US8342245B2 - Multi-position valves for fracturing and sand control and associated completion methods - Google Patents

Multi-position valves for fracturing and sand control and associated completion methods Download PDF

Info

Publication number
US8342245B2
US8342245B2 US13/324,450 US201113324450A US8342245B2 US 8342245 B2 US8342245 B2 US 8342245B2 US 201113324450 A US201113324450 A US 201113324450A US 8342245 B2 US8342245 B2 US 8342245B2
Authority
US
United States
Prior art keywords
screen
housing
shroud
gravel
valves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
US13/324,450
Other versions
US20120080188A1 (en
Inventor
Bennett M. Richard
Michael H. Johnson
Peter J. Fay
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baker Hughes Holdings LLC
Original Assignee
Baker Hughes Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baker Hughes Inc filed Critical Baker Hughes Inc
Priority to US13/324,450 priority Critical patent/US8342245B2/en
Publication of US20120080188A1 publication Critical patent/US20120080188A1/en
Application granted granted Critical
Publication of US8342245B2 publication Critical patent/US8342245B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/04Gravelling of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/08Screens or liners
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/261Separate steps of (1) cementing, plugging or consolidating and (2) fracturing or attacking the formation
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B2200/00Special features related to earth drilling for obtaining oil, gas or water
    • E21B2200/06Sleeve valves

