WO2004012131A1 - Monitoring system and methods for monitoring processes and devices - Google Patents

Monitoring system and methods for monitoring processes and devices Download PDF

Info

Publication number
WO2004012131A1
WO2004012131A1 PCT/US2003/023352 US0323352W WO2004012131A1 WO 2004012131 A1 WO2004012131 A1 WO 2004012131A1 US 0323352 W US0323352 W US 0323352W WO 2004012131 A1 WO2004012131 A1 WO 2004012131A1
Authority
WO
WIPO (PCT)
Prior art keywords
field device
monitoring data
time
computer system
flow rate
Prior art date
Application number
PCT/US2003/023352
Other languages
French (fr)
Inventor
Marco Aurelio De Oliveira Pagnano
Alexandre Calura Yamasita
Original Assignee
Smar Research Corporation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Smar Research Corporation filed Critical Smar Research Corporation
Priority to AU2003261259A priority Critical patent/AU2003261259A1/en
Publication of WO2004012131A1 publication Critical patent/WO2004012131A1/en

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0423Input/output
    • G05B19/0425Safety, monitoring
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/23Pc programming
    • G05B2219/23193Memory stores lifetime, different settings, configurations of controlled device
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/24Pc safety
    • G05B2219/24048Remote test, monitoring, diagnostic
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/24Pc safety
    • G05B2219/24055Trace, store a working, operation history
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/24Pc safety
    • G05B2219/24058Remote testing, monitoring independent from normal control by pc

