WO1992007168A1 - Selective placement of a permeability-reducing material to inhibit fluid communication between a near well bore interval and an underlying aquifer - Google Patents

Selective placement of a permeability-reducing material to inhibit fluid communication between a near well bore interval and an underlying aquifer Download PDF

Info

Publication number
WO1992007168A1
WO1992007168A1 PCT/US1991/004706 US9104706W WO9207168A1 WO 1992007168 A1 WO1992007168 A1 WO 1992007168A1 US 9104706 W US9104706 W US 9104706W WO 9207168 A1 WO9207168 A1 WO 9207168A1
Authority
WO
WIPO (PCT)
Prior art keywords
interval
gel
permeability
well bore
immature
Prior art date
Application number
PCT/US1991/004706
Other languages
French (fr)
Inventor
Robert D. Sydansk
Original Assignee
Marathon Oil Company
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Marathon Oil Company filed Critical Marathon Oil Company
Priority to RU9193032323A priority Critical patent/RU2062863C1/en
Priority to BR919106936A priority patent/BR9106936A/en
Priority to AU90318/91A priority patent/AU649760B2/en
Priority to NL9120020A priority patent/NL191714C/en
Publication of WO1992007168A1 publication Critical patent/WO1992007168A1/en
Priority to GB9300892A priority patent/GB2263293B/en
Priority to NO93931310A priority patent/NO931310L/en

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/60Compositions for stimulating production by acting on the underground formation
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/50Compositions for plastering borehole walls, i.e. compositions for temporary consolidation of borehole walls
    • C09K8/504Compositions based on water or polar solvents
    • C09K8/506Compositions based on water or polar solvents containing organic compounds
    • C09K8/508Compositions based on water or polar solvents containing organic compounds macromolecular compounds
    • C09K8/512Compositions based on water or polar solvents containing organic compounds macromolecular compounds containing cross-linking agents
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • E21B33/138Plastering the borehole wall; Injecting into the formation

