US7848646B2 - Optical, network, node apparatus and method for recovery path fault - Google Patents
Optical, network, node apparatus and method for recovery path fault Download PDFInfo
- Publication number
- US7848646B2 US7848646B2 US11/491,072 US49107206A US7848646B2 US 7848646 B2 US7848646 B2 US 7848646B2 US 49107206 A US49107206 A US 49107206A US 7848646 B2 US7848646 B2 US 7848646B2
- Authority
- US
- United States
- Prior art keywords
- communication path
- path
- node
- optical signal
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related, expires
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q11/00—Selecting arrangements for multiplex systems
- H04Q11/0001—Selecting arrangements for multiplex systems using optical switching
- H04Q11/0062—Network aspects
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04J—MULTIPLEX COMMUNICATION
- H04J14/00—Optical multiplex systems
- H04J14/02—Wavelength-division multiplex systems
- H04J14/0227—Operation, administration, maintenance or provisioning [OAMP] of WDM networks, e.g. media access, routing or wavelength allocation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04J—MULTIPLEX COMMUNICATION
- H04J14/00—Optical multiplex systems
- H04J14/02—Wavelength-division multiplex systems
- H04J14/0227—Operation, administration, maintenance or provisioning [OAMP] of WDM networks, e.g. media access, routing or wavelength allocation
- H04J14/0241—Wavelength allocation for communications one-to-one, e.g. unicasting wavelengths
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04J—MULTIPLEX COMMUNICATION
- H04J14/00—Optical multiplex systems
- H04J14/02—Wavelength-division multiplex systems
- H04J14/0278—WDM optical network architectures
- H04J14/0284—WDM mesh architectures
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04J—MULTIPLEX COMMUNICATION
- H04J14/00—Optical multiplex systems
- H04J14/02—Wavelength-division multiplex systems
- H04J14/0287—Protection in WDM systems
- H04J14/0293—Optical channel protection
- H04J14/0295—Shared protection at the optical channel (1:1, n:m)
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0654—Management of faults, events, alarms or notifications using network fault recovery
- H04L41/0663—Performing the actions predefined by failover planning, e.g. switching to standby network elements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0677—Localisation of faults
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04J—MULTIPLEX COMMUNICATION
- H04J14/00—Optical multiplex systems
- H04J14/02—Wavelength-division multiplex systems
- H04J14/0287—Protection in WDM systems
- H04J14/0297—Optical equipment protection
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/16—Threshold monitoring
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q11/00—Selecting arrangements for multiplex systems
- H04Q11/0001—Selecting arrangements for multiplex systems using optical switching
- H04Q11/0062—Network aspects
- H04Q2011/0079—Operation or maintenance aspects
- H04Q2011/0081—Fault tolerance; Redundancy; Recovery; Reconfigurability
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q11/00—Selecting arrangements for multiplex systems
- H04Q11/0001—Selecting arrangements for multiplex systems using optical switching
- H04Q11/0062—Network aspects
- H04Q2011/0079—Operation or maintenance aspects
- H04Q2011/0083—Testing; Monitoring
Definitions
- the present invention relates to an optical network, a node apparatus, and a method for relieving a path fault. More specifically, the present invention relates to an optical network, a node apparatus, and a method for relieving a path fault, which use performance monitoring and alarm transfer for relieving a fault.
- a sharp increase in data traffic typified by the Internet in recent years is making the transmission capacity of a communication network larger.
- optical transmission is advancing, intending to increase its capacity using a time division multiplexing technique or an optical wavelength division multiplexing technique.
- a transmitter of 10 gigabits per second for one channel has been practically used.
- There has also been practically used a point-to-point wavelength multiplexing transmission apparatus which performs wavelength-multiplexing for several channels to several tens of channels by one fiber and uses optical amplifiers and regeneration repeaters to permit long distance transmission exceeding several hundred kilometers.
- a ring optical network which ring-connects connection nodes and a mesh optical network which mesh-connects them to increase connectivity are being studied.
- Such optical networks are used together with a monitoring control system which remotely and integrally manages node apparatuses, thereby expected to facilitate end-to-end path management from the start point to the end point of a line and to make path setting faster.
- the control units of node apparatuses are in conjunction with each other, thereby expected to facilitate end-to-end path management from the start point to the end point of a line and to make path setting faster.
- the mesh optical network can select a necessary line when the spare capacity in a mesh network is required.
- the spare capacity can be shared between plural working paths to economically realize the entire network.
- an optical signal switching apparatus and an optical cross connect apparatus which can switch, an optical signal such as STM-64/OC-192 and 10 GbE and perform path switching and switching to a stand-by system are being developed.
- the optical cross connect apparatus can switch the connection between transmission paths connected to a node or the connection relation between a transmission path and a user device in an distribution control method or a centralized and remote control method.
- An O-E-O (optic-electronic-optic) type optical cross connect system which uses light as optical input/output and performs signal processing by an electric signal performs processing by an electronic circuit in a transmission unit, for instance, in an STS-1 unit finer than STM-64 or OC-192. Efficient signal switching can be done.
