US8008913B2 - Automatic lift-off compensation for pulsed eddy current inspection - Google Patents
Automatic lift-off compensation for pulsed eddy current inspection Download PDFInfo
- Publication number
- US8008913B2 US8008913B2 US12/134,317 US13431708A US8008913B2 US 8008913 B2 US8008913 B2 US 8008913B2 US 13431708 A US13431708 A US 13431708A US 8008913 B2 US8008913 B2 US 8008913B2
- Authority
- US
- United States
- Prior art keywords
- signal
- probe
- lift
- reference signal
- test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related, expires
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N27/00—Investigating or analysing materials by the use of electric, electrochemical, or magnetic means
- G01N27/72—Investigating or analysing materials by the use of electric, electrochemical, or magnetic means by investigating magnetic variables
- G01N27/82—Investigating or analysing materials by the use of electric, electrochemical, or magnetic means by investigating magnetic variables for investigating the presence of flaws
- G01N27/90—Investigating or analysing materials by the use of electric, electrochemical, or magnetic means by investigating magnetic variables for investigating the presence of flaws using eddy currents
- G01N27/9046—Investigating or analysing materials by the use of electric, electrochemical, or magnetic means by investigating magnetic variables for investigating the presence of flaws using eddy currents by analysing electrical signals
- G01N27/9053—Compensating for probe to workpiece spacing
Definitions
- the present invention relates to a method and an apparatus which may be used to detect defects such as corrosion, cracks etc in material or structures, in particular conductive structures such as aircraft panels and pipelines for example.
- Defects such as corrosion, cracks etc weaken the structural integrity of a material or structure.
- the failure of a structure in many industries may have very serious consequences such as the failure of a structure forming a component of a pipeline, such as a gas or oil pipeline or an aircraft panel. Consequently, considerable effort is directed to the inspection of structures to determine whether they have or acquire any defects which may affect their structural integrity.
- Structures can be visually inspected in an attempt to detect defects. However, whilst some defects may be able to be detected visually, such as serious corrosion which may result in surface distortion, many defects, such as cracks or corrosion which is not easily visible from the outside surface of the structure may be missed. Furthermore, many structures are covered in layers of paint, coatings and insulation which would make visual inspection even more difficult.
- Eddy current inspection offers important advantages for the detection of flaws in conductive structures and has a very broad range of applications. It is non-destructive, and can detect flaws invisible to the unaided eye. A single frequency is commonly used to realize non-destructive inspection. Sometimes two frequencies or multi frequencies may be used in order to improve inspection capability and detection reliability. Eddy currents can penetrate multi-layers of material to discover hidden damage which may threaten the serviceability of a material or structure. However, for precisely locating a defect position in a complex structure, conventional eddy current techniques encounter difficulties caused by frequency attenuation. A Pulsed Eddy Current (PEC) square wave pulse provides wide band frequency energy, particularly at low frequencies. Therefore it provides more information regarding defect depth and the potential for subsequent data processing.
- PEC Pulsed Eddy Current
- Probe lift-off is a problem associated with passing a probe over a surface of a structure to be tested in that variations in the spacing between the probe and the structure to be inspected produce false variations in the received signal which may mask variations indicative of real defects which is misleading for the identification of defects.
- the variations in the lift-off may be produced, for example, by variations in the structure surface over which a probe is passed such as paint and/or coating thickness, the presence of surface features such as rivets and the variation in pressure applied to the probe by the operator when in use.
- U.S. Pat. No. 6,344,741 and CA 2 312 101 disclose a method for compensating for lift-off variations in pulsed eddy current techniques.
- Calibration signals are obtained from a probe at two or more different lift-off distances from a structure to be tested at a position free from defects.
- the point where the detected signals cross in the time domain is determined to establish a “lift-off point of intersection” at that particular point in time of the time domain signal.
- the amplitudes of subsequent time domain test signals are compared at that same point of time at which the calibration signals crossed to compensate for lift-off.
- intersection point may not be very precise and may drift when different size defects are detected.
- lift-off compensation is only achieved at a single point on the received signal such that only a limited amount of information is available from the time domain signal limiting defect analysis.
- U.S. Pat. No. 5,391,988 discloses a method of detecting a flaw within a conductive object using eddy current testing.
- a ferrite core has a primary and a secondary coil wound upon it.
- a rectangular-wave current is supplied to the primary coil to induce a voltage of a pulse wave form in the secondary coil.