Definitions

  • the invention relates to a process for recovering hydrocarbons from a subterranean hydrocarbon-bearing formation and more particularly to a hydrocarbon recovery process utilizing a permeability-reducing material.
  • Fluid communication in the near well bore between a hydrocarbon production interval or a drive fluid injection interval and an underlying aquifer can diminish hydrocarbon recovery from the associated hydrocarbon- bearing formation. Fluid communication can occur either across permeable matrix separating the interval from the aquifer or via one or more vertical fractures or a fracture network connecting the interval and the aquifer.
  • water coning When hydrocarbons are produced from a formation across a near well bore production interval into the well bore penetrating the formation, water from an underlying aquifer tends to migrate upward into the production interval if there is fluid communication between the interval and the aquifer. Migration of water into the production interval is termed water coning.
  • water coning There are two negative consequences of water coning. The first is that water residing in the production interval can block or significantly diminish the flow of hydrocarbons from the outlying formation into the well bore. The second consequence is that water production can compete with and diminish hydrocarbon production. As a result, the ratio of water to hydrocarbons produced from the well bore can become unacceptabiy high when water coning occurs.
  • Water coning is extremely difficult to remedy whether fluid communication between the interval and aquifer is across vertical fractures or matrix.
  • a traditional method of treating water coning is to cement the well bore over the lower portion of the production interval. Unfortunately, well bore cementing at best only slightly reduces water coning and subsequent water production. Water coning usually recurs at the uncemented upper portion of the production interval shortly after the cement treatment, negating the effectiveness of the treatment.
  • Another means of treating water coning is to inject gels into the fractures or matrix providing fluid communication with the production interval. A gel treatment can block migration of aquifer water into the production interval, but the treatment also unacceptably damages the production interval because of the presence of gel in the interval.
  • a treatment process is needed for selectively placing a permeability- reducing material in the lower portion of a near well bore production or injection interval in fluid communication with an underlying aquifer via permeable matrix or vertical fractures.
  • a treatment process is further needed which does not significantly diminish fluid communication between the upper portion of the near well bore interval and an outlying hydrocarbon-bearing formation when the permeability-reducing material is placed in the lower portion of the interval.
  • the present invention is a process for inhibiting fluid flow between a near well bore interval and an aquifer underlying the interval.
  • the interval is penetrated by a well bore which is either an injection well bore or a production well bore in fluid communication with a hydrocarbon-bearing reservoir.
  • the present process inhibits water coning and its attendant consequences including the reduction of the relative permeability of oil in the near well bore production interval and the production of aquifer water into the well bore.
  • the present process inhibits the flow of drive fluid from the near well bore injection interval into the underlying aquifer.
  • the process comprises injection of a flowing permeability-reducing material across the entire vertical interval of the near well bore. Injection of the permeability-reducing material is followed by the controlled injection of a less dense gas into the upper portion of t e interval. The gas overdisplaces the permeability-reducing material from the upper portion of the interval out into the formation where it dissipates without substantially altering the injection or production capacity of the well.
  • the permeability-reducing material injected into the lower portion of the interval which encompasses permeable matrix or fractures in fluid communication with the underlying aquifer, remains therein and transforms from a flowing state to a nonflowing state to effect permeability reduction.
  • the present process enables selective placement of the permeability- reducing material in the lower portion of the production interval a sufficient distance from the well bore to effectively inhibit undesirable water coning or drive fluid dissipation, without excessively damaging the upper portion of the interval.
  • the overdisplacing gas obviates the need for selective injection of the permeability-reducing material into the interval because the gas enables restoration of desirable fluid communication between the hydrocarbon reservoir and the well bore across the upper portion of the interval even after injection of the permeability-reducing material into the upper portion.
  • the process is advantageously performed without the use of mechanical zone isolation and costly workovers which require a rig.
  • the present invention is a treatment process for selectively placing a permeability-reducing material in the lower portion of a near well bore hydrocarbon production interval by means of an overdisplacing gas.
  • the invention is a treatment process for selectively placing a permeability-reducing material in the lower portion of a near well bore injection interval by means of an overdisplacing gas.
  • the process of both embodiments preferably applies to an interval which is in fluid communication with both a hydrocarbon-bearing reservoir and an underlying aquifer, i.e., the interval exhibits good vertical permeability.
  • the interval may be in fluid communication with the aquifer across a matrix or a substantially vertical fracture, either of which is permeable to aquifer water or injected drive fluids.
  • vertical fracture encompasses a single substantially vertical fracture connecting the interval and the aquifer, a plurality of substantially vertical fractures connecting the interval and the aquifer in parallel, or a network of substantially vertical fractures connecting the interval and the aquifer in series.
  • near well bore constitutes a volume of the formation in direct fluid communication with the well bore and extending a finite radial distance from the well bore face.
  • the near well bore preferably extends a radial distance up to about 10 meters from the well bore face and more preferably up to about 30 meters from the well bore face.
  • the near well bore is the desired treatment zone of the present invention.
  • the permeability-reducing material is selectively placed in the lower portion of the near well bore interval by first conventionally injecting the material in a liquid-like flowing state across the entire vertical near well bore interval.
  • the overdisplacing gas is subsequently injected into the interval at a controlled rate and injection pressure known to one skilled in the art which optimizes preferential entry of the overdisplacing gas into the upper portion of the interval and minimizes entry of the overdisplacing gas into the lower portion of the interval.
  • the gas overdisplaces the flowing permeability-reducing material from the upper portion of the interval away from the near well bore in a substantially radial direction.
  • the radially displaced material is dissipated out into the formation where the material does not substantially diminish the production or displacement capacity of the well.