- An O-O-O type optical cross connect system which performs switching using an optical switch without converting an optical signal to an electric signal is expected to process a large amount of information difficult to be realized by an electronic circuit, for the increased amount of node processing information.
- Document 1 describes a method of dividing an optical path into segmented paths having plural nodes and at least one link to perform efficient circuit recovery using the optical cross connect system.
- IETF Internet engineering task force
- GMPLS generalized multi-protocol label switching
- Document 5 describes tandem connection monitoring (TCM) which can accumulatively perform performance monitoring by the bit interleaved parity (BIP) operation of a signal across plural nodes.
- TCM tandem connection monitoring
- BIP bit interleaved parity
- a node has a switching function to a spare path, and when a preliminary resource connected to the node is shared between working paths and been has already used for recovering a fault on the working path (exhaustion of the preliminary resource) and a fault occurs on the spare path (the spare path is abnormal), another switching node is specified to perform spare path re-calculation for recovery on another spare path to reset a fault detection section. A specific procedure before and after resetting the fault detection section has not been clarified.
- a fault monitoring section is provided for each switching section, and when a spare path expected by the switching section exhausts a preliminary resource or is abnormal, the switching section, the spare path, and the fault monitoring section are changed.
- alarm generation on the reception side of the original fault monitoring section is prevented to set the transmission side, and the transmission side of the changed fault monitoring section is set to set the reception side.
- prevention of monitoring of the changed fault monitoring section is released.
- the fault monitoring section on the spare path is set, and the fault monitoring section of a switching section in which a fault occurs is maintained.
- the normally recovered switching section can be rapidly checked to facilitate judgment of switching-back.
- FIG. 1 is a block diagram of an optical network
- FIG. 2 is a node function block diagram
- FIG. 3 is a path setting flowchart
- FIG. 4 is a flowchart of assistance in explaining path monitoring
- FIGS. 5A and 5B are block diagrams of assistance in explaining working path and spare paths
- FIGS. 6A and 6B are block diagrams of assistance in explaining path reset.
- FIGS. 7A and 7B are diagrams of assistance in explaining change of a path table due to spare path abnormality of FIGS. 5A and 5B and due to working path abnormality of FIG. 6A , respectively.
- FIG. 1 is a block diagram of an optical network.
- an optical network 10 has nodes 20 , transmission paths 30 connecting the nodes, a network management system 40 , a monitoring controlling network 50 for transmitting and receiving a monitoring control signal between the network management system and the nodes, and a repeater 60 located between the nodes.
- the network management system 40 executes network configuration management, fault management, bandwidth management, performance management, and security management. To secure a communication bandwidth between any nodes according to demand, the network management sysytem 40 selects a necessary number of IF units usable by the corresponding node with reference to configuration management information and fault management information and a path in which no fault occurs, and controls switch units of plural nodes including the corresponding node to set a communication path or a path.
- the relay 60 performing as a regeneration repeater or a linear amplification repeater for extending a transmission distance is located between the nodes 20 .
- the relay 60 is located at each suitable distance according to the transmission distance so that plural relays 60 are located between the nodes.
- the regeneration repeater of the relay 60 converts an optical signal propagated on a transmission line to an electric signal to perform waveform shaping and digital quality monitoring, that is, bit error monitoring by BIP.
- the linear repeater amplifies wavelength multiplexed signals together by an optical fiber amplifier using an erbium-doped fiber.
- the linear repeater may be an optical semiconductor amplifier.
- the relay 60 having the function of extending a transmission distance may be an optical 2R (reshaping, retiming) or optical 3R (reshaping, retiming, regeneration) relay which uses a nonlinear effect in a fiber or semiconductor to provide an improving effect of waveform shaping and a signal-to-noise ratio without converting an optical signal to an electric signal.
- the relay 60 may branch and insert only a desired line of plural lines.
- a device performing the above-described branch and insertion without converting an optical signal to an electric signal is called OADM (optical add drop multiplexer).
- the network management system 40 may be a concentration control method by one or redundant server.
- FIG. 2 is a node function block diagram.
- the node 20 has a device monitoring control unit 21 , a switch unit 22 switching main signals, plural IF units 23 monitoring main signal quality using overhead processing and BIP and converting wavelengths outputted to transmission paths, and plural WDM units 24 wavelength-multiplexing outputs of the plural IF units for transmission to transmission path fibers.
- the IF unit 23 performs error correction code processing to compensate for quality deterioration due to other factors such as transmission distance extension, fiber seasonal variation, loss fluctuation due to a physical external force, and aged deterioration of components.
- the IF unit 23 accommodates a signal from a client device 100 using STM (synchronous transport module)-64 (10 Gbit/s) as an interface, and converts it to a signal having a wavelength defined by ITU-T with OTU (optical transport unit)-2 (10.7 Gbit/s) defined by Document 5 to output it to the WDM unit.