Definitions

  • the present invention relates generally to systems and methods for monitoring processes and devices.
  • the invention is directed to the system and method in which devices or components are maintained or replaced, or both.
  • Conventional monitoring systems may include a plurality of field devices, e ⁇ , smart field devices, positioned at various locations on a network.
  • the smart field devices may include a processor, and can be temperature sensors, pressure sensors, flow rate sensors, valves, switches, etc., or combinations thereof.
  • the smart field devices may be communicatively coupled to each other using an open smart communications protocol.
  • Such open smart communications protocols may include HART ® , PROFU3US ® , FOUNDATION ® Fieldbus, etc. These open smart communications protocol enable smart field devices that are manufactured by different manufactures to be used together in the same process.
  • the conventional systems also may include a controller cornmiuiicativery coupled to each of the smart field devices using the open smart communications protocol.
  • the controller may include a processor, and can receive data from each of the smart field devices.
  • each smart field device may perform a function within the system.
  • a temperature sensor may measure a temperature of a liquid
  • a pressure sensor may measure pressure within a container
  • a flow rate sensor may measure a flow rate of the liquid
  • valves and switches may open to allow or increase the flow of the liquid, or may close to stop the flow of the liquid or to decrease the flow rate of the liquid.
  • the smart field devices may communicate with the controller. For example, the smart field devices may forward the data to the controller, and the controller can implement a control procedure based on the received data.
  • the smart field devices, the controller, or both may be adapted to detect existing problems associated with the smart field devices.
  • the smart field device can measure instantaneous temperatures and/or instantaneous flow rates of a fluid, and may store the temperatures and flow rates in a database.
  • the smart field devices can also continuously calculate an average fluid temperature or an average fluid flow rate, and compare the most recently measured temperature or flow rate to the average fluid temperature or flow rate, respectively. When the efficiency of the smart field device decreases, the most recently measured temperature or flow rate may be substantially less than or greater than the average temperature or flow rate, respectively. When the smart field device detects this
  • the smart field device may be replaced and/or maintenance can be performed on the smart field device.
  • One of the advantages of the present invention is that data associated with the performance of the field device and/or data collected independent of the performance of the field device can be used to determine whether to replace or perform maintenance on the field device. For example, when the amount of time (that the field device has been in operation) is greater than a predetermined value, this data can be forwarded to a computer system. Consequently, such computer system would instruct the field device to be replaced, or can require maintenance to be performed on the field device before problems arise associated with the field device.
  • a system and method for monitoring a device or component are provided.
  • a controller is communicatively coupled to at least one field device, and a computer system is communicatively coupled to the controller.
  • the at least one field device may be a smart field device, and the controller may communicate with the smart field device using an open smart communications protocol, e *., Foundation Fieldbus protocol, PROFIBUS protocol, etc.
  • the controller and/or the field device may be adapted to transmit monitoring data associated with the field device to the computer system when an amount of time that the field device has been in operation is greater than a predetermined value.
  • a server may be communicatively coupled to the computer system, such that the server is adapted to access the monitoring data, and transmit a request for a replacement field device and/or a recommendation that maintenance be performed on the field device independent of a performance of the field device.
  • the field device may be a temperature sensor, a pressure sensor, a flow rate sensor, a valve, a switch, etc.
  • the monitoring data may include values associated with temperature, pressure, flow rate, the amount of time that the field device has been in operation, a position of the valve, a position of the switch, etc.
  • controller and/or the field device may be adapted to compare an instantaneous temperature, pressure or flow rate with an average temperature, pressure or flow rate, respectively.
  • controller also may be adapted to transmit the monitoring data to the computer system when the difference between the instantaneous temperature, pressure or flow rate and the average temperature, pressure or flow rate, respectively, is greater than a predetermined value.
  • Fig. la is a schematic of an exemplary embodiment of a system according to the present invention.
  • Fig. lb is a flowchart of another exemplary embodiment of a system according to the present invention for monitoring a device or component.
  • Fig. 2a is a flowchart of a first exemplary embodiment of the method according to the present invention for monitoring the devices and/or component.
  • Fig. 2b is a flowchart depicting examples of monitoring data which may be transmitted to a controller by at least one field device using the exemplary method of Fig. 2a.
  • Fig. 2c is a flowchart of a second exemplary embodiment of the method according to the present invention.
  • Fig. 2d is a flowchart of a third exemplary embodiment of the method according to the present invention.
  • Fig. 3 a is a flowchart of a fourth exemplary embodiment of the method of the present invention.
  • Fig. 3b is a flowchart depicting examples of monitoring data which may be transmitted to a controller by the field device using the exemplary method of Fig. 3 a.
  • the system 100 may include at least one field device 10 (e.g., at least one smart field device) positioned on a network, and each field device 10 may include a processor (not shown).
  • each of the smart field devices 10 may be a sensor, a control element, etc.
  • the sensor may be a temperature sensor, a pressure sensor, a flow rate sensor, etc.
  • the control elements can be a valve, a switch, etc.
  • each of the field devices 10 may perform a function within the system 100.
  • a field device 10a which is a temperature sensor may measure a temperature of a liquid
  • a field device 10b which is a pressure sensor may measure pressure within a container
  • a field device 10c which is a flow rate sensor may measure a flow rate of the liquid
  • field devices lOd, lOe which are a valve and a switch, respectively, may open to allow for or increase the flow rate of the liquid, or may close to stop the flow of the liquid or to decrease the flow rate of the liquid.
  • each field device 10 maybe communicatively coupled to at least one other field device 10 using an open smart communications protocol 30.
  • Such open smart communications protocols may be HART ® , PROFIBUS ® , FOUNDATION ® Fieldbus, etc.
  • the system 100 also may include a controller 20.