- the pulse duration of the induced voltage is measured at two separate time instances corresponding to two different threshold voltages. The effect of variations in the distance between the ferrite core and the conductive object (lift-off) are cancelled using a comparison of the two measured pulse durations.
- U.S. Pat. No. 6,573,712 discloses an inspection device which has a driving section to adjust a position of an inspection probe to maintain a constant lift-off.
- a method for compensating for separation between an eddy current probe and a surface of a conductive specimen comprising
- obtaining at least one set of reference data by locating an eddy current probe at a defect free specimen area and at a known reference separation (lift-off) from a surface of the specimen, the probe being excited to generate eddy currents in the specimen and sensing a reference signal generated by the eddy currents produced in the conductive specimen at the known reference separation; and determining a gradient value of the sensed signal;
- Embodiments of the present invention have been found to have the capability to provide precise and reliable lift-off compensation. Embodiments of the present invention also provide a complete lift-off compensated signal unlike many prior methods which only provide lift-off compensation at a single point along a time-varying signal. A complete signal is useful for subsequent signal analysis and processing to determine the nature and location of defects. Pulsed eddy currents are preferably generated.
- balancing may be performed by placing the probe on a defect free area with no lift-off and obtaining a balance signal which is then subtracted from all subsequent signals.
- the largest magnitude gradient (regardless of whether it is a positive or a negative gradient) is preferably determined and used to perform the compensation.
- the largest magnitude gradient may be easily determined by a control system including a processor or computer for example which can determine a peak differential of the sensed time-varying signal. Consequently, the method of the present invention may be easily automated.
- the sensed signal is preferably smoothed, such as by being passed through a low pass filter, prior to determining the gradient to remove any spurious results produced by noise.
- Compensation in the test measurements may involve obtaining a plurality of sets of reference data, each at a different known separation between the probe and the surface of the specimen.
- the set of reference data with the closest gradient to the test signal may then be selected and the difference determined between the selected reference signal and the test signal.
- reference data may be interpolated from one or more reference sets of data.
- the data relating to the reference signal or test signal may be multiplied by a factor dependent upon a ratio of the sizes of the test and reference signals.
- an eddy current inspection device comprising an eddy current probe and a processing means arranged to perform the method of the first aspect of the present invention.
- FIG. 1 illustrates the separation (lift-off) between a probe and a surface of a sample
- FIG. 2 shows a flow diagram illustrating a method of performing an embodiment of the invention
- FIG. 3 illustrates a pulsed eddy current inspection device
- FIG. 4 a shows a series of detected pulsed eddy current signals obtained from a specimen without lift-off and at a number of different lift-offs
- FIG. 4 b shows the differential of the signals presented in FIG. 4 a
- FIG. 4 c shows pulsed eddy current signals from a 20% defect before and after they have been compensated for lift-off
- FIG. 5 a shows variable lift-off distances and locations used in a pulsed eddy current test scan
- FIG. 5 b shows a pulsed eddy current image of an inspection C-scan without lift-off compensation
- FIG. 5 c shows the inspection C-scan of FIG. 5 b with lift-off compensation according to an embodiment of the present invention applied.
- FIG. 1 illustrates the separation known as lift-off between a probe 1 and the surface of a specimen 2 to be inspected.
- FIG. 2 is a flow diagram 10 illustrating an example of a method of performing the present invention.
- the flow diagram consists of a first portion 20 for generating reference data and a second portion 30 for generating compensated test data.
- the probe is preferably balanced by being placed on a defect free area with no lift-off to obtain a balance signal to be subtracted from all subsequent signals.
- the probe is located a known reference separation (lift-off) from the surface of a sample.
- the probe is preferably located over a portion of the sample which is substantially free from defects.
- Any suitable eddy current probe as is well known in the art may be used, such as an absolute probe, a differential probe, a reflection probe, an unshielded probe, a shielded probe or combinations of the above in single, multiple or array configurations using coil or electronic sensors.
- a probe with an integral transmitter coil and receiver array is used.
- the receiver array typically has 16 or 32 sensors as is well known in the art.
- a probe with a separate transmitter and receiver may be used if desired.
- the probe may be located at a known lift-off from the surface of the specimen by placing a shim (usually non-conductive) of known thickness between the probe and a non-defective part of the sample.
- the probe is excited to generate eddy currents in the surface of the sample and a reference signal generated by the eddy currents is detected by the probe.
- the transmitter coil is excited, for example with a square-wave current, to generate a wide band of frequencies so that defects at many depths in the specimen may be detected.
- the gradient of the reference signal is determined.
