communication lines 44, e.g. hydraulic ports, is provided and the ports are disposed sequentially in an axial direction along lower completion stage 28. The communication lines 44 are integrated with the lower completion stage and are coupled with communication line connectors 46. Similarly, a plurality of communication lines 72, e.g. hydraulic ports, is provided and the ports are located sequentially in an axial direction along upper completion stage 30. The communication lines 72 are integrated with the upper completion stage and comprise communication line connectors 74 that engage connectors 46. The sequential ports are hydraulically isolated by circumferential sleeve seals 102. Generally, the communication lines/ports are not located in the same axial plane but are spaced from each other. Once the connection is made and each set of integrated ports is aligned, optical fiber can be pumped through the connection system in applications utilizing optical fibers. Additionally, this embodiment as well as other illustrated embodiments can utilize a combination alignment system in which key 64 and alignment groove 38 provide for coarse alignment. However, a separate fine alignment key 104 and corresponding fine alignment slot 106 can be used to provide fine alignment of the lower and upper completion stages.
Another alternate embodiment is illustrated in FIG. 13. In this embodiment, the connection system has integrated control line connectors 46/74 that do not require rotational alignment. The communication line connections are accomplished by features that extend around the circumference of stinger 58 and receptacle 34. For example, the communication lines 72 are coupled to circumferential features 108 that engage with corresponding circumferential features 110 coupled to communication lines 44. Because the features are circumferential, the rotational position of the upper completion stage can vary relative to the lower completion stage. To form a hydraulic connection, for example, circumferential features 108 and corresponding circumferential features 110 may be formed as grooves on the outside of the stinger body and the inside of the receptacle body, respectively, to create flow paths for fluids. To form other types of connections, such as electrical connections, the circumferential features can comprise conductors or other suitable elements extending circumferentially to enable the communication of appropriate signals.
In another embodiment, the connection assembly comprises a compensation system 112, as illustrated in FIG. 14. Compensation system 112 can be used to prevent wellbore fluids from being transmitted to the internal components and connectors in the overall system while still allowing the internal components and connectors to be referenced to hydrostatic pressure. This approach reduces the pressure differential to which the seals are subjected without exposing the components and connectors to debris or other corrosive or harmful effects of the wellbore fluids. The compensation system comprises a compensator piston 114 that is sealed within and moves within a chamber 116, e.g. a bore. On one side of compensator piston 114, chamber 116 contains uncontaminated fluid 118 in fluid communication with, for example, fluid communication lines 72. On the other side of piston 114, chamber 116 is referenced to the surrounding wellbore by an external port 119 that extends either to the annulus or the tubing. Optionally, a spring 120 can be used on either side of compensator piston 114 to keep fluid 118 at a pressure significantly or slightly above or below the hydrostatic pressure in the wellbore. The compensator piston 114 moves back and forth in chamber 116 to accommodate changes in wellbore pressure as well as the expansion and compression of internal fluids due to temperature changes. A relief valve 122 also can be utilized to limit the maximum pressure differential. In the embodiment illustrated, a single compensation system 112 is located in a running tool and connected to a plurality of hydraulic ports or passageways to equalize pressure acting on the communication lines in receptacle 34 and the lower completion assembly during installation. Alternatively, separate compensation systems 112 can be connected to individual communication line passageways. Additional flexibility can be added by providing single or multiple lines connected from the running tool to the surface to allow pressure inside the lines/passageways to be actively controlled either collectively or individually from a surface location during installation of receptacle 34. The compensation system can be combined with the various connector assembly embodiments described herein.
The various multiple stage connection assemblies described herein can be used with many types of completion systems depending on the specific wellbore application for which a given completion system is designed. In FIG. 15, one example of a completion system 124 utilizing a multiple stage connection assembly 126 is illustrated. It should be noted that the multiple stage connection assembly 126 is representative of the several embodiments described above. Additionally, the completion system 124 is representative of a variety of completion systems, and the components and arrangement of components can vary substantially from one well application to another.
In the embodiment illustrated, completion system 124 comprises a wellbore assembly 128 deployed in a wellbore 130 extending downwardly from a wellhead 132. By way of example, wellbore assembly 128 may comprise an upper completion assembly or stage, e.g. stage 30, having a ported production packer 133 and a contraction joint 132. A communication line, e.g. communication line 72, in the form of a cable, conduit or other suitable communication line extends downwardly to the multiple stage connection assembly. The wellbore assembly 128 also comprises a lower completion assembly or stage, e.g. stage 28, having a variety of components. In one example, the lower completion assembly comprises a gravel pack packer 134, a gravel pack circulation housing 136, a formation isolation valve 138, one or more gravel pack screens 140, and a turnaround loop 142. Additionally, a communication line, e.g. communication line 44, may be in the form of a cable, conduit or other suitable communication line that extends below the multiple stage connection assembly 126.
It should be noted that multiple stage connection assembly 126 can be utilized in many other locations within completion system 124 and with other types of completion systems. For example, the multiple stage connection assembly can be placed above or below gravel pack packer 134. Additionally, the multiple stage connection assembly 126 can be used for connecting many types of communication lines, including fluid lines, electrical lines, optical lines and other types of communication lines. Furthermore, the multiple stage connection assembly can be used to form communication line connections utilized in controlling the operation of flow control components incorporated into completion system 124 or located within wellbore 130 at locations separate from the completion system.
In general, the multiple stage completions have been described in terms of connecting previously installed electric, fiber optic, fluid, or other communication lines. These communication lines or cables can be used for variety of purposes including communication of data. The lines themselves also can be used as sensors or for other purposes. The communication line connectors can be designed for connecting a blank control line in the lower completion stage with a blank control line in the upper completion stage. This control line can then be used to control valves or other devices located in the lower completion. It can also be used to transmit fluids for release into the lower completion in chemical injection or scale inhibitor applications. An optical fiber or other communication line can then be pumped through the coupled blank control line to form a continuous communication line through the multiple stage completion. In other applications, the mating sequence may be adjusted to form the communication line coupling prior to completing the landing of the upper completion stage in the lower completion stage. Other adjustments also can be made to the mating sequence depending on the specific well application. Furthermore, a variety of additional or alternate components can be incorporated into the lower completion stage and/or the upper completion stage to accommodate various well procedures.
Accordingly, although only a few embodiments of the present invention have been described in detail above, those of ordinary skill in the art will readily appreciate that many modifications are possible without materially departing from the teachings of this invention. Accordingly, such modifications are intended to be included within the scope of this invention as defined in the claims.