Definitions

  • the field of the invention relates to completion techniques involving fracturing and more particularly the ability to gravel pack and fracture discrete segments of a formation in a desired order through dedicated valved ports followed by configuring another valve for screened sand control duty to let production begin.
  • a crossover tool and a separate run for sand control screens after the fracturing operation is not required.
  • Typical completion sequences in the past involve running in an assembly of screens with a crossover tool and an isolation packer above the crossover tool.
  • the crossover tool has a squeeze position where it eliminates a return path to allow fluid pumped down a work string and through the packer to cross over to the annulus outside the screen sections and into the formation through, for example, a cemented and perforated casing or in open hole.
  • the casing could have telescoping members that are extendable into the formation and the tubular from which they extend could be cemented or not cemented.
  • the fracture fluid in any event, would go into the annular space outside the screens and get squeezed into the formation that is isolated by the packer above the crossover tool and another downhole packer or the bottom of the hole.
  • the crossover tool When a particular portion of a zone was fractured in this manner the crossover tool would be repositioned to allow a return path, usually through the annular space above the isolation packer and outside the work string so that a gravel packing operation could then begin. In the gravel packing operation, the gravel exits the crossover tool to the annular space outside the screens. Carrier fluid goes through the screens and back into the crossover tool to get through the packer above and into the annular space outside the work string and back to the surface.
  • a completion tubular is placed in position adjacent the zone or zones to be fractured and produced. It features preferably sliding sleeve valves one series of which can be put in the wide open position after run in for gravel packing and fracturing zones one at a time or in any desired order. These valves are then closed and another series of valves can be opened wide but with a screen material juxtaposed in the flow passage to selectively produce from one or more fractured zones.
  • An annular path behind the gravel is provided by an offset screen to promote flow to the screened production port. The path can be a closed annulus that comes short of the production port or goes over it. For short runs an exterior screen or shroud is eliminated for a sliding sleeve with multiple screened ports that can be opened in tandem.
  • FIG. 1 is a section view of an embodiment with a proppant control shroud shown in the run in position;
  • FIG. 2 is the view of FIG. 1 with a valve open for proppant deposition and fracturing;
  • FIG. 3 is the view of FIG. 2 with the frac valve closed and the production valve open with a screen in the flow path of the production valve;
  • FIG. 4 is the view of FIG. 1 but with an alternative embodiment where the proppant shroud straddles the production valve;
  • FIG. 5 is the view of FIG. 4 with the fracture and proppant deposition valve open;
  • FIG. 6 is the view of FIG. 5 with the fracture and proppant deposition valve closed and the production valve open with a screen in the flow path;
  • FIG. 7 is an alternative embodiment with no external proppant shroud and instead having a sleeve to open multiple production ports with screened openings and a frac valve all shown in a closed position for run in;
  • FIG. 8 is the view of FIG. 7 with the frac valve in the wide open fracturing position
  • FIG. 9 is the view of FIG. 8 with the frac valve closed and the production sliding sleeve in the open position;
  • FIG. 10 is a view of a frac valve in the closed position
  • FIG. 11 is the view of FIG. 10 with the frac valve in the open position
  • FIG. 12 is the view of FIG. 11 with the frac valve in the open position and an insertable screen in position for production;
  • FIG. 13 is the view of the insertable screen shown in FIG. 12 ;
  • FIG. 1 is a schematic illustration of a wellbore 10 that can be cased or in open hole. There are perforations 12 into a formation 14 .
  • a string 16 is shown in part if FIG. 1 to the extent it spans a production interval defined between seals or packers 18 and 20 . These seal locations can be polished bores in a cased hole or any type of packer.
  • the two barriers 18 and 20 define a production interval 22 . While only one interval is shown the string 16 can pass through multiple intervals that preferably have similar equipment so that access to them can occur in any desired order and access can be to one interval at a time or multiple intervals together.
  • the string 16 for the interval 22 that is illustrated has a frac valve 24 that is preferably a sliding sleeve shown in the closed position in FIG. 1 for run in.
  • Valve 24 regulates opening or openings 25 and is used in two positions. The closed position is shown in FIG. 1 and the wide open position is shown in FIG. 2 .
  • gravel slurry can be squeezed into the formation 14 leaving the gravel 28 in the annular interval 22 just outside the proppant screen or shroud 29 .
  • Shroud 29 is sealed on opposite ends 30 and 32 and in between defines an annular flow area 34 . While the shroud 29 is shown as one continuous unit, it can also be segmented with discrete or interconnected segments.
  • the proppant 28 stays in the interval 22 and the carrier fluid is pumped into the formation 14 to complete the fracturing operation. At that point the valve 24 is closed and excess proppant 28 that is still in the string 16 can be circulated out to the surface using, for example, coiled tubing 36 .
  • the production valve 26 which is preferably a sliding sleeve with a screen material 38 in or over its ports is brought into alignment with ports 40 and production from the formation 14 begins.
  • the screen material 38 can be fixed to either side of the string 16 .
  • the open position of production valve 26 results in the production flow being screened regardless of screen position and screen type. Flow can take a path of less resistance through the flow area 34 to reach the port 40 . While such flow avoids most of the gravel pack 28 by design, the presence of passage 34 allows a greater flow to reach the ports 40 so as not to impede production.
  • the presence of a screen material 38 at ports 40 serves to exclude solids that may have gotten into passage 34 through the coarse openings in shroud 29 .
  • the screen material 38 can be of a variety of designs such as a weave, conjoined spheres, porous sintered metal or equivalent designs that perform the function of a screen to keep gravel 28 out of the flow passage through string 16 .
  • valves 24 and 26 are preferably longitudinally shiftable sliding sleeves that can be operated with a shifting tool, hydraulic or pneumatic pressure or a variety of motor drivers, other styles of valves can be used.
  • the valves can be a sleeve that rotates rather than shifts axially.
  • a single valve assembly in an interval between barriers 18 and 20 is illustrated for valves 24 and 26 and their associated ports, multiple assemblies can be used with either discrete sleeves for a given row of associated openings or longer sleeves that can service multiple rows of associated openings that are axially displaced.
  • FIGS. 4-6 correspond to FIGS. 1-3 with the only difference being the shroud 29 having an end 32 that is past the openings 40 so that the passage 34 goes directly to the ports 40 .
  • the valves 24 and 26 are closed for run in. When the string 16 is in position and the barriers 18 and 20 are activated, the valve 24 is opened, as shown in FIG. 5 , and proppant slurry 28 is delivered through ports 25 . There is no crossover needed.
  • valve 24 When the proper amount of proppant is deposited in the interval 22 , the valve 24 is closed and valve 26 is opened to place the screen material 38 over openings 40 to let production begin.
  • the same options are available to the alternative design of FIGS. 4-6 .
  • One advantage of the design in FIGS. 4-6 is that there is less resistance to flow in passage 34 because of the avoidance of going through the shroud 29 a second time to get to the ports 40 .
  • one of the advantages of the design of FIGS. 1-3 is that the inside dimension of the string 16 in the region close to valve 26 can be larger because the shroud 29 terminates at end 32 well below the ports 40 .
  • shroud 29 can span many pipe joints and can exceed hundreds if not thousands of feet depending on the length of the interval 22 .
  • short jumper sections can be used to cover the connections after assembly so that the passage 34 winds up being continuous.
  • FIGS. 7-9 work similarly to FIGS. 1-3 with the only design difference being that the shroud 29 is not used because the application for this design is for rather short intervals where a bypass passage such as 34 around a shroud 29 is not necessary to get the desired production flow rates.
  • valve 26 has a plurality of screen sections 38 that can be aligned with axially spaced arrays of openings 40 .
  • the valves 24 and 26 can be located within or outside the tubular string 16 .
  • the operation of the embodiment of FIGS. 7-9 is the same as FIGS. 1-3 .
  • FIG. 7 for run in the valves 24 and 26 are closed.
  • the string 16 is placed in position and barriers 18 and 20 define the producing zone 22 .
  • FIG. 7 for run in the valves 24 and 26 are closed.
  • the string 16 is placed in position and barriers 18 and 20 define the producing zone 22 .
  • FIG. 7 for run in the valves 24 and 26 are closed.
  • the string 16 is placed in position and barriers 18 and 20 define the producing
  • valve 24 is opened and the gravel slurry 28 is squeezed into the formation 14 leaving the gravel in the interval 22 outside of openings 40 .
  • FIG. 9 the gravel packing and frac is completed and the valve 24 is closed.
  • valve 26 is opened placing screen material 38 in front of openings 40 and production can begin.
  • valve 26 with its screen sections 38 and openings 40 act as a screen that is blocked for run in and gravel deposition and frac and then functions as a screen for production.
  • multiple assemblies of valves 24 and 26 can be used so that if one fails to operate another can be used as a backup. In the same manner if one set of screen sections 38 clog up, another section can be placed in service to continue production.
  • FIG. 10 illustrates a valve 50 that uses as sliding sleeve 52 to selectively cover ports 54 .
  • the ports 54 are closed in FIG. 10 and open in FIG. 11 .
  • a latch profile 56 is provided adjacent each sleeve 52 .
  • An array of valves 50 and associated ports 54 is envisioned.
  • the configuration of the latch profile 56 is preferably unique so as to accept a specific screen assembly 58 , one of which is shown in FIG. 13 .
  • Each screen assembly has a latch 60 that is uniquely matched to a profile 56 .
  • FIG. 12 shows a screen assembly 58 that has a latch 60 engaged in its mating profile 56 . In that position a screen 62 has end seals 64 and 66 that straddle ports 54 with sleeve 52 disposed to uncover the ports 54 .
  • One or more such assemblies are envisioned in an interval 22 between isolators 18 and 20 in the manner described before.
  • the ports 54 are closed for run in as shown in FIG. 10 .
  • the ports 54 are exposed and gravel slurry is forced into the formation as the formation is fractured.
  • the screen assembly 58 is not in string 16 .
  • the valves 50 to be used in production are opened.
  • a screen assembly 58 with a latch 60 that matches the valve or valves 50 just opened is delivered into the string 16 and secured to its associated profile 56 .
  • the ports 54 that are now open each receive a screen assembly 58 and production can begin. Any order of producing multiple intervals can be established.
  • the screen sections 58 can be dropped in or lowered in on wireline or other means. They are designed to release with an upward pull so if they clog during production they can be released from latch 56 and removed and replaced to allow production to resume.
  • the screen assemblies can have a fishing neck 68 to be used with known fishing tools to retrieve the screen section 58 to the surface.
  • One screen section can cover one array of ports 54 or multiple arrays, depending on its length and the spacing between seals 64 and 66 .
  • the shroud 29 of from the other embodiments can be combined into the FIGS. 10-13 embodiment and it can be positioned to come just short of ports 54 or to straddle them as previously described and for the same reasons.

