- WO2013148547A1 WO2013148547A1 PCT/US2013/033653 US2013033653W WO2013148547A1 WO 2013148547 A1 WO2013148547 A1 WO 2013148547A1 US 2013033653 W US2013033653 W US 2013033653W WO 2013148547 A1 WO2013148547 A1 WO 2013148547A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- barge
- drill ship
- hull
- tender
- drilling
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B35/4413—Floating drilling platforms, e.g. carrying water-oil separating devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/40—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting marine vessels
- B63B35/42—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting marine vessels with adjustable draught
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/12—Underwater drilling
- E21B7/128—Underwater drilling from floating support with independent underwater anchored guide base
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B3/00—Hulls characterised by their structure or component parts
- B63B3/14—Hull parts
- B63B2003/147—Moon-pools, e.g. for offshore drilling vessels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B2211/00—Applications
- B63B2211/06—Operation in ice-infested waters
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B25/00—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
- B63B25/002—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for goods other than bulk goods
- B63B25/006—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for goods other than bulk goods for floating containers, barges or other floating cargo
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/003—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting very large loads, e.g. offshore structure modules
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63C—LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
- B63C1/00—Dry-docking of vessels or flying-boats
- B63C1/02—Floating docks
Definitions
- the disclosure relates to tender barges used in association with drill ship floating drilling platforms. More specifically, the disclosure relates to a tender barge that can store materials used during drilling operations on a drill ship and that can store waste products resulting from such drilling operations until the drilling operations are completed and the drill ship is moved from the drilling location.
- the tender barge may also act as the mooring facility for the drilling vessel.
- Drill ships are one type of floating drilling platform that may be used to drill wellbores through formations below the bottom of a body of water such as a lake or the ocean. Drill ships may be used in environmentally sensitive areas such as the Arctic. Regulations governing drilling activities in such environmentally sensitive areas may require that no formation cuttings or other waste products, e.g, produced water and/or oil from a formation, resulting from drilling a wellbore be discharged into the water. Further, air pollution regulations may require that only a limited number of additional fossil fuel powered vessels be permitted to operated within a predetermined distance from the drill ship.
- a method for drilling a wellbore using a drill ship and a tender barge includes moving the tender barge to a well drilling location.
- the tender barge is moored on location.
- the drill ship is moved so that a moon pool therein is positioned over a corresponding opening in a hull of the tender barge.
- the tender barge is deballasted until a support structure on the hull thereof contacts a corresponding structure on a bottom of the drill ship. Thereafter the tender barge is ballasted to maintain the drill ship in a trim condition for drilling operations.
- FIGS. 1, 2 and 3 show end views of an example tender barge.
- FIGS. 4 shows a plan view of the tender barge anchored to the water bottom.
- FIG. 5 shows an oblique view of the example barge of FIG. 4.
- FIG. 6 shows a view of an example barge rotated 90 degrees from the views in
- FIG. 7 shows a plan view of an example drill ship.
- FIG 8. Shows a portion of the drill ship hull that may be supported by an example barge.
- FIG. 9 shows a side view of a drill ship indicating an approximate water line.
- FIGS. 10, 11 and 12 show the drill ship positioned in a receiving area of the example barge.
- FIG. 13 shows a plan view of the drill ship positioned above the barge.
- FIG. 14 shows a side view of the drill ship positioned above the barge, wherein the barge supports with weight of the drill ship.
- FIGS. 15 and 16 show more detailed views of the receiving area of the barge.
- FIG. 17 shows a plan view of an example of the barge which is moored but does not support the weight of the drill ship.
- FIG. 18 shows a side view of the barge of FIG. 17.
- FIG. 19 shows an end view of the drill ship positioned over the barge, wherein the drill ship weight is not supported by the barge.
- FIG. 20 shows and end view as in FIG. 19, wherein the drill ship is in contact with the barge but the weight thereof is not supported by the barge.
- FIG. 21 shows a plan view of the drill ship and barge of FIG. 20.
- FIG. 22 shows a side view of the drill ship and barge of FIG. 21.
- FIGS. 1, 2 and 3 show end views of an example tender barge 10 for use in connection with a drill ship.
- the barge 10 may include a plurality of anchor lines 12 to moor the tender barge 10 to the water bottom.
- the barge 10 may include a support platform 10A with a center opening 10B to correspond to the position of the moon pool on the drill ship when the drill ship is moved over the tender barge 10, as will be further explained below.
- the interior of the hull of the tender barge 10 may include segregated compartments (not shown separately) for storage of fuel, fresh water cement and other consumables used during drilling operations.
- FIG. 4 shows the barge 10 in plan view with the mooring lines 12 deployed in a selected pattern.
- FIG. 5 shows the example barge 10 in oblique view so that more of the barge features may be observed.
- FIG. 6 shows a side view of the barge 10, wherein may be observed the opening 10B in the hull to be positioned beneath the moon pool of the drill ship.
- FIG. 7 shows a plan view of an example drill ship 14 to illustrate the position of the drilling unit 14A thereon and the position of the moon pool 14B.