  • the gas may also overdisplace a part of the permeability-reducing material from the upper portion of the interval in a downward direction into the lower portion of the interval. The net effect of gas overdisplacement is to substantially restore permeability in the upper interval to desirable injected drive fluids or produced hydrocarbons.
  • the preference of the overdisplacing gas to enter the upper portion of the interval is enhanced by the substantially lower density of the gas relative to the density of the permeability-reducing material.
  • the specific gravity of the gas is between about 0.001 and about 0.2 and preferably between about 0.005 and about 0.1.
  • the specific gravity of the permeability-reducing material is between about 0.94 and about 2.0 and preferably between about 1.0 and about 1.5.
  • the overdisplacing gas is also preferably inert and immiscible with the permeability-reducing material.
  • a preferred overdisplacing gas for use in conjunction with the preferred permeability-reducing material is nitrogen or natural gas, although virtually any other gas meeting the density and miscibility requirements recited herein has utility in the present invention.
  • the well bore penetrating the interval is preferably shut in to enable the heretofore flowing permeability- reducing material in the lower portion of the interval to transform to a nonflowing state.
  • the permeability-reducing material is deemed “flowing” if it is displaceable from the upper portion of the near well bore interval by an overdisplacing gas.
  • the material is deemed “nonflowing” if it has sufficient structure to resist propagation from the lower portion of the interval during well bore operations for injection or production purposes.
  • a preferred permeability-reducing material satisfying the above- recited criteria is a crosslinked polymer gel.
  • the term "gel" as used herein is directed to a continuous three-dimensional crosslinked polymeric network integrating a liquid into the interstices of the network.
  • the crosslinked polymer gel comprises a crosslinkable polymer, a crosslinking agent, and a liquid solvent.
  • the crosslinkable polymer is preferably a carboxylate-containing polymer and more preferably an acrylamide-containing polymer.
  • acrylamide-containing polymers the most preferred are polyacrylamide (PA), partially hydrolyzed polyacrylamide (PHPA), copolymers of acrylamide and acrylate, and carboxylate-containing terpolymers of acrylate.
  • PA having utility herein has from about 0.1% to about 3% of its amide groups hydrolyzed.
  • PHPA as defined herein, has greater than about 3% of its amide groups hydrolyzed.
  • the crosslinking agent in the gel effects chemical crosslinking between the carboxylate sites of the same or different polymer molecules. Crosslinking of the polymer creates the network structure of the gel.
  • the crosslinking agent is preferably a molecule or complex containing a reactive transition metal cation.
  • a most preferred crosslinking agent comprises a trivalent chromium cation complexed or bonded to an anion, atomic oxygen or water.
  • Exemplary crosslinking agents are chromic triacetate (CrAc3) and chromic trichloride.
  • Other transition metal cations which are found in crosslinking agents having utility in the present invention, although less preferred, are chromium VI within a redox system, aluminum III, iron II, iron III and zirconium IV. «
  • the liquid solvent may be any liquid in which the polymer and crosslinking agent can be dissolved, mixed, suspended or otherwise dispersed to facilitate gel formation.
  • the solvent is preferably an aqueous liquid such as distilled water, fresh water or a brine.
  • the gel is formed by admixing the polymer and crosslinking agent at the surface.
  • Surface admixing broadly encompasses inter alia mixing of the gel components in bulk at the surface prior to injection or simultaneously mixing the gel components at or near the wellhead by in-line mixing means while injecting them.
  • the volume of gel required is a function of the characteristics of the interval, the adjoining formation and the fluids contained therein and is readily determinable by one skilled in the art.
  • Crosslinking or gelation as it is alternatively termed, is initiated as soon as the polymer and crosslinking agent contact and proceeds until either the crosslinking agent or the crosslinking sites of the polymer are consumed.
  • the gel is injected into the interval in a flowing state before crosslinking is completed, i.e., while the gel is immature.
  • the gel is crosslinked to completion, i.e., reaches maturity, in situ after injection of the overdisplacing gas. Complete crosslinking transforms the gel to a nonflowing state.
  • the following example demonstrates the practice and utility of the present invention, but is not to be construed as limiting the scope thereof.
  • An oil reservoir is located in a clean high-permeability sandstone formation which is highly faulted.
  • the oil reservoir is at a depth of 1700 meters.
  • the reservoir pressure is 21 ,000 kPa.
  • the reservoir temperature is
  • In situ oil viscosity is 0.5 cp.
  • the reservoir pay interval is about 26 meters thick and directly overlays an active aquifer which extends up into the producing formation. Horizontal and vertical permeabilities of the formation are nearly equal.
  • the average effective permeability at residual oil saturation under reservoir conditions is 285 md.
  • a well penetrating the formation is perforated over the upper 21 meters of the reservoir pay interval.
  • the well initially produces at 14,800 m 3 of oil per day and at 0 m 3 of water per day.
  • water production from the well begins and water cuts from the well increase rapidly thereafter.
  • the specific gravity of the produced water is 1.03.
  • the well produces at only 330 m 3 of oil per day and 10,800 m 3 of water per day as the result of water coning through the matrix reservoir rock.
  • 1260 m 3 of an immature flowing crosslinked polyacrylamide gel are injected into the perforated interval of the well.
  • the gel comprises polyacrylamide at a concentration of 4.5 weight percent in fresh water which has a molecular weight of 500,000 and which is hydrolyzed at 0.5 mole percent.
  • the polyacrylamide is crosslinked with chromic acetate at a PA:CrAc3 weight ratio of 9:1.
  • the gel treatment is designed for total matrix shut off up to a radial distance of 4.3 meters from the well bore face.
  • the immature gel in the upper half of the producing interval is overdisplaced by injecting a natural gas volume of 56,600 standard cubic meters into the interval over a 31 hour period at a downhole injection differential pressure of 140 kPa subject to fluctuations.
  • a natural gas volume of 56,600 standard cubic meters into the interval over a 31 hour period at a downhole injection differential pressure of 140 kPa subject to fluctuations.
  • the well is shut in for 48 hours to enable maturity of the gel. Thereafter, oil production from the well is resumed.
  • Post treatment production from the well initially stabilizes at 1820 m 3 of oil per day and 3210 m 3 of water per day. After two months of post- treatment production, the well produces at 1640 m 3 of oil per day and 3740 m 3 of water per day.
  • a post-treatment production log indicates that fluid production is almost exclusively from the upper half of the perforated interval, whereas a pre-treatment production log indicates that a majority of the fluids are produced from the lower half of the producing interval.

