WO2008097677A2 - Polyurethane to polyethylene adhesion process - Google Patents
Polyurethane to polyethylene adhesion process Download PDFInfo
- Publication number
- WO2008097677A2 WO2008097677A2 PCT/US2008/050556 US2008050556W WO2008097677A2 WO 2008097677 A2 WO2008097677 A2 WO 2008097677A2 US 2008050556 W US2008050556 W US 2008050556W WO 2008097677 A2 WO2008097677 A2 WO 2008097677A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- cable
- area
- enclosure
- cleaning
- distribution cable
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G02—OPTICS
- G02B—OPTICAL ELEMENTS, SYSTEMS OR APPARATUS
- G02B6/00—Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
- G02B6/44—Mechanical structures for providing tensile strength and external protection for fibres, e.g. optical transmission cables
- G02B6/4439—Auxiliary devices
- G02B6/4471—Terminating devices ; Cable clamps
- G02B6/4472—Manifolds
- G02B6/4475—Manifolds with provision for lateral branching
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C45/00—Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
- B29C45/14—Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor incorporating preformed parts or layers, e.g. injection moulding around inserts or for coating articles
- B29C45/14549—Coating rod-like, wire-like or belt-like articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C65/00—Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor
- B29C65/70—Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor by moulding
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C66/00—General aspects of processes or apparatus for joining preformed parts
- B29C66/01—General aspects dealing with the joint area or with the area to be joined
- B29C66/02—Preparation of the material, in the area to be joined, prior to joining or welding
- B29C66/022—Mechanical pre-treatments, e.g. reshaping
- B29C66/0224—Mechanical pre-treatments, e.g. reshaping with removal of material
- B29C66/02245—Abrading, e.g. grinding, sanding, sandblasting or scraping
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C66/00—General aspects of processes or apparatus for joining preformed parts
- B29C66/01—General aspects dealing with the joint area or with the area to be joined
- B29C66/02—Preparation of the material, in the area to be joined, prior to joining or welding
- B29C66/026—Chemical pre-treatments
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C66/00—General aspects of processes or apparatus for joining preformed parts
- B29C66/01—General aspects dealing with the joint area or with the area to be joined
- B29C66/02—Preparation of the material, in the area to be joined, prior to joining or welding
- B29C66/028—Non-mechanical surface pre-treatments, i.e. by flame treatment, electric discharge treatment, plasma treatment, wave energy or particle radiation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C66/00—General aspects of processes or apparatus for joining preformed parts
- B29C66/50—General aspects of joining tubular articles; General aspects of joining long products, i.e. bars or profiled elements; General aspects of joining single elements to tubular articles, hollow articles or bars; General aspects of joining several hollow-preforms to form hollow or tubular articles
- B29C66/51—Joining tubular articles, profiled elements or bars; Joining single elements to tubular articles, hollow articles or bars; Joining several hollow-preforms to form hollow or tubular articles
- B29C66/52—Joining tubular articles, bars or profiled elements
- B29C66/526—Joining bars
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C66/00—General aspects of processes or apparatus for joining preformed parts
- B29C66/70—General aspects of processes or apparatus for joining preformed parts characterised by the composition, physical properties or the structure of the material of the parts to be joined; Joining with non-plastics material
- B29C66/73—General aspects of processes or apparatus for joining preformed parts characterised by the composition, physical properties or the structure of the material of the parts to be joined; Joining with non-plastics material characterised by the intensive physical properties of the material of the parts to be joined, by the optical properties of the material of the parts to be joined, by the extensive physical properties of the parts to be joined, by the state of the material of the parts to be joined or by the material of the parts to be joined being a thermoplastic or a thermoset
- B29C66/731—General aspects of processes or apparatus for joining preformed parts characterised by the composition, physical properties or the structure of the material of the parts to be joined; Joining with non-plastics material characterised by the intensive physical properties of the material of the parts to be joined, by the optical properties of the material of the parts to be joined, by the extensive physical properties of the parts to be joined, by the state of the material of the parts to be joined or by the material of the parts to be joined being a thermoplastic or a thermoset characterised by the intensive physical properties of the material of the parts to be joined
- B29C66/7316—Surface properties
- B29C66/73161—Roughness or rugosity
-
- C—CHEMISTRY; METALLURGY
- C08—ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
- C08J—WORKING-UP; GENERAL PROCESSES OF COMPOUNDING; AFTER-TREATMENT NOT COVERED BY SUBCLASSES C08B, C08C, C08F, C08G or C08H
- C08J5/00—Manufacture of articles or shaped materials containing macromolecular substances
- C08J5/12—Bonding of a preformed macromolecular material to the same or other solid material such as metal, glass, leather, e.g. using adhesives
- C08J5/121—Bonding of a preformed macromolecular material to the same or other solid material such as metal, glass, leather, e.g. using adhesives by heating
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C45/00—Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
- B29C45/14—Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor incorporating preformed parts or layers, e.g. injection moulding around inserts or for coating articles
- B29C45/14549—Coating rod-like, wire-like or belt-like articles
- B29C2045/14557—Coating rod-like, wire-like or belt-like articles coating spliced fibres or cables, e.g. optical fiber splices or junctions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C59/00—Surface shaping of articles, e.g. embossing; Apparatus therefor
- B29C59/02—Surface shaping of articles, e.g. embossing; Apparatus therefor by mechanical means, e.g. pressing
- B29C59/04—Surface shaping of articles, e.g. embossing; Apparatus therefor by mechanical means, e.g. pressing using rollers or endless belts
- B29C59/043—Surface shaping of articles, e.g. embossing; Apparatus therefor by mechanical means, e.g. pressing using rollers or endless belts for profiled articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C66/00—General aspects of processes or apparatus for joining preformed parts
- B29C66/01—General aspects dealing with the joint area or with the area to be joined
- B29C66/02—Preparation of the material, in the area to be joined, prior to joining or welding
- B29C66/022—Mechanical pre-treatments, e.g. reshaping
- B29C66/0222—Mechanical pre-treatments, e.g. reshaping without removal of material, e.g. cleaning by air blowing or using brushes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C66/00—General aspects of processes or apparatus for joining preformed parts
- B29C66/01—General aspects dealing with the joint area or with the area to be joined
- B29C66/05—Particular design of joint configurations
- B29C66/10—Particular design of joint configurations particular design of the joint cross-sections
- B29C66/11—Joint cross-sections comprising a single joint-segment, i.e. one of the parts to be joined comprising a single joint-segment in the joint cross-section
- B29C66/114—Single butt joints
- B29C66/1142—Single butt to butt joints
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C66/00—General aspects of processes or apparatus for joining preformed parts
- B29C66/70—General aspects of processes or apparatus for joining preformed parts characterised by the composition, physical properties or the structure of the material of the parts to be joined; Joining with non-plastics material
- B29C66/71—General aspects of processes or apparatus for joining preformed parts characterised by the composition, physical properties or the structure of the material of the parts to be joined; Joining with non-plastics material characterised by the composition of the plastics material of the parts to be joined
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29K—INDEXING SCHEME ASSOCIATED WITH SUBCLASSES B29B, B29C OR B29D, RELATING TO MOULDING MATERIALS OR TO MATERIALS FOR MOULDS, REINFORCEMENTS, FILLERS OR PREFORMED PARTS, e.g. INSERTS
- B29K2023/00—Use of polyalkenes or derivatives thereof as moulding material
- B29K2023/04—Polymers of ethylene
- B29K2023/06—PE, i.e. polyethylene
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29K—INDEXING SCHEME ASSOCIATED WITH SUBCLASSES B29B, B29C OR B29D, RELATING TO MOULDING MATERIALS OR TO MATERIALS FOR MOULDS, REINFORCEMENTS, FILLERS OR PREFORMED PARTS, e.g. INSERTS
- B29K2075/00—Use of PU, i.e. polyureas or polyurethanes or derivatives thereof, as moulding material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29L—INDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
- B29L2031/00—Other particular articles
- B29L2031/34—Electrical apparatus, e.g. sparking plugs or parts thereof
- B29L2031/3462—Cables
-
- C—CHEMISTRY; METALLURGY
- C08—ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
- C08J—WORKING-UP; GENERAL PROCESSES OF COMPOUNDING; AFTER-TREATMENT NOT COVERED BY SUBCLASSES C08B, C08C, C08F, C08G or C08H
- C08J2323/00—Characterised by the use of homopolymers or copolymers of unsaturated aliphatic hydrocarbons having only one carbon-to-carbon double bond; Derivatives of such polymers
- C08J2323/02—Characterised by the use of homopolymers or copolymers of unsaturated aliphatic hydrocarbons having only one carbon-to-carbon double bond; Derivatives of such polymers not modified by chemical after treatment
- C08J2323/04—Homopolymers or copolymers of ethene
- C08J2323/06—Polyethene
-
- C—CHEMISTRY; METALLURGY
- C08—ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
- C08J—WORKING-UP; GENERAL PROCESSES OF COMPOUNDING; AFTER-TREATMENT NOT COVERED BY SUBCLASSES C08B, C08C, C08F, C08G or C08H
- C08J2375/00—Characterised by the use of polyureas or polyurethanes; Derivatives of such polymers
- C08J2375/04—Polyurethanes
Definitions
- the principles disclosed herein relate to fiber optic cable systems. More particularly, the present disclosure relates to fiber optic cable systems having breakout arrangements protecting branch cables broken out from main cables.
- FIG. 1 illustrates a network 100 deploying passive fiber optic lines.
- the network 100 may include a central office 110 that connects a number of end subscribers 115 (also called end users 115 herein) in a network.
- the central office 110 may additionally connect to a larger network such as the Internet (not shown) and a public switched telephone network (PSTN).
- PSTN public switched telephone network
- the network 100 may also include fiber distribution hubs (FDHs) 130 having one or more optical splitters (e.g., l-to-8 splitters, l-to-16 splitters, or l-to-32 splitters) that generate a number of individual fibers that may lead to the premises of an end user 115.
- FDHs fiber distribution hubs
- the various lines of the network can be aerial or housed within underground conduits (e.g., see conduit 105).
- the portion of network 100 that is closest to central office 110 is generally referred to as the Fl region, where Fl is the "feeder fiber" from the central office.
- the Fl portion of the network may include a distribution cable having on the order of 12 to 48 fibers; however, alternative implementations may include fewer or more fibers.
- the portion of network 100 that includes an FDH 130 and a number of end users 115 may be referred to as an F2 portion of network 100.
- Splitters used in an FDH 130 may accept a feeder cable having a number of fibers and may split those incoming fibers into, for example, 216 to 432 individual distribution fibers that may be associated with a like number of end user locations.
- the network 100 includes a plurality of breakout locations 125 at which branch cables (e.g., drop cables, stub cables, etc.) are separated out from main cables (e.g., distribution cables).