- STM synchronous transport module
- OTU optical transport unit
- the IF unit 23 has the function of performing reverse conversion of the signal from the WDM unit.
- the IF unit 23 has the function of regeneration repeating the OTU-2 signal with respect to a signal transferred by the node from one transmission path to the other.
- the IF unit 23 can also accommodate, as a client signal, GbE (Gigabit Ethernet) (1 Gbit/s), and 10 GbE (10.3 Gbit/s).
- GbE Gigabit Ethernet
- 10 GbE 10.3 Gbit/s.
- the interface speed between the IF unit 23 and the WDM unit is obtained by adding, to these, about 7%, an error correction code percentage.
- the error correction code percentage can be increased according to necessary correction ability.
- the WDM unit 24 wavelength-multiplexes outputs from the IF units 23 , when necessary amplifies, and transmits to a transmission path fiber.
- the WDM unit 24 demultiplexes the wavelength-multiplexed signal from the transmission path fiber and transmits to the IF units 23 .
- the WDM unit 24 has the function of, when necessary, amplifying the optical signal before or after being subjected to wavelength-demultiplexing, before transmission to the IF units 23 , and wavelength-multiplexing/wavelength-demultiplexing an optical supervisory signal (monitoring light) onto/from main signal light.
- the optical power when the WDM unit 24 performs transmission on the transmission path fiber is determined in consideration of waveform deterioration and noise increase due to loss between the nodes, an optical signal-to-noise ratio (OSNR) based on a noise figure of the optical amplifier, and the nonlinear effect in the fiber.
- OSNR optical signal-to-noise ratio
- nonlinear effect self phase modulation (SPM), cross phase modulation (XPM), and four wave mixing (FWM) have been known.
- SPM self phase modulation
- XPM cross phase modulation
- FWM four wave mixing
- the amount of waveform deterioration depends on the number of wavelengths, fiber dispersion, input power to a fiber, and a nonlinear constant.
- the fiber dispersion and the nonlinear constant are different depending on whether the fiber is a single mode fiber (SMF) or a dispersion shifted fiber (DSF).
- SMF single mode fiber
- DSF dispersion shifted fiber
- An output power of the amplifier before transmission to the IF unit 23 is determined in consideration of the dynamic range and the reception sensitivity of the receiver.
- a dispersion compensator which cancels waveform deterioration due to chromatic dispersion of the fiber may be incorporated into the WDM unit 24 .
- the dispersion compensators which use a dispersion compensation fiber in which the positive and negative codes are different from those of the transmission path fiber, a fiber diffraction grating, an optical lens, and a resonator.
- the device monitoring control unit 21 has a communication control unit 211 communicating with the network management system and the switch unit 22 , the IF unit 23 , and the WDM unit 24 of the node 20 , a CPU 212 , a configuration management information storing unit 213 , a fault management information storing unit 214 , a performance management information storing unit 215 , and a switching management information storing unit 216 .
- the switch unit 22 has a communication control unit 221 communicating with the device monitoring control unit 21 , the IF unit 23 , and the WDM unit 24 of the node 20 , a CPU unit 222 , a switching status unit 223 , a performance information unit 224 , a fault information unit 225 , a driving control unit 226 , and a switch unit 227 .
- the WDM unit 24 may be divided into a wavelength multiplexing unit and a wavelength demultiplexing unit.
- the IF unit 23 may be divided into an input IF and an output IF.
- FIG. 3 is a path setting flowchart.
- the network management system 40 searches for a working path between desired nodes.
- the operator or the network management system according to a desired rule selects one of plural candidates (S 301 ).
- the network management system searches for and sets a spare path (S 302 ) and sets a fault monitoring section between nodes switching to the spare path (S 303 ).
- Monitoring control of both the working path and the spare path is executed (S 304 ).
- a working path is divided into plural partial working path sections to assign a spare path to each of the segmented path sections, thereby permitting efficient preliminary resource utilization and rapid circuit recovery.
- a working path is selected so that the number of nodes forming the path is minimum.
- a spare path as a bypass is shared between plural working paths. It is effective to perform switching-back.
- TCM can be used as a method of monitoring a fault between switching nodes.
- the IF unit 23 calculates the number of bit errors by BIP by processing with an electronic circuit after optical/electrical (O/E) conversion.
- the threshold value incorporated into the IF unit 23 or instructed from the network management system is compared with the number of bit errors.
- the IF unit 23 judges the number of errors per unit time exceeding the threshold value as being at fault to generate an alarm to the network management system 40 via the device monitoring control unit 21 .
- the network management system 40 uses this as a switching trigger to perform switching to a spare path for performing line reliving.
- the device monitoring control unit 21 of each of the nodes may store switching information based on spare path calculation from the network management system 40 , perform switching to the spare path by signaling which uses main signal overhead between the nodes with the generated alarm as a trigger, transfer the result to the network management system 40 .
- a bidirectional path or a unidirectional path may be used.
- a different fiber may be used in each direction or bidirectional transmission may be performed on the same fiber.