Abstract

Undesirable fluid flow is inhibited between a near well bore interval and an underlying aquifer in fluid communication therewith. A permeability-reducing material is injected into the near well bore interval and a portion of the material is selectively overdisplaced out into the formation by means of a low density gas subsequently injected into the interval. The gas desirably restores hydrocarbon productivity or fluid injectivity to the interval while the permeability-reducing material remaining in the interval inhibits fluid communication between the interval and the aquifer.

Description

SELECTIVE PLACEMENT OF A PERMEABILITY- REDUCING MATERIAL TO INHIBIT FLUID COMMUNICATION BETWEEN A NEAR WELL BORE INTERVAL AND AN UNDERLYING AQUIFER
BACKGROUND OF THE INVENTION
Technical Field:
The invention relates to a process for recovering hydrocarbons from a subterranean hydrocarbon-bearing formation and more particularly to a hydrocarbon recovery process utilizing a permeability-reducing material.
Background Information:
Fluid communication in the near well bore between a hydrocarbon production interval or a drive fluid injection interval and an underlying aquifer can diminish hydrocarbon recovery from the associated hydrocarbon- bearing formation. Fluid communication can occur either across permeable matrix separating the interval from the aquifer or via one or more vertical fractures or a fracture network connecting the interval and the aquifer.
When hydrocarbons are produced from a formation across a near well bore production interval into the well bore penetrating the formation, water from an underlying aquifer tends to migrate upward into the production interval if there is fluid communication between the interval and the aquifer. Migration of water into the production interval is termed water coning. There are two negative consequences of water coning. The first is that water residing in the production interval can block or significantly diminish the flow of hydrocarbons from the outlying formation into the well bore. The second consequence is that water production can compete with and diminish hydrocarbon production. As a result, the ratio of water to hydrocarbons produced from the well bore can become unacceptabiy high when water coning occurs.
Water coning is extremely difficult to remedy whether fluid communication between the interval and aquifer is across vertical fractures or matrix. A traditional method of treating water coning is to cement the well bore over the lower portion of the production interval. Unfortunately, well bore cementing at best only slightly reduces water coning and subsequent water production. Water coning usually recurs at the uncemented upper portion of the production interval shortly after the cement treatment, negating the effectiveness of the treatment. Another means of treating water coning is to inject gels into the fractures or matrix providing fluid communication with the production interval. A gel treatment can block migration of aquifer water into the production interval, but the treatment also unacceptably damages the production interval because of the presence of gel in the interval. Even attempts at selective gel placement, such as mechanical zone isolation, are not entirely satisfactory because the gel tends to migrate into the production interval. Since it is difficult to place a gel using present technology to effectively prevent water coning without excessive damage to the production interval, known gel treatments have limited practical utility for the prevention of water coning.
The inverse problem to water coning exists where there is fluid communication between an underlying aquifer and a drive fluid injection interval. Hydrocarbon drive fluids are commonly injected into a hydrocarbon- bearing formation via the injection interval of an injection well bore to displace the hydrocarbons into an adjoining production well bore. Where fluid communication exists between the injection interval and the underlying aquifer, particularly in the near well bore, the drive fluid is undesirably diverted away from the outlying hydrocarbon-bearing zones of the formation into the underlying aquifer. For the same types of reasons that gels are not suited for the treatment of water coning in a production interval, gels are unsuitable for treating the loss of drive fluid from an injection interval. When gels are used to plug fluid pathways between an injection interval and an aquifer, corresponding plugging of the injection interval is virtually unavoidable, even with zone isolation. As such, gel treatments unacceptably reduce injectivity into the injection well bore and reduce hydrocarbon production from the adjacent production well bore.
A treatment process is needed for selectively placing a permeability- reducing material in the lower portion of a near well bore production or injection interval in fluid communication with an underlying aquifer via permeable matrix or vertical fractures. A treatment process is further needed which does not significantly diminish fluid communication between the upper portion of the near well bore interval and an outlying hydrocarbon-bearing formation when the permeability-reducing material is placed in the lower portion of the interval. SUMMARY OF THE INVENTION
The present invention is a process for inhibiting fluid flow between a near well bore interval and an aquifer underlying the interval. The interval is penetrated by a well bore which is either an injection well bore or a production well bore in fluid communication with a hydrocarbon-bearing reservoir.
In the case of a production well bore, the present process inhibits water coning and its attendant consequences including the reduction of the relative permeability of oil in the near well bore production interval and the production of aquifer water into the well bore. In the case of an injection well bore, the present process inhibits the flow of drive fluid from the near well bore injection interval into the underlying aquifer.
The process comprises injection of a flowing permeability-reducing material across the entire vertical interval of the near well bore. Injection of the permeability-reducing material is followed by the controlled injection of a less dense gas into the upper portion of t e interval. The gas overdisplaces the permeability-reducing material from the upper portion of the interval out into the formation where it dissipates without substantially altering the injection or production capacity of the well. The permeability-reducing material injected into the lower portion of the interval, which encompasses permeable matrix or fractures in fluid communication with the underlying aquifer, remains therein and transforms from a flowing state to a nonflowing state to effect permeability reduction.
The present process enables selective placement of the permeability- reducing material in the lower portion of the production interval a sufficient distance from the well bore to effectively inhibit undesirable water coning or drive fluid dissipation, without excessively damaging the upper portion of the interval. The overdisplacing gas obviates the need for selective injection of the permeability-reducing material into the interval because the gas enables restoration of desirable fluid communication between the hydrocarbon reservoir and the well bore across the upper portion of the interval even after injection of the permeability-reducing material into the upper portion. Thus, the process is advantageously performed without the use of mechanical zone isolation and costly workovers which require a rig.
DESCRIPTION OF PREFERRED EMBODIMENTS
In a first embodiment, the present invention is a treatment process for selectively placing a permeability-reducing material in the lower portion of a near well bore hydrocarbon production interval by means of an overdisplacing gas. In a second embodiment, the invention is a treatment process for selectively placing a permeability-reducing material in the lower portion of a near well bore injection interval by means of an overdisplacing gas.
The process of both embodiments preferably applies to an interval which is in fluid communication with both a hydrocarbon-bearing reservoir and an underlying aquifer, i.e., the interval exhibits good vertical permeability. The interval may be in fluid communication with the aquifer across a matrix or a substantially vertical fracture, either of which is permeable to aquifer water or injected drive fluids.
As used herein, the term "vertical fracture" encompasses a single substantially vertical fracture connecting the interval and the aquifer, a plurality of substantially vertical fractures connecting the interval and the aquifer in parallel, or a network of substantially vertical fractures connecting the interval and the aquifer in series. t
The term "near well bore", as defined herein, constitutes a volume of the formation in direct fluid communication with the well bore and extending a finite radial distance from the well bore face. The near well bore preferably extends a radial distance up to about 10 meters from the well bore face and more preferably up to about 30 meters from the well bore face. The near well bore is the desired treatment zone of the present invention.