- Breakout locations can also be referred to as tap locations or branch locations and branch cables can also be referred to as breakout cables.
- fibers of the branch cables are typically spliced to selected fibers of the main cable.
- the interface between the fibers of the main cable and the fibers of the branch cables can be connectorized.
- Stub cables are typically branch cables that are routed from breakout locations to intermediate access locations such as a pedestals, drop terminals or hubs. Intermediate access locations can provide connector interfaces located between breakout locations and subscriber locations.
- a drop cable is a cable that typically forms the last leg to a subscriber location. For example, drop cables are routed from intermediate access locations to subscriber locations. Drop cables can also be routed directly from breakout locations to subscriber locations hereby bypassing any intermediate access locations
- Branch cables can manually be separated out from a main cable in the field using field splices.
- Field splices are typically housed within sealed splice enclosures. Manual splicing in the field is time consuming and expensive.
- Pre-terminated cable systems include factory integrated breakout locations manufactured at predetermined positions along the length of a main cable (e.g., see U.S. Patent Nos. 4,961,623; 5,125,060; and 5,210,812).
- pre-terminated cables can be difficult.
- pre-terminations can complicate passing pre- terminated cable through the underground conduit typically used to hold fiber optic cable (e.g., 1.25 inch inner diameter conduit).
- pre- terminations can complicate passing pre-terminated cable through aerial cable retention loops.
- Certain aspects of the disclosure relate to a breakout process for pre- terminating branch cables to fiber optic distribution cables.
- inventive aspects can relate to individual features and to combinations of features. It is to be understood that both the forgoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the broad inventive concepts upon which the embodiments disclosed herein are based.
- FIG. 1 shows a prior art passive fiber optic network
- FIG. 2 is a side view of a tether branching from a distribution cable
- FIG. 3 is a cross sectional view of an example distribution cable
- FIG. 4 is a cross sectional view of an example tether
- FIG. 5 is a perspective view of an example breakout assembly installed on a distribution cable at breakout location
- FIG. 6 is a perspective view of an example retention block used at the breakout location of FIG. 5;
- FIG. 7 shows an initial preparation of the distribution cable at the breakout location of FIG. 5;
- FIG. 8 shows a first preparation step for a tether used at the breakout location of FIG. 5;
- FIG. 9 shows a subsequent preparation step for the tether of FIG. 8;
- FIG. 10 is a side view of an enclosure installed at breakout location according to one embodiment of the present disclosure.
- FIG. 11 is a top view of the enclosure of FIG. 10;
- FIG. 12 is a flowchart illustrating an example installation process for installing an enclosure over a breakout assembly according to one embodiment of the present disclosure;
- FIG. 13 is a schematic view of a telecommunications cable including a tether branching from a distribution cable;
- FIG. 14 is a flowchart illustrating an example treatment process for preparing a cable to bond with an enclosure body according to one embodiment of the present disclosure.
- FIG. 15 is a schematic diagram showing respective movement of a cable relative to a plasma etcher during the treatment process of FIG. 14;
- FIG. 16 is a flow chart illustrating an example overmolding process for forming the enclosure body according to one embodiment of the present disclosure
- FIG. 17 is a cross-sectional, schematic view depicting a distribution cable and tether placed within molds during the overmolding process of FIG. 16;
- FIG. 18 is a schematic diagram depicting an enclosure overmolded over a breakout location on a distribution cable of FIG. 17.
- the present disclosure relates to mid-span breakout arrangements provided on distribution cables and methods for providing the breakout arrangements.
- Each breakout arrangement is provided at a breakout location to protect the optical coupling of a tether (i.e., a branch cable) to a distribution cable.
- a tether i.e., a branch cable
- a fiber 224 t of a tether 240 is optically coupled to a fiber 224 dC of the distribution cable 220 at a coupling location 205.
- An enclosure 300 e.g., an overmold is typically provided around the distribution cable 220 and the tether 240 at the breakout location 260 to protect the optical fibers 224.
- FIG. 3 shows an example distribution cable 220 including six separate buffer tubes 222 each containing twelve fibers 224a c .
- the buffer tubes 222 may be gel filled.
- the distribution cable 220 also includes a central strength member 226 for reinforcing the cable 220, and an outer strength layer/member 228, such as aramid fiber/yarn (e.g., Kevlar® fiber), also for reinforcing the cable.
- the distribution cable 220 further includes an outer jacket 230 that encloses the buffer tubes 222. Ripcords 232 can be provided for facilitating tearing away portions of the jacket 230 to access the fibers 224 d0 within the jacket 230.
- a typical distribution cable includes a relatively large number of fibers (e.g., 72, 144 or more fibers).
- the fibers are typically segregated into separate groups with each group contained within a separate buffer tube.
- the fibers within each buffer tube can include either ribbon fibers or loose fibers.
- the distribution cable can include an outer jacket enclosing a single buffer tube and at least two strength members extending on opposite sides of the single buffer tube (not shown).
- An outer strength layer/member such as aramid fiber/yarn, can surround the single buffer tube within the jacket.
- the single buffer tube can enclose loose fibers or ribbon fibers.
- FIG. 4 illustrates an example tether 240 configured to join to the distribution cable 220 at the breakout location 260.
- the tether 240 includes a central buffer tube 242 containing multiple fibers 224 t (e.g., typically one to twelve loose or ribbonized fibers).
- Strength members 246 e.g., flexible rods formed by glass fiber reinforced epoxy
- An outer jacket 250 surrounds the strength members 246 and the buffer tube 242.
- An additional strength layer 248 e.g., aramid fiber/yarn
- the tether 240 is depicted as having a flat cable configuration.
- the outer jacket 250 includes an outer perimeter having an elongated transverse cross-sectional shape.
- the transverse cross-sectional shape includes oppositely positioned, generally parallel sides 252 interconnected by rounded ends 254.
- any suitable cable configuration can be utilized for both the distribution cable and the tether cable.
- one or more tether fibers (e.g., typically less than twelve fibers) 224 t are preferably optically coupled (e.g., spliced) at a coupling location 205 to selected fibers 224 dC of the distribution cable 220 extending from one of the exposed buffer tubes 222.
- selected fibers 224 dC of the distribution cable 220 extending from one of the exposed buffer tubes 222.
- the opposite ends of the tether fibers 224 t are configured to optically couple to a drop terminal or other type of telecommunications equipment (not shown) offset from the breakout location 260.
- the tether 240 can terminate in one or more fiber optic connectors (not shown).
- a breakout assembly 200 having features that are examples of inventive aspects in accordance with the principles of the present disclosure is shown installed on a distribution cable in FIG. 5.
- the breakout assembly 200 includes a sleeve 202 mounted over the optical fibers 224 t , 224 dC at the coupling location 205.
- An optional protective tube 280 can also be provided over the fibers 224 t , 224dc and the sleeve 202.
- An enclosure 300 surrounds the coupled optical fibers 224 dc , 224 t , the sleeve 202, the optional tube 280, and the exposed buffer tubes 222 of the distribution cable 220.
- the enclosure 300 has a body 310 that protects the optical connection between the tether 240 and the distribution cable 220.
- One end 302 of a body 310 of the enclosure 300 extends over the distribution cable 220 adjacent a first end 352 of the stripped region 350 and the other end 304 of the body 310 extends over the tether cable 240 and the distribution cable 220 adjacent a second end 354 of the stripped region 350.
- the tether 240 generally extends outwardly a length from the enclosure 300 to a connection end 256.
- the enclosure 300 can include an overmold.
- the breakout assembly 200 also can includes a retention block 270 (see FIG. 6) configured to strengthen the mechanical interface between the tether 240 and the distribution cable 220.
- the retention block 270 is enclosed within the protective enclosure 300.
- the retention block 270 includes a base 274 and a cover 272 between which the fiber 224 t of the tether 240 extends.
- First and second protrusions 276, 278 extend from the cover 272 and base 274, respectively.
- the retention block 270 has a polycarbonate construction.
- the retention block 270 can be found in U.S. provisional application Serial No. 60/781 ,280, filed March 9, 2006, and entitled "FIBER OPTIC CABLE BREAKOUT CONFIGURATION," the disclosure of which is hereby incorporated by reference. It is preferred for the fibers 224 t of the tether to be pre-terminated to the fibers 224 dc of the distribution cable. "Pre-terminated” means that the tether fibers 224 t are fused or otherwise connected to the fibers 224a c of the distribution cable 220 at the factory as part of the cable manufacturing process rather than being field terminated. The remainder of the breakout assembly 200 is also preferably factory installed.
- a portion of the outer jacket 230 is first stripped away to provide a stripped region 350 (FIG. 7).
- portions of a cable netting can be removed adjacent the first and second ends 352, 354, respectively, so that the buffer tubes 222 are exposed (FIG. 7).
- the outer strength layer/member 228 also can be displaced (e.g., bunched at one side of the cable 220) adjacent the ends 352, 354 to facilitate accessing the buffer tubes 222 (see, e.g., FIG. 5).
- Tape can be used to prevent the intermediate length of netting that remains at the breakout location 260 from unraveling (FIG. 7).
- One of the buffer tubes 222 is selected and a first window 358 is cut into the selected buffer tube 222 adjacent the first end 352 of the stripped region 350 and a second window 360 is cut into the selected buffer tube 222 adjacent the second end 354 of the stripped region 350 (FIG. 7).
- the fibers 224d C desired to be broken out are accessed and severed at the second window 360.
- the fibers 224 dc are pulled from the buffer tube 222 through the first window 358.
- the fibers 224 dc are ready to be terminated to one or more fibers 224 t of a prepared tether 240.
- a portion of the outer jacket 250 is stripped away to expose the central buffer tube 242 and the strength members 246 (see FIG. 8). As shown at FIG. 8, the central buffer tube 242 and the strength members 246 project outwardly beyond an end 247 of the outer jacket 250.
- the strength layer 248 (FIG. 4) is removed from around the buffer tube 242. After removing the end portion of the outer jacket 250, the strength members 246 are trimmed as shown at FIG. 8, and an end portion of the central buffer tube 242 is removed to expose the fibers 224 t (FIG. 9).
- the sleeve 202 (FIG. 5) is first slid over the fibers 224 t of the tether.
- the sleeve 202 can be slid up over the buffer tube 242 of the tether 240.
- the optional protective tube 280 (FIG. 5) also can be slid over the tether 240.
- the fibers 224 t of the tether 240 are coupled (e.g., fused) to the fibers 224 dC of the distribution cable 220.
- the sleeve 202 can be slid over the coupling location 205 to protect the fused fibers 224 t , 224 dC -
- the tube 280 can be slid over the sleeve 202. The fibers are then tested to confirm that the fibers meet minimum insertion loss requirements.
- the tether 240 can be mounted to the retention block 270.