- FIG. 4 is a flowchart of assistance in explaining path monitoring executed by the network management system.
- the network management system 40 judges both normal judgment of a monitoring section on a working path (S 401 ) and normal judgment on a spare path (S 402 ) as being Yes.
- S 401 and S 403 or S 402 and S 403 are repeated.
- the network management system 40 performs switching to the spare path (S 404 ).
- the working path becomes normal, and the spare path (the initial working path) is abnormal.
- the response in S 402 is No. Change of the spare path and the switching node (S 405 ) and change/addition of the performance monitoring section (S 406 ) are executed.
- the spare path is allowed to be shared between plural segmented path sections. Specified spare path setting is not always done to the switch of the node on the spare path.
- the spare path is monitored on each link not including switch setting between adjacent nodes. This can also be done by temporarily controlling the switch unit to be performed through plural links between the switching nodes on the spare path and all nodes.
- FIGS. 5A and 5B are block diagrams of assistance in explaining a working path and spare paths.
- a suitable spare path 90 - 1 (B-H-I-J-D in FIG. 5A ) is set to a currently-used segmented path section 80 - 1 (B-C-D in FIG. 5A ).
- the network management system 40 detects abnormality (J-D) on a spare path while a working path is normal. The network management system 40 prepares another spare path to rapidly perform circuit recovery when the normal path is abnormal.
- the network management system 40 performs spare path re-search based on the latest configuration information, fault information, and performance information to set another spare path 90 - 3 (B-H-I-J-K-E).
- the network management system 40 decides the switching nodes (node B and node E).
- the network management system 40 changes the fault monitoring section along with change of the switching nodes (from B-C-D in FIG. 5A to B-C-D-E in FIG. 5B ).
- the network management system 40 performs alarm prevention processing concerning TCM of the signal from node E to node B in FIGS. 5A and 5B of bidirectional signals at node B on the reception side of TCM byte.
- the network management system 40 then changes the transmission side nodes E to D to release alarm prevention of the reception side node for starting monitoring of a new fault monitoring section. This can prevent erroneous alarm generation, unnecessary switching at change of the fault monitoring section, and interruption of the currently-used line along therewith.
- the switching nodes are the nodes B and D
- a fault occurs at the nodes J-D.
- the switching nodes D-F sharing the nodes J-D as a spare path.
- the switching nodes D-F are changed to the nodes E-F and the fault monitoring section is changed from D-F to E-F.
- Monitoring in the fault monitoring section is performed between the switching nodes on the working path using an optical path. Monitoring in the fault monitoring section is performed on the spare path by error detection on each link between nodes forming the spare path when connection setting at the nodes is not performed before a fault occurs. When connection setting at the nodes is performed on the spare path, monitoring may be performed by error detection between the switching nodes.
- the network management system 40 collects monitoring information from the devices. The network management system 40 accumulates monitoring information on plural links forming the spare path to monitor the fault monitoring section of the spare path.
- FIGS. 6A and 6B are block diagrams of assistance in explaining path recovery.
- the network management system 40 maintains setting of a fault monitoring section 70 - 1 (B-C-D) in an old currently-used segmented path section in which a fault is detected, executes switching to the newest spare path, and sets a fault monitoring section 70 - 2 (B-H-I-J-D) on the switched path (old spare path).
- a recovery check signal is flowed to the fault monitoring section 70 - 1 (B-C-D).
- the recovery check signal may be a special bit string or may be a typically used alarm notification signal to the downstream. This can judge in real time based on the number of bit errors that the old working path section is normally returned and rapid and reliable switching-back can be executed.
- the network management system 40 detects normal return check to visualize and notify it to the operator. The operator may judge it to execute the switching-back operation. The operator may set a suitable condition to the network management system 40 and the device monitoring control unit 21 to automatically execute it after normal return check.
- switching to the newest spare path is executed to change the fault monitoring section 70 - 1 (B-C-D) in the old currently-used segmented path section to a fault monitoring section 70 - 3 (B-C-D-E) to set a fault monitoring section 70 - 4 (B-H-I-J-K-E) to the switched path.
- the recovery check signal is flowed to the fault monitoring section 70 - 3 (B-C-D-E). This can judge in real time based on the number of bit errors that the old working path section is normally returned. Rapid and reliable switching-back can be executed.
- the network management system judges switching to the spare path and switching-back to the old working path.
- the device monitoring control units of the nodes may judge them.
- FIG. 7A is a diagram of assistance in explaining change of a path table due to spare path abnormality of FIGS. 5A and 5B .
- FIG. 7B is a diagram of assistance in explaining change of a path table due to working path abnormality of FIG. 6A .
- a path table 200 A has path information 210 , segmented path information 220 , and spare path information 230 .
- the path information 210 has a path ID 211 , a start node 212 , and an end node 213 .
- the path of “00000001” of the path ID is a path between the nodes A and F.
- the path has plural segmented paths.