Claims (28)

1. A downhole completion system, comprising:
a lower completion stage having a receptacle and a first communication line connector;
an upper completion stage having a stinger and a second communication line connector, wherein the lower completion stage further comprises a first sleeve enclosing the first communication line connector; and the upper completion stage further comprises a second sleeve enclosing the second communication line connector, the first sleeve and the second sleeve being positioned such that sufficient insertion of the stinger into the receptacle moves the first sleeve and the second sleeve to enable coupling of the first and second communication line connectors; and
an alignment feature to align the first communication line connector with the second communication line connector upon the sufficient insertion, the sufficient insertion further moving the first sleeve and the second sleeve to create a sealed chamber in which the first and second communication line connectors are coupled.
2. The downhole completion system as recited in claim 1, further comprising fiber optic lines coupled to the first communication line connector and to the second communication line connector.
3. The downhole completion system as recited in claim 1, further comprising tubing lines coupled to the first communication line connector and to the second communication line connector.
4. The downhole completion system as recited in claim 3, wherein the tubing lines are sized to receive a fiber optic line therethrough.
5. The downhole completion system as recited in claim 1, wherein the first sleeve and the second sleeve are spring loaded sleeves.
6. The downhole completion system as recited in claim 1, wherein the sufficient insertion creates a seal between the lower completion stage and the upper completion stage.
7. A downhole completion system, comprising:
a lower completion stage having a receptacle and a first communication line connector;
an upper completion stage having a stinger and a second communication line connector, wherein the lower completion stage further comprises a first sleeve enclosing the first communication line connector; and the upper completion stage further comprises a second sleeve enclosing the second communication line connector, the first sleeve and the second sleeve being positioned such that sufficient insertion of the stinger into the receptacle moves the first sleeve and the second sleeve to enable coupling of the first and second communication line connectors; and
wherein the stinger comprises radial circulation ports.
8. The downhole completion system as recited in claim 7, further comprising fiber optic lines coupled to the first communication line connector and to the second communication line connector.
9. The downhole completion system as recited in claim 7, further comprising tubing lines coupled to the first communication line connector and to the second communication line connector.
10. The downhole completion system as recited in claim 9, wherein the tubing lines are sized to receive a fiber optic line therethrough.
11. The downhole completion system as recited in claim 7, wherein the first sleeve and the second sleeve are spring loaded sleeves.
12. The downhole completion as recited in claim 7, wherein the sufficient insertion creates a seal between the lower completion stage and the upper completion stage.
13. A method of connecting a multiple stage completion, comprising:
enclosing a first communication line connector in a first completion stage;
enclosing a second communication line connector in a second completion stage;
exposing the first communication line connector and the second communication line connector to each other in a common chamber created upon engagement of the second completion stage with the first completion stage at a downhole location; and
subsequently moving at least one of the first and second communication line connectors into engagement with the other.
14. The method as recited in claim 13, wherein enclosing the first communication line comprises providing a spring loaded sleeve biased toward an enclosed position.
15. The method as recited in claim 13, wherein enclosing the second communication line comprises providing a spring loaded sleeve biased toward an enclosed position.