- FIG. 8 shows a cut away end view or cross sectional view of the drill ship 14 to illustrate the portions of the drill ship hull, particularly the moon pool 14B, that are to be disposed over the barge (10 in FIG. 1).
- a side view of the drill ship 14 showing the approximate position of the water line 16 may be observed in FIG. 9.
- the drill ship hull may be fully supported by buoyancy provided by the barge (10 in FIG. 1).
- the drill ship (14 in FIG. 7) is moved into position above the barge (10 in FIG. 1), and the barge may be deballasted (e.g., by pumping water out of ballast chambers therein) so that its buoyancy supports the weight of the drill ship (14 in FIG. 7).
- FIG. 10 shows an end view/cross sectional view of the drill ship 14 moved into position above the barge 10, after the barge 10 has been moored as shown in FIG. 4. Note that there is a gap between the base of the hull of the drill ship 14 and the support structure on the barge 10. Thereafter the tender barge 10 is ballasted to maintain the drill ship 14 in a trim condition for drilling operations.
- FIG. 11 shows the barge 10 being deballasted.
- the barge 10 is fully deballasted and the drill ship 14 may be moved upwardly so that no part of the drill ship 14 hull is beneath the water surface.
- FIG. 13 shows the drill ship 14 disposed on the barge 10, wherein the barge 10 is fully moored.
- FIG. 14 shows a side view of the drill ship 14 and barge 10 combination wherein the drill ship 14 is fully supported out of the water.
- the mooring system for the barge 10 and the amount of buoyancy provided by the barge 10 may be selected to maintain position of both the barge 10 and the drill ship 14, and to fully support the weight in air of the drill ship 14, including any downward force exerted by the drill ship 14 during drilling operations.
- Such downward force may be as much as is capable of being supported by the drilling unit, as a non-limiting example, two million pounds.
- FIG. 15 Another example of the barge 10 is shown in end view/cross section in FIG. 15.
- FIG. 15 may have buoyancy sufficient to hold the barge 10 in position when suitably moored, however, such example of the barge 10 may not be required to support the weight of the drill ship 14.
- FIG. 16 Another end view/cross section of the present example barge 10 is shown in FIG. 16.
- FIG. 17 shows the example barge 10 of FIGS. 15 and 16 in plan view, including a mooring system having been deployed.
- the number of mooring lines 12 may be fewer than the example shown in FIG. 13 because the barge mooring is not required to support the weight of the drill ship 14.
- a side view of the present example barge 10 is shown in FIG. 18.
- the barge 10 may be moved to a well drilling location and moored in place.
- the drill ship 14 may then be moved into position over the barge. This is shown in end view/cross section in FIG. 19.
- the barge 10 may then be deballasted, as explained with reference to the previous example and shown in FIGS. 10, 11 and 12, however, as shown in FIG. 20, the base of the drill ship 14 hull may just contact the support structure 10A without transfer of any substantial amount of the weight of the drill ship 14 to the support structure 10A.
- FIG. 21 shows a plan view of the barge and drill ship of the present example.
- the drill ship 14 is immersed in the water, wherein the approximate position of the water line 16 on the drill ship 14 hull is shown.
- the drill ship 14 may be dynamically positioned, for example, using thrusters as known in the art.
- various lines may be rigid conduits having suitable swivel and other connections, or may be or may include flexible hose
- Pumps (not shown) to transfer the various materials stored in the barge to and from the drill ship may be located on the drill ship 14, on the barge 10 or both.
- deballasting pump(s) may be disposed on the barge 10.
- Such pumps may be powered by equipment on the barge 10, or may be powered, for example by electric power communicated from the drill ship 14.
- the barge 10 may be reballasted to come out of contact with the drill ship 14 (i.e., the drill ship 14 is in free flotation). The drill ship 14 may then move away from the wellbore location, e.g., to a next wellbore location. The barge 10 may then be unmoored, deballasted and moved to another location for emptying the compartments holding waste materials, and refilling the compartments storing the consumables to be used on a subsequent well drilling operation.
- a tender barge may provide wellbore drilling operators with means to eliminate discharge of drilling waste into the water, and may provide enough consumables to avoid the necessity of having any other self powered vessels approach the vicinity of the drill ship during drilling operations.