- the segmented path information 220 includes a segmented path ID 221 , a start node 222 , an end node 223 , and a relay node 224 .
- the nodes are described in order to define plural links of the segmented paths.
- the segmented path information 220 further includes performance monitoring 225 , a segmented path status 226 , and the number of spare paths 227 .
- the status described to the segmented path status 226 is any one of “active”, “standby”, and “fault”. When a segmented path is active, it is selected as a working path. When a segmented path is at fault, it has a fault. When a segmented path is on standby, it has no fault and is not selected as a working path.
- the performance monitoring 225 is ON, performance evaluation as the entire segmented path is executed.
- the segmented path status is active, the performance monitoring 225 is ON.
- the number of spare paths 227 with respect to the segmented path is described. Here, for simplification, it is 1 in all cases.
- the spare path information 230 has a spare path ID 231 , a relay node 232 , a priority order 233 , performance monitoring 234 , and a spare path status 235 . Since the number of spare paths is 1 in all cases, all the priority orders 233 indicate 1.
- the spare path status 235 is any one of “active”, “standby”, “fault”, and “deactive”. The statuses “active”, “standby”, and “fault” are described in the same manner as the segmented path.
- the status “deactive” is the status of a spare path when a segmented path corresponding to the spare path is in the “standby” status.
- the left status of “ ⁇ ” is the status selecting the performance monitoring section of FIG. 5A
- the right status of “ ⁇ ” is the status selecting the performance monitoring section of FIG. 5B .
- the spare path status 235 of the spare path IDs “s0002. 001” and “s0003. 001” of the spare paths using the nodes J-D of FIG. 7A is at fault.
- the segmented path IDs “s0002” and “s0003” which have lost the spare path are changed from active to standby.
- the segmented path IDs “s0004” and “s0005” are changed from standby to active.
- the spare path status 235 of the corresponding spare path IDs “s0004. 001” and “s0005. 001” are changed from deactive to standby.
- the performance monitoring 225 of the segmented path information 220 is switched between on and off according to the segmented path status 226 .
- the left status of “ ⁇ ” is a path table before a fault occurs in the working path in FIG. 6A
- the right status of “ ⁇ ” is a path table after a fault occurs in FIG. 6A .
- the segmented path status 226 of the segmented path ID “s0002” using the nodes B-C of FIG. 7B is changed from active to fault.
- the spare path status 235 of the corresponding spare path ID “s0002. 001” along therewith is changed from standby to active.
- the performance monitoring 234 is changed from OFF to ON.
- the performance monitoring 225 of the segmented path ID “s0002” is not changed to OFF and continues to be ON.
- the performance monitoring 225 can continues to be ON because the switching status of the nodes on the spare path is unstable and the switching status of the middle node on the working path is held.
- connection of the start node and the end node is maintained.
- the start node B and the end node D transmit the recovery check signal to the fault path to continue performance monitoring of the nodes B-D.
- the performance monitoring can detect recovery. The switching back to the old working path as the simplest configuration can be easily done.
- the line reliving method is not limited to the above embodiment.
- the network management system performs fault monitoring section setting to nodes, instruction of switching to a spare path, and spare path calculation. It is clear that the same is true for fault monitoring section setting, spare path calculation, and instruction of switching to a spare path performed based on information exchange by mutual communication of the device monitoring control units, as described in FIG. 1 .
- Spare path calculation may be based on a routing protocol called OSPF (open shortest path first) discussed in IETF.
- OSPF open shortest path first
- the network management system may collect monitoring bytes (B2 bytes) of section overhead of SDH and performance monitoring information on each link by an OTUk section monitor of OTN, compute signal quality between predetermined nodes, and compare it with the threshold value to judge fault occurrence.
- the network configuration of FIGS. 5A , 5 B, 6 A, and 6 B is an optical network in which the nodes are connected by three-way or more transmission path, the same effect can be expected.
- a two-way path may be used at the end node.
- a fault monitoring section can be changed without causing an erroneous alarm and unnecessary switching.
- a high-reliable optical network by flexible spare path setting can be provided.
- the trigger of switching to a spare path is fault detection in a currently-used segmented path section.
- the operator may start switching to a spare path.
- the trigger resetting a spare path and a fault monitoring section the example of fault detection of an expected spare path is shown.
- the effect of this embodiment is not limited to this.
- a spare path has been already used for reliving a working path protected by another currently-used segmented path section and another line reliving method. Switching at switching nodes expected for reliving a currently-used segmented path cannot be done.
- the network management system or the device monitoring controller detects this by updating configuration management information to change a combination of spare paths and switching nodes. In such case, the effect of this embodiment is the same.
- the switch unit of FIG. 1 or 2 may be an electric switch.
- an optical switch an optical waveguide movable optical switch, an optical waveguide non-movable optical switch, and a micro machine optical switch can be used.
- the working path in this application means a path being currently used or an absolute path. Those skilled in the art can easily understand distinguishing between the uses of them.