16. The method as recited in claim 13, wherein exposing comprises utilizing the second completion stage to move a first displaceable member enclosing the first communication line connector, and utilizing the first completion stage to move a second displaceable member enclosing the second communication line connector.
17. The method as recited in claim 13, further comprising connecting fiber optic lines to the first and second communication line connectors.
18. The method as recited in claim 13, further comprising connecting blank tubing lines to the first and second communication line connectors.
19. The method as recited in claim 13, further comprising connecting electric lines to the first and second communication line connectors.
20. A method of forming a completion in a wellbore, comprising:
deploying a lower completion stage downhole;
landing an upper completion stage having a second communication line connector in the lower completion stage having a first communication line connector;
forming a sealed communication line chamber during landing; and exposing the first communication line connector and the second communication line connector to each other in the sealed communication line chamber created upon engagement of the second completion stage with the first completion stage at a downhole location; and
subsequently moving the first communication line connector outwardly from a communication line passageway and into engagement with the second communication line connector in the sealed communication line chamber.
21. The method as recited in claim 20, further comprising circulating a flushing fluid through the upper completion stage during landing.
22. The method as recited in claim 20, further comprising enclosing the first and second communication line connectors with slidable sleeves prior to forming the sealed communication line chamber.
23. The method as recited in claim 20, wherein extending comprises connecting a fiber optic line.
24. The method as recited in claim 20, further comprising using an alignment feature to rotationally align the upper completion stage with the lower completion stage during landing.
25. The method as recited in claim 20, wherein landing comprises inserting a stinger into a receptacle.
26. A completion system, comprising:
a lower completion stage having a first line connector enclosed by a first sleeve; and
an upper completion stage having a second line connector enclosed by a second sleeve;
the first and second sleeves being movable to expose the first and second line connectors in a common chamber created upon engagement of the upper completion stage with the lower completion stage at a downhole location, wherein at least one of the first and second line connectors is movable outwardly from a communication line passageway following engagement of the upper completion stage with the lower completion stage.
27. The system as recited in claim 26, wherein the first and second sleeves are spring loaded sleeves.
28. The system as recited in claim 26, wherein engagement of the upper completion stage with the lower completion stage moves the first and second sleeves to expose the first and second line connectors.
US11/561,546 2005-11-29 2006-11-20 System and method for connecting multiple stage completions Active 2026-12-30 US7640977B2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US11/561,546 US7640977B2 (en) 2005-11-29 2006-11-20 System and method for connecting multiple stage completions
NO20065486A NO343852B1 (en) 2005-11-29 2006-11-28 System and method for connecting multi-stage additions
US12/554,674 US20090321069A1 (en) 2005-11-29 2009-09-04 System and method for connecting multiple stage completions

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US59740205P 2005-11-29 2005-11-29
US11/561,546 US7640977B2 (en) 2005-11-29 2006-11-20 System and method for connecting multiple stage completions

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US12/554,674 Continuation US20090321069A1 (en) 2005-11-29 2009-09-04 System and method for connecting multiple stage completions

Publications (2)

Publication Number Publication Date
US20070144746A1 US20070144746A1 (en) 2007-06-28
US7640977B2 true US7640977B2 (en) 2010-01-05

Family

ID=38192274

Family Applications (2)

Application Number Title Priority Date Filing Date
US11/561,546 Active 2026-12-30 US7640977B2 (en) 2005-11-29 2006-11-20 System and method for connecting multiple stage completions
US12/554,674 Abandoned US20090321069A1 (en) 2005-11-29 2009-09-04 System and method for connecting multiple stage completions

Family Applications After (1)