The permeability-reducing material is selectively placed in the lower portion of the near well bore interval by first conventionally injecting the material in a liquid-like flowing state across the entire vertical near well bore interval. The overdisplacing gas is subsequently injected into the interval at a controlled rate and injection pressure known to one skilled in the art which optimizes preferential entry of the overdisplacing gas into the upper portion of the interval and minimizes entry of the overdisplacing gas into the lower portion of the interval.
The gas overdisplaces the flowing permeability-reducing material from the upper portion of the interval away from the near well bore in a substantially radial direction. The radially displaced material is dissipated out into the formation where the material does not substantially diminish the production or displacement capacity of the well. To some extent, the gas may also overdisplace a part of the permeability-reducing material from the upper portion of the interval in a downward direction into the lower portion of the interval. The net effect of gas overdisplacement is to substantially restore permeability in the upper interval to desirable injected drive fluids or produced hydrocarbons.
The preference of the overdisplacing gas to enter the upper portion of the interval is enhanced by the substantially lower density of the gas relative to the density of the permeability-reducing material. The specific gravity of the gas is between about 0.001 and about 0.2 and preferably between about 0.005 and about 0.1. The specific gravity of the permeability-reducing material is between about 0.94 and about 2.0 and preferably between about 1.0 and about 1.5. The overdisplacing gas is also preferably inert and immiscible with the permeability-reducing material. A preferred overdisplacing gas for use in conjunction with the preferred permeability-reducing material is nitrogen or natural gas, although virtually any other gas meeting the density and miscibility requirements recited herein has utility in the present invention. After the overdisplacing gas is injected, the well bore penetrating the interval is preferably shut in to enable the heretofore flowing permeability- reducing material in the lower portion of the interval to transform to a nonflowing state. As used herein, the permeability-reducing material is deemed "flowing" if it is displaceable from the upper portion of the near well bore interval by an overdisplacing gas. The material is deemed "nonflowing" if it has sufficient structure to resist propagation from the lower portion of the interval during well bore operations for injection or production purposes.
After the material sets up to a nonflowing state, the well bore is restored to normal operation as an injection or production well bore. In the case of a production well bore, water coning is preferably diminished and hydrocarbon production is maintained or increased over that prior to treatment while water production is decreased. In the case of an injection well bore, the amount of injected drive fluid lost to the aquifer is preferably reduced without significantly impairing the injectivity of the interval. A preferred permeability-reducing material satisfying the above- recited criteria is a crosslinked polymer gel. The term "gel" as used herein is directed to a continuous three-dimensional crosslinked polymeric network integrating a liquid into the interstices of the network. The crosslinked polymer gel comprises a crosslinkable polymer, a crosslinking agent, and a liquid solvent.
The crosslinkable polymer is preferably a carboxylate-containing polymer and more preferably an acrylamide-containing polymer. Of the acrylamide-containing polymers, the most preferred are polyacrylamide (PA), partially hydrolyzed polyacrylamide (PHPA), copolymers of acrylamide and acrylate, and carboxylate-containing terpolymers of acrylate. PA, having utility herein has from about 0.1% to about 3% of its amide groups hydrolyzed. PHPA, as defined herein, has greater than about 3% of its amide groups hydrolyzed.
The crosslinking agent in the gel effects chemical crosslinking between the carboxylate sites of the same or different polymer molecules. Crosslinking of the polymer creates the network structure of the gel. The crosslinking agent is preferably a molecule or complex containing a reactive transition metal cation. A most preferred crosslinking agent comprises a trivalent chromium cation complexed or bonded to an anion, atomic oxygen or water. Exemplary crosslinking agents are chromic triacetate (CrAc3) and chromic trichloride. Other transition metal cations which are found in crosslinking agents having utility in the present invention, although less preferred, are chromium VI within a redox system, aluminum III, iron II, iron III and zirconium IV. «
The liquid solvent may be any liquid in which the polymer and crosslinking agent can be dissolved, mixed, suspended or otherwise dispersed to facilitate gel formation. The solvent is preferably an aqueous liquid such as distilled water, fresh water or a brine.
A number of the most preferred gels which have utility within the present invention are taught in U.S. Patent 4,683,949 which is incorporated herein by reference.
The gel is formed by admixing the polymer and crosslinking agent at the surface. Surface admixing broadly encompasses inter alia mixing of the gel components in bulk at the surface prior to injection or simultaneously mixing the gel components at or near the wellhead by in-line mixing means while injecting them. The volume of gel required is a function of the characteristics of the interval, the adjoining formation and the fluids contained therein and is readily determinable by one skilled in the art.
Crosslinking, or gelation as it is alternatively termed, is initiated as soon as the polymer and crosslinking agent contact and proceeds until either the crosslinking agent or the crosslinking sites of the polymer are consumed. The gel is injected into the interval in a flowing state before crosslinking is completed, i.e., while the gel is immature. The gel is crosslinked to completion, i.e., reaches maturity, in situ after injection of the overdisplacing gas. Complete crosslinking transforms the gel to a nonflowing state. The following example demonstrates the practice and utility of the present invention, but is not to be construed as limiting the scope thereof.
EXAMPLE
An oil reservoir is located in a clean high-permeability sandstone formation which is highly faulted. The oil reservoir is at a depth of 1700 meters. The reservoir pressure is 21 ,000 kPa. The reservoir temperature is
88°C. In situ oil viscosity is 0.5 cp. The reservoir pay interval is about 26 meters thick and directly overlays an active aquifer which extends up into the producing formation. Horizontal and vertical permeabilities of the formation are nearly equal. The average effective permeability at residual oil saturation under reservoir conditions is 285 md.
A well penetrating the formation is perforated over the upper 21 meters of the reservoir pay interval. The well initially produces at 14,800 m3 of oil per day and at 0 m3 of water per day. However, after several weeks'of production, water production from the well begins and water cuts from the well increase rapidly thereafter. The specific gravity of the produced water is 1.03. After two months of production the well produces at only 330 m3 of oil per day and 10,800 m3 of water per day as the result of water coning through the matrix reservoir rock. In response to water coning, 1260 m3 of an immature flowing crosslinked polyacrylamide gel are injected into the perforated interval of the well. The gel comprises polyacrylamide at a concentration of 4.5 weight percent in fresh water which has a molecular weight of 500,000 and which is hydrolyzed at 0.5 mole percent. The polyacrylamide is crosslinked with chromic acetate at a PA:CrAc3 weight ratio of 9:1. The gel treatment is designed for total matrix shut off up to a radial distance of 4.3 meters from the well bore face.
The immature gel in the upper half of the producing interval is overdisplaced by injecting a natural gas volume of 56,600 standard cubic meters into the interval over a 31 hour period at a downhole injection differential pressure of 140 kPa subject to fluctuations. Upon completion of the gas injection, the well is shut in for 48 hours to enable maturity of the gel. Thereafter, oil production from the well is resumed.
Post treatment production from the well initially stabilizes at 1820 m3 of oil per day and 3210 m3 of water per day. After two months of post- treatment production, the well produces at 1640 m3 of oil per day and 3740 m3 of water per day. A post-treatment production log indicates that fluid production is almost exclusively from the upper half of the perforated interval, whereas a pre-treatment production log indicates that a majority of the fluids are produced from the lower half of the producing interval.