  • the controller 20 may have a processor (not shown), and also can be communicatively coupled to each field device 10 using the open smart communications protocol 30.
  • the system 100 further may include a computer system 40 communicatively coupled to the controller 20.
  • the computer system 40 may be communicatively coupled to the controller 20 using an Ethernet connection.
  • each of the smart field devices 10 may collect monitoring data associated with a function block of that particular field device 10. For example, in a case when the field device 10 is a sensor, the monitoring data may include values associated with instantaneous temperatures, pressures, flow rates, etc. detected by the field device 10 at various times.
  • the monitoring rate may include values associated with a position of the field device 10 at various times. Moreover, when the field device 10 is a sensor or a control element, the monitoring rate further may include values associated with historical data, e ⁇ g., the amount of time that the field device 10 has been in operation.
  • the controller 20 and/or the field device 10 maybe adapted to continuously calculate the average temperature, pressure, flow rate, etc., and to compare the most recently obtained instantaneous temperature, pressure, flow rate, etc. with the average temperature, pressure, flow rate, etc. respectively.
  • the field device 20 and/or the controller 20 further may transmit the monitoring data to the computer system 40 when a difference between the instantaneous temperature, pressure, flow rate, etc. and the average temperature, pressure, flow rate, etc. is greater than a predetermined temperature, pressure, flow rate, etc. differential, respectively.
  • the field device 10 and/or the controller 20 may transmit the monitoring data to the computer system 40.
  • the predetermined amount of time may be selected such that the field device 10 will not experience a substantial decrease in the efficiency prior to the expiration of the predetermined amount of time.
  • the monitoring data may be transmitted to the computer system 40 before the field device 10 experiences a decrease in efficiency; such data transmission can be performed independently from, or in combination with, the performance of the field device 10.
  • the system 100 may further include at least one server 50.
  • the server 50 can be communicatively coupled to the computer system 40.
  • the server 50 may be adapted to access the monitoring data stored in the computer system 40, and to transmit a recommendation that maintenance be performed on the field device 10 or that the field device 10 should be replaced.
  • the server 50 can transmit a request to the manufacturer of the field device 10 requiring the delivery or installation of a replacement field device 10. For example, when the amount of time that the field device 10 has been in operation exceeds a predetermined amount value of time, the field device 10 and/or the controller 20 can transmit the monitoring data to the computer system 40. Thereafter, a user (not shown) of the server 50 can access the monitoring data stored in the computer system 40. The user of the server 50 also can transmit a recommendation for the maintenance to be performed on the field device 10, transmit a recommendation for the field device 10 to be replaced, request the delivery or the installation of a replacement field device 10, or combinations thereof. Similarly, when a difference between the instantaneous temperature, pressure, flow rate, etc.
  • the field device 10 and/or the controller 20 can transmit the monitoring data to the computer system 40. Thereafter, the user of the server 50 can access the monitoring data stored in the computer system 40.
  • the predetermined amount of time may be selected such that the field device 10 will not experience a substantial decrease in efficiency prior to the expiration of the predetermined amount of time.
  • the controller 20 may receive monitoring data 210 associated with at least one field device 10.
  • the monitoring data can include any combination of monitoring data 210'a-210'f.
  • the monitoring data can include any combination of the amount of time that the field device 10 has been in operation (block 210'a), values associated with a temperature of a fluid measured by the field device 10 (block 210'b), values associated with a pressure within a container measured by the field device 10 (block 210'c), values associated with a flow rate of a fluid measured by the field device 10 (block 210'd), a position of a valve at various times during the operation of the field device 10 (block 210'e), and a position of a switch at various times during the operation of the field device 10 (block 210'f).
  • step 220 the controller 20 and/or the field device 10 may determine the amount of time that the field device 10 has been in operation, and the controller 20 and/or the field device 10 may transmit the monitoring data 210' to the computer system 40 when the amount of time that the field device 10 has been in operation exceeds the predetermined amount of time (step 225).
  • the controller and/or the field device may transmit another indication that the threshold has not been reached in step 227, if such determination was made in step 220.
  • steps 220-227 may be replaced by steps 220'-227'.
  • the controller 20 may determine if a difference between the instantaneous temperature, pressure, flow rate, etc.
  • the method 200 may include steps 220-227 of Fig. 2a.
  • the server 50 may access the monitoring data from the computer system 40.
  • the server 50 may transmit a recommendation for maintenance to be performed on the field device 10, the field device 10 is to be replaced, a request for the delivery and/or the installation of a replacement field device 10 to be made, etc. As such, maintenance may be performed on the field device 10 or the field device 10 may be replaced.
  • the controller 20 may receive the monitoring data associated with the field device 10.
  • the monitoring data can include any combination of monitoring data 310'a-310'f.
  • the monitoring data can include any combination of the amount of time that at least one field device 10 has been in operation (block 310'a), values associated with a temperature of a fluid measured by the field device 10 (block 310'b), values associated with a pressure within a container measured by the field device 10 (block 310'c), values associated with a flow rate of a fluid measured by the field device 10 (block 310'd), a position of a valve at various times during the operation of the field device 10 (block 310'e), and a position of a switch at various times during the operation of the field device 10 (bock 310'f).
  • the controller 20 may transmit the monitoring data to the computer system 40.
  • the server 50 may access the monitoring data 310 from the computer system 40. Moreover, in step 340, the server 50 may transmit a recommendation for the maintenance to be performed on the field device 10, for the field device 10 to be replaced, a request for the delivery or the installation of a replacement field device 10, or combinations thereof. For example, the server 50 may transmit such recommendations and/or requests when the amount of time that the field device 10 has been in operation exceeds the predetermined amount of time. As such, maintenance may be performed on the field device 10, or the field device 10 may be replaced, independent from, or in combination with, the performance of the field device 10.