- the maximum gradient (regardless of whether the gradient is positive or negative) of the reference signal is determined.
- An eddy current inspection device in accordance with the present invention would have a processing means such as a microprocessor which could determine the gradient by calculating the first order differential of the reference signal. The largest magnitude of the gradient of the test signal would be the peak value of the first order differential.
- At least one of the detected reference signal or determined gradient or differential is smoothed for example by Gaussian smoothing or by being passed through a low pass filter in order to remove any spikes which may be caused by noise and which could generate erroneous values.
- the detected reference signal and its associated peak gradient or differential are stored together in a memory means associated with the processor.
- steps 21 to 24 are repeated as many times as necessary. It has been found that the use of more sets of reference signals provides more precise results. If steps 21 to 24 are repeated then a different shim (usually non-conductive) of another known thickness is placed between the probe and a non-defective part of the sample to make measurements at this second known lift-off. If multiple sets of reference signals are generated then the gradient for each of the generated reference signals could either be determined individually after each reference signal is obtained or all of the gradients could be determined together after all of the reference signals have been detected.
- a different shim usually non-conductive
- the method may be used to generate test data in order to detect any defects.
- the test data may be compensated for lift-off.
- the probe may be located over the specimen.
- the probe's use to generate reference data as in steps 21 to 24 above in this instance it does not matter what level of separation exists between the sample and the probe.
- the probe is likely to be passed over sections of a structure to be tested such as an aircraft panel or a pipeline component and the lift-off is likely to vary as the probe passes over the structure, due to for example variations in the thickness of paint work, coatings and insulation, due to the probe encountering surface features such as rivets etc and due to variations in pressure applied to the probe by the operator.
- step 32 the signal generated by the eddy currents in the specimen are sensed using the receiver in the probe.
- the gradient of the test signal is determined, in this example by calculating the first order differential and determining its differential peak.
- the largest magnitude gradient of the test signal is preferably determined by calculating the peak differential of the test signal.
- the test signal is compensated to reduce or remove the effects of lift-off. This is performed by subtracting weighted lift-off reference data relating to a generated reference signal from the data for the test signal. If a plurality of reference signals were generated, the reference signal with the most similar gradient peak or closest peak differential to that of the test signal would be identified, and indexed as the current lift-off appearance and the corresponding weighted identified reference signal used as the signal which is subtracted from the test signal.
- the maximum gradient or peak differentials may be compared by any suitable method such as the nearest distance rule as is well known to those skilled in the art. Alternatively or additionally data for a reference signal may be interpolated to produce a more suitable set of reference data to be subtracted from the data for the test signal.
- Interpolation may be helpful, for example when the slope of a test signal is found to lie substantially midway between the slopes of two reference signals or if only a single reference signal is available.
- the reference signal may be multiplied by a compensation ratio derived from a ratio of the test signal and the corresponding reference signal to compensate for any difference in sizes of the test and reference signals.
- step 34 is preceded by a series of steps 34 a to 34 d to determine whether the lift-off phenomena is present for the generated signals and if so to switch on the compensation function and select a reference signal. If desired lift-off compensation may be switched off at step 34 e .
- the compensation procedure is repeated at step 34 f until all data has been compensated and imaging of the data is then performed at step 34 g.
- FIG. 3 illustrates a pulsed eddy current inspection device suitable for use to perform the present invention.
- the device includes a probe 40 as described above.
- the probe 40 in this example has an array of sensors.
- the probe 40 is connected via connector 41 to a processing and display device 42 .
- the processing and display device 42 has a processor, such as a microprocessor and a memory to store signals and perform appropriate processing such as determination of peak differentials, performance of compensation and storage of signals with associated peak differentials.
- the device 42 has a display means 43 to display results to a user.
- the device 42 may perform an automatic differential lift-off compensation process as described below:
- Sig_test is the test signal and Sig_LO_Ref(k) is the appropriate reference signal.
- FIG. 4 a shows a series of detected pulsed eddy current signals obtained from a specimen without lift-off (Group A) and with the probe at a lift-off of 0.05 mm (Group B), with a lift-off of 0.25 mm (Group C) and with a lift-off of 0.5 mm (Group D).
- Groups A, B, C and D each contain signals for defects that are about 5%, 10% and 20% of total specimen thickness material loss.
- the gradient of the pulsed eddy current signals is mainly affected by the lift-off distance whereas a variation in defect size within each individual group has far less of an effect. Therefore, in FIG. 4 a , the pulsed eddy current signals relating to different defect sizes but with the same lift-off distance were clustered into the same group of pulsed eddy current signals which is mainly decided by the lift-off distance.
