WO2014121270A3 - Methods for time-delayed fracturing in hydrocarbon formations - Google Patents
Methods for time-delayed fracturing in hydrocarbon formations Download PDFInfo
- Publication number
- WO2014121270A3 WO2014121270A3 PCT/US2014/014663 US2014014663W WO2014121270A3 WO 2014121270 A3 WO2014121270 A3 WO 2014121270A3 US 2014014663 W US2014014663 W US 2014014663W WO 2014121270 A3 WO2014121270 A3 WO 2014121270A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- time
- methods
- hydrocarbon formations
- fracturing
- delayed fracturing
- Prior art date
Links
- 239000004215 Carbon black (E152) Substances 0.000 title abstract 3
- 230000015572 biosynthetic process Effects 0.000 title abstract 3
- 229930195733 hydrocarbon Natural products 0.000 title abstract 3
- 150000002430 hydrocarbons Chemical class 0.000 title abstract 3
- 238000000034 method Methods 0.000 title abstract 3
- 238000005755 formation reaction Methods 0.000 title 1
- 230000001902 propagating effect Effects 0.000 abstract 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/267—Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimizing the spacing of wells comprising at least one inclined or horizontal well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/006—Measuring wall stresses in the borehole
Abstract
Methods of fracturing a hydrocarbon formation are described herein. A method may include propagating one or more first fractures from a first wellbore in the hydrocarbon formation, allowing a selected period of time to elapse so that at least a portion of the first fractures close, and propagating at least one second fracture in the wellbore or a second wellbore after the elapsed selected period of time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/765,613 US20160003020A1 (en) | 2013-02-04 | 2014-02-04 | Methods for time-delayed fracturing in hydrocarbon formations |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201361760480P | 2013-02-04 | 2013-02-04 | |
US61/760,480 | 2013-02-04 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2014121270A2 WO2014121270A2 (en) | 2014-08-07 |
WO2014121270A3 true WO2014121270A3 (en) | 2015-01-08 |
Family
ID=50138004
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2014/014663 WO2014121270A2 (en) | 2013-02-04 | 2014-02-04 | Methods for time-delayed fracturing in hydrocarbon formations |
Country Status (2)
Country | Link |
---|---|
US (1) | US20160003020A1 (en) |
WO (1) | WO2014121270A2 (en) |
Families Citing this family (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2937225C (en) | 2013-12-18 | 2024-02-13 | Conocophillips Company | Method for determining hydraulic fracture orientation and dimension |
WO2015187919A1 (en) * | 2014-06-04 | 2015-12-10 | The Johns Hopkins University | Method for a radiator egs to harvest geothermal energy |
US10480289B2 (en) * | 2014-09-26 | 2019-11-19 | Texas Tech University System | Fracturability index maps for fracture placement and design of shale reservoirs |
WO2016060651A1 (en) * | 2014-10-14 | 2016-04-21 | Landmark Graphics Corporation | Automated fracture planning methods for multi-well fields |
US10030497B2 (en) | 2015-02-10 | 2018-07-24 | Statoil Gulf Services LLC | Method of acquiring information of hydraulic fracture geometry for evaluating and optimizing well spacing for multi-well pad |
US10344204B2 (en) | 2015-04-09 | 2019-07-09 | Diversion Technologies, LLC | Gas diverter for well and reservoir stimulation |
US10012064B2 (en) | 2015-04-09 | 2018-07-03 | Highlands Natural Resources, Plc | Gas diverter for well and reservoir stimulation |
US9988900B2 (en) | 2015-06-30 | 2018-06-05 | Statoil Gulf Services LLC | Method of geometric evaluation of hydraulic fractures by using pressure changes |
US20170114613A1 (en) * | 2015-10-22 | 2017-04-27 | Schlumberger Technology Corporation | Well re-stimulation |
US10982520B2 (en) | 2016-04-27 | 2021-04-20 | Highland Natural Resources, PLC | Gas diverter for well and reservoir stimulation |
US10215014B2 (en) | 2016-07-03 | 2019-02-26 | Reveal Energy Services, Inc. | Mapping of fracture geometries in a multi-well stimulation process |
CA3045295A1 (en) * | 2016-11-29 | 2018-06-07 | Nicolas P. Roussel | Methods for shut-in pressure escalation analysis |
WO2018102274A1 (en) * | 2016-11-29 | 2018-06-07 | Conocophillips Company | Engineered stress state with multi-well completions |
US11028679B1 (en) | 2017-01-24 | 2021-06-08 | Devon Energy Corporation | Systems and methods for controlling fracturing operations using monitor well pressure |
US11365617B1 (en) | 2017-01-24 | 2022-06-21 | Devon Energy Corporation | Systems and methods for controlling fracturing operations using monitor well pressure |
WO2019014090A2 (en) * | 2017-07-10 | 2019-01-17 | Texas Tech University System | Methods and systems for ballooned hydraulic fractures and complex toe-to-heel flooding |
CA3012209C (en) * | 2017-07-24 | 2023-07-04 | Reveal Energy Services, Inc. | Dynamically modeling a proppant area of a hydraulic fracture |
CA3080938C (en) * | 2017-11-01 | 2022-12-13 | Seismos, Inc. | Fracture length and fracture complexity determination using fluid pressure waves |
CN108180006B (en) * | 2017-12-25 | 2021-03-30 | 中国石油天然气股份有限公司 | Horizontal well productivity prediction method based on formation energy uplift after volume fracturing |
US20190249527A1 (en) * | 2018-02-09 | 2019-08-15 | Crestone Peak Resources | Simultaneous Fracturing Process |
WO2019212734A1 (en) * | 2018-05-04 | 2019-11-07 | Exxonmobil Upstream Research Company | Performing a well operation based upon a minimum in-situ stress determination |