- the strength members 246 can be positioned within side grooves 273 on the base 274 of the retention block 270, and the central buffer tube 242 can be inserted within a central groove 275 on the base 274.
- the central buffer tube 242 has a length that extends beyond a first end of the base 274, and the strength members 246 have lengths that terminate generally at the first end of the base 274.
- one end of the optional protective tube 280 can be mounted over the protrusions 276, 278 of the retention block 270 (see FIG. 5).
- FIG. 12 illustrates a flowchart depicting an installation process 1200 for installing the enclosure body 310.
- the installation process 1200 begins at start module 1202 and proceeds to a first prepare operation 1204.
- the first prepare operation 1204 provides protection for the exposed buffer tubes 222 and coupled optical fibers 224 dC , 224 t against the heat and other stresses associated with overmolding an enclosure.
- heat resistant tape 208 (FIG. 13) can be wrapped around the buffer tubes 222 and coupled optical fibers 224dc, 224 t .
- the heat resistant tape 208 is wrapped from the distribution cable jacket 230 adjacent the first end 352 of the stripped region 350 (FIG. 5), around the breakout assembly 200 (FIG. 5), past the second end 354 of the stripped region 350, and over the distribution cable jacket 230 and tether jacket 250 at the second end 354 of the stripped region 350 (FIG. 5).
- a second prepare operation 1206 provides regions of adhesion on the distribution cable 220 to which the enclosure body 310 can be secured.
- the process for providing the adhesion regions will be discussed herein with reference to FIGS. 14-17.
- the adhesion regions 322, 324 are provided on the outer jacket
- a first adhesion region 322 is typically provided on the distribution cable 220 adjacent the first end 352 of the stripped region 350 and a second adhesion region 324 is provided adjacent the second end 354 of the stripped region 350.
- the adhesion regions 322, 324 have lengths Lj, L 2 , respectively, that extend longitudinally along the distribution cable 220 (FIG. 13).
- the first adhesion region 322 extends from a first end of the heat resistant tape 208 in a first direction extending generally away from the breakout location 206 (FIG. 5).
- the second adhesion region 324 extends from a second, opposite end of the tape 208 in a second, opposite direction generally away from the breakout location 206.
- the lengths Li, L 2 of the adhesion regions 322, 324 extend about 1-4 inches, inclusive.
- the lengths Li, L 2 each extend about 2-3 inches.
- An optional third prepare operation 1208 provides a region of adhesion on the tether 240 to which the enclosure body 310 also can be secured.
- a third adhesion region 326 having a third length L 3 is shown in FIG. 13 extending over the outer jacket 250 of the tether 240.
- the third prepare operation 1208 is substantially similar to the second prepare operation 1206.
- the third adhesion region 326 therefore, is generally similar to the adhesion regions 322, 324 provided on the distribution cable 220.
- the length L 3 of the third adhesion region 326 is substantially the same as the lengths Li, L 2 of the adhesion regions 322, 324, respectively, of the distribution cable 220.
- An overmold operation 1210 installs the enclosure body 310 over the breakout location 206 (FIG. 5) of the distribution cable 220.
- the enclosure 310 encloses the distribution cable 220 and the breakout assembly 200.
- the enclosure 310 also encloses a portion of the tether 240.
- the first end 302 of the enclosure body 310 is formed around the first adhesion region 352 and the second end 304 of the enclosure body 310 is formed around the second adhesion region 354 and the third adhesion region 356.
- the enclosure body 310 also can extend past the adhesion regions 352, 354, 356.
- the overmold operation 1210 is described in more detail with respect to FIG. 16.
- FIG. 14 illustrates a flowchart depicting an example treatment process 1400 for providing enhanced adhesion between two materials, such as two polymeric materials.
- the treatment process 1400 increases the adhesion between a polyurethane material and a polyethylene material.
- the treatment process 1400 can be used to prepare the outer j acket 230 of the distribution cable 220 to enable the enclosure body 310 to couple more securely to the outer jacket 230.
- the treatment process 1400 has increased the pull out strength of a polyethylene cable from a polyurethane enclosure by 300%-400%.
- the outer jacket 250 of the tether 240 can be prepared using substantially the same process.
- the treatment process 1400 begins at start module 1402 and proceeds to a sand operation 1404.
- the sand operation 1404 roughens the circumferential surface of the outer jacket 230 at the first and second adhesion regions 322, 324.
- the outer jacket 230 along the regions 322, 324 is sanded with a grit ranging from about 40 to about 180, and more preferably ranging from about 60 to about 120.
- the gritted material e.g., sandpaper
- the cable 220 alternatively could be sanded along the longitudinal length of the cable 220.
- a clean operation 1406 applies a cleaning agent to the sanded areas and then removes the excess cleaning agent.
- a cleaning agent e.g., isopropyl alcohol
- the clean operation 1406 can be performed anytime after the sand operation 1404.
- An etch operation 1408 is performed after the clean operation 1404.
- the etch operation 1408 is performed while the outer jacket 230 is still clean. It is believed that dirt or other contaminants can shield the outer jacket 230 from the full effects of the etching.
- the etch operation 1408 is performed within four minutes of the clean operation 1406 to inhibit contamination of the jacket 230 (e.g., from the environment).
- the etch operation 1408 is performed within two minutes when not in a clean room environment.
- the etch operation 1408 increases the surface area of the adhesion regions 322, 324 by providing disruptions on the outer jacket 230 along the cleaned and sanded regions 322, 324.
- the etch operation 1408 is performed using a plasma etcher 400 (FIG. 15).
- a plasma etcher 400 FIG. 15
- a suitable plasma etcher is the FlumeTM system from Plasmatreat North America, Inc.
- the plasma etcher 400 has at least a first head 402 (FIG. 15). Each head 402 is configured to emit a beam of plasma. In some embodiments, the beam of plasma is emitted in a ringed configuration. In other embodiments, a beam emitting nozzle (not shown) on the head 402 is configured to rotate in a circular pattern. In still other embodiments, however, the beam of plasma can be emitted from the head 402 in any desired configuration.
- the cable 220 is positioned adjacent the first head 402 so that the plasma beam is directed at one of the adhesion regions 322, 324.
- the adhesion regions 322, 324 extend over a length that is greater than the diameter/width of the plasma beam.
- the length of the adhesion region 322 is preferably about three inches and the diameter/width of the plasma beam is typically about one inch.
- the cable 220 is moved back and forth along the length of each adhesion region 322, 324 along a longitudinal axis M of the cable 220.
- the cable 220 is rotated at least partially about the longitudinal axis M.
- the cable 220 can be flipped about 180° so that the etcher head 402 faces the opposite side of the cable 220.
- the etching operation 1408 can then be repeated for the opposite side.
- the plasma etcher 400 has a first head 402 and a second, opposing head 404 as shown in FIG. 15.
- the cable 220 is positioned between the opposing heads 402, 404 so that the plasma beams emitted from the heads 402, 404 contact both sides of the cable 220.
- the cable 220 can be moved along the longitudinal axis M as discussed above to increase the surface area with which the etcher 400 interacts.
- the cable 220 also can be rotated about the longitudinal axis M to etch the entire circumference of the cable 220.
- the treatment process 1400 ends at stop module 1410.
- FIG. 16 illustrates a flowchart depicting an example overmold process 1600 for overmolding a telecommunications cable.
- the overmold process 1600 is performed after the etch operation 1408 of the treatment process 1400. In general, care is taken to avoid contacting the treated (e.g., etched) cables 220, 240 with human hands. Preferably, the overmold process 1600 is performed within four minutes of the etch operation 1408 to mitigate the chances of contaminating (e.g., touching) the treated cables 220, 240.
- the overmold operation 1410 surrounds the distribution cable 220 at the breakout location 206 (FIG. 5) and the adhesion regions 322, 324, 326 of the cable jackets 230, 250 with an enclosure 300.
- the overmold process 1600 begins at start module 1602 and proceeds to a mount operation 1604.
- the treated distribution cable 220 is placed in a mold 370.
- the distribution cable 220 is placed within a mold 370 formed from a first member 372 and a second member 374.
- Other suitable molds 370 can also be used.
- Polymeric material is introduced into the mold in inject operation 1606.
- the polymeric material is injected from a source 376, through a conduit 378, and into the mold 370 to cover portions of the distribution cable 220 including the treated adhesion regions 322, 324.
- the enclosure body 310 is formed of a different material than the outer jacket of the distribution cable 220.
- the enclosure body 310 is formed of polyurethane and the outer jacket of the distribution cable 220 is formed from polyethylene.
- a portion of the tether 240 is placed into the mold 370 with the distribution cable 220 and the polymeric material is injected around the treated region 326 of the tether cable jacket 250.
- a cure operation 1608 allows the polymeric material to harden.
- the cure operation 1608 can allow the polymeric material time to cool.
- a remove operation 1610 removes the distribution cable 220 from the mold 370.
- the hardened polymeric material remains secured around the distribution cable 220 to form an enclosure body 310 (FIG. 18).
- the overmold process 1600 ends at stop module 1612.
- the enclosure body 310 prefferably be sized with a cross sectional shape sufficient to allow the breakout location 260 to be readily passed through a one and one-half inch inner diameter conduit or a one and one-quarter inch diameter conduit.
- the breakout location 260 has a cross sectional area that can be passed through a one inch inner diameter conduit.
Abstract
A telecommunications cable includes a distribution cable, a tether branching from the distribution cable at a breakout location, and an enclosure that surrounds the breakout location. The enclosure is secured to the distribution cable at first and second adhesion regions. The enclosure can also secure to the tether at a third adhesion region. The adhesion regions are treated by sanding the regions, cleaning the regions, and then plasma-etching the regions immediately before welding/injection molding the enclosure around the breakout location.
Description
POLYURETHANE TO POLYETHYLENE ADHESION PROCESS
This application is being filed on 09 January 2008, as a PCT International Patent application in the name of ADC Telecommunications, Inc., a U.S. national corporation, applicant for the designation of all countries except the U.S., and Scott CARLSON, a citizen of the U.S., and Dennis Ray WELLS, a citizen of the U.S., applicant for the designation of the U.S. only, and claims priority to U.S. Patent Utility Application Serial No. 11/702,914 filed on 06 February 2007.
Technical Field
The principles disclosed herein relate to fiber optic cable systems. More particularly, the present disclosure relates to fiber optic cable systems having breakout arrangements protecting branch cables broken out from main cables.