- FIG. 4 b shows the differentials of the signals presented in FIG. 4 a .
- the differentials of the pulsed eddy current signals with different defects but with the same lift-off distance were not only clustered into the same group dependent upon the lift-off distance, but also provided very close differential peak values. From this it can be seen that the differential peak values are clearly indicative of the lift-off present in that pulsed eddy current signal.
- the lift-off features are extracted and used to calculate the compensation ratio parameter to perform automatic lift-off compensation.
- FIG. 4 c illustrates the effect of variable lift-off pulsed eddy current compensation in accordance with an embodiment of the present invention.
- An ideal pulsed eddy current signal for a specimen with a defect of 20% of the total specimen thickness material loss with the probe carefully positioned so that there was no lift-off between the probe and the surface of the specimen is indicated in FIG. 4 c by the thick solid line. This is the ideal signal that would be obtained without the effect of lift-off.
- Pulsed eddy current signals obtained from the 20% defect of the specimen with 0.05 mm, 0.25 mm and 0.5 mm lift-off distances are also shown in FIG. 4 c by the respective indicated dashed lines.
- the corresponding lift-off compensated pulsed eddy current signals are shown in close dashed lines which partly overlap the ideal signal obtained without lift-off.
- the effectiveness of the lift-off compensation of embodiments of the present invention is clearly illustrated in FIG. 4 c by how closely the lift-off compensated signals follow or even overlie the ideal signals obtained without lift-off.
- FIGS. 5 a , 5 b and 5 c illustrate lift-off compensation of an embodiment of the present invention performed on a pulsed eddy current C-scan image.
- FIG. 5 a illustrates the lift-off distances and their locations in the pulsed eddy current C-scan.
- Different lift-off distances namely 0 mm, 0.127 mm, 0.254 mm, 0.381 mm and 0.508 mm are presented by different shades in the monochrome image of FIG. 5 a but could also be illustrated by different colours.
- FIG. 5 b shows a pulsed eddy current image of an inspection scan as may be seen on the display means 43 of the device 42 shown in FIG. 3 .
- the scan image shows a pulsed eddy current image in which different shades or colours indicate different levels of material loss.
- a chart indicating the percentage level of material loss indicated by a particular shade or colour may be provided adjacent to the pulsed eddy current C-scan image.
- the pulsed eddy current C-scan image indicates the location of defects consisting of material loss presented as different shades or colours in a position on the C-scan image corresponding to the actual location of the defect in the structure being tested.
- the image shown in FIG. 5 b indicates typical data that may be acquired by passing a probe 40 as shown in FIG.
- FIG. 5 a A number of “patches” are shown which are due to lift-off of the probe 40 in the measurement at that point during use as indicated by FIG. 5 a .
- the patches caused by lift-off incurred at those points make the C-scan image rather unclear such that actual defects may be difficult to clearly identify.
- FIG. 5 c shows the Pulsed Eddy Current C-scan Image of FIG. 5 b after lift-off compensation has been applied in accordance with an embodiment of the present invention.
- the defects at positions 20 and 90 on the x-axis can be seen much more clearly than in the C-scan Image in FIG. 5 b .
- the defects are now so clear that information about the shapes of the defects is clearly discernable. The presence and location of the defects is clearly seen after the lift-off effect has been removed. Thus far more precise defect information may be obtained.
- the probe may have a transmitter and receiver provided integrally together within the probe body or the transmitter and receiver may be provided separately.
- the receiver may comprise one or more coils or sensors.
Abstract
Description
-
- 1) First, a number (K) of lift-off reference signals Lo_Ref(k), each at a predetermined lift-off of the
probe 40 from a sample is collected. This is the reference signal set. - Lift-Off Reference Set: {Lo_Ref(k)} k=1, 2, . . . , K
- For example: lift-off distance: 5 mil (0.127 mm), 10 mil (0.254 mm), 15 mils (0.381 mm) and 20 mils (0.508 mm) are used to produce four Lift-off reference signals. K=1, 2, 3, 4
- 2) After that, all the known lift-off reference signals first order differentials are calculated to find their peak values DPv_Lo_Ref(k), where k=1, 2, . . . , K.