Application Number Title Priority Date Filing Date
US12/554,674 Abandoned US20090321069A1 (en) 2005-11-29 2009-09-04 System and method for connecting multiple stage completions

Country Status (2)

Country Link
US (2) US7640977B2 (en)
NO (1) NO343852B1 (en)

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080029274A1 (en) * 2006-07-28 2008-02-07 Rytlewski Gary L Downhole wet mate connection
US20090033331A1 (en) * 2007-08-02 2009-02-05 Baker Hughes Incorporated Optical fiber landing indicator with distributed temperature sensor calibration
US20110029273A1 (en) * 2009-07-10 2011-02-03 Schlumberger Technology Corporation Method and apparatus to monitor reformation and replacement of co2/ch4 gas hydrates
US20110139458A1 (en) * 2009-12-10 2011-06-16 Schlumberger Technology Corporation Well completion with hydraulic and electrical wet connect system
US20110146988A1 (en) * 2009-12-22 2011-06-23 Halliburton Energy Services, Inc. Apparatus and Method for Separating a Downhole Tubular String into Two Parts
US20110168406A1 (en) * 2010-01-12 2011-07-14 Schlumberger Technology Corporation Downhole hydraulic coupling assembly
US20120152569A1 (en) * 2010-12-16 2012-06-21 Baker Hughes Incorporated Plural barrier valve system with wet connect
US20130075110A1 (en) * 2011-08-15 2013-03-28 Halliburton Energy Services, Inc. Debris Barrier for Hydraulic Disconnect Tools
US20130233563A1 (en) * 2012-03-07 2013-09-12 Baker Hughes Incorporated Well isolation control system and method
US8739884B2 (en) 2010-12-07 2014-06-03 Baker Hughes Incorporated Stackable multi-barrier system and method
US8739885B2 (en) 2011-08-15 2014-06-03 Halliburton Energy Services, Inc. Debris barrier for hydraulic disconnect tools
US8813855B2 (en) 2010-12-07 2014-08-26 Baker Hughes Incorporated Stackable multi-barrier system and method
US8955600B2 (en) 2011-04-05 2015-02-17 Baker Hughes Incorporated Multi-barrier system and method
US9016389B2 (en) 2012-03-29 2015-04-28 Baker Hughes Incorporated Retrofit barrier valve system
US9016372B2 (en) 2012-03-29 2015-04-28 Baker Hughes Incorporated Method for single trip fluid isolation
US9027651B2 (en) 2010-12-07 2015-05-12 Baker Hughes Incorporated Barrier valve system and method of closing same by withdrawing upper completion
US9051811B2 (en) 2010-12-16 2015-06-09 Baker Hughes Incorporated Barrier valve system and method of controlling same with tubing pressure
US9238953B2 (en) 2011-11-08 2016-01-19 Schlumberger Technology Corporation Completion method for stimulation of multiple intervals
US9540911B2 (en) 2010-06-24 2017-01-10 Schlumberger Technology Corporation Control of multiple tubing string well systems
US9631468B2 (en) 2013-09-03 2017-04-25 Schlumberger Technology Corporation Well treatment
US9650851B2 (en) 2012-06-18 2017-05-16 Schlumberger Technology Corporation Autonomous untethered well object
US9828829B2 (en) 2012-03-29 2017-11-28 Baker Hughes, A Ge Company, Llc Intermediate completion assembly for isolating lower completion
WO2021021418A1 (en) * 2019-08-01 2021-02-04 Weatherford Technology Holdings, Llc Downhole fiber optic wet mate connections
WO2021247726A1 (en) * 2020-06-03 2021-12-09 Schlumberger Technology Corporation System and method for connecting multiple stage completions
US20220170346A1 (en) * 2020-11-27 2022-06-02 Halliburton Energy Services, Inc. Travel Joint For Tubular Well Components
US11795767B1 (en) 2020-11-18 2023-10-24 Schlumberger Technology Corporation Fiber optic wetmate