Background
Passive optical networks are becoming prevalent in part because service providers want to deliver high bandwidth communication capabilities to customers. Passive optical networks are a desirable choice for delivering high-speed communication data because they may not employ active electronic devices, such as amplifiers and repeaters, between a central office and a subscriber termination. The absence of active electronic devices may decrease network complexity and/or cost and may increase network reliability. FIG. 1 illustrates a network 100 deploying passive fiber optic lines. As shown in FIG. 1, the network 100 may include a central office 110 that connects a number of end subscribers 115 (also called end users 115 herein) in a network. The central office 110 may additionally connect to a larger network such as the Internet (not shown) and a public switched telephone network (PSTN). The network 100 may also include fiber distribution hubs (FDHs) 130 having one or more optical splitters (e.g., l-to-8 splitters, l-to-16 splitters, or l-to-32 splitters) that generate a number of individual fibers that may lead to the premises of an end user 115. The various lines of the network can be aerial or housed within underground conduits (e.g., see conduit 105). The portion of network 100 that is closest to central office 110 is generally referred to as the Fl region, where Fl is the "feeder fiber" from the central office.
The Fl portion of the network may include a distribution cable having on the order
of 12 to 48 fibers; however, alternative implementations may include fewer or more fibers. The portion of network 100 that includes an FDH 130 and a number of end users 115 may be referred to as an F2 portion of network 100. Splitters used in an FDH 130 may accept a feeder cable having a number of fibers and may split those incoming fibers into, for example, 216 to 432 individual distribution fibers that may be associated with a like number of end user locations.
Referring to FIG. 1, the network 100 includes a plurality of breakout locations 125 at which branch cables (e.g., drop cables, stub cables, etc.) are separated out from main cables (e.g., distribution cables). Breakout locations can also be referred to as tap locations or branch locations and branch cables can also be referred to as breakout cables. At a breakout location, fibers of the branch cables are typically spliced to selected fibers of the main cable. However, for certain applications, the interface between the fibers of the main cable and the fibers of the branch cables can be connectorized. Stub cables are typically branch cables that are routed from breakout locations to intermediate access locations such as a pedestals, drop terminals or hubs. Intermediate access locations can provide connector interfaces located between breakout locations and subscriber locations. A drop cable is a cable that typically forms the last leg to a subscriber location. For example, drop cables are routed from intermediate access locations to subscriber locations. Drop cables can also be routed directly from breakout locations to subscriber locations hereby bypassing any intermediate access locations
Branch cables can manually be separated out from a main cable in the field using field splices. Field splices are typically housed within sealed splice enclosures. Manual splicing in the field is time consuming and expensive.
As an alternative to manual splicing in the field, pre-terminated cable systems have been developed. Pre-terminated cable systems include factory integrated breakout locations manufactured at predetermined positions along the length of a main cable (e.g., see U.S. Patent Nos. 4,961,623; 5,125,060; and 5,210,812). However, the installation of pre-terminated cables can be difficult. For example, for underground applications, pre-terminations can complicate passing pre- terminated cable through the underground conduit typically used to hold fiber optic cable (e.g., 1.25 inch inner diameter conduit). Similarly, for aerial applications, pre-
terminations can complicate passing pre-terminated cable through aerial cable retention loops.
Summary
Certain aspects of the disclosure relate to a breakout process for pre- terminating branch cables to fiber optic distribution cables.
A variety of additional inventive aspects will be set forth in the description that follows. The inventive aspects can relate to individual features and to combinations of features. It is to be understood that both the forgoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the broad inventive concepts upon which the embodiments disclosed herein are based.
Brief Description of the Drawings
FIG. 1 shows a prior art passive fiber optic network; FIG. 2 is a side view of a tether branching from a distribution cable; FIG. 3 is a cross sectional view of an example distribution cable;
FIG. 4 is a cross sectional view of an example tether; FIG. 5 is a perspective view of an example breakout assembly installed on a distribution cable at breakout location;
FIG. 6 is a perspective view of an example retention block used at the breakout location of FIG. 5;
FIG. 7 shows an initial preparation of the distribution cable at the breakout location of FIG. 5;
FIG. 8 shows a first preparation step for a tether used at the breakout location of FIG. 5; FIG. 9 shows a subsequent preparation step for the tether of FIG. 8;
FIG. 10 is a side view of an enclosure installed at breakout location according to one embodiment of the present disclosure;
FIG. 11 is a top view of the enclosure of FIG. 10; FIG. 12 is a flowchart illustrating an example installation process for installing an enclosure over a breakout assembly according to one embodiment of the present disclosure;
FIG. 13 is a schematic view of a telecommunications cable including a tether branching from a distribution cable;
FIG. 14 is a flowchart illustrating an example treatment process for preparing a cable to bond with an enclosure body according to one embodiment of the present disclosure; and
FIG. 15 is a schematic diagram showing respective movement of a cable relative to a plasma etcher during the treatment process of FIG. 14;
FIG. 16 is a flow chart illustrating an example overmolding process for forming the enclosure body according to one embodiment of the present disclosure; FIG. 17 is a cross-sectional, schematic view depicting a distribution cable and tether placed within molds during the overmolding process of FIG. 16; and
FIG. 18 is a schematic diagram depicting an enclosure overmolded over a breakout location on a distribution cable of FIG. 17.
Detailed Description
The present disclosure relates to mid-span breakout arrangements provided on distribution cables and methods for providing the breakout arrangements. Each breakout arrangement is provided at a breakout location to protect the optical coupling of a tether (i.e., a branch cable) to a distribution cable. Referring now to the figures in general, a typical breakout location
260 is provided at an intermediate point along the length of a distribution cable 220 (e.g., see FIG. 2). At the breakout location 260, a fiber 224t of a tether 240 is optically coupled to a fiber 224dC of the distribution cable 220 at a coupling location 205. An enclosure 300 (e.g., an overmold) is typically provided around the distribution cable 220 and the tether 240 at the breakout location 260 to protect the optical fibers 224.
FIG. 3 shows an example distribution cable 220 including six separate buffer tubes 222 each containing twelve fibers 224ac. The buffer tubes 222 may be gel filled. The distribution cable 220 also includes a central strength member 226 for reinforcing the cable 220, and an outer strength layer/member 228, such as aramid fiber/yarn (e.g., Kevlar® fiber), also for reinforcing the cable. The distribution cable 220 further includes an outer jacket 230 that encloses the buffer tubes 222. Ripcords 232 can be provided for facilitating tearing away portions of
the jacket 230 to access the fibers 224d0 within the jacket 230. A typical distribution cable includes a relatively large number of fibers (e.g., 72, 144 or more fibers). The fibers are typically segregated into separate groups with each group contained within a separate buffer tube. The fibers within each buffer tube can include either ribbon fibers or loose fibers.
The various aspects of the present disclosure are also applicable to distribution cables having fewer numbers of fibers (e.g., two or more fibers). For example, the distribution cable can include an outer jacket enclosing a single buffer tube and at least two strength members extending on opposite sides of the single buffer tube (not shown). An outer strength layer/member, such as aramid fiber/yarn, can surround the single buffer tube within the jacket. The single buffer tube can enclose loose fibers or ribbon fibers.
FIG. 4 illustrates an example tether 240 configured to join to the distribution cable 220 at the breakout location 260. The tether 240 includes a central buffer tube 242 containing multiple fibers 224t (e.g., typically one to twelve loose or ribbonized fibers). Strength members 246 (e.g., flexible rods formed by glass fiber reinforced epoxy) are positioned on opposite sides of the central buffer tube 242. An outer jacket 250 surrounds the strength members 246 and the buffer tube 242. An additional strength layer 248 (e.g., aramid fiber/yarn) can be positioned between the buffer tube 242 and the outer jacket 250. In the example shown, the tether 240 is depicted as having a flat cable configuration. The outer jacket 250 includes an outer perimeter having an elongated transverse cross-sectional shape. The transverse cross-sectional shape includes oppositely positioned, generally parallel sides 252 interconnected by rounded ends 254. However, any suitable cable configuration can be utilized for both the distribution cable and the tether cable.
Referring now to FIG. 5, one or more tether fibers (e.g., typically less than twelve fibers) 224t are preferably optically coupled (e.g., spliced) at a coupling location 205 to selected fibers 224dC of the distribution cable 220 extending from one of the exposed buffer tubes 222. For clarity, only a single tether fiber 224t and distribution cable fiber 224dC are shown coupled together in the figures. The opposite ends of the tether fibers 224t are configured to optically couple to a drop terminal or other type of telecommunications equipment (not shown) offset from the
breakout location 260. For example, the tether 240 can terminate in one or more fiber optic connectors (not shown).
A breakout assembly 200 having features that are examples of inventive aspects in accordance with the principles of the present disclosure is shown installed on a distribution cable in FIG. 5. The breakout assembly 200 includes a sleeve 202 mounted over the optical fibers 224t, 224dC at the coupling location 205. An optional protective tube 280 can also be provided over the fibers 224t, 224dc and the sleeve 202. An enclosure 300 surrounds the coupled optical fibers 224dc, 224t, the sleeve 202, the optional tube 280, and the exposed buffer tubes 222 of the distribution cable 220.
In general, the enclosure 300 has a body 310 that protects the optical connection between the tether 240 and the distribution cable 220. One end 302 of a body 310 of the enclosure 300 extends over the distribution cable 220 adjacent a first end 352 of the stripped region 350 and the other end 304 of the body 310 extends over the tether cable 240 and the distribution cable 220 adjacent a second end 354 of the stripped region 350. The tether 240 generally extends outwardly a length from the enclosure 300 to a connection end 256. The enclosure 300 can include an overmold.
When the tether 240 is secured to the distribution cable 220, the tether 240 should preferably be able to withstand a pullout force of at least one hundred pounds. To meet this pullout force requirement, the breakout assembly 200 also can includes a retention block 270 (see FIG. 6) configured to strengthen the mechanical interface between the tether 240 and the distribution cable 220. Typically, the retention block 270 is enclosed within the protective enclosure 300. As shown at FIG. 6, the retention block 270 includes a base 274 and a cover 272 between which the fiber 224t of the tether 240 extends. First and second protrusions 276, 278 extend from the cover 272 and base 274, respectively. In one embodiment, the retention block 270 has a polycarbonate construction. Further details regarding the retention block 270 can be found in U.S. provisional application Serial No. 60/781 ,280, filed March 9, 2006, and entitled "FIBER OPTIC CABLE BREAKOUT CONFIGURATION," the disclosure of which is hereby incorporated by reference.
It is preferred for the fibers 224t of the tether to be pre-terminated to the fibers 224dc of the distribution cable. "Pre-terminated" means that the tether fibers 224t are fused or otherwise connected to the fibers 224ac of the distribution cable 220 at the factory as part of the cable manufacturing process rather than being field terminated. The remainder of the breakout assembly 200 is also preferably factory installed.