Abstract

A system and method for monitoring a device or component are provided. In particular, a controller and/or a field device may be adapted to transmit monitoring data associated with the field device or component to the computer system when an amount of time that the field device has been in operation is greater than a predetermined amount of time. Also, a server can be adapted to access the monitoring data, and to transmit a request to replace the field device and a recommendation for :maintenance to be performed on the field device independently from a performance of the field device.

Description

MONITORING SYSTEM AND METHODS FOR MONITORING PROCESSES AND DEVICES
RELATED APPLICATION This application claims priority to United States Application No. 10/209,601 filed July 31, 2002, and is incorporated by reference.
FIELD OF THE INVENTION
The present invention relates generally to systems and methods for monitoring processes and devices. In particular, the invention is directed to the system and method in which devices or components are maintained or replaced, or both.
BACKGROUND OF THE INVENTION Conventional monitoring systems may include a plurality of field devices, e^, smart field devices, positioned at various locations on a network. The smart field devices may include a processor, and can be temperature sensors, pressure sensors, flow rate sensors, valves, switches, etc., or combinations thereof. The smart field devices may be communicatively coupled to each other using an open smart communications protocol. Such open smart communications protocols may include HART®, PROFU3US®, FOUNDATION® Fieldbus, etc. These open smart communications protocol enable smart field devices that are manufactured by different manufactures to be used together in the same process. The conventional systems also may include a controller cornmiuiicativery coupled to each of the smart field devices using the open smart communications protocol. Moreover the controller may include a processor, and can receive data from each of the smart field devices.
In operation, each smart field device may perform a function within the system. For example, a temperature sensor may measure a temperature of a liquid, a pressure sensor may measure pressure within a container, a flow rate sensor may measure a flow rate of the liquid, etc. Similarly, valves and switches may open to allow or increase the flow of the liquid, or may close to stop the flow of the liquid or to decrease the flow rate of the liquid. After the smart field devices obtain measurements of various process parameters, or the valves or switches are opened/closed, the smart field devices may communicate with the controller. For example, the smart field devices may forward the data to the controller, and the controller can implement a control procedure based on the received data.
Moreover, the smart field devices, the controller, or both, may be adapted to detect existing problems associated with the smart field devices. For example, the smart field device can measure instantaneous temperatures and/or instantaneous flow rates of a fluid, and may store the temperatures and flow rates in a database. The smart field devices can also continuously calculate an average fluid temperature or an average fluid flow rate, and compare the most recently measured temperature or flow rate to the average fluid temperature or flow rate, respectively. When the efficiency of the smart field device decreases, the most recently measured temperature or flow rate may be substantially less than or greater than the average temperature or flow rate, respectively. When the smart field device detects this
I: deviation, it forwards the data to the controller, and the controller reports the existence of the problem to a computer system. Subsequently, the smart field device may be replaced and/or maintenance can be performed on the smart field device.
Nevertheless, such systems only depend on the data associated with the performance of the smart field device to determine whether to replace or perform maintenance on the smart field device. Consequently, problems with the smart field device arise before the maintenance is performed on the smart field device, or before the smart field device is replaced, or both.
SUMMARY OF THE INVENTION
Therefore, a need has arisen to provide a system and method for monitoring devices and components which overcome the above-described and other shortcomings of the conventional systems and methods. One of the advantages of the present invention is that data associated with the performance of the field device and/or data collected independent of the performance of the field device can be used to determine whether to replace or perform maintenance on the field device. For example, when the amount of time (that the field device has been in operation) is greater than a predetermined value, this data can be forwarded to a computer system. Consequently, such computer system would instruct the field device to be replaced, or can require maintenance to be performed on the field device before problems arise associated with the field device.
According to an exemplary embodiment of the present invention, a system and method for monitoring a device or component are provided. In particular, a controller is communicatively coupled to at least one field device, and a computer system is communicatively coupled to the controller. For example, the at least one field device may be a smart field device, and the controller may communicate with the smart field device using an open smart communications protocol, e *., Foundation Fieldbus protocol, PROFIBUS protocol, etc. Moreover, the controller and/or the field device may be adapted to transmit monitoring data associated with the field device to the computer system when an amount of time that the field device has been in operation is greater than a predetermined value. Alternatively, a server may be communicatively coupled to the computer system, such that the server is adapted to access the monitoring data, and transmit a request for a replacement field device and/or a recommendation that maintenance be performed on the field device independent of a performance of the field device. In another exemplary embodiment of the present invention, the field device may be a temperature sensor, a pressure sensor, a flow rate sensor, a valve, a switch, etc. Also, the monitoring data may include values associated with temperature, pressure, flow rate, the amount of time that the field device has been in operation, a position of the valve, a position of the switch, etc. Moreover, the controller and/or the field device may be adapted to compare an instantaneous temperature, pressure or flow rate with an average temperature, pressure or flow rate, respectively. The controller also may be adapted to transmit the monitoring data to the computer system when the difference between the instantaneous temperature, pressure or flow rate and the average temperature, pressure or flow rate, respectively, is greater than a predetermined value. BRIEF DESCRIPTION OF THE DRAWINGS For a more complete understanding of the present invention, the needs satisfied thereby, and the objects, features, and advantages thereof, reference now is made to the following descriptions taken in connection with the accompanying drawings.
Fig. la is a schematic of an exemplary embodiment of a system according to the present invention.
Fig. lb is a flowchart of another exemplary embodiment of a system according to the present invention for monitoring a device or component. Fig. 2a is a flowchart of a first exemplary embodiment of the method according to the present invention for monitoring the devices and/or component.
Fig. 2b is a flowchart depicting examples of monitoring data which may be transmitted to a controller by at least one field device using the exemplary method of Fig. 2a. Fig. 2c is a flowchart of a second exemplary embodiment of the method according to the present invention.
Fig. 2d is a flowchart of a third exemplary embodiment of the method according to the present invention.
Fig. 3 a is a flowchart of a fourth exemplary embodiment of the method of the present invention.
Fig. 3b is a flowchart depicting examples of monitoring data which may be transmitted to a controller by the field device using the exemplary method of Fig. 3 a.
DETAILED DESCRIPTION OF PREFERRED EMBODIMENTS
Exemplary embodiments of the present invention and their advantages may be understood by referring to Figs. la-3b, like numerals being used for like corresponding parts in the various drawings.
In particular, as shown in Fig. la, an exemplary embodiment of a system 100 for maintaining devices and components according to the present invention are provided. The system 100 may include at least one field device 10 (e.g., at least one smart field device) positioned on a network, and each field device 10 may include a processor (not shown). Referring to Fig. lb, which shows another exemplary embodiment of the system 100, each of the smart field devices 10 may be a sensor, a control element, etc. The sensor may be a temperature sensor, a pressure sensor, a flow rate sensor, etc., and the control elements can be a valve, a switch, etc. In operation, each of the field devices 10 may perform a function within the system 100. For example, a field device 10a which is a temperature sensor may measure a temperature of a liquid, a field device 10b which is a pressure sensor may measure pressure within a container, a field device 10c which is a flow rate sensor may measure a flow rate of the liquid, etc. Similarly, field devices lOd, lOe which are a valve and a switch, respectively, may open to allow for or increase the flow rate of the liquid, or may close to stop the flow of the liquid or to decrease the flow rate of the liquid. In an exemplary embodiment of the system 100 according to the present invention, each field device 10 maybe communicatively coupled to at least one other field device 10 using an open smart communications protocol 30. Such open smart communications protocols may be HART®, PROFIBUS®, FOUNDATION® Fieldbus, etc.