Abstract
Description
Claims
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA2869136A CA2869136A1 (en) | 2012-03-30 | 2013-03-25 | Tender barge for drillship operating in environmentally sensitive areas |
RU2014140838A RU2014140838A (en) | 2012-03-30 | 2013-03-25 | TENDER BARGE FOR A DRILLING BOAT, WORKING IN ENVIRONMENTALLY SENSITIVE ZONES |
US14/389,258 US20150060137A1 (en) | 2012-03-30 | 2013-03-25 | Tender Barge for Drillship Operating in Environmentally Sensitive Areas |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201261617691P | 2012-03-30 | 2012-03-30 | |
US61/617,691 | 2012-03-30 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2013148547A1 true WO2013148547A1 (en) | 2013-10-03 |
Family
ID=49261141
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2013/033653 WO2013148547A1 (en) | 2012-03-30 | 2013-03-25 | Tender barge for drillship operating in environmentally sensitive areas |
Country Status (4)
Country | Link |
---|---|
US (1) | US20150060137A1 (en) |
CA (1) | CA2869136A1 (en) |
RU (1) | RU2014140838A (en) |
WO (1) | WO2013148547A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018118180A1 (en) * | 2016-12-21 | 2018-06-28 | Exxonmobil Upstream Research Company (Emhc-E2-4A-296) | Floating modular protective harbor structure and method of seasonal service extention of offshore vessels in ice-prone environments |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
USD751970S1 (en) * | 2014-04-24 | 2016-03-22 | Fincantieri S.P.A. | Drillship |
NL2014763B1 (en) * | 2015-05-04 | 2017-01-26 | Gustomsc Resources Bv | A vessel provided with a moon pool. |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2000027692A1 (en) * | 1998-10-26 | 2000-05-18 | Lund, Mohr & Giæver-Enger Marin As | Device for positioning of vessels |
US6125780A (en) * | 1997-04-15 | 2000-10-03 | Mobil Oil Corporation | Floating barge-platform and method of assembly |
US6682265B1 (en) * | 1999-05-27 | 2004-01-27 | A.P. Moller-Maersk A/S | Method of establishing and/or operating a bore well in a seabed and a drilling vessel for use in connection therewith |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6085851A (en) * | 1996-05-03 | 2000-07-11 | Transocean Offshore Inc. | Multi-activity offshore exploration and/or development drill method and apparatus |
AU2009310624B2 (en) * | 2008-10-28 | 2014-05-22 | Piet Ellnor | Ocean going transport vessel with docking arrangements |
-
2013
- 2013-03-25 CA CA2869136A patent/CA2869136A1/en not_active Abandoned
- 2013-03-25 RU RU2014140838A patent/RU2014140838A/en not_active Application Discontinuation
- 2013-03-25 US US14/389,258 patent/US20150060137A1/en not_active Abandoned
- 2013-03-25 WO PCT/US2013/033653 patent/WO2013148547A1/en active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6125780A (en) * | 1997-04-15 | 2000-10-03 | Mobil Oil Corporation | Floating barge-platform and method of assembly |
WO2000027692A1 (en) * | 1998-10-26 | 2000-05-18 | Lund, Mohr & Giæver-Enger Marin As | Device for positioning of vessels |
US6682265B1 (en) * | 1999-05-27 | 2004-01-27 | A.P. Moller-Maersk A/S | Method of establishing and/or operating a bore well in a seabed and a drilling vessel for use in connection therewith |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018118180A1 (en) * | 2016-12-21 | 2018-06-28 | Exxonmobil Upstream Research Company (Emhc-E2-4A-296) | Floating modular protective harbor structure and method of seasonal service extention of offshore vessels in ice-prone environments |
Also Published As
Publication number | Publication date |
---|---|
RU2014140838A (en) | 2016-05-20 |
CA2869136A1 (en) | 2013-10-03 |
US20150060137A1 (en) | 2015-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109952246B (en) | System and method for reconfiguring mobile docking equipment for transporting, removing, assembling, housing and transferring assets | |
US6257165B1 (en) | Vessel with movable deck and method | |
CN101356092B (en) | Mooring system | |
AU2017269088B2 (en) | A seabed supported unit and method to provide a shallow water drilling terminal | |
KR101785965B1 (en) | Mono hull vessel and method for submerging equipment or retrieving submerged equipment | |
US6701861B2 (en) | Semi-submersible floating production facility | |
US3880102A (en) | Method and apparatus for offshore submersible oil storage and drilling | |
US20150060137A1 (en) | Tender Barge for Drillship Operating in Environmentally Sensitive Areas | |
RU2483967C2 (en) | Ice-breaking system for floating bodies | |
EP2465764B1 (en) | Spar hull load out method | |
AU4084700A (en) | Method and apparatus for deck installation on an offshore substructure | |
KR20150099062A (en) | Mobile type tension leg platform | |
EP2841334B1 (en) | Method for dry-docking a floating unit | |
EP3810500B1 (en) | Method and vessel for deploying heavy objects | |
KR20150137353A (en) | An addition buoyancy tank seperate structure of a Semi-submersible | |
RU2603340C1 (en) | Offshore ice-resistant process platform | |
RU2180635C2 (en) | System for mooring ship in ocean (versions) | |
WO1996040549A1 (en) | Buoyant platform | |
KR101785519B1 (en) | Offshore structure | |
RU158156U1 (en) | MARINE TECHNOLOGICAL ICE-RESISTANT PLATFORM | |
KR101112129B1 (en) | Anti-Motion Foundation | |
RU2245271C1 (en) | Technical fleet ship, underwater system for single-leg mooring and servicing of ships and method of erection of such system | |
KR20100131722A (en) | Floating quay | |
Wu | Overview of design considerations for spars in the pre-service conditions | |
KR20190076526A (en) | Submersible Floating Structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13767858 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 14389258 Country of ref document: US |
|
ENP | Entry into the national phase |
Ref document number: 2869136 Country of ref document: CA |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 2014140838 Country of ref document: RU Kind code of ref document: A |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 13767858 Country of ref document: EP Kind code of ref document: A1 |