Families Citing this family (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9109439B2 (en) * 2005-09-16 2015-08-18 Intelliserv, Llc Wellbore telemetry system and method
US7793718B2 (en) * 2006-03-30 2010-09-14 Schlumberger Technology Corporation Communicating electrical energy with an electrical device in a well
US8056619B2 (en) 2006-03-30 2011-11-15 Schlumberger Technology Corporation Aligning inductive couplers in a well
US7712524B2 (en) 2006-03-30 2010-05-11 Schlumberger Technology Corporation Measuring a characteristic of a well proximate a region to be gravel packed
US7644755B2 (en) * 2006-08-23 2010-01-12 Baker Hughes Incorporated Annular electrical wet connect
US20080223585A1 (en) * 2007-03-13 2008-09-18 Schlumberger Technology Corporation Providing a removable electrical pump in a completion system
US7900698B2 (en) * 2007-08-13 2011-03-08 Baker Hughes Incorporated Downhole wet-mate connector debris exclusion system
US20090078429A1 (en) * 2007-09-05 2009-03-26 Schlumberger Technology Corporation System and method for engaging well equipment in a wellbore
US8496064B2 (en) * 2007-09-05 2013-07-30 Schlumberger Technology Corporation System and method for engaging completions in a wellbore
US7806190B2 (en) * 2007-09-24 2010-10-05 Du Michael H Contraction joint system
US7934553B2 (en) 2008-04-21 2011-05-03 Schlumberger Technology Corporation Method for controlling placement and flow at multiple gravel pack zones in a wellbore
US7735559B2 (en) 2008-04-21 2010-06-15 Schlumberger Technology Corporation System and method to facilitate treatment and production in a wellbore
US9482233B2 (en) * 2008-05-07 2016-11-01 Schlumberger Technology Corporation Electric submersible pumping sensor device and method
US8839850B2 (en) 2009-10-07 2014-09-23 Schlumberger Technology Corporation Active integrated completion installation system and method
US20110083856A1 (en) * 2009-10-08 2011-04-14 Schlumberger Technology Corporation Sensor deployment and retrieval system using fluid drag force
US20110162839A1 (en) * 2010-01-07 2011-07-07 Henning Hansen Retrofit wellbore fluid injection system
NO333239B1 (en) * 2011-05-03 2013-04-15 Vetco Gray Scandinavia As Method for connecting two coupling parts of a submarine coupling device.
US8915304B2 (en) * 2011-07-30 2014-12-23 Halliburton Energy Services, Inc. Traversing a travel joint with a fluid line
US9249559B2 (en) 2011-10-04 2016-02-02 Schlumberger Technology Corporation Providing equipment in lateral branches of a well
US9644476B2 (en) 2012-01-23 2017-05-09 Schlumberger Technology Corporation Structures having cavities containing coupler portions
US9175560B2 (en) 2012-01-26 2015-11-03 Schlumberger Technology Corporation Providing coupler portions along a structure
US9938823B2 (en) 2012-02-15 2018-04-10 Schlumberger Technology Corporation Communicating power and data to a component in a well
US10036234B2 (en) 2012-06-08 2018-07-31 Schlumberger Technology Corporation Lateral wellbore completion apparatus and method
US9759016B2 (en) 2013-01-10 2017-09-12 Halliburton Energy Services, Inc. Protection assembly for downhole wet connectors
WO2015023807A1 (en) * 2013-08-14 2015-02-19 Schlumberger Canada Limited Hydraulic load sensor system and methodology
US10502003B2 (en) * 2015-07-13 2019-12-10 Baker Hughes, A Ge Company, Llc Pressure and thermal compensation system for subterranean hydraulic control line connectors
US11053770B2 (en) * 2016-03-01 2021-07-06 Baker Hughes, A Ge Company, Llc Coiled tubing deployed ESP with seal stack that is slidable relative to packer bore
US10267097B2 (en) * 2016-11-09 2019-04-23 Baker Hughes, A Ge Company, Llc Pressure compensating connector system, downhole assembly, and method
US11719065B2 (en) * 2020-11-13 2023-08-08 Onesubsea Ip Uk Limited Configurable coupling assembly
BR112023014399A2 (en) * 2021-01-18 2023-10-03 Schlumberger Technology Bv FIBER ELECTRIC WET COMBINATION