Referring again to Fig. la, the system 100 also may include a controller 20. The controller 20 may have a processor (not shown), and also can be communicatively coupled to each field device 10 using the open smart communications protocol 30. The system 100 further may include a computer system 40 communicatively coupled to the controller 20. In an exemplary embodiment of the present invention, the computer system 40 may be communicatively coupled to the controller 20 using an Ethernet connection. In operation, each of the smart field devices 10 may collect monitoring data associated with a function block of that particular field device 10. For example, in a case when the field device 10 is a sensor, the monitoring data may include values associated with instantaneous temperatures, pressures, flow rates, etc. detected by the field device 10 at various times. When the field device 10 is a control element, the monitoring rate may include values associated with a position of the field device 10 at various times. Moreover, when the field device 10 is a sensor or a control element, the monitoring rate further may include values associated with historical data, e^g., the amount of time that the field device 10 has been in operation.
Further, the controller 20 and/or the field device 10 maybe adapted to continuously calculate the average temperature, pressure, flow rate, etc., and to compare the most recently obtained instantaneous temperature, pressure, flow rate, etc. with the average temperature, pressure, flow rate, etc. respectively. The field device 20 and/or the controller 20 further may transmit the monitoring data to the computer system 40 when a difference between the instantaneous temperature, pressure, flow rate, etc. and the average temperature, pressure, flow rate, etc. is greater than a predetermined temperature, pressure, flow rate, etc. differential, respectively. Similarly, when the amount of time that the field device 10 has been in operation exceeds a predetermined amount of time, the field device 10 and/or the controller 20 may transmit the monitoring data to the computer system 40. The predetermined amount of time may be selected such that the field device 10 will not experience a substantial decrease in the efficiency prior to the expiration of the predetermined amount of time. As such, the monitoring data may be transmitted to the computer system 40 before the field device 10 experiences a decrease in efficiency; such data transmission can be performed independently from, or in combination with, the performance of the field device 10. In another embodiment, the system 100 may further include at least one server 50. The server 50 can be communicatively coupled to the computer system 40. The server 50 may be adapted to access the monitoring data stored in the computer system 40, and to transmit a recommendation that maintenance be performed on the field device 10 or that the field device 10 should be replaced. Similarly, the server 50 can transmit a request to the manufacturer of the field device 10 requiring the delivery or installation of a replacement field device 10. For example, when the amount of time that the field device 10 has been in operation exceeds a predetermined amount value of time, the field device 10 and/or the controller 20 can transmit the monitoring data to the computer system 40. Thereafter, a user (not shown) of the server 50 can access the monitoring data stored in the computer system 40. The user of the server 50 also can transmit a recommendation for the maintenance to be performed on the field device 10, transmit a recommendation for the field device 10 to be replaced, request the delivery or the installation of a replacement field device 10, or combinations thereof. Similarly, when a difference between the instantaneous temperature, pressure, flow rate, etc. and the average temperature, pressure, flow rate, etc. is greater than the predetermined temperature, pressure, flow rate, etc., respectively, the field device 10 and/or the controller 20, can transmit the monitoring data to the computer system 40. Thereafter, the user of the server 50 can access the monitoring data stored in the computer system 40. As described above, the predetermined amount of time may be selected such that the field device 10 will not experience a substantial decrease in efficiency prior to the expiration of the predetermined amount of time.
Referring to Fig. 2a, an exemplary method 200 is depicted which can be utilized by the system 100 of Fig. la. In step 210, the controller 20 may receive monitoring data 210 associated with at least one field device 10. Referring to Fig. 2b, in a second exemplary embodiment, the monitoring data can include any combination of monitoring data 210'a-210'f. For example, the monitoring data can include any combination of the amount of time that the field device 10 has been in operation (block 210'a), values associated with a temperature of a fluid measured by the field device 10 (block 210'b), values associated with a pressure within a container measured by the field device 10 (block 210'c), values associated with a flow rate of a fluid measured by the field device 10 (block 210'd), a position of a valve at various times during the operation of the field device 10 (block 210'e), and a position of a switch at various times during the operation of the field device 10 (block 210'f). step 220, the controller 20 and/or the field device 10 may determine the amount of time that the field device 10 has been in operation, and the controller 20 and/or the field device 10 may transmit the monitoring data 210' to the computer system 40 when the amount of time that the field device 10 has been in operation exceeds the predetermined amount of time (step 225). In addition, the controller and/or the field device may transmit another indication that the threshold has not been reached in step 227, if such determination was made in step 220. In another exemplary embodiment, referring to Fig. 2c, steps 220-227 may be replaced by steps 220'-227'. In step 220', the controller 20 may determine if a difference between the instantaneous temperature, pressure, flow rate, etc. and the average temperature, pressure, flow rate, etc. is greater than the predetermined temperature, pressure, flow rate, etc. differential, respectively. The indication of the determination is formulated by the field device and/or the controller (i.e., steps 225', 227'). Moreover, referring to Fig. 2d, in yet another exemplary embodiment, the method 200 may include steps 220-227 of Fig. 2a. In step 230, the server 50 may access the monitoring data from the computer system 40. Moreover, in step 240, the server 50 may transmit a recommendation for maintenance to be performed on the field device 10, the field device 10 is to be replaced, a request for the delivery and/or the installation of a replacement field device 10 to be made, etc. As such, maintenance may be performed on the field device 10 or the field device 10 may be replaced.
Referring to Fig. 3 a, another exemplary embodiment of the method 300 which can be used by the system 100 of Fig. la is depicted. In step 310, the controller 20 may receive the monitoring data associated with the field device 10. Referring to Fig. 3b, in another embodiment of the method of the present invention, the monitoring data can include any combination of monitoring data 310'a-310'f. Specifically, the monitoring data can include any combination of the amount of time that at least one field device 10 has been in operation (block 310'a), values associated with a temperature of a fluid measured by the field device 10 (block 310'b), values associated with a pressure within a container measured by the field device 10 (block 310'c), values associated with a flow rate of a fluid measured by the field device 10 (block 310'd), a position of a valve at various times during the operation of the field device 10 (block 310'e), and a position of a switch at various times during the operation of the field device 10 (bock 310'f). In step 320, the controller 20 may transmit the monitoring data to the computer system 40. In step 330, the server 50 may access the monitoring data 310 from the computer system 40. Moreover, in step 340, the server 50 may transmit a recommendation for the maintenance to be performed on the field device 10, for the field device 10 to be replaced, a request for the delivery or the installation of a replacement field device 10, or combinations thereof. For example, the server 50 may transmit such recommendations and/or requests when the amount of time that the field device 10 has been in operation exceeds the predetermined amount of time. As such, maintenance may be performed on the field device 10, or the field device 10 may be replaced, independent from, or in combination with, the performance of the field device 10. While the invention has been described in connection with preferred embodiments, it will be understood by those of ordinary skill in the art that other variations and modifications of the preferred embodiments described above may be made without departing from the scope of the invention. Other embodiments will be apparent to those of ordinary skill in the art from a consideration of the specification or practice of the invention disclosed herein. It is intended that the specification and the described examples are considered as exemplary only, with the true scope and spirit of the invention indicated by the following claims.