Claims

I claim:
1 1. A process for selectively placing a permeability-reducing
2 material in a near well bore interval which has an underlying aquifer in fluid
3 communication with said interval comprising:
4 injecting a flowing permeability-reducing material into an upper
5 portion and a lower portion of said near well bore interval;
6 injecting a gas having a density substantially less than the
7 density of said flowing permeability-reducing material into said upper portion
8 of said interval to displace said flowing permeability-reducing material from
9 said upper portion of said permeability-reducing interval; and
I 0 transforming said flowing permeability-reducing material in said
I I lower portion of said interval to a nonflowing permeability-reducing material 1 2 which substantially reduces fluid communication between said upper portion 1 3 of said interval and said underlying aquifer.
1 2. The process of Claim 1 wherein said flowing permeability-
2 reducing material is an immature crosslinked polymer gel.
1 3. The process of Claim 2 wherein said gel comprises an
2 acrylamide-containing polymer and a metal cation-containing crosslinking
3 agent.
1 4. The process of Claim 3 wherein said acrylamide-containing
2 polymer is selected from the group consisting of polyacrylamide, partially
3 hydrolyzed polyacrylamide, copolymers and acrylamide and acrylate, and
4 carboxylate-containing terpolymers of acrylate.
1 5. The process of Claim 3 wherein said metal cation is selected
2 from the group consisting of chromium, aluminum, iron and zirconium.
1 6. The process of Claim 3 wherein said metal cation is trivalent
2 chromium.
1 7. The process of Claim 1 wherein said interval is a hydrocarbon-
2 production interval in fluid communication with a hydrocarbon reservoir.
1 8. The process of Claim 1 wherein said interval is an injection
2 interval in fluid communication with a hydrocarbon reservoir.
1 9. The process of Claim 1 wherein fluid communication between
2 said interval and said aquifer is across permeable matrix.
1 10. The process of Claim 1 wherein fluid communication between
2 said interval and said aquifer is across a substantially vertical fracture.
1 11. The process of Claim 1 wherein said gas is substantially
2 immiscible with said permeability-reducing material. 1 12. The process of Claim 1 wherein said gas is selected from the
2 group consisting of nitrogen and natural gas.
1 13. A process for selectively placing a permeability-reducing gel in
2 a near well bore hydrocarbon production interval to substantially reduce
3 water coning resulting from fluid communication between said interval and
4 an underlying aquifer comprising:
5 injecting an immature flowing crosslinked polymer gel into an
6 upper portion and a lower portion of said near well bore hydrocarbon
7 production interval, wherein said immature flowing gel comprises an
8 acrylamide-containing polymer and a metal cation-containing crosslinking
9 agent;
I 0 injecting an overdisplacing gas having a density substantially
I I less than said immature flowing gel and substantially immiscible with said 1 2 immature flowing gel into said upper portion of said near well bore 1 3 hydrocarbon production interval to displace said immature flowing gel from 1 4 said upper portion of said interval;
1 5 shutting in said well bore for a time sufficient to enable said
1 6 immature gel in said lower portion of said interval to mature into a nonflowing
1 7 gel; and
1 8 producing hydrocarbons across said upper portion of said
1 9 interval while substantially reducing water coning therein.
1 14. The process of Claim 13 wherein said immature gel penetrates
2 formation matrix in said lower portion of said interval to reduce the
3 permeability of said matrix to water in said aquifer.
1 15. The process of Claim 13 wherein said immature gel penetrates
2 a vertical fracture in said lower portion of said interval to reduce the
3 permeability of said vertical fracture to water in said aquifer.
1 16. A process for selectively placing a permeability-reducing gel in
2 a near well bore injection interval in fluid communication with an underlying
3 aquifer and a hydrocarbon-bearing reservoir to substantially divert an
4 injected drive fluid from said aquifer to said hydrocarbon-bearing reservoir
5 comprising:
1 injecting an immature flowing crosslinked polymer gel into an
2 upper portion and a lower portion of said near well bore injection interval,
3 wherein said immature flowing gel comprises an acrylamide-containing
4 polymer and a metal cation-containing crosslinking agent;
5 injecting an overdisplacing gas having a density substantially
6 less than said immature flowing gel and substantially immiscible with said 7 immature flowing gel into said upper portion of said near well bore injection
8 interval to displace said immature flowing gel from said upper portion of said
9 interval;
I 0 shutting in said well bore for a time sufficient to enable said
I I immature gel in said lower portion of said interval to mature into a nonflowing 1 2 gel; and
1 3 injecting a drive fluid across said upper portion of said interval
1 4 into said hydrocarbon-bearing reservoir.
1 17. The process of Claim 16 wherein said immature gel penetrates
2 formation matrix in said lower portion of said interval to reduce the
3 permeability of said matrix to said drive fluid.
1 18. The process of Claim 16 wherein said immature gel penetrates
2 a vertical fracture in said lower portion of said interval to reduce the
3 permeability of said vertical fracture to said drive fluid. 1 19. All inventions described herein.
PCT/US1991/004706 1990-10-12 1991-07-02 Selective placement of a permeability-reducing material to inhibit fluid communication between a near well bore interval and an underlying aquifer WO1992007168A1 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
RU9193032323A RU2062863C1 (en) 1990-10-12 1991-07-02 Method for selective motion of unripened flowing gel of cross-linked polymer through the area of the nearest drill well with lower water bearing bed with liquid communication to this area
BR919106936A BR9106936A (en) 1990-10-12 1991-07-02 PROCESS FOR SELECTIVE PLACEMENT OF REDUCING MATERIAL AND REDUCING GEL
AU90318/91A AU649760B2 (en) 1990-10-12 1991-07-02 Selective placement of a permeability-reducing material to inhibit fluid communication between a near well bore interval and an underlying aquifer
NL9120020A NL191714C (en) 1990-10-12 1991-07-02 Selective placement of a permeability-reducing material to prevent fluid communication between a space around a wellbore and an underlying aquifer.
GB9300892A GB2263293B (en) 1990-10-12 1993-01-18 Selective placement of a permeability-reducing material to inhibit fluid communication between a near well bore interval and an underlying aquifer
NO93931310A NO931310L (en) 1990-10-12 1993-04-06 SELECTIVE LOCATION OF A PERMEABILITY-REDUCING MATERIAL FOR AA INHIBIT FLUID COMMUNICATION BETWEEN A Borehole INTERVENTION AND AN UNDERLYING WATER RESERVE