Referring to FIGS. 7-9, to prepare the breakout location 260 on the distribution cable 220, a portion of the outer jacket 230 is first stripped away to provide a stripped region 350 (FIG. 7). In certain embodiments, portions of a cable netting can be removed adjacent the first and second ends 352, 354, respectively, so that the buffer tubes 222 are exposed (FIG. 7). The outer strength layer/member 228 also can be displaced (e.g., bunched at one side of the cable 220) adjacent the ends 352, 354 to facilitate accessing the buffer tubes 222 (see, e.g., FIG. 5). Tape can be used to prevent the intermediate length of netting that remains at the breakout location 260 from unraveling (FIG. 7).
One of the buffer tubes 222 is selected and a first window 358 is cut into the selected buffer tube 222 adjacent the first end 352 of the stripped region 350 and a second window 360 is cut into the selected buffer tube 222 adjacent the second end 354 of the stripped region 350 (FIG. 7). The fibers 224dC desired to be broken out are accessed and severed at the second window 360. After the fibers 224dC have been severed, the fibers 224dc are pulled from the buffer tube 222 through the first window 358. With the distribution cable 220 prepared as shown in FIG. 7, the fibers 224dc are ready to be terminated to one or more fibers 224t of a prepared tether 240.
To prepare the tether 240 to be installed on the prepared distribution cable 220, a portion of the outer jacket 250 is stripped away to expose the central buffer tube 242 and the strength members 246 (see FIG. 8). As shown at FIG. 8, the central buffer tube 242 and the strength members 246 project outwardly beyond an end 247 of the outer jacket 250. The strength layer 248 (FIG. 4) is removed from around the buffer tube 242. After removing the end portion of the outer jacket 250, the strength members 246 are trimmed as shown at FIG. 8, and an end portion of the central buffer tube 242 is removed to expose the fibers 224t (FIG. 9).
To connect the tether fibers 224t to the distribution cable fibers 224dC, the sleeve 202 (FIG. 5) is first slid over the fibers 224t of the tether. In certain
embodiments, the sleeve 202 can be slid up over the buffer tube 242 of the tether 240. The optional protective tube 280 (FIG. 5) also can be slid over the tether 240. When the sleeve 202 and protective tube 280 are mounted on the tether 240, the fibers 224t of the tether 240 are coupled (e.g., fused) to the fibers 224dC of the distribution cable 220. After the coupling process is complete, the sleeve 202 can be slid over the coupling location 205 to protect the fused fibers 224t, 224dC- The tube 280 can be slid over the sleeve 202. The fibers are then tested to confirm that the fibers meet minimum insertion loss requirements.
If desired, the tether 240 can be mounted to the retention block 270. For example, as shown at FIG. 9, the strength members 246 can be positioned within side grooves 273 on the base 274 of the retention block 270, and the central buffer tube 242 can be inserted within a central groove 275 on the base 274. In the example illustrated, the central buffer tube 242 has a length that extends beyond a first end of the base 274, and the strength members 246 have lengths that terminate generally at the first end of the base 274. After securing the retention block 270 to the distribution cable 220, one end of the optional protective tube 280 can be mounted over the protrusions 276, 278 of the retention block 270 (see FIG. 5).
After verifying insertion loss, heat resistant tape is wrapped around the distribution cable 220, the tether 240, and the breakout location assembly 200. Thereafter, the enclosure 300 is applied over the taped breakout location 260 (see FIGS. 10-11). The enclosure (e.g., an overmold layer) 300 seals and protects the underlying components of the breakout assembly 200. The tether 240 extends outwardly from the body 310 of the enclosure 300 to tether connectors (not shown) spaced from the enclosure body 310. Referring now to FIG. 12, the enclosure 300 is installed over the breakout assembly 200 by securing the ends 302, 304 of the enclosure body 310 to the distribution cable 220. The ends 302, 304 of the enclosure body 310 also can be secured to the tether 240. FIG. 12 illustrates a flowchart depicting an installation process 1200 for installing the enclosure body 310. The installation process 1200 begins at start module 1202 and proceeds to a first prepare operation 1204.
The first prepare operation 1204 provides protection for the exposed buffer tubes 222 and coupled optical fibers 224dC, 224t against the heat and other stresses associated with overmolding an enclosure. For example, heat resistant tape
208 (FIG. 13) can be wrapped around the buffer tubes 222 and coupled optical fibers 224dc, 224t. As shown in FIG. 13, the heat resistant tape 208 is wrapped from the distribution cable jacket 230 adjacent the first end 352 of the stripped region 350 (FIG. 5), around the breakout assembly 200 (FIG. 5), past the second end 354 of the stripped region 350, and over the distribution cable jacket 230 and tether jacket 250 at the second end 354 of the stripped region 350 (FIG. 5).
A second prepare operation 1206 provides regions of adhesion on the distribution cable 220 to which the enclosure body 310 can be secured. The process for providing the adhesion regions will be discussed herein with reference to FIGS. 14-17. In general, the adhesion regions 322, 324 are provided on the outer jacket
230 of the distribution cable 220. For example, as shown in FIG. 13, a first adhesion region 322 is typically provided on the distribution cable 220 adjacent the first end 352 of the stripped region 350 and a second adhesion region 324 is provided adjacent the second end 354 of the stripped region 350. The adhesion regions 322, 324 have lengths Lj, L2, respectively, that extend longitudinally along the distribution cable 220 (FIG. 13). In the example shown in FIG. 13, the first adhesion region 322 extends from a first end of the heat resistant tape 208 in a first direction extending generally away from the breakout location 206 (FIG. 5). The second adhesion region 324 extends from a second, opposite end of the tape 208 in a second, opposite direction generally away from the breakout location 206. Typically, the lengths Li, L2 of the adhesion regions 322, 324 extend about 1-4 inches, inclusive. Preferably, the lengths Li, L2 each extend about 2-3 inches.
An optional third prepare operation 1208 provides a region of adhesion on the tether 240 to which the enclosure body 310 also can be secured. For example, a third adhesion region 326 having a third length L3 is shown in FIG. 13 extending over the outer jacket 250 of the tether 240. In general, the third prepare operation 1208 is substantially similar to the second prepare operation 1206. The third adhesion region 326, therefore, is generally similar to the adhesion regions 322, 324 provided on the distribution cable 220. Typically, the length L3 of the third adhesion region 326 is substantially the same as the lengths Li, L2 of the adhesion regions 322, 324, respectively, of the distribution cable 220.
An overmold operation 1210 installs the enclosure body 310 over the breakout location 206 (FIG. 5) of the distribution cable 220. In general, the enclosure 310 encloses the distribution cable 220 and the breakout assembly 200. Typically, the enclosure 310 also encloses a portion of the tether 240. In the example shown, the first end 302 of the enclosure body 310 is formed around the first adhesion region 352 and the second end 304 of the enclosure body 310 is formed around the second adhesion region 354 and the third adhesion region 356. In some embodiments, the enclosure body 310 also can extend past the adhesion regions 352, 354, 356. The overmold operation 1210 is described in more detail with respect to FIG. 16.
FIG. 14 illustrates a flowchart depicting an example treatment process 1400 for providing enhanced adhesion between two materials, such as two polymeric materials. For example, the treatment process 1400 increases the adhesion between a polyurethane material and a polyethylene material. The treatment process 1400 can be used to prepare the outer j acket 230 of the distribution cable 220 to enable the enclosure body 310 to couple more securely to the outer jacket 230. For example, in preliminary testing, the treatment process 1400 has increased the pull out strength of a polyethylene cable from a polyurethane enclosure by 300%-400%. Optionally, the outer jacket 250 of the tether 240 can be prepared using substantially the same process.
The treatment process 1400 begins at start module 1402 and proceeds to a sand operation 1404. The sand operation 1404 roughens the circumferential surface of the outer jacket 230 at the first and second adhesion regions 322, 324. Generally, the outer jacket 230 along the regions 322, 324 is sanded with a grit ranging from about 40 to about 180, and more preferably ranging from about 60 to about 120. Preferably, the gritted material (e.g., sandpaper) is rubbed laterally across the cable 220. However, the cable 220 alternatively could be sanded along the longitudinal length of the cable 220.
A clean operation 1406 applies a cleaning agent to the sanded areas and then removes the excess cleaning agent. For example, alcohol (e.g., isopropyl alcohol) can be applied to the roughened surfaces of the outer jacket 230. The excess alcohol can be wiped away with a clean cloth. The clean operation 1406 can be performed anytime after the sand operation 1404.
An etch operation 1408 is performed after the clean operation 1404. In general, the etch operation 1408 is performed while the outer jacket 230 is still clean. It is believed that dirt or other contaminants can shield the outer jacket 230 from the full effects of the etching. Typically, the etch operation 1408 is performed within four minutes of the clean operation 1406 to inhibit contamination of the jacket 230 (e.g., from the environment). Preferably, the etch operation 1408 is performed within two minutes when not in a clean room environment.
The etch operation 1408 increases the surface area of the adhesion regions 322, 324 by providing disruptions on the outer jacket 230 along the cleaned and sanded regions 322, 324. Typically, the etch operation 1408 is performed using a plasma etcher 400 (FIG. 15). One example of a suitable plasma etcher is the Flume™ system from Plasmatreat North America, Inc.
The plasma etcher 400 has at least a first head 402 (FIG. 15). Each head 402 is configured to emit a beam of plasma. In some embodiments, the beam of plasma is emitted in a ringed configuration. In other embodiments, a beam emitting nozzle (not shown) on the head 402 is configured to rotate in a circular pattern. In still other embodiments, however, the beam of plasma can be emitted from the head 402 in any desired configuration.
The cable 220 is positioned adjacent the first head 402 so that the plasma beam is directed at one of the adhesion regions 322, 324. Typically, the adhesion regions 322, 324 extend over a length that is greater than the diameter/width of the plasma beam. For example, the length of the adhesion region 322 is preferably about three inches and the diameter/width of the plasma beam is typically about one inch. To etch the entire length of each adhesion region 322, 324, therefore, the cable 220 is moved back and forth along the length of each adhesion region 322, 324 along a longitudinal axis M of the cable 220. In some embodiments, to etch the entire circumference of each adhesion region 322, 324, the cable 220 is rotated at least partially about the longitudinal axis M. When one side of the cable 220 has been etched, the cable 220 can be flipped about 180° so that the etcher head 402 faces the opposite side of the cable 220. The etching operation 1408 can then be repeated for the opposite side.
In other embodiments, however, the plasma etcher 400 has a first head 402 and a second, opposing head 404 as shown in FIG. 15. The cable 220 is positioned between the opposing heads 402, 404 so that the plasma beams emitted from the heads 402, 404 contact both sides of the cable 220. If desired, the cable 220 can be moved along the longitudinal axis M as discussed above to increase the surface area with which the etcher 400 interacts. In addition, the cable 220 also can be rotated about the longitudinal axis M to etch the entire circumference of the cable 220. The treatment process 1400 ends at stop module 1410.