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3545542A (en) * 1968-06-10 1970-12-08 Byron Jackson Inc Cementing plug launching apparatus
US4673242A (en) * 1981-12-21 1987-06-16 Thomas & Betts Corporation Movable closure for optical elements
US5831156A (en) * 1997-03-12 1998-11-03 Mullins; Albert Augustus Downhole system for well control and operation
US5838857A (en) 1997-04-07 1998-11-17 Lockheed Martin Corporation Joined chamber connector
GB2333786A (en) 1998-01-29 1999-08-04 Baker Hughes Inc Downhole connector for production tubing and control line
WO2002006625A1 (en) 2000-07-13 2002-01-24 Shell Internationale Research Maatschappij B.V. Deploying a cable through a guide conduit in a well
US6378610B2 (en) 2000-03-17 2002-04-30 Schlumberger Technology Corp. Communicating with devices positioned outside a liner in a wellbore
US20020162666A1 (en) 2001-05-04 2002-11-07 Koehler Kurt D. Deep well instrumentation
US6487893B2 (en) 1999-10-18 2002-12-03 Schlumberger Technology Corporation Apparatus and method for pressure testing the sealing engagement of the fittings associated with the communication lines of a well tool
US20030173077A1 (en) * 2001-12-19 2003-09-18 Smith Robert C. Pressure control system for a wet connect/disconnect hydraulic control line connector
US20030211768A1 (en) * 1999-11-05 2003-11-13 David Cameron Prb with tec bypass and wet disconnect/connect feature
GB2398806A (en) 2003-02-27 2004-09-01 Sensor Highway Ltd Deploying a control line in a subterranean well
US6789621B2 (en) 2000-08-03 2004-09-14 Schlumberger Technology Corporation Intelligent well system and method
US20050072564A1 (en) * 2003-10-07 2005-04-07 Tommy Grigsby Gravel pack completion with fluid loss control fiber optic wet connect
GB2407649A (en) 2003-10-31 2005-05-04 Weatherford Lamb Optical waveguide connector assembly
GB2413399A (en) 2004-04-20 2005-10-26 Halliburton Energy Serv Inc Fibre optic connector acceleration protection and tolerance compliance
US6983796B2 (en) 2000-01-05 2006-01-10 Baker Hughes Incorporated Method of providing hydraulic/fiber conduits adjacent bottom hole assemblies for multi-step completions
US20060086508A1 (en) 2003-08-15 2006-04-27 Weatherford/Lamb, Inc. Placing fiber optic sensor line
US7487830B2 (en) * 2002-11-11 2009-02-10 Baker Hughes Incorporated Method and apparatus to facilitate wet or dry control line connection for the downhole environment

Patent Citations (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3545542A (en) * 1968-06-10 1970-12-08 Byron Jackson Inc Cementing plug launching apparatus
US4673242A (en) * 1981-12-21 1987-06-16 Thomas & Betts Corporation Movable closure for optical elements
US5831156A (en) * 1997-03-12 1998-11-03 Mullins; Albert Augustus Downhole system for well control and operation
US5838857A (en) 1997-04-07 1998-11-17 Lockheed Martin Corporation Joined chamber connector
GB2333786A (en) 1998-01-29 1999-08-04 Baker Hughes Inc Downhole connector for production tubing and control line
US6186229B1 (en) 1998-01-29 2001-02-13 Baker Hughes Incorporated Downhole connector for production tubing and control line and method
US6390193B1 (en) 1998-01-29 2002-05-21 Baker Hughes Incorporated Downhole connector for production tubing and control line and method
US6487893B2 (en) 1999-10-18 2002-12-03 Schlumberger Technology Corporation Apparatus and method for pressure testing the sealing engagement of the fittings associated with the communication lines of a well tool
US20030211768A1 (en) * 1999-11-05 2003-11-13 David Cameron Prb with tec bypass and wet disconnect/connect feature
US6983796B2 (en) 2000-01-05 2006-01-10 Baker Hughes Incorporated Method of providing hydraulic/fiber conduits adjacent bottom hole assemblies for multi-step completions
US6378610B2 (en) 2000-03-17 2002-04-30 Schlumberger Technology Corp. Communicating with devices positioned outside a liner in a wellbore
WO2002006625A1 (en) 2000-07-13 2002-01-24 Shell Internationale Research Maatschappij B.V. Deploying a cable through a guide conduit in a well
US6789621B2 (en) 2000-08-03 2004-09-14 Schlumberger Technology Corporation Intelligent well system and method
US6668921B2 (en) * 2001-05-04 2003-12-30 Sensor Highway Limited Providing a conduit for an instrumentation line
US20020162666A1 (en) 2001-05-04 2002-11-07 Koehler Kurt D. Deep well instrumentation
US6755253B2 (en) 2001-12-19 2004-06-29 Baker Hughes Incorporated Pressure control system for a wet connect/disconnect hydraulic control line connector
US20030173077A1 (en) * 2001-12-19 2003-09-18 Smith Robert C. Pressure control system for a wet connect/disconnect hydraulic control line connector
GB2410263A (en) 2002-03-04 2005-07-27 Schlumberger Holdings A completion assembly for a well
US7487830B2 (en) * 2002-11-11 2009-02-10 Baker Hughes Incorporated Method and apparatus to facilitate wet or dry control line connection for the downhole environment
GB2398806A (en) 2003-02-27 2004-09-01 Sensor Highway Ltd Deploying a control line in a subterranean well
US20060086508A1 (en) 2003-08-15 2006-04-27 Weatherford/Lamb, Inc. Placing fiber optic sensor line
US20050072564A1 (en) * 2003-10-07 2005-04-07 Tommy Grigsby Gravel pack completion with fluid loss control fiber optic wet connect
WO2005045185A1 (en) 2003-10-07 2005-05-19 Halliburton Energy Services, Inc. Gravel pack completion with fluid loss control and fiber optic wet connect
GB2407649A (en) 2003-10-31 2005-05-04 Weatherford Lamb Optical waveguide connector assembly
US7252437B2 (en) * 2004-04-20 2007-08-07 Halliburton Energy Services, Inc. Fiber optic wet connector acceleration protection and tolerance compliance
GB2413399A (en) 2004-04-20 2005-10-26 Halliburton Energy Serv Inc Fibre optic connector acceleration protection and tolerance compliance