Abstract

A completion tubular is placed in position adjacent the zone or zones to be fractured and produced. It features preferably sliding sleeve valves one series of which can be put in the wide open position after run in for gravel packing and fracturing zones one at a time or in any desired order. These valves are then closed and another series of valves can be opened wide but with a screen material juxtaposed in the flow passage to selectively produce from one or more fractured zones. An annular path behind the gravel is provided by an offset screen to promote flow to the screened production port. The path can be a closed annulus that comes short of the production port or goes over it. For short runs an exterior screen or shroud is eliminated for a sliding sleeve with multiple screened ports that can be opened in tandem.

Description

PRIORITY INFORMATION
This application is a divisional of U.S. patent application Ser. No. 11/949,403, filed on Dec. 3, 2007.
FIELD OF THE INVENTION
The field of the invention relates to completion techniques involving fracturing and more particularly the ability to gravel pack and fracture discrete segments of a formation in a desired order through dedicated valved ports followed by configuring another valve for screened sand control duty to let production begin. A crossover tool and a separate run for sand control screens after the fracturing operation is not required.
BACKGROUND OF THE INVENTION
Typical completion sequences in the past involve running in an assembly of screens with a crossover tool and an isolation packer above the crossover tool. The crossover tool has a squeeze position where it eliminates a return path to allow fluid pumped down a work string and through the packer to cross over to the annulus outside the screen sections and into the formation through, for example, a cemented and perforated casing or in open hole. Alternatively, the casing could have telescoping members that are extendable into the formation and the tubular from which they extend could be cemented or not cemented. The fracture fluid, in any event, would go into the annular space outside the screens and get squeezed into the formation that is isolated by the packer above the crossover tool and another downhole packer or the bottom of the hole. When a particular portion of a zone was fractured in this manner the crossover tool would be repositioned to allow a return path, usually through the annular space above the isolation packer and outside the work string so that a gravel packing operation could then begin. In the gravel packing operation, the gravel exits the crossover tool to the annular space outside the screens. Carrier fluid goes through the screens and back into the crossover tool to get through the packer above and into the annular space outside the work string and back to the surface.
This entire procedure is repeated if another zone in the well needs to be fractured and gravel packed before it can be produced. Once a given zone was gravel packed, the production string is tagged into the packer and the zone is produced.
There are many issues with this technique and foremost among them is the rig time for running in the hole and conducting the discrete operations. Other issues relate to the erosive qualities of the gravel slurry during deposition of gravel in the gravel packing procedure. Portions of the crossover tool could wear away during the fracking operation or the subsequent gravel packing operation, if the zone was particularly long. If more than a single zone needs to be fractured and gravel packed, it means additional trips in the hole with more screens coupled to a crossover tool and an isolation packer and a repeating of the process. The order of operations using this technique was generally limited to working the hole from the bottom up. Alternatively, one trip multi-zone systems have been developed that require a large volume of proppant slurry through the crossover tool and that increases the erosion risk.
What the present invention addresses are ways to optimize the operation to reduce rig time and enhance the choices available for the sequence of locations where fracturing can occur. Furthermore, through a unique valve system, fracturing can occur in a plurality of zones in any desired order followed by operating another valve to place filter media in position of ports so that production could commence with a production string without having to run screens or a crossover tool into the well. These and other advantages of the present invention will be more readily apparent to those skilled in the art from the description of the various embodiments that are discussed below along with their associated drawings, while recognizing that the claims define the full scope of the invention.
SUMMARY OF THE INVENTION
A completion tubular is placed in position adjacent the zone or zones to be fractured and produced. It features preferably sliding sleeve valves one series of which can be put in the wide open position after run in for gravel packing and fracturing zones one at a time or in any desired order. These valves are then closed and another series of valves can be opened wide but with a screen material juxtaposed in the flow passage to selectively produce from one or more fractured zones. An annular path behind the gravel is provided by an offset screen to promote flow to the screened production port. The path can be a closed annulus that comes short of the production port or goes over it. For short runs an exterior screen or shroud is eliminated for a sliding sleeve with multiple screened ports that can be opened in tandem.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1 is a section view of an embodiment with a proppant control shroud shown in the run in position;
FIG. 2 is the view of FIG. 1 with a valve open for proppant deposition and fracturing;
FIG. 3 is the view of FIG. 2 with the frac valve closed and the production valve open with a screen in the flow path of the production valve;
FIG. 4 is the view of FIG. 1 but with an alternative embodiment where the proppant shroud straddles the production valve;
FIG. 5 is the view of FIG. 4 with the fracture and proppant deposition valve open;
FIG. 6 is the view of FIG. 5 with the fracture and proppant deposition valve closed and the production valve open with a screen in the flow path;
FIG. 7 is an alternative embodiment with no external proppant shroud and instead having a sleeve to open multiple production ports with screened openings and a frac valve all shown in a closed position for run in;
FIG. 8 is the view of FIG. 7 with the frac valve in the wide open fracturing position;
FIG. 9 is the view of FIG. 8 with the frac valve closed and the production sliding sleeve in the open position;
FIG. 10 is a view of a frac valve in the closed position;
FIG. 11 is the view of FIG. 10 with the frac valve in the open position;
FIG. 12 is the view of FIG. 11 with the frac valve in the open position and an insertable screen in position for production;
FIG. 13 is the view of the insertable screen shown in FIG. 12;
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
FIG. 1 is a schematic illustration of a wellbore 10 that can be cased or in open hole. There are perforations 12 into a formation 14. A string 16 is shown in part if FIG. 1 to the extent it spans a production interval defined between seals or packers 18 and 20. These seal locations can be polished bores in a cased hole or any type of packer. The two barriers 18 and 20 define a production interval 22. While only one interval is shown the string 16 can pass through multiple intervals that preferably have similar equipment so that access to them can occur in any desired order and access can be to one interval at a time or multiple intervals together.