Claims

CLAIMSWhat Is Claimed Is:
1. A system comprising: a controller communicatively coupled to at least one field device; and a computer system communicatively coupled to the controller, wherein at least one of the controller and the field device is adapted to transmit monitoring data associated with the at least one field device to the computer system when an amount of time that the at least one field device has been in operation is greater than a predetermined amount of time.
2. The system of claim 1, wherein the monitoring data includes the amount of time that the at least one field device has been in operation.
3. The system of claim 1, wherein the at least one field device includes at least one of a temperature sensor, a pressure sensor, a flow rate sensor, a valve and a switch.
4. The system of claim 3, wherein the monitoring data includes values associated with at least one measurement performed by the at least one field device, the at least one measurement including at least one of a temperature, pressure and flow rate.
5. The system of claim 4, wherein at least one of the field device and the controller is further adapted to compare an instantaneous temperature to an average temperature, and to transmit the monitoring data to the computer system when a difference between the instantaneous temperature and the average temperature is greater than a predetermined value.
6. The system of claim 4, wherein at least one of the field device and the controller is further adapted to compare an instantaneous pressure to an average pressure, and to transmit the monitoring data to the computer system when a difference between the instantaneous pressure and the average pressure is greater than a predetermined value.
7. The system of claim 4, wherein at least one of the field device and the controller is further adapted to compare an instantaneous flow rate to an average flow rate, and to transmit the monitoring data to the computer system when a difference between the instantaneous flow rate and the average flow rate is greater than a predetermined value.
8. The system of claim 3, wherein the monitoring data includes at least one of a position of the valve and a position of the switch at various times during the operation of the at least one field device.
9. The system of claim 1, further comprising a server communicatively coupled to the computer system, wherein the server is adapted to access the momtoring data and to transmit a request to replace the at least one field device when the amount of time that the at least one field device has been in operation is greater than the predetermined amount of time.
10. The system of claim 1, further comprising a server communicatively coupled to the computer system, wherein the server is adapted to access the monitoring data and to transmit a recommendation for maintenance to be performed on the at least one field device when the amount of time that the at least one field device has been in operation is greater than the predetermined amount of time.
11. The system of claim 1, wherein the at least one field device is at least one smart field device, and wherein the controller communicates with the at least one smart field device using an open smart communications protocol.
12. The system of claim 11, wherein the open smart communications protocol is a Foundation Fieldbus protocol.
13. The system of claim 11, wherein the open smart communications protocol is a PROFIBUS protocol.
14. The system of claim 1, wherein the computer system is communicatively coupled to the controller using an Ethernet connection.
15. A system comprising: a controller communicatively coupled to at least one field device; a computer system commumcatively coupled to the controller, wherein the controller is adapted to transmit monitoring data associated with the at least one field device to the computer system; and a server communicatively coupled to the computer system, wherein the server is adapted to access the monitoring data, and to transmit at least one of a request to replace the at least one field device and a recommendation for maintenance to be performed on the at least one field device, wherein the at least one of the request and recommendation is transmitted at least partially independently of a performance of the at least one field device.
16. The system of claim 15, wherein at least one of the field device and the controller is adapted to transmit the monitoring data to the computer system when an amount of time that the at least one field device has been in operation is greater than a predetermined amount of time.
17. The system of claim 16, wherein the monitoring data includes the amount of time that the at least one field device has been in operation.
18. The system of claim 15, wherein the at least one field device includes at least one of a temperature sensor, a pressure sensor, a flow rate sensor, a valve and a switch.
19. The system of claim 18, wherein the monitoring data includes values associated with at least one measurement performed by the at least one field device, the at least one measurement including at least one of a temperature, pressure and flow rate.
20. The system of claim 19, wherein at least one of the field device and the controller is further adapted to compare an instantaneous temperature to an average temperature, and to transmit the monitoring data to the computer system when a difference between the instantaneous temperature and the average temperature is greater than a predetermined value.
21. The system of claim 19, wherein at least one of the field device and the controller is further adapted to compare an instantaneous pressure to an average pressure, and to transmit the monitoring data to the computer system when a difference between the instantaneous pressure and the average pressure is greater than a predetermined value.
22. The system of claim 19, wherein at least one of the field device and the controller is further adapted to compare an instantaneous flow rate to an average flow rate, and to transmit the monitoring data to the computer system when a difference between the instantaneous flow rate and the average flow rate is greater than a predetermined value.
23. The system of claim 18, wherein the monitoring data includes at least one of a position of the valve and a position of the switch at various times during the operation of the at least one field device.
24. The system of claim 16, wherein the server is adapted to transmit the request for the at least one replacement field device when the amount of time that the at least one field device has been in operation is greater than the predetermined amount of time.
25. The system of claim 16, wherein the server is adapted to transmit the recommendation that maintenance be performed on the at least one field device when the amount of time that the at least one field device has been in operation is greater than the predetermined amount of time.
26. The system of claim 15, wherein the at least one field device is at least one smart field device, and wherein the controller communicates with the at least one smart field device using an open smart communications protocol.
27. The system of claim 26, wherein the open smart communications protocol is a Foundation Fieldbus protocol.
28. The system of claim 26, wherein the open smart communications protocol is a PROFIBUS protocol.
29. The system of claim 15, wherein the computer system is communicatively coupled to the controller using an Ethernet connection.
30. A method of momtoring at least one field device, comprising the steps of: receiving monitoring data from the at least one field device, wherein the monitoring data is associated with the at least one field device; and transmitting the monitoring data to a computer system when an amount of time that the at least one field device has been in operation is greater than a predetermined amount of time.
31. The method of claim 30, further comprising the step of determining whether the amount of time that the at least one field device has been in operation is greater than the predetermined amount of time, wherein the monitoring data includes the amount of time that the at least one field device has been in operation.
32. The method of claim 30, wherein the at least one field device includes at least one of a temperature sensor, a pressure sensor, a flow rate sensor, a valve and a switch.
33. The method of claim 32, wherein the monitoring data includes values associated with at least one measurement performed by the at least one field device, the at least one measurement including at least one of a temperature, pressure and flow rate.
34. The method of claim 33, further comprising the steps of: comparing an instantaneous temperature to an average temperature; and transmitting the monitoring data to the computer system when a difference between the instantaneous temperature and the average temperature is greater than a predetermined value.
35. The method of claim 33 , further comprising the steps of: comparing an instantaneous pressure to an average pressure; and transmitting the monitoring data to the computer system when a difference between the instantaneous pressure and the average pressure is greater than a predetermined value.
36. The method of claim 33, further comprising the steps of: comparing an instantaneous flow rate to an average flow rate; and transmitting the monitoring data to the computer system when a difference between the instantaneous flow rate and the average flow rate is greater than a predetermined value.
37. The method of claim 32, wherein the monitoring data includes at least one of a position of the valve or a position of the switch at various times during the operation of the at least one field device.
38. The method of claim 30, further comprising the steps of: accessing the monitoring data; and transmitting a request to replace the at least one field device when the amount of time that the at least one field device has been in operation is greater than the predetermined amount of time.
39. The method of claim 30, further comprising the steps of: accessing the monitoring data; and transmitting a recommendation for maintenance to be performed on the at least one field device when the amount of time that the at least one field device has been in operation is greater than the predetermined amount of time.
40. The method of claim 30, wherein the at least one field device is at least one smart field device, and wherein the controller commumcates with the at least one field device using an open smart communications protocol.
41. The method of claim 40, wherein the open smart communications protocol is a Foundation Fieldbus protocol.
42. The method of claim 41, wherein the open smart communications protocol is a PROFIBUS protocol.
43. The method of claim 30, wherein the computer system is commumcatively coupled to the controller using an Ethernet connection.
44. A method of monitoring at least one field device, comprising the steps of: receiving monitoring data from at least one field device, wherein the monitoring data is associated with the at least one field device; transmitting the monitoring data to a computer system; and forwarding at least one of a request to replace the at least one field device and a recommendation for maintenance to be performed on the at least one smart device at least partially, independently of a performance of the at least one field device.
45. The method of claim 44, further comprising the step of determining whether an amount of time that the at least one field device has been in operation is greater than a predetermined amount of time, wherein the step of transmitting the monitoring data to the computer system includes the step of transmitting the monitoring data to the computer system when the amount of time that the at least one field device has been in operation is greater than the predetermined amount of time.
46. The method of claim 44, wherein the monitoring data includes the amount of time that the at least one field device has been in operation.
47. The method of claim 45, wherein the at least one field device includes at least one of a temperature sensor, a pressure sensor, a flow rate sensor, a valve and a switch.
48. The method of claim 47, wherein the momtoring data includes values associated with at least one measurement performed by the at least one field device, the at least one measurement including at least one of a temperature, pressure and flow rate.
49. The method of claim 48, further comprising the steps of: comparing an instantaneous temperature to an average temperature; and transmitting the monitoring data to the computer system when a difference between the instantaneous temperature and the average temperature is greater than a predetermined value.
50. The method of claim 48, further comprising the steps of: comparing an instantaneous pressure to an average pressure; and transmitting the momtoring data to the computer system when a difference between the instantaneous pressure and the average pressure is greater than a predetermined value.
51. The method of claim 48, further comprising the steps of: comparing an instantaneous flow rate to an average flow rate; and transmitting the monitoring data to the computer system when a difference between the instantaneous flow rate and the average flow rate is greater than a predetermined value.
52. The method of claim 47, wherein the monitoring data includes at least one of a position of the valve and a position of the switch over time during the operation of the at least one field device.
53. The method of claim 45, wherein the step of transmitting the request includes the step of transmitting the request when the amount of time that the at least one field device has been in operation is greater than the predetermined amount of time.
54. The method of claim 44, wherein the step of transmitting the recommendation includes the step of transmitting the recommendation when the amount of time that the at least one field device has been in operation is greater than the predetermined amount of time.
55. The method of claim 54, wherein the at least one field device is at least one smart field device, and wherein the controller communicates with the at least one smart field device using an open communications protocol.
56. The method of claim 55, wherein the open smart communications protocol is a Foundation Fieldbus protocol.
57. The method of claim 55, wherein the open smart communications protocol is a PROFIBUS protocol.
58. The method of claim 44, wherein the computer system is communicatively coupled to the controller using an Ethernet connection.
PCT/US2003/023352 2002-07-31 2003-07-25 Monitoring system and methods for monitoring processes and devices WO2004012131A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2003261259A AU2003261259A1 (en) 2002-07-31 2003-07-25 Monitoring system and methods for monitoring processes and devices

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US10/209,601 US6725182B2 (en) 2002-07-31 2002-07-31 System and method for monitoring devices and components
US10/209,601 2002-07-31

Publications (1)

Publication Number Publication Date
WO2004012131A1 true WO2004012131A1 (en) 2004-02-05

Family

ID=31187092

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2003/023352 WO2004012131A1 (en) 2002-07-31 2003-07-25 Monitoring system and methods for monitoring processes and devices

Country Status (3)