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
http://dictionary.reference.com/browse/couple. *
http://dictionary.reference.com/browse/seal. *

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080029274A1 (en) * 2006-07-28 2008-02-07 Rytlewski Gary L Downhole wet mate connection
US8752635B2 (en) 2006-07-28 2014-06-17 Schlumberger Technology Corporation Downhole wet mate connection
US20090033331A1 (en) * 2007-08-02 2009-02-05 Baker Hughes Incorporated Optical fiber landing indicator with distributed temperature sensor calibration
US7744292B2 (en) * 2007-08-02 2010-06-29 Baker Hughes Incorporated Optical fiber landing indicator with distributed temperature sensor calibration
US20110029273A1 (en) * 2009-07-10 2011-02-03 Schlumberger Technology Corporation Method and apparatus to monitor reformation and replacement of co2/ch4 gas hydrates
US8548743B2 (en) 2009-07-10 2013-10-01 Schlumberger Technology Corporation Method and apparatus to monitor reformation and replacement of CO2/CH4 gas hydrates
US8550175B2 (en) * 2009-12-10 2013-10-08 Schlumberger Technology Corporation Well completion with hydraulic and electrical wet connect system
US20110139458A1 (en) * 2009-12-10 2011-06-16 Schlumberger Technology Corporation Well completion with hydraulic and electrical wet connect system
US8316954B2 (en) * 2009-12-22 2012-11-27 Halliburton Energy Services, Inc. Apparatus and method for separating a downhole tubular string into two parts
US20110146988A1 (en) * 2009-12-22 2011-06-23 Halliburton Energy Services, Inc. Apparatus and Method for Separating a Downhole Tubular String into Two Parts
US20110168406A1 (en) * 2010-01-12 2011-07-14 Schlumberger Technology Corporation Downhole hydraulic coupling assembly
US9540911B2 (en) 2010-06-24 2017-01-10 Schlumberger Technology Corporation Control of multiple tubing string well systems
US8739884B2 (en) 2010-12-07 2014-06-03 Baker Hughes Incorporated Stackable multi-barrier system and method
US9027651B2 (en) 2010-12-07 2015-05-12 Baker Hughes Incorporated Barrier valve system and method of closing same by withdrawing upper completion
US8813855B2 (en) 2010-12-07 2014-08-26 Baker Hughes Incorporated Stackable multi-barrier system and method
US20120152569A1 (en) * 2010-12-16 2012-06-21 Baker Hughes Incorporated Plural barrier valve system with wet connect
US8550172B2 (en) * 2010-12-16 2013-10-08 Baker Hughes Incorporated Plural barrier valve system with wet connect
US9051811B2 (en) 2010-12-16 2015-06-09 Baker Hughes Incorporated Barrier valve system and method of controlling same with tubing pressure
US8955600B2 (en) 2011-04-05 2015-02-17 Baker Hughes Incorporated Multi-barrier system and method
US20130075110A1 (en) * 2011-08-15 2013-03-28 Halliburton Energy Services, Inc. Debris Barrier for Hydraulic Disconnect Tools
US8770300B2 (en) * 2011-08-15 2014-07-08 Halliburton Energy Services, Inc. Debris barrier for hydraulic disconnect tools
US8739885B2 (en) 2011-08-15 2014-06-03 Halliburton Energy Services, Inc. Debris barrier for hydraulic disconnect tools
AU2016201706B2 (en) * 2011-08-15 2016-11-24 Halliburton Energy Services, Inc. Debris barrier for hydraulic disconnect tools
US9238953B2 (en) 2011-11-08 2016-01-19 Schlumberger Technology Corporation Completion method for stimulation of multiple intervals
US20130233563A1 (en) * 2012-03-07 2013-09-12 Baker Hughes Incorporated Well isolation control system and method
US9016389B2 (en) 2012-03-29 2015-04-28 Baker Hughes Incorporated Retrofit barrier valve system
US9016372B2 (en) 2012-03-29 2015-04-28 Baker Hughes Incorporated Method for single trip fluid isolation
US9828829B2 (en) 2012-03-29 2017-11-28 Baker Hughes, A Ge Company, Llc Intermediate completion assembly for isolating lower completion
US9650851B2 (en) 2012-06-18 2017-05-16 Schlumberger Technology Corporation Autonomous untethered well object
US9631468B2 (en) 2013-09-03 2017-04-25 Schlumberger Technology Corporation Well treatment
WO2021021418A1 (en) * 2019-08-01 2021-02-04 Weatherford Technology Holdings, Llc Downhole fiber optic wet mate connections
US11162306B2 (en) * 2019-08-01 2021-11-02 Weatherford Technology Holdings, Llc Downhole fiber optic wet mate connections
EP4234879A3 (en) * 2019-08-01 2023-09-06 Weatherford Technology Holdings, LLC Downhole fiber optic wet mate connections
WO2021247726A1 (en) * 2020-06-03 2021-12-09 Schlumberger Technology Corporation System and method for connecting multiple stage completions
GB2610129A (en) * 2020-06-03 2023-02-22 Schlumberger Technology Bv System and method for connecting multiple stage completions
US11795767B1 (en) 2020-11-18 2023-10-24 Schlumberger Technology Corporation Fiber optic wetmate
US20220170346A1 (en) * 2020-11-27 2022-06-02 Halliburton Energy Services, Inc. Travel Joint For Tubular Well Components
US11764509B2 (en) 2020-11-27 2023-09-19 Halliburton Energy Services, Inc. Sliding electrical connector for multilateral well