FIG. 16 illustrates a flowchart depicting an example overmold process 1600 for overmolding a telecommunications cable. The overmold process 1600 is performed after the etch operation 1408 of the treatment process 1400. In general, care is taken to avoid contacting the treated (e.g., etched) cables 220, 240 with human hands. Preferably, the overmold process 1600 is performed within four minutes of the etch operation 1408 to mitigate the chances of contaminating (e.g., touching) the treated cables 220, 240. The overmold operation 1410 surrounds the distribution cable 220 at the breakout location 206 (FIG. 5) and the adhesion regions 322, 324, 326 of the cable jackets 230, 250 with an enclosure 300.
The overmold process 1600 begins at start module 1602 and proceeds to a mount operation 1604. In the mount operation 1604, the treated distribution cable 220 is placed in a mold 370. In the example shown in FIG. 17, the distribution cable 220 is placed within a mold 370 formed from a first member 372 and a second member 374. Other suitable molds 370 can also be used.
Polymeric material is introduced into the mold in inject operation 1606. The polymeric material is injected from a source 376, through a conduit 378, and into the mold 370 to cover portions of the distribution cable 220 including the treated adhesion regions 322, 324. Generally, the enclosure body 310 is formed of a different material than the outer jacket of the distribution cable 220. Typically, the enclosure body 310 is formed of polyurethane and the outer jacket of the distribution cable 220 is formed from polyethylene. In some embodiments, a portion of the tether 240 is placed into the mold 370 with the distribution cable 220 and the polymeric material is injected around the treated region 326 of the tether cable jacket 250.
A cure operation 1608 allows the polymeric material to harden. For example, the cure operation 1608 can allow the polymeric material time to cool. A remove operation 1610 removes the distribution cable 220 from the mold 370. The hardened polymeric material remains secured around the distribution cable 220 to form an enclosure body 310 (FIG. 18). The overmold process 1600 ends at stop module 1612.
It is preferred for the enclosure body 310 to be sized with a cross sectional shape sufficient to allow the breakout location 260 to be readily passed through a one and one-half inch inner diameter conduit or a one and one-quarter inch diameter conduit. In certain embodiments, the breakout location 260 has a cross sectional area that can be passed through a one inch inner diameter conduit.
The above specification, examples and data provide a complete description of the manufacture and use of the composition of the invention. Since many embodiments of the invention can be made without departing from the spirit and scope of the invention, the invention resides in the claims hereinafter appended.
Claims
1. A method for treating a telecommunications cable, the method comprising: selecting a first area on the telecommunications cable, the first area extending partially along a first length of the telecommunications cable and circumferentially around the telecommunications cable; sanding a first surface of the first area to provide a first roughened surface; cleaning the first roughened surface with a cleaning agent to provide a first cleaned surface; etching disruptions in the first cleaned surface to form a first treated surface; and forming an enclosure over the telecommunications cable, at least a portion of the enclosure contacting the first treated surface of the telecommunications cable.
2. The method of claim 1, wherein forming an enclosure comprises forming the enclosure from a polymeric material.
3. The method of claim 2, wherein forming an enclosure comprises forming the enclosure from polyurethane.
4. The method of claim 1 , wherein the cable jacket of the distribution cable is formed from polyethylene.
5. The method of claim 1, wherein cleaning comprises applying a cleaning agent to the first roughened area and wiping excess cleaning agent from the first roughened area.
6. The method of claim 1 , wherein the cleaning agent comprises isopropyl alcohol.
7. The method of claim 1 , wherein etching disruptions is performed less than four minutes after cleaning the first roughened surface.
8. The method of claim 1, wherein etching disruptions is performed with a plasma-etcher.
9. The method of claim 1 , wherein forming the enclosure is performed less than four minutes after etching disruptions.
10. The method of claim 1, further comprising: selecting a second area on the telecommunications cable, the second area extending partially along a second length of the telecommunications cable; sanding a surface of the second area to provide a second roughened surface; cleaning the second roughened surface with a cleaning agent to provide a second cleaned surface; and etching disruptions in the second cleaned surface to form a seconded treated surface.
11. The method of claim 10, wherein the first length is less than four inches and the second length is substantially equal to the first length.
12. The method of claim 11 , wherein the first length is about three inches.
13. A method for overmolding a section of a telecommunications cable, the method comprising: selecting a first area on the telecommunications cable, the first area extending partially along a length of the telecommunications cable and circumferentially around the telecommunications cable; sanding a first surface of the first area to provide a first roughened surface; cleaning the first roughened surface with alcohol to provide a first cleaned surface; etching disruptions in the first cleaned surface to form a first treated surface; mounting the first treated surface in a mold; injecting a liquid polymeric material into the mold to cover the first treated surface; allowing the polymeric material to harden; and removing the mold to leave the hardened polymeric material around the first treated surface.
14. The telecommunications cable of claim 13, wherein the enclosure if formed from polyurethane.
15. The telecommunications cable of claim 13 , wherein the cable j acket of the distribution cable is formed from polyethylene.
16. The method of claim 13 , further comprising: selecting a second area on the telecommunications cable; sanding a surface of the second area to provide a second roughened surface; cleaning the second roughened surface with alcohol to provide a second cleaned surface; etching disruptions in the second cleaned surface to form a seconded treated surface; and mounting the second treated surface in the mold, wherein the liquid polymeric material injected into the mold also cover the second treated surface; and the hardened polymeric material surrounds the second treated surface.
17. A method for preterminating a tether to a distribution cable, the method comprising: coupling at least a first fiber of a tether to a first fiber of a distribution cable at a breakout location on the distribution cable; selecting a first area on the distribution cable, the first area located at a first end of the breakout location, the first area having a first surface; selecting a second area on the distribution cable, the second area located at a second, opposite end of the breakout location, the second area having a second surface; sanding the first surface of the first area to provide a first roughened surface; sanding the second surface of the second area to provide a second roughened surface; cleaning the first roughened surface with a cleaning agent to provide a first cleaned surface; cleaning the second roughened surface with the cleaning agent to provide a second cleaned surface; etching disruptions in the first cleaned surface to form a first treated surface; etching disruptions in the second cleaned surface to form a second treated surface; and forming an enclosure over the breakout location on the distribution cable, at least a first portion of the enclosure contacting the first treated surface of the distribution cable and at least a second portion of the enclosure contacting the second treated surface of the distribution cable.
18. The method of claim 17, wherein the enclosure if formed from polyurethane.
19. The method of claim 17, wherein the cable jacket of the distribution cable is formed from polyethylene.
20. The method of claim 17, further comprising installing a breakout assembly on the distribution cable to protect the first fiber of the tether and the first fiber of the distribution cable, the enclosure also surrounding the breakout assembly.
21. The method of claim 17, wherein the enclosure is formed on the distribution cable in a factory prior to installation in the field.
22. The method of claim 17, further comprising: selecting a third area on the tether, the third area located adjacent the second end of the breakout location on the distribution cable; sanding a surface of the third area to provide a third roughened surface; cleaning the third roughened surface with a cleaning agent to provide a third cleaned surface; and etching disruptions in the third cleaned surface to form a third treated surface, wherein at least a portion of the enclosure contacts the third treated surface of the tether.
23. A method for providing enhanced adhesion between a polyethylene surface and an overmolded polyurethane layer, the method comprising: sanding a first section of the polyethylene surface to produce a first roughened surface; cleaning the first roughened surface with a cleaning agent to provide a first cleaned surface; etching disruptions in the first cleaned surface to form a first treated surface; and overmolding the first treated surface with polyurethane to produce an overmolded polyurethane layer, wherein the overmolded polyurethane layer is adhered to the first treated surface.
24. The method of claim 23, wherein cleaning comprises cleaning the first roughened surface with isopropyl alcohol.
25. The method of claim 23, wherein etching disruptions is performed less than two minutes after cleaning the first roughened surface.