- In this example, the differential operator is a First order Differential, the Smoothing Operator is Gaussian Smoothing and the Differential Peak Values are termed: DPv_Lo_Ref Set
- 3) Next a lift-off reference book set is defined which is composed of the lift-off reference signal Lo_Ref(k) and its corresponding differential peak values DPv_Lo_Ref(k) where k=1, 2, . . . , K
- 1) First, a number (K) of lift-off reference signals Lo_Ref(k), each at a predetermined lift-off of the
-
- 4) Then for each individual test signal with unknown defects and unknown lift-off type, the following is performed:
- a) Calculate the differential peak value for the test signal—DPv_test.
- b) Compare the current DPv_test with DPv_Lo_Ref Set by the nearest distance rule to find the most similar DPv_Lo_Ref(k) and obtain the lift-off class index k.
- c) According to the lift-off class index k, we learn the type of the lift-off embedded in the test signal, so that we are able to choose the right corresponding lift-off reference signal Lo_Ref(k) in the later compensation procedure.
- 5) Finally, with Lo_Ref(k), by using a compensation formula automatic lift-off compensation is realised. The compensation formula comprises determining the difference between the appropriate reference signal and the test signal.
- 4) Then for each individual test signal with unknown defects and unknown lift-off type, the following is performed:
Ratio=DPv_test/DPv_Lo_Ref
Auto_Comp=Sig_test−Ratio*Sig_LO_Ref(k)
Claims (12)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB0711349A GB2450112B (en) | 2007-06-12 | 2007-06-12 | Automatic lift-off compensation for pulsed eddy current inspection |
GB0711349.1 | 2007-06-12 |
Publications (2)
Publication Number | Publication Date |
---|---|
US20080309328A1 US20080309328A1 (en) | 2008-12-18 |
US8008913B2 true US8008913B2 (en) | 2011-08-30 |
Family
ID=38331975
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/134,317 Expired - Fee Related US8008913B2 (en) | 2007-06-12 | 2008-06-06 | Automatic lift-off compensation for pulsed eddy current inspection |
Country Status (6)
Country | Link |
---|---|
US (1) | US8008913B2 (en) |
JP (1) | JP5406468B2 (en) |
CN (1) | CN101413923B (en) |
DE (1) | DE102008002883A1 (en) |
FR (1) | FR2917500A1 (en) |
GB (1) | GB2450112B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110268343A1 (en) * | 2008-05-15 | 2011-11-03 | V & M Deutschland Gmbh | Method for the nondestructive testing of pipes |
US20130083628A1 (en) * | 2011-09-30 | 2013-04-04 | Ge Inspection Technologies Ltd | Imaging system and method |
US9091664B2 (en) | 2012-06-07 | 2015-07-28 | Thomas Krause | Pulsed eddy current sensor for precision measurement at-large lift-offs on metallic surfaces |
US9518851B2 (en) | 2014-12-03 | 2016-12-13 | General Electric Company | Probes for inspection system for substantially round hole |
Families Citing this family (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL2003000C2 (en) * | 2009-06-11 | 2010-12-15 | Roentgen Tech Dienst Bv | METHOD FOR DETERMINING AT LEAST ONE PROPERTY FOR AN ELECTRICALLY CONDUCTIVE OBJECT. |
JP5692007B2 (en) * | 2011-11-02 | 2015-04-01 | トヨタ自動車株式会社 | Thermal spray coating quality evaluation method |
JP5948004B2 (en) * | 2012-04-28 | 2016-07-06 | 東日本旅客鉄道株式会社 | Eddy current testing method and eddy current testing equipment |
CN102841137B (en) * | 2012-09-30 | 2014-12-03 | 爱德森(厦门)电子有限公司 | Compensating method for detecting interference signal through rotating eddy current |
CN103076390B (en) * | 2012-12-27 | 2015-11-04 | 佛山市斯派力管业科技股份有限公司 | Be applied to the localization method of eddy current test, device and eddy current flaw detec |
CN103257182B (en) * | 2013-06-07 | 2015-11-18 | 电子科技大学 | A kind of impulse eddy current defect quantitative detection method and detection system |
CN103336049B (en) * | 2013-06-27 | 2016-03-16 | 电子科技大学 | A kind of pulse eddy current detection method and device eliminating Lift-off effect |
CN103399083B (en) * | 2013-08-27 | 2015-09-16 | 南昌航空大学 | A kind of suppressing method of Pulsed eddy current testing Lift-off effect |
JP6228792B2 (en) * | 2013-09-20 | 2017-11-08 | 東日本旅客鉄道株式会社 | Eddy current flaw detection method and eddy current flaw detector |