- the node apparatus According to the optical network, the node apparatus, and the path fault reliving method of the present invention, recovery to the normal status of a partial working path in which a fault occurs can be checked. Rapid and reliable switching-back can be realized.
Abstract
Description
Claims (8)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005-213728 | 2005-07-25 | ||
JP2005213728A JP4621086B2 (en) | 2005-07-25 | 2005-07-25 | Optical communication network, node device, and path fault relief method |
JP2010230171A JP2011024263A (en) | 2005-07-25 | 2010-10-13 | Optical communication network, node device, and method of relieving path fault |
Publications (2)
Publication Number | Publication Date |
---|---|
US20070036544A1 US20070036544A1 (en) | 2007-02-15 |
US7848646B2 true US7848646B2 (en) | 2010-12-07 |
Family
ID=69846176
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US11/491,072 Expired - Fee Related US7848646B2 (en) | 2005-07-25 | 2006-07-24 | Optical, network, node apparatus and method for recovery path fault |
Country Status (3)
Country | Link |
---|---|
US (1) | US7848646B2 (en) |
JP (2) | JP4621086B2 (en) |
CN (2) | CN1905415B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080304494A1 (en) * | 2003-09-26 | 2008-12-11 | Fujitsu Limited | Communication device |
US20150295674A1 (en) * | 2012-07-02 | 2015-10-15 | Nec Corporation | Optical branching unit and optical branching method |
Families Citing this family (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2905214B1 (en) * | 2006-08-28 | 2008-10-24 | Alcatel Sa | METHOD FOR DETERMINING AN OPTIMAL PATH IN AN OPTICAL TELECOMMUNICATIONS NETWORK. |
JP2008211330A (en) * | 2007-02-23 | 2008-09-11 | Hitachi Communication Technologies Ltd | Node control unit and node system |
JP4839287B2 (en) * | 2007-09-12 | 2011-12-21 | Kddi株式会社 | Communication path communication confirmation test apparatus and computer program |
EP2043308B1 (en) * | 2007-09-27 | 2012-01-25 | Hitachi, Ltd. | GMPLS in optical networks |
JP2009177599A (en) * | 2008-01-25 | 2009-08-06 | Nec Corp | Network system, communication device, path management method, and program |
JP4661892B2 (en) * | 2008-03-25 | 2011-03-30 | 日本電気株式会社 | COMMUNICATION NETWORK SYSTEM, COMMUNICATION DEVICE, ROUTE DESIGN DEVICE, AND FAILURE RECOVERY METHOD |
US7855952B2 (en) * | 2008-11-20 | 2010-12-21 | At&T Intellectual Property I, L.P. | Silent failure identification and trouble diagnosis |
JP5163479B2 (en) | 2008-12-19 | 2013-03-13 | 富士通株式会社 | Path switching method |
US8305877B2 (en) * | 2009-09-10 | 2012-11-06 | Tyco Electronics Subsea Communications Llc | System and method for distributed fault sensing and recovery |
CN102104397B (en) * | 2009-12-22 | 2013-09-11 | 华为技术有限公司 | Link protection method and device |
JP5367610B2 (en) * | 2010-02-10 | 2013-12-11 | 日本電信電話株式会社 | WDM transmission system, protection path setting method and protection path switching method |
JP5167293B2 (en) * | 2010-02-18 | 2013-03-21 | 日本電信電話株式会社 | Route control apparatus, communication system, and route calculation method |
US8750706B2 (en) * | 2010-03-12 | 2014-06-10 | Ciena Corporation | Shared photonic mesh |
US9178794B2 (en) * | 2010-08-30 | 2015-11-03 | Nec Corporation | Communication quality monitoring system, communication quality monitoring method and recording medium |
JP5624848B2 (en) * | 2010-10-22 | 2014-11-12 | 株式会社日立製作所 | Optical communication card and optical transmission device |
KR101313233B1 (en) | 2011-03-09 | 2013-09-30 | 한양대학교 산학협력단 | Communication Device and Method For Substation Automation System |
WO2011157162A2 (en) * | 2011-06-01 | 2011-12-22 | 华为技术有限公司 | Protection switching method and apparatus |
JP5481658B2 (en) * | 2011-06-17 | 2014-04-23 | 株式会社日立製作所 | Optical communication system, interface board, and control method |
JP5849793B2 (en) * | 2012-03-15 | 2016-02-03 | 富士通株式会社 | Optical cross-connect device |
JP5863565B2 (en) * | 2012-05-21 | 2016-02-16 | 三菱電機株式会社 | Optical transmission node and path switching method |
WO2014020664A1 (en) * | 2012-07-30 | 2014-02-06 | 富士機械製造株式会社 | Optical wireless system |
JPWO2014030732A1 (en) * | 2012-08-24 | 2016-08-08 | 日本電気株式会社 | Communication system, communication apparatus, protection switching method and switching program |
JP6056494B2 (en) | 2013-01-17 | 2017-01-11 | 富士通株式会社 | Determination device, determination method, and determination program |
CN104243196B (en) | 2013-06-21 | 2019-03-12 | 中兴通讯股份有限公司 | Virtual network mapping guard method and system under a kind of SDN framework |
KR101631651B1 (en) * | 2013-12-04 | 2016-06-20 | 주식회사 쏠리드 | Optical Repeater of Ring Topology type |