Country Link
US (1) US6725182B2 (en)
AU (1) AU2003261259A1 (en)
WO (1) WO2004012131A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1772112A2 (en) * 2005-10-07 2007-04-11 Sherwood Services AG Remote monitoring of medical device
WO2007077264A1 (en) * 2005-12-30 2007-07-12 Intel Corporation Dynamic estimation of the lifetime of a semiconductor device
WO2009095546A3 (en) * 2008-01-31 2009-09-24 Metso Automation Oy A method for controlling a process and for monitoring the condition of process equipment, and an automation system
US9098561B2 (en) 2011-08-30 2015-08-04 Intel Corporation Determining an effective stress level on a processor
US9317389B2 (en) 2013-06-28 2016-04-19 Intel Corporation Apparatus and method for controlling the reliability stress rate on a processor
US9704598B2 (en) 2014-12-27 2017-07-11 Intel Corporation Use of in-field programmable fuses in the PCH dye
US9904339B2 (en) 2014-09-10 2018-02-27 Intel Corporation Providing lifetime statistical information for a processor

Families Citing this family (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10393080T5 (en) * 2002-10-08 2005-09-29 Invensys Systems, Inc., Foxboro service portal
US7110843B2 (en) * 2003-02-24 2006-09-19 Smar Research Corporation Arrangements and methods for monitoring processes and devices using a web service
US7266812B2 (en) * 2003-04-15 2007-09-04 Smar Research Corporation Arrangements, storage mediums and methods for transmitting a non-proprietary language device description file associated with a field device using a web service
US20040230582A1 (en) * 2003-05-13 2004-11-18 Pagnano Marco Aurelio De Oliveira Arrangement, storage medium and method for providing information which is obtained via a device type manager, and transmitted in an extensible mark-up language format or a hypertext mark-up language format
US20050154611A1 (en) * 2004-01-13 2005-07-14 Sgl Carbon, Ag Product support method for industrial processes
US7412842B2 (en) 2004-04-27 2008-08-19 Emerson Climate Technologies, Inc. Compressor diagnostic and protection system
US7275377B2 (en) 2004-08-11 2007-10-02 Lawrence Kates Method and apparatus for monitoring refrigerant-cycle systems
US7177706B2 (en) * 2004-08-13 2007-02-13 Disney Enterprises, Inc. Automated attraction and ride maintenance verification system
US20070034264A1 (en) * 2005-08-12 2007-02-15 Stonel Corporation Apparatus for valve communication and control
US8590325B2 (en) 2006-07-19 2013-11-26 Emerson Climate Technologies, Inc. Protection and diagnostic module for a refrigeration system
US20080216494A1 (en) 2006-09-07 2008-09-11 Pham Hung M Compressor data module
US8380842B2 (en) * 2007-04-26 2013-02-19 Mtelligence Corporation System and methods for the universal integration of plant floor assets and a computerized management system
US20090037142A1 (en) 2007-07-30 2009-02-05 Lawrence Kates Portable method and apparatus for monitoring refrigerant-cycle systems
US9140728B2 (en) 2007-11-02 2015-09-22 Emerson Climate Technologies, Inc. Compressor sensor module
DE102007059847A1 (en) * 2007-12-12 2009-06-18 Siemens Ag Field device for process instrumentation
EP2430503B1 (en) 2009-05-15 2017-11-22 Fisher-Rosemount Systems, Inc. Method of evaluating a potential location to add a wireless field device to an existing network
CN102356364A (en) * 2009-05-15 2012-02-15 费希尔-罗斯蒙德系统公司 Handheld field maintenance tool with improved functionality
US9703279B2 (en) 2010-07-28 2017-07-11 Fisher-Rosemount Systems, Inc. Handheld field maintenance device with improved user interface
WO2012118830A2 (en) 2011-02-28 2012-09-07 Arensmeier Jeffrey N Residential solutions hvac monitoring and diagnosis
US20150088281A1 (en) * 2011-05-31 2015-03-26 General Electric Company Systems and methods to overlay behaviors on foundation fieldbus alerts
US8937555B2 (en) * 2011-05-31 2015-01-20 General Electric Company Systems and methods to overlay behaviors on foundation fieldbus alerts
US8964338B2 (en) 2012-01-11 2015-02-24 Emerson Climate Technologies, Inc. System and method for compressor motor protection
US9477936B2 (en) 2012-02-09 2016-10-25 Rockwell Automation Technologies, Inc. Cloud-based operator interface for industrial automation
US9031892B2 (en) 2012-04-19 2015-05-12 Invensys Systems, Inc. Real time safety management system and method
US9310439B2 (en) 2012-09-25 2016-04-12 Emerson Climate Technologies, Inc. Compressor having a control and diagnostic module
US9803902B2 (en) 2013-03-15 2017-10-31 Emerson Climate Technologies, Inc. System for refrigerant charge verification using two condenser coil temperatures
WO2014144446A1 (en) 2013-03-15 2014-09-18 Emerson Electric Co. Hvac system remote monitoring and diagnosis
US9551504B2 (en) 2013-03-15 2017-01-24 Emerson Electric Co. HVAC system remote monitoring and diagnosis
WO2014145977A1 (en) 2013-03-15 2014-09-18 Bates Alexander B System and methods for automated plant asset failure detection
AU2014248049B2 (en) 2013-04-05 2018-06-07 Emerson Climate Technologies, Inc. Heat-pump system with refrigerant charge diagnostics
US9989958B2 (en) 2013-05-09 2018-06-05 Rockwell Automation Technologies, Inc. Using cloud-based data for virtualization of an industrial automation environment
US9438648B2 (en) 2013-05-09 2016-09-06 Rockwell Automation Technologies, Inc. Industrial data analytics in a cloud platform
US9709978B2 (en) 2013-05-09 2017-07-18 Rockwell Automation Technologies, Inc. Using cloud-based data for virtualization of an industrial automation environment with information overlays
US9786197B2 (en) 2013-05-09 2017-10-10 Rockwell Automation Technologies, Inc. Using cloud-based data to facilitate enhancing performance in connection with an industrial automation system
US9703902B2 (en) 2013-05-09 2017-07-11 Rockwell Automation Technologies, Inc. Using cloud-based data for industrial simulation
US9842302B2 (en) 2013-08-26 2017-12-12 Mtelligence Corporation Population-based learning with deep belief networks
US9311810B2 (en) * 2014-01-23 2016-04-12 General Electric Company Implementing standardized behaviors in a hosting device
MX361329B (en) * 2014-11-26 2018-11-16 Tlv Co Ltd Device management system and construction method using same.
US11042131B2 (en) * 2015-03-16 2021-06-22 Rockwell Automation Technologies, Inc. Backup of an industrial automation plant in the cloud
US11243505B2 (en) 2015-03-16 2022-02-08 Rockwell Automation Technologies, Inc. Cloud-based analytics for industrial automation
US11513477B2 (en) 2015-03-16 2022-11-29 Rockwell Automation Technologies, Inc. Cloud-based industrial controller
US10496061B2 (en) 2015-03-16 2019-12-03 Rockwell Automation Technologies, Inc. Modeling of an industrial automation environment in the cloud
US11692884B2 (en) * 2020-08-17 2023-07-04 Rosemount Inc. Thermowell with pressure sensing capabilities