CN103808795B (en) * | 2014-02-11 | 2017-05-31 | 湖州师范学院 | A kind of novel pulse detection algorithm |
JP6356579B2 (en) | 2014-11-14 | 2018-07-11 | 株式会社東芝 | Eddy current flaw detector and eddy current flaw detection method |
CN104330469B (en) * | 2014-11-28 | 2017-04-26 | 南昌航空大学 | Pulse eddy current detection lift-off effect inhibiting method based on high-pass filtering |
JP6175091B2 (en) * | 2015-03-05 | 2017-08-02 | 非破壊検査株式会社 | Eddy current inspection device and eddy current inspection method |
CN106404899A (en) * | 2016-08-29 | 2017-02-15 | 爱德森(厦门)电子有限公司 | Eddy current detection uplift shake compensation method |
CN109764800A (en) * | 2019-01-15 | 2019-05-17 | 西南石油大学 | A kind of corrosive pipeline wall thickness detecting system based on vortex thermal imaging array |
CN112129830B (en) * | 2020-09-02 | 2023-09-12 | 中国人民解放军空军工程大学航空机务士官学校 | Airplane metal structure burn detection method based on eddy current conductivity |
CN113075463B (en) * | 2021-03-01 | 2022-05-24 | 北京航空航天大学 | Differential probe for millimeter wave focusing antenna measurement |
CN113671022B (en) * | 2021-07-14 | 2023-06-23 | 南京航空航天大学 | Lifting-off measurement method based on pulse eddy current detection probe coil interval crossing point |
CN113640369B (en) * | 2021-07-19 | 2023-09-26 | 哈尔滨工程大学 | Alternating current electromagnetic field lift-off effect compensation method suitable for metal surface cracks |
CN115406959A (en) * | 2022-08-15 | 2022-11-29 | 四川德源管道科技股份有限公司 | Eddy current detection circuit, method, system, storage medium and terminal |
CN116068045B (en) * | 2023-04-06 | 2023-06-02 | 中国石油大学(华东) | Composite structure defect identification method for inhibiting lift-off effect interference |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4303885A (en) * | 1979-06-18 | 1981-12-01 | Electric Power Research Institute, Inc. | Digitally controlled multifrequency eddy current test apparatus and method |
US4383218A (en) * | 1978-12-29 | 1983-05-10 | The Boeing Company | Eddy current flow detection including compensation for system variables such as lift-off |
US4620152A (en) * | 1983-01-11 | 1986-10-28 | Amf Tuboscope, Inc. | Lift-off compensation of eddy current probes by translating without rotation the X-Y coordinate plot of the complex locus of the probe output |
US5371461A (en) * | 1992-06-26 | 1994-12-06 | General Electric Company | Apparatus and method for compensating for variations in the lift-off of eddy current surface inspection array elements |
US5391988A (en) | 1990-03-16 | 1995-02-21 | Kabushiki Kaisha Nihon Hihakai Keisoku Kenkyusho | Method and apparatus for detecting flaws within a conductive object while cancelling the effects of variation in distance between the detection apparatus and the conductive object |
US5394084A (en) * | 1991-12-23 | 1995-02-28 | The Boeing Company | Method and apparatus for reducing errors in eddy-current conductivity measurements due to lift-off by interpolating between a plurality of reference conductivity measurements |
CA2312101A1 (en) | 2000-06-22 | 2001-12-22 | Sylvain R. Giguere | In-service detection of corrosion in multi-layer structure using the lift-off point of intersection |
US6344741B1 (en) | 2000-06-20 | 2002-02-05 | Her Majesty The Queen As Represented By The Minister Of National Defence In Right Of Canada | Pulsed eddy current method for detection of corrosion in multilayer structures using the lift-off point of intersection |
US20020093330A1 (en) * | 2000-08-24 | 2002-07-18 | Crouzen Paulus Carolus Nicolaas | Method for inspecting an object of electrically conducting material |
US6573712B2 (en) | 1999-12-20 | 2003-06-03 | Nsk Ltd. | Non-destructive inspection device |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4609870A (en) * | 1981-03-27 | 1986-09-02 | Hocking Electronics Limited | Lift off compensation of eddy current crack detection system by controlling damping resistance of oscillator |
JPH01316655A (en) * | 1988-06-16 | 1989-12-21 | Nippon Hihakai Keisoku Kenkyusho:Kk | Eddy current test equipment |
US5233297A (en) * | 1990-08-06 | 1993-08-03 | Atlantic Richfield Company | Transient electromagnetic method and apparatus for inspecting conductive objects utilizing sensors that move during inspection |
US6291992B1 (en) * | 1996-07-12 | 2001-09-18 | Shell Oil Company | Eddy current inspection technique |