JP6588567B2 (en) * | 2015-11-26 | 2019-10-09 | 日本電信電話株式会社 | Communication system and fault location identification method |
JP6885237B2 (en) * | 2017-07-11 | 2021-06-09 | 富士通株式会社 | Inter-node communication device, parallel processing device, and inter-node communication path control method |
CN111699637B (en) * | 2018-02-09 | 2023-05-30 | 瑞典爱立信有限公司 | Method and apparatus for fiber optic line fault determination |
US10623791B2 (en) | 2018-06-01 | 2020-04-14 | At&T Intellectual Property I, L.P. | Field of view prediction in live panoramic video streaming |
US11019361B2 (en) * | 2018-08-13 | 2021-05-25 | At&T Intellectual Property I, L.P. | Methods, systems and devices for adjusting panoramic view of a camera for capturing video content |
US11283518B2 (en) * | 2019-11-08 | 2022-03-22 | Infinera Corporation | Method and apparatus for a restoration network with dynamic activation of pre-deployed network resources |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003218912A (en) | 2002-01-23 | 2003-07-31 | Nec Corp | Path fault recovery system and switch-back system after fault restoration, and node using them |
JP2003258851A (en) | 2002-02-27 | 2003-09-12 | Hitachi Ltd | Optical communication network, node device and device for managing optical communication network |
US6735392B1 (en) * | 1999-10-18 | 2004-05-11 | Nortel Networks Limited | System and method for transmitting and restoring an optical signal |
CN2641926Y (en) | 2003-07-09 | 2004-09-15 | 武汉光迅科技有限责任公司 | Synchronous handover protector for dynamic optical line |
JP2005027144A (en) | 2003-07-04 | 2005-01-27 | Hitachi Communication Technologies Ltd | Signal switching device and transmission system using same |
US6862380B2 (en) * | 2000-02-04 | 2005-03-01 | At&T Corp. | Transparent optical switch |
US7289728B2 (en) * | 2004-03-11 | 2007-10-30 | General Instrument Corporation | Use of variable ratio couplers for network protection and recovery |
US7302177B2 (en) * | 2004-07-29 | 2007-11-27 | Fujitsu Limited | Optical transmission system including a plurality of optical transmission devices |
US7340163B2 (en) * | 2002-12-16 | 2008-03-04 | Alcatel Lucent | Signaling protocol and architecture for protection rings |
US7424220B2 (en) * | 2004-07-15 | 2008-09-09 | Fujitsu Limited | Optical transmission system with two-mode ring protection mechanism for prioritized client signals |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10327215A (en) * | 1997-05-26 | 1998-12-08 | Nec Corp | Monitor and control system |
-
2005
- 2005-07-25 JP JP2005213728A patent/JP4621086B2/en not_active Expired - Fee Related
-
2006
- 2006-07-21 CN CN2006101077398A patent/CN1905415B/en not_active Expired - Fee Related
- 2006-07-21 CN CN2010101178183A patent/CN101790115B/en not_active Expired - Fee Related
- 2006-07-24 US US11/491,072 patent/US7848646B2/en not_active Expired - Fee Related
-
2010
- 2010-10-13 JP JP2010230171A patent/JP2011024263A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6735392B1 (en) * | 1999-10-18 | 2004-05-11 | Nortel Networks Limited | System and method for transmitting and restoring an optical signal |
US6862380B2 (en) * | 2000-02-04 | 2005-03-01 | At&T Corp. | Transparent optical switch |
JP2003218912A (en) | 2002-01-23 | 2003-07-31 | Nec Corp | Path fault recovery system and switch-back system after fault restoration, and node using them |
JP2003258851A (en) | 2002-02-27 | 2003-09-12 | Hitachi Ltd | Optical communication network, node device and device for managing optical communication network |
US7340163B2 (en) * | 2002-12-16 | 2008-03-04 | Alcatel Lucent | Signaling protocol and architecture for protection rings |
JP2005027144A (en) | 2003-07-04 | 2005-01-27 | Hitachi Communication Technologies Ltd | Signal switching device and transmission system using same |
CN2641926Y (en) | 2003-07-09 | 2004-09-15 | 武汉光迅科技有限责任公司 | Synchronous handover protector for dynamic optical line |
US7289728B2 (en) * | 2004-03-11 | 2007-10-30 | General Instrument Corporation | Use of variable ratio couplers for network protection and recovery |
US7424220B2 (en) * | 2004-07-15 | 2008-09-09 | Fujitsu Limited | Optical transmission system with two-mode ring protection mechanism for prioritized client signals |
US7302177B2 (en) * | 2004-07-29 | 2007-11-27 | Fujitsu Limited | Optical transmission system including a plurality of optical transmission devices |
Non-Patent Citations (6)
Title |
---|
Chinese Office Action dated Sep. 25, 2009; 4 pages. |
Itu, "Interfaces for the Optical Transport Network (OTN)", Itu-t, g.709/y.1331, Mar. 2003. |
Japanese Office Action dated May 18, 2010 for Application No. 2005-213728. |