The string 16 for the interval 22 that is illustrated has a frac valve 24 that is preferably a sliding sleeve shown in the closed position in FIG. 1 for run in. Valve 24 regulates opening or openings 25 and is used in two positions. The closed position is shown in FIG. 1 and the wide open position is shown in FIG. 2. In the FIG. 2 position, gravel slurry can be squeezed into the formation 14 leaving the gravel 28 in the annular interval 22 just outside the proppant screen or shroud 29. Shroud 29 is sealed on opposite ends 30 and 32 and in between defines an annular flow area 34. While the shroud 29 is shown as one continuous unit, it can also be segmented with discrete or interconnected segments. The proppant 28 stays in the interval 22 and the carrier fluid is pumped into the formation 14 to complete the fracturing operation. At that point the valve 24 is closed and excess proppant 28 that is still in the string 16 can be circulated out to the surface using, for example, coiled tubing 36.
At this point the production valve 26 which is preferably a sliding sleeve with a screen material 38 in or over its ports is brought into alignment with ports 40 and production from the formation 14 begins. Alternatively, the screen material 38 can be fixed to either side of the string 16. In short, the open position of production valve 26 results in the production flow being screened regardless of screen position and screen type. Flow can take a path of less resistance through the flow area 34 to reach the port 40. While such flow avoids most of the gravel pack 28 by design, the presence of passage 34 allows a greater flow to reach the ports 40 so as not to impede production. The presence of a screen material 38 at ports 40 serves to exclude solids that may have gotten into passage 34 through the coarse openings in shroud 29. The screen material 38 can be of a variety of designs such as a weave, conjoined spheres, porous sintered metal or equivalent designs that perform the function of a screen to keep gravel 28 out of the flow passage through string 16.
It should be noted that while only a single port 25 and 40 are shown that there can be multiple ports that are respectively exposed by operation of valves 24 and 26. While valves 24 and 26 are preferably longitudinally shiftable sliding sleeves that can be operated with a shifting tool, hydraulic or pneumatic pressure or a variety of motor drivers, other styles of valves can be used. For example, the valves can be a sleeve that rotates rather than shifts axially. While a single valve assembly in an interval between barriers 18 and 20 is illustrated for valves 24 and 26 and their associated ports, multiple assemblies can be used with either discrete sleeves for a given row of associated openings or longer sleeves that can service multiple rows of associated openings that are axially displaced.
FIGS. 4-6 correspond to FIGS. 1-3 with the only difference being the shroud 29 having an end 32 that is past the openings 40 so that the passage 34 goes directly to the ports 40. Here, as opposed to FIGS. 1-3, once the flow from the formation 14 passes through the shroud 29 it doesn't have to pass through that shroud 29 a second time. In all other respects the method is the same. In FIG. 4 the valves 24 and 26 are closed for run in. When the string 16 is in position and the barriers 18 and 20 are activated, the valve 24 is opened, as shown in FIG. 5, and proppant slurry 28 is delivered through ports 25. There is no crossover needed. When the proper amount of proppant is deposited in the interval 22, the valve 24 is closed and valve 26 is opened to place the screen material 38 over openings 40 to let production begin. As before, with the design of FIGS. 1-3 and the variations described for those FIGS., the same options are available to the alternative design of FIGS. 4-6. One advantage of the design in FIGS. 4-6 is that there is less resistance to flow in passage 34 because of the avoidance of going through the shroud 29 a second time to get to the ports 40. On the other hand, one of the advantages of the design of FIGS. 1-3 is that the inside dimension of the string 16 in the region close to valve 26 can be larger because the shroud 29 terminates at end 32 well below the ports 40.
In both designs the length of shroud 29 can span many pipe joints and can exceed hundreds if not thousands of feet depending on the length of the interval 22. Those skilled in the art will appreciate that short jumper sections can be used to cover the connections after assembly so that the passage 34 winds up being continuous.
FIGS. 7-9 work similarly to FIGS. 1-3 with the only design difference being that the shroud 29 is not used because the application for this design is for rather short intervals where a bypass passage such as 34 around a shroud 29 is not necessary to get the desired production flow rates. Instead valve 26 has a plurality of screen sections 38 that can be aligned with axially spaced arrays of openings 40. In this case as with the other designs, the valves 24 and 26 can be located within or outside the tubular string 16. In all other ways, the operation of the embodiment of FIGS. 7-9 is the same as FIGS. 1-3. In FIG. 7 for run in the valves 24 and 26 are closed. The string 16 is placed in position and barriers 18 and 20 define the producing zone 22. In FIG. 8, the valve 24 is opened and the gravel slurry 28 is squeezed into the formation 14 leaving the gravel in the interval 22 outside of openings 40. In FIG. 9 the gravel packing and frac is completed and the valve 24 is closed. Then valve 26 is opened placing screen material 38 in front of openings 40 and production can begin. In essence, valve 26 with its screen sections 38 and openings 40 act as a screen that is blocked for run in and gravel deposition and frac and then functions as a screen for production. Again multiple assemblies of valves 24 and 26 can be used so that if one fails to operate another can be used as a backup. In the same manner if one set of screen sections 38 clog up, another section can be placed in service to continue production.
FIG. 10 illustrates a valve 50 that uses as sliding sleeve 52 to selectively cover ports 54. The ports 54 are closed in FIG. 10 and open in FIG. 11. A latch profile 56 is provided adjacent each sleeve 52. An array of valves 50 and associated ports 54 is envisioned. The configuration of the latch profile 56 is preferably unique so as to accept a specific screen assembly 58, one of which is shown in FIG. 13. Each screen assembly has a latch 60 that is uniquely matched to a profile 56. FIG. 12 shows a screen assembly 58 that has a latch 60 engaged in its mating profile 56. In that position a screen 62 has end seals 64 and 66 that straddle ports 54 with sleeve 52 disposed to uncover the ports 54. One or more such assemblies are envisioned in an interval 22 between isolators 18 and 20 in the manner described before. In operation, the ports 54 are closed for run in as shown in FIG. 10. After getting the string 16 into position and setting the barriers (not shown in FIG. 10) to define an interval 22, as before, the ports 54 are exposed and gravel slurry is forced into the formation as the formation is fractured. At this time the screen assembly 58 is not in string 16. When that step is done and the excess slurry is circulated out, the valves 50 to be used in production are opened. A screen assembly 58 with a latch 60 that matches the valve or valves 50 just opened is delivered into the string 16 and secured to its associated profile 56. In this manner, the ports 54 that are now open each receive a screen assembly 58 and production can begin. Any order of producing multiple intervals can be established. The screen sections 58 can be dropped in or lowered in on wireline or other means. They are designed to release with an upward pull so if they clog during production they can be released from latch 56 and removed and replaced to allow production to resume. The screen assemblies can have a fishing neck 68 to be used with known fishing tools to retrieve the screen section 58 to the surface. One screen section can cover one array of ports 54 or multiple arrays, depending on its length and the spacing between seals 64 and 66.
Optionally, the shroud 29 of from the other embodiments can be combined into the FIGS. 10-13 embodiment and it can be positioned to come just short of ports 54 or to straddle them as previously described and for the same reasons.
The above description is illustrative of the preferred embodiment and many modifications may be made by those skilled in the art without departing from the invention whose scope is to be determined from the literal and equivalent scope of the claims below.

