WO2000065418A3 - PROCEDE ET AUTOMATISME DE REGULATION D'UNE PRODUCTION INDUSTRIELLE ETAGEE AVEC MAITRISE D'UN STRESS ENCHAINE ALEATOIRE, APPLICATION AU CONTROLE DU BRUIT ET DU RISQUE VaR D'UNE CHAMBRE DE COMPENSATION - Google Patents

PROCEDE ET AUTOMATISME DE REGULATION D'UNE PRODUCTION INDUSTRIELLE ETAGEE AVEC MAITRISE D'UN STRESS ENCHAINE ALEATOIRE, APPLICATION AU CONTROLE DU BRUIT ET DU RISQUE VaR D'UNE CHAMBRE DE COMPENSATION Download PDF

Info

Publication number
WO2000065418A3
WO2000065418A3 PCT/FR2000/001059 FR0001059W WO0065418A3 WO 2000065418 A3 WO2000065418 A3 WO 2000065418A3 FR 0001059 W FR0001059 W FR 0001059W WO 0065418 A3 WO0065418 A3 WO 0065418A3
Authority
WO
WIPO (PCT)
Prior art keywords
automatic control
regulating
industrial
value
probabilistic
Prior art date
Application number
PCT/FR2000/001059
Other languages
English (en)
Other versions
WO2000065418A2 (fr
Inventor
Jean-Marie Billiotte
Ingmar Adlerberg
Raphael Douady
Ivan Kovalenko
Philippe Durand
Jean-Francois Casanova
Jean-Philippe Frignet
Frederic Basset
Original Assignee
Billiotte Jean Marie
Ingmar Adlerberg
Raphael Douady
Ivan Kovalenko
Philippe Durand
Casanova Jean Francois
Frignet Jean Philippe
Frederic Basset
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Billiotte Jean Marie, Ingmar Adlerberg, Raphael Douady, Ivan Kovalenko, Philippe Durand, Casanova Jean Francois, Frignet Jean Philippe, Frederic Basset filed Critical Billiotte Jean Marie
Priority to EP00922712A priority Critical patent/EP2062111B1/fr
Priority to US10/149,960 priority patent/US7644005B1/en
Priority to AT00922712T priority patent/ATE463780T1/de
Priority to AU71936/00A priority patent/AU7193600A/en
Priority to CA002406899A priority patent/CA2406899C/fr
Priority to DE60044163T priority patent/DE60044163D1/de
Publication of WO2000065418A2 publication Critical patent/WO2000065418A2/fr
Publication of WO2000065418A3 publication Critical patent/WO2000065418A3/fr

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/02Banking, e.g. interest calculation or account maintenance
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • G06Q10/06375Prediction of business process outcome or impact based on a proposed change
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

Procédé et automatisme probabiliste (3) de régulation et prévention de rupture d'un flux de production industrielle multi-étagée et multi-liaison, visant à optimiser ce flux de production tout en maîtrisant un impact industriel résultant d'un stress enchaîné aléatoire, et applications au contrôle de bruit d'une usine et à la maîtrise de la VaR d'une chambre de compensation. L'invention consiste à réguler la production grâce à un automatisme probabiliste (3) à boucle d'action (5) et boucle de réaction (6). Industriellement, cet automatisme (3) de régulation peut être réalisé électroniquement à l'aide d'un calculateur programmé et câblé. La boucle d'action (5) de l'automatisme (3) est constituée d'un simulateur d'évaluation probabiliste inductive (11) de l'enchaînement des stress aléatoires dans la chaîne de production aboutissant à une mesure probabiliste de l'impact I(r) industriel résultant, ce en fonction du niveau 'réglable' du paramètre d'action industrielle (r). La méthode mise en oeuvre, au sein de la boucle d'action (5) de l'automatisme (3), est du type appelé 'Value at Risk' ou 'VaR'. La boucle de réaction (6) de l'automatisme (3) règle au cours du temps (t) le niveau du paramètre d'action industrielle (r) à la valeur extrémale, maintenant ledit estimateur d'effet VaR(p,T)(r) en deçà de son niveau de nuisance autorisé M. Ceci a pour but de rendre extrémal le niveau de production industrielle F(r) à un niveau néanmoins compatible avec le respect de conditions réglementaires ou de rupture. Le procédé et dispositif selon l'invention peut être avantageusement utilisé dans de nombreuses industries aussi bien industrielles, financières, qu'agricoles où des risques de pollution ou d'autre nature résultant d'un stress enchaîné aléatoire doivent être maîtrisés.
PCT/FR2000/001059 1999-04-21 2000-04-21 PROCEDE ET AUTOMATISME DE REGULATION D'UNE PRODUCTION INDUSTRIELLE ETAGEE AVEC MAITRISE D'UN STRESS ENCHAINE ALEATOIRE, APPLICATION AU CONTROLE DU BRUIT ET DU RISQUE VaR D'UNE CHAMBRE DE COMPENSATION WO2000065418A2 (fr)