WO1999012684A1 (en) * | 1997-09-08 | 1999-03-18 | Seppta Research (Ontario) Inc. | Rotary turning attachment equipped with at least two tools |
JP2000046802A (en) * | 1998-07-27 | 2000-02-18 | Non-Destructive Inspection Co Ltd | Sensor head for eddy current flaw detection |
US6593737B2 (en) * | 2000-08-24 | 2003-07-15 | Shell Oil Company | Method for measuring the wall thickness of an electrically conductive object |
ATE312334T1 (en) * | 2002-02-26 | 2005-12-15 | Shell Int Research | MEASURING METHOD FOR DETERMINING A SURFACE PROFILE |
US7005851B2 (en) * | 2003-09-30 | 2006-02-28 | General Electric Company | Methods and apparatus for inspection utilizing pulsed eddy current |
-
2007
- 2007-06-12 GB GB0711349A patent/GB2450112B/en not_active Expired - Fee Related
-
2008
- 2008-06-06 US US12/134,317 patent/US8008913B2/en not_active Expired - Fee Related
- 2008-06-10 FR FR0853822A patent/FR2917500A1/en not_active Withdrawn
- 2008-06-10 JP JP2008151156A patent/JP5406468B2/en not_active Expired - Fee Related
- 2008-06-11 DE DE102008002883A patent/DE102008002883A1/en not_active Ceased
- 2008-06-12 CN CN200810131433.5A patent/CN101413923B/en not_active Expired - Fee Related
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4383218A (en) * | 1978-12-29 | 1983-05-10 | The Boeing Company | Eddy current flow detection including compensation for system variables such as lift-off |
US4303885A (en) * | 1979-06-18 | 1981-12-01 | Electric Power Research Institute, Inc. | Digitally controlled multifrequency eddy current test apparatus and method |
US4620152A (en) * | 1983-01-11 | 1986-10-28 | Amf Tuboscope, Inc. | Lift-off compensation of eddy current probes by translating without rotation the X-Y coordinate plot of the complex locus of the probe output |
US5391988A (en) | 1990-03-16 | 1995-02-21 | Kabushiki Kaisha Nihon Hihakai Keisoku Kenkyusho | Method and apparatus for detecting flaws within a conductive object while cancelling the effects of variation in distance between the detection apparatus and the conductive object |
US5394084A (en) * | 1991-12-23 | 1995-02-28 | The Boeing Company | Method and apparatus for reducing errors in eddy-current conductivity measurements due to lift-off by interpolating between a plurality of reference conductivity measurements |
US5371461A (en) * | 1992-06-26 | 1994-12-06 | General Electric Company | Apparatus and method for compensating for variations in the lift-off of eddy current surface inspection array elements |
US6573712B2 (en) | 1999-12-20 | 2003-06-03 | Nsk Ltd. | Non-destructive inspection device |
US6344741B1 (en) | 2000-06-20 | 2002-02-05 | Her Majesty The Queen As Represented By The Minister Of National Defence In Right Of Canada | Pulsed eddy current method for detection of corrosion in multilayer structures using the lift-off point of intersection |
CA2312101A1 (en) | 2000-06-22 | 2001-12-22 | Sylvain R. Giguere | In-service detection of corrosion in multi-layer structure using the lift-off point of intersection |
US20020093330A1 (en) * | 2000-08-24 | 2002-07-18 | Crouzen Paulus Carolus Nicolaas | Method for inspecting an object of electrically conducting material |
Non-Patent Citations (1)
Title |
---|
German Patent Application No. 102008002883.5-52, German Search Report and Written Opinion, Apr. 14, 2011. |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110268343A1 (en) * | 2008-05-15 | 2011-11-03 | V & M Deutschland Gmbh | Method for the nondestructive testing of pipes |
US8552718B2 (en) * | 2008-05-15 | 2013-10-08 | V & M Deutschland Gmbh | Method for the nondestructive testing of pipes |
US20130083628A1 (en) * | 2011-09-30 | 2013-04-04 | Ge Inspection Technologies Ltd | Imaging system and method |
US9091664B2 (en) | 2012-06-07 | 2015-07-28 | Thomas Krause | Pulsed eddy current sensor for precision measurement at-large lift-offs on metallic surfaces |
US9518851B2 (en) | 2014-12-03 | 2016-12-13 | General Electric Company | Probes for inspection system for substantially round hole |
Also Published As
Publication number | Publication date |
---|---|
GB2450112B (en) | 2010-12-08 |
CN101413923A (en) | 2009-04-22 |
JP5406468B2 (en) | 2014-02-05 |
DE102008002883A1 (en) | 2008-12-24 |