26. The method of claim 23, wherein overmolding the first treated surface is performed less than two minutes after etching disruptions in the first cleaned surface.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/702,914 | 2007-02-06 | ||
US11/702,914 US7489843B2 (en) | 2007-02-06 | 2007-02-06 | Polyurethane to polyethylene adhesion process |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2008097677A2 true WO2008097677A2 (en) | 2008-08-14 |
WO2008097677A3 WO2008097677A3 (en) | 2008-11-20 |
Family
ID=39651301
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2008/050556 WO2008097677A2 (en) | 2007-02-06 | 2008-01-09 | Polyurethane to polyethylene adhesion process |
Country Status (3)
Country | Link |
---|---|
US (1) | US7489843B2 (en) |
AR (1) | AR065153A1 (en) |
WO (1) | WO2008097677A2 (en) |
Families Citing this family (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100065058A1 (en) * | 2008-09-18 | 2010-03-18 | Moldex-Metric, Inc. | Full face respirator mask |
US7941021B2 (en) * | 2008-12-22 | 2011-05-10 | Corning Cable Systems Llc | Distribution cable assembly having mid-span access location |
WO2011137236A1 (en) | 2010-04-30 | 2011-11-03 | Corning Cable Systems Llc | Fiber optic cables with access features and methods of making fiber optic cables |
CN101968561A (en) * | 2010-10-22 | 2011-02-09 | 华为技术有限公司 | Prefabricated optical distribution cable and manufacturing method thereof |
ES2822160T3 (en) | 2010-10-28 | 2021-04-29 | Corning Optical Communications LLC | Fiber Optic Cables with Extruded Access Characteristics and Methods for Manufacturing Fiber Optic Cables |
PL2643139T3 (en) | 2010-11-23 | 2023-12-04 | Corning Optical Communications LLC | Fiber optic cables with access features and method of manufacturing |
JP2013058330A (en) * | 2011-09-07 | 2013-03-28 | Sumitomo Wiring Syst Ltd | Connector connection terminal processing structure part of shield wire, and method for manufacturing connector connection terminal processing structure part of shield wire |
US9323022B2 (en) | 2012-10-08 | 2016-04-26 | Corning Cable Systems Llc | Methods of making and accessing cables having access features |
US8682124B2 (en) | 2011-10-13 | 2014-03-25 | Corning Cable Systems Llc | Access features of armored flat fiber optic cable |
US9274302B2 (en) | 2011-10-13 | 2016-03-01 | Corning Cable Systems Llc | Fiber optic cables with extruded access features for access to a cable cavity |
US9201208B2 (en) | 2011-10-27 | 2015-12-01 | Corning Cable Systems Llc | Cable having core, jacket and polymeric jacket access features located in the jacket |
US9176293B2 (en) | 2011-10-28 | 2015-11-03 | Corning Cable Systems Llc | Buffered fibers with access features |
US9360624B2 (en) | 2013-03-22 | 2016-06-07 | Corning Optical Communications LLC | Splice protector for fiber optic ribbons |
US8702326B2 (en) | 2012-03-23 | 2014-04-22 | Corning Cable Systems Llc | Splice protector for fiber optic ribbons |
US8909014B2 (en) | 2012-04-27 | 2014-12-09 | Corning Cable Systems Llc | Fiber optic cable with access features and jacket-to-core coupling, and methods of making the same |
US9482839B2 (en) | 2013-08-09 | 2016-11-01 | Corning Cable Systems Llc | Optical fiber cable with anti-split feature |
US10705307B2 (en) * | 2017-02-16 | 2020-07-07 | Go!Foton Holdings, Inc. | Optical cable with illumination path |
US11881690B2 (en) * | 2020-06-30 | 2024-01-23 | State Grid Huzhou Power Supply Company | Insulating coating device for electric wire |
DE102020125490B3 (en) * | 2020-09-30 | 2022-03-31 | Md Elektronik Gmbh | Method for assembling a multi-core cable and correspondingly assembled cable |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4961623A (en) | 1989-09-05 | 1990-10-09 | Siecor Corporation | Preterminated optical cable |
US5125060A (en) | 1991-04-05 | 1992-06-23 | Alcatel Na Cable Systems, Inc. | Fiber optic cable having spliceless fiber branch and method of making |
US5210812A (en) | 1991-04-05 | 1993-05-11 | Alcatel Na Cable Systems, Inc. | Optical fiber cable having spliced fiber branch and method of making the same |
Family Cites Families (118)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2047152A (en) * | 1932-10-22 | 1936-07-07 | Galvin Mfg Corp | Automobile radio cable |
US3912854A (en) * | 1970-01-26 | 1975-10-14 | John T Thompson | Encapsulated conductor junction |
US3691505A (en) * | 1970-08-20 | 1972-09-12 | Gen Electric | Heater cable splice and method of forming |
US3869701A (en) | 1972-03-02 | 1975-03-04 | Douglas G Waltz | Plurality of electronic elements connected together by interconnecting wires and connecting joints |
US3912855A (en) | 1973-04-20 | 1975-10-14 | John T Thompson | Encapsulating splice assembly |
IT992377B (en) * | 1973-05-30 | 1975-09-10 | Casellato Raoul | PROCEDURE FOR ATTACHING SURFACES OF POLYOLEFIN RESINS PREVENTIVELY MADE POROUS THROUGH A STRUCTURAL ADHESIVE PENETRATING THE PORES PARTICULARLY FOR THE JOINT OF POLYETHYLENE OR SIMILAR PIPES |
US3879575A (en) * | 1974-02-21 | 1975-04-22 | Bell Telephone Labor Inc | Encapsulating compound and closure |
US4085286A (en) * | 1974-09-27 | 1978-04-18 | Raychem Corporation | Heat-recoverable sealing article with self-contained heating means and method of sealing a splice therewith |
US4107451A (en) * | 1975-11-19 | 1978-08-15 | Trech, Inc. | Reinforced splice joint and method of making same |
US4152539A (en) * | 1977-10-21 | 1979-05-01 | Northern Telecom Limited | Telecommunication cable splices |
US4413881A (en) | 1979-07-26 | 1983-11-08 | Northern Telecom Limited | Optical fiber hermetic seal |
US4322573A (en) * | 1980-03-11 | 1982-03-30 | Northern Telecom Limited | Encapsulation of telecommunications cable splices |
US4666537A (en) * | 1980-04-24 | 1987-05-19 | Thomas & Betts Corporation | Method of sealing and repairing electrical cables |
US4732628A (en) * | 1980-04-24 | 1988-03-22 | Thomas & Betts Corporation | Method of sealing and repairing electrical cables |
US4343844A (en) * | 1980-11-17 | 1982-08-10 | Eaton Corporation | Shrinkable sleeve adapted for cable and tubing gas flow blocking |
JPS5824107A (en) | 1981-07-24 | 1983-02-14 | Nippon Telegr & Teleph Corp <Ntt> | Manufacture of long optical fiber core |
US4490315A (en) | 1982-02-04 | 1984-12-25 | Northern Telecom Limited | Methods of moulding of plastics articles |
US4405083A (en) * | 1982-03-19 | 1983-09-20 | Northern Telecom Limited | Moulding apparatus for encapsulating cable splices |
FR2524986A1 (en) * | 1982-04-08 | 1983-10-14 | Cables De Lyon Geoffroy Delore | DEVICE FOR JOINING THE ENDS OF TWO FIBER OPTIC SUBMARINE CABLES |
US4467137A (en) * | 1982-06-21 | 1984-08-21 | Raychem Limited | Cable breakout article |
US4481380A (en) | 1982-08-26 | 1984-11-06 | Alden Research Foundation | High voltage insulator for electrical components having telescoping insulative sleeves |
US4528150A (en) * | 1982-09-23 | 1985-07-09 | Northern Telecom Limited | Methods and apparatus for sealing articles |
US4592721A (en) * | 1982-09-23 | 1986-06-03 | Northern Telecom Limited | Apparatus for sealably encapsulating articles |
US4512628A (en) * | 1983-05-31 | 1985-04-23 | Gte Products Corporation | Splice casing assembly |
CA1197296A (en) | 1983-06-08 | 1985-11-26 | Leonard J. Charlebois | Telecommunications cable splice closures |
JPS6088908A (en) * | 1983-10-20 | 1985-05-18 | Furukawa Electric Co Ltd:The | Optical cable line |
US4550220A (en) | 1983-11-04 | 1985-10-29 | National Industries, Inc. | Splice insulator assembly |
US4528419A (en) * | 1983-12-12 | 1985-07-09 | Northern Telecom Limited | Forming of cable splice closures |
US4556281A (en) | 1983-12-19 | 1985-12-03 | Gte Products Corporation | End plug for a fiber optic in-line splice case assembly |
US4913512A (en) * | 1983-12-19 | 1990-04-03 | Gte Products Corporation | Fiber optic in-line splice case assembly |
US4589939A (en) * | 1984-02-17 | 1986-05-20 | Raychem Corporation | Insulating multiple-conductor cables using coated insert means |
US4875952A (en) | 1984-06-11 | 1989-10-24 | American Telephone And Telegraph Company, At&T Bell Laboratories | Forced encapsulation means for a cable |
US4570032A (en) * | 1984-09-07 | 1986-02-11 | Northern Telecom Limited | Sealing closure for a cable splice |
US4581480A (en) * | 1984-09-07 | 1986-04-08 | Northern Telecom Limited | Cable splice closure and strain relief |
US4648919A (en) * | 1984-09-18 | 1987-03-10 | Raychem Corp. | Protection of cable splice |
US4670069A (en) * | 1984-09-18 | 1987-06-02 | Raychem Corp. | Protection of cable splice |
US4591330A (en) * | 1984-11-05 | 1986-05-27 | Northern Telecom Limited | Moulding equipment |
US4701574A (en) | 1985-02-06 | 1987-10-20 | Raychem Corp. | Cable sealing apparatus |
US4625073A (en) | 1985-03-11 | 1986-11-25 | Raychem Corporation | Cable having a branch-off region sealed with a branch-off article and method of making same |
US4963698A (en) | 1985-05-02 | 1990-10-16 | Raychem Corporation | Cable sealing |
CA1232954A (en) * | 1985-06-19 | 1988-02-16 | Leonard J. Charlebois | Forming of cable splice closures |
CA1247826A (en) * | 1985-06-28 | 1989-01-03 | Leonard J. Charlebois | Manufacture of sealing closures for a telecommunications cable splice |
CA1236958A (en) * | 1985-06-28 | 1988-05-24 | Leonard J. Charlebois | Manufacture of sealing closures for a telecommunications cable splice |
US4678866A (en) * | 1985-07-08 | 1987-07-07 | Northern Telecom Limited | Forming of cable splice closures |
US4609773A (en) * | 1985-07-08 | 1986-09-02 | Northern Telecom Limited | Seal assembly |
US4629597A (en) | 1985-07-08 | 1986-12-16 | Northern Telecom Limited | Forming of cable splice closures |
US4648606A (en) * | 1985-07-08 | 1987-03-10 | Northern Telecom Limited | Seals |
US4684764A (en) * | 1985-12-09 | 1987-08-04 | Amerace Corporation | High voltage cable splice protector |
GB8602425D0 (en) * | 1986-01-31 | 1986-03-05 | Raychem Sa Nv | Optical fibre splice case |
US4747020A (en) * | 1986-05-16 | 1988-05-24 | Adc Telecommunications, Inc. | Wire distribution apparatus |
JPS6319780A (en) * | 1986-07-10 | 1988-01-27 | 矢崎総業株式会社 | Formation of covered layer at connection of wire |
US4764232A (en) * | 1986-09-26 | 1988-08-16 | Raychem Corporation | Method of protecting a cable splice with a splice closure having pressure measuring means |
US4818824A (en) * | 1987-08-19 | 1989-04-04 | American Telephone And Telegraph Company, At&T Bell Laboratories | Closure for aerial telephone cable splices |
US4884863A (en) | 1989-03-06 | 1989-12-05 | Siecor Corporation | Optical fiber splicing enclosure for installation in pedestals |
US5245151A (en) * | 1989-04-07 | 1993-09-14 | Minnesota Mining And Manufacturing Company | Method and article for microwave bonding of splice closure |