Priority Applications (6)

Application Number Priority Date Filing Date Title
EP00922712A EP2062111B1 (fr) 1999-04-21 2000-04-21 PROCEDE ET AUTOMATISME DE REGULATION D'UNE PRODUCTION INDUSTRIELLE ETAGEE AVEC MAITRISE D'UN STRESS ENCHAINE ALEATOIRE, APPLICATION AU CONTROLE DU BRUIT ET DU RISQUE VaR D'UNE CHAMBRE DE COMPENSATION
US10/149,960 US7644005B1 (en) 1999-04-21 2000-04-21 Method and automatic control for regulating a multiple-stage industrial production controlling random chained stress, application to noise and value at risk control of a clearing house
AT00922712T ATE463780T1 (de) 1999-04-21 2000-04-21 Verfahren und automatisierungsgerät zur regelung einer stufenförmigen industriellen fertigung mit umfassender kontrolle über zufällig miteinander verkettete belastung, anwendung zur steuerung des rauschens und das var-risiko eines kompensationsraums
AU71936/00A AU7193600A (en) 1999-04-21 2000-04-21 Method and automatic control for regulating a multiple-stage industrial production controlling random chained stress, application to noise and value at risk control of a clearing house
CA002406899A CA2406899C (fr) 1999-04-21 2000-04-21 Procede et automatisme de regulation d'une production industrielle etagee avec maitrise d'un stress enchaine aleatoire, application au controle du bruit et du risque var d'une chambre de compensation
DE60044163T DE60044163D1 (de) 1999-04-21 2000-04-21 Verfahren und automatisierungsgerät zur regelung einer stufenförmigen industriellen fertigung mit umfassender kontrolle über zufällig miteinander verkettete belastung, anwendung zur steuerung des rauschens und das var-risiko eines kompensationsraums

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR99/05074 1999-04-21
FR9905074A FR2792746B1 (fr) 1999-04-21 1999-04-21 PROCEDE ET AUTOMATISME DE REGULATION D'UNE PRODUCTION INDUSTRIELLE ETAGEE AVEC MAITRISE D'UN STRESS ENCHAINE ALEATOIRE, APPLICATION AU CONTROLE DU BRUIT ET DU RISQUE VaR D'UNE CHAMBRE DE COMPENSATION

Publications (2)

Publication Number Publication Date
WO2000065418A2 WO2000065418A2 (fr) 2000-11-02
WO2000065418A3 true WO2000065418A3 (fr) 2001-04-12

Family

ID=9544723

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/FR2000/001059 WO2000065418A2 (fr) 1999-04-21 2000-04-21 PROCEDE ET AUTOMATISME DE REGULATION D'UNE PRODUCTION INDUSTRIELLE ETAGEE AVEC MAITRISE D'UN STRESS ENCHAINE ALEATOIRE, APPLICATION AU CONTROLE DU BRUIT ET DU RISQUE VaR D'UNE CHAMBRE DE COMPENSATION

Country Status (8)