GB2450112A (en) | 2008-12-17 |
FR2917500A1 (en) | 2008-12-19 |
JP2009002945A (en) | 2009-01-08 |
CN101413923B (en) | 2013-08-21 |
US20080309328A1 (en) | 2008-12-18 |
GB0711349D0 (en) | 2007-07-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8008913B2 (en) | Automatic lift-off compensation for pulsed eddy current inspection | |
Lebrun et al. | Pulsed eddy current signal analysis: application to the experimental detection and characterization of deep flaws in highly conductive materials | |
US6344741B1 (en) | Pulsed eddy current method for detection of corrosion in multilayer structures using the lift-off point of intersection | |
US4924182A (en) | Eddy current method to measure distance between scanned surface and a subsurface defect | |
JP5155566B2 (en) | Inspection of non-planar parts using multifrequency eddy currents by phase analysis | |
CN110702783A (en) | Array eddy current method for detecting thermal fatigue cracks of water-cooled wall tube | |
Giguère et al. | Pulsed eddy current: Finding corrosion independently of transducer lift-off | |
EP2482067A1 (en) | A non-destructive test method for automatic fastener inspection | |
US20120074932A1 (en) | Nondestructive inspection of a structure in an aircraft | |
US4881031A (en) | Eddy current method and apparatus for determining structural defects in a metal object without removing surface films or coatings | |
US6933718B2 (en) | Quantification method and system for corrosion and damage assessment | |
CN103399083B (en) | A kind of suppressing method of Pulsed eddy current testing Lift-off effect | |
CN111044606B (en) | Method for improving accuracy of natural crack eddy current depth measurement | |
JPH0771905A (en) | Determination of thickness of ferromagnetic substance deposited on nuclear fuel rod | |
US6285183B1 (en) | Method and system for measuring the volume loss of a metal substrate | |
Lepine et al. | Interpretation of pulsed eddy current signals for locating and quantifying metal loss in thin skin lap splices | |
Watson et al. | Surface-breaking flaw detection in mild steel welds using quantum well hall effect sensor devices | |
US10775347B2 (en) | Material inspection using eddy currents | |
Watson et al. | A Comparative Study of Electromagnetic NDE Methods and Quantum Well Hall Effect Sensor Imaging for Surface-Flaw Detection in Mild Steel Welds | |
Smith et al. | Essential factors in improving the characterization of cracks and corrosion using transient eddy currents | |
CA2312101C (en) | In-service detection of corrosion in multi-layer structure using the lift-off point of intersection | |
US20240118240A1 (en) | Lift-off compensated eddy current system | |
Rawicki | Unconventional methods of non-destructive tests. Part 2 | |
Stumm | Concerning the multi-parameter methods in the non-destructive material testing | |
CN111487294A (en) | Metal flaw detection method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: GE INSPECTION TECHNOLOGIES, LTD, UNITED KINGDOM Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:QIAO, XIAOYU;HANSEN, JOHN;REEL/FRAME:021156/0221;SIGNING DATES FROM 20080605 TO 20080620 Owner name: GE INSPECTION TECHNOLOGIES, LTD, UNITED KINGDOM Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:QIAO, XIAOYU;HANSEN, JOHN;SIGNING DATES FROM 20080605 TO 20080620;REEL/FRAME:021156/0221 |
|
ZAAA | Notice of allowance and fees due |
Free format text: ORIGINAL CODE: NOA |
|
ZAAB | Notice of allowance mailed |
Free format text: ORIGINAL CODE: MN/=. |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
CC | Certificate of correction | ||
FPAY | Fee payment |
Year of fee payment: 4 |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY Year of fee payment: 8 |
|
FEPP | Fee payment procedure |
Free format text: MAINTENANCE FEE REMINDER MAILED (ORIGINAL EVENT CODE: REM.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
LAPS | Lapse for failure to pay maintenance fees |
Free format text: PATENT EXPIRED FOR FAILURE TO PAY MAINTENANCE FEES (ORIGINAL EVENT CODE: EXP.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
|
STCH | Information on status: patent discontinuation |
Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362 |
|
FP | Lapsed due to failure to pay maintenance fee |
Effective date: 20230830 |