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US07/596,796 US5067564A (en) 1990-10-12 1990-10-12 Selective placement of a permeability-reducing material to inhibit fluid communication between a near well bore interval and an underlying aquifer
US596,796 1990-10-12

Publications (1)

Publication Number Publication Date
WO1992007168A1 true WO1992007168A1 (en) 1992-04-30

Family

ID=24388746

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US1991/004706 WO1992007168A1 (en) 1990-10-12 1991-07-02 Selective placement of a permeability-reducing material to inhibit fluid communication between a near well bore interval and an underlying aquifer

Country Status (10)

Country Link
US (1) US5067564A (en)
CN (1) CN1023139C (en)
AU (1) AU649760B2 (en)
BR (1) BR9106936A (en)
CA (1) CA2086594A1 (en)
GB (1) GB2263293B (en)
NL (1) NL191714C (en)
RU (1) RU2062863C1 (en)
TN (1) TNSN91087A1 (en)
WO (1) WO1992007168A1 (en)

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5203834A (en) * 1990-12-21 1993-04-20 Union Oil Company Of California Foamed gels having selective permeability
US5150754A (en) * 1991-05-28 1992-09-29 Mobil Oil Corporation Aqueous and petroleum gel method for preventing water-influx
US5259453A (en) * 1992-06-25 1993-11-09 Phillips Petroleum Company Blocking water coning in oil and gas producing reservoirs
US5358043A (en) * 1993-03-22 1994-10-25 Phillips Petroleum Company Gelling compositions useful for oil field applications
US5476145A (en) * 1994-05-10 1995-12-19 Marathon Oil Company Selective placement of a permeability-reducing material in a subterranean interval to inhibit vertical flow through the interval
GB2335680B (en) * 1998-03-27 2000-05-17 Sofitech Nv Method for water control
CN1075790C (en) * 1998-07-24 2001-12-05 山西省稷山县福利化工厂 Alkaline process for producing active zinc oxide
US6431280B2 (en) * 1998-12-21 2002-08-13 Geoffrey Stanley Bayliss Method for placement of blocking gels or polymers at specific depths of penetration into oil and gas, and water producing formations
US7021376B2 (en) * 1998-12-21 2006-04-04 Geoffrey Stanley Bayliss Method for placement of blocking gels or polymers at multiple specific depths of penetration into oil and gas, and water producing formations
US6777377B2 (en) * 2001-12-03 2004-08-17 Wyo-Ben, Inc. Composition for use in sealing a porous subterranean formation, and methods of making and using
US7281579B2 (en) * 2001-12-07 2007-10-16 Aqueolic Canada Ltd. Method for terminating or reducing water flow in a subterranean formation
EP2045439B1 (en) * 2002-05-24 2010-07-21 3M Innovative Properties Company Use of surface-modified nanoparticles for oil recovery
EA014368B1 (en) * 2005-06-30 2010-10-29 Эм-Ай ЭлЭлСи. Fluid loss pills, a method for forming thereof and a method for reducing fluid loss
US7934557B2 (en) * 2007-02-15 2011-05-03 Halliburton Energy Services, Inc. Methods of completing wells for controlling water and particulate production
US7832478B2 (en) 2007-11-07 2010-11-16 Schlumberger Technology Corporation Methods for manipulation of air flow into aquifers
US7987910B2 (en) * 2007-11-07 2011-08-02 Schlumberger Technology Corporation Methods for manipulation of the flow of fluids in subterranean formations
US8657005B2 (en) 2010-04-30 2014-02-25 Exxonmobil Upstream Research Company Systems and methods for hydraulic barrier formation to improve sweep efficiency in subterranean oil reservoirs
IT1406671B1 (en) * 2010-12-27 2014-03-07 Eni Spa METHOD FOR RECOVERY OF OIL FROM A FIELD USING MICRO (NANO) FLUIDS STRUCTURED TO RELEASE CONTROLLED BARRIER SUBSTANCES
IT1406670B1 (en) * 2010-12-27 2014-03-07 Eni Spa METHOD TO CONTAIN THE FORMATION OF WATER OR GAS CONES IN AN EXTRACTION WELL OF A HYDROCARBURIC FLUID
CN103498643B (en) * 2013-10-23 2016-05-25 天津亿利科能源科技发展股份有限公司 A kind of composite slug deep shutoff method for high water-cut reservoir
EA039360B1 (en) * 2020-01-09 2022-01-18 Научно-Исследовательский И Проектный Институт Нефти И Газа (Нипинг) Method for development of heterogeneous oil reservoir