Country Link
US (1) US7644005B1 (fr)
EP (1) EP2062111B1 (fr)
AT (1) ATE463780T1 (fr)
AU (1) AU7193600A (fr)
CA (1) CA2406899C (fr)
DE (1) DE60044163D1 (fr)
FR (1) FR2792746B1 (fr)
WO (1) WO2000065418A2 (fr)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7937313B2 (en) * 2001-06-29 2011-05-03 Goldman Sachs & Co. Method and system for stress testing simulations of the behavior of financial instruments
US9729639B2 (en) 2001-08-10 2017-08-08 Rockwell Automation Technologies, Inc. System and method for dynamic multi-objective optimization of machine selection, integration and utilization
US20090210081A1 (en) * 2001-08-10 2009-08-20 Rockwell Automation Technologies, Inc. System and method for dynamic multi-objective optimization of machine selection, integration and utilization
US8914300B2 (en) 2001-08-10 2014-12-16 Rockwell Automation Technologies, Inc. System and method for dynamic multi-objective optimization of machine selection, integration and utilization
US20050075970A1 (en) * 2003-10-06 2005-04-07 Doyle Thomas James Risk assessment system and method
US8788247B2 (en) * 2008-08-20 2014-07-22 International Business Machines Corporation System and method for analyzing effectiveness of distributing emergency supplies in the event of disasters
US8972067B2 (en) 2011-05-11 2015-03-03 General Electric Company System and method for optimizing plant operations
US9031892B2 (en) 2012-04-19 2015-05-12 Invensys Systems, Inc. Real time safety management system and method
WO2014145705A2 (fr) 2013-03-15 2014-09-18 Battelle Memorial Institute Système d'analyse de progression
US10637240B2 (en) * 2014-01-24 2020-04-28 Fujitsu Limited Energy curtailment event implementation based on uncertainty of demand flexibility
EP3324254A1 (fr) * 2016-11-17 2018-05-23 Siemens Aktiengesellschaft Dispositif et procédé de détermination des paramètres d'un dispositif de réglage
SG11202104066UA (en) * 2018-10-26 2021-05-28 Dow Global Technologies Llc Deep reinforcement learning for production scheduling
EP3908807B1 (fr) 2020-03-17 2023-11-29 Freeport-McMoRan Inc. Procédés et systèmes pour déployer un équipement nécessaire pour atteindre des objectifs de production définis
CN111723093A (zh) * 2020-06-17 2020-09-29 江苏海平面数据科技有限公司 基于数据划分的不确定间隔数据查询方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5148365A (en) * 1989-08-15 1992-09-15 Dembo Ron S Scenario optimization
WO1994020912A1 (fr) * 1993-03-09 1994-09-15 C*Ats Software Inc. Systeme oriente objets servant a creer, a structurer, a manipuler et a evaluer un instrument financier
WO1997007475A1 (fr) * 1995-08-15 1997-02-27 The Trustees Of Columbia University In The City Of New York Procede et systeme d'estimation pour l'achat et la vente de valeurs financieres
WO1998054666A1 (fr) * 1997-05-29 1998-12-03 Algorithmics Incorporated Procede informatise de compression de portefeuille et dispositif associe

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7188075B1 (en) * 2000-06-29 2007-03-06 Oracle International Corporation Extended product configuration techniques
US7155399B2 (en) * 2001-04-03 2006-12-26 Witness Systems, Inc. System and method for complex schedule generation
US7043444B2 (en) * 2001-04-13 2006-05-09 I2 Technologies Us, Inc. Synchronization of planning information in a high availability planning and scheduling architecture

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5148365A (en) * 1989-08-15 1992-09-15 Dembo Ron S Scenario optimization
WO1994020912A1 (fr) * 1993-03-09 1994-09-15 C*Ats Software Inc. Systeme oriente objets servant a creer, a structurer, a manipuler et a evaluer un instrument financier
WO1997007475A1 (fr) * 1995-08-15 1997-02-27 The Trustees Of Columbia University In The City Of New York Procede et systeme d'estimation pour l'achat et la vente de valeurs financieres
WO1998054666A1 (fr) * 1997-05-29 1998-12-03 Algorithmics Incorporated Procede informatise de compression de portefeuille et dispositif associe