L. Berger, "Generalized Multi-Protocol Label switching (GMPLS) Signaling Functional Description", Jan. 2003, IETF. |
L. Berger, "Generalized Multi-Protocol Label switching (GMPLS) Signaling Resource Reservation Protocol-Traffic Engineering (RSVP-TE) Extensions", Jan. 2003, IETF. |
P. Ashwood-Smith et al., "Generalized Multi-Protocol Label switching (GMPLS) Signaling Constraint-based Routed Label Distribution Protocol 9CD-LDP) Extensions", Jan. 2003, IETF. |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080304494A1 (en) * | 2003-09-26 | 2008-12-11 | Fujitsu Limited | Communication device |
US20150295674A1 (en) * | 2012-07-02 | 2015-10-15 | Nec Corporation | Optical branching unit and optical branching method |
US9544086B2 (en) * | 2012-07-02 | 2017-01-10 | Nec Corporation | Optical branching unit and optical branching method |
Also Published As
Publication number | Publication date |
---|---|
CN101790115A (en) | 2010-07-28 |
US20070036544A1 (en) | 2007-02-15 |
JP2007036412A (en) | 2007-02-08 |
CN1905415B (en) | 2012-08-29 |
CN101790115B (en) | 2012-06-20 |
JP2011024263A (en) | 2011-02-03 |
CN1905415A (en) | 2007-01-31 |
JP4621086B2 (en) | 2011-01-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7848646B2 (en) | Optical, network, node apparatus and method for recovery path fault | |
US7447398B2 (en) | Optical crossconnect apparatus | |
US7286758B2 (en) | Method for switching transmission route, and optical transmission device | |
JP5267191B2 (en) | Optical ring network system and optical transmission device | |
JP4176061B2 (en) | Optical network system | |
JP5521168B2 (en) | Optical transmission device and optical transmission system | |
CN101442376B (en) | Optical transmission system and optical node | |
JP2014220575A (en) | Optical transmission device, optical transmission system and optical transmission method | |
US20120087648A1 (en) | Method and system for protection switching | |
US11838048B2 (en) | SD-FEC defect propagation across regeneration nodes in support of single and multi-carrier super channel protection in ROADM networks | |
JP3586586B2 (en) | Light wave ring system | |
WO2009081449A1 (en) | Wavelength division multiplexing equipment and method for dispersion compensation of optical signal | |
US9306663B2 (en) | Controller, a communication system, a communication method, and a storage medium for storing a communication program | |
JP4572721B2 (en) | Optical transmission system, optical repeater, and quality monitoring method thereof | |
US20090060499A1 (en) | Apparatus and method for monitoring quality of optical signal | |
JP3475756B2 (en) | Communication network, communication network / node device, and failure recovery method | |
US11310572B2 (en) | Multi layer protection control for coherent DWDM networks | |
JP3788263B2 (en) | Communication network, communication network node device, and failure recovery method | |
JP4999759B2 (en) | Optical path switching device | |
JP2018174366A (en) | Communication device and communication method | |
JP3351365B2 (en) | Communication network, communication node, and failure recovery method | |
JP2001217776A (en) | System and method for recovering wavelength multiplexed communication network fault | |
WO2004077701A1 (en) | Method and device for switching between active and auxiliary circuits for optical transmission | |
JP2013207639A (en) | Wavelength division multiplex optical transmission device and network including the same | |
WO2001091339A2 (en) | Optical transmission systems and methods including optical protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: HITACHI COMMUNICATION TECHNOLOGIES, LTD., JAPAN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:FUKASHIRO, YASUYUKI;HIRAI, TOORU;REEL/FRAME:018477/0832 Effective date: 20061006 |
|
AS | Assignment |
Owner name: HITACHI, LTD.,JAPAN Free format text: MERGER;ASSIGNOR:HITACHI COMMUNICATION TECHNOLOGIES, LTD.;REEL/FRAME:023758/0625 Effective date: 20090701 Owner name: HITACHI, LTD., JAPAN Free format text: MERGER;ASSIGNOR:HITACHI COMMUNICATION TECHNOLOGIES, LTD.;REEL/FRAME:023758/0625 Effective date: 20090701 |
|
FEPP | Fee payment procedure |
Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
FPAY | Fee payment |
Year of fee payment: 4 |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552) Year of fee payment: 8 |
|
FEPP | Fee payment procedure |
Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
LAPS | Lapse for failure to pay maintenance fees |
Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
STCH | Information on status: patent discontinuation |
Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362 |
|
FP | Lapsed due to failure to pay maintenance fee |
Effective date: 20221207 |