Claims (8)

1. A completion method, comprising:
delivering a housing having at least one valved port to a desired location downhole;
performing a downhole operation through said valved port when said valved port is open;
inserting at least one open ended tubular screen into said housing after performing said downhole operation, said open ended screen allowing tools to pass therethrough;
sealingly supporting said screen to said housing while said screen covers said valved port; and
taking fluids into said housing through said screen.
2. The method of claim 1, comprising:
performing a gravel pack and formation fracture as said downhole operation.
3. The method of claim 2, comprising:
providing interacting components on said housing and said screen that engage for placement of said screen over said valved port.
4. The method of claim 3, comprising:
providing a plurality of valved ports with each having a unique interacting component on said housing designed to accept a matched component on said screen for specific placement of each screen in said housing.
5. The method of claim 4, comprising:
providing unique profiles in said housing and a matching latch on each screen to specifically locate and support each said screen in said housing.
6. The method of claim 5, comprising:
isolating a plurality of producing zones around said housing where each zone has a valved port capable of accepting the inserted screen after performing said gravel pack and fracturing.
7. The method of claim 2, comprising:
providing at least one perforated shroud around said housing;
depositing gravel outside said shroud; taking production flow through a passage in said shroud to bypass some of the gravel pack before reaching said screen.
8. The method of claim 1, comprising:
performing said inserting by lowering or dropping said screen into said housing.
US13/324,450 2007-12-03 2011-12-13 Multi-position valves for fracturing and sand control and associated completion methods Active US8342245B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US13/324,450 US8342245B2 (en) 2007-12-03 2011-12-13 Multi-position valves for fracturing and sand control and associated completion methods

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US11/949,403 US8127847B2 (en) 2007-12-03 2007-12-03 Multi-position valves for fracturing and sand control and associated completion methods
US13/324,450 US8342245B2 (en) 2007-12-03 2011-12-13 Multi-position valves for fracturing and sand control and associated completion methods

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US11/949,403 Division US8127847B2 (en) 2007-12-03 2007-12-03 Multi-position valves for fracturing and sand control and associated completion methods

Publications (2)

Publication Number Publication Date
US20120080188A1 US20120080188A1 (en) 2012-04-05
US8342245B2 true US8342245B2 (en) 2013-01-01

Family

ID=40674562

Family Applications (2)

Application Number Title Priority Date Filing Date
US11/949,403 Active 2028-10-30 US8127847B2 (en) 2007-12-03 2007-12-03 Multi-position valves for fracturing and sand control and associated completion methods
US13/324,450 Active US8342245B2 (en) 2007-12-03 2011-12-13 Multi-position valves for fracturing and sand control and associated completion methods

