Tasks (T) such as repair jobs on a telecommunications system, that are to be performed by a plurality of resources such as field engineers (E), at different locations in a geographical area (2), are scheduled by means of a scheduler (10) at a work manager server (5). The scheduler provides schedule data...http://www.google.es/patents/US20030041087?utm_source=gb-gplus-sharePatente US20030041087 - Handling unscheduled tasks in a scheduling process
Handling unscheduled tasks in a scheduling process
Número de solicitud: 10/239,087 Número de publicación: US 2003/0041087 A1 Fecha de presentación: 19 Sep 2002 Patente emitida: US7210119 ( Fecha de emisión 24 Abr 2007)