US11500114B2 (en) | 2018-05-09 | 2022-11-15 | Conocophillips Company | Ubiquitous real-time fracture monitoring |
CN108952663B (en) * | 2018-08-15 | 2019-10-18 | 中国石油大学(北京) | The live fracturing process of complicated seam net is generated using interval pressure break mode |
US20220050224A1 (en) * | 2019-01-25 | 2022-02-17 | Halliburton Energy Services, Inc. | Evaluating anisotropic effective permeability in rock formations having natural fracture networks |
US20210017853A1 (en) * | 2019-07-16 | 2021-01-21 | Well Data Labs, Inc. | Real-time analysis of in-field collected well fracturing data |
US11359479B2 (en) | 2019-11-04 | 2022-06-14 | Chevron U.S.A. Inc. | Determining a hydraulic fracture completion configuration for a wellbore |
US11913314B2 (en) * | 2019-12-19 | 2024-02-27 | Schlumberger Technology Corporation | Method of predicting and preventing an event of fracture hit |
US20210230992A1 (en) * | 2020-01-24 | 2021-07-29 | Halliburton Energy Services, Inc. | Fracturing control |
NO20221322A1 (en) * | 2020-06-09 | 2022-12-08 | Baker Hughes Oilfield Operations Llc | Geomechanical applications using biot's coefficient based on advanced downhole logging measurements |
US11624277B2 (en) | 2020-07-20 | 2023-04-11 | Reveal Energy Services, Inc. | Determining fracture driven interactions between wellbores |
US11753917B2 (en) * | 2020-09-25 | 2023-09-12 | Halliburton Energy Services, Inc. | Real time parent child well interference control |
US11739631B2 (en) * | 2020-10-21 | 2023-08-29 | Saudi Arabian Oil Company | Methods and systems for determining reservoir and fracture properties |
US11859490B2 (en) | 2021-08-19 | 2024-01-02 | Devon Energy Corporation | Systems and methods for monitoring fracturing operations using monitor well flow |
CN117662126A (en) * | 2024-01-31 | 2024-03-08 | 四川富利斯达石油科技发展有限公司 | Crack closure pressure and output profile monitoring method based on quantum tracer |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080083532A1 (en) * | 2006-10-10 | 2008-04-10 | Surjaatmadja Jim B | Methods for Maximizing Second Fracture Length |
US20090194273A1 (en) * | 2005-12-01 | 2009-08-06 | Surjaatmadja Jim B | Method and Apparatus for Orchestration of Fracture Placement From a Centralized Well Fluid Treatment Center |
-
2014
- 2014-02-04 WO PCT/US2014/014663 patent/WO2014121270A2/en active Application Filing
- 2014-02-04 US US14/765,613 patent/US20160003020A1/en not_active Abandoned
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090194273A1 (en) * | 2005-12-01 | 2009-08-06 | Surjaatmadja Jim B | Method and Apparatus for Orchestration of Fracture Placement From a Centralized Well Fluid Treatment Center |
US20080083532A1 (en) * | 2006-10-10 | 2008-04-10 | Surjaatmadja Jim B | Methods for Maximizing Second Fracture Length |
Also Published As
Publication number | Publication date |
---|---|
WO2014121270A2 (en) | 2014-08-07 |
US20160003020A1 (en) | 2016-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2014121270A3 (en) | Methods for time-delayed fracturing in hydrocarbon formations | |
EP3277776A4 (en) | Fracturing fluids and methods of treating hydrocarbon formations | |
MX2017003461A (en) | Proppant compositions and methods of use. | |
EP3102782A4 (en) | Frac sleeve system and method for non-sequential downhole operations | |
GB2549898B (en) | Emulsions, treatment fluids and methods for treating subterranean formations | |
MX2013012009A (en) | Systems and methods for hydraulic fracture characterization using microseismic event data. | |
EP2981669A4 (en) | Fracturing systems and methods for a wellbore | |
GB2535346A (en) | Methods for enhancing propped fracture conductivity | |
MX2017006623A (en) | Proppant comprising an oil well treatment agent coating. | |
WO2012178026A3 (en) | Method for determining spacing of hydraulic fractures in a rock formation | |
EP2802840A4 (en) | Geologic fracturing method and resulting fractured geologic structure | |
GB201400669D0 (en) | System and method for performing wellbore fracture operations | |
GB201401193D0 (en) | System and method for performing wellbore fracture operations | |
EP3303513A4 (en) | Fluids and methods for treating hydrocarbon-bearing formations | |
EP3507339A4 (en) | Emulsions, treatment fluids and methods for treating subterranean formations | |
MX343560B (en) | Methods and devices for hydraulic fracturing design and optimization: a modification to zipper frac. | |
WO2013055851A3 (en) | Hydraulic fracturing with proppant pulsing through clustered abrasive perforations | |
WO2011130159A3 (en) | Methods and systems for drilling | |
GB2535080B (en) | Methods and systems for acidizing subterranean formations | |
EP3132112A4 (en) | Stimulation of wells in nano-darcy shale formations | |
EP2753793A4 (en) | Lithology and borehole condition independent methods for locating tagged proppant in induced subterranean formation fractures | |
GB201610135D0 (en) | Fracturing sequential operation method using signal responsive ported subs and packers | |
EP3008283A4 (en) | Methods and compositions for stimulating the production of hydrocarbons from subterranean formations | |
GB2525808B (en) | Components of drilling assemblies, drilling assemblies, and methods of stabilizing drilling assemblies in wellbores in subterranean formations | |
EP3022391A4 (en) | Multiple-interval wellbore stimulation system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14705450 Country of ref document: EP Kind code of ref document: A2 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 14765613 Country of ref document: US |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 14705450 Country of ref document: EP Kind code of ref document: A2 |