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US11/949,403 Active 2028-10-30 US8127847B2 (en) 2007-12-03 2007-12-03 Multi-position valves for fracturing and sand control and associated completion methods

Country Status (6)

Country Link
US (2) US8127847B2 (en)
EP (1) EP2222936B1 (en)
CN (2) CN101910550B (en)
BR (1) BRPI0819995B1 (en)
CA (1) CA2707480A1 (en)
WO (1) WO2009073391A2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9617836B2 (en) 2013-08-23 2017-04-11 Baker Hughes Incorporated Passive in-flow control devices and methods for using same
CN108518203A (en) * 2018-03-16 2018-09-11 大连坤麟金属制品有限公司 A kind of rotation production facilities are integrated
US10184316B2 (en) 2015-09-03 2019-01-22 Baker Hughes, A Ge Company, Llc Three position interventionless treatment and production valve assembly
US10830028B2 (en) 2013-02-07 2020-11-10 Baker Hughes Holdings Llc Frac optimization using ICD technology
US10941640B2 (en) 2018-09-06 2021-03-09 Halliburton Energy Services, Inc. Multi-functional sleeve completion system with return and reverse fluid path
US11261674B2 (en) 2020-01-29 2022-03-01 Halliburton Energy Services, Inc. Completion systems and methods to perform completion operations
US11333002B2 (en) 2020-01-29 2022-05-17 Halliburton Energy Services, Inc. Completion systems and methods to perform completion operations

Families Citing this family (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7971646B2 (en) 2007-08-16 2011-07-05 Baker Hughes Incorporated Multi-position valve for fracturing and sand control and associated completion methods
US7775271B2 (en) 2007-10-19 2010-08-17 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7913755B2 (en) 2007-10-19 2011-03-29 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7784543B2 (en) * 2007-10-19 2010-08-31 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7793714B2 (en) 2007-10-19 2010-09-14 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7789139B2 (en) 2007-10-19 2010-09-07 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7775277B2 (en) * 2007-10-19 2010-08-17 Baker Hughes Incorporated Device and system for well completion and control and method for completing and controlling a well
US7934553B2 (en) * 2008-04-21 2011-05-03 Schlumberger Technology Corporation Method for controlling placement and flow at multiple gravel pack zones in a wellbore
US8113292B2 (en) 2008-05-13 2012-02-14 Baker Hughes Incorporated Strokable liner hanger and method
US8171999B2 (en) 2008-05-13 2012-05-08 Baker Huges Incorporated Downhole flow control device and method
US8555958B2 (en) * 2008-05-13 2013-10-15 Baker Hughes Incorporated Pipeless steam assisted gravity drainage system and method
US7814981B2 (en) * 2008-08-26 2010-10-19 Baker Hughes Incorporated Fracture valve and equalizer system and method
MY162236A (en) * 2009-05-27 2017-05-31 Schlumberger Technology Bv Method and system of sand management
US20100300674A1 (en) * 2009-06-02 2010-12-02 Baker Hughes Incorporated Permeability flow balancing within integral screen joints
US8056627B2 (en) * 2009-06-02 2011-11-15 Baker Hughes Incorporated Permeability flow balancing within integral screen joints and method
US8151881B2 (en) * 2009-06-02 2012-04-10 Baker Hughes Incorporated Permeability flow balancing within integral screen joints
US8132624B2 (en) * 2009-06-02 2012-03-13 Baker Hughes Incorporated Permeability flow balancing within integral screen joints and method
US20100300675A1 (en) * 2009-06-02 2010-12-02 Baker Hughes Incorporated Permeability flow balancing within integral screen joints
EP2521839A1 (en) 2010-01-04 2012-11-14 Packers Plus Energy Services Inc. Wellbore treatment apparatus and method
BR112013008040A2 (en) 2010-09-22 2016-06-14 Packers Plus Energy Serv Inc well wall hydraulic fracturing tool with inlet flow control field
US9797221B2 (en) 2010-09-23 2017-10-24 Packers Plus Energy Services Inc. Apparatus and method for fluid treatment of a well
EP2640930A1 (en) 2010-11-19 2013-09-25 Packers Plus Energy Services Inc. Kobe sub, wellbore tubing string apparatus and method
BR112014005570A2 (en) * 2011-09-12 2017-03-21 Packers Plus Energy Serv Inc Influx control well fracturing tool
CN103573226B (en) * 2012-07-24 2016-03-02 思达斯易能源技术(集团)有限公司 A kind of completion and sand control technique and sand control pipe thereof
CN103015952B (en) * 2012-12-12 2015-07-15 山东瑞丰石油技术有限责任公司 Method for packing multiple layers of gravel in one time
CN103821476A (en) * 2014-03-14 2014-05-28 胡和萍 Fixing valve
US9759057B2 (en) 2014-04-11 2017-09-12 Dynacorp Fabricators Inc. Apparatus, system and method for separating sand and other solids from oil and other fluids
CA2916168C (en) 2014-12-23 2019-04-30 Ncs Multistage Inc. Downhole flow control apparatus with screen
WO2016144288A1 (en) * 2015-03-06 2016-09-15 Halliburton Energy Services, Inc. High flow injection screen system with sleeves
CN104775802B (en) * 2015-03-26 2017-02-22 中国石油化工股份有限公司 Separate-layer fracturing sand control string for thermal production well and sand control method thereof
CN104929603B (en) * 2015-06-05 2017-07-11 中国石油集团渤海钻探工程有限公司 Sleeve pipe infinite stages staged fracturing method
CA2965068C (en) 2016-04-22 2023-11-14 Ncs Multistage Inc. Apparatus, systems and methods for controlling flow communication with a subterranean formation
GB2551308B (en) 2016-05-03 2021-11-03 Darcy Tech Limited Downhole apparatus
EP3513031B1 (en) 2016-09-16 2021-06-16 NCS Multistage Inc. Wellbore flow control apparatus with solids control
US10294754B2 (en) 2017-03-16 2019-05-21 Baker Hughes, A Ge Company, Llc Re-closable coil activated frack sleeve
CN109958417A (en) * 2017-12-26 2019-07-02 中国石油天然气股份有限公司 Fracturing sand control tubing string and method
US11867025B2 (en) 2019-03-08 2024-01-09 Ncs Multistage Inc. Downhole flow controller
WO2022132172A1 (en) * 2020-12-18 2022-06-23 Halliburton Energy Services, Inc. Production valve having washpipe free activation
CN112901131B (en) * 2021-02-20 2022-07-22 中海油能源发展股份有限公司 Staged fracturing process pipe column for loose sandstone in-service screen pipe sand-prevention horizontal well and operation method