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
SLY DAVID P.: "MATERIAL FLOW ANALYSIS OF AUTOMOTIVE ASSEMBLY PLANTS USING FACTORYFLOW", WINTER SIMULATION CONFERENCE PROCEEDINGS,US,NEW YORK, IEEE, 1995, pages 902 - 908, XP000631990, ISBN: 0-7803-3018-8 *
YOONHO SEO ET AL: "CONFIGURATION AND OPERATION OF A PULL-TYPE FLEXIBLE MANUFACTURING SYSTEM", MANUFACTURING REVIEW,US,AMERICAN SOCIETY OF MECHANICAL ENGINEERS, NEW YORK, vol. 4, no. 1, 1 March 1991 (1991-03-01), pages 44 - 52, XP000204977, ISSN: 0896-1611 *

Also Published As

Publication number Publication date
US7644005B1 (en) 2010-01-05
CA2406899A1 (fr) 2000-11-02
EP2062111B1 (fr) 2010-04-07
FR2792746A1 (fr) 2000-10-27
DE60044163D1 (de) 2010-05-20
ATE463780T1 (de) 2010-04-15
EP2062111A2 (fr) 2009-05-27
FR2792746B1 (fr) 2003-10-17
WO2000065418A2 (fr) 2000-11-02
CA2406899C (fr) 2009-11-24
AU7193600A (en) 2000-11-10

Similar Documents

Publication Publication Date Title
WO2000065418A3 (fr) PROCEDE ET AUTOMATISME DE REGULATION D'UNE PRODUCTION INDUSTRIELLE ETAGEE AVEC MAITRISE D'UN STRESS ENCHAINE ALEATOIRE, APPLICATION AU CONTROLE DU BRUIT ET DU RISQUE VaR D'UNE CHAMBRE DE COMPENSATION
WO2006014372A3 (fr) Logiciel d'optimisation de reglage de debit de conduite et procedes
WO2007127897A3 (fr) Algorithme de regulation en boucle fermee avec adaptation du temps de reponse
US8170761B2 (en) Method for real-time learning of actuator transfer characteristics
EP0899638A3 (fr) Système de régulation pour une installation
CN1393746A (zh) Pid参数模糊自适应控制器
US20090222179A1 (en) Dynamic learning of solenoid p-i curves for closed loop pressure controls
CN113910148B (zh) 一种伺服电批的控制方法及其控制系统
US8172060B2 (en) Dynamic pressure control system with solenoid valve command current trimming
CN113007829B (zh) 空调控制方法、装置及空调
CN1854627A (zh) 一种变风量空调系统变静压与总风量双重控制方法
WO1998038423A3 (fr) Procede pour reguler une grandeur avec une intervention limitee du regulateur
AU2003218619A1 (en) Method and controller for the adaptive control of at least one component of a technical plant
EP1308329A3 (fr) Compresseurs à capacité variable et procédés pour leur contrôle
CN113759697B (zh) 基于pso智能整定带式输送机pid控制器参数的优化方法
CN111338205B (zh) 一种基于控制偏差变化分区的自适应pid控制器及控制方法
CN203836611U (zh) 一种多级控制阀装置
Temkin The application of the fuzzy controller for tension system control of the scraper conveyor in the mines
CN110794879A (zh) 一种稳定氧气流量调节阀的pid调节方法及其控制系统
JP2017146045A (ja) 空気調和装置の制御装置、及びそれを備えた空気調和装置、並びに空気調和装置の制御方法
Li et al. Characteristics of a piloted digital flow valve based on flow amplifier
CN111623385A (zh) 一种吸油烟机的电动阀流量自适应控制方法
EP3987186A1 (fr) Procédé pour régler une pompe de circulation et pompe de circulation
ATE194230T1 (de) Methode zur regelung einer anlage mit nichtlinearen eigenschaften, insbesondere eines lichtbogenofens mit hilfe eines adaptiven proportional-integralen reglers
CN211248078U (zh) 具有调速装置的钢筋弯曲机

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A2

Designated state(s): AU BR CA CN IL IN JP MX NZ PL RU SG US ZA

AL Designated countries for regional patents

Kind code of ref document: A2

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
AK Designated states

Kind code of ref document: A3

Designated state(s): AU BR CA CN IL IN JP MX NZ PL RU SG US ZA

AL Designated countries for regional patents

Kind code of ref document: A3

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE

WWE Wipo information: entry into national phase

Ref document number: 2000922712

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2406899

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 10149960

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: JP