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4683949A (en) * 1985-12-10 1987-08-04 Marathon Oil Company Conformance improvement in a subterranean hydrocarbon-bearing formation using a polymer gel

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2402588A (en) * 1940-09-14 1946-06-25 Essex Royalty Corp Method of oil recovery
US3004598A (en) * 1958-05-14 1961-10-17 Gulf Research Development Co Method of reducing the permeability of underground formations
US3148730A (en) * 1960-06-27 1964-09-15 Sinclair Research Inc Secondary recovery process
US3299953A (en) * 1964-07-24 1967-01-24 Union Oil Co Method of using a foaming agent in a cementing process
US3369605A (en) * 1966-08-19 1968-02-20 Interior Usa Method of treating oil wells to prevent water coning
US4418755A (en) * 1979-02-14 1983-12-06 Conoco Inc. Methods of inhibiting the flow of water in subterranean formations
US4428429A (en) * 1981-05-26 1984-01-31 Standard Oil Company Method for sweep improvement utilizing gel-forming lignins
US4413680A (en) * 1981-12-21 1983-11-08 Union Oil Company Of California Permeability reduction in subterranean reservoirs
US4657944A (en) * 1984-02-09 1987-04-14 Phillips Petroleum Company CO2 -induced in-situ gelation of polymeric viscosifiers for permeability contrast correction
US4569393A (en) * 1984-02-09 1986-02-11 Phillips Petroleum Company CO2 -Induced in-situ gelation of polymeric viscosifiers for permeability contrast correction
US4776398A (en) * 1985-01-31 1988-10-11 Mobil Oil Corporation Oil reservoir permeability control
US4694906A (en) * 1985-08-30 1987-09-22 Union Oil Company Of California Method for emplacement of a gelatinous foam in gas flooding enhanced recovery
US4665982A (en) * 1986-06-26 1987-05-19 Brown Billy R Formation fracturing technique using liquid proppant carrier followed by foam
US4722397A (en) * 1986-12-22 1988-02-02 Marathon Oil Company Well completion process using a polymer gel
US4928763A (en) * 1989-03-31 1990-05-29 Marathon Oil Company Method of treating a permeable formation

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4683949A (en) * 1985-12-10 1987-08-04 Marathon Oil Company Conformance improvement in a subterranean hydrocarbon-bearing formation using a polymer gel

Also Published As

Publication number Publication date
US5067564A (en) 1991-11-26
CA2086594A1 (en) 1992-04-13
NL9120020A (en) 1993-07-01
BR9106936A (en) 1994-01-25
GB9300892D0 (en) 1993-03-17
GB2263293B (en) 1994-08-17
NL191714B (en) 1995-12-01
CN1060512A (en) 1992-04-22
GB2263293A (en) 1993-07-21
AU649760B2 (en) 1994-06-02
RU2062863C1 (en) 1996-06-27
AU9031891A (en) 1992-05-20
NL191714C (en) 1996-04-02
TNSN91087A1 (en) 1992-10-25
CN1023139C (en) 1993-12-15

Similar Documents

Publication Publication Date Title
AU649760B2 (en) Selective placement of a permeability-reducing material to inhibit fluid communication between a near well bore interval and an underlying aquifer
US7182136B2 (en) Methods of reducing water permeability for acidizing a subterranean formation
CA2459672C (en) Organosilicon containing compositions for enhancing hydrocarbon production and method of using the same
US4409110A (en) Enhanced oil displacement processes and compositions
US3762476A (en) Subterranean formation permeability correction
US7008908B2 (en) Selective stimulation with selective water reduction
EP1534927B1 (en) Process for treating a formation
US4809781A (en) Method for selectively plugging highly permeable zones in a subterranean formation
US5314019A (en) Method for treating formations
US5425421A (en) Method for sealing unwanted fractures in fluid-producing earth formations
US4915170A (en) Enhanced oil recovery method using crosslinked polymeric gels for profile control
US20080035344A1 (en) Delayed polyacrylamide-co-aluminum hydroxyl chloride gel
US4964466A (en) Hydraulic fracturing with chlorine dioxide cleanup
EP2009076A1 (en) Method for stimulating hydrocarbon production and reducing the production of water from a subterranean formation
US4494606A (en) Process for improving vertical conformance in a near well bore environment
US5682951A (en) Foamed gel completion, workover, and kill fluid
US5476145A (en) Selective placement of a permeability-reducing material in a subterranean interval to inhibit vertical flow through the interval
US5322125A (en) Foamed gels to reduce gas coning in matrix environments
US5082057A (en) Sand consolidation treatment for a hydrocarbon production well bore using an overdisplacement fluid
Avery et al. Field Evaluation of a New Gelant for Water Control in Production Wells
EP0136773A2 (en) Composition for cross-linking carboxyl polymers and the use thereof in treating subterranean formations
US10280352B2 (en) Water swellable polymer as a diverter for acid stimulation treatments in high temperature environments
CA2515063C (en) Methods of improving conformance control in fractured hydrocarbon reservoirs
US3193007A (en) Method for controlling injectivity profiles
US4478283A (en) Process for improving waterflood performance in heterogeneous clay-sensitive formations

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AT AU BB BG BR CA CS DE DK FI GB HU JP KP KR LK LU MC MG MN MW NL NO PL RO SD SE SU

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE BF BJ CF CG CH CI CM DE DK ES FR GA GB GN GR IT LU ML MR NL SE SN TD TG

WWE Wipo information: entry into national phase

Ref document number: 2086594

Country of ref document: CA

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642