Wind-Diesel Project: Nikolski, Alaska - EERE
Wind-Diesel Project: Nikolski, Alaska - EERE
Wind-Diesel Project: Nikolski, Alaska - EERE
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
LOGISTICS<br />
• Anchorage to <strong>Nikolski</strong> is 916 air miles for $1,316 rt.<br />
• Weather Rules.
Siting Considerations<br />
• Protection from the <strong>Wind</strong><br />
• Land Ownership<br />
• USFWS Approval<br />
• SHPO Approval<br />
• DOD Approval<br />
• FAA Approval<br />
Met Tower
<strong>Nikolski</strong> <strong>Wind</strong> Resource Report <br />
<strong>Nikolski</strong> has superb potential<br />
for wind power development<br />
with Class 7 wind power<br />
density, moderate wind shear,<br />
bi-directional winds and low<br />
turbulence.<br />
Average wind speed 9.01 m/s<br />
Maximum wind gust 40.9 m/s<br />
Turbulence Intensity 0.108
Paul Melovidov and Art Torres<br />
Fepuali Valelei, Robert Kochuten, Rodney Harris<br />
Vestas Operations and Maintenance Training <br />
Portland, Oregon<br />
September 5-9, 2006
Pre-Pay Meter System Types <br />
• “PowerStat” <br />
Atka, Akutan, <br />
Nelson Lagoon<br />
• “AMPY”<br />
St. George, <strong>Nikolski</strong>
The <strong>Nikolski</strong> IRA will use a $30,000 prize from AFN’s<br />
<strong>Alaska</strong> Marketplace Competition to install a geodesic<br />
dome greenhouse near the turbine this summer.