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4969524A (en) 1989-10-17 1990-11-13 Halliburton Company Well completion assembly
US5413176A (en) * 1992-07-29 1995-05-09 Halliburton Company Sand screen repair
US5875852A (en) * 1997-02-04 1999-03-02 Halliburton Energy Services, Inc. Apparatus and associated methods of producing a subterranean well
US5971070A (en) 1997-08-27 1999-10-26 Halliburton Energy Services, Inc. Apparatus for completing a subterranean well and associated methods
US6176307B1 (en) 1999-02-08 2001-01-23 Union Oil Company Of California Tubing-conveyed gravel packing tool and method
US20030230406A1 (en) 2002-06-17 2003-12-18 Hans-Jacob Lund Single placement well completion system
US6978840B2 (en) * 2003-02-05 2005-12-27 Halliburton Energy Services, Inc. Well screen assembly and system with controllable variable flow area and method of using same for oil well fluid production
US7013979B2 (en) 2002-08-23 2006-03-21 Baker Hughes Incorporated Self-conforming screen
US20060124310A1 (en) 2004-12-14 2006-06-15 Schlumberger Technology Corporation System for Completing Multiple Well Intervals
US7066265B2 (en) 2003-09-24 2006-06-27 Halliburton Energy Services, Inc. System and method of production enhancement and completion of a well
US7185703B2 (en) 2004-06-18 2007-03-06 Halliburton Energy Services, Inc. Downhole completion system and method for completing a well
US7316274B2 (en) 2004-03-05 2008-01-08 Baker Hughes Incorporated One trip perforating, cementing, and sand management apparatus and method
US7401648B2 (en) 2004-06-14 2008-07-22 Baker Hughes Incorporated One trip well apparatus with sand control
US7461699B2 (en) 2003-10-22 2008-12-09 Baker Hughes Incorporated Method for providing a temporary barrier in a flow pathway
US20090044944A1 (en) 2007-08-16 2009-02-19 Murray Douglas J Multi-Position Valve for Fracturing and Sand Control and Associated Completion Methods
US20090084553A1 (en) 2004-12-14 2009-04-02 Schlumberger Technology Corporation Sliding sleeve valve assembly with sand screen
US7520335B2 (en) 2003-12-08 2009-04-21 Baker Hughes Incorporated Cased hole perforating alternative
US20090101355A1 (en) 2007-10-19 2009-04-23 Baker Hughes Incorporated Water Sensing Adaptable In-Flow Control Device and Method of Use
US7575062B2 (en) 2006-06-09 2009-08-18 Halliburton Energy Services, Inc. Methods and devices for treating multiple-interval well bores
US20090223678A1 (en) 2008-03-05 2009-09-10 Baker Hughes Incorporated Heat Generator For Screen Deployment
US20090255686A1 (en) 2003-10-22 2009-10-15 Baker Hughes Incorporated Method for providing a temporary barrier in a flow pathway

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5333688A (en) * 1993-01-07 1994-08-02 Mobil Oil Corporation Method and apparatus for gravel packing of wells
US6644406B1 (en) * 2000-07-31 2003-11-11 Mobil Oil Corporation Fracturing different levels within a completion interval of a well
US7096945B2 (en) * 2002-01-25 2006-08-29 Halliburton Energy Services, Inc. Sand control screen assembly and treatment method using the same
AU2008287022B2 (en) * 2007-08-13 2013-12-19 Baker Hughes Incorporated Multi-position valve for fracturing and sand control and associated completion methods
US7703510B2 (en) * 2007-08-27 2010-04-27 Baker Hughes Incorporated Interventionless multi-position frac tool