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5521848A (en) * 1990-02-01 1996-05-28 Her Majesty The Queen As Represented By The Minister Of National Defence Of Her Majesty's Canadian Government Computer based system timer (CBST)

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2714091B2 (en) * 1989-01-09 1998-02-16 株式会社日立製作所 Field instrument
JP3061429B2 (en) * 1991-02-01 2000-07-10 パロマ工業株式会社 Combustion appliance usage monitoring device
JPH07306239A (en) * 1994-05-16 1995-11-21 Hitachi Ltd Electric product with residual life sensor
US5841654A (en) * 1995-10-16 1998-11-24 Smar Research Corporation Windows based network configuration and control method for a digital control system
US6094600A (en) * 1996-02-06 2000-07-25 Fisher-Rosemount Systems, Inc. System and method for managing a transaction database of records of changes to field device configurations
US5995916A (en) 1996-04-12 1999-11-30 Fisher-Rosemount Systems, Inc. Process control system for monitoring and displaying diagnostic information of multiple distributed devices
CA2267528C (en) 1996-10-04 2006-04-04 Fisher Controls International, Inc. Maintenance interface device for use in a process control network
US6006171A (en) * 1997-07-28 1999-12-21 Vines; Caroline J. Dynamic maintenance management system
CA2306767C (en) 1997-10-13 2007-05-01 Rosemount Inc. Communication technique for field devices in industrial processes
US6434512B1 (en) * 1998-04-02 2002-08-13 Reliance Electric Technologies, Llc Modular data collection and analysis system
US6326758B1 (en) * 1999-12-15 2001-12-04 Reliance Electric Technologies, Llc Integrated diagnostics and control systems
US6298454B1 (en) 1999-02-22 2001-10-02 Fisher-Rosemount Systems, Inc. Diagnostics in a process control system
US6424930B1 (en) * 1999-04-23 2002-07-23 Graeme G. Wood Distributed processing system for component lifetime prediction
US6490543B1 (en) * 1999-07-13 2002-12-03 Scientific Monitoring Inc Lifeometer for measuring and displaying life systems/parts
US6421571B1 (en) * 2000-02-29 2002-07-16 Bently Nevada Corporation Industrial plant asset management system: apparatus and method
US6738748B2 (en) * 2001-04-03 2004-05-18 Accenture Llp Performing predictive maintenance on equipment
US6965806B2 (en) * 2001-03-01 2005-11-15 Fisher-Rosemount Systems Inc. Automatic work order/parts order generation and tracking
WO2002097545A1 (en) * 2001-05-29 2002-12-05 Westinghouse Electric Company Llc Health monitoring display system for a complex plant

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5521848A (en) * 1990-02-01 1996-05-28 Her Majesty The Queen As Represented By The Minister Of National Defence Of Her Majesty's Canadian Government Computer based system timer (CBST)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
ALLEN C.: "Intelligent valves & actuators", IEE CONFERENCE, 2 December 1994 (1994-12-02), pages 4/1 - 4/2, XP002973518 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1772112A2 (en) * 2005-10-07 2007-04-11 Sherwood Services AG Remote monitoring of medical device
EP1772112A3 (en) * 2005-10-07 2007-06-06 Covidien AG Remote monitoring of medical device
WO2007077264A1 (en) * 2005-12-30 2007-07-12 Intel Corporation Dynamic estimation of the lifetime of a semiconductor device
US8151094B2 (en) 2005-12-30 2012-04-03 Intel Corporation Dynamically estimating lifetime of a semiconductor device
WO2009095546A3 (en) * 2008-01-31 2009-09-24 Metso Automation Oy A method for controlling a process and for monitoring the condition of process equipment, and an automation system
US8560275B2 (en) 2008-01-31 2013-10-15 Metso Automation Oy Method for controlling a process and for monitoring the condition of process equipment, and an automation system
US9098561B2 (en) 2011-08-30 2015-08-04 Intel Corporation Determining an effective stress level on a processor
US9317389B2 (en) 2013-06-28 2016-04-19 Intel Corporation Apparatus and method for controlling the reliability stress rate on a processor
US9904339B2 (en) 2014-09-10 2018-02-27 Intel Corporation Providing lifetime statistical information for a processor
US9704598B2 (en) 2014-12-27 2017-07-11 Intel Corporation Use of in-field programmable fuses in the PCH dye

Also Published As

Publication number Publication date
AU2003261259A1 (en) 2004-02-16
US6725182B2 (en) 2004-04-20
US20040024572A1 (en) 2004-02-05

Similar Documents

Publication Publication Date Title
US6725182B2 (en) System and method for monitoring devices and components
US7110843B2 (en) Arrangements and methods for monitoring processes and devices using a web service
AU2016330769B2 (en) Monitoring of field devices via a communication network
EP0948759B1 (en) Device in a process system for validating a control signal from a field device
EP0746804B1 (en) Field transmitter for storing information
US20040203434A1 (en) Virtual wireless transmitter
US7092767B2 (en) System and method for providing information in a particular format
US20060224726A1 (en) Monitoring system
RU2576588C2 (en) Detection of sensor performance degradation implemented in transmitter
JP2016129063A (en) Process monitoring system, process monitoring method, and data transmission method
US20110145180A1 (en) Diagnostic Method for a Process Automation System
US20100262264A1 (en) Method for Plant Monitoring With a Field Bus of Process Automation Technology
EP3044603A1 (en) Hall effect sensor system with diagnostic capabilities
RU2315350C2 (en) Method and device for reducing amount of process data subject to transmission
EP2034650A2 (en) Systems and methods for control over unreliable networks
US11188059B2 (en) Method for monitoring a plant of the automation technology
CN113124909B (en) Process variable transmitter with self-learning loop diagnostics
US11016478B2 (en) Method for the application-specific setting of a field device
US11463849B2 (en) Data processing device, data analyzing device, data processing system and method for processing data
WO2017027240A1 (en) Communications device with adaptive scanner for process control
KR101421936B1 (en) System and methdo for controlling device
AU2023203910A1 (en) Method for managing a communicating meter
AU2023203606A1 (en) Method for managing a communicating meter
CN114543327A (en) Method and device for determining opening degree of expansion valve, air conditioner and storage medium
US20070239909A1 (en) Status Indicator

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: JP

WWW Wipo information: withdrawn in national office

Country of ref document: JP