GB8916333D0 (en) * | 1989-07-17 | 1989-08-31 | Telephone Cables Ltd | Junction box for optical communications cords,and gland assembly for cord |
JPH0353466A (en) * | 1989-07-19 | 1991-03-07 | Three Bond Co Ltd | Coating member for joint member |
US4995688A (en) * | 1989-07-31 | 1991-02-26 | Adc Telecommunications, Inc. | Optical fiber distribution frame |
GB8922354D0 (en) * | 1989-10-04 | 1989-11-22 | British Telecomm | Cable joint |
US5217808A (en) * | 1989-11-29 | 1993-06-08 | At&T Bell Laboratories | Water blocked cable portion and methods of making same |
FR2658308B1 (en) | 1990-02-09 | 1993-04-09 | Alcatel Cable | JUNCTION BOX FOR OPTICAL FIBER CABLE, AND MOUNTING METHOD THEREOF. |
US5115105A (en) * | 1990-02-21 | 1992-05-19 | Amphenol Corporation | Overbraided in-line data bus loom |
CA2080009A1 (en) * | 1990-05-21 | 1991-11-22 | Gordon Dwight Henson | Optical fiber distribution center |
GB9013987D0 (en) * | 1990-06-22 | 1990-08-15 | Raychem Ltd | Branch off |
US5042901A (en) * | 1990-07-31 | 1991-08-27 | Siecor Corporation | Preconnectorized optical splice closure |
US5054868A (en) | 1990-08-29 | 1991-10-08 | The United States Of America As Represented By The Secretary Of The Navy | Armored optical fiber cable interconnection for dual payout systems |
US5194692A (en) * | 1990-09-27 | 1993-03-16 | Amphenol Corporation | Uncased data bus coupler |
US5074808A (en) | 1991-02-06 | 1991-12-24 | Amp Incorporated | Molded strain relief in back shell |
US5097529A (en) * | 1991-03-22 | 1992-03-17 | At&T Bell Laboratories | Space-saving optical fiber cable closure |
US5121458A (en) * | 1991-04-05 | 1992-06-09 | Alcatel Na Cable Systems, Inc. | Preterminated fiber optic cable |
DE4122946A1 (en) | 1991-07-11 | 1993-01-14 | Kabelmetal Electro Gmbh | DEVICE FOR SEALING THE END OF A HEAT-SHRINKED CUFF |
US5185844A (en) * | 1991-07-29 | 1993-02-09 | At&T Bell Laboratories | Closure for optical fiber connective arrangements and method of providing same |
FR2686729B1 (en) * | 1992-01-29 | 1994-03-18 | Filotex | MULTI-BRANCHED ARMORED LINK. |
JP2827076B2 (en) * | 1992-09-21 | 1998-11-18 | 日東電工株式会社 | Waterproofing method of wire branch connection part and cover used in the method |
US5432302A (en) * | 1992-11-19 | 1995-07-11 | The United States Of America As Represented By The Secretary Of The Navy | Hydrostatic sealing sleeve for spliced wire connections |
CA2160470A1 (en) * | 1993-04-16 | 1994-10-27 | Van Le Huynh | Bonding assembly for fiber optic cable and associated method |
US5440665A (en) * | 1993-04-16 | 1995-08-08 | Raychem Corporation | Fiber optic cable system including main and drop cables and associated fabrication method |
DE9316172U1 (en) * | 1993-10-22 | 1993-12-09 | Kabelmetal Electro Gmbh | Sleeve for receiving branch or connection points of optical or electrical cables |
US5353367A (en) | 1993-11-29 | 1994-10-04 | Northern Telecom Limited | Distribution frame and optical connector holder combination |
US5394502A (en) * | 1993-12-21 | 1995-02-28 | United Technologies Corporation | Fiber optic cable harness break-out fitting |
US5425121A (en) * | 1994-02-02 | 1995-06-13 | Siecor Corporation | Cable assembly for use with opto-electronic equipment enclosures |
US5442726A (en) * | 1994-02-22 | 1995-08-15 | Hubbell Incorporated | Optical fiber storage system |
US5402515A (en) * | 1994-03-01 | 1995-03-28 | Minnesota Mining And Manufacturing Company | Fiber distribution frame system, cabinets, trays and fiber optic connector couplings |
US5416874A (en) * | 1994-07-01 | 1995-05-16 | Siecor Corporation | Optical receiver stub fitting |
US5450517A (en) * | 1994-07-01 | 1995-09-12 | The Whitaker Corporation | Re-enterable fiber optic splicer for data communications |
US5666453A (en) * | 1994-07-15 | 1997-09-09 | Roy Witte | Fiber optic jumper cables and tracing method using same |
FR2728113A1 (en) * | 1994-12-13 | 1996-06-14 | Eurocopter France | ARMORED ELECTRICAL CONDUCTOR HARNESS AND ITS REALIZATION PROCESS |
US5684911A (en) | 1995-09-01 | 1997-11-04 | Lucent Technologies Inc. | Sub-surface fiber optic splice housing and method of splicing fiber optic cable |
US5892870A (en) * | 1995-11-16 | 1999-04-06 | Fiber Connections Inc. | Fibre optic cable connector |
US6353183B1 (en) * | 1996-05-23 | 2002-03-05 | The Siemon Company | Adapter plate for use with cable adapters |
US6376774B1 (en) * | 1996-08-22 | 2002-04-23 | Littelfuse Inc. | Housing for cable assembly |
US5734776A (en) * | 1996-08-28 | 1998-03-31 | Adc Telecommunications, Inc. | Outside plant cross-connect apparatus |
US5696864A (en) | 1996-09-18 | 1997-12-09 | Communications Technology Corporation | Aerial enclosure for coupling data signals to a customer site |
US5767448A (en) * | 1996-09-30 | 1998-06-16 | Raychem Corporation | Sealing device |
US5778122A (en) * | 1996-12-24 | 1998-07-07 | Siecor Corporation | Fiber optic cable assembly for interconnecting optical fibers within a receptacle mounted within the wall of an enclosure |
US6407338B1 (en) * | 1997-01-15 | 2002-06-18 | Uniseal, Inc. | Composite sealant and splice case therefor |
DE59813727D1 (en) * | 1997-02-14 | 2006-11-02 | Nexans Deutschland Ind Ag & Co | Arrangement for branching to a telecommunications cable containing a plurality of stranding elements with optical fibers |
US5823646A (en) | 1997-09-02 | 1998-10-20 | Siecor Corporation | Door assembly for optical hardware cabinet |
US5969294A (en) | 1997-12-31 | 1999-10-19 | Siecor Operations, Llc | Fiber optic connector cabinet with rotatably mounted adapter panels |
US6215930B1 (en) * | 1998-05-11 | 2001-04-10 | Bellsouth Intellectual Property Management Corporation | Remote-splitter fiber optic cable |
US6104846A (en) * | 1998-07-31 | 2000-08-15 | Litton Systems, Inc. | System for splicing sensors into a multiple fiber optical cable |
US6706968B2 (en) * | 2000-04-24 | 2004-03-16 | Tyco Electronics Corporation | Environmentally sealed wrap-around sleeves having a longitudinal sealant chamber |
US7113679B2 (en) * | 2000-05-26 | 2006-09-26 | Corning Cable Systems, Llc | Fiber optic drop cables and preconnectorized assemblies having toning portions |
US6539160B2 (en) * | 2000-10-27 | 2003-03-25 | Corning Cable Systems Llc | Optical fiber splicing and connecting assembly with coupler cassette |
US6619697B2 (en) * | 2000-12-27 | 2003-09-16 | Nkf Kabel B.V. | Y-branch splittable connector |
DE60109429T2 (en) * | 2001-06-08 | 2006-05-11 | Pirelli General Plc | Arrangement for connections between optical fibers |
US6579014B2 (en) * | 2001-09-28 | 2003-06-17 | Corning Cable Systems Llc | Fiber optic receptacle |
US6621975B2 (en) * | 2001-11-30 | 2003-09-16 | Corning Cable Systems Llc | Distribution terminal for network access point |
WO2003062890A2 (en) * | 2002-01-23 | 2003-07-31 | Tyco Electronics Raychem Nv | Optical fibre tube sealing |
US7086539B2 (en) * | 2002-10-21 | 2006-08-08 | Adc Telecommunications, Inc. | High density panel with rotating tray |
US6973719B1 (en) * | 2003-05-16 | 2005-12-13 | Patel Rati M | Method of making a thermal management for a circuit board panel |
US6856748B1 (en) * | 2003-09-30 | 2005-02-15 | Corning Cable Systems Llc | Interconnection enclosure having a connector port and preterminated optical connector |
US7006739B2 (en) * | 2003-12-15 | 2006-02-28 | Corning Cable Systems Llc | Pre-connectorized fiber optic distribution cable |
US7184633B2 (en) * | 2003-11-26 | 2007-02-27 | Corning Cable Systems Llc | Preterminated fiber optic distribution cable |
US7088893B2 (en) * | 2003-11-26 | 2006-08-08 | Corning Cable Systems Llc | Pre-connectorized fiber optic distribution cable having multifiber connector |
US7155093B2 (en) * | 2004-05-24 | 2006-12-26 | Corning Cable Systems Llc | Distribution cable having overmolded mid-span access location with preferential bending |
US7330621B2 (en) * | 2004-05-24 | 2008-02-12 | Corning Cable Systems Llc | Flexible optical closure and other flexible optical assemblies |
US7266274B2 (en) * | 2004-11-03 | 2007-09-04 | Corning Cable Systems Llc | Pre-connectorized fiber optic distribution cable having overmolded access location |
-
2007
- 2007-02-06 US US11/702,914 patent/US7489843B2/en not_active Expired - Fee Related
-
2008
- 2008-01-09 WO PCT/US2008/050556 patent/WO2008097677A2/en active Application Filing
- 2008-02-04 AR ARP080100447A patent/AR065153A1/en unknown
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4961623A (en) | 1989-09-05 | 1990-10-09 | Siecor Corporation | Preterminated optical cable |
US5125060A (en) | 1991-04-05 | 1992-06-23 | Alcatel Na Cable Systems, Inc. | Fiber optic cable having spliceless fiber branch and method of making |
US5210812A (en) | 1991-04-05 | 1993-05-11 | Alcatel Na Cable Systems, Inc. | Optical fiber cable having spliced fiber branch and method of making the same |
Also Published As
Publication number | Publication date |
---|---|
US7489843B2 (en) | 2009-02-10 |
WO2008097677A3 (en) | 2008-11-20 |
US20080187274A1 (en) | 2008-08-07 |
AR065153A1 (en) | 2009-05-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7489843B2 (en) | Polyurethane to polyethylene adhesion process | |
US7590321B2 (en) | Mid-span breakout with helical fiber routing | |
US7658549B2 (en) | Pre-connectorized fiber optic distribution cable having overmolded access location | |
US20220026658A1 (en) | Fiber optic cable assembly with furcation and method of making same | |
US8333519B2 (en) | Splice of fiber optic cables | |
US8885998B2 (en) | Splice enclosure arrangement for fiber optic cables | |
US7088893B2 (en) | Pre-connectorized fiber optic distribution cable having multifiber connector | |
US20060056782A1 (en) | Flexible optical closure and other flexible optical assemblies | |
US20070212003A1 (en) | Mid-span breakout with potted closure | |
US7630610B2 (en) | Loop back plug with protective dust cap | |
WO2009114771A1 (en) | Method of attachment of a connector to a fiber optic cable | |
WO2019023342A1 (en) | Hardened fan-out arrangement | |
WO2013019465A1 (en) | Fiber optic cable assemblies having a connector with a stable fiber length therein | |
US7289714B1 (en) | Tubing wrap procedure | |
US11906782B2 (en) | Terminating a cable assembly with connectorized pigtails | |
US9664864B2 (en) | Method for terminating high fiber count cables | |
AU2011203294B2 (en) | A tap point for connecting fiber optic cable | |
US20120328249A1 (en) | Fiber optic cable assemblies having a crimp band disposed about a cushioning member along with methods for making the same | |
WOOD | Overmold zip strip |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 08705789 Country of ref document: EP Kind code of ref document: A2 |