Patent Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4969524A (en) 1989-10-17 1990-11-13 Halliburton Company Well completion assembly
US5413176A (en) * 1992-07-29 1995-05-09 Halliburton Company Sand screen repair
US5875852A (en) * 1997-02-04 1999-03-02 Halliburton Energy Services, Inc. Apparatus and associated methods of producing a subterranean well
US5971070A (en) 1997-08-27 1999-10-26 Halliburton Energy Services, Inc. Apparatus for completing a subterranean well and associated methods
US6176307B1 (en) 1999-02-08 2001-01-23 Union Oil Company Of California Tubing-conveyed gravel packing tool and method
US20030230406A1 (en) 2002-06-17 2003-12-18 Hans-Jacob Lund Single placement well completion system
US7013979B2 (en) 2002-08-23 2006-03-21 Baker Hughes Incorporated Self-conforming screen
US6978840B2 (en) * 2003-02-05 2005-12-27 Halliburton Energy Services, Inc. Well screen assembly and system with controllable variable flow area and method of using same for oil well fluid production
US7066265B2 (en) 2003-09-24 2006-06-27 Halliburton Energy Services, Inc. System and method of production enhancement and completion of a well
US20090078408A1 (en) 2003-10-22 2009-03-26 Baker Hughes Incorporated Apparatus for Providing a Temporary Degradable Barrier in a Flow Pathway
US7461699B2 (en) 2003-10-22 2008-12-09 Baker Hughes Incorporated Method for providing a temporary barrier in a flow pathway
US20090255686A1 (en) 2003-10-22 2009-10-15 Baker Hughes Incorporated Method for providing a temporary barrier in a flow pathway
US7520335B2 (en) 2003-12-08 2009-04-21 Baker Hughes Incorporated Cased hole perforating alternative
US7316274B2 (en) 2004-03-05 2008-01-08 Baker Hughes Incorporated One trip perforating, cementing, and sand management apparatus and method
US7401648B2 (en) 2004-06-14 2008-07-22 Baker Hughes Incorporated One trip well apparatus with sand control
US7185703B2 (en) 2004-06-18 2007-03-06 Halliburton Energy Services, Inc. Downhole completion system and method for completing a well
US20060124310A1 (en) 2004-12-14 2006-06-15 Schlumberger Technology Corporation System for Completing Multiple Well Intervals
US20090084553A1 (en) 2004-12-14 2009-04-02 Schlumberger Technology Corporation Sliding sleeve valve assembly with sand screen
US7575062B2 (en) 2006-06-09 2009-08-18 Halliburton Energy Services, Inc. Methods and devices for treating multiple-interval well bores
US20090044944A1 (en) 2007-08-16 2009-02-19 Murray Douglas J Multi-Position Valve for Fracturing and Sand Control and Associated Completion Methods
US20090101355A1 (en) 2007-10-19 2009-04-23 Baker Hughes Incorporated Water Sensing Adaptable In-Flow Control Device and Method of Use
US20090223678A1 (en) 2008-03-05 2009-09-10 Baker Hughes Incorporated Heat Generator For Screen Deployment

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
Durst, Doug G., et al., "Improved Single-Trip Multistage Completion Systems for Unconventional Gas Formations", SPE 115260, Jun. 1-14, 2008.
Garfield, G., "New One-Trip Sand-Control Completion System That Eliminates Formation Damage Resulting Fom Conventional Perforating and Gravel-Packing Operations", SPE 96660, Oct. 1-5, 2005.
Lorenz, M., et al., "Advancement in Completion Technologies Proves Successful in Deepwater Frac-Pack and Horizontal Gravel-Pack Completions", SPE 103103, Sep. 1-22, 2006.
Watson, Don R., et al., "One-Trip Multistage Completion Technology for Unconventional Gas Formations", SPE 114973, Jun. 1-14, 2008.

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10830028B2 (en) 2013-02-07 2020-11-10 Baker Hughes Holdings Llc Frac optimization using ICD technology
US9617836B2 (en) 2013-08-23 2017-04-11 Baker Hughes Incorporated Passive in-flow control devices and methods for using same
US10184316B2 (en) 2015-09-03 2019-01-22 Baker Hughes, A Ge Company, Llc Three position interventionless treatment and production valve assembly
CN108518203A (en) * 2018-03-16 2018-09-11 大连坤麟金属制品有限公司 A kind of rotation production facilities are integrated
CN108518203B (en) * 2018-03-16 2020-07-07 大连坤麟金属制品有限公司 Rotary oil production facility integration
US10941640B2 (en) 2018-09-06 2021-03-09 Halliburton Energy Services, Inc. Multi-functional sleeve completion system with return and reverse fluid path
US11261674B2 (en) 2020-01-29 2022-03-01 Halliburton Energy Services, Inc. Completion systems and methods to perform completion operations
US11333002B2 (en) 2020-01-29 2022-05-17 Halliburton Energy Services, Inc. Completion systems and methods to perform completion operations

Also Published As

Publication number Publication date
US20090139717A1 (en) 2009-06-04
WO2009073391A3 (en) 2009-08-27
EP2222936A2 (en) 2010-09-01
CA2707480A1 (en) 2009-06-11
CN101910550A (en) 2010-12-08
BRPI0819995A2 (en) 2015-05-12
CN102817583B (en) 2016-04-20
US8127847B2 (en) 2012-03-06
CN101910550B (en) 2014-08-13
WO2009073391A2 (en) 2009-06-11
EP2222936B1 (en) 2021-04-28
CN102817583A (en) 2012-12-12
EP2222936A4 (en) 2012-06-13
US20120080188A1 (en) 2012-04-05
BRPI0819995B1 (en) 2018-10-23

Similar Documents

Publication Publication Date Title
US8342245B2 (en) Multi-position valves for fracturing and sand control and associated completion methods
US8245782B2 (en) Tool and method of performing rigless sand control in multiple zones
US8291982B2 (en) Multi-position valve for fracturing and sand control and associated completion methods
CA2819371C (en) Wellbore apparatus and methods for multi-zone well completion, production and injection
US6575243B2 (en) Zonal isolation tool with same trip pressure test
US6782948B2 (en) Remotely operated multi-zone packing system
US9677387B2 (en) Screen assembly
US20020148610A1 (en) Intelligent well sand control
WO2015013582A1 (en) Sand control system and methodology
AU2008287022B2 (en) Multi-position valve for fracturing and sand control and associated completion methods
US10941640B2 (en) Multi-functional sleeve completion system with return and reverse fluid path
AU2013258831B2 (en) Multi-position valve for fracturing and sand control

Legal Events

Date Code Title Description
FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

STCF Information on status: patent grant

Free format text: PATENTED CASE

FPAY Fee payment

Year of fee payment: 4

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 8