Also Published As

Publication number Publication date
US20070144746A1 (en) 2007-06-28
US20090321069A1 (en) 2009-12-31
NO343852B1 (en) 2019-06-24
NO20065486L (en) 2007-05-30

Similar Documents

Publication Publication Date Title
US7640977B2 (en) System and method for connecting multiple stage completions
US7398822B2 (en) Downhole connection system
US8752635B2 (en) Downhole wet mate connection
US7640993B2 (en) Method of deploying and powering an electrically driven in a well
US7770650B2 (en) Integral orientation system for horizontal tree tubing hanger
US8011436B2 (en) Through riser installation of tree block
US20080311776A1 (en) Well Completion Self Orienting Connector system
US9915104B2 (en) Downhole expandable control line connector
EP2943639B1 (en) Protection assembly for downhole wet connectors
US9404314B2 (en) Reciprocating debris exclusion device for downhole connectors
US20230212915A1 (en) System and method for connecting multiple stage completions
US10337276B2 (en) Well tube and a well bore component
US20110162839A1 (en) Retrofit wellbore fluid injection system
EP4007838B1 (en) Downhole fiber optic wet mate connections
US10267097B2 (en) Pressure compensating connector system, downhole assembly, and method
NO20230573A1 (en) Fiber optic wetmate
WO2022025913A1 (en) Coated electrical connector bands & pressure compensation assemblies for downhole electrical disconnect tools
US7165620B2 (en) Wellhead completion system having a horizontal control penetrator and method of using same
US20240125183A1 (en) Contact chamber flushing appartus for concentric electrical wet connect
WO2024015583A1 (en) Wetmate connection system and method

Legal Events

Date Code Title Description
AS Assignment

Owner name: SCHLUMBERGER TECHNOLOGY CORPORATION, TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:JONAS, JASON K.;REEL/FRAME:018538/0131

Effective date: 20061120

STCF Information on status: patent grant

Free format text: PATENTED CASE

FPAY Fee payment

Year of fee payment: 4

FPAY Fee payment

Year of fee payment: 8

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 12TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1553); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 12